edg testbed status moving to testbed two

23
Presenter Name Facility Name EDG Testbed Status Moving to Testbed Two

Upload: tacy

Post on 19-Jan-2016

65 views

Category:

Documents


0 download

DESCRIPTION

EDG Testbed Status Moving to Testbed Two. Outline. Current production status. Testbed at RAL. Testbed two. Changes from testbed one. LCFG -> LCFGng Software by node type. Status of integration of testbed two. Current Application TB Status. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EDG Testbed Status Moving to Testbed Two

Presenter Name

Facility Name

EDG Testbed StatusMoving to Testbed Two

Page 2: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Outline

• Current production status.

• Testbed at RAL.

• Testbed two.

• Changes from testbed one.

• LCFG -> LCFGng

• Software by node type.

• Status of integration of testbed two.

Page 3: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Current Application TB Status

• Recommended testbed is still RH6.2 , edg1.4.9 with LCFG.

• Currently eight UK sites contribute to the the total seventeen in datagrid.

• Not changed this year since the BD-II was introduced. The RB is again the limiting factor now the information system is reliable.

Page 4: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Production Testbed at RAL.

• 1 CE, 1 SE (350 GB), 10 WNs, 1 UI.

• Top edgapp GIIS now at RAL.

• 1 CE as a gatekeeper into tier1a system.

– In use by Atlas, Babar, LHCb and DZero,

Page 5: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Running Production Jobs

One month to 27th April

Page 6: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Development Testbed at RAL

• CE, SE, WN, MON, RLS, VOMS and LCFGng exist already.

• UI exists (gppui06.gridpp.rl.ac.uk)

• RB, HLR and PA to be installed this week.

• Updates happen twice a day on average.

• Improvements now faster than the addition of software.

Page 7: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Testbed Two

• Lots more node types.

• Everything is incompatible including schema, globus, gridftp,…

• Still a lot of testing to be done. Loose cannons are not yet loose.

• GDMP vanishes which is good for integration of software into farms.

Page 8: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

LCFG -> LCFGng• LCFGng is definitely an improvement.

– NIS clients can be configured.– DMA can be turned on.– Using autofs is now the default.– Node profile updates happen immediately and reliably. – Reboot for ever does not happen.– PXE support built in from the start.

http://gpplcfg.gridpp.rl.ac.uk/install/install.cgi– LCFGng generally is more complete.

• WP4s instructions are better and time proof.• LCFGng has a web interface.

Page 9: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

LCFG ->LCFGng(2)• Each node and object reports back its status.• http://gpplcfg.gridpp.rl.ac.uk/status/.• Middleware configuration completed by the developers

and is a lot more ‘intelligent’.• EDG profiles are more modular and clearer than

before.• Hardware support is still limited, e.G. Raid, SCSI,

e1000 all require special case kernels.• Post install notes will be supplied but are smaller, e.g

gridmapdir is mounted, pool account lock files created, site GIIS configured to accept registrations from SE.

Page 10: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Compute Element Node

• Now use’s Maui 3.2.6 for scheduling.– Information providers claimed to support this.

• MPICH is installed.– Needed for wp1’s support of MPI jobs.

• GLOBUS v2.2.4 supplied from VDT 1.1.8.– VDT. Virtual data toolkit from iVDgl.

• Gatekeeper, MDS and gridftp server.• R-GMA client

– Publishing CE information via GIN.

Page 11: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Computing Element(2)

• GridFTP logs published into R-GMA.

• MSA. Monitoring Sensor Agent.

• Application software.

• DGAS client.

• One CE per site is required.

Page 12: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Worker Node

• Application Software.

• Globus clients, GridFTP.

• RFIO clients.

• MSA, Monitoring Sensor Agent.

• VOMS, R-GMA, RLS, Reptor, Netcost and SE clients.

• At least one per site required.

Page 13: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Storage Element

• Globus, GridFTP and MDS• Information Providers publishing via MDS and

GIN, R-GMA.• GridFTP logs published into R-GMA.• Replica Location -> Site Replica mapping.• SE (apache) and SE web service (tomcat).• One per site, possibly one per media, e.g.

CASTOR, Atlas Data Store, Disk?• MSA. Monitoring Sensor Agent.

Page 14: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

User Interface

• Clients for:– Datagrid job submission.– Globus job submission.– R-GMA– SE– VOMS– RLS, Reptor, Optor– Network cost client.

• Access required by all users of datagrid.

Page 15: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Monitor Box• Two distinct functions. • R-GMA servlets(tomcat)

– CE, SE and application producers register here.• The fmonServer collects information from all the

MSA. – Sensors such as lm_sensors, load, uptime,

network I/O collected on the MON box.• MySQL.• One per site required, unless tomcat is moved

elsewhere.

Page 16: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Replica Location Service Node

• Tomcat• MySQL• R-GMA client, publishes service status.• Replica catalogue.• Metadata catalogue.• Replaces the current replica catalogue.• One node per VO until VOMS is

integrated.

Page 17: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Information Catalogue Node

• R-GMA registry servlets.

• Tomcat

• MySQL

• One node required per testbed.

Page 18: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Network Monitor

• Iperf – Network bandwidth.• Pinger – RTT time.• UDPmon – UDP throughput.• rTPL – A combination of the above.• Netagent – Network traffic from interface

to router.• All published via apache and perl cgi.• One per site.

Page 19: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

VOMS and MyProxy node

• VOMS– Apache (mod_perl)– MySQL– One per VO required. – VOMS will not be in TB2.

• MyProxy– MyProxy server.– At least one per testbed.

Page 20: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

WP1 Nodes• DGAS (dg accounting service) 3 nodes.• Deployment commences this week.• RB ( Resource Broker)

– At least one per testbed.• HLR (Home Location Register Node)

– Stores the accounts of users and resources.– One per testbed. (or site?).

• PA (Price Authority Node)– Assigns prices to resources.– One per VO.

Page 21: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Status of Integration• Lots of parallel changes, lots of new software.

– Impossible to follow.• Globus job submission is working, with some magic.• Fabric Management and Network Monitoring

complete.• Information system , R-GMA was working well but

introduction of GLUE has required a re-release.• RLS service has been shown to work.• Integration of the SE and SE with RLS is not

completed.

Page 22: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Status of Integration(2)

• Introduction of WP1 software this week and its success is critical to a release date.

• Job management interfaces to almost everything though this is the final component.

• May is expected to consist of continuous bug fixes once all software has been deployed.

Page 23: EDG Testbed Status Moving to Testbed Two

28th April 2003 Steve Traylen, [email protected]

PPD

Testbed Two in the UK

• For a UK independent grid the UK will need to support the gridpp VO.– RB, HLR(?), PA, RLS, VOMS.

• Once the RB is in place (IC) then it makes sense to move interested sites to testbed two.

• What happens next?– LCG1 , Crossgrid and EDG boundaries

become blurred.