4
Datos: TPD= 35 veh/día A= 29% B= 71% r= 1.30% n= 20 años FC= 1 ESAL= 60027.268503 Fs= 0.5 f'c= 350 kg/cm2 CBR= 30 % W18= 30013.634252 Zr= 0 So= 0.35 ΔPSI= 2.5 Po= 4.5 Pt= 2 S´c= 598.66518188 Cd= 1.05 J= 4.2 Ec= 399140.36632 Psi K= 95.357360657 D= 4.5763968 pulg (asumir)

Upload: alexandrafernandez

Post on 15-Apr-2016

1 views

Category:

Documents


0 download

DESCRIPTION

ecuaciones de pavimentos

TRANSCRIPT

Page 1: Ecuaciones AASHTO 1993

Datos:TPD= 35 veh/díaA= 29%B= 71%r= 1.30%n= 20 añosFC= 1

ESAL= 60027.268503Fs= 0.5

f'c= 350 kg/cm2CBR= 30 %

W18= 30013.634252Zr= 0So= 0.35ΔPSI= 2.5Po= 4.5Pt= 2S´c= 598.66518188Cd= 1.05J= 4.2Ec= 399140.36632 PsiK= 95.357360657

D= 4.5763968 pulg (asumir)

Page 2: Ecuaciones AASHTO 1993

Ec.I = 4.5373185859

Ec.II = 6.2444558128

1.7071372269

Page 3: Ecuaciones AASHTO 1993

11.6240479 cm

Page 4: Ecuaciones AASHTO 1993