ecovillage charrette - fall 2011
TRANSCRIPT
-
8/3/2019 EcoVillage Charrette - Fall 2011
1/97
EcoVillage CharretteOct. 22-26, 2011
-
8/3/2019 EcoVillage Charrette - Fall 2011
2/97
Workshop AKA Charrette
Charrette [shuh-ret]:
The word charrette may refer to any accelerated
collaborative session in which a group of designersdrafts a solution to a design problem.
Such charrettes serve as a way ofquickly generatinga design solution while integrating the aptitudes and
interests of a diverse group of people.
-
8/3/2019 EcoVillage Charrette - Fall 2011
3/97
Howard Street, Akron Charrette
CUDC students & staff
October 2007
-
8/3/2019 EcoVillage Charrette - Fall 2011
4/97
Design Process
-
8/3/2019 EcoVillage Charrette - Fall 2011
5/97
Design Process
Research
-
8/3/2019 EcoVillage Charrette - Fall 2011
6/97
Design Process
Research
Reflect
-
8/3/2019 EcoVillage Charrette - Fall 2011
7/97
Design Process
Research
Create
Reflect
-
8/3/2019 EcoVillage Charrette - Fall 2011
8/97
Design Process
Research
Review
Create
Reflect
-
8/3/2019 EcoVillage Charrette - Fall 2011
9/97
Design Process
Research
Review
Create
Reflect
-
8/3/2019 EcoVillage Charrette - Fall 2011
10/97
Design Process
Research
Review
Create
Reflect
-
8/3/2019 EcoVillage Charrette - Fall 2011
11/97
Design Process
Research
Review
Create
Reflect
-
8/3/2019 EcoVillage Charrette - Fall 2011
12/97
Design Process
Research
Review
Create
Reflect
-
8/3/2019 EcoVillage Charrette - Fall 2011
13/97
Design Process
Research
Review
Create
Reflect
-
8/3/2019 EcoVillage Charrette - Fall 2011
14/97
Schedule
Saturday, Oct. 22
10am-noon Community Mtg. #1
Discussion
Next steps
Noon-1:30pm Working Lunch
Review feedback w/ stakeholders
7-8pm Community Review Session #1
Students present preliminary ideas
Sunday, Oct. 23
10am-8pm Work Session at CUDC
4-5:00pm Community Review Session #2
Review session w/ stakeholders
Monday, Oct. 24
9am-5pm Work Session at CUDC
Prepare presentation and report
Wednesday, Oct. 26
7-8:30pm Final Community Meeting
-
8/3/2019 EcoVillage Charrette - Fall 2011
15/97
Schedule
Saturday, Oct. 22
10am-noon Community Mtg. #1
Discussion
Next steps
Noon-1:30pm Working Lunch
Review feedback w/ stakeholders
7-8pm Community Review Session #1
Students present preliminary ideas
Sunday, Oct. 23
10am-8pm Work Session at CUDC
4-5:00pm Community Review Session #2
Review session w/ stakeholders
Monday, Oct. 24
9am-5pm Work Session at CUDC
Prepare presentation and report
Wednesday, Oct. 26
7-8:30pm Final Community Meeting
-
8/3/2019 EcoVillage Charrette - Fall 2011
16/97
Submit Ideas Card
-
8/3/2019 EcoVillage Charrette - Fall 2011
17/97
EcoVillage CharretteExisting Conditions
-
8/3/2019 EcoVillage Charrette - Fall 2011
18/97
EcoVillage Goal:
To develop a model urban villagethat will realize the potential of urban
life in the most ecological way possible.
From Clevelands EcoVillage: Green and Affordable Housing Through a Network Alliance
by Wendy A. Kellogg and W. Dennis Keating
-
8/3/2019 EcoVillage Charrette - Fall 2011
19/97
EcoVillage Areas of Focus:
Cleveland EcoVillage is a demonstration project
that showcases best practices in:
Green Building
Transit Oriented Development Urban Agriculture
Societal Interdependence
-
8/3/2019 EcoVillage Charrette - Fall 2011
20/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
21/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
22/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
23/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
24/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
25/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
26/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
27/97
Land Use
-
8/3/2019 EcoVillage Charrette - Fall 2011
28/97
Zoning
-
8/3/2019 EcoVillage Charrette - Fall 2011
29/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
30/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
31/97
Land Availability
-
8/3/2019 EcoVillage Charrette - Fall 2011
32/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
33/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
34/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
35/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
36/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
37/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
38/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
39/97
EcoVillage CharrettePrevious Plans & Investments
-
8/3/2019 EcoVillage Charrette - Fall 2011
40/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
41/97
EcoVillage Vision
City Architecture, 1997
-
8/3/2019 EcoVillage Charrette - Fall 2011
42/97
EcoVillage Plan 2005
-
8/3/2019 EcoVillage Charrette - Fall 2011
43/97
EcoVillage Green Mobility Plan 2007
Streetscape Improvements on Lorain Avenue
Connection to Zone Rec: Rapid Station to Lorain
Madison Ave. Bridge re-design
Pedestrian wayfinding system
EcoVillage gateway identity
EcoVillage walking trail improvements
Traffic Calming: Speed reduction measures
Bicycle Connections: Bike lanes, paths, parking, transit
Bus Stop Improvements: Shelters, signage, access
Bus Route Planning: Proposed ECO circulator and carsharing
-
8/3/2019 EcoVillage Charrette - Fall 2011
44/97
Michael J. Zone Recreation Center
McKnight Associates, 2011
-
8/3/2019 EcoVillage Charrette - Fall 2011
45/97
EcoVillage Target Area Plan (TAP)
Analysis of existing housing stock
Infill housing recommendations
Green Infrastructure and bicyclingimprovements for W. 58th Street corridor
New neighborhood pathways through blocks
Fencing improvement effort, possibly in
collaboration with Cleveland Public Art
-
8/3/2019 EcoVillage Charrette - Fall 2011
46/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
47/97
Madison Avenue Pedestrian Bridge
-
8/3/2019 EcoVillage Charrette - Fall 2011
48/97
EcoVillage Transit Station
Opened in September 2004
$3.4 million project
GCRTAs first green Rapid Station
Does not include a park and ride limits parking to 20 spots
Intended to serve local neighborhood residents who walk or ride bicycles
-
8/3/2019 EcoVillage Charrette - Fall 2011
49/97
EcoVillage Green townhomes
Built in 2003
20 townhome units
Average annual heating/cooling costs of $400/year
Project used for educating local builders
On-site energy generation
-
8/3/2019 EcoVillage Charrette - Fall 2011
50/97
EcoVillage Green cottages
Products with low off-gassing of volatile organic compounds
(VOCs) including paints, cabinets and floor coverings
Enegy efficient building envelope, well insulated and air-sealed
Heating bills projected at $36/month average
Controlled ventilation to insure fresh indoor air
Energy efficient HVAC system, appliances, windows, and
lighting fixtures
Water saving products, including low-flow faucets and toilets
Native, drought tolerant landscaping, with rain barrels to
capture stormwater and the opportunity for a rain garden on
the three-bedroom home sites
Recycled and recyclable content products, including flooring,
carpet, and decking materials
Advanced framing and construction waste management
Detailed homeowners manual with maintenance tips.
-
8/3/2019 EcoVillage Charrette - Fall 2011
51/97
EcoVillage Amenities
-
8/3/2019 EcoVillage Charrette - Fall 2011
52/97
EcoVillage Amenities
Mary and Earl Simmons
-
8/3/2019 EcoVillage Charrette - Fall 2011
53/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
54/97
EcoVillage CharretteCommunicating ecological
values in the neighborhood
-
8/3/2019 EcoVillage Charrette - Fall 2011
55/97
Solar parking garage Cleveland Heights
-
8/3/2019 EcoVillage Charrette - Fall 2011
56/97
Solar bus shelter Cleveland Heights
-
8/3/2019 EcoVillage Charrette - Fall 2011
57/97
Solar crosswalks Cleveland Heights
-
8/3/2019 EcoVillage Charrette - Fall 2011
58/97
Modular Urban Raingarden St. Louis
-
8/3/2019 EcoVillage Charrette - Fall 2011
59/97
Streetscape bioretention Lansing, MI
-
8/3/2019 EcoVillage Charrette - Fall 2011
60/97
Streetscape bioretention Lansing, MI
-
8/3/2019 EcoVillage Charrette - Fall 2011
61/97
Streetscape bioretention Lansing, MI
-
8/3/2019 EcoVillage Charrette - Fall 2011
62/97
Street Edge Alternative Seattle
-
8/3/2019 EcoVillage Charrette - Fall 2011
63/97
Native Planting Front Yards
-
8/3/2019 EcoVillage Charrette - Fall 2011
64/97
Bicycle Amenities Cleveland Heights, Portland
-
8/3/2019 EcoVillage Charrette - Fall 2011
65/97
Plant Walls / Exterior Living Walls
-
8/3/2019 EcoVillage Charrette - Fall 2011
66/97
Helps insulate building
Reducing energy consumption
Protects facades from harsh weather elements
Improves air quality through biofiltration- Heavy metal reduction
- Dust reduction
Noise reduction Potential for biodiversity
Looks GREAT, although there are climate concerns
Benefits of Exterior Living Walls
-
8/3/2019 EcoVillage Charrette - Fall 2011
67/97
Deciduous climbers,such as Honeysuckle
and Wisteria, are
recommended for
this region
Types of plants
-
8/3/2019 EcoVillage Charrette - Fall 2011
68/97
English Ivy, an evergreen,
is also effective Sarah Lawrence College
Parking Structure (Yonkers, NY)
Types of plants
-
8/3/2019 EcoVillage Charrette - Fall 2011
69/97
Living WallNova Scotia Community College
Changes with every season
Purifies air
-
8/3/2019 EcoVillage Charrette - Fall 2011
70/97
Living WallSemiahmoo Sky Garden
Semiahmoo Library (Surrey, British
Columbia, Canada)
-
8/3/2019 EcoVillage Charrette - Fall 2011
71/97
Community composting
-
8/3/2019 EcoVillage Charrette - Fall 2011
72/97
Urban shepherding
Goats eat weeds & invasive plantsSheep mow lawns
-
8/3/2019 EcoVillage Charrette - Fall 2011
73/97
Sustainable businesses Neighborhood services
GreenShine waterless car wash, Orange Cty, CA CO2 Dry Cleaner, NYC
-
8/3/2019 EcoVillage Charrette - Fall 2011
74/97
Eco-branding & identity
Gordon Square Arts District + EcoVillage?
-
8/3/2019 EcoVillage Charrette - Fall 2011
75/97
Gordon Square Arts District + EcoVillage?
Gordon Square Arts District + EcoVillage?
-
8/3/2019 EcoVillage Charrette - Fall 2011
76/97
Gordon Square Arts District + EcoVillage?
Restaurant food scraps
Economic development
Creative Energy
Artists and Storytellers
Gordon Square Arts District + EcoVillage?
-
8/3/2019 EcoVillage Charrette - Fall 2011
77/97
Gordon Square Arts District + EcoVillage?
Restaurant food scraps
Economic development
Creative Energy
Artists and Storytellers
Fresh Food
Transit Access for Visitors
Renewable Energy
Green Housing
Eco-centric public art
-
8/3/2019 EcoVillage Charrette - Fall 2011
78/97
Eco-centric public art
Ana Garforth
Eco-centric local artists
-
8/3/2019 EcoVillage Charrette - Fall 2011
79/97
Charmaine Spencer
Eco-centric local artists
-
8/3/2019 EcoVillage Charrette - Fall 2011
80/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
81/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
82/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
83/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
84/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
85/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
86/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
87/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
88/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
89/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
90/97
-
8/3/2019 EcoVillage Charrette - Fall 2011
91/97
What long-term projects can be tested
-
8/3/2019 EcoVillage Charrette - Fall 2011
92/97
What long term projects can be tested
now with temporary interventions?
Bridge Mix event, Tremont pedestrian bridge, 2008
What long-term projects can be tested
-
8/3/2019 EcoVillage Charrette - Fall 2011
93/97
at o g te p ojects ca be tested
now with temporary interventions?
Hipp Deck, Downtown parking garage, 2011
What long-term projects can be tested
-
8/3/2019 EcoVillage Charrette - Fall 2011
94/97
g p j
now with temporary interventions?
Madison Avenue Bridge
Complete Street (W. 58th St. or W. 65th St.)
Pedestrian Crossing Improvements (Lorain Ave.) Traffic Calming
Wayfinding and Signage
-
8/3/2019 EcoVillage Charrette - Fall 2011
95/97
EcoVillage CharretteInitial Focus Sites
Initial Focus Sites
-
8/3/2019 EcoVillage Charrette - Fall 2011
96/97
Initial Focus Sites
W. 53rd St. & Lorain Ave. site
W. 58th St. & Lorain Ave. vacant property W. 58th St. Corridor (Green Infrastructure)
Metro Catholic School Campus (Stormwater management and
garden)
CMHA Housing on W. 58th St. (Green Infrastructure and parking)
St. Stephens Church (Meditation Garden) Madison Ave. Bridge
Lorain Ave. Bridge @ W. 58th St.
W. 65th Corridor (Green infrastructure and connection to Train Ave.
bikeway and Edgewater Park)
EcoVillage gateways Rapid Station platform environment
RTA Rail Corridor Trail (Connection to the Towpath)
Connect Zone Rec to Rapid Station, Urban Community School and
Max Hayes
-
8/3/2019 EcoVillage Charrette - Fall 2011
97/97
Discussion questions
1. What are the defining features of the EcoVillage
today?
2. Why did you move to this neighborhood and what
keeps you here?3. What does the EcoVillage need most?
4. Are there long-term projects that can be explored and