ecotecplus - vaillant · forthecompetentperson installationandmaintenanceinstructions ecotecplus...
TRANSCRIPT
For the competent person
Installation and maintenance instructions
ecoTEC plusVU ..6/6-5 OVZ (H-GB)
GB, IE
Installation and maintenance instructions
Publisher/manufacturer
Vaillant GmbHBerghauser Str. 40 D-42859 RemscheidTel. +49 21 91 18‑0 Fax +49 21 91 18‑[email protected] www.vaillant.de
Contents
2 Installation and maintenance instructions ecoTEC plus 0020238195_01
Contents
1 Safety .................................................................... 3
1.1 Action-related warnings ......................................... 3
1.2 Risk caused by inadequate qualifications.............. 3
1.3 Intended use.......................................................... 3
1.4 General safety information .................................... 3
1.5 Regulations (directives, laws, standards) .............. 5
2 Notes on the documentation .............................. 6
2.1 Observing other applicable documents ................. 6
2.2 Storing documents................................................. 6
2.3 Validity of the instructions...................................... 6
3 Product description............................................. 6
3.1 Benchmark............................................................. 6
3.2 Compartment Ventilation ....................................... 6
3.3 Serial number ........................................................ 6
3.4 Information on the identification plate.................... 6
3.5 Functional elements............................................... 7
3.6 CE label ................................................................. 7
4 Assembly.............................................................. 7
4.1 Transporting the unit.............................................. 7
4.2 Unpacking the product........................................... 7
4.3 Checking the scope of delivery.............................. 7
4.4 Dimensions ............................................................ 8
4.5 Minimum clearances.............................................. 8
4.6 Using the installation template............................... 8
4.7 Wall-mounting the product..................................... 8
4.8 Removing/installing the front casing...................... 9
4.9 Removing/installing the side section ..................... 9
5 Installation.......................................................... 10
5.1 Preparing for installation...................................... 10
5.2 Installing the heating pump.................................. 10
5.3 Heating water supply in the open heatingsystem ................................................................. 11
5.4 Connecting the heating flow and heatingreturn ................................................................... 11
5.5 Gas connection.................................................... 11
5.6 Connecting the condensate discharge pipe ........ 12
5.7 Electrical installation ............................................ 12
6 Operation............................................................ 14
6.1 Operating concept ............................................... 14
6.2 Calling up the installer level ................................. 14
6.3 Live Monitor (status codes) ................................. 14
7 Start-up ............................................................... 14
7.1 Carrying out the initial start-up............................. 14
7.2 Running the installation assistants ...................... 14
7.3 Restarting the installation assistants ................... 15
7.4 Test programmes................................................. 15
7.5 Checking the factory setting ................................ 15
7.6 Checking and treating the heating water/fillingand supplementary water .................................... 15
7.7 Filling the condensate siphon .............................. 17
7.8 Switching on the product ..................................... 17
7.9 Filling the heating installation .............................. 17
7.10 Checking the gas flow rate .................................. 17
7.11 Checking and adjusting the gas settings ............. 17
7.12 Checking leak-tightness ...................................... 19
7.13 Checking the heating mode................................. 19
8 Adapting the unit to the heatinginstallation.......................................................... 19
8.1 Burner anti-cycling time ....................................... 19
9 Handing the product over to the operator ...... 19
10 Troubleshooting ................................................ 19
10.1 Rectifying faults ................................................... 19
10.2 Calling up the fault memory................................. 19
10.3 Deleting the fault memory.................................... 20
10.4 Preparing the repair work .................................... 20
10.5 Replacing defective components......................... 20
10.6 Checking the product for leak-tightness .............. 21
11 Inspection and maintenance ............................ 21
11.1 Using original seals.............................................. 21
11.2 Observing inspection and maintenanceintervals ............................................................... 21
11.3 Procuring spare parts .......................................... 22
11.4 Checking the CO₂ content ................................... 22
11.5 Setting the CO₂ content ....................................... 22
11.6 Removing the gas-air mixture unit ....................... 23
11.7 Cleaning the heat exchanger............................... 23
11.8 Checking the burner ............................................ 24
11.9 Checking the ignition electrode ........................... 24
11.10 Cleaning the condensate siphon ......................... 24
11.11 Installing the gas-air mixture unit ......................... 24
11.12 Draining the product ............................................ 24
11.13 Completing inspection and maintenance work .... 24
11.14 Checking the product for leak-tightness .............. 24
12 Decommissioning the product ......................... 24
13 Customer service............................................... 24
Appendix ............................................................................ 25
A Inspection and maintenance work –Overview............................................................. 25
B Installer level – Overview .................................. 25
C Overview of diagnostics codes........................ 28
D Status codes – Overview .................................. 31
E Overview of fault codes .................................... 32
F Connection diagram.......................................... 34
G Connection diagram, 30 kW.............................. 35
H Opening in the flue pipe.................................... 36
H.1 Positioning of the opening of a fan-supportedflue gas pipe ........................................................ 36
H.2 Horizontal terminal positioning ............................ 37
I Commissioning Checklist................................. 38
J Technical data.................................................... 42
Index ................................................................................... 46
Safety 1
0020238195_01 ecoTEC plus Installation and maintenance instructions 3
1 Safety
1.1 Action-related warnings
Classification of action-related warningsThe action-related warnings are classified inaccordance with the severity of the possibledanger using the following warning signs andsignal words:
Warning symbols and signal wordsDanger!Imminent danger to life or risk ofsevere personal injury
Danger!Risk of death from electric shock
Warning.Risk of minor personal injury
Caution.Risk of material or environmentaldamage
1.2 Risk caused by inadequatequalifications
The following work must only be carried outby competent persons who are sufficientlyqualified to do so:
– Installation– Disassembly– Installation– Start-up– Maintenance– Repair– Decommissioning
▶ Observe all instructions that are includedwith the product.
▶ Proceed in accordance with the currentstate of technology.
▶ Observe all applicable directives, stand-ards, laws and other regulations.
1.3 Intended use
There is a risk of injury or death to the user orothers, or of damage to the product and otherproperty in the event of improper use or usefor which it is not intended.
The product is intended as a heat generatorfor open or closed heating installations andfor domestic hot water generation with a ven-ted or unvented domestic hot water cylinder.
Depending on the gas-fired boiler type, theproducts referred to in these instructionsmust only be installed and operated in con-junction with the air/flue pipe accessories lis-ted in the other applicable documents.
Intended use includes the following:
– observance of accompanying operating,installation and servicing instructions forthe product and any other system compon-ents
– installing and fitting the product in accord-ance with the product and system approval
– compliance with all inspection and main-tenance conditions listed in the instruc-tions.
Intended use also covers installation in ac-cordance with the IP class.
Any other use that is not specified in theseinstructions, or use beyond that specified inthis document shall be considered improperuse. Any direct commercial or industrial useis also deemed to be improper.
Caution.
Improper use of any kind is prohibited.
1.4 General safety information
1.4.1 Risk of injury due to the heavyweight of the product
▶ Make sure that the product is transportedby at least two people.
1.4.2 Risk of death from escaping gas
What to do if you smell gas in the building:
▶ Avoid rooms that smell of gas.▶ If possible, open doors and windows fully
and ensure adequate ventilation.▶ Do not use naked flames (e.g. lighters,
matches).
1 Safety
4 Installation and maintenance instructions ecoTEC plus 0020238195_01
▶ Do not smoke.▶ Do not use any electrical switches, mains
plugs, doorbells, telephones or other com-munication systems in the building.
▶ If it is safe to do so, close the emergencycontrol valve or the main isolator.
▶ If possible, close the gas isolator cock onthe product.
▶ Warn other occupants in the building byyelling or banging on doors or walls.
▶ Leave the building immediately and ensurethat others do not enter the building.
▶ Notify the gas supply company or the Na-tional Grid +44 (0) 800 111999 by tele-phone once you are outside of the build-ing.
1.4.3 Risk of death from escaping fluegas
If you operate the product with an empty con-densate siphon, flue gas may escape into theroom air.
▶ In order to operate the product, ensure thatthe condensate siphon is always full.
1.4.4 Risk of death due to blocked orleaking flue gas routes
Installation errors, damage, tampering, unau-thorised installation sites or similar can causeflue gas to escape and result in a risk of pois-oning.
What to do if you smell flue gas in the prop-erty:
▶ Open all accessible doors and windowsfully to provide ventilation.
▶ Switch off the product.▶ Check the flue gas routes in the product
and the flue gas diversions.
1.4.5 Risk of poisoning caused byinsufficient supply of combustionair
Conditions: Open-flued operation
▶ Ensure that the air supply to the product'sinstallation room is permanently unobstruc-ted and sufficient in accordance with therelevant ventilation requirements.
1.4.6 Risk of poisoning due to escapingflue gases in overpressurised, multi-occupancy air/flue gas installations
In overpressurised, multi-occupancy air/fluegas installations, the combustion air is sup-plied in the countercurrent flow for the fluegas pipe in the air gap between the flue gaspipe and the shaft wall.
When you open inspection openings in theair/flue gas installation or in a heat generator,flue gas may escape.
▶ Never operate the heat generator as anopen-flued system under any circum-stances.
▶ Always operate the heat generator usinga return check valve that is authorised foruse with the product.
1.4.7 Risk of poisoning and burns causedby escaping hot flue gases
▶ Only operate the product if the air/flue pipehas been completely installed.
▶ With the exception of short periods fortesting purposes, only operate the productwhen the front casing is installed andclosed.
1.4.8 Risk of death due to explosive andflammable materials
▶ Do not use or store explosive or flammablematerials (e.g. petrol, paper, paint) in theinstallation room of the product.
1.4.9 Risk of death from electric shock
There is a risk of death from electric shock ifyou touch live components.
Before commencing work on the product:
▶ Disconnect the product from the powersupply by switching off all power supplies(electrical partition with a contact openingof at least 3 mm, e.g. fuse or line protec-tion switch).
▶ Secure against being switched back onagain.
▶ Wait for at least 3 minutes until the capa-citors have discharged.
▶ Check that there is no voltage.
Safety 1
0020238195_01 ecoTEC plus Installation and maintenance instructions 5
1.4.10 Risk of death due to lack of safetydevices
The schematic drawings included in this doc-ument do not show all safety devices re-quired for correct installation.
▶ Install the necessary safety devices in thesystem.
▶ Observe the applicable national and inter-national laws, standards and guidelines.
1.4.11 Risk of corrosion damage due tounsuitable combustion and roomair
Sprays, solvents, chlorinated cleaningagents, paint, adhesives, ammonia com-pounds, dust or similar substances may leadto corrosion on the product and in the air/fluepipe.
▶ Ensure that the supply of combustion air isalways free of fluorine, chlorine, sulphur,dust, etc.
▶ Ensure that no chemical substances arestored at the installation site.
▶ If you are installing the product inhairdressing salons, painter's or joiner'sworkshops, cleaning businesses or similarlocations, choose a separate installationroom in which the room air is technicallyfree of chemical substances.
1.4.12 Risk of material damage caused byfrost
▶ Do not install the product in rooms proneto frost.
1.4.13 Risk of being burned or scalded byhot components
▶ Only carry out work on these componentsonce they have cooled down.
1.4.14 Risk of material damage caused byusing an unsuitable tool
▶ Use the correct tool to tighten or loosenscrew connections.
1.5 Regulations (directives, laws,standards)
▶ Observe the national regulations, stand-ards, guidelines and laws.
2 Notes on the documentation
6 Installation and maintenance instructions ecoTEC plus 0020238195_01
2 Notes on the documentation
2.1 Observing other applicable documents
▶ You must observe all the operating and installation in-structions included with the system components.
2.2 Storing documents
▶ Pass these instructions and all other applicable docu-ments on to the system operator.
2.3 Validity of the instructions
These instructions apply only to:
Product article number
Article numberGas CouncilNumber
VU 126/6-5 OVZ (H-GB) 0010021220 41-694-13
VU 156/6-5 OVZ (H-GB) 0010021221 41-694-14
VU 186/6-5 OVZ (H-GB) 0010021222 41-694-15
VU 246/6-5 OVZ (H-GB) 0010021223 41-694-16
VU 306/6-5 OVZ (H-GB) 0010021224 41-694-17
VU 356/6-5 OVZ (H-GB) 0020015674 41-044-76
3 Product description
3.1 Benchmark
Vaillant is a licensed member of the Benchmark Scheme.
Benchmark places responsibilities on both manufacturersand installers. The purpose is to ensure that customers areprovided with the correct equipment for their needs, that it isinstalled, commissioned and serviced in accordance with themanufacturer’s instructions by a competent person approvedat the time by the Health and Safety Executive and that itmeets the requirements of the appropriate Building Regu-lations. The Benchmark Checklist can be used to demon-strate compliance with Building Regulations and should beprovided to the customer for future reference.
Installers are required to carry out installation, commission-ing and servicing work in accordance with the BenchmarkCode of Practice which is available from the Heating andHotwater Industry Council who manage and promote theScheme.
Benchmark is managed and promoted by the Heating andHotwater Industry Council.
For more information visit www.centralheating.co.uk
3.2 Compartment Ventilation
The boilers are very high efficiency appliances.
As a consequence the heat loss from the appliance casingduring operation is very low.
Compartment ventilation is not required as the products areonly certified, and can only be fitted with a concentric fluesystem.
3.3 Serial number
The serial number is located on a plate behind the front flap.The plate is in a plastic fish plate. You can also display theserial number in the display.
3.4 Information on the identification plate
The identification plate is mounted on the underside of theproduct in the factory.
The identification plate keeps record of the country in whichthe product is to be installed.
Information on theidentification plate
Meaning
Barcode with serial number
Serial number For quality control purposes; 3rd and 4thdigits = year of production
For quality control purposes; 5th and 6thdigits = week of production
For identification purposes; 7th to 16thdigits = product article number
For quality control purposes; 17th to 20thdigits = place of manufacture
ecoTEC plus Product designation
2H, G20 – 2 kPa(20 mbar)
Factory setting for type of gas and gasconnection pressure
Cat. Gas-fired boiler category
Condensing techno-logy
Efficiency class of the boiler in accord-ance with EC Directive 92/42/EEC
Type: Xx3(x) Permissible flue gas connections
PMS Maximum water pressure in heatingmode
PMW Maximum water pressure in hot waterhandling mode
V/Hz Electrical connection
W Max. electrical power consumption
IP Level of protection
Heating mode
Pn Nominal heat output range in heatingmode
Pnc Nominal heat output range in heatingmode (condensing technology)
P Nominal heat output range in hot waterhandling mode
Qn Nominal heating load range in heatingmode
Qnw Nominal heating load range in hot waterhandling mode
Tmax. Max. flow temperature
NOx NOx class for the product
Assembly 4
0020238195_01 ecoTEC plus Installation and maintenance instructions 7
Information on theidentification plate
Meaning
Code (DSN) Specific product code
Read the instructions.
GC no. Gas council number
3.5 Functional elements
4
5
6
3
11
10
9
7
8
1
2
1 Supply air measuringstub pipe (for upper fluegas connection)
2 Flue gas analysis point(for upper flue gasconnection)
3 Gas-air mixture unit
4 Flue gas pipe
5 Flue gas analysis point(for rear flue gas con-nection)
6 Gas valve
7 Ignition transformer
8 Heat exchanger
9 Air intake pipe
10 Condensate siphon
11 Electronics box
3.6 CE label
The CE label shows that the products comply with the basicrequirements of the applicable directives as stated on theidentification plate.
The declaration of conformity can be viewed at the manufac-turer's site.
4 Assembly
4.1 Transporting the unit
Important: With regard to the regulations of 1992 concern-ing the manual handling of loads, the unit exceeds theweight that can be lifted by a single person.
4.1.1 General
▶ Hold the load as close as possible to your body. Avoidrotational movements. Instead, reposition your feet.
▶ If the unit is being lifted by two persons, ensure yourmovements are coordinated during lifting.
▶ Avoid bending your upper body – do not lean forwards orto the side.
▶ Wear suitable non-slip protective gloves in order to pro-tect your hands against sharp edges. Ensure that you arecarrying the load securely.
▶ If required, get somebody to assist you in this.
4.1.2 Unloading the box from the delivery van
▶ It is recommended that two people lift the unit together.
▶ Lift the box using the straps provided.
▶ Use safe lifting techniques – keep your back straight andbend your legs at the knee.
▶ Hold the load as close as possible to your body.
▶ If the unit is being lifted by two persons, ensure yourmovements are coordinated during lifting.
▶ If required, get somebody to assist you in this.
4.2 Unpacking the product
1. Remove the product from its box.
2. Remove the protective film from all of the product'scomponents.
4.3 Checking the scope of delivery
▶ Check that the scope of delivery is complete and intact.
4.3.1 Scope of delivery
Num-ber
Description
1 Heat generator
1 Hanging bracket
1 Flue gas adaptor
1 Gas isolator cock
1 Gas pipe
1 Condensate drain hose
1 Installation template
1 Enclosed documentation
4 Assembly
8 Installation and maintenance instructions ecoTEC plus 0020238195_01
4.4 Dimensions
112
183,5 71
3757833,5
602
220
150
32,5
100
157,5
280
1
2
3
4
5
6
1 Condensate discharge
2 Gas connection
3 Heating return
4 Heating flow
5 Connection on the backof the air/flue pipe
6 Connection on the topof the air/flue pipe
4.5 Minimum clearances
CC
AB
D
Minimum clearance
A 150 mm
B 150 mm
C 5 mm
(70 mm if the side sec-tions ought to be removed)
D 600 mm
It is not necessary to maintain a clearance between theproduct and components made of combustible materials thatgo beyond the minimum clearances.
4.6 Using the installation template
▶ Use the installation template to ascertain the locations atwhich you need to drill holes and make breakthroughs.
4.7 Wall-mounting the product
Note
If you are using the rear air/flue gas connection,install the flue pipe before you wall-mount theproduct.
1. Check whether the wall has sufficient load-bearing ca-pacity to bear the operational weight of the product.
2. Check if the supplied fixing material may be used forthe wall.
Conditions: The load-bearing capacity of the wall is sufficient, The fixingmaterial may be used for the wall
▶ Wall-mount the product as described.
Assembly 4
0020238195_01 ecoTEC plus Installation and maintenance instructions 9
Conditions: The load-bearing capacity of the wall is not sufficient
▶ Ensure that wall-mounting apparatus on-site has a suf-ficient load-bearing capacity. Use individual stands orprimary walling, for example.
▶ Do not wall-mount the product if you cannot providewall-mounting apparatus with a sufficient load-bearingcapacity.
Conditions: The fixing material may not be used for the wall
▶ Wall-mount the product as described using the permittedfixing material provided on-site.
4.8 Removing/installing the front casing
4.8.1 Removing the front casing
B
D
C
A
1. Undo the two screws .
2. Gently press the front casing backwards in the centreand pull it downwards on the lower edge so that theretaining clip is released.
3. Pull the front casing forwards at the bottom edge.
4. Lift the front casing upwards from the retainers.
4.8.2 Installing the front casing
1. Place the front casing on the upper retainer.
2. Press the front casing onto the product so that the re-tainer bracket clicks into place.
3. Secure the front casing by tightening both screws.
4.9 Removing/installing the side section
4.9.1 Removing the side section
Caution.Risk of material damage caused by mech-anical deformation.
Removing both side sections may causemechanical distortion in the product, whichmay cause damage to the piping, for ex-ample, and potentially result in leaks.
▶ Always remove only one side section –never both side sections at the same time.
Note
If there is sufficient lateral clearance (at least70 mm), you can remove the side section to fa-cilitate maintenance or repair work.
C
D
A
B
E
1. Tilt the electronics box forward.
2. Hold on to the side section so that it cannot fall, andunscrew both screws, one from the top and one fromthe bottom.
3. Tilt the side section to the outside and take it out to-wards the top.
4.9.2 Installing the side section
1. Push the side section into the recesses in the back wall.
2. Tilt the side section towards the product.
3. Screw the two screws into the side section, one at thetop and one at the bottom.
4. Fold up the electronics box.
5 Installation
10 Installation and maintenance instructions ecoTEC plus 0020238195_01
5 Installation
5.1 Preparing for installation
Danger!Risk of scalding and/or damage due toincorrect installation leading to escapingwater.
Stresses in the supply line can cause leaks.
▶ Make sure there is no voltage in the sup-ply lines when they are installed.
Caution.Risk of material damage caused by corro-sion
Due to non-diffusion-tight plastic pipes in theheating installation, air gets into the heatingwater. Air in the heating water causes corro-sion in the heat generator circuit and in theproduct.
▶ If you use non-diffusion-tight plastic pipesin the heating installation, ensure that noair gets into the heat generator circuit.
Caution.Risk of material damage due to heat trans-fer during soldering.
▶ Only solder connection pieces if the con-nection pieces are not yet screwed to theservice valves.
Caution.Risk of material damage caused bychanges to the connected pipes.
▶ Only bend connection pipes if they havenot yet been connected to the product.
Caution.Risk of damage caused by incorrect gasinstallation.
Excess test pressure or operating pressuremay cause damage to the gas valve.
▶ Check the leak-tightness of the gas valveusing a maximum pressure of 11 kPa(110 mbar).
▶ Flush the heating installation thoroughly prior to installa-tion.
▶ Make sure that the existing gas meter is capable ofpassing the rate of gas supply required.
▶ Install the following components:
– Drain cocks at the lowest points in the heating install-ation (→ current version of "BS 2879")
– A heating pump in the heating flow
– A bypass that is at least 1.5 m away from the product
– A stop cock in the gas pipe
– Where applicable, a flow regulator valve to adjust theflow rate
Pressure lossfrom the product
050100150200250300350400
0 200 400 600 800 1000 1200 1400 1600
430
424
418415412
435
A
B1
2
A Flow rate [l/h]
B Pressure loss [mbar]
1 Pressure loss 412 - 418
2 Pressure loss 424 - 435
The flow rate must not fall below the value in the diagram.
5.2 Installing the heating pump
▶ Only use pumps that have an in-rush current ≤ 10/15 A.
▶ When designing/selecting the pump, note the pressureloss of the product.
▶ Install the pump in the heating flow.
▶ Install the pump upstream and downstream of the pumpisolation valves.
▶ Set the pump so that the temperature difference betweenthe flow and return is no more than 20 °C when the max-imum flow temperature is set.
– The flow rate specified in the technical data isreached.
Installation 5
0020238195_01 ecoTEC plus Installation and maintenance instructions 11
5.3 Heating water supply in the open heatingsystem
▶ Connect the product to a supply/expansion tank asshown in the figure.
– The tank must not be more than 27 m (90 ft) abovethe product.
– The purging line must be installed with an upwardgradient and must not be blocked.
– Supply line diameter: ≥ 15 mm
– The relative positions of the pump, supply and pur-ging line must be as shown in the figure.
Conditions: Combined supply and purging line
▶ Install the line in accordance with "BS 5449".
– Diameter: ≥ 22 mm
5.4 Connecting the heating flow and heatingreturn
2
1
1 Heating return connec-tion
2 Heating flow connection
1. Establish the heating connections in accordance withthe applicable standards.
2. Purge the gas pipe before start-up.
3. Check whether the connections (→ Page 19) are leak-tight.
5.5 Gas connection
1
1. Establish the gas connection (1) in accordance with theapplicable standards.
2. Purge the gas line before start-up.
3. Check the entire gas line properly for leak-tightness.
5 Installation
12 Installation and maintenance instructions ecoTEC plus 0020238195_01
5.6 Connecting the condensate discharge pipe
1
2
▶ Follow the instructions listed here and observe directivesand local regulations on condensate discharge.
▶ Use PVC or another material that is suitable for drainingthe non-neutralised condensate.
▶ If it cannot be guaranteed that the materials the drainlines are made from are suitable, install a system forneutralising the condensate.
▶ Ensure that the connection between the condensatedrain pipework and the drain hose is not air-tight.
Note
The condensate drain pipework must have acontinuous fall (45 mm per metre) and shouldwhenever possible terminate at a suitabledrain point within the heated envelope of thebuilding that will remain frost free under longperiods of low external temperatures.
▶ During installation remove all burs from inside of cut pipework and avoid excessive adhesive which may trap smallpockets of water close to the pipe wall which can freezeand build into a larger ice plug.
▶ As with other pipe work insulate the condensate dis-charge pipe to minimise any risk of freezing and bewarewhen crossing cavities that the fall is maintained and thepipe sleeved.
You can find further information in the "BS 6798" specific-ation for installing and maintaining gas-fired boilers with anominal heat load of less than 70 kW.
5.7 Electrical installation
Danger!Risk of death from electric shock!
The power supply terminals L and N remainlive even if the product is switched off:
▶ Switch off the power supply.▶ Secure the power supply against being
switched on again.
5.7.1 Opening the electronics box
A
B
B
▶ Follow the instructions in the specified sequence.
5.7.2 Cable route
1
2
1 24-V eBUS cable route 2 230-V eBUS cable route
Installation 5
0020238195_01 ecoTEC plus Installation and maintenance instructions 13
5.7.3 Carrying out the wiring
30 mm max.
1. Shorten the connection cables to the appropriatelengths to prevent them from causing damage insidethe electronics box.
2. Screw the plug to the connection cable.
3. Plug the plug into the slot provided on the PCB.
5.7.4 Establishing the power supply
1
1. Observe all valid regulations.
2. Ensure that the rated mains voltage is 230 V.
3. Set up a fixed connection and install a partition with acontact opening of at least 3 mm (e.g. fuses or powerswitches).
4. Provide one common electricity supply for the boilerand for the corresponding controller:
– Power supply: Single-phase, 230 V, 50 Hz
– Fuse protection: ≤ 3 A
5. Open the electronics box. (→ Page 12)
6. Observe the routing of the power supply cable (1) in theelectronics box in order to guarantee that there is nostrain.
≤ 30
mm
NL X1230V~
RT
7. Carry out the wiring. (→ Page 13)
8. Close the electronics box.
9. Make sure that access to the mains connection is al-ways available and is not covered or blocked.
5.7.5 Connecting controllers to the electronicsystem
X2
X22 X41
– +24V=RT BUS
BurneroffX
106
BUS24 V
BU
SR
TB
.off
Burner
offR
T24V
=-
+B
US
1
4
32
1 Safety thermostat forfloor-standing heating
2 24 V controller
3 eBUS controller or radioreceiver unit
4 Outside temperaturesensor, wired
1. Open the electronics box. (→ Page 12)
2. Carry out the wiring. (→ Page 13)
3. Connect the individual components depending on thetype of installation.
Conditions: If installing a multi-circuit controller.
▶ Change the pump's operating mode d.18 from Eco (in-termittently operating pump) to Comfort (continuouslyoperating pump).
6 Operation
14 Installation and maintenance instructions ecoTEC plus 0020238195_01
Conditions: When connecting a controller (230 V).
≤ 30
mm
NL X1230V~
RT
▶ Connect the controller to the main plug.
▶ Remove the bridge from the plug 24V=RT.
Conditions: 230 V 3-wire connection
▶ Ensure that the controller is designed for a maximumrated current of 7 A.
▶ Connect the controller to the main plug X1.
– Terminal assignment: L ‑ line, N ‑ neutral conductor,‑ earth
▶ Draw the operator's attention to the fact that the follow-ing features are present with this type of installation.
◁ The frost protection function is deactivated. If theproduct is installed in a room where there is a riskof frost and it has not been protected by a room ther-mostat, install an additional frost protection thermo-stat.
◁ The pump programmes are not active.
◁ If the product is switched off, the display is switchedoff.
◁ Each time the unit is started, the fan runs for20 seconds.
◁ Residual heat in the heating return may result in theproduct blocking the burner for 10 minutes.
4. Close the electronics box.
6 Operation
6.1 Operating concept
The operating concept and the read-off and setting facilitiesof the operator level are described in the operating instruc-tions.
An overview of the reading and setting options for the in-staller level is included in the table in the appendix.
Installer level – Overview (→ Page 25)
6.2 Calling up the installer level
1. Only call up the installer level if you are a competentperson.
2. Navigate to Menu → Installer level and confirm bypressing .
3. Set the value 17 (code) and confirm by pressing .
6.3 Live Monitor (status codes)
Menu → Live Monitor
Status codes in the display provide information on the pro-duct's current operating status.
Status codes – Overview (→ Page 31)
7 Start-up
7.1 Carrying out the initial start-up
Initial start-up must be carried out by a customer servicetechnician or an authorised competent person using the first-commissioning-checklist. The first-commissioning-checklistin the appendix (→ Page 38) of the installation instructionsmust be filled out and stored carefully along with the unit'sdocumentation.
▶ Carry out the initial start-up using the first-commission-ing-checklist in the appendix.
▶ Fill out and sign the first-commissioning-checklist.
7.2 Running the installation assistants
The installation assistant is displayed whenever the productis switched on until it has been successfully completed.It provides direct access to the most important checkprogrammes and configuration settings for starting up theproduct.
To recheck and reset the most important system parameters,call up the Appliance config..
Menu → Installer level → Appliance config.
The settings options for more complex systems can be foundin the Diagnostics menu.
Menu → Installer level → Diagnostics menu
▶ Press to confirm installation assistant start-up.
◁ All heating and hot water requests are blocked whilstthe installation assistant is active.
Note
If you do not confirm the launch of the install-ation assistant within 10 seconds of switchingthe system on, the basic display reappears.
▶ To access the next point, confirm by pressing in eachcase.
7.2.1 Language
▶ Set the required language.
▶ To confirm the set language and to avoid unintentionallychanging it, press twice to confirm this.
If you have unintentionally set a language that you do notunderstand, proceed as follows to change it:
▶ Press and hold and at the same time.
▶ Also briefly press .
▶ Press and hold and until the display shows thelanguage setting option.
▶ Select the required language.
▶ Press twice to confirm this change.
Start-up 7
0020238195_01 ecoTEC plus Installation and maintenance instructions 15
7.2.2 Filling mode
Filling mode (check programme P.06) is activated automatic-ally in the installation assistant for as long as the filling modeappears on the display.
7.2.3 Purging
1. Unlike in the Check programs menu, to purge the sys-tem, start check programme P.00 by pressing or .
2. If you need to change the circuit that is to be purged,press .
7.2.4 Target flow temperature, hot watertemperature
1. To set the target flow temperature and hot water tem-perature, use and .
2. Press to confirm this setting.
Conditions: Water hardness: > 3.57 mol/m³, Product with connected cylin-der
Danger!Risk of death from Legionella.Legionella multiply at temperatures below60 °C.▶ Ensure that the operator is familiar with
all of the Anti-legionella measures in or-der to comply with the applicable regula-tions regarding legionella prevention.
▶ Set the hot water temperature.
– Water temperature: ≤ 50 ℃
7.2.5 Heating partial load
The heating partial load of the product is set to Auto at thefactory. The product independently determines the optimumheating output depending on the current heat demand ofthe system. You can retroactively change the setting in theDiagnostics menu under D.000.
7.2.6 Auxiliary relay and multi-functional module
1. If you have connected additional components to theproduct, assign these components to the individual re-lays.
2. In each case, confirm by pressing .
Note
This setting can be retroactively changed inthe Diagnostics menu using D.026, D.027and D.028.
7.2.7 Contact data
▶ If required, store your telephone number in the Appli-ance config. (max. 16 digits/no blank spaces). The oper-ator can view the telephone number.
7.2.8 Ending the installation assistant
▶ Once you have run through the installation assistant suc-cessfully, confirm by pressing .
◁ The installation assistant will close and will not launchagain when the product is next switched on.
7.3 Restarting the installation assistants
Menu → Installer level → Start inst. assistant
You can restart the installation assistant at any time by call-ing it up in the menu.
7.4 Test programmes
Menu → Installer level → Test programs
As well as the installation assistants, you can also call upthe following test programmes for start-up, service andtroubleshooting.
– Check programs
– Function menu
– Electronics self-test
7.5 Checking the factory setting
The product's combustion has been factory tested and ispreset for operation with the gas group indicated on the iden-tification plate.
The product is only authorised to be operated with naturalgas.
▶ Check the information about the type of gas indicated onthe identification plate and compare this with the type ofgas available at the installation location.
Conditions: The product design is not compatible with the local gasgroup
▶ Do not start up the product.
Conditions: The product design is compatible with the local gas group
▶ Proceed as described below.
7.6 Checking and treating the heatingwater/filling and supplementary water
Caution.Risk of material damage due to poor-qual-ity heating water
▶ Ensure that the heating water is of suffi-cient quality.
▶ Before filling or topping up the system, check the qualityof the heating water.
Checking the quality of the heating water▶ Remove a little water from the heating circuit.
▶ Check the appearance of the heating water.
▶ If you ascertain that it contains sedimentary materials,you must desludge the system.
▶ Use a magnetic rod to check whether it contains mag-netite (iron oxide).
7 Start-up
16 Installation and maintenance instructions ecoTEC plus 0020238195_01
▶ If you ascertain that it contains magnetite, clean the sys-tem and apply suitable corrosion-protection measures, orfit a magnet filter.
▶ Check the pH value of the removed water at 25 °C.
▶ If the value is below 6.5 or above 8.5, clean the systemand treat the heating water.
▶ Ensure that oxygen cannot get into the heating water.
Checking the filling and supplementary water▶ Before filling the system, measure the hardness of the
filling and supplementary water.
Treating the filling and supplementary water▶ Observe all applicable national regulations and technical
standards when treating the filling and supplementarywater.
Provided the national regulations and technical standardsdo not stipulate more stringent requirements, the followingapplies:
You must treat the heating water in the following cases:
– If the entire filling and supplementary water quantity dur-ing the operating life of the system exceeds three timesthe nominal volume of the heating installation, or
– If the guideline values listed in the following table are notmet, or
– if the pH value of the heating water is less than 6.5 ormore than 8.5.
Totalheatingoutput
Water hardness at specific system volume1)
≤ 20 l/kW> 20 l/kW≤ 50 l/kW
> 50 l/kW
kWppm
CaCO₃mol/m³
ppmCaCO₃
mol/m³
ppmCaCO₃
mol/m³
< 50 < 300 < 3 200 2 2 0.02
> 50to ≤ 200
200 2 150 1.5 2 0.02
> 200to ≤ 600
150 1.5 2 0.02 2 0.02
> 600 2 0.02 2 0.02 2 0.02
1) Nominal capacity in litres/heating output; in the case of multi-boiler systems, the smallest single heating output is to be used.
Caution.The use of unsuitable heating water maycause aluminium corrosion and a result-ing lack of leak-tightness.
In contrast to steel, grey cast iron or copper,for example, aluminium reacts with alkalineheating water (pH value > 8.5) to producesubstantial corrosion.
▶ When using aluminium, make sure thatthe pH value of the heating water isbetween 6.5 and a maximum of 8.5.
Caution.Risk of material damage if the heatingwater is treated with unsuitable additives.
Unsuitable additives may cause changes inthe components, noises in heating mode andpossibly subsequent damage.
▶ Do not use any unsuitable frost and cor-rosion protection agents, biocides or seal-ants.
No incompatibility with our products has been detected todate with proper use of the following additives.
▶ When using additives, follow the manufacturer's instruc-tions without exception.
We accept no liability for the compatibility of any additive orits effectiveness in the rest of the heating system.
Additives for cleaning measures (subsequentflushing required)– Adey MC3+
– Adey MC5
– Fernox F3
– Sentinel X 300
– Sentinel X 400
Additives intended to remain permanently in thesystem– Adey MC1+
– Fernox F1
– Fernox F2
– Sentinel X 100
– Sentinel X 200
Additives for frost protection intended to remainpermanently in the system– Adey MC ZERO
– Fernox Antifreeze Alphi 11
– Sentinel X 500
▶ If you have used the above-mentioned additives, informthe operator about the measures that are required.
▶ Inform the operator about the measures required for frostprotection.
Start-up 7
0020238195_01 ecoTEC plus Installation and maintenance instructions 17
7.7 Filling the condensate siphon
C
2
3
1
A B
1. Unclip the lower section of the siphon (1) from the up-per section of the siphon (2).
2. Remove the float (3).
3. Fill the lower section of the siphon with water up to10 mm below the upper edge of the condensate drainpipework.
4. Re-insert the float (3).
Note
Check whether the float is present in thecondensate siphon.
5. Clip the lower section of the siphon (1) into the uppersection of the siphon (2).
7.8 Switching on the product
▶ Switch on the product via the main switch installed on-site.
7.9 Filling the heating installation
1. Flush the heating installation through.
2. Fill the heating installation with the maximum possiblevolume flow.
7.10 Checking the gas flow rate
The gas flow rate has been set during production and doesnot require adjustment. With the front casing fitted check thegas flow rate of the boiler as follows:
▶ Start up the product with the check programme P.01.
▶ In addition, ensure that maximum heat can be dissipatedinto the heating system by turning up the room thermo-stat.
▶ Wait at least 5 minutes until the boiler has reached itsoperating temperature.
▶ Ensure that all other gas appliances in the property areturned off.
▶ Measure the gas flow rate at the gas meter.
▶ Compare the measured values with the correspondingvalues in the table.
Qnw from the dataplate
H gas in m³/h
Nom. +5% −10%
15.3 1.62 1.70 1.46
18.4 1.95 2.05 1.76
24.7 2.61 2.74 2.35
25.7 2.72 2.86 2.45
28.6 3.03 3.18 2.73
30.6 3.24 3.40 2.92
35.7 3.78 3.97 3.40
Conditions: Gas flow rate not in the permissible range
▶ Check all of the piping and ensure that the gas flow ratesare correct.
▶ Only put the product into operation once the gas flowrates have been corrected.
Conditions: Gas flow rate in the permissible range
▶ End the check programme P.01.
▶ Allow the boiler to cool down by allowing pump overrun tooperate for a minimum of 2 minutes.
▶ Record the boiler maximum gas flow rate onto theBenchmark gas boiler commissioning checklist.
7.11 Checking and adjusting the gas settings
Only a qualified competent person is authorised to imple-ment the settings on the gas valve.
Each destroyed tamper-proof seal must be replaced.
The CO2 adjusting screw must be sealed.
Never modify the factory setting of the gas pressure regu-lator of the gas valve.
7.11.1 Checking the gas connection pressure (gasflow pressure)
1
2
1. Ensure that the gas inlet working pressure can beobtained with all other gas appliances in the propertyworking.
2. Close the gas isolator cock (1).
3. Undo the sealing screw on the measuring nipple (2).
4. Connect a pressure gauge to the measuring nipple (2).
5. Open the gas isolator cock (1).
6. Start up the product with check programme P.01(system with eBUS controller) or P.03 (system withouteBUS controller).
7. In addition, ensure that maximum heat can be dissip-ated into the heating system by turning up the roomthermostat.
8. With the boiler operating at full load check that the gasinlet working pressure at the reference test point (2)complies with the requirements.
7 Start-up
18 Installation and maintenance instructions ecoTEC plus 0020238195_01
Permissible connection pressure
Great Bri-tain
Natural gas G20 1.7… 2.5 kPa
(17.0… 25.0 mbar)
9. Should the pressure recorded at the reference test pointin the boiler be lower than indicated check if there isany blockage in the pipework or if the pipework is un-dersized.
Conditions: Gas flow pressure not in the permissible range
Caution.Risk of material damage and operatingfaults caused by incorrect gas connec-tion pressure.If the gas connection pressure lies outsidethe permissible range, this can cause oper-ating faults in and damage to the product.▶ Do not make any adjustments to the
product.▶ Do not start up the product.
▶ If you cannot correct the failure, notify the gas supplycompany and proceed as follows:
▶ End check programme P.01.
▶ Allow the boiler to cool down by allowing pump overrunto operate for a minimum of two minutes.
▶ Close the gas isolator cock.
▶ Remove the pressure gauge and retighten the sealingscrew (2) for the measuring nipple.
▶ Open the gas isolator cock (1).
▶ Check the measuring nipple for gas tightness.
▶ Close the gas isolator cock (1).
▶ Install the front casing. (→ Page 9)
▶ Disconnect the product from the power mains.
▶ You must not start up the boiler.
Conditions: Gas flow pressure in the permissible range
▶ End the check programme P.01.
▶ Allow the boiler to cool down allowing pump overrun tooperate for a minimum of two minutes.
▶ Close the gas isolator cock (1).
▶ Remove the pressure gauge and retighten the sealingscrew (2) for the measuring nipple.
▶ Open the gas isolator cock (1).
▶ Check the measuring nipple for gas tightness.
▶ Install the front casing. (→ Page 9)
▶ Reset boiler controls for normal operation.
▶ Record the appliance gas inlet working pressure (kParesp. mbar) in the Benchmark gas boiler commissioningchecklist.
7.11.2 Checking the leak-tightness of the flue gasinstallation and flue gas recirculation
1. Check the flue gas installation is intact in accordancewith the latest gas safe technical bulletin and informa-tion supplied in the installation instructions.
2. For extended flue gas installations check for flue gasrecirculation using the air analysis point.
3. Use a flue gas analyser.
4. If you discover CO or CO2 in the supply air, search forthe leak in the flue gas installation or for signs of fluegas recirculation.
5. Eliminate the damage properly.
6. Check again whether the supply air contains any CO orCO2.
7. If you cannot eliminate the damage, do not start up theproduct.
7.11.3 Checking the CO₂ content
1. Start up the product with check programme (P.01).
Installer level – Overview (→ Page 25)
2. Wait until the value that is read is stable.
– Waiting period for reading a stable value: 5 min
1
3. Unscrew the cover from the flue gas analysis point (1).
4. Measure the CO₂ content at the flue gas analysis point(1).
5. Compare the measured value with the correspondingvalue in the table.
Checking the CO₂ content
Great Britain
Removed frontcasing/installed frontcasing
Natural gas
G20
9.2 ±1 %
◁ The value is OK.
▽ The value is not OK; you cannot start up theproduct.
▶ Inform Customer Service.
Adapting the unit to the heating installation 8
0020238195_01 ecoTEC plus Installation and maintenance instructions 19
7.12 Checking leak-tightness
▶ Check the gas pipe, the heating circuit and the hot watercircuit for leak-tightness.
▶ Check that the air/flue pipe has been installed correctly.
Conditions: Room-sealed operation
▶ Check whether the vacuum chamber has been sealed sothat it is leak-tight.
7.13 Checking the heating mode
1. Activate the heating mode on the user interface.
2. Turn all thermostatic radiator valves on the radiatorsuntil they are fully open.
3. Allow the product to operate for at least 15 minutes.
4. Purge the heating installation.
5. Call up the Live Monitor.
– Menu → Live Monitor
Status codes – Overview (→ Page 31)
◁ If the product is working correctly, the display showsS.04.
8 Adapting the unit to the heatinginstallation
You can reset/change the system parameters using the fol-lowing menu points:
Menu → Installer level → Start inst. assistant
You can restart and run through the installation assistant atany time.
Menu → Installer level Appliance config.
You can set/change the most important system parametersin the Appliance config. menu point.
Menu → Installer level Diagnostics menu
You can set/change additional system parameters in theDiagnostics menu point.
You can find an overview of all the system parameters in the"Installer level – Overview" table in the appendix.
Installer level – Overview (→ Page 25)
8.1 Burner anti-cycling time
To prevent frequent switching on and off of the burner andthus prevent energy losses, an electronic restart lockoutis activated for a specific period each time the burner isswitched off. The burner anti-cycling time is only active forthe heating mode. Hot water handling mode during a burneranti-cycling time does not affect the time function element.
8.1.1 Setting the burner anti-cycling time
▶ Set the burner anti-cycling time via the diagnostics code.
Overview of diagnostics codes (→ Page 28)
8.1.2 Resetting the remaining burner anti-cyclingtime
▶ Press and hold the fault clearance key for more thanthree seconds.
◁ is shown in the display.
9 Handing the product over to theoperator
▶ When you have finished the installation, attach the stickersupplied (in the operator's language) to the productcover.
▶ Explain to the operator how the safety devices work andwhere they are located.
▶ Inform the operator how to handle the product.
▶ In particular, draw attention to the safety informationwhich the operator must follow.
▶ Inform the operator of the necessity to have the productmaintained on a regular basis.
▶ Instruct the operator about measures taken to ensure thesupply of combustion air and flue gas pipe.
10 Troubleshooting
10.1 Rectifying faults
▶ If fault codes (F.XX) are present, refer to the table in theappendix for advice or use the check programme(s).
Overview of fault codes
Installer level – Overview (→ Page 25)
If several faults occur at the same time, the display showsthe corresponding fault messages for two seconds each inalternation.
▶ Press and hold the fault clearance key for more thanthree seconds.
▶ If you are unable to clear the fault code and it reappearsdespite several fault clearance attempts, contact cus-tomer service.
10.2 Calling up the fault memory
The last 10 fault messages are stored in the fault memory.
▶ Navigate to the Fault list menu.
◁ The display shows the number of faults that haveoccurred, the fault numbers and the correspondingplain text display.
▶ Press or to call up individual fault messages.
10 Troubleshooting
20 Installation and maintenance instructions ecoTEC plus 0020238195_01
10.3 Deleting the fault memory
1. Navigate to the Fault list menu.
2. Press twice to delete the fault list.
10.4 Preparing the repair work
1. Decommission the product.
2. Disconnect the product from the power mains.
3. Remove the front casing.
4. Close the gas isolator cock.
5. Close the service valves in the heating flow and in theheating return.
6. Close the service valve in the cold water pipe.
7. Drain the product if you want to replace water-bearingcomponents of the product.
8. Make sure that water does not drip on live components(e.g. the electronics box).
9. Use only new seals and O-rings. Do not use any addi-tional components.
10.5 Replacing defective components
10.5.1 Replacing the burner
1. Remove the gas-air mixture unit. (→ Page 23)
2. Remove the burner seal.
3. Remove the burner.
4. Install the new burner complete with new seal on theheat exchanger.
5. Install the gas-air mixture unit. (→ Page 24)
10.5.2 Replacing the gas-air mixture unit
1. Remove the gas-air mixture unit. (→ Page 23)
2. Install the new gas-air mixture (→ Page 24).
10.5.3 Replacing the heat exchanger
1. Remove the side section. (→ Page 9)
2. Remove the gas-air mixture unit. (→ Page 23)
E
1
2
D
B
C
A
3. Remove the flow pipe (1).
4. Remove the return pipe (2).
B
A
5. Remove the gas pipe.
B3
4
A
6. Undo the clip underneath the condensate tray (4).
7. Undo the two screws (3).
Inspection and maintenance 11
0020238195_01 ecoTEC plus Installation and maintenance instructions 21
A
5
C
B
8. Lift the heat exchanger up slightly and remove it to-gether with the condensate tray.
9. Remove the ignition transformer (5).
10. Replace all the seals.
11. Install the new heat exchanger in reverse order.
10.5.4 Replacing the main PCB
C
C
D
B
A
A
1. Open the electronics box. (→ Page 12)
2. Pull all of the plugs out from the PCB.
3. Undo the clips on the PCB.
4. Remove the PCB.
5. Install the new PCB in such a way that it clicks into thegroove at the bottom and into the clip at the top.
6. Plug in the PCB plugs.
7. Close the electronics box.
10.5.5 Replacing the PCB for the user interface
B
CC
D
A
A
1. Open the electronics box. (→ Page 12)
2. Pull the plug out of the PCB.
3. Undo the clips on the PCB.
4. Remove the PCB.
5. Install the new PCB in such a way that it clicks into thegroove at the bottom and into the clip at the top.
6. Plug in the PCB plug.
7. Close the electronics box.
10.6 Checking the product for leak-tightness
▶ Check that the product is leak-tight. (→ Page 19)
11 Inspection and maintenance
11.1 Using original seals
If you replace components, use only the enclosed originalseals; additional sealing materials are not required.
11.2 Observing inspection and maintenanceintervals
▶ Adhere to the minimum inspection and maintenance in-tervals. The inspection may require maintenance to becarried out earlier, depending on the results.
Inspection and maintenance work – Overview(→ Page 25)
11 Inspection and maintenance
22 Installation and maintenance instructions ecoTEC plus 0020238195_01
11.3 Procuring spare parts
The original components of the product were also certifiedby the manufacturer as part of the declaration of conformity.If you use other, non-certified or unauthorised parts duringmaintenance or repair work, this may void the conformity ofthe product and it will therefore no longer comply with theapplicable standards.
We strongly recommend that you use original spare partsfrom the manufacturer as this guarantees fault-free and safeoperation of the product. To receive information about theavailable original spare parts, contact the contact addressprovided on the reverse of these instructions.
▶ If you require spare parts for maintenance or repairwork, use only the spare parts that are permitted for theproduct.
11.4 Checking the CO₂ content
1. Start up the product with check programme (P.01).
Installer level – Overview (→ Page 25)
2. Wait until the value that is read is stable.
– Waiting period for reading a stable value: 5 min
1
3. Unscrew the cover from the flue gas analysis point (1).
4. Measure the CO₂ content at the flue gas analysis point(1).
5. Compare the measured value with the correspondingvalue in the table.
Checking the CO₂ content
Great Bri-tain
Removedfront cas-ing/installedfront casing
Natural gas
G20
9.2 ±1 %
◁ The value is OK.
▽ The value is not OK; you cannot start up theproduct.
▶ Set the CO₂ content. (→ Page 22)
11.5 Setting the CO₂ content
Conditions: The CO₂ content must be adjusted
1
A
B
▶ Remove the sticker.
▶ Turn the screw (1) to set the CO₂ content (value withfront casing removed).
◁ To increase the CO₂ content: Turn anti-clockwise
◁ To decrease the CO₂ content: Turn clockwise
▶ Only carry out the adjustment in increments of 1/8 turnand wait approximately 1 minute after each adjustmentuntil the value has stabilised.
▶ Compare the measured value with the correspondingvalue in the table.
Setting the CO₂ value
Great Britain
Removed front cas-ing/installed frontcasing
Natural gas
G20
CO₂ at fullload
9.2 ±0.2 %
Set forWobbeindex W₀
14.09 kW⋅h/m³
O₂ at fullload
4.5 ±1.8 vol. %
CO at fullload
≤ 250 ppm
CO/CO₂ ≤ 0.0027
▽ If the setting is not in the specified adjustment range,you must not start up the product.
▶ Inform Customer Service.
▶ Check whether the air-quality requirements with regardto carbon monoxide are fulfilled.
▶ Fit the front panel.
Inspection and maintenance 11
0020238195_01 ecoTEC plus Installation and maintenance instructions 23
11.6 Removing the gas-air mixture unit
Note
The gas-air mixture unit consists of three maincomponents:
– Ventilator
– Gas valve
– Burner cover
1. Switch off the product via the main switch.
2. Close the gas isolator cock.
3. Remove the front casing. (→ Page 9)
A
B
1
4. Remove the air intake pipe (1).
D
C
B
2
3
A
5. Push the clip (2) upwards.
6. Remove the flue pipe (3).
A
D
C
B
7. Remove the plugs from the gas valve.
8. Remove the gas-air mixture unit.
9. Remove both burner seals from the burner cover.
1
10. Remove the burner (4).
11.7 Cleaning the heat exchanger
1. Check the heat exchanger for damage and dirt.
2. If required, clean and replace the heat exchanger.
3. Protect the folded down electronics box against sprayedwater.
1
4. Clean the ribs of the heat exchanger (1) with water.
◁ The water runs out via the condensate tray.
12 Decommissioning the product
24 Installation and maintenance instructions ecoTEC plus 0020238195_01
11.8 Checking the burner
▶ Check the surface of the burner for damage. If you seeany damage, replace the burner.
11.9 Checking the ignition electrode
1
2
3 4 5
1. Disconnect the connection (2) and the earthing cable(1).
2. Remove the fixing screws (3).
3. Carefully remove the electrode from the combustionchamber.
4. Check that the electrode ends (4) are undamaged.
5. Check the electrode distance.
– Clearance for the ignition electrodes: 3.5 … 4.5 mm
6. Make sure that the seal (5) is free from damage.
▽ If necessary, replace the seal.
11.10 Cleaning the condensate siphon
2
3
1
A B
1. Unclip the lower section of the siphon (1) from the up-per section of the siphon (2).
2. Remove the float (3).
3. Flush out the lower section of the siphon with water.
4. Reinsert the float (3).
Note
Check whether the float is present in thecondensate siphon.
5. Clip the lower section of the siphon (1) into the uppersection of the siphon (2).
11.11 Installing the gas-air mixture unit
1. Install the burner.
2. Install two new burner seals in the burner cover.
3. Install the gas-air mixture unit.
4. Tighten the screws on the gas-air mixture unit to 7 Nm.
5. Install the flue gas pipe.
6. Install the air intake pipe.
11.12 Draining the product
1. Close the service valves of the product.
2. Start check programme P.06.
3. Open the drain valves.
4. Make sure that the air vent cap on the internal pump isopen so that the product can be drained fully.
11.13 Completing inspection and maintenancework
1. Check the gas connection pressure (gas flow pressure).(→ Page 17)
2. Check the CO₂ content. (→ Page 22)
11.14 Checking the product for leak-tightness
▶ Check that the product is leak-tight. (→ Page 19)
12 Decommissioning the product
▶ Switch off the product.
▶ Disconnect the product from the power mains.
▶ Close the gas isolator cock.
▶ Close the cold water stop valve.
13 Customer service
To ensure regular servicing, it is strongly recommendedthat arrangements are made for a Maintenance Agreement.Please contact Vaillant Service Solutions for further details:
Telephone: 0330 100 3461
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 25
Appendix
A Inspection and maintenance work – Overview
The table below lists the manufacturer requirements with respect to minimum inspection and maintenance intervals. If na-tional regulations and directives require shorter inspection and maintenance intervals, you should observe these instead ofthe intervals listed in the table.
No. WorkInspection(annual)
Mainten-ance
(must becarried outat regularintervals)*
1Check the air/flue pipe for leak-tightness and to ensure that it is fastened correctly. Make surethat it is not blocked or damaged and has been installed in accordance with the relevant Installa-tion Manual.
X X
2Check the general condition of the product. Remove dirt from the product and from the vacuumchamber.
X X
3Visually inspect the general condition of the entire heating cell and, in particular, check for signsof corrosion, soot or other damage. If you notice any damage, carry out maintenance work.
X X
4Check the gas connection pressure at maximum heat input. If the gas connection pressure is notwithin the correct range, carry out maintenance work.
X X
5Check the CO₂ content (the air ratio) of the product and, if necessary, adjust it. Keep a record ofthis.
X X
6Disconnect the product from the power mains. Check that the electrical plug connections andother connections are seated correctly and correct these if necessary.
X X
7 Close the gas isolator cock and the service valves. X X
8 Drain the product on the water side. X
9 Remove the gas-air mixture unit. X
10Check the seals in the combustion area. If you see any damage, replace the seals. Replace theburner seal each time it is opened and accordingly each time maintenance is carried out.
X
11 Clean the heat exchanger. X
12 Check the burner for damage and replace it if necessary. X
13 Check the condensate siphon in the product, clean and fill if necessary. X X
14 Install the gas-air mixture unit. Caution: Replace the seals. X
15 Open the gas isolator cock, reconnect the product to the power mains and switch the product on. X X
16 Open the service valves, fill the product/heating installation. X
17Perform a test operation of the product and heating installation, including hot water generation,and purge the system once more if necessary.
X X
18 Visually inspect the ignition and burner behaviour. X X
19 Check the CO₂ content (the air ratio) of the product again. X
20 Check the product for gas, flue gas, hot water and condensate leaks, and repair if necessary. X X
21 Record the inspection/maintenance work carried out. X X
*Note: For those appliances which are not part of an annual service agreement/policy, maintenance must be carried out at least every5 years.
B Installer level – Overview
Setting level ValuesUnit Increment, select, explanation
DefaultsettingMin. Max.
Installer level →
Enter code 00 99 – 1 (competent person code 17) –
Installer level → List of faults →
F.XX - F.XX¹ Current value – – –
¹Fault lists are only displayed, and can only be deleted, if faults have occurred.
Appendix
26 Installation and maintenance instructions ecoTEC plus 0020238195_01
Setting level ValuesUnit Increment, select, explanation
DefaultsettingMin. Max.
Installer level → Test programs →
Gas type check Current value – Liquid gas, natural gas –
Installer level → Test programs → Check programs →
P.00 Purging – – – Yes, No –
P.01 Maximum load – – – Yes, No –
P.02 Minimum load – – – Yes, No –
P.06 Filling mode – – – Yes, No –
Installer level → Test programs → Function menu →
T.02 3-way valve – – – On, Off –
T.03 Fan – – – On, Off –
T.04 Cyl. charging pump – – – On, Off –
T.05 Circulation pump – – – On, Off –
T.06 External pump – – – On, Off –
T.08 Burner – – – On, Off –
Installer level → Test programs → Electronics self-test →
Self-test – – – Yes, No –
Installer level → Appliance config. →
Language – – – Deutsch, English, Français, Italiano, Dansk,Nederlands, Castellano, Türkce, Magyar,Pусский, Українськa, Svenska, Norsk, Pol-ski, Čeština, Hrvatski, Slovenčina, Română,Slovenščina, Português, Srpski
English
Flow temp. setpoint 30 75 ℃ 1 –
DHW temperature 30 60 ℃ 1
Product with connected domestic hot water cylin-der
–
Auxiliary relay 1 10 – 1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (not active)
8 = eBUS remote control (not active)
9 = Legionella protection pump (not active)
10 = Solar valve (not active)
2
Accessory relay 1 1 10 – 1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (not active)
8 = eBUS remote control (not active)
9 = Legionella protection pump (not active)
10 = Solar valve (not active)
2
¹Fault lists are only displayed, and can only be deleted, if faults have occurred.
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 27
Setting level ValuesUnit Increment, select, explanation
DefaultsettingMin. Max.
Accessory relay 2 1 10 – 1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (not active)
8 = eBUS remote control (not active)
9 = Legionella protection pump (not active)
10 = Solar valve (not active)
2
Heating partial load – – kW Partial load only, full load only, auto Auto
Contact data Phonenum-ber
– – 0 – 9 Auto
Default setting – – – On, Off –
Installer level → Diagnostics menu →
D.XXX - D.XXX Current value – – –
Installer level → Start ins. assistant →
Language – – – Deutsch, English, Français, Italiano, Dansk,Nederlands, Castellano, Türkce, Magyar,Pусский, Українськa, Svenska, Norsk, Pol-ski, Čeština, Hrvatski, Slovenčina, Română,Slovenščina, Português, Srpski
English
Filling mode: 3-way valve is in mid-position
0 2 – 0 = Normal operating mode
1 = Mid-position (parallel operation)
2 = Permanent heating mode position
–
Purge programme – – – Automatic adaptive purging of the heating circuitand hot water circuit
Not active
Active
–
Flow temp. setpoint 30 75 ℃ 1 –
DHW temperature 35 60 ℃ 1
Product with hot water generation
–
Auxiliary relay 1 10 – 1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (not active)
8 = eBUS remote control (not active)
9 = Legionella protection pump (not active)
10 = Solar valve (not active)
2
Accessory relay 1 1 10 – 1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (not active)
8 = eBUS remote control (not active)
9 = Legionella protection pump (not active)
10 = Solar valve (not active)
2
¹Fault lists are only displayed, and can only be deleted, if faults have occurred.
Appendix
28 Installation and maintenance instructions ecoTEC plus 0020238195_01
Setting level ValuesUnit Increment, select, explanation
DefaultsettingMin. Max.
Accessory relay 2 1 10 – 1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (not active)
8 = eBUS remote control (not active)
9 = Legionella protection pump (not active)
10 = Solar valve (not active)
2
Contact data Phone number – 0-9 –
End the installation assistant? – – – Yes, No –
¹Fault lists are only displayed, and can only be deleted, if faults have occurred.
C Overview of diagnostics codes
Setting level ValuesUnit Increment, select, explanation
Default set-ting
Own settingMin. Max.
d.00 Heating maximum output – – kW The maximum heating output variesdepending on the product.
→ Section "Technical data"
→ Section"Technical
data"
Adjustable
d.01 Pump overrun in heatingmode
1 60 min 1 5 Adjustable
d.02 Burner anti-cycling timein heating mode
2 60 min 1 20 Adjustable
d.04 Water temperature in thecylinder
Current value ℃ – – Notadjustable
d.05 Determined heating flowset target temperature
Current value℃ – – Not
adjustable
d.07 Set target temperaturefor the domestic hot watercylinder
Current value ℃ – – Notadjustable
d.08 Status of the 230 V ther-mostat
Current value – 0 = Room thermostat open (no heatrequirement)
1 = Room thermostat closed (heatrequirement)
– Notadjustable
d.09 Heating flow set targettemperature that is set on theeBUS room thermostat
Current value – – – Notadjustable
d.10 Status of the internalpump in the heating circuit
Current value – off / on – Notadjustable
d.11 Status of the heating cir-cuit's shunt pump
Current value – off / on – Notadjustable
d.13 Status of the hot watercircuit's circulation pump
Current value – off / on – Notadjustable
d.16 Status of the 24 V roomthermostat
Current value – off = Heating off
on = Heating on
– Notadjustable
d.17 Heating control – – – off = Flow temperature
on = Return temperature (adjustmentfor underfloor heating. If you have ac-tivated the return temperature control,the automatic heating output determ-ination function is not active.)
0 Adjustable
d.18 Pump overrun operatingmode
1 3 – 1 = Comfort (continuously operatingpump)
3 = Eco (intermittent pump mode –for the dissipation of the residual heatafter hot water generation at an ex-tremely low heat demand)
1 Adjustable
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 29
Setting level ValuesUnit Increment, select, explanation
Default set-ting
Own settingMin. Max.
d.20 Maximum hot water settarget temperature
50 60 ℃ 1 50 Adjustable
d.23 Status of the heating de-mand
Current value – off = Heating off (Summer mode)
on = Heating on
– Notadjustable
d.24 Status of the pressuremonitor
0 1 – off = Not switched
on = Switched
– Notadjustable
d.25 Status of the requirementto reheat the cylinder or forthe hot water warm start fromthe eBUS thermostat
Current value – off = Function deactivated
on = Function activated
– Notadjustable
d.27 Function of relay 1 (multi-functional module)
1 10 – 1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (omitted)
8 = eBUS remote control
9 = Legionella protection pump
10 = Solar valve
1 Adjustable
d.28 Function of relay 2 (multi-functional module)
1 10 – 1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (omitted)
8 = eBUS remote control
9 = Legionella protection pump
10 = Solar valve
2 Adjustable
d.31 Automatic filling device 0 2 – 0 = Manual
1 = Semi-automatic
2 = Automatic
0 Adjustable
d.33 Fan speed target value Current value rpm Fan speed = Display value x 100 – Notadjustable
d.34 Value for the fan speed Current value rpm Fan speed = Display value x 100 – Notadjustable
d.40 Heating flow temperature Current value ℃ – – Notadjustable
d.41 Heating return temperat-ure
Current value ℃ – – Notadjustable
d.43 Heating curve 0.2 4 – 0.1 1.2 Adjustable
d.45 Value for the base pointof the heating curve
15 30 – 1 20 Adjustable
d.47 Outside temperature Current value ℃ – – Notadjustable
d.50 Correction of the min-imum fan speed
0 3000 rpm 1
Fan speed = Display value x 10
600 Adjustable
d.51 Correction of the max-imum fan speed
-2500 0 rpm 1
Fan speed = Display value x 10
-1000 Adjustable
d.58 Solar circuit reheating 0 3 – 0 = Boiler's Legionella protectionfunction deactivated
3 = Hot water activated (target valuemin. 60 °C)
0 Adjustable
d.60 Number of blocks by thetemperature sensor
Current value – – – Notadjustable
d.61 Number of successfulignitions
Current value – – – Notadjustable
d.62 Night set-back 0 30 – 1 0 Adjustable
Appendix
30 Installation and maintenance instructions ecoTEC plus 0020238195_01
Setting level ValuesUnit Increment, select, explanation
Default set-ting
Own settingMin. Max.
d.64 Average burner ignitiontime
Current value s – – Notadjustable
d.65 Maximum burner ignitiontime
Current value s – – Notadjustable
d.66 Activation of the warmstart function for hot water
– – – off = Function deactivated
on = Function activated
1 Adjustable
d.67 Remaining burner anti-cycling time (setting underd.02)
Current value min – – Notadjustable
d.68 Number of unsuccessfulignitions at 1st attempt
Current value – – – Notadjustable
d.69 Number of unsuccessfulignitions at 2nd attempt
Current value – – – Notadjustable
d.71 Maximum heating flow settarget temperature
45 80 ℃ 1 75 Adjustable
d.75 Maximum cylinder reheat-ing time
20 90 min 1 45 Adjustable
d.77 Max. cylinder reheating – – kW 1
→ Section "Technical data"
– Adjustable
d.78 DHW max. flow temperat-ure
50 80 ℃ 1 – Adjustable
d.80 Running time in heatingmode
Current value h – – Notadjustable
d.81 Running time in DHWmode
Current value h – – Notadjustable
d.82 Number of burner igni-tions in heating mode
Current value – Number of ignitions = Display value x100
– Notadjustable
d.83 Number of burner igni-tions in DHW mode
Current value – Number of ignitions = Display value x100
– Notadjustable
d.84 Maintenance in 0 3000 h Number of hours = Display value x 10 300 Notadjustable
d.85 Increase in the min. out-put (heating and DHW mode)
– – kW 1
→ Section "Technical data"
– Adjustable
d.90 Status of the eBUS roomthermostat
Current value – off = Not connected
on = Connected
– Notadjustable
d.93 Setting the product code 0 99 – 1 – Adjustable
d.94 Delete fault list 0 1 – off = No
on = Yes
– Adjustable
d.95 Software versions – – – 1 = Main PCB
2 = Interface PCB
– Adjustable
d.96 Reset to factory setting – – – 0 = No
1 = Yes
– Adjustable
d.128 Heating minimum targetvalue
10 75 ℃ 1 10 Adjustable
d.129 Hot water minimum tar-get value
35(com-bina-tionunit)
45(pureboiler)
60 ℃ 1 35 Adjustable
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 31
D Status codes – Overview
Status code Meaning
Displays in heating mode
S. 0 Heating mode: No requirement
S.01 Heating mode: Advance fan operation
S.02 Heating mode: Pump pre-run
S.03 Heating mode: Burner ignition
S.04 Heating mode: Burner on
S.05 Heating mode: Pump/fan overrun
S.06 Heating mode: Fan overrun
S.07 Heating mode: Pump overrun
S.08 Heating mode: Temporary shutdown after heating procedure
Display in hot water handling mode with cylinder
S.20 Hot water handling mode: Requirement
S.21 Hot water handling mode: Advance fan operation
S.22 Hot water handling mode: Pump pre-run
S.23 Hot water handling mode: Burner ignition
S.24 DHW mode: Burner on
S.25 DHW mode: Pump/fan overrun
S.26 DHW mode: Fan overrun
S.27 DHW mode: Pump overrun
S.28 Hot water handling mode: Temporary shutdown of the burner
Other displays
S.30 Room thermostat is blocking heating mode.
S.31 No heating demand: Summer mode, eBUS controller, waiting period
S.32 Fan waiting time: Fan speed outside of the tolerance values
S.34 Frost protection active
S.39 Underfloor heating contact open
S.42 Flue non-return flap closed
S.46 Frost protection mode (Comfort): Minimum load
S.53 Product in waiting period/operation block function due to low water pressure (flow/return spread too large)
S.54 Waiting period: Low water pressure in the circuit (flow/return spread too large)
S.88 Product purging active
S.91 Maintenance: Demo mode
S.96 Automatic test programme: Return temperature sensor, heating demands blocked.
S.98 Automatic test programme: Return temperature sensor, heating demands blocked.
S.99 Internal automatic test programmes
S.108 Purging the combustion chamber, fan in operation
S.109 Product's standby mode activated
Appendix
32 Installation and maintenance instructions ecoTEC plus 0020238195_01
E Overview of fault codes
Fault code Meaning Possible cause
F.00 Fault: Flow temperature sensor NTC plug not plugged in or has come loose, multiple plug on the PCB notplugged in correctly, interruption in cable harness, NTC sensor defective
F.01 Fault: Return temperature sensor NTC plug not plugged in or has come loose, multiple plug on the PCB notplugged in correctly, interruption in cable harness, NTC sensor defective
F.10 Short circuit: Flow temperature sensor NTC sensor defective, short circuit in the cable harness, cable/casing
F.11 Short circuit: Return temperature sensor NTC sensor defective, short circuit in the cable harness, cable/casing
F.12 andF.91
Short circuit: Cylinder temperaturesensor
NTC sensor defective, short circuit in the cable harness, cable/casing
F.13 Short circuit: Domestic hot water cylindertemperature sensor
NTC sensor defective, short circuit in the cable harness, cable/casing
F.20 Safety switch-off: Overheating temperat-ure reached
Incorrect earth connection between cable harness and product, flow or returnNTC defective (loose connection), black discharge via ignition cable, ignitionplug or ignition electrode
F.23 Safety switch-off: Temperature differencetoo great (NTC1/NTC2)
Pump blocked, insufficient pump output, air in product, flow and return NTCsensors connected the wrong way round
F.24 Safety switch-off: Temperature rise toofast
Pump blocked, insufficient pump output, air in product, system pressure toolow, non-return valve blocked/incorrectly installed
F.25 Safety switch-off: Flue gas temperaturetoo high
Break in plug connection for optional flue gas safety cut-out (STB), break incable harness
F.27 Safety switch-off: Fault in flame detection Moisture on the electronics, electronics (flame monitor) defective, gas solen-oid valve leaking
F.28 Fault: Ignition unsuccessful when startingup
Gas meter defective or gas pressure monitor has triggered, air in gas, gasflow pressure too low, thermal isolator device (TAE) has triggered, incorrectgas restrictor, incorrect spare gas valve, fault on the gas valve, multiple plugon PCB incorrectly plugged in, break in cable harness, ignition system (ig-nition transformer, ignition cable, ignition plug, ignition electrode) defective,ionisation current interrupted (cable, electrode), incorrect earthing of product,electronics defective
F.29 Fault: Flame loss Gas supply temporarily stopped, flue gas recirculation, incorrect earthing ofproduct, ignition transformer has spark failure
F.32 Fan frost protection function active: Fanspeed outside the tolerance values
Plug on fan not correctly plugged in, multiple plug on PCB not correctlyplugged in, break in cable harness, fan blocked, Hall sensor defective, elec-tronics defective
F.49 eBUS fault: Voltage too low Short circuit on eBUS, eBUS overload or two power supplies with differentpolarities on the eBUS
F.61 Fault: Gas valve control system Short circuit/short to earth in cable harness for the gas valve, gas valvedefective (coils shorted to earth), electronics defective
F.62 Fault: Gas valve switch-off control Delayed switch-off of gas valve, delayed extinguishing of flame signal, gasvalve leaking, electronics defective
F.63 Fault: EEPROM Electronics defective
F.64 Fault: Electronics/sensor/analogue-to-digital converter
Flow or return NTC short circuited, electronics defective
F.65 Fault: Electronics temperature too high Electronics overheating due to external influences, electronics defective
F.67 Value sent back by ASIC is incorrect(flame signal)
Implausible flame signal, electronics defective
F.68 Fault: Unstable flame (analogue input) Air in gas, gas flow pressure too low, incorrect air ratio, incorrect gas re-strictor, ionisation flow interruption (cable, electrode)
F.70 Invalid product code (DSN) Display and PCB replaced at same time and Device Specific Number notreset, wrong or missing output range coding resistance
F.71 Fault: Flow/return temperature sensor Flow temperature sensor signalling constant value: Flow temperature sensorincorrectly positioned on supply pipe, flow temperature sensor defective
F.72 Fault: Deviation in the water pressuresensor/return temperature sensor
Flow/return NTC temperature difference too great → flow and/or return tem-perature sensor defective
F.77 Fault: Condensate or smoke No response, flue non-return flap defective
F.78 Interruption to DHW outlet sensor atexternal controller
UK link box is connected, but hot water NTC not bridged
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 33
Fault code Meaning Possible cause
F.83 Fault: Dry fire When the burner starts, the temperature change registered at the flow orreturn temperature sensor is non-existent or too small: Insufficient waterin the product, the flow or return temperature sensor is not in the correctposition on the pipe
F.84 Fault: Flow/return temperature sensor Values not consistent, difference < -6 K
Flow and return temperature sensors signalling implausible values: Flow andreturn temperature sensors have been inverted, flow and return temperaturesensors have not been correctly installed
F.85 Fault: Temperature sensor The flow and/or return temperature sensors have been installed on the samepipe/incorrect pipe
Temperature sensor not connected or is connected incorrectly
F.86 Fault: Underfloor heating contact Underfloor heating contact open, sensor disconnected or defective
F.87 Fault: Electrodes Electrodes not connected or they are connected incorrectly, short circuit inthe cable harness
F.88 Fault: Gas valve Gas valve not connected or it is connected incorrectly, short circuit in thecable harness
Connection No communication between the PCBand the user interface
Electronics defective
Appendix
34 Installation and maintenance instructions ecoTEC plus 0020238195_01
F Connection diagram
X14LN
X12
X51
X51
X20
16
19
3154
56
13
X51
X20
X40 X51
X30
X21
X41
X22
X14L
N
– +24V=RT BUS
Burneroff
RT
X1X1
06X32
X12
X35
X1
RT
X21
LN
LN
15
eBUS
Burner off
X106
M
4321
N
L
24V
230V~
24V
230V
~
2
7
9
14
3
5
6
10
11 12
8
1 Main PCB
2 Interface PCB
3 Control system
4 Temperature sensor in the heating flow
5 Temperature sensor in the heating return
6 Fan
7 Gas valve assembly
8 Heating pump
9 Monitoring electrode
10 Room thermostat
11 Main power supply
12 Ignition electrode
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 35
G Connection diagram, 30 kW
X14LN
X12
X51
X51
X20
16
19
3154
56
13
X51
X20
X40 X51
X30
X21
X41
X22
X14L
N
– +24V=RT BUS
Burneroff
RT
X1X1
06X32
X12
X35
X1
RT
X21
LN
LN
15
eBUS
Burner off
X106
M
4321
N
L
24V
230V~
24V
230V
~
2
7
9
14
3
5
6
10
11 12
8
1 Main PCB
2 Interface PCB
3 Control system
4 Temperature sensor in the heating flow
5 Temperature sensor in the heating return
6 Fan
7 Gas valve assembly
8 Heating pump
9 Monitoring electrode
10 Room thermostat
11 Main power supply
12 Ignition electrode
Appendix
36 Installation and maintenance instructions ecoTEC plus 0020238195_01
H Opening in the flue pipe
GN
N
MM
A
II
O
H
H
CBLJ
Q Q
Q
Q
Q
K
P
D, EF
I
S
R
T
H.1 Positioning of the opening of a fan-supported flue gas pipe
Installation siteMinimum dimen-sions
A Directly below an opening, air bricks, opening windows, etc., that can be opened. 300 mm
B Above an opening, air bricks, opening windows, etc., that can be opened. 300 mm
C Horizontally to an opening, air bricks, opening windows, etc., that can be opened. 300 mm
DBelow temperature-sensitive building components, e.g. plastic gutters, down pipes or wastewaterpipes
75 mm
E Below eaves 200 mm
F Below balconies or car port roofs 200 mm
G From vertical wastewater pipes or down pipes 150 mm
H From external or internal corners 200 mm
I Above floors, roofs or balconies 300 mm
J From a surface facing a terminal 600 mm
K From a terminal facing a terminal 1,200 mm
L From an opening in the car port (e.g. door, window) which leads into the dwelling 1,200 mm
M Vertical from a terminal on the same wall 1,500 mm
N Horizontal from a terminal on the same wall 300 mm
O From the wall on which the terminal has been installed 0 mm
P From a vertical structure on the roof 300 mm
Q Above the roof area 300 mm
R Horizontal from adjacent windows on pitched or flat roofs 600 mm
S Above adjacent windows on pitched or flat roofs 600 mm
T Below adjacent windows on pitched or flat roofs 2,000 mm
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 37
H.2 Horizontal terminal positioning
BS 5440-1 recommends that fanned flue chimney terminals should be positioned as follows:
a) at least 2 m from an opening in the building directly opposite, and
b) so that the products of combustion are not directed to discharge directly across a boundary if the products are likely tocause a nuisance to a neighbour or discharge over a walkway or patio.
For IE see current issue of IS 813.
For boilers covered within this manual.
1) Dimensions D, E, F and G:
These clearances may be reduced to 25 mm without affecting the performance of the boiler. In order to ensure that the con-densate plume does not affect adjacent surfaces the terminal should be extended as shown below.
Balcony/eaves
Gutter
Adequately secured air/flue gas pipe
The flue pipe mustprotrude beyond any overhang
2) Dimension H:
This clearance may be reduced to 25 mm without affecting the performance of the boiler. However, in order to ensure thatthe condensate plume does not affect adjacent surfaces a clearance of 300 mm is preferred.
For 1 and 2 above you can use a flue gas management kit to enable the termination point to be positioned and directed awayfrom the building fabric.
Appendix
38 Installation and maintenance instructions ecoTEC plus 0020238195_01
I Commissioning Checklist
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Benchmark Commissioning and Servicing SectionIt is a requirement that the boiler is installed and commissioned to the
completed in full.
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 39
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
CONTROLS
Optimum start control
Fitted
Fitted
Fitted
Fitted
ALL SYSTEMS
Yes
Yes
CENTRAL HEATING MODE
OR
mbar OR mbar
COMBINATION BOILERS ONLY
Yes
Yes
DOMESTIC HOT WATER MODE
OR
mbar OR mbar
Yes Temperature
CONDENSING BOILERS ONLY
Yes
ALL INSTALLATIONS
AND ² Ratio
AND ² Ratio
Yes
Yes
Yes
Yes
Appendix
40 Installation and maintenance instructions ecoTEC plus 0020238195_01
It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.
Service Provider
SERVICE RECORD
SERVICE 01
AND ² %AND ² %
SERVICE 02
AND ² %AND ² %
SERVICE 03
AND ² %AND ² %
SERVICE 04
AND ² %AND ² %
SERVICE 05
AND ² %AND ² %
SERVICE 06
AND ² %AND ² %
SERVICE 07
AND ² %AND ² %
SERVICE 08
AND ² %AND ² %
SERVICE 09
AND ² %AND ² %
SERVICE 10
AND ² %AND ² %
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 41
PRIOR TO CO AND COMBUSTION RATIO CHECKThe boiler manufacturer’s installation instructions should have been followed, gas type verified and gas
supply pressure/rate checked as required prior to commissioning.As part of the installation process, especially where a flue has been fitted by persons other than the boiler installer, visually check the integrity of the whole flue system to confirm that all components are correctly assembled, fixed and supported. Check that manufacturer’s max. flue lengths have not been
exceeded and all guidance has been followed (e.g. Gas Safe Technical Bulletin TB008).The flue gas analyser should be of the correct type, as specified by BS 7967
Prior to its use, the flue gas analyser should have been maintained and calibrated as specified by the manufacturer. The installer must have the relevant competence for use of the analyser.
Check and zero the analyser IN FRESH AIR as per analyser manufacturer’s instructions.
NOTETHE AIR GAS RATIO VALVE IS FACTORY
SET AND MUST NOT BE ADJUSTED DURING COMMISSIONING UNLESS THIS ACTION IS RECOMMENDED FOLLOWING CONTACT WITH THE MANUFACTURER.
If any such adjustment is recommended and further checking of the boiler is required the
installer/service engineer must be competent to carry out this work and to use the flue gas
analyser accordingly.If the boiler requires conversion to operate with
a different gas family (e.g. conversion from natural gas to LPG) separate guidance will be
provided by the boiler manufacturer
CARRY OUT FLUE INTEGRITY CHECK USING ANALYSERInsert analyser probe into air inlet test point and allow readings to stabilise.NOTE - where no air inlet test point is provided then a flue integrity check
with the analyser is not possible. The installer should verify that flue integrity has been visually checked in accordance with the “Prior to
CO and combustion ratio check” box above before proceeding to the “Check CO and combustion ratio at maximum rate” stage below.
SET BOILER TO MINIMUM RATEIn accordance with boiler instructions, set boiler to operate at minimum rate (to
minimum load condition). Allow sufficient time for combustion to stabilise.NOTE - If manufacturer’s instructions do not specify how to set boiler to minimum
rate contact Technical Helpline for advice.
CHECK CO AND COMBUSTION RATIO AT MINIMUM RATEWith boiler still set at minimum rate, insert analyser probe into flue gas sampling
point. Allow readings to stabilise before recording.NOTE - If no flue gas sampling point is present and the correct procedure is not
specified in the manual, consult boiler manufacturer for guidance.
CHECK CO AND COMBUSTION RATIO AT MAX. RATEWith boiler still set at maximum rate, insert analyser probe into flue gas
sampling point. Allow readings to stabilise before recording.NOTE - If no flue gas sampling point is present and the correct procedure is
not specified in the manual, consult boiler manufacturer for guidance.
SET BOILER TO MAXIMUM RATEIn accordance with boiler instructions, set boiler to operate at max. rate
(full load condition). Allow sufficient time for combustion to stabilise.NOTE - Do not insert analyser probe during this period to avoid
possible “flooding” of sensor.
IsCO less than 350ppm andCO/CO2 ratio
less than 0.004
IsO2 20.6%
andCO2 < 0.2%
IsCO less than 350ppm andCO/CO2 ratio
less than 0.004
BOILER IS OPERATING SATISFACTORILYno further actions required.
Ensure test points are capped, boiler case is correctly replaced and all other commissioning procedures are completed.
Complete Benchmark Checklist, recording CO and combustion ratio readings as required.
TURN OFF APPLIANCE AND CALL MANUFACTURER’S TECHNICAL HELPLINE
FOR ADVICE.THE APPLIANCE MUST NOT BE
COMMISSIONED UNTIL PROBLEMS ARE IDENTIFIED AND RESOLVED.
VERIFY FLUE INTEGRITYAnalyser readings indicate that combustion products and inlet air must be mixing. Further investigation of
the flue is therefore required.Check that flue components are assembled, fixed and supported as per boiler/flue manufacturer’s
instructions.Check that flue and flue terminal are not obstructed.
IsCO less than
335ppmand
CO/CO2 ratio less than 0.004
IsO2 20.6%
andCO2 < 0.2%
Check all seals around the appliance burner, internal flue seals, door and case seals.
Rectify where necessary.
TURN OFF APPLIANCE AND CALL MANUFACTURER’S TECHNICAL HELPLINE
FOR ADVICE.THE APPLIANCE MUST NOT BE
COMMISSIONED UNTIL PROBLEMS ARE IDENTIFIED AND RESOLVED. IF
COMMISSIONING CANNOT BE FULLY COMPLETED, THE APPLIANCE MUST BE
DISCONNECTED FROM THE GAS SUPPLY IN ACCORDANCE WITH THE GSIUR.
NOTE: Check and record CO and combustion ratio at both max. and min. rate before contacting the
manufacturer.
NO
NO
NO
NO
NO
YES
YES
YESYES
YES
Appendix
42 Installation and maintenance instructions ecoTEC plus 0020238195_01
J Technical data
Technical data – Heating
VU 126/6-5 OVZ (H-GB) VU 156/6-5 OVZ (H-GB) VU 186/6-5 OVZ (H-GB)
Max. flow temperature adjustmentrange (default setting: 75 °C)
10 … 80 ℃ 10 … 80 ℃ 10 … 80 ℃
Maximum permissible pressure 0.3 MPa
(3.0 bar)
0.3 MPa
(3.0 bar)
0.3 MPa
(3.0 bar)
Nominal water flow (ΔT = 20 K) 530 l/h 655 l/h 788 l/h
Nominal water flow at Pmin(ΔT = 20 K)
195 l/h 195 l/h 215 l/h
Nominal water flow (ΔT = 30 K) 353 l/h 436 l/h 525 l/h
Nominal water flow at Pmin(ΔT = 30 K)
130 l/h 130 l/h 145 l/h
Approximate value for thecondensate volume (pH valuebetween 3.5 and 4.0) at 50/30 °C
1.23 l/h 1.53 l/h 1.84 l/h
VU 246/6-5 OVZ (H-GB) VU 306/6-5 OVZ (H-GB) VU 356/6-5 OVZ (H-GB)
Max. flow temperature adjustmentrange (default setting: 75 °C)
10 … 80 ℃ 10 … 80 ℃ 10 … 80 ℃
Maximum permissible pressure 0.3 MPa
(3.0 bar)
0.3 MPa
(3.0 bar)
0.3 MPa
(3.0 bar)
Nominal water flow (ΔT = 20 K) 1,059 l/h 1,313 l/h 1,511 l/h
Nominal water flow at Pmin(ΔT = 20 K)
260 l/h 300 l/h 345 l/h
Nominal water flow (ΔT = 30 K) 706 l/h 876 l/h 1,008 l/h
Nominal water flow at Pmin(ΔT = 30 K)
170 l/h 200 l/h 230 l/h
Approximate value for thecondensate volume (pH valuebetween 3.5 and 4.0) at 50/30 °C
2.47 l/h 3.06 l/h 3.57 l/h
Technical data – G20 power/loading G20
VU 126/6-5 OVZ (H-GB)
VU 156/6-5 OVZ (H-GB)
VU 186/6-5 OVZ (H-GB)
VU 246/6-5 OVZ (H-GB)
Maximum heat output 12 kW 15 kW 18 kW 24 kW
Effective output range (P)at 40/30 °C
4.8 … 13.0 kW 4.8 … 16.2 kW 5.3 … 19.5 kW 6.5 … 26.2 kW
Effective output range (P)at 50/30 °C
4.7 … 12.8 kW 4.7 … 15.9 kW 5.2 … 19.1 kW 6.3 … 25.7 kW
Effective output range (P)at 80/60 °C
4.5 … 12.3 kW 4.5 … 15.2 kW 5.0 … 18.3 kW 6.1 … 24.6 kW
Domestic hot water heatoutput (P)
4.4 … 18.0 kW 4.4 … 18.0 kW 5.0 … 25.2 kW 6.0 … 30.0 kW
Maximum heat input –heating (Q max.)
12.3 kW 15.3 kW 18.4 kW 24.7 kW
Minimum heat input – heat-ing (Q min.)
4.5 kW 4.5 kW 5.0 kW 6.1 kW
Maximum heat input – hotwater (Q max.)
18.4 kW 18.4 kW 25.7 kW 30.6 kW
Minimum heat input – hotwater (Q min.)
4.5 kW 4.5 kW 5.1 kW 6.1 kW
VU 306/6-5 OVZ (H-GB)
VU 356/6-5 OVZ (H-GB)
Maximum heat output 30 kW 35 kW
Effective output range (P)at 40/30 °C
7.6 … 32.4 kW 7.6 … 37.8 kW
Effective output range (P)at 50/30 °C
7.5 … 31.8 kW 7.5 … 37.1 kW
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 43
VU 306/6-5 OVZ (H-GB)
VU 356/6-5 OVZ (H-GB)
Effective output range (P)at 80/60 °C
7.2 … 30.5 kW 7.1 … 35.1 kW
Domestic hot water heatoutput (P)
7.1 … 35.0 kW 7.1 … 35.1 kW
Maximum heat input –heating (Q max.)
30.6 kW 35.7 kW
Minimum heat input – heat-ing (Q min.)
7.2 kW 7.1 kW
Maximum heat input – hotwater (Q max.)
35.7 kW 35.7 kW
Minimum heat input – hotwater (Q min.)
7.2 kW 7.1 kW
Technical data – General
VU 126/6-5 OVZ (H-GB)
VU 156/6-5 OVZ (H-GB)
VU 186/6-5 OVZ (H-GB)
VU 246/6-5 OVZ (H-GB)
Gas category I2H I2H I2H I2H
Diameter of the gas pipe 1/2 inch 1/2 inch 1/2 inch 1/2 inch
Diameter of the heating connec-tions
3/4 inch 3/4 inch 3/4 inch 3/4 inch
Expansion relief valve connector(min.)
15 mm 15 mm 15 mm 15 mm
Condensate drain pipework (min.) 21.5 mm 21.5 mm 21.5 mm 21.5 mm
G20 gas supply pressure 2.0 kPa
(20.0 mbar)
2.0 kPa
(20.0 mbar)
2.0 kPa
(20.0 mbar)
2.0 kPa
(20.0 mbar)
Gas flow at P max. – hot water(G20)
1.9 m³/h 1.9 m³/h 2.7 m³/h 3.2 m³/h
Gas flow at P max. – heating mode(G20)
1.3 m³/h 1.6 m³/h 1.9 m³/h 2.6 m³/h
Gas flow at P min. (G20) 0.480 m³/h 0.480 m³/h 0.533 m³/h 0.646 m³/h
CE number (PIN) CE-0063CP3646 CE-0063CP3646 CE-0063CP3646 CE-0063CP3646
Flue gas mass rate in heatingmode at P min.
2.08 g/s 2.08 g/s 2.31 g/s 2.80 g/s
Flue gas mass rate in heatingmode at P max.
5.5 g/s 6.9 g/s 8.3 g/s 11.1 g/s
Flue gas mass rate in hot waterhandling mode at P max.
8.3 g/s 8.3 g/s 11.6 g/s 13.8 g/s
Flue gas temperature (80 °C/60 °C)at P max.
55 ℃ 55 ℃ 60 ℃ 77 ℃
Flue gas temperature (80 °C/60 °C)at P min.
55 ℃ 55 ℃ 55 ℃ 55 ℃
Flue gas temperature (50 °C/30 °C)at P max.
43 ℃ 48 ℃ 51 ℃ 60 ℃
Flue gas temperature (50 °C/30 °C)at P min.
32 ℃ 32 ℃ 34 ℃ 35 ℃
Flue gas temperature in hot waterhandling mode
71 ℃ 71 ℃ 69 ℃ 68 ℃
Flue gas temperature when over-heating
105 ℃ 105 ℃ 105 ℃ 95 ℃
Released system types C13, C33, C43, C53 C13, C33, C43, C53 C13, C33, C43, C53 C13, C33, C43, C53
Nominal efficiency at 50/30 °C 104.0 % 104.0 % 104.0 % 104.0 %
Nominal efficiency at 40/30 °C 106.0 % 106.0 % 106.0 % 106.0 %
NOx class 6 6 6 6
Product dimensions, width 375 mm 375 mm 375 mm 375 mm
Product dimensions, depth 320 mm 320 mm 320 mm 320 mm
Product dimensions, height 600 mm 600 mm 600 mm 600 mm
Appendix
44 Installation and maintenance instructions ecoTEC plus 0020238195_01
VU 126/6-5 OVZ (H-GB)
VU 156/6-5 OVZ (H-GB)
VU 186/6-5 OVZ (H-GB)
VU 246/6-5 OVZ (H-GB)
Net weight 23 kg 23 kg 23 kg 23 kg
Weight when filled with water 27 kg 27 kg 27 kg 28 kg
VU 306/6-5 OVZ (H-GB)
VU 356/6-5 OVZ (H-GB)
Gas category I2H I2H
Diameter of the gas pipe 1/2 inch 1/2 inch
Diameter of the heating connec-tions
3/4 inch 3/4 inch
Expansion relief valve connector(min.)
15 mm 15 mm
Condensate drain pipework (min.) 21.5 mm 21.5 mm
G20 gas supply pressure 2.0 kPa
(20.0 mbar)
2.0 kPa
(20.0 mbar)
Gas flow at P max. – hot water(G20)
3.8 m³/h 3.8 m³/h
Gas flow at P max. – heating mode(G20)
3.2 m³/h 3.8 m³/h
Gas flow at P min. (G20) 0.762 m³/h 0.762 m³/h
CE number (PIN) CE-0063CP3646 CE-0063CP3646
Flue gas mass rate in heatingmode at P min.
3.30 g/s 3.3 g/s
Flue gas mass rate in heatingmode at P max.
13.8 g/s 16.1 g/s
Flue gas mass rate in hot waterhandling mode at P max.
16.1 g/s 16.1 g/s
Flue gas temperature (80 °C/60 °C)at P max.
86 ℃ 86 ℃
Flue gas temperature (80 °C/60 °C)at P min.
56 ℃ 56 ℃
Flue gas temperature (50 °C/30 °C)at P max.
60 ℃ 60 ℃
Flue gas temperature (50 °C/30 °C)at P min.
37 ℃ 37 ℃
Flue gas temperature in hot waterhandling mode
75 ℃ 75 ℃
Flue gas temperature when over-heating
104 ℃ 104 ℃
Released system types C13, C33, C43, C53 C13, C33, C43, C53
Nominal efficiency at 50/30 °C 104.0 % 104.0 %
Nominal efficiency at 40/30 °C 106.0 % 106.0 %
NOx class 6 6
Product dimensions, width 375 mm 375 mm
Product dimensions, depth 320 mm 320 mm
Product dimensions, height 600 mm 600 mm
Net weight 23 kg 23 kg
Weight when filled with water 28 kg 28 kg
Technical data – Electrics
VU 126/6-5 OVZ (H-GB) VU 156/6-5 OVZ (H-GB) VU 186/6-5 OVZ (H-GB)
Electric connection 230 V / 50 Hz 230 V / 50 Hz 230 V / 50 Hz
Built-in fuse (slow-blow) T2/2A, 250V T2/2A, 250V T2/2A, 250V
Max. electrical power consump-tion
23 W 29 W 35 W
Appendix
0020238195_01 ecoTEC plus Installation and maintenance instructions 45
VU 126/6-5 OVZ (H-GB) VU 156/6-5 OVZ (H-GB) VU 186/6-5 OVZ (H-GB)
Standby electrical power con-sumption
2 W 2 W 2 W
Level of protection IPX4D IPX4D IPX4D
VU 246/6-5 OVZ (H-GB) VU 306/6-5 OVZ (H-GB) VU 356/6-5 OVZ (H-GB)
Electric connection 230 V / 50 Hz 230 V / 50 Hz 230 V / 50 Hz
Built-in fuse (slow-blow) T2/2A, 250V T2/2A, 250V T2/2A, 250V
Max. electrical power consump-tion
36 W 44 W 44 W
Standby electrical power con-sumption
2 W 2 W 2 W
Level of protection IPX4D IPX4D IPX4D
Index
46 Installation and maintenance instructions ecoTEC plus 0020238195_01
Index
AAir/flue pipe, installed ............................................................ 4Article number ....................................................................... 6Auxiliary relay ...................................................................... 15BBurner anti-cycling time....................................................... 19CCalling up the fault memory................................................. 19CE label ................................................................................. 7Check programmes ............................................................. 15Checking the burner ............................................................ 24Cleaning the condensate siphon......................................... 24Cleaning the heat exchanger .............................................. 23CO₂ content
Checking.................................................................. 18, 22Combustion air ...................................................................... 5Competent person................................................................. 3Completing inspection work ................................................ 24Completing maintenance work ............................................ 24Condensate discharge pipe................................................. 12Contact details..................................................................... 15Controller............................................................................. 13Corrosion............................................................................... 5DDecommissioning ................................................................ 24Decommissioning the product ............................................. 24Documents ............................................................................ 6Draining the product ............................................................ 24EElectricity ............................................................................... 4Ending, installation assistant ............................................... 15FFault codes.......................................................................... 19Filling mode ......................................................................... 15Filling the condensate siphon.............................................. 17Filling the heating installation .............................................. 17Flue gas................................................................................. 4Flue gas route ....................................................................... 4Front casing, closed .............................................................. 4Frost ...................................................................................... 5GGas connection value.......................................................... 17HHanding over to the operator............................................... 19Heating partial load ............................................................. 15Hot water temperature......................................................... 15IIdentification plate ................................................................. 6If you smell gas ..................................................................... 3Inspection opening ................................................................ 4Inspection work ............................................................. 21, 25Installation assistant, ending ............................................... 15Installation assistants, restarting ......................................... 15Installation site................................................................... 4–5Installer level, calling up ...................................................... 14Installing the front casing....................................................... 9Installing the side section ...................................................... 9Intended use.......................................................................... 3LLanguage ............................................................................ 14
MMains connection ................................................................ 13Maintenance work ......................................................... 21, 25Minimum clearance ............................................................... 8Multi-functional module ....................................................... 15Multi-occupancy in overpressurised systems........................ 4OOpen-flued............................................................................. 4Operating concept ............................................................... 14PPower supply....................................................................... 13Preparing the repair work .................................................... 20Preparing, repair work ......................................................... 20QQualification........................................................................... 3RRegulations ........................................................................... 5Removing the air intake pipe............................................... 23Removing the burner........................................................... 23Removing the flue pipe........................................................ 23Removing the gas-air mixture unit....................................... 23Removing the side section .................................................... 9Replacing the burner ........................................................... 20Replacing the heat exchanger............................................. 20Replacing the main PCB ..................................................... 21Resetting the burner anti-cycling time................................. 19Return check valve................................................................ 4SSafety device......................................................................... 5Schematic drawing ................................................................ 5Serial number ........................................................................ 6Setting the burner anti-cycling time..................................... 19Spare parts.......................................................................... 22Starting, installation assistants ............................................ 15Status codes........................................................................ 14Supply of combustion air ....................................................... 4Switching on the product ..................................................... 17TTarget flow temperature ...................................................... 15Telephone number, competent person ............................... 15Test programmes ................................................................ 15Tool ....................................................................................... 5Transport ............................................................................... 3Transporting .......................................................................... 7Treating the heating water .................................................. 15UUnloading the box ................................................................. 7Unpacking the product .......................................................... 7User interface, replacing the PCB....................................... 21VVoltage .................................................................................. 4WWall-mounting the product .................................................... 8Weight ................................................................................... 8
0020238195_01 25.10.2016
supplierVaillant Ltd.
Nottingham Road Belper Derbyshire DE56 1JT
Telephone 0330 100 3461
[email protected] www.vaillant.co.uk
© These instructions, or parts thereof, are protected by copyright and may be reproduced or distributed only withthe manufacturer's written consent.
We reserve the right to make technical changes.
0020238195_01