eden pps6 5 chain selection hugo seymour

45
Chain selection

Upload: h2portugal

Post on 18-Jan-2015

255 views

Category:

Business


0 download

DESCRIPTION

Projecto EDEN

TRANSCRIPT

Page 1: Eden Pps6 5 Chain Selection Hugo Seymour

Chain selection

Page 2: Eden Pps6 5 Chain Selection Hugo Seymour

Overview

• Introduction

• Potential chains (long list)

• Estimated impacts in 2020

• Summary

• Creation of short list

Page 3: Eden Pps6 5 Chain Selection Hugo Seymour

Introduction

• Hydrogen chains:

– Simplified description of various ways of producing, transporting and using hydrogen

– A key input for all the modelling work

• Potentially vast number of possibilities (18 technologies gives 1,028,160 potentialarrangements)

• Need to reduce to a more manageable size!

• Reduce a long list (28) to a short list (max 10)

Feedstock H2 Prod. Transport Distribution End-use

Page 4: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 5: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 6: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 7: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 8: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 9: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 10: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 11: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationsLH2 truckconversioncentral electrolysisSolar PV1.2.2

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 12: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

CHP

distribution

centrededicated pipelinethermal conversionSolar thermal1.2.3

transport (FC)refuelling stationsLH2 truckconversioncentral electrolysisSolar PV1.2.2

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 13: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

Grid connected FCstoragecentral electrolysisWave1.3.1

CHP

distribution

centrededicated pipelinethermal conversionSolar thermal1.2.3

transport (FC)refuelling stationsLH2 truckconversioncentral electrolysisSolar PV1.2.2

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 14: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationsGH2 truckcentral electrolysisGeothermal1.4.1

Grid connected FCstoragecentral electrolysisWave1.3.1

CHP

distribution

centrededicated pipelinethermal conversionSolar thermal1.2.3

transport (FC)refuelling stationsLH2 truckconversioncentral electrolysisSolar PV1.2.2

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 15: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationsdedicated pipelinethermal conversionGeothermal1.4.2

transport (FC)refuelling stationsGH2 truckcentral electrolysisGeothermal1.4.1

Grid connected FCstoragecentral electrolysisWave1.3.1

CHP

distribution

centrededicated pipelinethermal conversionSolar thermal1.2.3

transport (FC)refuelling stationsLH2 truckconversioncentral electrolysisSolar PV1.2.2

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 16: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

portable applicationsmetal hydride storageBiological production1.5.1

transport (FC)refuelling stationsdedicated pipelinethermal conversionGeothermal1.4.2

transport (FC)refuelling stationsGH2 truckcentral electrolysisGeothermal1.4.1

Grid connected FCstoragecentral electrolysisWave1.3.1

CHP

distribution

centrededicated pipelinethermal conversionSolar thermal1.2.3

transport (FC)refuelling stationsLH2 truckconversioncentral electrolysisSolar PV1.2.2

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 17: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

transport (FC)refuelling stationGH2 truckgasificationbiomass2.1.1

portable applicationsmetal hydride storageBiological production1.5.1

transport (FC)refuelling stationsdedicated pipelinethermal conversionGeothermal1.4.2

transport (FC)refuelling stationsGH2 truckcentral electrolysisGeothermal1.4.1

Grid connected FCstoragecentral electrolysisWave1.3.1

CHP

distribution

centrededicated pipelinethermal conversionSolar thermal1.2.3

transport (FC)refuelling stationsLH2 truckconversioncentral electrolysisSolar PV1.2.2

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 18: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 1 – renewables

CHP

distribution

centrepipelinegasificationbiomass2.1.2

transport (FC)refuelling stationGH2 truckgasificationbiomass2.1.1

portable applicationsmetal hydride storageBiological production1.5.1

transport (FC)refuelling stationsdedicated pipelinethermal conversionGeothermal1.4.2

transport (FC)refuelling stationsGH2 truckcentral electrolysisGeothermal1.4.1

Grid connected FCstoragecentral electrolysisWave1.3.1

CHP

distribution

centrededicated pipelinethermal conversionSolar thermal1.2.3

transport (FC)refuelling stationsLH2 truckconversioncentral electrolysisSolar PV1.2.2

transport (FC)refuelling stationsonsite electrolysisSolar PV1.2.1

transport (FC)refuelling stationsMethanol trucksConversioncentral electrolysisWind power1.1.5

transport (FC)refuelling stationsGH2 truckcentral electrolysisWind power1.1.4

CHP

distribution

centrededicated pipelinecentral electrolysisWind power1.1.3

transport (FC)refuelling stationsdedicated pipelinecentral electrolysisWind power1.1.2

transport (FC)refuelling stationsonsite electrolysisWind power1.1.1

End useH2 distribution

H2 transport1st conversion

CCSH2 productionFeedstock

Page 19: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 20: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

CHPdistribution centreonsite reformingnatural gas3.1.2

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 21: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

transport (FC)refuelling stationsGH2 truckCCScentral reformingnatural gas3.2.1

CHPdistribution centreonsite reformingnatural gas3.1.2

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 22: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

CHPdistribution centreH2-NG pipelineCCScentral reformingnatural gas3.2.2

transport (FC)refuelling stationsGH2 truckCCScentral reformingnatural gas3.2.1

CHPdistribution centreonsite reformingnatural gas3.1.2

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 23: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

transport (FC)refuelling stationspipelineCCScentral reformingLNG3.3.1

CHPdistribution centreH2-NG pipelineCCScentral reformingnatural gas3.2.2

transport (FC)refuelling stationsGH2 truckCCScentral reformingnatural gas3.2.1

CHPdistribution centreonsite reformingnatural gas3.1.2

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 24: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

transport (FC)refuelling stationsGH2 truckgasificationcoal4.1.1

transport (FC)refuelling stationspipelineCCScentral reformingLNG3.3.1

CHPdistribution centreH2-NG pipelineCCScentral reformingnatural gas3.2.2

transport (FC)refuelling stationsGH2 truckCCScentral reformingnatural gas3.2.1

CHPdistribution centreonsite reformingnatural gas3.1.2

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 25: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

CHPDistribution centreGH2 truckgasificationcoal4.1.2

transport (FC)refuelling stationsGH2 truckgasificationcoal4.1.1

transport (FC)refuelling stationspipelineCCScentral reformingLNG3.3.1

CHPdistribution centreH2-NG pipelineCCScentral reformingnatural gas3.2.2

transport (FC)refuelling stationsGH2 truckCCScentral reformingnatural gas3.2.1

CHPdistribution centreonsite reformingnatural gas3.1.2

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 26: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

transport (FC)refuelling stationspipelineCCSgasificationcoal4.2.1

CHPDistribution centreGH2 truckgasificationcoal4.1.2

transport (FC)refuelling stationsGH2 truckgasificationcoal4.1.1

transport (FC)refuelling stationspipelineCCScentral reformingLNG3.3.1

CHPdistribution centreH2-NG pipelineCCScentral reformingnatural gas3.2.2

transport (FC)refuelling stationsGH2 truckCCScentral reformingnatural gas3.2.1

CHPdistribution centreonsite reformingnatural gas3.1.2

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 27: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 2 – fossil fuels

CHPrefuelling stationspipelineCCSgasificationcoal4.2.2

transport (FC)refuelling stationspipelineCCSgasificationcoal4.2.1

CHPDistribution centreGH2 truckgasificationcoal4.1.2

transport (FC)refuelling stationsGH2 truckgasificationcoal4.1.1

transport (FC)refuelling stationspipelineCCScentral reformingLNG3.3.1

CHPdistribution centreH2-NG pipelineCCScentral reformingnatural gas3.2.2

transport (FC)refuelling stationsGH2 truckCCScentral reformingnatural gas3.2.1

CHPdistribution centreonsite reformingnatural gas3.1.2

transport (FC)refuelling stationsonsite reformingnatural gas3.1.1

End useH2 distributionH2 transport

1st conversion

CCSH2 production

Feedstock

Page 28: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 3 – electricity and

by-product

transport (FC)refuelling stationonsite electrolysisGrid electricity5.1.1

End useH2 distribution

H2 transport

1st conversion

CCSH2 production

Feedstock

Page 29: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 3 – electricity and

by-product

transport (FC)refuelling stationpipelinecentral electrolysisNuclear5.1.2

transport (FC)refuelling stationonsite electrolysisGrid electricity5.1.1

End useH2 distribution

H2 transport

1st conversion

CCSH2 production

Feedstock

Page 30: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 3 – electricity and

by-product

transport (FC)refuelling stationpipelinethermal conversionNuclear5.1.3

transport (FC)refuelling stationpipelinecentral electrolysisNuclear5.1.2

transport (FC)refuelling stationonsite electrolysisGrid electricity5.1.1

End useH2 distribution

H2 transport

1st conversion

CCSH2 production

Feedstock

Page 31: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 3 – electricity and

by-product

transport (FC)refuelling stationGH2 truckBy-product (refinery)6.1.1

transport (FC)refuelling stationpipelinethermal conversionNuclear5.1.3

transport (FC)refuelling stationpipelinecentral electrolysisNuclear5.1.2

transport (FC)refuelling stationonsite electrolysisGrid electricity5.1.1

End useH2 distribution

H2 transport

1st conversion

CCSH2 production

Feedstock

Page 32: Eden Pps6 5 Chain Selection Hugo Seymour

Potential chains: long list

part 3 – electricity and

by-product

CHPdistribution centreBy-product (refinery)6.1.2

transport (FC)refuelling stationGH2 truckBy-product (refinery)6.1.1

transport (FC)refuelling stationpipelinethermal conversionNuclear5.1.3

transport (FC)refuelling stationpipelinecentral electrolysisNuclear5.1.2

transport (FC)refuelling stationonsite electrolysisGrid electricity5.1.1

End useH2 distribution

H2 transport

1st conversion

CCSH2 production

Feedstock

Page 33: Eden Pps6 5 Chain Selection Hugo Seymour

Estimated impacts in

2020 – CO2

CO2 equivalent emissions - transport

0 500 1000 1500 2000 2500

IST 1.1.1 wind onsite

IST 1.1.2 wind central

IST 1.1.4 wind central truck

IST 1.2.1 Solar PV onsite

IST 1.2.2 Solar PV central LH2 truck

IST 1.4.1 geothermal central truck

IST 1.4.2 Geothermal thermal pipeline

IST 5.1.1 Electricity mix onsite

IST 5.2.1 Nuclear central electrolysis

IST 5.2.2 Nuclear thermal conversion

IST 6.1.1 By-product truck

IST 2.1.1 Biomass central truck

IST 3.1.1 NG onsite

IST 3.2.1 NG central truck

IST 3.3.1 LNG central SMR

IST 4.1.1 Coal central truck

IST 4.2.1 Coal central CCS pipeline

kg/vehicle km

Page 34: Eden Pps6 5 Chain Selection Hugo Seymour

Estimated impacts in

2020 – CO2

CO2 equivalent emissions - stationary

0 1000 2000 3000 4000 5000 6000 7000 8000

IST 1.1.3 wind central CHP

IST 1.2.3 Solar thermal CHP

IST 6.1.2 By-product CHP

IST 2.1.2 Biomass central pipeline CHP

IST 3.1.2 NG onsite CHP

IST 3.2.2 NGH2 CHP

IST 4.2.2 Coal central CCS pipeline CHP

kg/kWh

Page 35: Eden Pps6 5 Chain Selection Hugo Seymour

Estimated impacts in

2020 – CostsCosts per chain

0 500 1000 1500 2000 2500

IST 1.1.1 wind onsite demand version

IST 1.1.2 wind central demand version

IST 1.1.3 wind central CHP

IST 1.2.1 Solar PV onsite demand version

IST 1.2.3 Solar thermal CHP

IST 1.4.1 geothermal central truck demand version

IST 1.4.2 Geothermal thermal pipeline demand version

IST 2.1.1 Biomass central truck demand version

IST 2.1.2 Biomass central pipeline CHP

IST 3.1.2 NG onsite CHP

IST 3.2.1 NG central truck demand version

IST 3.2.2 NGH2 CHP

IST 3.3.1 LNG central SMR demand version

IST 4.1.1 Coal central truck demand version

IST 4.2.2 Coal central CCS pipeline CHP

IST 5.1.1 Electricity mix onsite demand version

IST 5.2.2 Nuclear thermal conversion demand version

IST 6.1.1 By-product truck demand version

IST 6.1.2 By-product CHP

M€

Cost/year (M€)

Investment cost (M€)

Page 36: Eden Pps6 5 Chain Selection Hugo Seymour

Summary

• Highest emissions from fossil fuel-basedchains, especially coal

• Truck transport adds to the CO2 intensity

• Highest costs:

– Thermal conversion

– CCS

– Nuclear

Page 37: Eden Pps6 5 Chain Selection Hugo Seymour

Creation of short list

• Target: 6 – 10 hydrogen chains

• Representation is more important thanrealism!

Page 38: Eden Pps6 5 Chain Selection Hugo Seymour

Feedstocks

• Definite yes:

– Solar

– Geothermal (islands)

– Wind

– Wave

– Coal with ccs

– NG

– biomass

• Definite no:

– Coal without ccs

• Maybe

– nuclear

Page 39: Eden Pps6 5 Chain Selection Hugo Seymour

H2 production

• Definite yes:

– SMR onsite/central

– Gasification

– Electrolysis onsite/central

– Thermal conversion

• Other possibilities

– Biological production (maybe)

Page 40: Eden Pps6 5 Chain Selection Hugo Seymour

Complementary

technologies

• CCS

– yes

• Liquefaction

– Yes (depending on cost)

• Other

– Metal hydrides/chemical hydrides

– Novel technologies

Page 41: Eden Pps6 5 Chain Selection Hugo Seymour

H2 transport

• Definite yes:

– Lh2 trucks

– Gh2 trucks

– Pipeline (dedicated)

• Definite no:

Page 42: Eden Pps6 5 Chain Selection Hugo Seymour

H2 distribution

• Definite yes:

– LH2 fuelling stations for LH2 truck transport

– GH2 fuelling station

– Distribution centre

Page 43: Eden Pps6 5 Chain Selection Hugo Seymour

End use

• Definite yes:

– Transport

– Stationary

– Portable applications

Page 44: Eden Pps6 5 Chain Selection Hugo Seymour

Final chains – I

Tra

Electrolysis(onsite)Wind3

Geothe

rmal

(islan

ds)2

Solar1

End useH2 distribution

H2 transport

1st conversion

CCSH2 production

Feedstock

Page 45: Eden Pps6 5 Chain Selection Hugo Seymour

Final chains – II

10

9

8

7

6

End useH2 distribution

H2 transport

1st conversion

CCSH2 production

Feedstock