edi system project for coca-cola hellenic - ecr baltic€¦ · edi system project for coca-cola...

16
EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development manager

Upload: buitram

Post on 24-Apr-2018

243 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

EDI system project

for Coca-Cola Hellenic

Baltic’s

Valdas Pakstys

Coca-Cola Hellenic Baltics

Business development manager

Page 2: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Coca-Cola HBC Coca-Cola Femsa Coca-Cola AmatilCoca-Cola Enterprises

CCHBC – is one of 4 Anchor Bottlers in the World

• We are the 2nd largest bottler in revenue and the 3rd largest bottler in volume in the world

• We operate in 28 countries, 16 of which are part of the EU – including 3 Baltic Countries

• We address the needs of over 540 million consumers

• We operate 80 plants

Page 3: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Tallinn

Estonia

Latvia

Lithuania

Vilnius

6 SALES CENTRES

PLANT Alytus -PET (0.5l, 1.25l,1,5l & 2.0 L )

6 BRANCHES

Jõhvi

TartuPärnu

Valmiera

Jekabpils

Kuldiga

Panevežys

Klaipeda

Kaunas

Alytus

Riga

CCHBC Baltics Sales Organisation

Page 4: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

EDI current situation an possibilities Baltic’s

Past Current Future

OrdersMD order-> Order

entry to Sales

System

Orders by emails

(few Key

chains) = Order

entry entering to

Sales System

Full automatic

way = from order

to order in Sales

System

Loading

documentsPaper document Paper document

EDI + full

electronic

document

InvoicesPaper document

from each shop

Paper document

from each shop

Possibility to send

summary invoice

for the chain by

EDI

Page 5: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Process for orders/invoices using EDI

Customer

Operator EDI

Customer

Operator EDI

CCH

Coca-Cola

Hellenic

1) Customer enter

order in own

system

2) ‘Translation’ to

universal language

EDIFACT or XML

Order pack Order pack Order pack

4) Order automatically

enters CCH Sales

System

Information about order

sent by e-mail

about 20 min.

3) ‘Translation’ to

CCH language

8) Invoice ready for

Customer payment

system

5) Summary

Invoice issued in

CCH system

about 30 min.

Invoice packInvoice packInvoice pack

6) ‘Translation’ to

universal language

EDIFACT of XML

7) ‘Translation’ to

Customer language

Page 6: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Electronic Data Interchange in CCHBC

Order

Dispatch adv.

Invoice

Customer CCH

Page 7: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Customer

Translation

EDI example – Order via EDI operators

CCH

Customer EDI

Operator

CCH EDI

operator Translation

Sales

system

e-mail notification

App. 20 minutes

electronic

systems &

Internet

Page 8: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

EDI central solutions for Baltic’s

Business

Partner 1

Coca-Cola Hellenic

EDI global platform

Baltic countries

Other CCH

countriesBusiness

Partner 2

VAN

connection

AS2 connection

Business

Partner 3

Business

Partner 4

AS2 connectionBusiness

Partner 1

Coca-Cola Hellenic

EDI global platform

Baltic countries

Other CCH

countriesBusiness

Partner 2

VAN

connection

AS2 connection

Business

Partner 3

Business

Partner 4

AS2 connection

Page 9: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Customer

Translation

EDI example – Order via AS2

CCH

Translation

Sales

system

e-mail notification

App. 10 minutes

electronic

systems &

Internet

Page 10: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

EDI how to start

The following items represents high level preparation

task in order to start exchanging EDI messages

between parties

- Agreement on using standard coding for product (GTIN-EAN) and

location (GLN)

- Agreement on details related to specifics of document/message coding

(EDIFACT, XML,..). This is called MIG (Message Implementation Guideline)

- Agreement on used unit of measures (retail unit [bottle], wholesale unit

[case])

- Agreement on cooperation during tests and approvals of created

documents with clear identification of responsible persons

- Agreement on contact/responsible persons to handle all unexpected

items during EDI implementation

Page 11: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Deployment Phases

- Tollgates

Phase

sSyst

em

sD

elivera

ble

s

Test Systems – EDI/Sales/Invoicing Production Systems

Appr. 14 weeks total 3 weeks

Decision for

implementatio

n

Project

Go-ahead Go-live

decision

Post-implementation review

Business Case based

on Completed

questionnaires from

Country;

Project charter and

organization;

Start date

and time-line agreed

Partner mappings;

Process mappings;

Customizations to

the system;

Infrastructure and

telecom;

Requirement

Specifications from

Business partners;

VAN providers

evaluation

Integration tests

(off-line and on-

line);

Acceptance test and

Acceptance sign-off;

Go-live date

confirmed

Training &

Training

materials;

Business change

activities;

Go-live;

Period of intensive

support;

Project Evaluation

Service Support

Pre-preparation

Preparation

Mappings development

Customization &

Infrastructure set-upTests

Training &

Sign-off

Intensive Post

Go-live support Regular service

Page 12: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

EDI benefits

CCHBC expected following benefits of EDI:

increased satisfaction of the customers –

saving on the order processing resources.

-faster documents delivery versus paper, phone, fax

-more accurate data

(any manual handling like typing order from fax, or entering invoice details into

system from paper is reduced so less risk of mistakes)

-less human involvement in documents handling (we have order automatically

created in our sales system without anybody's time)

- paper reduction (no paper, fax,..)

Page 13: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

EDI current disadvantages

CCHBC faced following disadvantages of EDI:

-Reduced flexibility at order modifications and variations.

-Different customers have different EDI providers

-Our customers wants from us EDI invoices in addition to paper one…

For CCHBC is rather additional complication and additional cost (on top of paper

we would need to pay for EDI messages)

Page 14: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

EDI CCHBC Baltic’s status and plans

Nearest future plans: implement electronic orders in fully

automatic way, using CCHBC EDI group wide solution.

What was done so far :

•Communication channel has been configured between :

(1) eXite (CCHBC international EDI partner) and Edisoft;

(2) eXite and Prisma;

• XML order conversion to standard EDIFACT format has been developed

• We have started group wide standard EDI order testing with Statoil, Mego

and Prisma of Estonia.

• We have started to investigate possibilities to implement electronic

invoices.

Page 15: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Thank You!

Q&A

Page 16: EDI system project for Coca-Cola Hellenic - Ecr Baltic€¦ · EDI system project for Coca-Cola Hellenic Baltic’s Valdas Pakstys Coca-Cola Hellenic Baltics Business development

Enjoy the day!

Next: EDI Legal Aspects in Estonia