EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
BREVARD COUNTY SCHOOL DISTRICTSurvey: Number 5 - Version 1
District:
Survey Status: Active Pending
PAGE:1 of 290 Report Date: 11/27/2017 6:01:31 AM
Section 1: Survey
PAGE:2 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
District:
Whole Survey 5.1
Survey Open Date: 10/18/2016 5:56:54 PM
Description:
DVE768 Approval Date: 3/16/2017
Board Approval Date:
Dane Theodore
Contact Phone Number: (321)633-1000
Contact Name:
Contact Email:
Survey Notes:
Survey Status Status Time User
Active Pending 10/18/2016 5:56:54 PM Dane Theodore
Survey Expiration Date:
PAGE:3 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PREFACE
Report of an educational plant survey, hereinafter also referenced as “survey,” conducted in accordance with the requirements of, and pursuant to specifications in, Article IX and Article XII of the Florida Constitution; Chapters 1001, 1011, and 1013, Florida Statutes (F.S.); State Requirements for Educational Facilities (SREF); and the Florida Building Code (FBC). This survey report describes the current educational plants and the estimated capital outlay needs resulting from a systematic study of present educational and ancillary plants. This study also addresses the future needs, including long range planning, to provide an appropriate educational program and services for each student based on projected capital outlay FTE’s (COFTE) approved or authorized for use by the Department of Education.
NOTE: All educational plant surveys are valid for five full years and expire on June 30 of the fifth full year from the beginning date of the survey. For example, a survey approved in October will be valid through the remaining fiscal year and for five full years beginning on the following July 1; effectively, this makes the survey approved in October valid for five years and eight months. By the same scenario, a survey approved in May will be valid through the remaining fiscal year and for five full years beginning on the following July 1; effectively, this makes the survey approved in May valid for five years and one month.
PAGE:4 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
INTRODUCTION TO THE EDUCATIONAL PLANT SURVEY
Definition of an Educational Plant Survey The educational plant survey is a systematic study of present educational and ancillary plants and the determination of future needs. The survey is not directly concerned with the instructional program but the relationship of educational plants to the instructional program is such that judgments regarding the instructional program are necessarily a part of an educational plant survey.
PAGE:5 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Purpose of an Educational Plant Survey
A formal educational plant survey is required by §1013.31, F.S., to be conducted every five years, but may be conducted as often as necessary. It is sometimes necessary to make changes to the survey recommendations in the interim. Local school administrators are responsible for a regular auditing of survey recommendations and for the initiation of the request for any necessary changes.
The construction of new educational facilities is a major undertaking even in school systems where such construction is a continuous process. If a 50-year capital investment is to be protected, the location, size, type of materials, arrangement of spaces, and other considerations, regarding each new facility or addition to an existing facility must be determined on the basis of reliable, factual data. To do otherwise would violate the trust of present and future generations of children and of taxpayers.
The purpose of an educational plant survey is to aid in formulating plans for housing the educational activities of students and staff of the school district for the next several years and the survey must consider the local comprehensive plan in its forecast strategies. The development of this plan must be based on a careful study of all available data regarding the current status of educational and ancillary facilities in relation to capital outlay full-time equivalency (COFTE) student membership and the projected changes in COFTE student membership. The intent of a regular, formal educational plant survey is to encourage the thoughtful, orderly development of a program for providing educational and ancillary plants to adequately house the educational and academic support activities of the district.
PAGE:6 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
In 1957, the Florida Legislature established the School Construction Fund which annually authorized an increase of $200 per student in average daily attendance, subject to matching by local funds. School Construction Fund monies also had to be expended in accordance with the recommendations of a school plant survey. The program was continued with modifications by subsequent legislatures until 1972.
In 1952, the Florida Constitution §9(d), Article XII, was amended to authorize the issuance of State Board of Education (SBE) bonds guaranteed by the Minimum Foundation Program CO&DS allocation. The SBE bond program led to major school construction activities and further strengthened the school plant survey program by requiring that bond proceeds be expended in accordance with survey recommendations.
Legal Basis for Educational Plant Surveys
When the Florida School Code of 1939 was developed, the importance of having a valid basis for a school building program was recognized by inclusion of the requirement that district school boards have periodic school plant surveys of building needs in the districts. The 1939 Code directed the district school superintendent to "recommend plans and procedures for having a survey made" and instructed the district boards to "approve and adopt a district-wide school building program...based on the recommendations of the survey."
The provisions in the 1939 Code for periodic school plant surveys were, for the most part, ineffective. No state financing program for school plants was in effect at that time. Further, the coming of World War II, and the resulting cessation of school plant construction, made any statutory provision relating to school plants meaningless.
The 1972 Legislature enacted the School District Supplemental Capital Outlay Act as an interim measure pending the outcome of the proposed amendment to §9, Article XII of the Constitution. The amendment, which was ratified in the November 1972 general election, increased the CO&DS annual allotment from $400 to $600 per instruction unit in the school districts for the school fiscal year 1967-1968 plus $800 for each “growth unit” since 1967-1968.
The 1973 Legislature established the Florida Educational Finance Act which provided funds for comprehensive school construction and debt service. The amount allocated to each school district was determined by formulas prescribed by the Legislature.In 1974, the Florida Constitution, §9(a) (2), Article XII, was amended to authorize the issuance of state bonds guaranteed by revenues derived from gross receipts utility taxes for the state system of public education, including, but not limited to, institutions of higher learning, junior colleges, vocational-technical schools, and public schools, as defined by law.Since 1974, regular changes have been made to statutory provisions and the Florida Constitution in regards to educational facilities, including the establishment of a state lottery where funding is specifically earmarked for education as a supplement to other state funding, and the capping of class sizes. The continual changes to educational laws and funding mechanisms are due, in part, to Florida’s unrelenting effort to maintain and provide state-of-the art facilities to meet the demands of change for our schools programs and the expectations of our citizenry.
When the Minimum Foundation Program law was enacted in 1947, the requirement for periodic school plant surveys was included. The law established that a Capital Outlay and Debt Service (CO&DS) annual allotment of $400 per instruction unit had to be expended in accordance with a planned building program based on a school plant survey. It was at this point that Florida’s school plant survey program became a meaningful and established operation.
PAGE:7 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Method For Making Educational Plant Surveys
The survey is limited to the study of educational and ancillary plants owned or under long-term lease agreement by the school board. No comprehensive study is made of the instructional program and recommendations made for the improvement of the educational and ancillary plants of the district are not an evaluation of the instructional program. Recommendations, however, must be clearly associated with the relationship between educational facilities and instructional programs.
The board must arrange for an educational plant survey to be conducted either by district staff, through contractual agreement, or a combination of district staff and private vendors. A survey conducted by the Office of Educational Facilities is a cooperative process with staff from the Office of Educational Facilities and staff from school districts outside of the district being surveyed. Typically, the survey process will include, as a minimum:
Spot or grid maps showing the residence of all elementary, middle or junior high, and senior high school students, the school attended by each student, and the location of each school.
COFTE student membership trends of each school center for the past five years.A floor plan for each building at each educational plant identifying each building and each room (space) by number as they appear in the Florida Inventory of School Houses (FISH).
A list of the construction projects under contract.A statement of the policies of the board with respect to grade organization and the types and sizes of facilities to be provided for new elementary, middle or junior high, and senior high schools (facilities lists).
Other information that may affect building costs, population trends, and other related matters that may influence the district educational facilities building needs program.
The survey team members visit and evaluate each educational plant; student capacities are carefully evaluated at each school center.
The districtwide projection of students is distributed among the various existing school centers and any new school centers are recommended on the basis of past trends and the best judgment of both the District and the County Growth Management Office as to where growth is most likely to occur. The survey team should make logical recommendations based on all relevant information available.
*
**
**
*
*
*
*
The broad, general state-level conditions that give directions to a survey are established as guidelines only insofar as feasible for application within a given district.
The survey report must include a recommended pattern for housing the student projection for a five-year period, including changes in utilization of existing school centers, phasing out of unsatisfactory facilities and/or school centers, additions at existing school centers, and construction of new school centers. Ancillary facilities should also be considered in the recommendations.
State-level Requirements
PAGE:8 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
School Size:* Any school that is not large enough to justify a full-time principal, a media specialist, food service staff, and special instructional and clerical staff are economically inefficient and restrictive in program offering; simply stated, minimally sized schools are too expensive to operate if a district lacks sufficient financial resources to make such facilities a viable option. Generally, new school centers are not recommended for fewer than 400 students in elementary schools or 100 students per grade level in secondary schools. Where practical, existing schools that are below these sizes should be consolidated.
Generally, all wooden exterior buildings (other than relocatables) are considered unsatisfactory and are not assigned student capacity.
* Wooden Buildings:
Generally, all wooden exterior buildings (other than relocatables) are considered unsatisfactory and are not assigned student capacity.
* Unsatisfactory Space:
NOTE: Unsatisfactory space is typically designated as such due to compromising effects on the structural integrity, safety, or excessive physical deterioration of a building. Space condition should be the same, either satisfactory or unsatisfactory, for all rooms in a building with the exception of rooms reported in relocatable buildings that represent individual units. A space may be structurally unsound (unsatisfactory) and still be adequate in size.
Generally means that the size of space is not appropriate, sufficient, suitable, or lacks ability to meet the fitting requirements for instruction or instructional support, such as small classrooms or insufficient acreage for a school site. Inadequacy may be a condition brought on by changing standards, or increased enrollment causing overuse thereby resulting in undersized or unsuitable circumstances.
* Inadequate Space:
NOTE: Inadequate space is typically designated as such by the capital outlay classifications (COC) C-3 and C-7. Inadequate is a designation for an entire facility, not just a building or room. A space or building may be structurally sound (satisfactory) and still be inadequate.
Facilities designed and built to be moved from one school to another are recognized as providing valuable flexibility.
* Relocatable Building:
A student station is the area necessary for a student to engage with a teacher in appropriate subject matter educational (learning) activities. The size of this area will vary with the particular type of activity and by grade level. A laboratory or shop in which the student must move about requires more area per student than a regular classroom where the student remains seated at a desk. The total student stations at a school center are used to determine the capacity of the school.
* Student Station:
The maximum number of students that should be housed in a facility. In an elementary school, students are typically assigned to one classroom throughout the day and student capacity for elementary schools equals the student stations. However, in middle and secondary schools, students usually move from classroom to classroom to participate in different instructional subject matter, which interjects scheduling as a factor in calculating capacity. Experience has shown that the number of students in a secondary school is a major factor for determining the efficiency of space utilization that may be expected at a school.
* Student Capacity:
PAGE:9 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Used to determine “capacity” which is the number of students that may be housed in a facility at any given time based on a utilization percentage of the total number of existing satisfactory student stations:
* Utilization Factor:
Type School
Utilization Factor Percentage x
Satisfactory Student Stations
allall300 or less301-600601-900901-12001201-15001501 - and aboveallallallallall
100%90%70%75%80%85%90%95%90%100%100%120%150%
ElementaryMiddle & Junior HighSenior High
Combination SchoolsExceptional Student CentersAlternative Education CentersDesignated Area Vocational CentersDesignated Adult Centers
In the recommendations for building a new school center, the initial capacity assigned is the capacity necessary to house the students anticipated to enroll at the school by the end of the survey projection period. The ultimate capacity is usually the maximum capacity school of that type based on applicable district policies (facilities lists). The establishment of an ultimate desirable capacity makes it possible to plan the initial construction within the framework of the ultimate size school–meaning, building core facilities such as media, cafeteria, administration, circulation, and other auxiliary spaces to the full school size and then adding classrooms as the student population projections increase to a level that warrants additional classroom space.
* Initial and Ultimate Student Capacity:
NOTE: Educational plant survey COFTE student projections are determined by the Office of Economic and Demographic Research (EDR). Each five-year survey is based on COFTE projections that are five (5) full years from the official beginning of the survey period, which is July 1 of the first full year of the survey.
The recommendations made in the survey report are intended, in total, to provide adequate facilities for all of the students projected to be enrolled within the 5-year survey period. The priority systems established in statutes and rules define the eligibility for the expenditure of funds.
* Use of State and Local Funds for Recommended Facilities:
PAGE:10 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
NOTE: Educational plant survey costs for student stations are determined by the Office of Economic and Demographic Research (EDR). Each five-year survey is based on cost factors that are 31 months (January, the midway point of the five-year survey period) from the official beginning of the survey period, which is July 1 of the first full year of the survey. All new capacity construction uses the appropriate grade level student station cost factors; the cost per square foot for new construction, remodeling, and renovation is based on actual statewide average construction cost data with the EDR cost index increase applied to use the same 31 months mid-point of the survey costs for planning purposes. This cost estimate process is applied uniformly to all surveys in all districts so that consistent estimates can be made. Actual costs are reported yearly in the 5-year district facilities work program annual budget.
District School Board Policies and Prerogatives State funds alone usually are not enough to complete the recommended school plant construction program that will be identified in an educational plant survey. To ensure that all capital outlay funds are used for the best and most efficient purposes, the educational plant survey team should collaborate with the professional and instructional staff of the district on a plan for meeting the projected school plant needs for the next several years.
Some of the specific local board policies and prerogatives that generally apply to the survey report are:
Actual assignment of students to school centers in the county as authorized and directed by §1003.02, F.S.;*Facilities comprising a standard school plant for each grade grouping;*Square footage and special features of each instructional component (state minimums must be met);*Special facilities at a school center;*Level of custodial service;*Level of maintenance service;*Level of service indicators for local comprehensive planning;*Type of climatic control.*
Guide to Capital Outlay Classification (COC) Educational plants are identified by recommended type of facility for capital outlay expenditures. The COC of educational plants determines the extent to which certain funds may be used for capital improvements, subject to applicable Florida Statutes and SREF standards dealing with budgeting and in some cases priority ratings. The COC of an educational plant can only be assigned or changed by an educational plant survey recommendation made in compliance with all applicable laws, rules, and policies.
The COC is grouped into categories with applicable standards to guide the assignment of the appropriate classification:
Adequate site,*
An educational plant that is recommended for continued use. Generally, this includes:C-1:
Satisfactory building(s),*Projected membership within desired size range for the type of school, *Recommended new educational plant.*
PAGE:11 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
An educational plant that is in a period of transition with evidence insufficient to recommend replacement or consolidation, and typically new construction is not recommended for this COC. Generally, this includes:
C-2:
Inadequate site and/or inadequate building(s),*Declining or static enrollment,*An educational plant that probably would be recommended for consolidation if not for excessive distance required for student transportation.
*
An educational plant that is substandard in one or more major aspects. Generally, this includes:C-3:
Inadequate site and/or unsatisfactory building(s),*Declining or static enrollment to a level indicating that the needs of students can better and more economically be served at other educational plants,
*
Abandoned educational plants not currently housing students.*
NOTE: Educational plants assigned a C-3 COC and used to house students should be closed when adequate facilities are available elsewhere. Facilities assigned a C-3 COC do not generate PECO maintenance funds even when the facility contains satisfactory space.
Ancillary facility recommended for continued use. Generally, this includes:C-6:
Adequate site,*Satisfactory building(s),*Recommended new site and/or facilities.*
Ancillary facility is substandard. Generally, this includes:C-7:
Inadequate site and/or unsatisfactory building(s),*Abandoned facilities not currently being used.*
NOTE: Facilities assigned a C-7 COC that are in current use should be closed when adequate facilities are available elsewhere. Facilities assigned a C-7 COC do not generate PECO maintenance funds even when the facility contains satisfactory space.
Any district owned facility leased to an entity for use by the lessee for any purpose, including educational, but is not used by the district during the normal school hours of operation.
C-9:
NOTE 1: Facilities assigned a C-9 COC do not generate PECO maintenance funds.
NOTE 2: Facilities assigned a C-9 COC are to be counted in the district’s inventory of available space and may be considered in the determination of new construction needs.
PAGE:12 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
School centers are usually classified by standard grade groupings (K-5, 6-8, and 9-12), even though a school may have only one or two of the grades present. A school center may be classified as a combination school and recommended to house more than one grade grouping, e.g. grade group K-8, grade group 6-12, or grade group K-12. Whenever it is feasible, the survey should contain recommendations to upgrade and/or remodel/renovate existing educational plants that are classified as C-1 to meet the district’s educational facilities standards for spaces and school size based on the districts adopted facilities lists for each grade grouping.
School Plant PlanningPlanning a school plant, either a complete new school or an addition to an existing school, is a long and complex process when properly done. Remodeling and renovation of existing space can also be very time consuming to plan when all potential options for upgrading or replacement considerations are made. Suggestions made in this section are intended to provide useful, basic information and are not an exhaustive description of all available options for planning or meeting the facilities needs of a district school board.
School Size Generally, new school centers are not recommended for fewer than 400 students in elementary schools or 100 students per grade level in secondary schools. Any school that is not large enough to justify a full-time principal, a media specialist, food service staff, and special instructional and clerical staff are economically inefficient and restrictive in program offerings. Schools that are minimally sized are very expensive to operate.
The number of students in a school is a major factor in determining the efficiency of space utilization; schools that are too small do not offer optimal instructional standards or provide economically advantageous structures. Just like small schools are not economical, very large schools are not frugal to build, maintain, or staff. The logistics of managing and maintaining an overly large school can outweigh the reasons for building mega structures (such as more extensive program offerings in science or performing arts–these functions may be offered through magnet schools, thereby meeting a districtwide or area need without the burden of managing an overly large school reconfigured to offer such services).
Optimally, elementary schools should be planned for about 800 students, middle schools should be planned for about 1,200 students, and senior high schools should be planned for about 2,000 students. Flexibility and program offerings that allow schools to offer a more educationally diverse program or structural configurations that can provide significant economic rewards should always be considered when planning new schools. However, experience has shown that by modifying elementary schools sizes by more than 25% above or below the 800 student mark is not usually cost effective nor educationally practical. Secondary schools can sometimes be subjected to 25% to 50% modifications from the recommended median point and still be practical and efficient for both educational offerings and cost savings. Neither small or large schools provide cost saving benefits for construction nor for day-to-day operations; therefore, limiting the size of schools to near average size is usually preferable and more practical.
GUIDELINES FOR SCHOOL PLANT DEVELOPMENT
PAGE:13 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Educational Facilities Planning The basic concept behind educational facilities planning is a simple one. A school building is primarily a school and secondarily a building. If the “school” is not planned in terms of its purposes, its scope, and its programs, the resulting structure will almost certainly just be a “building.” No architect, regardless of talent or experience in school plant design, can plan a school without guidance from the educators who will use it.
The educational facilities planning process is slow and difficult; planning that does not consider school needs beyond the immediate future places an undue burden on the present and future generations of students and taxpayers. Equally as important as long-range planning, no board should commit local and state revenues for a new educational plant that has not been planned by educators. Although the detailed procedures for educational facilities planning will vary considerably from school to school, the ultimate responsibility for the future rests with those professionals who plan today.
School Plant Design An architect is responsible for designing the building to house the school program developed through the educational facilities planning process. Usually, the architect participates in that process so that educational planning and design do not constitute separate and distinct steps. The architect uses other specialists in designing the building and the system(s) it will contain; for example, structural engineers, heating and cooling specialists, electrical engineers, and environmental specialists should be involved in the total process. Some broad guidelines appropriate to school building design are:
A site (plot) plan should be developed to show the most effective use of the site for present needs and to guide future expansion. The site design and orientation should show awareness of the principles of “Crime Prevention Through Environmental Design” (CPTED) including natural access control, natural surveillance, and territorial reinforcement;
*
A building should be functional in design; it should meet the needs of and facilitate the attainment of the designed or planned program of the school;
*
The building must be made safe and healthful for all students and school staff personnel by observing all safety and sanitary regulations appropriate to school plants;
*
A balance should be achieved between quality and economy in construction and the anticipated maintenance and operation of the plant;
*
A building should be designed to permit economical expansion both in terms of additional classrooms and special facilities which will eventually serve the ultimate capacity of the school; e.g., media centers, cafeterias, circulation, sanitation, utilities, and administration should be built to their ultimate maximum sizes if additional classrooms are going to be needed for future expansion;
*
Adequate lighting, natural and artificial, should be provided for all instructional spaces;*A building should be designed to control the transient noise level; the objective in sonic design of instructional spaces is to secure the best hearing and speaking conditions without adversely affecting the surrounding or adjacent instructional programs;
*
Thermal conditioning of school spaces should be provided by economically designed systems that also render long-term cost savings in maintenance and operations.
*
PAGE:14 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Florida Inventory of School Houses (FISH) The district’s educational plant survey extracts facilities data from FISH; therefore, if FISH is not current and accurate, the educational plant survey cannot be a valid assessment of needs. The district’s facilities inventory may be corrected at any time when new additions or remodeling occurs, during a validation study conducted by the district or OEF, or as the result of an educational plant survey. FISH is the official inventory of the district’s educational facilities. It is the responsibility of the district to maintain an updated inventory. Changes to FISH are subject to review by OEF for compliance with statutory and rule provisions as well as compliance with educational plant survey recommendations.
NOTE: FISH data is imported into the educational plant survey as it exists the moment the survey is created. When a complete new survey is started, the FISH data is imported and does not change even if FISH changes are subsequently made. When a supplemental/spot survey is created, FISH data is imported into the spot survey as it exists for only the selected facilities as of the moment the spot survey is created; this process allows districts to update FISH and then do an updated survey using current FISH data.
School Sites Before a site is purchased or funds are encumbered for a site, it must meet the criteria established by §1013.36, F.S. Notably, the law requires a school board to coordinate site planning and selection with affected county and city governments to ensure consistency with local land-use plans. This coordination process is detailed in the interlocal agreement between the school board and the general-purpose local governments pursuant to §1013.33(2), F.S.
The choice of sites for new schools is critical to the overall development of a school plant program. In general, new sites should:
Provide adequate space for school buildings;*Provide adequate off-street parking and off-street loading/unloading;*Provide adequate playground area.*
In addition, new sites should generally be located to:
Minimize transportation costs and provide safe access from neighborhoods to the school;*Avoid sites where adjacent land uses may allow the location of undesirable commercial enterprises or industrial activities near the school;
*
Prevent the location of a site adjacent to, or near, high voltage power transmission lines or in an airport approach flight path;
*
Maximize proximity to residential areas and seek to collocate district educational facilities with other public facilities, such as parks, libraries, and community centers.
*
PAGE:15 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Section 2: Facility Lists
PAGE:16 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
FACILITIES LISTS
Minimum Space Requirements The Facility Lists component identifies the standard schools programs by grouping and listing the classrooms and support spaces that districts normally consider the most ideal for meeting the districts needs. These lists usually are a combination of elementary, middle, senior high, ancillary, and other special school centers such as exceptional students, alternative, and various types of combination schools, e.g. K-8, K-12, 6-12, etc.
All board approved and adopted facilities lists must conform to standards established in SREF. The facilities lists in EFIS are based on net square footage per space; the gross square footage in a facilities list for new construction is determined by adding a standardized percentage of the net square footage for all auxiliary and support spaces. Elementary schools have 27 percent added for net-to-gross conversions; middle schools have 32 percent added for net-to-gross conversions; and high schools have 34 percent added for net-to-gross conversions. An additional 6 percent is added to each type school for mechanical spaces.
Educational plant survey costs for student stations are determined by the Office of Economic and Demographic Research (EDR). Each five-year survey is based on cost factors that are 31 months (January, the midway point of the five-year survey period) from the official beginning of the survey period, which is July 1 of the first full year of the survey. All new capacity construction uses the appropriate grade level student station cost factors; the cost per square foot for new construction, remodeling, and renovation is based on actual statewide average construction cost data with the EDR cost index increase applied to use the same 31 months mid-point of the survey costs for planning purposes. This cost estimate process is applied uniformly to all surveys in all districts so that consistent estimates can be made. Actual costs are reported yearly in the 5-year district facilities work program annual budget.
Costs for remodeling recommendations are typically based on one-half the cost of new construction, but may vary significantly based on the type of remodeling. Costs for renovation recommendations are typically based on one-third the cost of new construction, and like remodeling costs, may vary significantly based on the renovation project. All cost estimates are best judgment approximations and may vary significantly between projects. Before entering into the planning phase on projects, the district should have a professional review of the estimated cost and assure that the current Uniform Building Code standards are applied when the cost estimates are made.
Cost estimates and recommendations for maintenance and operations of educational plants safety and sanitation deficiencies are not included in this survey. Boards should follow the requirements of §1013.12, F.S., to meet the needs in these areas.
Facilities recommended in accordance with the approved facilities lists at existing or recommended new schools may need to be changed as programs change.
PAGE:17 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Building New Schools Or Additions To Existing Schools Relative To Approved Facility Lists
All facility lists are developed and approved by a district school board to establish the district’s standard schools by type and for the ideal size of schools. These lists, once approved by the board and by the Department, are used in the educational plant survey process to identify the space needs of existing schools (comparing FISH and COFTE to the facility lists) and for building new schools. Any new schools constructed or the expansion of existing schools must be relative to the approved facility list and the classroom capacity must not exceed the projected COFTE for that/those schools. When building a new school center or adding classroom capacity to an existing school, the capacity of the instructional spaces (classrooms) for the school may not exceed the projected COFTE planned for the school in the out-year of the survey even though the facility list may be for a larger number of students. The school’s core facilities should be built to the full size of the facility list if it is reasonably anticipated that the school will eventually serve the number of students in the facility list; however, the classrooms must initially only be built to serve the projected COFTE; to do otherwise would violate the public trust and abuse tax-payer money.
PAGE:18 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
970
Target Number of Stations:
Total Stations:
ELEMENTARY (KG - 06)
970
970
Gross Sq. Feet:
Utilization:
Acres Required:
140,033
1.000
12
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
34 1 PK - 03 PRIMARY CLASSROOM (K-3) 882 29,988 18 612 38,084
808 MATERIAL STORAGE 100 3,400 0 0 4,318
811 OUTSIDE STORAGE 50 1,700 0 0 2,159
813 STUDENT STORAGE 40 1,360 0 0 1,727
814 STUDENT RESTROOM (BOTH SEXES) 60 2,040 0 0 2,590
14 2 04 - 08 INTERMEDIATE/MIDDLE CLASSROOM (4-8) 858 12,012 22 308 15,255
808 MATERIAL STORAGE 100 1,400 0 0 1,778
811 OUTSIDE STORAGE 50 700 0 0 889
815 STUDENT RESTROOM (MALE) 35 490 0 0 622
816 STUDENT RESTROOM (FEMALE) 35 490 0 0 622
3 10 PK - 03 PRIMARY SKILLS LAB (K-3) 882 2,646 18 0 3,360
808 MATERIAL STORAGE 100 300 0 0 381
813 STUDENT STORAGE 40 120 0 0 152
814 STUDENT RESTROOM (BOTH SEXES) 60 180 0 0 228
1 13 PK - 05 ELEMENTARY P E STORAGE 315 315 1 0 400
1 14 PK - 05 ELEMENTARY COVERED PLAY AREA 3,492 3,492 97 0 4,434
7 40 PK - 12 RESOURCE ROOM 290 2,030 10 0 2,578
808 MATERIAL STORAGE 100 700 0 0 889
2 50 PK - 05 ART - ELEMENTARY 1,000 2,000 22 0 2,540
808 MATERIAL STORAGE 100 200 0 0 254
812 PROJECT STORAGE 150 300 0 0 381
2 55 PK - 05 MUSIC - ELEMENTARY 1,000 2,000 22 0 2,540
PAGE:19 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
806 REFERENCE 100 200 0 0 254
808 MATERIAL STORAGE 100 200 0 0 254
831 MUSIC PRACTICE ROOM 70 140 0 0 177
2 61 PK - 12 E S E PART-TIME 975 1,950 15 30 2,476
808 MATERIAL STORAGE 100 200 0 0 254
813 STUDENT STORAGE 40 80 0 0 101
815 STUDENT RESTROOM (MALE) 35 70 0 0 88
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 88
2 62 PK - 12 E S E FULL-TIME 950 1,900 10 20 2,413
808 MATERIAL STORAGE 100 200 0 0 254
813 STUDENT STORAGE 40 80 0 0 101
815 STUDENT RESTROOM (MALE) 35 70 0 0 88
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 88
817 STUDENT RESTROOM & BATH 110 220 0 0 279
3 65 PK - 12 E S E RESOURCE 380 1,140 4 0 1,447
808 MATERIAL STORAGE 100 300 0 0 381
813 STUDENT STORAGE 40 120 0 0 152
2 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 100 200 2 0 254
808 MATERIAL STORAGE 100 200 0 0 254
2 70 PK - 12 E S E ITINERANT 200 400 4 0 508
808 MATERIAL STORAGE 100 200 0 0 254
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 317
4 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 700 0 0 889
1 302 PK - VE BOOKKEEPING OFFICE 125 125 0 0 158
2 303 PK - VE SECRETARIAL SPACE 158 316 0 0 401
1 304 PK - VE RECEPTION AREA 816 816 48 0 1,036
PAGE:20 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 305 PK - VE PRODUCTION WORKROOM 384 384 48 0 487
1 306 PK - VE CONFERENCE ROOM 672 672 48 0 853
1 307 PK - VE CLINIC 288 288 48 0 365
1 308 PK - VE GENERAL SCHOOL STORAGE 480 480 48 0 609
1 309 PK - VE VAULT/STUDENT RECORDS 288 288 48 0 365
1 310 PK - VE SCHOOL STORE 96 96 48 0 121
1 311 PK - VE STUDENT ACTIVITIES 480 480 48 0 609
1 312 PK - VE COMPUTER AREA 144 144 48 0 182
1 313 PK - VE CAREERS ROOM 288 288 48 0 365
3 314 PK - VE ITINERANT OFFICE 125 375 0 0 476
1 315 PK - VE TEACHER PLANNING OFFICE 1,940 1,940 97 0 2,463
1 316 PK - VE TEACHER LOUNGE/DINING 388 388 97 0 492
1 330 PK - VE CUSTODIAL RECEIVING 1,455 1,455 97 0 1,847
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 196
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 635
1 340 PK - VE DINING AREA 3,880 3,880 97 0 4,927
1 341 PK - VE KITCHEN & SERVING AREA 4,268 4,268 97 0 5,420
1 349 PK - VE KITCHEN CHAIR STORAGE 192 192 48 0 243
1 361 PK - VE MULTIPURPOSE ROOM (DINING) 3,007 3,007 97 0 3,818
1 362 PK - VE MULTIPURPOSE ROOM CHAIR STORAGE 194 194 97 0 246
1 363 PK - VE STAGE 990 990 1 0 1,257
1 364 PK - VE STAGE STORAGE 485 485 97 0 615
1 365 PK - VE STAGE DRESSING ROOM (MALE) 240 240 48 0 304
1 366 PK - VE STAGE DRESSING ROOM (FEMALE) 240 240 48 0 304
1 367 PK - VE CONTROL BOOTH/PROJECTION ROOM 100 100 1 0 127
1 368 PK - VE TEXTBOOK STORAGE 336 336 48 0 426
PAGE:21 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 3,589 3,589 97 0 4,558
1 381 PK - VE MEDIA TECHNICAL PROCESSING 388 388 97 0 492
1 382 PK - VE PROFESSIONAL LIBRARY 388 388 97 0 492
1 383 PK - VE AUDIO VISUAL STORAGE 582 582 97 0 739
1 384 PK - VE PERIODICAL STORAGE 194 194 97 0 246
1 385 PK - VE CLOSED CIRCUIT TV LAB 679 679 97 0 862
1 386 PK - VE CLOSED CIRCUIT STORAGE 485 485 97 0 615
1 387 PK - VE MEDIA PRODUCTION LAB 485 485 97 0 615
1 388 PK - VE MEDIA COPYING ROOM 194 194 97 0 246
1 389 PK - VE MEDIA SMALL GROUP ROOM 96 96 48 0 121
1 390 PK - VE MEDIA GROUP PROJECTS/INSTRUCTION 485 485 97 0 615
1 391 PK - VE MEDIA MAINTENANCE/REPAIR 96 96 48 0 121
14 815 06 - 12 STUDENT RESTROOM (MALE) 96 1,344 48 0 1,706
14 816 06 - 12 STUDENT RESTROOM (FEMALE) 96 1,344 48 0 1,706
PAGE:22 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
870
Target Number of Stations:
Total Stations:
ELEMENTARY (PK - 06)
870
870
Gross Sq. Feet:
Utilization:
Acres Required:
134,182
1.000
11
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
25 1 PK - 03 PRIMARY CLASSROOM (K-3) 882 22,050 18 450 28,003
808 MATERIAL STORAGE 100 2,500 0 0 3,175
811 OUTSIDE STORAGE 50 1,250 0 0 1,587
813 STUDENT STORAGE 40 1,000 0 0 1,270
814 STUDENT RESTROOM (BOTH SEXES) 60 1,500 0 0 1,905
15 2 04 - 08 INTERMEDIATE/MIDDLE CLASSROOM (4-8) 858 12,870 22 330 16,344
808 MATERIAL STORAGE 100 1,500 0 0 1,905
811 OUTSIDE STORAGE 50 750 0 0 952
815 STUDENT RESTROOM (MALE) 35 525 0 0 666
816 STUDENT RESTROOM (FEMALE) 35 525 0 0 666
3 10 PK - 03 PRIMARY SKILLS LAB (K-3) 882 2,646 18 0 3,360
808 MATERIAL STORAGE 100 300 0 0 381
813 STUDENT STORAGE 40 120 0 0 152
814 STUDENT RESTROOM (BOTH SEXES) 60 180 0 0 228
1 13 PK - 05 ELEMENTARY P E STORAGE 315 315 1 0 400
1 14 PK - 05 ELEMENTARY COVERED PLAY AREA 3,132 3,132 87 0 3,977
6 40 PK - 12 RESOURCE ROOM 290 1,740 10 0 2,209
808 MATERIAL STORAGE 100 600 0 0 762
2 50 PK - 05 ART - ELEMENTARY 1,000 2,000 22 0 2,540
808 MATERIAL STORAGE 100 200 0 0 254
812 PROJECT STORAGE 150 300 0 0 381
2 55 PK - 05 MUSIC - ELEMENTARY 1,000 2,000 22 0 2,540
PAGE:23 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
806 REFERENCE 100 200 0 0 254
808 MATERIAL STORAGE 100 200 0 0 254
831 MUSIC PRACTICE ROOM 70 140 0 0 177
8 60 PK - PK E S E PRE-K 475 3,800 5 40 4,826
808 MATERIAL STORAGE 100 800 0 0 1,016
813 STUDENT STORAGE 40 320 0 0 406
817 STUDENT RESTROOM & BATH 110 880 0 0 1,117
2 61 PK - 12 E S E PART-TIME 975 1,950 15 30 2,476
808 MATERIAL STORAGE 100 200 0 0 254
813 STUDENT STORAGE 40 80 0 0 101
815 STUDENT RESTROOM (MALE) 35 70 0 0 88
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 88
2 62 PK - 12 E S E FULL-TIME 950 1,900 10 20 2,413
808 MATERIAL STORAGE 100 200 0 0 254
813 STUDENT STORAGE 40 80 0 0 101
815 STUDENT RESTROOM (MALE) 35 70 0 0 88
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 88
817 STUDENT RESTROOM & BATH 110 220 0 0 279
1 64 PK - 12 E S E PT/OT LAB 475 475 5 0 603
808 MATERIAL STORAGE 100 100 0 0 127
813 STUDENT STORAGE 40 40 0 0 50
817 STUDENT RESTROOM & BATH 110 110 0 0 139
3 65 PK - 12 E S E RESOURCE 380 1,140 4 0 1,447
808 MATERIAL STORAGE 100 300 0 0 381
813 STUDENT STORAGE 40 120 0 0 152
2 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 100 200 2 0 254
PAGE:24 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
808 MATERIAL STORAGE 100 200 0 0 254
2 70 PK - 12 E S E ITINERANT 200 400 4 0 508
808 MATERIAL STORAGE 100 200 0 0 254
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 317
14 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 2,450 0 0 3,111
1 302 PK - VE BOOKKEEPING OFFICE 125 125 0 0 158
2 303 PK - VE SECRETARIAL SPACE 158 316 0 0 401
1 304 PK - VE RECEPTION AREA 731 731 43 0 928
1 305 PK - VE PRODUCTION WORKROOM 344 344 43 0 436
1 306 PK - VE CONFERENCE ROOM 602 602 43 0 764
1 307 PK - VE CLINIC 258 258 43 0 327
1 308 PK - VE GENERAL SCHOOL STORAGE 430 430 43 0 546
1 309 PK - VE VAULT/STUDENT RECORDS 258 258 43 0 327
1 310 PK - VE SCHOOL STORE 86 86 43 0 109
1 311 PK - VE STUDENT ACTIVITIES 430 430 43 0 546
1 312 PK - VE COMPUTER AREA 129 129 43 0 163
1 313 PK - VE CAREERS ROOM 258 258 43 0 327
3 314 PK - VE ITINERANT OFFICE 125 375 0 0 476
1 315 PK - VE TEACHER PLANNING OFFICE 1,740 1,740 87 0 2,209
1 316 PK - VE TEACHER LOUNGE/DINING 348 348 87 0 441
1 330 PK - VE CUSTODIAL RECEIVING 1,305 1,305 87 0 1,657
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 196
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 635
1 340 PK - VE DINING AREA 3,480 3,480 87 0 4,419
1 341 PK - VE KITCHEN & SERVING AREA 3,828 3,828 87 0 4,861
1 349 PK - VE KITCHEN CHAIR STORAGE 172 172 43 0 218
PAGE:25 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 361 PK - VE MULTIPURPOSE ROOM (DINING) 2,697 2,697 87 0 3,425
1 362 PK - VE MULTIPURPOSE ROOM CHAIR STORAGE 174 174 87 0 220
1 363 PK - VE STAGE 990 990 1 0 1,257
1 364 PK - VE STAGE STORAGE 435 435 87 0 552
1 365 PK - VE STAGE DRESSING ROOM (MALE) 215 215 43 0 273
1 366 PK - VE STAGE DRESSING ROOM (FEMALE) 215 215 43 0 273
1 367 PK - VE CONTROL BOOTH/PROJECTION ROOM 100 100 1 0 127
1 368 PK - VE TEXTBOOK STORAGE 301 301 43 0 382
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 3,219 3,219 87 0 4,088
1 381 PK - VE MEDIA TECHNICAL PROCESSING 348 348 87 0 441
1 382 PK - VE PROFESSIONAL LIBRARY 348 348 87 0 441
1 383 PK - VE AUDIO VISUAL STORAGE 522 522 87 0 662
1 384 PK - VE PERIODICAL STORAGE 174 174 87 0 220
1 385 PK - VE CLOSED CIRCUIT TV LAB 609 609 87 0 773
1 386 PK - VE CLOSED CIRCUIT STORAGE 435 435 87 0 552
1 387 PK - VE MEDIA PRODUCTION LAB 435 435 87 0 552
1 388 PK - VE MEDIA COPYING ROOM 174 174 87 0 220
1 389 PK - VE MEDIA SMALL GROUP ROOM 86 86 43 0 109
1 390 PK - VE MEDIA GROUP PROJECTS/INSTRUCTION 435 435 87 0 552
1 391 PK - VE MEDIA MAINTENANCE/REPAIR 86 86 43 0 109
15 815 06 - 12 STUDENT RESTROOM (MALE) 86 1,290 43 0 1,638
15 816 06 - 12 STUDENT RESTROOM (FEMALE) 86 1,290 43 0 1,638
PAGE:26 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
842
Target Number of Stations:
Total Stations:
ELEMENTARY (KG - 03)
842
842
Gross Sq. Feet:
Utilization:
Acres Required:
125,846
1.000
11
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
44 1 PK - 03 PRIMARY CLASSROOM (K-3) 882 38,808 18 792 49,286
808 MATERIAL STORAGE 100 4,400 0 0 5,588
811 OUTSIDE STORAGE 50 2,200 0 0 2,794
813 STUDENT STORAGE 40 1,760 0 0 2,235
814 STUDENT RESTROOM (BOTH SEXES) 60 2,640 0 0 3,352
3 10 PK - 03 PRIMARY SKILLS LAB (K-3) 882 2,646 18 0 3,360
808 MATERIAL STORAGE 100 300 0 0 381
813 STUDENT STORAGE 40 120 0 0 152
814 STUDENT RESTROOM (BOTH SEXES) 60 180 0 0 228
1 13 PK - 05 ELEMENTARY P E STORAGE 315 315 1 0 400
1 14 PK - 05 ELEMENTARY COVERED PLAY AREA 3,024 3,024 84 0 3,840
6 40 PK - 12 RESOURCE ROOM 290 1,740 10 0 2,209
808 MATERIAL STORAGE 100 600 0 0 762
2 50 PK - 05 ART - ELEMENTARY 1,000 2,000 22 0 2,540
808 MATERIAL STORAGE 100 200 0 0 254
812 PROJECT STORAGE 150 300 0 0 381
2 55 PK - 05 MUSIC - ELEMENTARY 1,000 2,000 22 0 2,540
806 REFERENCE 100 200 0 0 254
808 MATERIAL STORAGE 100 200 0 0 254
831 MUSIC PRACTICE ROOM 70 140 0 0 177
2 61 PK - 12 E S E PART-TIME 975 1,950 15 30 2,476
808 MATERIAL STORAGE 100 200 0 0 254
PAGE:27 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
813 STUDENT STORAGE 40 80 0 0 101
815 STUDENT RESTROOM (MALE) 35 70 0 0 88
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 88
2 62 PK - 12 E S E FULL-TIME 950 1,900 10 20 2,413
808 MATERIAL STORAGE 100 200 0 0 254
813 STUDENT STORAGE 40 80 0 0 101
815 STUDENT RESTROOM (MALE) 35 70 0 0 88
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 88
817 STUDENT RESTROOM & BATH 110 220 0 0 279
3 65 PK - 12 E S E RESOURCE 380 1,140 4 0 1,447
808 MATERIAL STORAGE 100 300 0 0 381
813 STUDENT STORAGE 40 120 0 0 152
2 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 100 200 2 0 254
808 MATERIAL STORAGE 100 200 0 0 254
2 70 PK - 12 E S E ITINERANT 200 400 4 0 508
808 MATERIAL STORAGE 100 200 0 0 254
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 317
4 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 700 0 0 889
1 302 PK - VE BOOKKEEPING OFFICE 125 125 0 0 158
2 303 PK - VE SECRETARIAL SPACE 158 316 0 0 401
1 304 PK - VE RECEPTION AREA 714 714 42 0 906
1 305 PK - VE PRODUCTION WORKROOM 336 336 42 0 426
1 306 PK - VE CONFERENCE ROOM 588 588 42 0 746
1 307 PK - VE CLINIC 252 252 42 0 320
1 308 PK - VE GENERAL SCHOOL STORAGE 420 420 42 0 533
1 309 PK - VE VAULT/STUDENT RECORDS 252 252 42 0 320
PAGE:28 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 310 PK - VE SCHOOL STORE 84 84 42 0 106
1 311 PK - VE STUDENT ACTIVITIES 420 420 42 0 533
1 312 PK - VE COMPUTER AREA 126 126 42 0 160
1 313 PK - VE CAREERS ROOM 252 252 42 0 320
2 314 PK - VE ITINERANT OFFICE 125 250 0 0 317
1 315 PK - VE TEACHER PLANNING OFFICE 1,680 1,680 84 0 2,133
1 316 PK - VE TEACHER LOUNGE/DINING 336 336 84 0 426
1 330 PK - VE CUSTODIAL RECEIVING 1,260 1,260 84 0 1,600
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 196
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 635
1 340 PK - VE DINING AREA 3,360 3,360 84 0 4,267
1 341 PK - VE KITCHEN & SERVING AREA 3,696 3,696 84 0 4,693
1 349 PK - VE KITCHEN CHAIR STORAGE 168 168 42 0 213
1 361 PK - VE MULTIPURPOSE ROOM (DINING) 2,604 2,604 84 0 3,307
1 362 PK - VE MULTIPURPOSE ROOM CHAIR STORAGE 168 168 84 0 213
1 363 PK - VE STAGE 990 990 1 0 1,257
1 364 PK - VE STAGE STORAGE 420 420 84 0 533
1 365 PK - VE STAGE DRESSING ROOM (MALE) 210 210 42 0 266
1 366 PK - VE STAGE DRESSING ROOM (FEMALE) 210 210 42 0 266
1 367 PK - VE CONTROL BOOTH/PROJECTION ROOM 100 100 1 0 127
1 368 PK - VE TEXTBOOK STORAGE 294 294 42 0 373
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 3,108 3,108 84 0 3,947
1 381 PK - VE MEDIA TECHNICAL PROCESSING 336 336 84 0 426
1 382 PK - VE PROFESSIONAL LIBRARY 336 336 84 0 426
1 383 PK - VE AUDIO VISUAL STORAGE 504 504 84 0 640
1 384 PK - VE PERIODICAL STORAGE 168 168 84 0 213
PAGE:29 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 385 PK - VE CLOSED CIRCUIT TV LAB 588 588 84 0 746
1 386 PK - VE CLOSED CIRCUIT STORAGE 420 420 84 0 533
1 387 PK - VE MEDIA PRODUCTION LAB 420 420 84 0 533
1 388 PK - VE MEDIA COPYING ROOM 168 168 84 0 213
1 389 PK - VE MEDIA SMALL GROUP ROOM 84 84 42 0 106
1 390 PK - VE MEDIA GROUP PROJECTS/INSTRUCTION 420 420 84 0 533
1 391 PK - VE MEDIA MAINTENANCE/REPAIR 84 84 42 0 106
PAGE:30 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
908
Target Number of Stations:
Total Stations:
ELEMENTARY (03 - 06)
908
908
Gross Sq. Feet:
Utilization:
Acres Required:
115,943
1.000
12
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
39 2 04 - 08 INTERMEDIATE/MIDDLE CLASSROOM (4-8) 858 33,462 22 858 42,496
808 MATERIAL STORAGE 100 3,900 0 0 4,953
811 OUTSIDE STORAGE 50 1,950 0 0 2,476
815 STUDENT RESTROOM (MALE) 35 1,365 0 0 1,733
816 STUDENT RESTROOM (FEMALE) 35 1,365 0 0 1,733
1 13 PK - 05 ELEMENTARY P E STORAGE 315 315 1 0 400
1 14 PK - 05 ELEMENTARY COVERED PLAY AREA 3,240 3,240 90 0 4,114
6 40 PK - 12 RESOURCE ROOM 290 1,740 10 0 2,209
808 MATERIAL STORAGE 100 600 0 0 762
2 50 PK - 05 ART - ELEMENTARY 1,000 2,000 22 0 2,540
808 MATERIAL STORAGE 100 200 0 0 254
812 PROJECT STORAGE 150 300 0 0 381
2 55 PK - 05 MUSIC - ELEMENTARY 1,000 2,000 22 0 2,540
806 REFERENCE 100 200 0 0 254
808 MATERIAL STORAGE 100 200 0 0 254
831 MUSIC PRACTICE ROOM 70 140 0 0 177
2 61 PK - 12 E S E PART-TIME 975 1,950 15 30 2,476
808 MATERIAL STORAGE 100 200 0 0 254
813 STUDENT STORAGE 40 80 0 0 101
815 STUDENT RESTROOM (MALE) 35 70 0 0 88
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 88
2 62 PK - 12 E S E FULL-TIME 950 1,900 10 20 2,413
PAGE:31 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
808 MATERIAL STORAGE 100 200 0 0 254
813 STUDENT STORAGE 40 80 0 0 101
815 STUDENT RESTROOM (MALE) 35 70 0 0 88
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 88
817 STUDENT RESTROOM & BATH 110 220 0 0 279
3 65 PK - 12 E S E RESOURCE 380 1,140 4 0 1,447
808 MATERIAL STORAGE 100 300 0 0 381
813 STUDENT STORAGE 40 120 0 0 152
2 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 50 100 2 0 127
808 MATERIAL STORAGE 100 200 0 0 254
2 70 PK - 12 E S E ITINERANT 200 400 4 0 508
808 MATERIAL STORAGE 100 200 0 0 254
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 317
4 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 700 0 0 889
1 302 PK - VE BOOKKEEPING OFFICE 125 125 0 0 158
2 303 PK - VE SECRETARIAL SPACE 158 316 0 0 401
1 304 PK - VE RECEPTION AREA 765 765 45 0 971
1 305 PK - VE PRODUCTION WORKROOM 360 360 45 0 457
1 306 PK - VE CONFERENCE ROOM 630 630 45 0 800
1 307 PK - VE CLINIC 270 270 45 0 342
1 309 PK - VE VAULT/STUDENT RECORDS 270 270 45 0 342
1 311 PK - VE STUDENT ACTIVITIES 450 450 45 0 571
1 313 PK - VE CAREERS ROOM 270 270 45 0 342
3 314 PK - VE ITINERANT OFFICE 125 375 0 0 476
1 315 PK - VE TEACHER PLANNING OFFICE 1,800 1,800 90 0 2,286
1 316 PK - VE TEACHER LOUNGE/DINING 360 360 90 0 457
PAGE:32 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 330 PK - VE CUSTODIAL RECEIVING 1,350 1,350 90 0 1,714
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 196
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 635
1 340 PK - VE DINING AREA 3,600 3,600 90 0 4,572
1 341 PK - VE KITCHEN & SERVING AREA 3,960 3,960 90 0 5,029
1 349 PK - VE KITCHEN CHAIR STORAGE 180 180 45 0 228
1 361 PK - VE MULTIPURPOSE ROOM (DINING) 2,790 2,790 90 0 3,543
1 363 PK - VE STAGE 990 990 1 0 1,257
1 364 PK - VE STAGE STORAGE 450 450 90 0 571
1 367 PK - VE CONTROL BOOTH/PROJECTION ROOM 100 100 1 0 127
1 368 PK - VE TEXTBOOK STORAGE 315 315 45 0 400
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 3,330 3,330 90 0 4,229
1 381 PK - VE MEDIA TECHNICAL PROCESSING 360 360 90 0 457
1 382 PK - VE PROFESSIONAL LIBRARY 360 360 90 0 457
1 383 PK - VE AUDIO VISUAL STORAGE 540 540 90 0 685
1 384 PK - VE PERIODICAL STORAGE 180 180 90 0 228
1 385 PK - VE CLOSED CIRCUIT TV LAB 630 630 90 0 800
1 386 PK - VE CLOSED CIRCUIT STORAGE 450 450 90 0 571
1 390 PK - VE MEDIA GROUP PROJECTS/INSTRUCTION 450 450 90 0 571
1 391 PK - VE MEDIA MAINTENANCE/REPAIR 90 90 45 0 114
3 10 PK - 03 PRIMARY SKILLS LAB (K-3) 882 2,646 18 0 3,360
808 MATERIAL STORAGE 100 300 0 0 381
813 STUDENT STORAGE 40 120 0 0 152
814 STUDENT RESTROOM (BOTH SEXES) 60 180 0 0 228
PAGE:33 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
115
Target Number of Stations:
Total Stations:
ALTERNATIVE EDUCATION (KG - 12)
115
115
Gross Sq. Feet:
Utilization:
Acres Required:
26,074
1.000
7
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 1 PK - 03 PRIMARY CLASSROOM (K-3) 882 882 18 18 1,181
808 MATERIAL STORAGE 100 100 0 0 134
811 OUTSIDE STORAGE 50 50 0 0 67
813 STUDENT STORAGE 40 40 0 0 53
814 STUDENT RESTROOM (BOTH SEXES) 60 60 0 0 80
1 2 04 - 08 INTERMEDIATE/MIDDLE CLASSROOM (4-8) 858 858 22 22 1,149
808 MATERIAL STORAGE 100 100 0 0 134
811 OUTSIDE STORAGE 50 50 0 0 67
815 STUDENT RESTROOM (MALE) 35 35 0 0 46
816 STUDENT RESTROOM (FEMALE) 35 35 0 0 46
2 3 09 - 12 SENIOR HIGH CLASSROOM (9-12) 800 1,600 25 50 2,144
808 MATERIAL STORAGE 100 200 0 0 268
1 10 PK - 03 PRIMARY SKILLS LAB (K-3) 882 882 18 0 1,181
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
814 STUDENT RESTROOM (BOTH SEXES) 60 60 0 0 80
1 13 PK - 05 ELEMENTARY P E STORAGE 315 315 1 0 422
1 14 PK - 05 ELEMENTARY COVERED PLAY AREA 396 396 11 0 530
1 40 PK - 12 RESOURCE ROOM 290 290 10 0 388
808 MATERIAL STORAGE 100 100 0 0 134
1 50 PK - 05 ART - ELEMENTARY 1,000 1,000 22 0 1,340
808 MATERIAL STORAGE 100 100 0 0 134
PAGE:34 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
812 PROJECT STORAGE 150 150 0 0 201
1 55 PK - 05 MUSIC - ELEMENTARY 1,000 1,000 22 0 1,340
806 REFERENCE 100 100 0 0 134
808 MATERIAL STORAGE 100 100 0 0 134
831 MUSIC PRACTICE ROOM 70 70 0 0 93
1 61 PK - 12 E S E PART-TIME 975 975 15 15 1,306
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
815 STUDENT RESTROOM (MALE) 35 35 0 0 46
816 STUDENT RESTROOM (FEMALE) 35 35 0 0 46
1 62 PK - 12 E S E FULL-TIME 950 950 10 10 1,273
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
815 STUDENT RESTROOM (MALE) 35 35 0 0 46
816 STUDENT RESTROOM (FEMALE) 35 35 0 0 46
817 STUDENT RESTROOM & BATH 110 110 0 0 147
1 65 PK - 12 E S E RESOURCE 380 380 4 0 509
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
1 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 100 100 2 0 134
808 MATERIAL STORAGE 100 100 0 0 134
1 270 09 - VE WORK EVALUATION LAB 1,110 1,110 15 0 1,487
810 MATERIAL STORAGE (LARGE) 395 395 0 0 529
853 VOCATIONAL TESTING 250 250 0 0 335
1 271 09 - VE VPI LAB 705 705 15 0 944
802 INSTRUCTIONAL CONFERENCE ROOM 225 225 0 0 301
PAGE:35 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
808 MATERIAL STORAGE 100 100 0 0 134
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
846 RECEPTION (VOC ED INSTRUCTION) 90 90 0 0 120
853 VOCATIONAL TESTING 250 250 0 0 335
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 335
4 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 700 0 0 938
1 302 PK - VE BOOKKEEPING OFFICE 125 125 0 0 167
1 303 PK - VE SECRETARIAL SPACE 158 158 0 0 211
1 304 PK - VE RECEPTION AREA 85 85 5 0 113
1 305 PK - VE PRODUCTION WORKROOM 40 40 5 0 53
1 306 PK - VE CONFERENCE ROOM 70 70 5 0 93
1 307 PK - VE CLINIC 30 30 5 0 40
1 308 PK - VE GENERAL SCHOOL STORAGE 50 50 5 0 67
1 309 PK - VE VAULT/STUDENT RECORDS 30 30 5 0 40
1 310 PK - VE SCHOOL STORE 10 10 5 0 13
1 311 PK - VE STUDENT ACTIVITIES 50 50 5 0 67
1 312 PK - VE COMPUTER AREA 15 15 5 0 20
1 314 PK - VE ITINERANT OFFICE 125 125 0 0 167
1 315 PK - VE TEACHER PLANNING OFFICE 220 220 11 0 294
1 316 PK - VE TEACHER LOUNGE/DINING 44 44 11 0 58
1 330 PK - VE CUSTODIAL RECEIVING 165 165 11 0 221
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 207
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 670
1 340 PK - VE DINING AREA 440 440 11 0 589
1 341 PK - VE KITCHEN & SERVING AREA 484 484 11 0 648
1 349 PK - VE KITCHEN CHAIR STORAGE 20 20 5 0 26
PAGE:36 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 815 06 - 12 STUDENT RESTROOM (MALE) 10 10 5 0 13
1 816 06 - 12 STUDENT RESTROOM (FEMALE) 10 10 5 0 13
PAGE:37 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
1,137
Target Number of Stations:
Total Stations:
MIDDLE (07 - 08)
1,264
1,264
Gross Sq. Feet:
Utilization:
Acres Required:
179,109
1.000
15
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
25 2 04 - 08 INTERMEDIATE/MIDDLE CLASSROOM (4-8) 858 21,450 22 550 28,314
808 MATERIAL STORAGE 100 2,500 0 0 3,300
811 OUTSIDE STORAGE 50 1,250 0 0 1,650
815 STUDENT RESTROOM (MALE) 35 875 0 0 1,155
816 STUDENT RESTROOM (FEMALE) 35 875 0 0 1,155
4 11 04 - 08 INTERMEDIATE/MIDDLE SKILLS LAB (4-8) 858 3,432 22 88 4,530
808 MATERIAL STORAGE 100 400 0 0 528
815 STUDENT RESTROOM (MALE) 35 140 0 0 184
816 STUDENT RESTROOM (FEMALE) 35 140 0 0 184
9 21 04 - 08 INTERMEDIATE/MIDDLE SCIENCE LAB (4-8) 1,122 10,098 22 198 13,329
808 MATERIAL STORAGE 100 900 0 0 1,188
812 PROJECT STORAGE 150 1,350 0 0 1,782
5 40 PK - 12 RESOURCE ROOM 290 1,450 10 0 1,914
808 MATERIAL STORAGE 100 500 0 0 660
2 51 04 - 08 ART - MIDDLE 1,260 2,520 30 60 3,326
803 INSTRUCTIONAL DARKROOM 100 200 0 0 264
805 KILN 60 120 0 0 158
808 MATERIAL STORAGE 100 200 0 0 264
812 PROJECT STORAGE 150 300 0 0 396
3 61 PK - 12 E S E PART-TIME 975 2,925 15 45 3,861
808 MATERIAL STORAGE 100 300 0 0 396
813 STUDENT STORAGE 40 120 0 0 158
PAGE:38 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
815 STUDENT RESTROOM (MALE) 35 105 0 0 138
816 STUDENT RESTROOM (FEMALE) 35 105 0 0 138
3 62 PK - 12 E S E FULL-TIME 950 2,850 10 30 3,762
808 MATERIAL STORAGE 100 300 0 0 396
813 STUDENT STORAGE 40 120 0 0 158
815 STUDENT RESTROOM (MALE) 35 105 0 0 138
816 STUDENT RESTROOM (FEMALE) 35 105 0 0 138
817 STUDENT RESTROOM & BATH 110 330 0 0 435
1 63 PK - 12 E S E VOCATIONAL 1,140 1,140 12 12 1,504
808 MATERIAL STORAGE 100 100 0 0 132
815 STUDENT RESTROOM (MALE) 35 35 0 0 46
816 STUDENT RESTROOM (FEMALE) 35 35 0 0 46
3 65 PK - 12 E S E RESOURCE 380 1,140 4 0 1,504
808 MATERIAL STORAGE 100 300 0 0 396
813 STUDENT STORAGE 40 120 0 0 158
3 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 100 300 2 0 396
808 MATERIAL STORAGE 100 300 0 0 396
1 70 PK - 12 E S E ITINERANT 200 200 4 0 264
808 MATERIAL STORAGE 100 100 0 0 132
1 75 06 - 12 VOCAL MUSIC CLASS (MIDDLE-SR HIGH) 1,425 1,425 25 25 1,881
806 REFERENCE 100 100 0 0 132
808 MATERIAL STORAGE 100 100 0 0 132
830 MUSIC ENSEMBLE 300 300 0 0 396
831 MUSIC PRACTICE ROOM 70 70 0 0 92
833 ROBE STORAGE 150 150 0 0 198
836 SHEET MUSIC STORAGE 150 150 0 0 198
PAGE:39 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
837 MUSIC EQUIPMENT STORAGE 400 400 0 0 528
1 76 06 - 12 BAND CLASS (MIDDLE-SR HIGH) 2,000 2,000 45 45 2,640
806 REFERENCE 100 100 0 0 132
808 MATERIAL STORAGE 100 100 0 0 132
830 MUSIC ENSEMBLE 300 300 0 0 396
831 MUSIC PRACTICE ROOM 70 70 0 0 92
832 INSTRUMENT STORAGE 600 600 0 0 792
834 UNIFORM STORAGE 300 300 0 0 396
835 MUSIC STUDIO 180 180 0 0 237
836 SHEET MUSIC STORAGE 150 150 0 0 198
837 MUSIC EQUIPMENT STORAGE 400 400 0 0 528
1 77 06 - 12 ORCHESTRA CLASS (MIDDLE-SR HIGH) 1,425 1,425 25 25 1,881
806 REFERENCE 100 100 0 0 132
808 MATERIAL STORAGE 100 100 0 0 132
830 MUSIC ENSEMBLE 300 300 0 0 396
831 MUSIC PRACTICE ROOM 70 70 0 0 92
832 INSTRUMENT STORAGE 600 600 0 0 792
836 SHEET MUSIC STORAGE 150 150 0 0 198
837 MUSIC EQUIPMENT STORAGE 400 400 0 0 528
1 90 06 - 12 P E DRESSING ROOM (MALE) 672 672 56 0 887
1 91 06 - 12 P E DRESSING ROOM (FEMALE) 672 672 56 0 887
1 92 06 - 12 P E LOCKER ROOM (MALE) 112 112 56 0 147
1 93 06 - 12 P E LOCKER ROOM (FEMALE) 112 112 56 0 147
1 94 06 - 12 P E SHOWER (MALE) 112 112 56 0 147
1 95 06 - 12 P E SHOWER (FEMALE) 112 112 56 0 147
1 96 06 - 12 P E DRYING AREA (MALE) 112 112 56 0 147
PAGE:40 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 97 06 - 12 P E DRYING AREA (FEMALE) 112 112 56 0 147
1 98 06 - 12 P E STORAGE (MIDDLE-SR HIGH) 504 504 56 0 665
1 99 06 - 12 P E TEACHERS SHOWER (MALE) 22 22 1 0 29
1 110 06 - 12 P E MULTIPURPOSE ROOM (MIDDLE-SR HIGH) 1,050 1,050 1 0 1,386
1 111 06 - 09 JR HIGH GYMNASIUM 5,800 5,800 120 120 7,656
1 113 06 - 12 GYMNASIUM SEATING 3,616 3,616 113 0 4,773
1 115 06 - 12 P E FIRST AID 112 112 56 0 147
1 117 06 - 12 P E WEIGHT ROOM 1,000 1,000 1 0 1,320
1 119 06 - 12 P E GYMNASTICS & DANCE 1,050 1,050 1 0 1,386
1 120 06 - 12 GYMNASIUM STORAGE 168 168 56 0 221
1 210 06 - 09 BUSINESS EXPLORATION LAB 1,210 1,210 22 22 1,597
808 MATERIAL STORAGE 100 100 0 0 132
1 230 06 - 09 HOME ECONOMICS EXPLORATION LAB 1,540 1,540 22 22 2,032
808 MATERIAL STORAGE 100 100 0 0 132
812 PROJECT STORAGE 150 150 0 0 198
842 KITCHEN (HOME ECONOMICS) 125 125 0 0 165
843 LAUNDRY (HOME ECONOMICS) 50 50 0 0 66
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,056
1 240 06 - 09 TECHNOLOGY/INDUSTRY EXPLORATION LAB 2,090 2,090 22 22 2,758
808 MATERIAL STORAGE 100 100 0 0 132
849 VOCATIONAL PROJECT STORAGE 310 310 0 0 409
851 VOCATIONAL TOOL STORAGE (LARGE) 310 310 0 0 409
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,056
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 330
8 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 1,400 0 0 1,848
2 302 PK - VE BOOKKEEPING OFFICE 125 250 0 0 330
PAGE:41 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
2 303 PK - VE SECRETARIAL SPACE 158 316 0 0 417
1 304 PK - VE RECEPTION AREA 952 952 56 0 1,256
1 305 PK - VE PRODUCTION WORKROOM 448 448 56 0 591
1 306 PK - VE CONFERENCE ROOM 784 784 56 0 1,034
1 307 PK - VE CLINIC 336 336 56 0 443
1 308 PK - VE GENERAL SCHOOL STORAGE 560 560 56 0 739
1 309 PK - VE VAULT/STUDENT RECORDS 336 336 56 0 443
1 310 PK - VE SCHOOL STORE 112 112 56 0 147
1 311 PK - VE STUDENT ACTIVITIES 560 560 56 0 739
1 312 PK - VE COMPUTER AREA 168 168 56 0 221
1 313 PK - VE CAREERS ROOM 336 336 56 0 443
3 314 PK - VE ITINERANT OFFICE 125 375 0 0 495
1 315 PK - VE TEACHER PLANNING OFFICE 2,260 2,260 113 0 2,983
1 316 PK - VE TEACHER LOUNGE/DINING 452 452 113 0 596
1 330 PK - VE CUSTODIAL RECEIVING 1,695 1,695 113 0 2,237
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 204
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 660
1 340 PK - VE DINING AREA 4,520 4,520 113 0 5,966
1 341 PK - VE KITCHEN & SERVING AREA 4,972 4,972 113 0 6,563
1 349 PK - VE KITCHEN CHAIR STORAGE 224 224 56 0 295
1 361 PK - VE MULTIPURPOSE ROOM (DINING) 3,503 3,503 113 0 4,623
1 362 PK - VE MULTIPURPOSE ROOM CHAIR STORAGE 226 226 113 0 298
1 363 PK - VE STAGE 990 990 1 0 1,306
1 364 PK - VE STAGE STORAGE 565 565 113 0 745
1 365 PK - VE STAGE DRESSING ROOM (MALE) 280 280 56 0 369
1 366 PK - VE STAGE DRESSING ROOM (FEMALE) 280 280 56 0 369
PAGE:42 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 367 PK - VE CONTROL BOOTH/PROJECTION ROOM 100 100 1 0 132
1 368 PK - VE TEXTBOOK STORAGE 392 392 56 0 517
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 4,181 4,181 113 0 5,518
1 381 PK - VE MEDIA TECHNICAL PROCESSING 452 452 113 0 596
1 382 PK - VE PROFESSIONAL LIBRARY 452 452 113 0 596
1 383 PK - VE AUDIO VISUAL STORAGE 678 678 113 0 894
1 384 PK - VE PERIODICAL STORAGE 226 226 113 0 298
1 385 PK - VE CLOSED CIRCUIT TV LAB 791 791 113 0 1,044
1 386 PK - VE CLOSED CIRCUIT STORAGE 565 565 113 0 745
1 387 PK - VE MEDIA PRODUCTION LAB 565 565 113 0 745
1 388 PK - VE MEDIA COPYING ROOM 226 226 113 0 298
1 389 PK - VE MEDIA SMALL GROUP ROOM 112 112 56 0 147
1 390 PK - VE MEDIA GROUP PROJECTS/INSTRUCTION 565 565 113 0 745
1 391 PK - VE MEDIA MAINTENANCE/REPAIR 112 112 56 0 147
25 815 06 - 12 STUDENT RESTROOM (MALE) 112 2,800 56 0 3,696
25 816 06 - 12 STUDENT RESTROOM (FEMALE) 112 2,800 56 0 3,696
PAGE:43 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
2,051
Target Number of Stations:
Total Stations:
COMBINATION (07 - 12)
2,279
2,279
Gross Sq. Feet:
Utilization:
Acres Required:
348,396
0.900
32
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
21 2 04 - 08 INTERMEDIATE/MIDDLE CLASSROOM (4-8) 858 18,018 22 462 24,144
808 MATERIAL STORAGE 100 2,100 0 0 2,814
811 OUTSIDE STORAGE 50 1,050 0 0 1,407
815 STUDENT RESTROOM (MALE) 35 735 0 0 984
816 STUDENT RESTROOM (FEMALE) 35 735 0 0 984
27 3 09 - 12 SENIOR HIGH CLASSROOM (9-12) 800 21,600 25 675 28,944
808 MATERIAL STORAGE 100 2,700 0 0 3,618
3 11 04 - 08 INTERMEDIATE/MIDDLE SKILLS LAB (4-8) 858 2,574 22 66 3,449
808 MATERIAL STORAGE 100 300 0 0 402
815 STUDENT RESTROOM (MALE) 35 105 0 0 140
816 STUDENT RESTROOM (FEMALE) 35 105 0 0 140
3 12 09 - 12 SENIOR HIGH SKILLS LAB (9-12) 800 2,400 25 75 3,216
808 MATERIAL STORAGE 100 300 0 0 402
6 21 04 - 08 INTERMEDIATE/MIDDLE SCIENCE LAB (4-8) 1,122 6,732 22 132 9,020
808 MATERIAL STORAGE 100 600 0 0 804
812 PROJECT STORAGE 150 900 0 0 1,206
9 23 09 - 12 SENIOR HIGH SCIENCE LAB (9-12) 1,275 11,475 25 225 15,376
808 MATERIAL STORAGE 100 900 0 0 1,206
812 PROJECT STORAGE 150 1,350 0 0 1,809
9 40 PK - 12 RESOURCE ROOM 290 2,610 10 0 3,497
808 MATERIAL STORAGE 100 900 0 0 1,206
1 51 04 - 08 ART - MIDDLE 1,260 1,260 30 30 1,688
PAGE:44 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
803 INSTRUCTIONAL DARKROOM 100 100 0 0 134
805 KILN 60 60 0 0 80
808 MATERIAL STORAGE 100 100 0 0 134
812 PROJECT STORAGE 150 150 0 0 201
1 52 09 - 12 ART - SENIOR HIGH 1,590 1,590 30 30 2,130
803 INSTRUCTIONAL DARKROOM 100 100 0 0 134
805 KILN 60 60 0 0 80
808 MATERIAL STORAGE 100 100 0 0 134
812 PROJECT STORAGE 150 150 0 0 201
5 61 PK - 12 E S E PART-TIME 975 4,875 15 75 6,532
808 MATERIAL STORAGE 100 500 0 0 670
813 STUDENT STORAGE 40 200 0 0 268
815 STUDENT RESTROOM (MALE) 35 175 0 0 234
816 STUDENT RESTROOM (FEMALE) 35 175 0 0 234
5 62 PK - 12 E S E FULL-TIME 950 4,750 10 50 6,365
808 MATERIAL STORAGE 100 500 0 0 670
813 STUDENT STORAGE 40 200 0 0 268
815 STUDENT RESTROOM (MALE) 35 175 0 0 234
816 STUDENT RESTROOM (FEMALE) 35 175 0 0 234
817 STUDENT RESTROOM & BATH 110 550 0 0 737
6 65 PK - 12 E S E RESOURCE 380 2,280 4 0 3,055
808 MATERIAL STORAGE 100 600 0 0 804
813 STUDENT STORAGE 40 240 0 0 321
5 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 100 500 2 0 670
808 MATERIAL STORAGE 100 500 0 0 670
2 75 06 - 12 VOCAL MUSIC CLASS (MIDDLE-SR HIGH) 1,425 2,850 25 50 3,819
PAGE:45 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
806 REFERENCE 100 200 0 0 268
808 MATERIAL STORAGE 100 200 0 0 268
830 MUSIC ENSEMBLE 300 600 0 0 804
831 MUSIC PRACTICE ROOM 70 140 0 0 187
833 ROBE STORAGE 150 300 0 0 402
836 SHEET MUSIC STORAGE 150 300 0 0 402
837 MUSIC EQUIPMENT STORAGE 400 800 0 0 1,072
1 76 06 - 12 BAND CLASS (MIDDLE-SR HIGH) 2,000 2,000 50 50 2,680
806 REFERENCE 100 100 0 0 134
808 MATERIAL STORAGE 100 100 0 0 134
830 MUSIC ENSEMBLE 300 300 0 0 402
831 MUSIC PRACTICE ROOM 70 70 0 0 93
832 INSTRUMENT STORAGE 600 600 0 0 804
834 UNIFORM STORAGE 300 300 0 0 402
835 MUSIC STUDIO 180 180 0 0 241
836 SHEET MUSIC STORAGE 150 150 0 0 201
837 MUSIC EQUIPMENT STORAGE 400 400 0 0 536
1 77 06 - 12 ORCHESTRA CLASS (MIDDLE-SR HIGH) 1,425 1,425 25 25 1,909
806 REFERENCE 100 100 0 0 134
808 MATERIAL STORAGE 100 100 0 0 134
830 MUSIC ENSEMBLE 300 300 0 0 402
831 MUSIC PRACTICE ROOM 70 70 0 0 93
832 INSTRUMENT STORAGE 600 600 0 0 804
836 SHEET MUSIC STORAGE 150 150 0 0 201
837 MUSIC EQUIPMENT STORAGE 400 400 0 0 536
1 90 06 - 12 P E DRESSING ROOM (MALE) 1,224 1,224 102 0 1,640
PAGE:46 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 91 06 - 12 P E DRESSING ROOM (FEMALE) 1,224 1,224 102 0 1,640
1 92 06 - 12 P E LOCKER ROOM (MALE) 204 204 102 0 273
1 93 06 - 12 P E LOCKER ROOM (FEMALE) 204 204 102 0 273
1 94 06 - 12 P E SHOWER (MALE) 204 204 102 0 273
1 95 06 - 12 P E SHOWER (FEMALE) 204 204 102 0 273
1 96 06 - 12 P E DRYING AREA (MALE) 204 204 102 0 273
1 97 06 - 12 P E DRYING AREA (FEMALE) 204 204 102 0 273
1 98 06 - 12 P E STORAGE (MIDDLE-SR HIGH) 918 918 102 0 1,230
1 99 06 - 12 P E TEACHERS SHOWER (MALE) 22 22 1 0 29
1 100 06 - 12 P E TEACHERS SHOWER (FEMALE) 22 22 1 0 29
1 110 06 - 12 P E MULTIPURPOSE ROOM (MIDDLE-SR HIGH) 1,050 1,050 1 0 1,407
1 112 09 - 12 SR HIGH GYMNASIUM 6,500 6,500 70 70 8,710
1 113 06 - 12 GYMNASIUM SEATING 6,560 6,560 205 0 8,790
1 114 06 - 12 P E LAUNDRY 204 204 102 0 273
1 115 06 - 12 P E FIRST AID 204 204 102 0 273
1 116 06 - 12 P E TRAINING ROOM 250 250 1 0 335
1 117 06 - 12 P E WEIGHT ROOM 1,000 1,000 1 0 1,340
1 118 06 - 12 P E WRESTLING ROOM 1,680 1,680 1 0 2,251
1 119 06 - 12 P E GYMNASTICS & DANCE 1,050 1,050 1 0 1,407
1 120 06 - 12 GYMNASIUM STORAGE 306 306 102 0 410
2 212 09 - VE BUSINESS EDUCATION LAB 1,460 2,920 20 40 3,912
808 MATERIAL STORAGE 100 200 0 0 268
1 222 09 - VE SMALL DISTRIBUTIVE/DIVERSIFIED LAB 1,100 1,100 20 20 1,474
812 PROJECT STORAGE 150 150 0 0 201
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
1 230 06 - 09 HOME ECONOMICS EXPLORATION LAB 1,540 1,540 22 22 2,063
PAGE:47 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
808 MATERIAL STORAGE 100 100 0 0 134
812 PROJECT STORAGE 150 150 0 0 201
842 KITCHEN (HOME ECONOMICS) 125 125 0 0 167
843 LAUNDRY (HOME ECONOMICS) 50 50 0 0 67
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
1 233 09 - VE MEDIUM HOME ECONOMICS LAB 1,380 1,380 20 20 1,849
808 MATERIAL STORAGE 100 100 0 0 134
842 KITCHEN (HOME ECONOMICS) 125 125 0 0 167
843 LAUNDRY (HOME ECONOMICS) 50 50 0 0 67
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
1 240 06 - 09 TECHNOLOGY/INDUSTRY EXPLORATION LAB 2,090 2,090 22 22 2,800
808 MATERIAL STORAGE 100 100 0 0 134
849 VOCATIONAL PROJECT STORAGE 310 310 0 0 415
851 VOCATIONAL TOOL STORAGE (LARGE) 310 310 0 0 415
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
2 242 09 - 12 MEDIUM TECHNOLOGY LAB 2,375 4,750 25 50 6,365
810 MATERIAL STORAGE (LARGE) 395 790 0 0 1,058
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 1,600 0 0 2,144
1 243 09 - 12 LARGE TECHNOLOGY LAB 3,375 3,375 25 25 4,522
808 MATERIAL STORAGE 100 100 0 0 134
810 MATERIAL STORAGE (LARGE) 395 395 0 0 529
849 VOCATIONAL PROJECT STORAGE 310 310 0 0 415
851 VOCATIONAL TOOL STORAGE (LARGE) 310 310 0 0 415
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
1 246 09 - VE LARGE INDUSTRIAL LAB 4,000 4,000 20 20 5,360
808 MATERIAL STORAGE 100 100 0 0 134
PAGE:48 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
810 MATERIAL STORAGE (LARGE) 395 395 0 0 529
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
847 VOCATIONAL FLAMMABLE STORAGE 125 125 0 0 167
849 VOCATIONAL PROJECT STORAGE 310 310 0 0 415
850 VOCATIONAL TOOL STORAGE (SMALL) 195 195 0 0 261
1 252 09 - VE SMALL HEALTH LAB 1,200 1,200 20 20 1,608
804 DISPENSARY 135 135 0 0 180
808 MATERIAL STORAGE 100 100 0 0 134
812 PROJECT STORAGE 150 150 0 0 201
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
1 270 09 - VE WORK EVALUATION LAB 1,110 1,110 15 0 1,487
810 MATERIAL STORAGE (LARGE) 395 395 0 0 529
853 VOCATIONAL TESTING 250 250 0 0 335
1 271 09 - VE VPI LAB 705 705 15 0 944
802 INSTRUCTIONAL CONFERENCE ROOM 225 225 0 0 301
808 MATERIAL STORAGE 100 100 0 0 134
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
846 RECEPTION (VOC ED INSTRUCTION) 90 90 0 0 120
853 VOCATIONAL TESTING 250 250 0 0 335
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 335
13 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 2,275 0 0 3,048
5 302 PK - VE BOOKKEEPING OFFICE 125 625 0 0 837
2 303 PK - VE SECRETARIAL SPACE 158 316 0 0 423
1 304 PK - VE RECEPTION AREA 1,734 1,734 102 0 2,323
1 305 PK - VE PRODUCTION WORKROOM 816 816 102 0 1,093
1 306 PK - VE CONFERENCE ROOM 1,428 1,428 102 0 1,913
PAGE:49 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 307 PK - VE CLINIC 612 612 102 0 820
1 308 PK - VE GENERAL SCHOOL STORAGE 1,020 1,020 102 0 1,366
1 309 PK - VE VAULT/STUDENT RECORDS 612 612 102 0 820
1 310 PK - VE SCHOOL STORE 204 204 102 0 273
1 311 PK - VE STUDENT ACTIVITIES 1,020 1,020 102 0 1,366
1 312 PK - VE COMPUTER AREA 306 306 102 0 410
1 313 PK - VE CAREERS ROOM 612 612 102 0 820
6 314 PK - VE ITINERANT OFFICE 125 750 0 0 1,005
1 315 PK - VE TEACHER PLANNING OFFICE 4,100 4,100 205 0 5,494
1 316 PK - VE TEACHER LOUNGE/DINING 820 820 205 0 1,098
1 330 PK - VE CUSTODIAL RECEIVING 3,075 3,075 205 0 4,120
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 207
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 670
1 340 PK - VE DINING AREA 8,200 8,200 205 0 10,988
1 341 PK - VE KITCHEN & SERVING AREA 9,020 9,020 205 0 12,086
1 349 PK - VE KITCHEN CHAIR STORAGE 408 408 102 0 546
1 351 06 - 12 MIDDLE/SR HIGH COVERED PATIO 7,380 7,380 205 0 9,889
1 360 06 - VE AUDITORIUM 6,150 6,150 205 0 8,241
1 363 PK - VE STAGE 990 990 1 0 1,326
1 364 PK - VE STAGE STORAGE 1,025 1,025 205 0 1,373
1 365 PK - VE STAGE DRESSING ROOM (MALE) 510 510 102 0 683
1 366 PK - VE STAGE DRESSING ROOM (FEMALE) 510 510 102 0 683
1 367 PK - VE CONTROL BOOTH/PROJECTION ROOM 100 100 1 0 134
1 368 PK - VE TEXTBOOK STORAGE 714 714 102 0 956
2 370 06 - VE LOBBY 1,020 2,040 102 0 2,733
2 371 06 - VE CONCESSIONS 200 400 1 0 536
PAGE:50 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
2 372 06 - VE TICKET BOOTH 30 60 1 0 80
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 7,585 7,585 205 0 10,163
1 381 PK - VE MEDIA TECHNICAL PROCESSING 820 820 205 0 1,098
1 382 PK - VE PROFESSIONAL LIBRARY 820 820 205 0 1,098
1 383 PK - VE AUDIO VISUAL STORAGE 1,230 1,230 205 0 1,648
1 384 PK - VE PERIODICAL STORAGE 410 410 205 0 549
1 385 PK - VE CLOSED CIRCUIT TV LAB 1,435 1,435 205 0 1,922
1 386 PK - VE CLOSED CIRCUIT STORAGE 1,025 1,025 205 0 1,373
1 387 PK - VE MEDIA PRODUCTION LAB 1,025 1,025 205 0 1,373
1 388 PK - VE MEDIA COPYING ROOM 410 410 205 0 549
1 389 PK - VE MEDIA SMALL GROUP ROOM 204 204 102 0 273
1 390 PK - VE MEDIA GROUP PROJECTS/INSTRUCTION 1,025 1,025 205 0 1,373
1 391 PK - VE MEDIA MAINTENANCE/REPAIR 204 204 102 0 273
1 708 09 - 12 JROTC 1,050 1,050 25 25 1,407
800 ARMS ROOM 150 150 0 0 201
801 FIRING RANGE (INDOOR) 2,400 2,400 0 0 3,216
802 INSTRUCTIONAL CONFERENCE ROOM 225 225 0 0 301
808 MATERIAL STORAGE 100 100 0 0 134
21 815 06 - 12 STUDENT RESTROOM (MALE) 204 4,284 102 0 5,740
21 816 06 - 12 STUDENT RESTROOM (FEMALE) 204 4,284 102 0 5,740
PAGE:51 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
2,716
Target Number of Stations:
Total Stations:
SENIOR HIGH (09 - 12)
2,859
2,859
Gross Sq. Feet:
Utilization:
Acres Required:
403,780
1.000
39
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
63 3 09 - 12 SENIOR HIGH CLASSROOM (9-12) 800 50,400 25 1,575 67,536
808 MATERIAL STORAGE 100 6,300 0 0 8,442
4 12 09 - 12 SENIOR HIGH SKILLS LAB (9-12) 800 3,200 25 100 4,288
808 MATERIAL STORAGE 100 400 0 0 536
1 22 09 - 12 SENIOR HIGH SCIENCE DEMO (9-12) 925 925 25 25 1,239
808 MATERIAL STORAGE 100 100 0 0 134
812 PROJECT STORAGE 150 150 0 0 201
11 23 09 - 12 SENIOR HIGH SCIENCE LAB (9-12) 1,275 14,025 25 275 18,793
808 MATERIAL STORAGE 100 1,100 0 0 1,474
812 PROJECT STORAGE 150 1,650 0 0 2,211
11 40 PK - 12 RESOURCE ROOM 290 3,190 10 0 4,274
808 MATERIAL STORAGE 100 1,100 0 0 1,474
2 52 09 - 12 ART - SENIOR HIGH 1,590 3,180 30 60 4,261
803 INSTRUCTIONAL DARKROOM 100 200 0 0 268
805 KILN 60 120 0 0 160
808 MATERIAL STORAGE 100 200 0 0 268
812 PROJECT STORAGE 150 300 0 0 402
6 61 PK - 12 E S E PART-TIME 975 5,850 15 90 7,839
808 MATERIAL STORAGE 100 600 0 0 804
813 STUDENT STORAGE 40 240 0 0 321
815 STUDENT RESTROOM (MALE) 35 210 0 0 281
816 STUDENT RESTROOM (FEMALE) 35 210 0 0 281
PAGE:52 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
6 62 PK - 12 E S E FULL-TIME 950 5,700 10 60 7,638
808 MATERIAL STORAGE 100 600 0 0 804
813 STUDENT STORAGE 40 240 0 0 321
815 STUDENT RESTROOM (MALE) 35 210 0 0 281
816 STUDENT RESTROOM (FEMALE) 35 210 0 0 281
817 STUDENT RESTROOM & BATH 110 660 0 0 884
2 63 PK - 12 E S E VOCATIONAL 1,140 2,280 12 24 3,055
808 MATERIAL STORAGE 100 200 0 0 268
815 STUDENT RESTROOM (MALE) 35 70 0 0 93
816 STUDENT RESTROOM (FEMALE) 35 70 0 0 93
8 65 PK - 12 E S E RESOURCE 380 3,040 4 0 4,073
808 MATERIAL STORAGE 100 800 0 0 1,072
813 STUDENT STORAGE 40 320 0 0 428
6 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 50 300 2 0 402
808 MATERIAL STORAGE 100 600 0 0 804
1 70 PK - 12 E S E ITINERANT 200 200 4 0 268
808 MATERIAL STORAGE 100 100 0 0 134
1 75 06 - 12 VOCAL MUSIC CLASS (MIDDLE-SR HIGH) 1,425 1,425 25 25 1,909
806 REFERENCE 100 100 0 0 134
808 MATERIAL STORAGE 100 100 0 0 134
830 MUSIC ENSEMBLE 300 300 0 0 402
831 MUSIC PRACTICE ROOM 70 70 0 0 93
833 ROBE STORAGE 150 150 0 0 201
836 SHEET MUSIC STORAGE 150 150 0 0 201
837 MUSIC EQUIPMENT STORAGE 400 400 0 0 536
1 76 06 - 12 BAND CLASS (MIDDLE-SR HIGH) 2,000 2,000 50 50 2,680
PAGE:53 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
806 REFERENCE 100 100 0 0 134
808 MATERIAL STORAGE 100 100 0 0 134
830 MUSIC ENSEMBLE 300 300 0 0 402
831 MUSIC PRACTICE ROOM 70 70 0 0 93
832 INSTRUMENT STORAGE 600 600 0 0 804
834 UNIFORM STORAGE 300 300 0 0 402
835 MUSIC STUDIO 180 180 0 0 241
836 SHEET MUSIC STORAGE 150 150 0 0 201
837 MUSIC EQUIPMENT STORAGE 400 400 0 0 536
1 77 06 - 12 ORCHESTRA CLASS (MIDDLE-SR HIGH) 1,425 1,425 25 25 1,909
806 REFERENCE 100 100 0 0 134
808 MATERIAL STORAGE 100 100 0 0 134
830 MUSIC ENSEMBLE 300 300 0 0 402
831 MUSIC PRACTICE ROOM 70 70 0 0 93
832 INSTRUMENT STORAGE 600 600 0 0 804
836 SHEET MUSIC STORAGE 150 150 0 0 201
837 MUSIC EQUIPMENT STORAGE 400 400 0 0 536
1 90 06 - 12 P E DRESSING ROOM (MALE) 1,620 1,620 135 0 2,170
1 91 06 - 12 P E DRESSING ROOM (FEMALE) 1,620 1,620 135 0 2,170
1 92 06 - 12 P E LOCKER ROOM (MALE) 270 270 135 0 361
1 93 06 - 12 P E LOCKER ROOM (FEMALE) 270 270 135 0 361
1 94 06 - 12 P E SHOWER (MALE) 270 270 135 0 361
1 95 06 - 12 P E SHOWER (FEMALE) 270 270 135 0 361
1 96 06 - 12 P E DRYING AREA (MALE) 270 270 135 0 361
1 97 06 - 12 P E DRYING AREA (FEMALE) 270 270 135 0 361
1 98 06 - 12 P E STORAGE (MIDDLE-SR HIGH) 1,215 1,215 135 0 1,628
PAGE:54 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 99 06 - 12 P E TEACHERS SHOWER (MALE) 22 22 1 0 29
1 100 06 - 12 P E TEACHERS SHOWER (FEMALE) 22 22 1 0 29
1 110 06 - 12 P E MULTIPURPOSE ROOM (MIDDLE-SR HIGH) 1,050 1,050 1 0 1,407
1 112 09 - 12 SR HIGH GYMNASIUM 6,500 6,500 70 70 8,710
1 113 06 - 12 GYMNASIUM SEATING 8,672 8,672 271 0 11,620
1 114 06 - 12 P E LAUNDRY 270 270 135 0 361
1 115 06 - 12 P E FIRST AID 270 270 135 0 361
1 116 06 - 12 P E TRAINING ROOM 250 250 1 0 335
1 117 06 - 12 P E WEIGHT ROOM 1,000 1,000 1 0 1,340
1 118 06 - 12 P E WRESTLING ROOM 1,680 1,680 1 0 2,251
1 119 06 - 12 P E GYMNASTICS & DANCE 1,050 1,050 1 0 1,407
1 120 06 - 12 GYMNASIUM STORAGE 405 405 135 0 542
1 202 09 - VE SMALL AGRICULTURE LAB 1,100 1,100 20 20 1,474
806 REFERENCE 100 100 0 0 134
810 MATERIAL STORAGE (LARGE) 395 395 0 0 529
818 LOCKERS/RESTROOM/SHOWER (ESE/VOC ED) 225 225 0 0 301
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
841 GREENHOUSE 800 800 0 0 1,072
847 VOCATIONAL FLAMMABLE STORAGE 125 125 0 0 167
848 VOCATIONAL MACHINERY STORAGE 1,100 1,100 0 0 1,474
850 VOCATIONAL TOOL STORAGE (SMALL) 195 195 0 0 261
6 212 09 - VE BUSINESS EDUCATION LAB 1,460 8,760 20 120 11,738
808 MATERIAL STORAGE 100 600 0 0 804
1 231 09 - 12 PRACTICAL HOME ECONOMICS LAB 1,600 1,600 25 25 2,144
808 MATERIAL STORAGE 100 100 0 0 134
843 LAUNDRY (HOME ECONOMICS) 50 50 0 0 67
PAGE:55 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
3 232 09 - VE SMALL HOME ECONOMICS LAB 1,100 3,300 20 60 4,422
812 PROJECT STORAGE 150 450 0 0 603
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 2,400 0 0 3,216
1 234 09 - VE LARGE HOME ECONOMICS LAB 2,250 2,250 25 25 3,015
812 PROJECT STORAGE 150 150 0 0 201
842 KITCHEN (HOME ECONOMICS) 125 125 0 0 167
843 LAUNDRY (HOME ECONOMICS) 50 50 0 0 67
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
1 241 09 - 12 SMALL TECHNOLOGY LAB 1,625 1,625 25 25 2,177
808 MATERIAL STORAGE 100 100 0 0 134
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
1 242 09 - 12 MEDIUM TECHNOLOGY LAB 2,375 2,375 25 25 3,182
810 MATERIAL STORAGE (LARGE) 395 395 0 0 529
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
2 244 09 - VE SMALL INDUSTRIAL LAB 1,100 2,200 20 40 2,948
808 MATERIAL STORAGE 100 200 0 0 268
840 VOCATIONAL RELATED CLASSROOM 680 1,360 20 0 1,822
3 245 09 - VE MEDIUM INDUSTRIAL LAB 1,800 5,400 20 60 7,236
808 MATERIAL STORAGE 100 300 0 0 402
810 MATERIAL STORAGE (LARGE) 395 1,185 0 0 1,587
840 VOCATIONAL RELATED CLASSROOM 680 2,040 20 0 2,733
849 VOCATIONAL PROJECT STORAGE 310 930 0 0 1,246
850 VOCATIONAL TOOL STORAGE (SMALL) 195 585 0 0 783
1 251 09 - 12 PRACTICAL HEALTH LAB 1,400 1,400 25 25 1,876
808 MATERIAL STORAGE 100 100 0 0 134
PAGE:56 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 261 09 - 12 PRACTICAL PUBLIC SERVICE LAB 1,375 1,375 25 25 1,842
808 MATERIAL STORAGE 100 100 0 0 134
1 270 09 - VE WORK EVALUATION LAB 1,110 1,110 15 0 1,487
810 MATERIAL STORAGE (LARGE) 395 395 0 0 529
853 VOCATIONAL TESTING 250 250 0 0 335
1 271 09 - VE VPI LAB 705 705 15 0 944
802 INSTRUCTIONAL CONFERENCE ROOM 225 225 0 0 301
808 MATERIAL STORAGE 100 100 0 0 134
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
846 RECEPTION (VOC ED INSTRUCTION) 90 90 0 0 120
853 VOCATIONAL TESTING 250 250 0 0 335
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 335
13 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 2,275 0 0 3,048
5 302 PK - VE BOOKKEEPING OFFICE 125 625 0 0 837
4 303 PK - VE SECRETARIAL SPACE 158 632 0 0 846
1 304 PK - VE RECEPTION AREA 2,295 2,295 135 0 3,075
1 305 PK - VE PRODUCTION WORKROOM 1,080 1,080 135 0 1,447
1 306 PK - VE CONFERENCE ROOM 1,890 1,890 135 0 2,532
1 307 PK - VE CLINIC 810 810 135 0 1,085
1 308 PK - VE GENERAL SCHOOL STORAGE 1,350 1,350 135 0 1,809
1 309 PK - VE VAULT/STUDENT RECORDS 810 810 135 0 1,085
1 310 PK - VE SCHOOL STORE 270 270 135 0 361
1 311 PK - VE STUDENT ACTIVITIES 1,350 1,350 135 0 1,809
1 312 PK - VE COMPUTER AREA 405 405 135 0 542
1 313 PK - VE CAREERS ROOM 810 810 135 0 1,085
7 314 PK - VE ITINERANT OFFICE 125 875 0 0 1,172
PAGE:57 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 315 PK - VE TEACHER PLANNING OFFICE 5,420 5,420 271 0 7,262
1 316 PK - VE TEACHER LOUNGE/DINING 1,084 1,084 271 0 1,452
1 330 PK - VE CUSTODIAL RECEIVING 4,065 4,065 271 0 5,447
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 207
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 670
1 340 PK - VE DINING AREA 10,840 10,840 271 0 14,525
1 341 PK - VE KITCHEN & SERVING AREA 11,924 11,924 271 0 15,978
1 349 PK - VE KITCHEN CHAIR STORAGE 540 540 135 0 723
1 351 06 - 12 MIDDLE/SR HIGH COVERED PATIO 9,756 9,756 271 0 13,073
1 360 06 - VE AUDITORIUM 8,130 8,130 271 0 10,894
1 363 PK - VE STAGE 990 990 1 0 1,326
1 364 PK - VE STAGE STORAGE 1,355 1,355 271 0 1,815
1 365 PK - VE STAGE DRESSING ROOM (MALE) 675 675 135 0 904
1 366 PK - VE STAGE DRESSING ROOM (FEMALE) 675 675 135 0 904
1 367 PK - VE CONTROL BOOTH/PROJECTION ROOM 100 100 1 0 134
1 368 PK - VE TEXTBOOK STORAGE 945 945 135 0 1,266
2 370 06 - VE LOBBY 1,350 2,700 135 0 3,618
2 371 06 - VE CONCESSIONS 200 400 1 0 536
2 372 06 - VE TICKET BOOTH 30 60 1 0 80
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 10,027 10,027 271 0 13,436
1 381 PK - VE MEDIA TECHNICAL PROCESSING 1,084 1,084 271 0 1,452
1 382 PK - VE PROFESSIONAL LIBRARY 1,084 1,084 271 0 1,452
1 383 PK - VE AUDIO VISUAL STORAGE 1,626 1,626 271 0 2,178
1 384 PK - VE PERIODICAL STORAGE 542 542 271 0 726
1 385 PK - VE CLOSED CIRCUIT TV LAB 1,897 1,897 271 0 2,541
1 386 PK - VE CLOSED CIRCUIT STORAGE 1,355 1,355 271 0 1,815
PAGE:58 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 387 PK - VE MEDIA PRODUCTION LAB 1,355 1,355 271 0 1,815
1 388 PK - VE MEDIA COPYING ROOM 542 542 271 0 726
1 389 PK - VE MEDIA SMALL GROUP ROOM 270 270 135 0 361
1 390 PK - VE MEDIA GROUP PROJECTS/INSTRUCTION 1,355 1,355 271 0 1,815
1 391 PK - VE MEDIA MAINTENANCE/REPAIR 270 270 135 0 361
1 708 09 - 12 JROTC 1,260 1,260 30 30 1,688
800 ARMS ROOM 150 150 0 0 201
801 FIRING RANGE (INDOOR) 2,400 2,400 0 0 3,216
802 INSTRUCTIONAL CONFERENCE ROOM 225 225 0 0 301
808 MATERIAL STORAGE 100 100 0 0 134
PAGE:59 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
0
Target Number of Stations:
Total Stations:
COUNTY ADMINISTRATION (DS - DS)
0
0
Gross Sq. Feet:
Utilization:
Acres Required:
170,000
0.000
7
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 400 CA - DS SUPERINTENDENTS OFFICE 0 0 0 0 0
1 401 CA - DS ANCILLARY CONFERENCE ROOM 0 0 0 0 0
1 402 CA - DS SUPERINTENDENTS SECRETARY 0 0 0 0 0
1 403 CA - DS ANCILLARY SECRETARIAL/CLERICAL OFFICE 0 0 0 0 0
1 404 CA - DS ANCILLARY RECEPTION AREA 0 0 0 0 0
1 405 CA - DS VAULT 0 0 0 0 0
1 406 CA - DS ASSISTANT SUPERINTENDENTS OFFICE 0 0 0 0 0
1 407 CA - DS ANCILLARY ADMINISTRATIVE OFFICE 0 0 0 0 0
1 408 CA - DS BUSINESS OPERATIONS WORK AREA 0 0 0 0 0
1 409 CA - DS BUSINESS OPERATIONS STORAGE 0 0 0 0 0
1 410 CA - DS SCHOOL PLANT PLANNING 0 0 0 0 0
1 411 CA - DS WORD PROCESSING CENTER 0 0 0 0 0
1 412 CA - DS PERSONNEL SERVICES 0 0 0 0 0
1 413 CA - DS CENTRAL REPRODUCTION & COPY 0 0 0 0 0
1 414 CA - DS CENTRAL ADMINISTRATIVE SUPPLY 0 0 0 0 0
1 415 CA - DS MAIL ROOM 0 0 0 0 0
1 416 CA - DS ANCILLARY CUSTODIAL SERVICES 0 0 0 0 0
1 417 CA - DS CENTRAL SECURITY OFFICE 0 0 0 0 0
1 418 CA - DS ANCILLARY ADMINISTRATIVE STORAGE 0 0 0 0 0
1 419 CA - DS ANCILLARY FLAMMABLE STORAGE 0 0 0 0 0
1 420 CA - DS SCHOOL BOARD MEETING ROOM 0 0 0 0 0
1 421 CA - DS ANCILLARY STAFF LOUNGE 0 0 0 0 0
PAGE:60 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 422 CA - DS MAIN LOBBY & SWITCHBOARD 0 0 0 0 0
1 424 CA - DS DIRECTORS OFFICE 0 0 0 0 0
1 426 CA - DS GENERAL ANCILLARY OFFICE 0 0 0 0 0
1 427 CA - DS STAFF DEVELOPMENT/INSTRUCTION 0 0 0 0 0
1 428 CA - DS OTHER ANCILLARY ADMINISTRATIVE SUPPORT 0 0 0 0 0
1 500 CA - DS PROGRAMMER ROOM 0 0 0 0 0
1 501 CA - DS DATA PROCESSING TECHNICAL AREA 0 0 0 0 0
1 502 CA - DS DATA PROCESSING EQUIPMENT 0 0 0 0 0
1 503 CA - DS COMPUTER ROOM (RAISED FLOOR) 0 0 0 0 0
1 504 CA - DS OFF-LINE EQUIPMENT 0 0 0 0 0
1 505 CA - DS ANCILLARY COMPUTER STORAGE 0 0 0 0 0
1 510 CA - DS WAREHOUSE STORAGE 0 0 0 0 0
1 515 CA - DS CENTRAL KITCHEN 0 0 0 0 0
1 520 CA - DS CARPENTRY SHOP 0 0 0 0 0
1 525 CA - DS GLAZING SHOP 0 0 0 0 0
1 530 CA - DS MASONRY SHOP 0 0 0 0 0
1 535 CA - DS SMALL ENGINE SHOP 0 0 0 0 0
1 540 CA - DS ELECTRONICS SHOP 0 0 0 0 0
1 545 CA - DS ELECTRICAL SHOP 0 0 0 0 0
1 550 CA - DS MACHINE SHOP 0 0 0 0 0
1 555 CA - DS PLUMBING SHOP 0 0 0 0 0
1 560 CA - DS PAINT SHOP 0 0 0 0 0
1 565 CA - DS WELDING SHOP 0 0 0 0 0
1 570 CA - DS AIR CONDITIONING SHOP 0 0 0 0 0
1 575 CA - DS CARPET SHOP 0 0 0 0 0
1 580 CA - DS LOCKSMITH SHOP 0 0 0 0 0
PAGE:61 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 585 CA - DS SCHOOL BUS PARTS ROOM 0 0 0 0 0
1 586 CA - DS SCHOOL BUS MACHINE SHOP 0 0 0 0 0
1 587 CA - DS SCHOOL BUS GLASS/UPHOLSTERY SHOP 0 0 0 0 0
1 588 CA - DS SCHOOL BUS BODY SHOP 0 0 0 0 0
1 589 CA - DS SCHOOL BUS PAINT/FLAMMABLE STORAGE 0 0 0 0 0
1 590 CA - DS SCHOOL BUS PAINT BAY 0 0 0 0 0
1 591 CA - DS SCHOOL BUS TIRE STORAGE & MOUNTING 0 0 0 0 0
1 592 CA - DS SCHOOL BUS WORK BAY 0 0 0 0 0
1 593 CA - DS SCHOOL BUS DRIVERS CLASSROOM 0 0 0 0 0
1 594 CA - DS ANCILLARY SUPPORT STORAGE 0 0 0 0 0
1 600 CA - DS ANCILLARY LIBRARY WAREHOUSE/STACKS 0 0 0 0 0
1 601 CA - DS ANCILLARY LIBRARY REFERENCE 0 0 0 0 0
1 602 CA - DS ANCILLARY PROFESSIONAL LIBRARY 0 0 0 0 0
1 603 CA - DS ANCILLARY PERIODICAL/JOURNAL SERVICES 0 0 0 0 0
1 604 CA - DS ANCILLARY MEDIA PROCESSING 0 0 0 0 0
1 605 CA - DS ANCILLARY AUDIO VISUAL EQUIPMENT 0 0 0 0 0
1 606 CA - DS ANCILLARY CLOSED CIRCUIT TV LABORATORY 0 0 0 0 0
1 607 CA - DS ANCILLARY CLOSED CIRCUIT TV SUPPORT 0 0 0 0 0
1 608 CA - DS ANCILLARY MEDIA PRODUCTION LABORATORY 0 0 0 0 0
1 609 CA - DS ANCILLARY MEDIA COPYING ROOM 0 0 0 0 0
1 610 CA - DS ANCILLARY MEDIA MAINTENANCE/REPAIR 0 0 0 0 0
1 611 CA - DS ANCILLARY MEDIA STORAGE 0 0 0 0 0
1 612 CA - DS OTHER ANCILLARY MEDIA SPACE 0 0 0 0 0
PAGE:62 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
0
Target Number of Stations:
Total Stations:
MAINTENANCE (DS - DS)
0
0
Gross Sq. Feet:
Utilization:
Acres Required:
75,000
0.000
7
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
2 401 CA - DS ANCILLARY CONFERENCE ROOM 0 0 0 0 0
6 403 CA - DS ANCILLARY SECRETARIAL/CLERICAL OFFICE 0 0 0 0 0
1 404 CA - DS ANCILLARY RECEPTION AREA 0 0 0 0 0
1 405 CA - DS VAULT 0 0 0 0 0
24 407 CA - DS ANCILLARY ADMINISTRATIVE OFFICE 0 0 0 0 0
1 408 CA - DS BUSINESS OPERATIONS WORK AREA 0 0 0 0 0
1 410 CA - DS SCHOOL PLANT PLANNING 0 0 0 0 0
2 416 CA - DS ANCILLARY CUSTODIAL SERVICES 0 0 0 0 0
25 418 CA - DS ANCILLARY ADMINISTRATIVE STORAGE 0 0 0 0 0
5 419 CA - DS ANCILLARY FLAMMABLE STORAGE 0 0 0 0 0
2 421 CA - DS ANCILLARY STAFF LOUNGE 0 0 0 0 0
1 428 CA - DS OTHER ANCILLARY ADMINISTRATIVE SUPPORT 0 0 0 0 0
6 510 CA - DS WAREHOUSE STORAGE 0 0 0 0 0
2 520 CA - DS CARPENTRY SHOP 0 0 0 0 0
2 525 CA - DS GLAZING SHOP 0 0 0 0 0
1 535 CA - DS SMALL ENGINE SHOP 0 0 0 0 0
7 540 CA - DS ELECTRONICS SHOP 0 0 0 0 0
5 545 CA - DS ELECTRICAL SHOP 0 0 0 0 0
1 550 CA - DS MACHINE SHOP 0 0 0 0 0
2 555 CA - DS PLUMBING SHOP 0 0 0 0 0
1 575 CA - DS CARPET SHOP 0 0 0 0 0
1 589 CA - DS SCHOOL BUS PAINT/FLAMMABLE STORAGE 0 0 0 0 0
PAGE:63 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
2 594 CA - DS ANCILLARY SUPPORT STORAGE 0 0 0 0 0
PAGE:64 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
0
Target Number of Stations:
Total Stations:
TRANSPORTATION (DS - DS)
0
0
Gross Sq. Feet:
Utilization:
Acres Required:
75,000
0.000
7
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 401 CA - DS ANCILLARY CONFERENCE ROOM 0 0 0 0 0
2 407 CA - DS ANCILLARY ADMINISTRATIVE OFFICE 0 0 0 0 0
1 421 CA - DS ANCILLARY STAFF LOUNGE 0 0 0 0 0
4 428 CA - DS OTHER ANCILLARY ADMINISTRATIVE SUPPORT 0 0 0 0 0
2 585 CA - DS SCHOOL BUS PARTS ROOM 0 0 0 0 0
1 587 CA - DS SCHOOL BUS GLASS/UPHOLSTERY SHOP 0 0 0 0 0
1 589 CA - DS SCHOOL BUS PAINT/FLAMMABLE STORAGE 0 0 0 0 0
1 592 CA - DS SCHOOL BUS WORK BAY 0 0 0 0 0
1 593 CA - DS SCHOOL BUS DRIVERS CLASSROOM 0 0 0 0 0
PAGE:65 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
0
Target Number of Stations:
Total Stations:
WAREHOUSE (DS - DS)
0
0
Gross Sq. Feet:
Utilization:
Acres Required:
25,000
0.000
7
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 401 CA - DS ANCILLARY CONFERENCE ROOM 0 0 0 0 0
1 404 CA - DS ANCILLARY RECEPTION AREA 0 0 0 0 0
9 407 CA - DS ANCILLARY ADMINISTRATIVE OFFICE 0 0 0 0 0
4 418 CA - DS ANCILLARY ADMINISTRATIVE STORAGE 0 0 0 0 0
4 421 CA - DS ANCILLARY STAFF LOUNGE 0 0 0 0 0
1 424 CA - DS DIRECTORS OFFICE 0 0 0 0 0
3 426 CA - DS GENERAL ANCILLARY OFFICE 0 0 0 0 0
4 427 CA - DS STAFF DEVELOPMENT/INSTRUCTION 0 0 0 0 0
9 428 CA - DS OTHER ANCILLARY ADMINISTRATIVE SUPPORT 0 0 0 0 0
6 510 CA - DS WAREHOUSE STORAGE 0 0 0 0 0
4 585 CA - DS SCHOOL BUS PARTS ROOM 0 0 0 0 0
1 587 CA - DS SCHOOL BUS GLASS/UPHOLSTERY SHOP 0 0 0 0 0
1 588 CA - DS SCHOOL BUS BODY SHOP 0 0 0 0 0
1 589 CA - DS SCHOOL BUS PAINT/FLAMMABLE STORAGE 0 0 0 0 0
2 590 CA - DS SCHOOL BUS PAINT BAY 0 0 0 0 0
2 592 CA - DS SCHOOL BUS WORK BAY 0 0 0 0 0
1 593 CA - DS SCHOOL BUS DRIVERS CLASSROOM 0 0 0 0 0
4 594 CA - DS ANCILLARY SUPPORT STORAGE 0 0 0 0 0
1 600 CA - DS ANCILLARY LIBRARY WAREHOUSE/STACKS 0 0 0 0 0
1 602 CA - DS ANCILLARY PROFESSIONAL LIBRARY 0 0 0 0 0
PAGE:66 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
0
Target Number of Stations:
Total Stations:
MULTIPLE USE SUPPORT (DS - DS)
0
0
Gross Sq. Feet:
Utilization:
Acres Required:
108,000
0.000
7
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 426 CA - DS GENERAL ANCILLARY OFFICE 0 0 0 0 0
4 428 CA - DS OTHER ANCILLARY ADMINISTRATIVE SUPPORT 0 0 0 0 0
1 824 CA - DS ANCILLARY RESTROOM (MALE) 0 0 0 0 0
1 825 CA - DS ANCILLARY RESTROOM (FEMALE) 0 0 0 0 0
PAGE:67 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
100
Target Number of Stations:
Total Stations:
PRE-K E S E (PK - PK)
100
100
Gross Sq. Feet:
Utilization:
Acres Required:
31,496
1.000
4
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 10 PK - 03 PRIMARY SKILLS LAB (K-3) 882 882 18 0 1,181
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
814 STUDENT RESTROOM (BOTH SEXES) 60 60 0 0 80
1 13 PK - 05 ELEMENTARY P E STORAGE 315 315 1 0 422
1 14 PK - 05 ELEMENTARY COVERED PLAY AREA 360 360 10 0 482
1 40 PK - 12 RESOURCE ROOM 290 290 10 0 388
808 MATERIAL STORAGE 100 100 0 0 134
1 50 PK - 05 ART - ELEMENTARY 1,000 1,000 22 0 1,340
808 MATERIAL STORAGE 100 100 0 0 134
812 PROJECT STORAGE 150 150 0 0 201
1 55 PK - 05 MUSIC - ELEMENTARY 1,000 1,000 22 0 1,340
806 REFERENCE 100 100 0 0 134
808 MATERIAL STORAGE 100 100 0 0 134
831 MUSIC PRACTICE ROOM 70 70 0 0 93
15 60 PK - PK E S E PRE-K 475 7,125 5 75 9,547
808 MATERIAL STORAGE 100 1,500 0 0 2,010
813 STUDENT STORAGE 40 600 0 0 804
817 STUDENT RESTROOM & BATH 110 1,650 0 0 2,211
1 61 PK - 12 E S E PART-TIME 975 975 15 15 1,306
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
PAGE:68 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
815 STUDENT RESTROOM (MALE) 35 35 0 0 46
816 STUDENT RESTROOM (FEMALE) 35 35 0 0 46
1 62 PK - 12 E S E FULL-TIME 950 950 10 10 1,273
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
815 STUDENT RESTROOM (MALE) 35 35 0 0 46
816 STUDENT RESTROOM (FEMALE) 35 35 0 0 46
817 STUDENT RESTROOM & BATH 110 110 0 0 147
1 65 PK - 12 E S E RESOURCE 380 380 4 0 509
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
1 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 100 100 2 0 134
808 MATERIAL STORAGE 100 100 0 0 134
1 69 PK - 12 E S E AUDIOLOGY LAB 250 250 0 0 335
808 MATERIAL STORAGE 100 100 0 0 134
2 70 PK - 12 E S E ITINERANT 200 400 4 0 536
808 MATERIAL STORAGE 100 200 0 0 268
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 335
1 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 175 0 0 234
1 302 PK - VE BOOKKEEPING OFFICE 125 125 0 0 167
1 303 PK - VE SECRETARIAL SPACE 158 158 0 0 211
1 304 PK - VE RECEPTION AREA 85 85 5 0 113
1 305 PK - VE PRODUCTION WORKROOM 40 40 5 0 53
2 306 PK - VE CONFERENCE ROOM 70 140 5 0 187
1 307 PK - VE CLINIC 30 30 5 0 40
1 308 PK - VE GENERAL SCHOOL STORAGE 50 50 5 0 67
PAGE:69 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 309 PK - VE VAULT/STUDENT RECORDS 30 30 5 0 40
1 314 PK - VE ITINERANT OFFICE 125 125 0 0 167
1 315 PK - VE TEACHER PLANNING OFFICE 200 200 10 0 268
1 316 PK - VE TEACHER LOUNGE/DINING 40 40 10 0 53
1 330 PK - VE CUSTODIAL RECEIVING 150 150 10 0 201
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 207
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 670
1 340 PK - VE DINING AREA 400 400 10 0 536
1 341 PK - VE KITCHEN & SERVING AREA 440 440 10 0 589
1 349 PK - VE KITCHEN CHAIR STORAGE 20 20 5 0 26
1 361 PK - VE MULTIPURPOSE ROOM (DINING) 310 310 10 0 415
1 362 PK - VE MULTIPURPOSE ROOM CHAIR STORAGE 20 20 10 0 26
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 370 370 10 0 495
1 381 PK - VE MEDIA TECHNICAL PROCESSING 40 40 10 0 53
PAGE:70 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
300
Target Number of Stations:
Total Stations:
ADULT EDUCATION (AE - AE)
200
200
Gross Sq. Feet:
Utilization:
Acres Required:
44,161
2.000
7
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
4 212 09 - VE BUSINESS EDUCATION LAB 1,460 5,840 20 80 7,825
808 MATERIAL STORAGE 100 400 0 0 536
1 233 09 - VE MEDIUM HOME ECONOMICS LAB 1,380 1,380 20 20 1,849
808 MATERIAL STORAGE 100 100 0 0 134
842 KITCHEN (HOME ECONOMICS) 125 125 0 0 167
843 LAUNDRY (HOME ECONOMICS) 50 50 0 0 67
852 VOCATIONAL TECHNOLOGY RESOURCE CENTER 800 800 0 0 1,072
1 244 09 - VE SMALL INDUSTRIAL LAB 1,100 1,100 20 20 1,474
808 MATERIAL STORAGE 100 100 0 0 134
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
1 252 09 - VE SMALL HEALTH LAB 1,200 1,200 20 20 1,608
804 DISPENSARY 135 135 0 0 180
808 MATERIAL STORAGE 100 100 0 0 134
812 PROJECT STORAGE 150 150 0 0 201
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
2 253 09 - VE MEDIUM HEALTH LAB 2,200 4,400 20 40 5,896
804 DISPENSARY 135 270 0 0 361
806 REFERENCE 100 200 0 0 268
808 MATERIAL STORAGE 100 200 0 0 268
810 MATERIAL STORAGE (LARGE) 395 790 0 0 1,058
812 PROJECT STORAGE 150 300 0 0 402
840 VOCATIONAL RELATED CLASSROOM 680 1,360 20 0 1,822
PAGE:71 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
849 VOCATIONAL PROJECT STORAGE 310 620 0 0 830
1 262 09 - VE SMALL PUBLIC SERVICE LAB 800 800 20 20 1,072
808 MATERIAL STORAGE 100 100 0 0 134
1 270 09 - VE WORK EVALUATION LAB 1,110 1,110 15 0 1,487
810 MATERIAL STORAGE (LARGE) 395 395 0 0 529
853 VOCATIONAL TESTING 250 250 0 0 335
1 271 09 - VE VPI LAB 705 705 15 0 944
802 INSTRUCTIONAL CONFERENCE ROOM 225 225 0 0 301
808 MATERIAL STORAGE 100 100 0 0 134
840 VOCATIONAL RELATED CLASSROOM 680 680 20 0 911
846 RECEPTION (VOC ED INSTRUCTION) 90 90 0 0 120
853 VOCATIONAL TESTING 250 250 0 0 335
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 335
1 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 175 0 0 234
1 302 PK - VE BOOKKEEPING OFFICE 125 125 0 0 167
1 303 PK - VE SECRETARIAL SPACE 158 158 0 0 211
1 304 PK - VE RECEPTION AREA 255 255 15 0 341
1 305 PK - VE PRODUCTION WORKROOM 120 120 15 0 160
1 306 PK - VE CONFERENCE ROOM 210 210 15 0 281
1 309 PK - VE VAULT/STUDENT RECORDS 90 90 15 0 120
1 314 PK - VE ITINERANT OFFICE 125 125 0 0 167
1 315 PK - VE TEACHER PLANNING OFFICE 600 600 30 0 804
1 316 PK - VE TEACHER LOUNGE/DINING 120 120 30 0 160
1 330 PK - VE CUSTODIAL RECEIVING 450 450 30 0 603
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 207
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 670
PAGE:72 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 340 PK - VE DINING AREA 1,200 1,200 30 0 1,608
1 341 PK - VE KITCHEN & SERVING AREA 1,320 1,320 30 0 1,768
1 371 06 - VE CONCESSIONS 200 200 1 0 268
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 1,110 1,110 30 0 1,487
1 381 PK - VE MEDIA TECHNICAL PROCESSING 120 120 30 0 160
PAGE:73 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
102
Target Number of Stations:
Total Stations:
EXCEPTIONAL STUDENT (PK - 12)
102
102
Gross Sq. Feet:
Utilization:
Acres Required:
30,718
1.000
7
Total Capacity:
Level:
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 14 PK - 05 ELEMENTARY COVERED PLAY AREA 360 360 10 0 482
1 50 PK - 05 ART - ELEMENTARY 1,000 1,000 22 0 1,340
808 MATERIAL STORAGE 100 100 0 0 134
812 PROJECT STORAGE 150 150 0 0 201
1 55 PK - 05 MUSIC - ELEMENTARY 1,000 1,000 22 0 1,340
806 REFERENCE 100 100 0 0 134
808 MATERIAL STORAGE 100 100 0 0 134
831 MUSIC PRACTICE ROOM 70 70 0 0 93
2 60 PK - PK E S E PRE-K 475 950 5 10 1,273
808 MATERIAL STORAGE 100 200 0 0 268
813 STUDENT STORAGE 40 80 0 0 107
817 STUDENT RESTROOM & BATH 110 220 0 0 294
8 62 PK - 12 E S E FULL-TIME 950 7,600 10 80 10,184
808 MATERIAL STORAGE 100 800 0 0 1,072
813 STUDENT STORAGE 40 320 0 0 428
815 STUDENT RESTROOM (MALE) 35 280 0 0 375
816 STUDENT RESTROOM (FEMALE) 35 280 0 0 375
817 STUDENT RESTROOM & BATH 110 880 0 0 1,179
1 63 PK - 12 E S E VOCATIONAL 1,140 1,140 12 12 1,527
808 MATERIAL STORAGE 100 100 0 0 134
815 STUDENT RESTROOM (MALE) 35 35 0 0 46
816 STUDENT RESTROOM (FEMALE) 35 35 0 0 46
PAGE:74 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 64 PK - 12 E S E PT/OT LAB 475 475 5 0 636
808 MATERIAL STORAGE 100 100 0 0 134
813 STUDENT STORAGE 40 40 0 0 53
817 STUDENT RESTROOM & BATH 110 110 0 0 147
2 65 PK - 12 E S E RESOURCE 380 760 4 0 1,018
808 MATERIAL STORAGE 100 200 0 0 268
813 STUDENT STORAGE 40 80 0 0 107
2 66 PK - 12 E S E SUPPLEMENTARY INSTRUCTION 100 200 2 0 268
808 MATERIAL STORAGE 100 200 0 0 268
1 69 PK - 12 E S E AUDIOLOGY LAB 250 250 0 0 335
808 MATERIAL STORAGE 100 100 0 0 134
2 70 PK - 12 E S E ITINERANT 200 400 4 0 536
808 MATERIAL STORAGE 100 200 0 0 268
1 300 PK - VE PRINCIPAL/DIRECTOR OFFICE 250 250 0 0 335
1 301 PK - VE ASSISTANT PRINCIPAL/OTHER OFFICE 175 175 0 0 234
1 302 PK - VE BOOKKEEPING OFFICE 125 125 0 0 167
1 303 PK - VE SECRETARIAL SPACE 158 158 0 0 211
1 304 PK - VE RECEPTION AREA 85 85 5 0 113
1 305 PK - VE PRODUCTION WORKROOM 40 40 5 0 53
2 306 PK - VE CONFERENCE ROOM 70 140 5 0 187
1 307 PK - VE CLINIC 30 30 5 0 40
1 308 PK - VE GENERAL SCHOOL STORAGE 50 50 5 0 67
1 309 PK - VE VAULT/STUDENT RECORDS 30 30 5 0 40
1 315 PK - VE TEACHER PLANNING OFFICE 200 200 10 0 268
1 316 PK - VE TEACHER LOUNGE/DINING 40 40 10 0 53
1 330 PK - VE CUSTODIAL RECEIVING 150 150 10 0 201
PAGE:75 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Spaces Design Grades Description NSF / Space
Total NSF
Cap. / Space
Total Stns.
Total GSF
1 333 PK - VE FLAMMABLE STORAGE 155 155 0 0 207
1 334 PK - VE CUSTODIAL EQUIPMENT STORAGE 500 500 0 0 670
1 340 PK - VE DINING AREA 400 400 10 0 536
1 341 PK - VE KITCHEN & SERVING AREA 440 440 10 0 589
1 351 06 - 12 MIDDLE/SR HIGH COVERED PATIO 360 360 10 0 482
1 368 PK - VE TEXTBOOK STORAGE 35 35 5 0 46
1 380 PK - VE LIBRARY (READING ROOM/STACKS) 370 370 10 0 495
1 381 PK - VE MEDIA TECHNICAL PROCESSING 40 40 10 0 53
1 383 PK - VE AUDIO VISUAL STORAGE 60 60 10 0 80
1 385 PK - VE CLOSED CIRCUIT TV LAB 70 70 10 0 93
1 386 PK - VE CLOSED CIRCUIT STORAGE 50 50 10 0 67
1 387 PK - VE MEDIA PRODUCTION LAB 50 50 10 0 67
1 388 PK - VE MEDIA COPYING ROOM 20 20 10 0 26
PAGE:76 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Section 3: Recommendations
PAGE:77 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: 520 BUS COMPOUND
Address: 2091 W KING STREET (SR 50), COCOA
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use WAREHOUSE WAREHOUSE
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $1,082,676 $0
Estimated Total Project Cost $1,082,676
520 BUS COMPOUND Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems to the entire facility 520 BUS COMPOUND.
82,940 0 $1,082,676 $13 $0
PAGE:78 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: ANDREW JACKSON MIDDLE
Address: 1515 KNOX MCRAE DRIVE, TITUSVILLE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 727 0 727
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 727 0 727
Utilization Factor 90% 90%
School Capacity 654 654
COFTE Student Membership 582 581
Survey Annotation Other=fencing & security & PE track resurfacing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $276,501 $0 $3,553,259 $0
Estimated Total Project Cost $3,829,760
ANDREW JACKSON MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility ANDREW JACKSON MIDDLE.
107,661 0 $3,553,259 $33 $0
PAGE:79 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: APOLLO ELEMENTARY
Address: 3085 KNOX MCRAE DRIVE, TITUSVILLE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 902 0 902
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 902 0 902
Utilization Factor 100% 100%
School Capacity 902 902
COFTE Student Membership 858 760
Survey Annotation
Other=fencing & securityRemodel to expand multipurpose/diningNew media centerNew covered play
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $116,404 $1,069,000 $6,506,785 $2,660,814
Estimated Total Project Cost $10,353,003
APOLLO ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (3247 NSF)
3,562 0 $886,938 $249 $0
PAGE:80 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
APOLLO ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of LIBRARY (READING ROOM/STACKS) (3337 NSF), 1 unit of MEDIA TECHNICAL PROCESSING (361 NSF), 1 unit of PROFESSIONAL LIBRARY (361 NSF), 1 unit of AUDIO VISUAL STORAGE (541 NSF), 1 unit of PERIODICAL STORAGE (180 NSF), 1 unit of CLOSED CIRCUIT TV LAB (631 NSF), 1 unit of CLOSED CIRCUIT STORAGE (451 NSF), 1 unit of MEDIA PRODUCTION LAB (451 NSF), 1 unit of MEDIA COPYING ROOM (180 NSF), 1 unit of MEDIA SMALL GROUP ROOM (90 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (451 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (90 NSF)
7,124 0 $1,773,876 $249 $0
Remodeling 2022 4 1 Removed NSF (8538), Added NSF (8552), Difference NSF (14), Percent (0.16%), Removed Stations (0), Added Stations (0) Remodeling: Adding 1 unit of DINING AREA (3318 NSF), 1 unit of KITCHEN CHAIR STORAGE (140 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2337 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (180 NSF), 1 unit of STAGE (990 NSF), 1 unit of STAGE STORAGE (377 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (180 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (180 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF), 1 unit of INSIDE CIRCULATION (750 NSF) and Removing Room 001 (1352 NSF), Room 045 (3018 NSF), Room 045A (311 NSF), Room 045B (171 NSF), Room 045C (133 NSF), Room 046 (2990 NSF), Room 046A (36 NSF), Room 046B (527 NSF)
8,552 0 $1,069,000 $125 $0
PAGE:81 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
APOLLO ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2022 4 1 Renovating: Apply Painting, Floor Cover, Electrical, Plumbing, Windows, Lighting, Restrooms, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 002 (748 NSF), Room 002A (107 NSF), Room 002B (16 NSF), Room 003 (757 NSF), Room 003A (224 NSF), Room 003B (24 NSF), Room 004 (747 NSF), Room 004A (24 NSF), Room 005 (147 NSF), Room 006 (149 NSF), Room 007 (742 NSF), Room 007A (24 NSF), Room 008 (748 NSF), Room 008A (24 NSF), Room 009 (747 NSF), Room 009A (24 NSF), Room 010 (769 NSF), Room 010A (226 NSF), Room 011 (772 NSF), Room 012 (765 NSF), Room 012A (220 NSF), Room 013 (767 NSF), Room 014 (762 NSF), Room 015 (765 NSF), Room 016 (767 NSF), Room 017 (769 NSF), Room 018 (752 NSF), Room 018A (229 NSF), Room 018B (24 NSF), Room 019 (754 NSF), Room 019A (24 NSF), Room 020 (753 NSF), Room 020A (220 NSF), Room 020B (24 NSF), Room 021 (768 NSF), Room 022 (756 NSF), Room 022A (24 NSF), Room 023 (757 NSF), Room 023A (24 NSF), Room 024 (757 NSF), Room 024A (24 NSF), Room 025 (789 NSF), Room 026 (784 NSF), Room 026A (225 NSF), Room 027 (787 NSF), Room 028 (781 NSF), Room 028A (220 NSF), Room 029 (743 NSF), Room 030 (785 NSF), Room 031 (781 NSF), Room 032 (738 NSF), Room 033 (761 NSF), Room 034 (846 NSF), Room 035 (218 NSF), Room 035A (24 NSF), Room 035B (10 NSF), Room 036 (188 NSF), Room 036B (10 NSF), Room 037 (187 NSF), Room 038 (13 NSF), Room 039 (103 NSF), Room 040 (230 NSF), Room 041 (190 NSF), Room 041A (14 NSF), Room 042 (256 NSF), Room 042A (179 NSF), Room 043 (367 NSF), Room 044 (92 NSF), Room 047 (870 NSF), Room 048 (42 NSF), Room 049 (69 NSF), Room 050 (195 NSF), Room 051 (187 NSF), Room 052 (430 NSF), Room 053 (152 NSF), Room 054 (25 NSF), Room 055 (464 NSF), Room 056 (42 NSF), Room 057 (69 NSF), Room 058 (192 NSF), Room 059 (222 NSF), Room 060 (293 NSF), Room 062 (440 NSF), Room 062A (81 NSF), Room 062B (48 NSF), Room 063 (40 NSF), Room 064 (105 NSF), Room 065 (89 NSF), Room 066 (414 NSF), Room 066A (667 NSF), Room 067 (6903 NSF), Room 069 (16960 NSF)
57,044 0 $4,734,652 $83 $0
PAGE:82 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
APOLLO ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2022 4 2 Renovating: Apply Painting, Floor Cover, Electrical, Plumbing, Windows, Lighting, Restrooms, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 200 (229 NSF), Room 201 (315 NSF), Room 202 (219 NSF), Room 203 (500 NSF), Room 203A (93 NSF), Room 204 (64 NSF), Room 205 (32 NSF), Room 206 (100 NSF), Room 207 (972 NSF), Room 208 (970 NSF), Room 208A (95 NSF), Room 208B (32 NSF), Room 208C (64 NSF), Room 208D (32 NSF), Room 208E (629 NSF), Room 209 (950 NSF), Room 210 (950 NSF), Room 210A (96 NSF), Room 210B (32 NSF), Room 210C (65 NSF), Room 210D (32 NSF), Room 211 (950 NSF), Room 212 (950 NSF), Room 212A (94 NSF), Room 212B (32 NSF), Room 212C (65 NSF), Room 212D (32 NSF), Room 212E (666 NSF), Room 213 (948 NSF), Room 214 (950 NSF), Room 214A (95 NSF), Room 214B (32 NSF), Room 214C (64 NSF), Room 214D (32 NSF), Room 216 (200 NSF)
11,581 0 $961,223 $83 $0
Renovation 2022 4 3 Renovating: Apply Painting, Floor Cover, Electrical, Plumbing, Windows, Lighting, Restrooms, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 300 (1582 NSF), Room 300A (108 NSF), Room 300B (37 NSF), Room 300C (149 NSF), Room 300D (148 NSF), Room 301 (55 NSF), Room 303 (75 NSF), Room 304 (868 NSF), Room 304A (91 NSF), Room 304B (25 NSF), Room 304C (54 NSF), Room 304D (25 NSF), Room 304E (606 NSF), Room 305 (849 NSF), Room 306 (869 NSF), Room 306A (91 NSF), Room 306B (25 NSF), Room 306C (51 NSF), Room 306D (25 NSF), Room 307 (844 NSF), Room 308 (640 NSF), Room 309 (640 NSF), Room 310 (260 NSF), Room 311 (271 NSF), Room 312 (640 NSF), Room 313 (54 NSF), Room 314 (261 NSF), Room 315 (269 NSF), Room 317 (37 NSF)
9,649 0 $800,867 $83 $0
Renovation 2022 4 5 Renovating: Apply Painting, Electrical, Lighting, Bell/Fire Alarm Systems to Room 100 (121 NSF)
121 0 $10,043 $83 $0
PAGE:83 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: ASTRONAUT SENIOR HIGH
Address: 800 WAR EAGLE BOULEVARD, TITUSVILLE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,522 0 1522
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 1,522 0 1522
Utilization Factor 95% 95%
School Capacity 1,445 1445
COFTE Student Membership 1,016 1,014
Survey Annotation Other=fencing & security & PE track resurfacing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $261,932 $0 $1,375,112 $0
Estimated Total Project Cost $1,637,044
ASTRONAUT SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility ASTRONAUT SENIOR HIGH.
244,150 0 $1,375,112 $6 $0
PAGE:84 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: ATLANTIS ELEMENTARY
Address: 7300 BRIGGS AVENUE, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 703 10 713
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 703 10 713
Utilization Factor 100% 100%
School Capacity 703 713
COFTE Student Membership 594 506
Survey AnnotationOther= fencing & securityNew construction is receipt of 2 relocatables (T-220 & T-227)from Space Coast Jr/Sr High. These will be moved using local funds.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $182,921 $278,375 $9,398,007 $1,041,920
Estimated Total Project Cost $10,901,223
ATLANTIS ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 2 units of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (858 NSF)
2,156 44 $1,041,920 $483 $23,680
PAGE:85 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
ATLANTIS ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 15 5 Removed NSF (2227), Added NSF (2120), Difference NSF (107), Percent (4.80%), Removed Stations (44), Added Stations (10) Remodeling: Adding 2 units of E S E PRE-K (850 NSF), 2 units of MATERIAL STORAGE (100 NSF), 2 units of STUDENT RESTROOM & BATH (110 NSF) and Removing Room 500 (945 NSF), Room 500A (107 NSF), Room 501 (945 NSF), Room 501A (63 NSF), Room 501B (30 NSF), Room 501C (30 NSF), Room 501D (107 NSF)
-2,227 -34 $278,375 $125 $0
Renovation 2018 15 1 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 001 (34844 NSF), Room 100 (560 NSF), Room 100A (190 NSF), Room 100B (290 NSF), Room 101 (200 NSF), Room 102 (245 NSF), Room 103 (277 NSF), Room 103A (25 NSF), Room 104 (196 NSF), Room 104A (25 NSF), Room 105 (245 NSF), Room 106 (198 NSF), Room 107 (321 NSF), Room 108 (408 NSF), Room 108A (117 NSF), Room 109 (259 NSF), Room 110 (44 NSF), Room 111 (96 NSF), Room 112 (72 NSF), Room 113 (106 NSF), Room 114 (72 NSF), Room 115 (92 NSF), Room 116 (584 NSF), Room 130 (2690 NSF), Room 130A (116 NSF), Room 130B (578 NSF), Room 130C (90 NSF), Room 130D (327 NSF), Room 130E (234 NSF), Room 130F (465 NSF), Room 130G (200 NSF), Room 130H (597 NSF), Room 130J (290 NSF), Room 130K (470 NSF), Room 130L (100 NSF), Room 130M (94 NSF), Room 140 (106 NSF)
45,823 0 $3,803,309 $83 $0
Renovation 2018 15 2 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 200 (997 NSF), Room 200A (104 NSF), Room 200B (96 NSF), Room 201 (1590 NSF), Room 201A (148 NSF), Room 201B (148 NSF), Room 201C (43 NSF), Room 201D (104 NSF), Room 202 (997 NSF), Room 202A (30 NSF), Room 202B (544 NSF), Room 203 (997 NSF), Room 203A (30 NSF), Room 204 (997 NSF), Room 204A (30 NSF), Room 205 (997 NSF), Room 205A (30 NSF), Room 206 (997 NSF), Room 206A (30 NSF), Room 206B (272 NSF), Room 207 (997 NSF), Room 207A (30 NSF), Room 208 (300 NSF), Room 209 (101 NSF), Room 210 (25 NSF)
10,634 0 $882,622 $83 $0
PAGE:86 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
ATLANTIS ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 15 3 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 300 (153 NSF), Room 301 (140 NSF), Room 302 (653 NSF), Room 303 (653 NSF), Room 304 (653 NSF), Room 305 (637 NSF), Room 305A (78 NSF), Room 305B (33 NSF), Room 306 (832 NSF), Room 306A (200 NSF), Room 306B (33 NSF), Room 306C (78 NSF), Room 307 (945 NSF), Room 307A (51 NSF), Room 307B (30 NSF), Room 307C (30 NSF), Room 307D (107 NSF), Room 308 (945 NSF), Room 308A (107 NSF), Room 308B (540 NSF), Room 309 (945 NSF), Room 309A (51 NSF), Room 309B (30 NSF), Room 309C (30 NSF), Room 310 (945 NSF), Room 311 (945 NSF), Room 311A (51 NSF), Room 311B (30 NSF), Room 311C (30 NSF), Room 311D (107 NSF), Room 312 (945 NSF), Room 312A (107 NSF), Room 312B (539 NSF), Room 313 (945 NSF), Room 313A (63 NSF), Room 313B (30 NSF), Room 313C (30 NSF), Room 314 (945 NSF)
13,666 0 $1,134,278 $83 $0
Renovation 2018 15 4 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 400 (580 NSF), Room 401 (580 NSF), Room 402 (580 NSF), Room 403 (945 NSF), Room 403A (51 NSF), Room 403B (30 NSF), Room 403C (30 NSF), Room 403D (107 NSF), Room 404 (945 NSF), Room 404A (107 NSF), Room 404B (501 NSF), Room 405 (945 NSF), Room 405A (51 NSF), Room 405B (30 NSF), Room 405C (30 NSF), Room 406 (945 NSF), Room 407 (945 NSF), Room 407A (51 NSF), Room 407B (30 NSF), Room 407C (30 NSF), Room 407D (107 NSF), Room 408 (945 NSF), Room 408A (107 NSF), Room 408B (501 NSF), Room 409 (945 NSF), Room 409A (63 NSF), Room 409B (30 NSF), Room 409C (30 NSF), Room 410 (945 NSF), Room 412 (438 NSF), Room 413 (25 NSF)
11,649 0 $966,867 $83 $0
PAGE:87 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
ATLANTIS ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 15 5 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 500B (501 NSF), Room 502 (945 NSF), Room 503 (945 NSF), Room 503A (51 NSF), Room 503B (30 NSF), Room 503C (30 NSF), Room 504 (945 NSF), Room 504A (107 NSF), Room 504B (501 NSF), Room 505 (945 NSF), Room 505A (51 NSF), Room 505B (30 NSF), Room 505C (30 NSF), Room 505D (107 NSF), Room 506 (945 NSF), Room 507 (945 NSF), Room 507A (51 NSF), Room 507B (30 NSF), Room 507C (30 NSF), Room 508 (945 NSF), Room 508A (107 NSF), Room 508B (501 NSF), Room 509 (945 NSF), Room 509A (51 NSF), Room 509B (30 NSF), Room 509C (30 NSF), Room 509D (107 NSF), Room 510 (945 NSF), Room 511 (945 NSF), Room 511A (51 NSF), Room 511B (30 NSF), Room 511C (30 NSF), Room 513 (29 NSF), Room 515 (812 NSF), Room 517 (284 NSF), Room 518 (110 NSF), Room 520 (110 NSF), Room 522 (114 NSF)
13,395 0 $1,111,785 $83 $0
Renovation 2018 15 6 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to Room 600 (761 NSF), Room 600A (71 NSF), Room 600B (123 NSF), Room 600C (125 NSF), Room 601 (370 NSF), Room 601A (140 NSF), Room 602 (541 NSF), Room 603 (1047 NSF), Room 604 (1047 NSF), Room 610 (3265 NSF), Room 612 (1611 NSF), Room 612A (193 NSF), Room 612B (130 NSF), Room 612C (138 NSF), Room 612D (36 NSF), Room 612E (32 NSF), Room 612F (28 NSF), Room 612G (133 NSF), Room 612H (84 NSF), Room 612J (219 NSF), Room 614 (554 NSF), Room 614A (77 NSF), Room 614B (60 NSF), Room 614C (110 NSF), Room 616 (341 NSF), Room 616A (43 NSF), Room 617 (153 NSF), Room 618 (123 NSF)
11,555 0 $959,065 $83 $0
Renovation 2018 15 7 Renovating: Apply Painting, Electrical, Bell/Fire Alarm Systems to Room 700 (881 NSF), Room 701 (232 NSF), Room 703 (120 NSF)
1,233 0 $102,339 $83 $0
Renovation 2018 15 8 Renovating: Apply Painting, Electrical, Bell/Fire Alarm Systems to Room 0001 (274 NSF)
274 0 $22,742 $83 $0
Renovation 2018 15 9 Renovating: Apply Painting, Electrical, Bell/Fire Alarm Systems to Room 100 (5000 NSF)
5,000 0 $415,000 $83 $0
PAGE:88 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: AUDUBON ELEMENTARY
Address: 1201 N BANANA RIVER DRIVE, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 761 -39 722
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 761 -39 722
Utilization Factor 100% 100%
School Capacity 761 722
COFTE Student Membership 627 594
Survey Annotation
Other=fencing & securityExpand administrationExpand multipurpose/diningExpand mediaExpand covered PE/storagePlumbing renovation = $500,000
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $21,865 $283,125 $500,000 $2,649,360
Estimated Total Project Cost $3,454,350
PAGE:89 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
AUDUBON ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2020 New Construction: Adding 1 unit of KITCHEN & SERVING AREA (899 NSF), 1 unit of KITCHEN CHAIR STORAGE (144 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2238 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (144 NSF), 1 unit of STAGE (408 NSF), 1 unit of STAGE STORAGE (180 NSF)
4,013 0 $999,237 $249 $0
New Construction 2020 New Construction: Adding 1 unit of LIBRARY (READING ROOM/STACKS) (888 NSF), 1 unit of MEDIA TECHNICAL PROCESSING (289 NSF), 1 unit of PROFESSIONAL LIBRARY (289 NSF), 1 unit of AUDIO VISUAL STORAGE (247 NSF), 1 unit of PERIODICAL STORAGE (144 NSF), 1 unit of CLOSED CIRCUIT TV LAB (505 NSF), 1 unit of CLOSED CIRCUIT STORAGE (100 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (361 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (72 NSF)
2,895 0 $720,855 $249 $0
New Construction 2020 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (1399 NSF)
1,714 0 $426,786 $249 $0
New Construction 2020 New Construction: Adding 1 unit of BOOKKEEPING OFFICE (125 NSF), 1 unit of RECEPTION AREA (614 NSF), 1 unit of PRODUCTION WORKROOM (288 NSF), 1 unit of CONFERENCE ROOM (96 NSF), 1 unit of VAULT/STUDENT RECORDS (122 NSF), 1 unit of SCHOOL STORE (72 NSF), 1 unit of COMPUTER AREA (108 NSF), 1 unit of CAREERS ROOM (216 NSF), 1 unit of ITINERANT OFFICE (125 NSF), 1 unit of TEXTBOOK STORAGE (252 NSF)
2,018 0 $502,482 $249 $0
Remodeling 2018 61 3 Removed NSF (2265), Added NSF (2265), Difference NSF (0), Percent (0%), Removed Stations (54), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (600 NSF), 3 units of MATERIAL STORAGE (45 NSF), 3 units of STUDENT RESTROOM & BATH (110 NSF) and Removing Room 002 (740 NSF), Room 002A (15 NSF), Room 004 (740 NSF), Room 004A (15 NSF), Room 006 (740 NSF), Room 006A (15 NSF)
2,265 -39 $283,125 $125 $0
Renovation 2018 Renovating: Apply Plumbing to the entire facility AUDUBON ELEMENTARY.
87,512 0 $500,000 $6 $0
PAGE:90 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: BAYSIDE SENIOR HIGH
Address: 1901 DEGROODT ROAD SW, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 2,353 0 2353
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 2,353 0 2353
Utilization Factor 95% 95%
School Capacity 2,235 2235
COFTE Student Membership 1,387 1,596
Survey Annotation Other=Fencing & Track resurfacing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $1,325,860 $0 $2,479,609 $0
Estimated Total Project Cost $3,805,469
BAYSIDE SENIOR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility BAYSIDE SENIOR HIGH.
354,701 0 $2,479,609 $7 $0
PAGE:91 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: BEACHSIDE OFFICE
Address: 331 RAMP ROAD, COCOA BEACH
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use COUNTY ADMINISTRATION COUNTY ADMINISTRATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
BEACHSIDE OFFICE Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:92 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: CAMBRIDGE ELEMENTARY MAGNET
Address: 2000 CAMBRIDGE DRIVE, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 649 74 723
Reloc. Stations 116 -116 0
Mod. Stations 0 0 0
Total Stations 765 -42 723
Utilization Factor 100% 100%
School Capacity 765 723
COFTE Student Membership 604 553
Survey Annotation
Relocatables in excess of 20 years old to be removed.
New construction is the receipt of 4 relo from Meadowlane Intermediate to replace relos > 20 years old utilizing local funds
Other=fencing & securityExpand administrationExpand multipurpose/diningExpand media
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $224,461 $40,000 $341,424 $3,548,729
Estimated Total Project Cost $4,154,614
PAGE:93 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
CAMBRIDGE ELEMENTARY MAGNET
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 3 units of PRIMARY CLASSROOM (K-3) (788 NSF), 1 unit of E S E PRE-K (600 NSF)
3,964 59 $1,397,120 $352 $23,680
New Construction 2022 New Construction: Adding 1 unit of BOOKKEEPING OFFICE (125 NSF), 1 unit of SECRETARIAL SPACE (158 NSF), 1 unit of RECEPTION AREA (615 NSF), 1 unit of CONFERENCE ROOM (176 NSF), 1 unit of GENERAL SCHOOL STORAGE (219 NSF), 1 unit of STUDENT ACTIVITIES (362 NSF), 1 unit of COMPUTER AREA (108 NSF), 1 unit of CAREERS ROOM (217 NSF), 1 unit of TEACHER LOUNGE/DINING (289 NSF), 1 unit of TEXTBOOK STORAGE (253 NSF)
2,522 0 $627,978 $249 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (289 NSF), 1 unit of PROFESSIONAL LIBRARY (289 NSF), 1 unit of AUDIO VISUAL STORAGE (228 NSF), 1 unit of PERIODICAL STORAGE (145 NSF), 1 unit of CLOSED CIRCUIT TV LAB (506 NSF), 1 unit of CLOSED CIRCUIT STORAGE (362 NSF), 1 unit of MEDIA PRODUCTION LAB (362 NSF), 1 unit of MEDIA COPYING ROOM (145 NSF), 1 unit of MEDIA SMALL GROUP ROOM (80 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (361 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (72 NSF)
2,839 0 $706,911 $249 $0
New Construction 2022 New Construction: Adding 1 unit of DINING AREA (751 NSF), 1 unit of KITCHEN CHAIR STORAGE (144 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2241 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (144 NSF)
3,280 0 $816,720 $249 $0
Remodeling 2018 21 99 Removed NSF (2364), Added NSF (2364), Difference NSF (0), Percent (0%), Removed Stations (44), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (788 NSF) and Removing Room T240 (788 NSF), Room T243 (788 NSF), Room T256 (788 NSF)
2,364 -29 $0 $0 $0
Remodeling 2018 21 99 Removed NSF (3128), Added NSF (0), Difference NSF (3128), Percent (100%), Removed Stations (72), Added Stations (0) Remodeling: Removing Room T100 (782 NSF), Room T101 (782 NSF), Room T102 (782 NSF), Room T103 (782 NSF)
-3,128 -72 $40,000 $13 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility CAMBRIDGE ELEMENTARY MAGNET.
85,284 0 $341,424 $4 $0
PAGE:94 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PAGE:95 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: CAPE VIEW ELEMENTARY
Address: 8440 N ROSALIND AVENUE, CAPE CANAVERAL
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 548 -17 531
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 548 -17 531
Utilization Factor 100% 100%
School Capacity 548 531
COFTE Student Membership 394 370
Survey Annotation Add covered play
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $97,500 $0 $554,523
Estimated Total Project Cost $652,023
CAPE VIEW ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2021 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (1912 NSF)
2,227 0 $554,523 $249 $0
PAGE:96 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
CAPE VIEW ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 68 3 Removed NSF (780), Added NSF (780), Difference NSF (0), Percent (0%), Removed Stations (22), Added Stations (5) Remodeling: Adding 1 unit of E S E PRE-K (780 NSF) and Removing Room 301 (780 NSF)
780 -17 $97,500 $125 $0
PAGE:97 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: CENTRAL MIDDLE
Address: 2600 WINGATE BOULEVARD, WEST MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,694 0 1694
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 1,694 0 1694
Utilization Factor 90% 90%
School Capacity 1,524 1524
COFTE Student Membership 1,135 1,198
Survey Annotation Other= fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $56,797 $0 $1,659,024 $0
Estimated Total Project Cost $1,715,821
CENTRAL MIDDLE Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems to the entire facility CENTRAL MIDDLE.
225,379 0 $1,659,024 $7 $0
PAGE:98 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: CHALLENGER 7 ELEMENTARY
Address: 6135 RENA DRIVE, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 551 0 551
Reloc. Stations 22 0 22
Mod. Stations 0 0 0
Total Stations 573 0 573
Utilization Factor 100% 100%
School Capacity 573 573
COFTE Student Membership 505 453
Survey Annotation Other=fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $97,722 $0 $541,079 $0
Estimated Total Project Cost $638,801
CHALLENGER 7 ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility CHALLENGER 7 ELEMENTARY.
108,604 0 $541,079 $5 $0
PAGE:99 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: CHRISTA MCAULIFFE ELEMENTARY
Address: 155 DEL MUNDO AVENUE NW, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 754 15 769
Reloc. Stations 164 -120 44
Mod. Stations 0 0 0
Total Stations 918 -105 813
Utilization Factor 100% 100%
School Capacity 918 813
COFTE Student Membership 730 724
Survey Annotation
Relocatables in excess of 20 years old to be removed. 3 to be converted to PK ESE
2 relos to be transferred to Hans Christian Anderson to replace relos>20 years old and 1 to Sunrise. These will be moved utilizing local funds.
Other=fencing & Security
Add multipurpose & related spacesExpand administrationAdd covered PE & storage
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $214,547 $40,000 $0 $1,675,521
Estimated Total Project Cost $1,930,068
PAGE:100 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
CHRISTA MCAULIFFE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY COVERED PLAY AREA (2768 NSF)
2,768 0 $689,232 $249 $0
New Construction 2022 New Construction: Adding 1 unit of PRODUCTION WORKROOM (307 NSF), 1 unit of VAULT/STUDENT RECORDS (231 NSF), 1 unit of STUDENT ACTIVITIES (385 NSF), 1 unit of COMPUTER AREA (115 NSF), 1 unit of CAREERS ROOM (231 NSF)
1,269 0 $315,981 $249 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (154 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2384 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (154 NSF)
2,692 0 $670,308 $249 $0
Remodeling 2020 43 99 Removed NSF (1923), Added NSF (0), Difference NSF (1923), Percent (100%), Removed Stations (54), Added Stations (0) Remodeling: Removing Room N915 (683 NSF), Room T021 (620 NSF), Room T023 (620 NSF)
-1,923 -54 $30,000 $16 $0
Remodeling 2018 43 99 Removed NSF (788), Added NSF (0), Difference NSF (788), Percent (100%), Removed Stations (0), Added Stations (0) Remodeling: Removing Room T461 (788 NSF)
-788 0 $10,000 $13 $0
Remodeling 2018 43 99 Removed NSF (2364), Added NSF (2364), Difference NSF (0), Percent (0%), Removed Stations (66), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (788 NSF) and Removing Room T339 (788 NSF), Room T460 (788 NSF), Room T462 (788 NSF)
2,364 -51 $0 $0 $0
PAGE:101 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: CLEARLAKE EDUCATION CENTER
Address: 1225 CLEARLAKE ROAD, COCOA
Existing Recommended
Capital Outlay Classification
2 - SCHOOL CONDITIONALLY RECOMMENDED FOR CONTINUED USE
2 - SCHOOL CONDITIONALLY RECOMMENDED FOR CONTINUED USE
Facility Use VACANT ADULT EDUCATION
Low Grade ADULT EDUCATION ADULT EDUCATION
High Grade ADULT EDUCATION ADULT EDUCATION
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 747 0 747
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 747 0 747
Utilization Factor 0% 150%
School Capacity 0 1120
COFTE Student Membership 0 0
Survey Annotation Other= fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $31,165 $0 $1,398,252 $0
Estimated Total Project Cost $1,429,417
CLEARLAKE EDUCATION CENTER
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility CLEARLAKE EDUCATION CENTER.
101,611 0 $1,398,252 $14 $0
PAGE:102 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: COCOA BEACH JR/SR HIGH
Address: 1500 MINUTEMAN CAUSEWAY, COCOA BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use COMBINATION COMBINATION
Low Grade GRADE 7 GRADE 7
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,253 0 1253
Reloc. Stations 375 -25 350
Mod. Stations 0 0 0
Total Stations 1,628 -25 1603
Utilization Factor 90% 90%
School Capacity 1,465 1442
COFTE Student Membership 1,052 1,074
Survey AnnotationRelocatable in excess of 20 years old to be removed. Other=fencing & security & resurfacing of PE track.Move 1 relocatable to Surfside using local funds.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $609,666 $20,000 $1,651,130 $0
Estimated Total Project Cost $2,280,796
COCOA BEACH JR/SR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2019 65 99 Removed NSF (1465), Added NSF (0), Difference NSF (1465), Percent (100%), Removed Stations (25), Added Stations (0) Remodeling: Removing Room N172 (683 NSF), Room T112 (782 NSF)
-1,465 -25 $20,000 $14 $0
PAGE:103 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA BEACH JR/SR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility COCOA BEACH JR/SR HIGH.
223,966 0 $1,651,130 $7 $0
PAGE:104 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: COCOA JR/SR HIGH
Address: 2000 TIGER TRAIL, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use COMBINATION COMBINATION
Low Grade GRADE 7 GRADE 7
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,730 228 1958
Reloc. Stations 250 0 250
Mod. Stations 0 0 0
Total Stations 1,980 228 2208
Utilization Factor 90% 90%
School Capacity 1,782 1987
COFTE Student Membership 1,234 1,345
Survey AnnotationOther=fencing & security & resurfacing PE trackMove 1 relocatable to Surfside utilizing local funds.New construction will be funded with Impact Fees.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $690,299 $1,424,525 $22,637,062 $9,365,955
Estimated Total Project Cost $34,117,841
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2019 New Construction: Adding 1 unit of MEDIUM TECHNOLOGY LAB (2375 NSF), 1 unit of LARGE TECHNOLOGY LAB (3375 NSF)
8,860 50 $1,643,150 $185 $32,863
PAGE:105 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2019 New Construction: Adding 4 units of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (858 NSF), 3 units of SENIOR HIGH CLASSROOM (9-12) (800 NSF), 1 unit of INTERMEDIATE/MIDDLE SKILLS LAB (4-8) (858 NSF), 2 units of SENIOR HIGH SKILLS LAB (9-12) (800 NSF)
9,840 235 $7,722,805 $785 $32,863
Remodeling 2018 28 6 Removed NSF (3468), Added NSF (3468), Difference NSF (0), Percent (0%), Removed Stations (100), Added Stations (88) Remodeling: Adding 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (627 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (851 NSF), 1 unit of INTERMEDIATE/MIDDLE SKILLS LAB (4-8) (1250 NSF), 1 unit of INTERMEDIATE/MIDDLE SKILLS LAB (4-8) (740 NSF) and Removing Room 603 (627 NSF), Room 613 (851 NSF), Room 617 (1250 NSF), Room 621 (740 NSF)
3,468 -12 $329,460 $95 $0
Remodeling 2018 28 7 Removed NSF (7006), Added NSF (7006), Difference NSF (0), Percent (0%), Removed Stations (225), Added Stations (198) Remodeling: Adding 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (704 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (738 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (734 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (733 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (752 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (683 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (703 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (751 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (1208 NSF) and Removing Room 701 (703 NSF), Room 702 (704 NSF), Room 703 (683 NSF), Room 709 (738 NSF), Room 710 (733 NSF), Room 711 (752 NSF), Room 712 (751 NSF), Room 713 (734 NSF), Room 714 (1208 NSF)
7,006 -27 $665,570 $95 $0
PAGE:106 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2019 28 10 Removed NSF (4251), Added NSF (4251), Difference NSF (0), Percent (0%), Removed Stations (150), Added Stations (132) Remodeling: Adding 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (701 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (753 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (686 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (687 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (735 NSF), 1 unit of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (689 NSF) and Removing Room 100 (701 NSF), Room 101 (687 NSF), Room 102 (686 NSF), Room 108 (735 NSF), Room 109 (753 NSF), Room 112 (689 NSF)
4,251 -18 $429,495 $101 $0
Renovation 2018 28 1 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to Room 001 (67530 NSF), Room 100 (700 NSF), Room 101 (131 NSF), Room 102 (153 NSF), Room 103 (186 NSF), Room 104 (180 NSF), Room 105 (184 NSF), Room 106 (156 NSF), Room 107 (137 NSF), Room 108 (371 NSF), Room 109 (128 NSF), Room 110 (149 NSF), Room 111 (122 NSF), Room 111A (95 NSF), Room 112 (122 NSF), Room 113 (316 NSF), Room 114 (177 NSF), Room 115 (285 NSF), Room 117 (178 NSF), Room 118 (122 NSF), Room 119 (122 NSF), Room 120 (325 NSF), Room 121 (163 NSF), Room 121A (79 NSF), Room 121B (58 NSF), Room 121C (87 NSF), Room 121D (20 NSF), Room 121G (8 NSF), Room 1251E (65 NSF), Room 131 (151 NSF), Room 133 (145 NSF), Room 134 (48 NSF), Room 136 (137 NSF), Room 137 (61 NSF), Room 138 (39 NSF)
72,930 0 $6,928,350 $95 $0
Renovation 2018 28 2 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 001 (383 NSF), Room 201 (5316 NSF), Room 201A (412 NSF), Room 201B (268 NSF), Room 201C (136 NSF), Room 202 (352 NSF), Room 203 (374 NSF), Room 203A (144 NSF), Room 203B (101 NSF), Room 204 (234 NSF), Room 205 (67 NSF), Room 206 (83 NSF), Room 207 (120 NSF), Room 208 (10 NSF), Room 209 (120 NSF), Room 210 (502 NSF), Room 211 (193 NSF), Room 212 (184 NSF), Room 217 (633 NSF)
9,632 0 $915,040 $95 $0
PAGE:107 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 28 3 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 301 (67 NSF), Room 302 (2888 NSF), Room 302A (41 NSF), Room 302B (279 NSF), Room 302C (120 NSF), Room 302D (120 NSF), Room 302E (511 NSF), Room 302F (50 NSF), Room 302G (310 NSF), Room 302H (44 NSF), Room 302J (75 NSF), Room 302K (166 NSF), Room 302L (48 NSF), Room 303 (148 NSF), Room 304 (194 NSF), Room 305 (241 NSF), Room 306 (268 NSF), Room 307 (2027 NSF), Room 307A (41 NSF), Room 307B (122 NSF), Room 307C (120 NSF), Room 307D (50 NSF), Room 307E (40 NSF)
7,970 0 $757,150 $95 $0
Renovation 2018 28 4 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 401 (1313 NSF), Room 401A (640 NSF), Room 401B (162 NSF), Room 401C (156 NSF), Room 401D (112 NSF), Room 401E (16 NSF), Room 402 (140 NSF), Room 403 (190 NSF), Room 404 (127 NSF), Room 404A (32 NSF), Room 405 (76 NSF), Room 406 (162 NSF), Room 407 (110 NSF)
3,236 0 $307,420 $95 $0
Renovation 2018 28 5 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 500 (288 NSF), Room 501 (9078 NSF), Room 502 (174 NSF), Room 503 (929 NSF), Room 503A (48 NSF), Room 503B (96 NSF), Room 503C (102 NSF), Room 503D (100 NSF), Room 503E (39 NSF), Room 503F (289 NSF), Room 504 (39 NSF), Room 505 (2575 NSF), Room 505A (309 NSF), Room 505B (81 NSF), Room 506 (308 NSF), Room 507 (80 NSF), Room 508 (227 NSF), Room 509 (167 NSF), Room 510 (143 NSF), Room 511 (169 NSF), Room 512 (1060 NSF), Room 512A (45 NSF), Room 512B (87 NSF), Room 512C (94 NSF), Room 512D (206 NSF), Room 512E (36 NSF), Room 512F (288 NSF), Room 513 (193 NSF), Room 514 (1017 NSF), Room 514A (90 NSF), Room 514B (137 NSF), Room 514C (29 NSF), Room 514D (221 NSF), Room 514E (57 NSF), Room 514F (185 NSF)
18,986 0 $1,803,670 $95 $0
PAGE:108 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 28 6 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 601 (900 NSF), Room 602 (708 NSF), Room 607 (44 NSF), Room 611 (926 NSF), Room 611A (165 NSF), Room 614 (704 NSF), Room 615 (961 NSF), Room 615A (153 NSF), Room 615B (174 NSF), Room 618 (704 NSF), Room 618A (50 NSF), Room 619 (715 NSF), Room 619A (72 NSF), Room 619B (72 NSF), Room 619C (74 NSF), Room 620 (623 NSF), Room 620A (191 NSF)
7,236 0 $680,184 $94 $0
Renovation 2018 28 7 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 701A (160 NSF), Room 703A (547 NSF), Room 703B (160 NSF), Room 703C (190 NSF), Room 704 (80 NSF), Room 705 (116 NSF), Room 706 (10 NSF), Room 707 (120 NSF), Room 708 (304 NSF), Room 715 (811 NSF), Room 716 (909 NSF), Room 716A (64 NSF)
3,471 0 $326,274 $94 $0
Renovation 2018 28 8 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 801 (1470 NSF), Room 802 (1492 NSF), Room 803 (1483 NSF), Room 804 (1489 NSF), Room 807 (1140 NSF), Room 808 (182 NSF), Room 809 (162 NSF), Room 810 (64 NSF), Room 811 (76 NSF), Room 812 (100 NSF)
7,658 0 $719,852 $94 $0
Renovation 2018 28 9 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 901 (1033 NSF), Room 901A (132 NSF), Room 901B (110 NSF), Room 901C (172 NSF), Room 902 (933 NSF), Room 903 (904 NSF), Room 904 (906 NSF), Room 905 (825 NSF), Room 905A (98 NSF), Room 905B (130 NSF), Room 905C (101 NSF), Room 906 (963 NSF), Room 906A (76 NSF), Room 906B (10 NSF), Room 907 (969 NSF), Room 907A (269 NSF), Room 908 (1502 NSF), Room 909 (1502 NSF)
10,635 0 $1,010,325 $95 $0
Renovation 2018 28 10 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 100A (356 NSF), Room 100B (344 NSF), Room 103 (500 NSF), Room 104 (907 NSF), Room 105 (591 NSF), Room 106 (752 NSF), Room 107 (740 NSF), Room 110 (1100 NSF), Room 110A (204 NSF), Room 110B (112 NSF), Room 110C (87 NSF), Room 111 (750 NSF)
6,443 0 $605,642 $94 $0
PAGE:109 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 28 11 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 110 (971 NSF), Room 110A (170 NSF), Room 111 (971 NSF), Room 111A (160 NSF), Room 112 (800 NSF), Room 112A (35 NSF), Room 113 (100 NSF), Room 114 (250 NSF), Room 115 (145 NSF), Room 116 (180 NSF), Room 116A (10 NSF), Room 117 (500 NSF), Room 117A (501 NSF), Room 118 (316 NSF), Room 118A (40 NSF)
5,149 0 $489,155 $95 $0
Renovation 2018 28 12 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 120 (9874 NSF), Room 120A (177 NSF), Room 120B (52 NSF), Room 120C (17 NSF), Room 120D (33 NSF), Room 120E (1431 NSF), Room 120F (211 NSF), Room 120G (186 NSF), Room 120H (17 NSF), Room 121 (1647 NSF), Room 121A (91 NSF), Room 121B (83 NSF), Room 121C (43 NSF), Room 121D (257 NSF), Room 121E (257 NSF), Room 122 (122 NSF), Room 123 (208 NSF), Room 124 (194 NSF), Room 125 (125 NSF)
15,025 0 $1,427,375 $95 $0
Renovation 2018 28 13 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 201 (372 NSF), Room 202 (190 NSF), Room 203 (188 NSF), Room 204 (164 NSF), Room 205 (165 NSF), Room 206 (140 NSF), Room 206A (69 NSF), Room 207 (345 NSF), Room 208 (315 NSF), Room 209 (256 NSF), Room 210 (189 NSF), Room 211 (220 NSF), Room 212 (189 NSF), Room 213 (252 NSF), Room 214 (14 NSF), Room 215 (14 NSF), Room 216 (139 NSF), Room 220 (160 NSF), Room 221 (143 NSF)
3,524 0 $334,780 $95 $0
Renovation 2018 28 14 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 140 (468 NSF), Room 140A (834 NSF), Room 141 (2908 NSF), Room 141A (117 NSF), Room 141B (118 NSF), Room 141C (26 NSF), Room 142 (1068 NSF), Room 143 (60 NSF), Room 144 (613 NSF), Room 145 (185 NSF)
6,397 0 $607,715 $95 $0
PAGE:110 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 28 15 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 150 (30 NSF), Room 151 (2034 NSF), Room 151A (159 NSF), Room 151B (119 NSF), Room 151C (64 NSF), Room 152 (2012 NSF), Room 152A (31 NSF), Room 152B (350 NSF), Room 152C (58 NSF), Room 152D (58 NSF), Room 152E (25 NSF), Room 152F (33 NSF), Room 153 (1338 NSF), Room 154 (591 NSF), Room 154A (118 NSF), Room 154B (238 NSF), Room 154C (64 NSF), Room 155 (658 NSF), Room 155A (30 NSF), Room 155B (55 NSF), Room 156 (861 NSF), Room 156A (36 NSF), Room 156B (116 NSF), Room 157 (872 NSF), Room 157A (45 NSF), Room 157B (178 NSF), Room 158 (492 NSF), Room 158A (140 NSF)
10,805 0 $1,026,475 $95 $0
Renovation 2018 28 16 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 160 (1545 NSF), Room 160B (119 NSF), Room 160C (103 NSF), Room 160D (149 NSF), Room 161 (1549 NSF), Room 161A (119 NSF), Room 161B (133 NSF), Room 161C (256 NSF), Room 163 (1023 NSF), Room 163A (291 NSF), Room 163B (265 NSF), Room 163C (113 NSF), Room 164 (1028 NSF), Room 165 (983 NSF), Room 165A (116 NSF), Room 166 (1034 NSF), Room 166A (745 NSF), Room 167 (501 NSF), Room 168 (1070 NSF), Room 169 (36 NSF)
11,178 0 $1,061,910 $95 $0
Renovation 2018 28 17 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 001 (387 NSF), Room 170 (1904 NSF), Room 171 (297 NSF), Room 172 (79 NSF), Room 173 (297 NSF), Room 173A (102 NSF), Room 174 (1971 NSF), Room 174A (289 NSF), Room 174B (274 NSF), Room 174C (365 NSF), Room 174D (373 NSF), Room 174E (459 NSF), Room 174F (215 NSF), Room 174G (73 NSF), Room 174H (39 NSF), Room 174J (144 NSF), Room 174K (198 NSF), Room 175 (179 NSF), Room 175A (386 NSF), Room 176 (1269 NSF), Room 176A (422 NSF), Room 177 (1072 NSF), Room 177A (188 NSF), Room 177B (126 NSF), Room 178 (834 NSF), Room 179 (1018 NSF), Room 180 (996 NSF), Room 181 (36 NSF), Room 182 (151 NSF)
14,143 0 $1,343,585 $95 $0
PAGE:111 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 28 18 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 100 (343 NSF), Room 100A (529 NSF), Room 101 (848 NSF), Room 101A (167 NSF), Room 102 (371 NSF), Room 103 (1220 NSF), Room 104 (1205 NSF), Room 106 (1306 NSF), Room 106A (110 NSF), Room 106C (61 NSF), Room 106D (81 NSF), Room 107 (627 NSF), Room 107A (123 NSF), Room 108 (211 NSF), Room 108A (62 NSF), Room 108B (45 NSF), Room 109 (82 NSF), Room 110 (200 NSF), Room 111 (447 NSF), Room 111A (126 NSF), Room 111B (142 NSF), Room 112 (3170 NSF), Room 112A (190 NSF), Room 112B (127 NSF), Room 113 (3037 NSF), Room 113A (100 NSF), Room 113B (690 NSF), Room 113C (174 NSF), Room 113D (119 NSF), Room 113E (162 NSF), Room 113F (78 NSF), Room 113G (356 NSF), Room 113H (79 NSF), Room 113J (322 NSF), Room 113K (107 NSF), Room 113L (108 NSF), Room 113M (80 NSF), Room 115 (832 NSF), Room 115A (41 NSF)
18,078 0 $1,717,410 $95 $0
Renovation 2018 28 19 Renovating: Apply Painting, Electrical, Plumbing to Room 190 (84 NSF), Room 191 (55 NSF), Room 192 (179 NSF), Room 193 (95 NSF), Room 194 (244 NSF)
657 0 $62,415 $95 $0
Renovation 2018 28 20 Renovating: Apply Painting, Electrical, Plumbing to Room 200 (156 NSF), Room 201 (29 NSF), Room 202 (156 NSF)
341 0 $32,395 $95 $0
Renovation 2018 28 21 Renovating: Apply Painting, Electrical, HVAC Systems to Room 100 (1749 NSF), Room 100A (336 NSF), Room 100B (141 NSF), Room 100C (92 NSF), Room 100D (251 NSF)
2,569 0 $244,055 $95 $0
Renovation 2018 28 22 Renovating: Apply Painting, Electrical to Room 220P (288 NSF)
288 0 $27,360 $95 $0
Renovation 2018 28 23 Renovating: Apply Painting, Electrical to Room 001 (31 NSF), Room 002 (65 NSF), Room 003 (245 NSF)
341 0 $32,395 $95 $0
Renovation 2018 28 24 Renovating: Apply Painting, Electrical to Room 101 (64 NSF)
64 0 $6,080 $95 $0
Renovation 2018 28 25 Renovating: Apply Painting, Electrical, Plumbing to Room 101 (139 NSF), Room 102 (28 NSF), Room 103 (28 NSF), Room 201 (199 NSF)
394 0 $37,430 $95 $0
Renovation 2018 28 26 Renovating: Apply Painting, Electrical to Room 100 (225 NSF)
225 0 $21,375 $95 $0
Renovation 2018 28 27 Renovating: Apply Painting, Electrical to Room 100 (414 NSF), Room 101 (175 NSF)
589 0 $55,955 $95 $0
PAGE:112 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COCOA JR/SR HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 28 28 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 100 (68 NSF), Room 101 (68 NSF), Room 102 (150 NSF), Room 200 (296 NSF)
582 0 $55,290 $95 $0
PAGE:113 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: COLUMBIA ELEMENTARY
Address: 1225 WACO BOULEVARD SE, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 685 -43 642
Reloc. Stations 66 -44 22
Mod. Stations 0 0 0
Total Stations 751 -87 664
Utilization Factor 100% 100%
School Capacity 751 664
COFTE Student Membership 543 642
Survey Annotation1 relocatable to be transferred to Surfside ES and 1 to Kennedy MS to replace old. These will be moved utilizing local funds.Other=fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $199,460 $20,000 $263,582 $0
Estimated Total Project Cost $483,042
COLUMBIA ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2019 41 2 Removed NSF (2844), Added NSF (2844), Difference NSF (0), Percent (0%), Removed Stations (58), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (948 NSF) and Removing Room 201 (948 NSF), Room 202 (948 NSF), Room 203 (948 NSF)
2,844 -43 $0 $0 $0
PAGE:114 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COLUMBIA ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2022 41 99 Removed NSF (1576), Added NSF (0), Difference NSF (1576), Percent (100%), Removed Stations (44), Added Stations (0) Remodeling: Removing Room T353 (788 NSF), Room T356 (788 NSF)
-1,576 -44 $20,000 $13 $0
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility COLUMBIA ELEMENTARY.
116,966 0 $263,582 $2 $0
PAGE:115 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: COQUINA ELEMENTARY
Address: 850 KNOX MCRAE DRIVE, TITUSVILLE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 627 0 627
Reloc. Stations 66 0 66
Mod. Stations 0 0 0
Total Stations 693 0 693
Utilization Factor 100% 100%
School Capacity 693 693
COFTE Student Membership 534 498
Survey Annotation
Buildings 15 and 16, which are each 264 NSF Material Storage buildings, were constructed in 2010 and will not be renovated.Other=fencing & securityExpand multipurpose/diningExpand covered play and add PE Storage
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $87,361 $0 $1,703,351 $869,010
Estimated Total Project Cost $2,659,722
PAGE:116 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
COQUINA ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (138 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (725 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (138 NSF), 1 unit of STAGE (454 NSF), 1 unit of STAGE STORAGE (347 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (139 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (139 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
2,180 0 $542,820 $249 $0
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (995 NSF)
1,310 0 $326,190 $249 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility COQUINA ELEMENTARY.
80,440 0 $1,703,351 $21 $0
PAGE:117 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: CROTON ELEMENTARY
Address: 1449 CROTON ROAD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 707 0 707
Reloc. Stations 88 0 88
Mod. Stations 0 0 0
Total Stations 795 0 795
Utilization Factor 100% 100%
School Capacity 795 795
COFTE Student Membership 639 638
Survey Annotation Other=fencing & security $86,395 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$103,246
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $288,841 $0 $1,735,156 $0
Estimated Total Project Cost $2,023,997
CROTON ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility CROTON ELEMENTARY.
70,895 0 $1,735,156 $24 $0
PAGE:118 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: CUYLER SCHOOL
Address: 2327 HARRY T MOORE AVENUE, MIMS
Existing Recommended
Capital Outlay Classification
3 - SCHOOL NOT RECOMMENDED FOR CONTINUED USE
7 - ANCILLARY NOT RECOMMENDED FOR CONTINUED USE
Facility Use VACANT MAINTENANCE
Low Grade KINDERGARTEN DISTRICT SERVICES
High Grade GRADE 12 DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 98 0 98
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 98 0 98
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
CUYLER SCHOOL Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:119 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: DELAURA MIDDLE
Address: 300 JACKSON AVENUE, SATELLITE BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,046 0 1046
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 1,046 0 1046
Utilization Factor 90% 90%
School Capacity 941 941
COFTE Student Membership 685 673
Survey Annotation Other=fencing & security-$68,261 & Site Improvement=Deferred infrastructure improvements as described in 1013.01(22)$187,720
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $405,981 $0 $3,206,623 $0
Estimated Total Project Cost $3,612,604
DELAURA MIDDLE Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility DELAURA MIDDLE.
111,303 0 $3,206,623 $29 $0
PAGE:120 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: DISCOVERY ELEMENTARY
Address: 1275 GLENDALE AVENUE NW, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 826 -34 792
Reloc. Stations 154 -154 0
Mod. Stations 0 0 0
Total Stations 980 -188 792
Utilization Factor 100% 100%
School Capacity 980 792
COFTE Student Membership 600 748
Survey AnnotationTransfer 1 relo to Endeavour Elem, 5 to Harbor City Elem, & 2 to Kennedy to replace relos >20 years old utilizing local funds.Site Improvement=Deferred infrastructure improvements as described in 1013.01(22)
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $812,000 $90,000 $0 $0
Estimated Total Project Cost $902,000
DISCOVERY ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 42 4 Removed NSF (1890), Added NSF (1890), Difference NSF (0), Percent (0%), Removed Stations (44), Added Stations (10) Remodeling: Adding 2 units of E S E PRE-K (945 NSF) and Removing Room 405 (945 NSF), Room 406 (945 NSF)
1,890 -34 $0 $0 $0
PAGE:121 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
DISCOVERY ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2020 42 99 Removed NSF (6740), Added NSF (0), Difference NSF (6740), Percent (100%), Removed Stations (154), Added Stations (0) Remodeling: Removing Room B006 (436 NSF), Room T307 (788 NSF), Room T309 (788 NSF), Room T311 (788 NSF), Room T327 (788 NSF), Room T329 (788 NSF), Room T330 (788 NSF), Room T411 (788 NSF), Room T412 (788 NSF)
-6,740 -154 $90,000 $13 $0
PAGE:122 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: DR W J CREEL ELEMENTARY
Address: 2000 GLENWOOD DRIVE, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,088 -100 988
Reloc. Stations 66 0 66
Mod. Stations 0 0 0
Total Stations 1,154 -100 1054
Utilization Factor 100% 100%
School Capacity 1,154 1054
COFTE Student Membership 884 884
Survey Annotation
This school is an ESE PK ClusterOther=security & fencing-$71,449 & Site Improvement=Deferred infrastructure improvements as described in 1013.01(22)$197,106
Expand media.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $396,555 $0 $1,794,654 $734,799
Estimated Total Project Cost $2,926,008
PAGE:123 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
DR W J CREEL ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 1 unit of AUDIO VISUAL STORAGE (632 NSF), 1 unit of PERIODICAL STORAGE (211 NSF), 1 unit of CLOSED CIRCUIT TV LAB (738 NSF), 1 unit of CLOSED CIRCUIT STORAGE (527 NSF), 1 unit of MEDIA PRODUCTION LAB (527 NSF), 1 unit of MEDIA COPYING ROOM (211 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (105 NSF)
2,951 0 $734,799 $249 $0
Remodeling 2018 78 1 Removed NSF (5296), Added NSF (5290), Difference NSF (6), Percent (0.11%), Removed Stations (140), Added Stations (40) Remodeling: Adding 5 units of E S E PRE-K (740 NSF), 3 units of E S E PRE-K (530 NSF) and Removing Room 003C (740 NSF), Room 003D (525 NSF), Room 004C (740 NSF), Room 006C (740 NSF), Room 006D (525 NSF), Room 007C (740 NSF), Room 007D (546 NSF), Room 008C (740 NSF)
-5,296 -100 $0 $0 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility DR W J CREEL ELEMENTARY.
113,473 0 $1,794,654 $16 $0
PAGE:124 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: EAU GALLIE SENIOR HIGH
Address: 1400 COMMODORE BOULEVARD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 2,050 45 2095
Reloc. Stations 250 0 250
Mod. Stations 0 0 0
Total Stations 2,300 45 2345
Utilization Factor 95% 95%
School Capacity 2,185 2227
COFTE Student Membership 1,573 1,562
Survey AnnotationOther=fencing & security & resurface PE trackExpand diningTransfer 2 relocatables to Melbourne HS utilizing local funds.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $282,083 $20,000 $2,060,036 $2,436,518
Estimated Total Project Cost $4,798,637
EAU GALLIE SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 1 unit of DINING AREA (3293 NSF)
3,293 0 $941,798 $286 $0
New Construction 2018 New Construction: Adding 1 unit of SENIOR HIGH SKILLS LAB (9-12) (800 NSF), 1 unit of LARGE INDUSTRIAL LAB (7500 NSF)
10,205 45 $1,494,720 $146 $33,216
PAGE:125 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
EAU GALLIE SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 46 99 Removed NSF (1576), Added NSF (0), Difference NSF (1576), Percent (100%), Removed Stations (0), Added Stations (0) Remodeling: Removing Room T453 (788 NSF), Room T455 (788 NSF)
-1,576 0 $20,000 $13 $0
Renovation 2018 Renovating: Apply Electrical, Plumbing, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility EAU GALLIE SENIOR HIGH.
309,687 0 $1,860,036 $6 $0
Renovation 2018 46 27 Renovating: Apply HVAC Systems to Room 101 (2634 NSF), Room 101A (111 NSF), Room 101B (20 NSF), Room 101C (890 NSF), Room 101D (20 NSF), Room 101E (99 NSF), Room 101F (208 NSF), Room 102 (198 NSF), Room 102A (56 NSF), Room 102B (20 NSF), Room 103 (2415 NSF), Room 103A (20 NSF), Room 103B (111 NSF), Room 103C (115 NSF), Room 103D (20 NSF)
6,937 0 $200,000 $29 $0
PAGE:126 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: EDGEWOOD JR/ SR HIGH
Address: 180 E MERRITT AVENUE, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use COMBINATION COMBINATION
Low Grade GRADE 7 GRADE 7
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,100 0 1100
Reloc. Stations 91 0 91
Mod. Stations 0 0 0
Total Stations 1,191 0 1191
Utilization Factor 90% 90%
School Capacity 1,071 1071
COFTE Student Membership 868 867
Survey Annotation Other = fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $369,818 $0 $14,189,105 $0
Estimated Total Project Cost $14,558,923
EDGEWOOD JR/ SR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2022 Renovating: Apply Painting, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility EDGEWOOD JR/ SR HIGH.
149,359 0 $14,189,105 $95 $0
PAGE:127 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: EDUCATIONAL SERVICES FACILITY
Address: 2700 JUDGE FRAN JAMIESON WAY, VIERA
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use COUNTY ADMINISTRATION COUNTY ADMINISTRATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
The following parcels, which are not associated with any FISH Facility, are no longer required for educational or ancillary purposes and will be offered for sale:Parcel #79 Nieman Heights (Avenue D)Parcel #83 Titusville Marl Pit (S.R. 50)Parcel #86 Bike Path (Shady Run Road)Parcel #96 Melbourne Marl Pit (U.S. 192)Parcel #101 Sullivan Groves (S.R.3)Parcel #120 Grissom Parkway
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $1,723,069 $0
Estimated Total Project Cost $1,723,069
PAGE:128 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
EDUCATIONAL SERVICES FACILITY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, HVAC Systems to the entire facility EDUCATIONAL SERVICES FACILITY.
168,450 0 $1,723,069 $10 $0
PAGE:129 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: ENDEAVOUR ELEMENTARY MAGNET
Address: 905 PINEDA STREET, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 852 -39 813
Reloc. Stations 138 -84 54
Mod. Stations 0 0 0
Total Stations 990 -123 867
Utilization Factor 100% 100%
School Capacity 990 867
COFTE Student Membership 747 716
Survey Annotation
Relocatable in excess of 20 years old to be removed and replaced with 1 from Discovery (shown as new construction). The move from Discovery will utilize local funds. 3 to be converted to PK ESE.Other=fencing & securityRenovation project for "entire campus" is for plumbing, painting, HVAC, and technology and does not include Covered Play, building 14.Expand administrationExpand mediaExpand multipurpose/dining
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $205,480 $609,875 $980,031 $2,378,448
Estimated Total Project Cost $4,173,834
PAGE:130 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
ENDEAVOUR ELEMENTARY MAGNET
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2020 New Construction: Adding 1 unit of RECEPTION AREA (490 NSF), 1 unit of VAULT/STUDENT RECORDS (256 NSF), 1 unit of COMPUTER AREA (127 NSF), 1 unit of CAREERS ROOM (256 NSF), 1 unit of ITINERANT OFFICE (125 NSF)
1,254 0 $312,246 $249 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (170 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2275 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (170 NSF), 1 unit of STAGE STORAGE (426 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (213 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (213 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
3,567 0 $888,183 $249 $0
New Construction 2022 New Construction: Adding 1 unit of LIBRARY (READING ROOM/STACKS) (1595 NSF), 1 unit of MEDIA TECHNICAL PROCESSING (347 NSF), 1 unit of PROFESSIONAL LIBRARY (341 NSF), 1 unit of AUDIO VISUAL STORAGE (175 NSF), 1 unit of PERIODICAL STORAGE (170 NSF), 1 unit of CLOSED CIRCUIT TV LAB (596 NSF), 1 unit of CLOSED CIRCUIT STORAGE (426 NSF), 1 unit of MEDIA PRODUCTION LAB (426 NSF), 1 unit of MEDIA COPYING ROOM (170 NSF), 1 unit of MEDIA SMALL GROUP ROOM (85 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (85 NSF)
4,416 0 $1,099,584 $249 $0
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF)
315 0 $78,435 $249 $0
Remodeling 2018 22 4 Removed NSF (2435), Added NSF (2416), Difference NSF (19), Percent (0.78%), Removed Stations (54), Added Stations (0) Remodeling: Adding 2 units of RESOURCE ROOM (400 NSF), 1 unit of E S E PT/OT LAB (816 NSF), 2 units of E S E RESOURCE (400 NSF) and Removing Room 416 (816 NSF), Room 417 (803 NSF), Room 418 (816 NSF)
-2,435 -54 $304,375 $125 $0
Remodeling 2018 22 99 Removed NSF (2364), Added NSF (2364), Difference NSF (0), Percent (0%), Removed Stations (62), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (788 NSF) and Removing Room T204 (788 NSF), Room T275 (788 NSF), Room T401 (788 NSF)
2,364 -47 $295,500 $125 $0
PAGE:131 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
ENDEAVOUR ELEMENTARY MAGNET
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2020 22 99 Removed NSF (620), Added NSF (0), Difference NSF (620), Percent (100%), Removed Stations (22), Added Stations (0) Remodeling: Removing Room T018 (620 NSF)
-620 -22 $10,000 $16 $0
Renovation 2018 Renovating: Apply Painting, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility ENDEAVOUR ELEMENTARY MAGNET.
93,716 0 $980,031 $10 $0
PAGE:132 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: ENTERPRISE ELEMENTARY
Address: 7000 ENTERPRISE ROAD, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 707 0 707
Reloc. Stations 22 0 22
Mod. Stations 0 0 0
Total Stations 729 0 729
Utilization Factor 100% 100%
School Capacity 729 729
COFTE Student Membership 532 349
Survey Annotation Other= fencing & securityExpand multipurpose
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $105,196 $0 $703,379 $536,844
Estimated Total Project Cost $1,345,419
ENTERPRISE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (146 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (1864 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (146 NSF)
2,156 0 $536,844 $249 $0
PAGE:133 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
ENTERPRISE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2019 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility ENTERPRISE ELEMENTARY.
113,516 0 $703,379 $6 $0
PAGE:134 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: FAIRGLEN ELEMENTARY
Address: 201 INDIAN TRAIL, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 753 36 789
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 753 36 789
Utilization Factor 100% 100%
School Capacity 753 789
COFTE Student Membership 645 585
Survey AnnotationOther=fencing & securityNew construction is receipt of 2 relocatables (T-222 & T-225)from Space Coast Jr/Sr High. These will be moved using local funds.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $30,168 $0 $3,219,486 $852,480
Estimated Total Project Cost $4,102,134
FAIRGLEN ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 2 units of PRIMARY CLASSROOM (K-3) (882 NSF)
2,264 36 $852,480 $377 $23,680
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility FAIRGLEN ELEMENTARY.
99,720 0 $3,219,486 $32 $0
PAGE:135 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PAGE:136 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: FREEDOM 7 ELEMENTARY SCHOOL OF INTERNATIONAL STUDIES
Address: 400 4TH STREET, COCOA BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 453 0 453
Reloc. Stations 22 0 22
Mod. Stations 0 0 0
Total Stations 475 0 475
Utilization Factor 100% 100%
School Capacity 475 475
COFTE Student Membership 409 382
Survey Annotation
Other=fencing & securityExpand AdministrationAdd stage & related spacesAdd covered play
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $134,341 $0 $197,581 $1,004,217
Estimated Total Project Cost $1,336,139
FREEDOM 7 ELEMENTARY SCHOOL OF INTERNATIONAL STUDIES
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (1710 NSF)
2,025 0 $504,225 $249 $0
PAGE:137 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
FREEDOM 7 ELEMENTARY SCHOOL OF INTERNATIONAL STUDIES
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 1 unit of GENERAL SCHOOL STORAGE (237 NSF), 1 unit of VAULT/STUDENT RECORDS (142 NSF), 1 unit of COMPUTER AREA (71 NSF)
450 0 $112,050 $249 $0
New Construction 2018 New Construction: Adding 1 unit of STAGE (990 NSF), 1 unit of STAGE STORAGE (238 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (115 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (115 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
1,558 0 $387,942 $249 $0
Renovation 2018 Renovating: Apply Painting, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility FREEDOM 7 ELEMENTARY SCHOOL OF INTERNATIONAL STUDIES.
50,606 0 $197,581 $4 $0
PAGE:138 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: GARDENDALE EDUCATION CENTER
Address: 301 GROVE BOULEVARD, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
3 - SCHOOL NOT RECOMMENDED FOR CONTINUED USE
2 - SCHOOL CONDITIONALLY RECOMMENDED FOR CONTINUED USE
Facility Use VACANT ALTERNATIVE EDUCATION
Low Grade KINDERGARTEN GRADE 7
High Grade GRADE 6 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 681 0 681
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 681 0 681
Utilization Factor 0% 100%
School Capacity 0 681
COFTE Student Membership 0 25
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
GARDENDALE EDUCATION CENTER
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:139 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: GEMINI ELEMENTARY
Address: 2100 S OAK STREET, MELBOURNE BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 667 0 667
Reloc. Stations 44 0 44
Mod. Stations 0 0 0
Total Stations 711 0 711
Utilization Factor 100% 100%
School Capacity 711 711
COFTE Student Membership 477 420
Survey Annotation Other=fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $180,830 $0 $746,847 $0
Estimated Total Project Cost $927,677
GEMINI ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2021 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility GEMINI ELEMENTARY.
80,054 0 $746,847 $9 $0
PAGE:140 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: GIBSON PARK
Address: Gibson Field Sycamore St, Titusville
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use MULTIPLE USE SUPPORT MULTIPLE USE SUPPORT
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
GIBSON PARK Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:141 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: GOLFVIEW ELEMENTARY MAGNET
Address: 1530 S FISKE BOULEVARD, ROCKLEDGE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 689 7 696
Reloc. Stations 88 -66 22
Mod. Stations 0 0 0
Total Stations 777 -59 718
Utilization Factor 100% 100%
School Capacity 777 718
COFTE Student Membership 609 536
Survey Annotation Other= fencing & securityExpand Administration & Media
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $200,055 $0 $747,650 $1,211,883
Estimated Total Project Cost $2,159,588
PAGE:142 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
GOLFVIEW ELEMENTARY MAGNET
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of BOOKKEEPING OFFICE (125 NSF), 1 unit of SECRETARIAL SPACE (158 NSF), 1 unit of RECEPTION AREA (127 NSF), 1 unit of PRODUCTION WORKROOM (287 NSF), 1 unit of CONFERENCE ROOM (322 NSF), 1 unit of GENERAL SCHOOL STORAGE (319 NSF), 1 unit of SCHOOL STORE (72 NSF), 1 unit of STUDENT ACTIVITIES (359 NSF), 1 unit of COMPUTER AREA (108 NSF), 1 unit of CAREERS ROOM (215 NSF), 1 unit of TEACHER LOUNGE/DINING (287 NSF), 1 unit of TEXTBOOK STORAGE (251 NSF)
2,630 0 $654,870 $249 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (107 NSF), 1 unit of PROFESSIONAL LIBRARY (287 NSF), 1 unit of AUDIO VISUAL STORAGE (182 NSF), 1 unit of PERIODICAL STORAGE (144 NSF), 1 unit of CLOSED CIRCUIT TV LAB (503 NSF), 1 unit of CLOSED CIRCUIT STORAGE (359 NSF), 1 unit of MEDIA PRODUCTION LAB (359 NSF), 1 unit of MEDIA COPYING ROOM (144 NSF), 1 unit of MEDIA SMALL GROUP ROOM (80 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (72 NSF)
2,237 0 $557,013 $249 $0
Remodeling 2018 23 4 Removed NSF (1394), Added NSF (1394), Difference NSF (0), Percent (0%), Removed Stations (44), Added Stations (36) Remodeling: Adding 2 units of PRIMARY CLASSROOM (K-3) (697 NSF) and Removing Room 403 (697 NSF), Room 407 (697 NSF)
1,394 -8 $0 $0 $0
Remodeling 2018 23 99 Removed NSF (2364), Added NSF (2364), Difference NSF (0), Percent (0%), Removed Stations (66), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (788 NSF) and Removing Room T413 (788 NSF), Room T414 (788 NSF), Room T425 (788 NSF)
2,364 -51 $0 $0 $0
Renovation 2018 Renovating: Apply Painting, HVAC Systems, Retrofit for Technology to the entire facility GOLFVIEW ELEMENTARY MAGNET.
86,805 0 $747,650 $9 $0
PAGE:143 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: HANS CHRISTIAN ANDERSEN ELEMENTARY
Address: 3011 S FISKE BOULEVARD, ROCKLEDGE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 840 36 876
Reloc. Stations 44 -44 0
Mod. Stations 0 0 0
Total Stations 884 -8 876
Utilization Factor 100% 100%
School Capacity 884 876
COFTE Student Membership 696 705
Survey AnnotationRelocatables in excess of 20 years old to be removed and replaced with 2 newer units from Christa McAuliffe Elem (shown as new construction)utilizing local funds.Other = fencing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $182,389 $20,000 $364,996 $852,480
Estimated Total Project Cost $1,419,865
HANS CHRISTIAN ANDERSEN ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2020 New Construction: Adding 2 units of PRIMARY CLASSROOM (K-3) (788 NSF)
2,076 36 $852,480 $411 $23,680
PAGE:144 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
HANS CHRISTIAN ANDERSEN ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 30 99 Removed NSF (1366), Added NSF (0), Difference NSF (1366), Percent (100%), Removed Stations (44), Added Stations (0) Remodeling: Removing Room N129 (683 NSF), Room N223 (683 NSF)
-1,366 -44 $20,000 $15 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility HANS CHRISTIAN ANDERSEN ELEMENTARY.
106,400 0 $364,996 $3 $0
PAGE:145 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: HARBOR CITY ELEMENTARY
Address: 1377 SARNO ROAD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 453 100 553
Reloc. Stations 176 -154 22
Mod. Stations 0 0 0
Total Stations 629 -54 575
Utilization Factor 100% 100%
School Capacity 629 575
COFTE Student Membership 408 389
Survey Annotation
5 relocatables in excess of 20 years old to be removed and replaced with 5 from Discovery Elem. (Shown as new construction) utilizing local funds. 2 existing to be converted to PK ESE
Other= fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $153,721 $60,000 $961,558 $2,131,200
Estimated Total Project Cost $3,306,479
HARBOR CITY ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2020 New Construction: Adding 5 units of PRIMARY CLASSROOM (K-3) (788 NSF)
5,190 90 $2,131,200 $411 $23,680
PAGE:146 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
HARBOR CITY ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 51 99 Removed NSF (1600), Added NSF (1600), Difference NSF (0), Percent (0%), Removed Stations (44), Added Stations (10) Remodeling: Adding 2 units of E S E PRE-K (800 NSF) and Removing Room T458 (800 NSF), Room T459 (800 NSF)
1,600 -34 $0 $0 $0
Remodeling 2022 51 99 Removed NSF (3842), Added NSF (0), Difference NSF (3842), Percent (100%), Removed Stations (110), Added Stations (0) Remodeling: Removing Room N902 (665 NSF), Room N902A (19 NSF), Room T109 (735 NSF), Room T109A (56 NSF), Room T117 (735 NSF), Room T117A (54 NSF), Room T118 (735 NSF), Room T118A (54 NSF), Room T119 (735 NSF), Room T119A (54 NSF)
-3,842 -110 $60,000 $16 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility HARBOR CITY ELEMENTARY.
62,615 0 $961,558 $15 $0
PAGE:147 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: HERBERT C HOOVER MIDDLE
Address: 2000 HAWK HAVEN DRIVE, INDIALANTIC
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 732 0 732
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 732 0 732
Utilization Factor 90% 90%
School Capacity 658 658
COFTE Student Membership 506 504
Survey Annotation Other = fencing & security & resurfacing PE trackAdd multipurpose & stage related spaces
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $285,625 $0 $804,230 $766,314
Estimated Total Project Cost $1,856,169
PAGE:148 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
HERBERT C HOOVER MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of MULTIPURPOSE ROOM (DINING) (2040 NSF), 1 unit of STAGE (990 NSF), 1 unit of STAGE STORAGE (242 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (165 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (165 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
3,702 0 $766,314 $207 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility HERBERT C HOOVER MIDDLE.
104,230 0 $804,230 $8 $0
PAGE:149 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: HERITAGE HIGH
Address: 2353 WEST MALABAR RD, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 2,436 0 2436
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 2,436 0 2436
Utilization Factor 95% 95%
School Capacity 2,314 2314
COFTE Student Membership 1,709 1,746
Survey Annotation Other = fencing & security & resurfacing PE track
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $293,029 $0 $572,284 $0
Estimated Total Project Cost $865,313
HERITAGE HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2021 Renovating: Apply HVAC Systems to the entire facility HERITAGE HIGH.
370,006 0 $572,284 $2 $0
PAGE:150 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: IMPERIAL ESTATES ELEMENTARY
Address: 900 IMPERIAL ESTATE LANE, TITUSVILLE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 729 0 729
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 729 0 729
Utilization Factor 100% 100%
School Capacity 729 729
COFTE Student Membership 647 540
Survey Annotation
Other = fencing & security -$27,125 Site improvements = Deferred infrastructure improvements as described in 1013.01(22)-$31,840
Add multipurpose & chair storage
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $150,000 $0 $58,965 $0 $1,135,512 $645,408
Estimated Total Project Cost $1,989,885
IMPERIAL ESTATES ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (166 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2260 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (166 NSF)
2,592 0 $645,408 $249 $0
PAGE:151 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
IMPERIAL ESTATES ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility IMPERIAL ESTATES ELEMENTARY.
107,927 0 $1,135,512 $11 $0
PAGE:152 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: INDIALANTIC ELEMENTARY
Address: 1050 N PALM AVENUE, INDIALANTIC
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 754 0 754
Reloc. Stations 44 0 44
Mod. Stations 0 0 0
Total Stations 798 0 798
Utilization Factor 100% 100%
School Capacity 798 798
COFTE Student Membership 742 670
Survey Annotation
Other = fencing & security -$29,317 Site improvements = Deferred infrastructure improvements as described in 1013.01(22)-$43,320
Expand media
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $236,637 $0 $1,111,302 $662,340
Estimated Total Project Cost $2,010,279
PAGE:153 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
INDIALANTIC ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (320 NSF), 1 unit of PROFESSIONAL LIBRARY (301 NSF), 1 unit of AUDIO VISUAL STORAGE (452 NSF), 1 unit of PERIODICAL STORAGE (151 NSF), 1 unit of CLOSED CIRCUIT STORAGE (377 NSF), 1 unit of MEDIA PRODUCTION LAB (377 NSF), 1 unit of MEDIA COPYING ROOM (150 NSF), 1 unit of MEDIA SMALL GROUP ROOM (80 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (377 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (75 NSF)
2,660 0 $662,340 $249 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility INDIALANTIC ELEMENTARY.
99,186 0 $1,111,302 $11 $0
PAGE:154 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: JAMES MADISON MIDDLE
Address: 3375 DAIRY ROAD, TITUSVILLE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 825 0 825
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 825 0 825
Utilization Factor 90% 90%
School Capacity 742 742
COFTE Student Membership 437 436
Survey AnnotationOther=fencing & securityAdd stage & related spacesExpand administration
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $41,044 $0 $1,634,430 $1,249,452
Estimated Total Project Cost $2,924,926
PAGE:155 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
JAMES MADISON MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of BOOKKEEPING OFFICE (125 NSF), 1 unit of SECRETARIAL SPACE (158 NSF), 1 unit of PRODUCTION WORKROOM (240 NSF), 1 unit of CONFERENCE ROOM (236 NSF), 1 unit of VAULT/STUDENT RECORDS (134 NSF), 1 unit of STUDENT ACTIVITIES (191 NSF), 1 unit of CAREERS ROOM (222 NSF), 1 unit of ITINERANT OFFICE (125 NSF), 1 unit of TEXTBOOK STORAGE (259 NSF)
1,690 0 $349,830 $207 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (148 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2219 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (148 NSF), 1 unit of STAGE (990 NSF), 1 unit of STAGE STORAGE (371 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (185 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (185 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
4,346 0 $899,622 $207 $0
Renovation 2022 Renovating: Apply HVAC Systems, Retrofit for Technology to the entire facility JAMES MADISON MIDDLE.
113,214 0 $1,634,430 $14 $0
PAGE:156 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: JOHN F KENNEDY MIDDLE
Address: 2100 S FISKE BOULEVARD, ROCKLEDGE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 749 66 815
Reloc. Stations 154 -66 88
Mod. Stations 0 0 0
Total Stations 903 0 903
Utilization Factor 90% 90%
School Capacity 812 812
COFTE Student Membership 580 579
Survey Annotation
Relocatables in excess of 20 years old to be removed, 2 to be replaced with 2 from Discovery, 1 from Columbia utilizing local funds.( shown as new construction)Other= fencing & security & resurface trackExpand administrationAdd stage & related spaces
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $619,371 $30,000 $2,922,819 $2,288,880
Estimated Total Project Cost $5,861,070
JOHN F KENNEDY MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 3 units of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (788 NSF)
3,024 66 $1,687,752 $558 $25,572
PAGE:157 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
JOHN F KENNEDY MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of CLINIC (202 NSF), 1 unit of STUDENT ACTIVITIES (337 NSF), 1 unit of CAREERS ROOM (202 NSF), 1 unit of TEXTBOOK STORAGE (236 NSF)
977 0 $202,239 $207 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (135 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (135 NSF), 1 unit of STAGE (990 NSF), 1 unit of STAGE STORAGE (337 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (115 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (115 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
1,927 0 $398,889 $207 $0
Remodeling 2019 26 99 Removed NSF (2148), Added NSF (0), Difference NSF (2148), Percent (100%), Removed Stations (66), Added Stations (0) Remodeling: Removing Room N032 (683 NSF), Room N937 (683 NSF), Room T110 (782 NSF)
-2,148 -66 $30,000 $14 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility JOHN F KENNEDY MIDDLE.
112,052 0 $2,922,819 $26 $0
PAGE:158 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: JOHN F TURNER SR ELEMENTARY
Address: 3175 JUPITER BOULEVARD SE, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 830 -34 796
Reloc. Stations 44 0 44
Mod. Stations 0 0 0
Total Stations 874 -34 840
Utilization Factor 100% 100%
School Capacity 874 840
COFTE Student Membership 644 670
Survey AnnotationOther= security & fencingExpand mediaProvide covered PE
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $146,508 $0 $1,570,958 $1,255,956
Estimated Total Project Cost $2,973,422
PAGE:159 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
JOHN F TURNER SR ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of PERIODICAL STORAGE (144 NSF), 1 unit of CLOSED CIRCUIT TV LAB (503 NSF), 1 unit of CLOSED CIRCUIT STORAGE (359 NSF), 1 unit of MEDIA PRODUCTION LAB (359 NSF), 1 unit of MEDIA COPYING ROOM (144 NSF), 1 unit of MEDIA SMALL GROUP ROOM (80 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (359 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (72 NSF)
2,020 0 $502,980 $249 $0
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY COVERED PLAY AREA (3024 NSF)
3,024 0 $752,976 $249 $0
Remodeling 2018 39 1 Removed NSF (1791), Added NSF (1790), Difference NSF (1), Percent (0.06%), Removed Stations (44), Added Stations (10) Remodeling: Adding 2 units of E S E PRE-K (895 NSF) and Removing Room 500 (897 NSF), Room 501 (894 NSF)
-1,791 -34 $0 $0 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility JOHN F TURNER SR ELEMENTARY.
96,049 0 $1,570,958 $16 $0
PAGE:160 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: JUPITER ELEMENTARY
Address: 950 TUPELO ROAD SW, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 780 20 800
Reloc. Stations 150 -150 0
Mod. Stations 0 0 0
Total Stations 930 -130 800
Utilization Factor 100% 100%
School Capacity 930 800
COFTE Student Membership 760 756
Survey Annotation
Relocatables in excess of 20 years old to be removed.
New construction is the receipt of 4 relos from Meadowlane Intermediate
This school is a PK ESE Cluster
Other + fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $216,724 $70,000 $772,617 $473,600
Estimated Total Project Cost $1,532,941
JUPITER ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 4 units of E S E PRE-K (788 NSF)
4,152 20 $473,600 $114 $23,680
PAGE:161 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
JUPITER ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2022 45 99 Removed NSF (4886), Added NSF (0), Difference NSF (4886), Percent (100%), Removed Stations (150), Added Stations (0) Remodeling: Removing Room N014 (683 NSF), Room N015 (683 NSF), Room N033 (683 NSF), Room N047 (683 NSF), Room N079 (683 NSF), Room N205 (683 NSF), Room T210 (788 NSF)
-4,886 -150 $70,000 $14 $0
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility JUPITER ELEMENTARY.
125,746 0 $772,617 $6 $0
PAGE:162 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: LEWIS CARROLL ELEMENTARY
Address: 1 SKYLINE BOULEVARD, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 751 0 751
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 751 0 751
Utilization Factor 100% 100%
School Capacity 751 751
COFTE Student Membership 636 580
Survey Annotation Other = Security & FencingAdd covered PE
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $37,607 $0 $1,948,922 $602,082
Estimated Total Project Cost $2,588,611
LEWIS CARROLL ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (2103 NSF)
2,418 0 $602,082 $249 $0
Renovation 2018 Renovating: Apply Electrical, HVAC Systems, Retrofit for Technology to the entire facility LEWIS CARROLL ELEMENTARY.
100,153 0 $1,948,922 $19 $0
PAGE:163 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PAGE:164 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: LOCKMAR ELEMENTARY
Address: 525 PEPPER STREET NE, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 892 -47 845
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 892 -47 845
Utilization Factor 100% 100%
School Capacity 892 845
COFTE Student Membership 711 801
Survey Annotation
Other= fencing & securityAdd PE Storage & expand covered playExpand mediaExpand administration
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $50,557 $0 $0 $1,684,734
Estimated Total Project Cost $1,735,291
LOCKMAR ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (2442 NSF)
2,757 0 $686,493 $249 $0
PAGE:165 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
LOCKMAR ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of CLOSED CIRCUIT TV LAB (592 NSF), 1 unit of CLOSED CIRCUIT STORAGE (423 NSF), 1 unit of MEDIA PRODUCTION LAB (423 NSF), 1 unit of MEDIA COPYING ROOM (169 NSF), 1 unit of MEDIA SMALL GROUP ROOM (84 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (423 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (85 NSF)
2,199 0 $547,551 $249 $0
New Construction 2018 New Construction: Adding 1 unit of GENERAL SCHOOL STORAGE (422 NSF), 1 unit of VAULT/STUDENT RECORDS (253 NSF), 1 unit of SCHOOL STORE (84 NSF), 1 unit of STUDENT ACTIVITIES (422 NSF), 1 unit of COMPUTER AREA (126 NSF), 1 unit of CAREERS ROOM (253 NSF), 2 units of ITINERANT OFFICE (125 NSF)
1,810 0 $450,690 $249 $0
Remodeling 2018 38 1 Removed NSF (2700), Added NSF (2700), Difference NSF (0), Percent (0%), Removed Stations (62), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (900 NSF) and Removing Room 200 (900 NSF), Room 201 (900 NSF), Room 202 (900 NSF)
2,700 -47 $0 $0 $0
PAGE:166 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: LONGLEAF ELEMENTARY
Address: 4290 N WICKHAM ROAD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 790 -17 773
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 790 -17 773
Utilization Factor 100% 100%
School Capacity 790 773
COFTE Student Membership 544 729
Survey Annotation Other= Fencing & Security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $29,980 $0 $8,785,218 $0
Estimated Total Project Cost $8,815,198
LONGLEAF ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 110 1 Removed NSF (1082), Added NSF (1082), Difference NSF (0), Percent (0%), Removed Stations (22), Added Stations (5) Remodeling: Adding 1 unit of E S E PRE-K (1082 NSF) and Removing Room 603 (1082 NSF)
1,082 -17 $0 $0 $0
PAGE:167 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
LONGLEAF ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility LONGLEAF ELEMENTARY.
105,846 0 $8,785,218 $83 $0
PAGE:168 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: LYNDON B JOHNSON MIDDLE
Address: 2155 CROTON ROAD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,111 0 1111
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 1,111 0 1111
Utilization Factor 90% 90%
School Capacity 999 999
COFTE Student Membership 778 776
Survey AnnotationOther= fencing & security & resurface PE trackExpand mediaAdd multipurpose/stage
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $522,013 $0 $3,844,225 $2,243,466
Estimated Total Project Cost $6,609,704
PAGE:169 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
LYNDON B JOHNSON MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (400 NSF), 1 unit of PROFESSIONAL LIBRARY (399 NSF), 1 unit of AUDIO VISUAL STORAGE (278 NSF), 1 unit of CLOSED CIRCUIT TV LAB (699 NSF), 1 unit of CLOSED CIRCUIT STORAGE (499 NSF), 1 unit of MEDIA PRODUCTION LAB (499 NSF), 1 unit of MEDIA COPYING ROOM (199 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (499 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (100 NSF)
3,572 0 $739,404 $207 $0
New Construction 2022 New Construction: Adding 1 unit of PRODUCTION WORKROOM (399 NSF), 1 unit of CONFERENCE ROOM (603 NSF), 1 unit of GENERAL SCHOOL STORAGE (499 NSF), 1 unit of COMPUTER AREA (150 NSF), 1 unit of ITINERANT OFFICE (125 NSF)
1,776 0 $367,632 $207 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (200 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (3000 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (200 NSF), 1 unit of STAGE (990 NSF), 1 unit of STAGE STORAGE (500 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (250 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (250 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
5,490 0 $1,136,430 $207 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility LYNDON B JOHNSON MIDDLE.
147,248 0 $3,844,225 $26 $0
PAGE:170 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MANATEE BUS COMPOUND
Address: 3425 VIERA BOULEVARD, VIERA
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use TRANSPORTATION TRANSPORTATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $187,658 $0
Estimated Total Project Cost $187,658
MANATEE BUS COMPOUND
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2019 Renovating: Apply Painting, HVAC Systems to the entire facility MANATEE BUS COMPOUND.
2,290 0 $187,658 $82 $0
PAGE:171 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MANATEE ELEMENTARY
Address: 3425 VIERA BOULEVARD, VIERA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 866 0 866
Reloc. Stations 88 -88 0
Mod. Stations 0 0 0
Total Stations 954 -88 866
Utilization Factor 100% 100%
School Capacity 954 866
COFTE Student Membership 833 822
Survey AnnotationTransfer 4 relos to Ralph Williams Elem utilizing local funds.
Other = Fencing & Security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $165,075 $40,000 $943,731 $0
Estimated Total Project Cost $1,148,806
MANATEE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2021 121 99 Removed NSF (3200), Added NSF (0), Difference NSF (3200), Percent (100%), Removed Stations (88), Added Stations (0) Remodeling: Removing Room T203 (800 NSF), Room T265 (800 NSF), Room T322 (800 NSF), Room T442 (800 NSF)
-3,200 -88 $40,000 $13 $0
PAGE:172 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
MANATEE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems to the entire facility MANATEE ELEMENTARY.
123,001 0 $943,731 $8 $0
PAGE:173 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MCLARTY STADIUM
Address: MURRELL ROAD, ROCKLEDGE
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use MULTIPLE USE SUPPORT MULTIPLE USE SUPPORT
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
MCLARTY STADIUM Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:174 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MEADOWLANE INTERMEDIATE ELEMENTARY
Address: 2700 WINGATE BLVD, WEST MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade GRADE 3 GRADE 3
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 894 0 894
Reloc. Stations 220 -220 0
Mod. Stations 0 0 0
Total Stations 1,114 -220 894
Utilization Factor 100% 100%
School Capacity 1,114 894
COFTE Student Membership 952 850
Survey Annotation
2 relos to be transferred to Riviera Elem and1 relo to be transferred to Cambridge Elem utilizing local funds.4 relos to be transferred to Jupiter Elem
Other = fencing & security HVAC remodeling at $1.6 mm does not include Covered Play Area.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $279,661 $120,000 $1,621,937 $0
Estimated Total Project Cost $2,021,598
PAGE:175 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
MEADOWLANE INTERMEDIATE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2022 129 99 Removed NSF (9104), Added NSF (0), Difference NSF (9104), Percent (100%), Removed Stations (220), Added Stations (0) Remodeling: Removing Room B004 (436 NSF), Room T236 (788 NSF), Room T238 (788 NSF), Room T241 (788 NSF), Room T242 (788 NSF), Room T244 (788 NSF), Room T245 (788 NSF), Room T247 (788 NSF), Room T250 (788 NSF), Room T253 (788 NSF), Room T334 (788 NSF), Room T408 (788 NSF)
-9,104 -220 $120,000 $13 $0
Renovation 2022 129 1 Renovating: Apply HVAC Systems to Room 002 (18808 NSF), Room 101 (1329 NSF), Room 101A (420 NSF), Room 101B (188 NSF), Room 101C (255 NSF), Room 101D (182 NSF), Room 101E (181 NSF), Room 101F (184 NSF), Room 101G (432 NSF), Room 101H (39 NSF), Room 101J (39 NSF), Room 101K (38 NSF), Room 101L (332 NSF), Room 101M (237 NSF), Room 101N (488 NSF), Room 101P (36 NSF), Room 101Q (182 NSF), Room 101R (300 NSF), Room 101S (217 NSF), Room 101T (306 NSF), Room 101V (45 NSF), Room 101W (46 NSF), Room 101X (53 NSF), Room 101Y (53 NSF), Room 102 (3533 NSF), Room 102A (165 NSF), Room 102B (380 NSF), Room 102C (43 NSF), Room 102D (42 NSF), Room 103 (249 NSF), Room 104 (797 NSF), Room 104A (378 NSF), Room 105 (264 NSF), Room 106 (228 NSF), Room 107 (568 NSF), Room 108 (348 NSF), Room 109 (366 NSF), Room 110 (95 NSF), Room 111 (42 NSF), Room 112 (42 NSF), Room 113 (1058 NSF), Room 113A (53 NSF), Room 113B (53 NSF), Room 114 (1175 NSF), Room 115 (893 NSF), Room 115A (54 NSF), Room 115B (191 NSF), Room 116 (868 NSF), Room 116A (54 NSF), Room 117 (867 NSF), Room 117A (54 NSF), Room 117B (191 NSF), Room 118 (930 NSF), Room 118A (54 NSF), Room 119 (891 NSF), Room 119A (54 NSF), Room 119B (191 NSF), Room 120 (865 NSF), Room 120A (54 NSF), Room 121 (865 NSF), Room 121A (54 NSF), Room 121B (191 NSF), Room 122 (868 NSF), Room 122A (54 NSF), Room 123 (865 NSF), Room 123A (54 NSF), Room 123B (191 NSF), Room 124 (894 NSF), Room 124A (54 NSF), Room 125 (873 NSF), Room 125A (54 NSF), Room 125B (94 NSF), Room 126 (215 NSF), Room 128 (60 NSF), Room 129 (42 NSF), Room 130 (42 NSF), Room 131 (192 NSF), Room 132 (956 NSF), Room 132A (52
102,095 0 $1,621,937 $16 $0
PAGE:176 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
NSF), Room 132B (154 NSF), Room 133 (960 NSF), Room 133A (52 NSF), Room 134 (1421 NSF), Room 134A (46 NSF), Room 134B (222 NSF), Room 134C (63 NSF), Room 135 (235 NSF), Room 136 (160 NSF), Room 136A (30 NSF), Room 137 (52 NSF), Room 138 (110 NSF), Room 139 (234 NSF), Room 140 (850 NSF), Room 140A (52 NSF), Room 140B (174 NSF), Room 141 (921 NSF), Room 141A (52 NSF), Room 142 (982 NSF), Room 142A (52 NSF), Room 142B (165 NSF), Room 143 (922 NSF), Room 143A (52 NSF), Room 144 (980 NSF), Room 144A (52 NSF), Room 144B (89 NSF), Room 145 (5354 NSF), Room 145A (95 NSF), Room 145B (68 NSF), Room 146 (975 NSF), Room 146A (159 NSF), Room 146B (177 NSF), Room 147 (170 NSF), Room 148 (181 NSF), Room 149 (52 NSF), Room 150 (84 NSF), Room 151 (1571 NSF), Room 151A (64 NSF), Room 151B (187 NSF), Room 151C (44 NSF), Room 151D (44 NSF), Room 151E (10 NSF), Room 152 (167 NSF), Room 153 (49 NSF), Room 154 (53 NSF), Room 155 (39 NSF), Room 156 (262 NSF), Room 156A (78 NSF), Room 156B (42 NSF), Room 156C (43 NSF), Room 157 (1915 NSF), Room 157A (202 NSF), Room 157B (391 NSF), Room 157C (40 NSF), Room 157D (100 NSF), Room 157E (205 NSF), Room 157F (151 NSF), Room 157G (328 NSF), Room 159 (87 NSF), Room 160 (305 NSF), Room 161 (209 NSF), Room 162 (260 NSF), Room 162A (90 NSF), Room 163 (444 NSF), Room 164 (405 NSF), Room 165 (42 NSF), Room 166 (42 NSF), Room 167 (614 NSF), Room 167A (67 NSF), Room 167B (99 NSF), Room 167C (70 NSF), Room 168 (240 NSF), Room 169 (204 NSF), Room 170 (420 NSF), Room 171 (420 NSF), Room 172 (420 NSF), Room 173 (308 NSF), Room 201 (894 NSF), Room 201A (54 NSF), Room 201B (182 NSF), Room 202 (867 NSF), Room 202A (54 NSF), Room 203 (867 NSF), Room 203A (54 NSF), Room 203B (182 NSF), Room 204 (867 NSF), Room 204A (54 NSF), Room 205 (867 NSF), Room 205A (54 NSF), Room 205B (191 NSF), Room 206 (894 NSF), Room 206A (54 NSF), Room 207 (879 NSF), Room 207A (54 NSF), Room 207B (94 NSF), Room 208 (111 NSF), Room 208A (102 NSF), Room 209 (60 NSF), Room 210 (42 NSF), Room 211 (42 NSF), Room 212 (193 NSF), Room 213 (927 NSF), Room 213A (54 NSF), Room 213B (234 NSF), Room 214 (935 NSF), Room 214A (54 NSF), Room 215 (915
PAGE:177 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
NSF), Room 215A (54 NSF), Room 215B (238 NSF), Room 216 (942 NSF), Room 216A (54 NSF), Room 217 (210 NSF), Room 217A (138 NSF), Room 218 (125 NSF), Room 219 (21 NSF), Room 220 (27 NSF), Room 221 (871 NSF), Room 221A (54 NSF), Room 221B (191 NSF), Room 222 (870 NSF), Room 222A (54 NSF), Room 223 (870 NSF), Room 223A (54 NSF), Room 223B (191 NSF), Room 224 (899 NSF), Room 224A (54 NSF), Room 225 (895 NSF), Room 225A (54 NSF), Room 225B (188 NSF), Room 226 (869 NSF), Room 226A (54 NSF), Room 227 (869 NSF), Room 227A (54 NSF), Room 227B (186 NSF), Room 228 (969 NSF), Room 228A (54 NSF), Room 229A (70 NSF), Room 229B (61 NSF), Room 230 (878 NSF), Room 231 (1108 NSF), Room 231A (103 NSF), Room 232 (960 NSF), Room 232A (54 NSF), Room 232B (182 NSF), Room 233 (867 NSF), Room 233A (54 NSF), Room 234 (867 NSF), Room 234A (54 NSF), Room 234B (182 NSF), Room 235 (894 NSF), Room 235A (543 NSF)
PAGE:178 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MEADOWLANE PRIMARY ELEMENTARY
Address: 2800 WINGATE BOULEVARD, WEST MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 3 GRADE 3
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 824 0 824
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 824 0 824
Utilization Factor 100% 100%
School Capacity 824 824
COFTE Student Membership 789 780
Survey Annotation Other = Fencing & Security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $36,195 $0 $2,688,242 $0
Estimated Total Project Cost $2,724,437
MEADOWLANE PRIMARY ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility MEADOWLANE PRIMARY ELEMENTARY.
144,366 0 $2,688,242 $19 $0
PAGE:179 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MELBOURNE BUS COMPOUND
Address: 3200 MONROE STREET, MELBOURNE
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use TRANSPORTATION TRANSPORTATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $17,994 $0
Estimated Total Project Cost $17,994
MELBOURNE BUS COMPOUND
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2019 Renovating: Apply Electrical to the entire facility MELBOURNE BUS COMPOUND.
11,037 0 $17,994 $2 $0
PAGE:180 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MELBOURNE SENIOR HIGH
Address: 74 BULLDOG BOULEVARD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 2,439 22 2461
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 2,439 22 2461
Utilization Factor 95% 95%
School Capacity 2,317 2337
COFTE Student Membership 2,063 2,079
Survey Annotation Other= fencing & security & PE track resurfacingNew construction is receipt of 2 relocatables from Eau Gallie HS utilizing local funds.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $288,999 $0 $8,804,983 $730,752
Estimated Total Project Cost $9,824,734
MELBOURNE SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 2 units of BUSINESS EDUCATION LAB (788 NSF)
1,776 22 $730,752 $411 $33,216
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility MELBOURNE SENIOR HIGH.
334,439 0 $8,804,983 $26 $0
PAGE:181 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PAGE:182 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MERRITT ISLAND SENIOR HIGH
Address: 100 E MUSTANG WAY, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,965 0 1965
Reloc. Stations 50 0 50
Mod. Stations 0 0 0
Total Stations 2,015 0 2015
Utilization Factor 95% 95%
School Capacity 1,914 1914
COFTE Student Membership 1,398 1,397
Survey Annotation Other=fencing & security $80,759 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$265,696 & resurface PE track
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $1,866,455 $0 $1,841,538 $0
Estimated Total Project Cost $3,707,993
MERRITT ISLAND SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility MERRITT ISLAND SENIOR HIGH.
264,962 0 $1,841,538 $7 $0
PAGE:183 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MID-SOUTH AREA SUPPORT SERVICES
Address: 1948 PINEAPPLE AVENUE, MELBOURNE
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use MULTIPLE USE SUPPORT MULTIPLE USE SUPPORT
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$140,790
Building 1 and 3 acres of the site adjacent to the building are no longer required for educational or ancillary use and will be offered for sale.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $140,790 $0 $416,820 $0
Estimated Total Project Cost $557,610
PAGE:184 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
MID-SOUTH AREA SUPPORT SERVICES
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 50 1 Removed NSF (17037), Added NSF (0), Difference NSF (17037), Percent (100%), Removed Stations (0), Added Stations (0) Remodeling: Removing Room 001 (60 NSF), Room 002 (181 NSF), Room 003 (710 NSF), Room 003A (125 NSF), Room 004 (187 NSF), Room 005 (168 NSF), Room 005A (177 NSF), Room 005B (153 NSF), Room 006 (786 NSF), Room 006A (102 NSF), Room 006B (102 NSF), Room 007 (120 NSF), Room 008 (55 NSF), Room 009 (903 NSF), Room 010 (109 NSF), Room 011 (212 NSF), Room 012 (843 NSF), Room 100 (378 NSF), Room 100A (30 NSF), Room 100B (112 NSF), Room 100C (40 NSF), Room 100D (394 NSF), Room 100E (12 NSF), Room 101 (103 NSF), Room 101A (30 NSF), Room 101B (22 NSF), Room 101C (164 NSF), Room 102 (370 NSF), Room 102A (104 NSF), Room 102B (33 NSF), Room 102C (168 NSF), Room 103 (331 NSF), Room 103A (317 NSF), Room 104 (488 NSF), Room 104A (84 NSF), Room 105 (209 NSF), Room 106 (209 NSF), Room 107 (1670 NSF), Room 200 (1164 NSF), Room 201 (40 NSF), Room 202 (194 NSF), Room 203 (144 NSF), Room 203A (83 NSF), Room 203B (113 NSF), Room 203C (118 NSF), Room 203D (132 NSF), Room 205 (187 NSF), Room 205A (96 NSF), Room 205B (112 NSF), Room 207 (280 NSF), Room 207A (107 NSF), Room 207B (116 NSF), Room 207C (134 NSF), Room 207D (154 NSF), Room 207E (112 NSF), Room 207F (112 NSF), Room 209 (147 NSF), Room 210 (108 NSF), Room 212 (16 NSF), Room 214 (70 NSF), Room 216 (649 NSF), Room 218 (652 NSF), Room 300 (1736 NSF)
-17,037 0 $0 $0 $0
Renovation 2019 50 3 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 100 (352 NSF), Room 101 (144 NSF), Room 102 (186 NSF), Room 103 (54 NSF), Room 104 (57 NSF), Room 105 (755 NSF), Room 106 (6 NSF), Room 107 (92 NSF), Room 108 (20 NSF), Room 109 (20 NSF), Room 110 (6 NSF), Room 111 (741 NSF), Room 112 (135 NSF)
2,568 0 $154,080 $60 $0
PAGE:185 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
MID-SOUTH AREA SUPPORT SERVICES
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2019 50 4 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to Room 001 (56 NSF), Room 100 (56 NSF), Room 100A (113 NSF), Room 100B (18 NSF), Room 101 (41 NSF), Room 102 (25 NSF), Room 103 (40 NSF), Room 104 (222 NSF), Room 105 (30 NSF), Room 106 (240 NSF), Room 106A (18 NSF), Room 106B (6 NSF), Room 107 (395 NSF), Room 108 (1943 NSF), Room 108A (110 NSF), Room 109 (190 NSF), Room 110 (477 NSF), Room 110A (77 NSF), Room 110B (203 NSF), Room 111 (119 NSF)
4,379 0 $262,740 $60 $0
PAGE:186 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MILA ELEMENTARY
Address: 288 W MERRITT AVENUE, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 707 -47 660
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 707 -47 660
Utilization Factor 100% 100%
School Capacity 707 660
COFTE Student Membership 473 457
Survey Annotation
Other=fencing & security $51,606 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$167,504
Expand mediaExpand administrationAdd multipurpose dining
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $1,514,776 $239,625 $1,514,776 $1,653,858
Estimated Total Project Cost $4,923,035
PAGE:187 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
MILA ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (132 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2046 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (132 NSF), 1 unit of STAGE STORAGE (330 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (165 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (165 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
3,070 0 $764,430 $249 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (264 NSF), 1 unit of PROFESSIONAL LIBRARY (136 NSF), 1 unit of AUDIO VISUAL STORAGE (294 NSF), 1 unit of CLOSED CIRCUIT TV LAB (462 NSF), 1 unit of CLOSED CIRCUIT STORAGE (330 NSF), 1 unit of MEDIA PRODUCTION LAB (330 NSF), 1 unit of MEDIA COPYING ROOM (132 NSF), 1 unit of MEDIA SMALL GROUP ROOM (80 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (330 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (66 NSF)
2,424 0 $603,576 $249 $0
New Construction 2022 New Construction: Adding 1 unit of GENERAL SCHOOL STORAGE (330 NSF), 1 unit of VAULT/STUDENT RECORDS (198 NSF), 1 unit of SCHOOL STORE (66 NSF), 1 unit of STUDENT ACTIVITIES (330 NSF), 1 unit of COMPUTER AREA (99 NSF), 1 unit of ITINERANT OFFICE (125 NSF)
1,148 0 $285,852 $249 $0
Remodeling 2018 59 1 Removed NSF (624), Added NSF (624), Difference NSF (0), Percent (0%), Removed Stations (18), Added Stations (5) Remodeling: Adding 1 unit of E S E PRE-K (624 NSF) and Removing Room 100K (624 NSF)
624 -13 $0 $0 $0
Remodeling 2018 59 5 Removed NSF (1917), Added NSF (1916), Difference NSF (1), Percent (0.05%), Removed Stations (44), Added Stations (10) Remodeling: Adding 2 units of E S E PRE-K (958 NSF) and Removing Room 504 (961 NSF), Room 505 (956 NSF)
-1,917 -34 $239,625 $125 $0
Renovation 2018 Renovating: Apply Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility MILA ELEMENTARY.
91,174 0 $1,514,776 $17 $0
PAGE:188 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: MIMS ELEMENTARY
Address: 2582 U S HIGHWAY 1, MIMS
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 725 -30 695
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 725 -30 695
Utilization Factor 100% 100%
School Capacity 725 695
COFTE Student Membership 442 421
Survey Annotation Other=fencing & security $55,025 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$46,930
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $101,954 $0 $505,510 $0
Estimated Total Project Cost $607,464
MIMS ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 7 1 Removed NSF (1670), Added NSF (1670), Difference NSF (0), Percent (0%), Removed Stations (40), Added Stations (10) Remodeling: Adding 2 units of E S E PRE-K (835 NSF) and Removing Room 113 (835 NSF), Room 114 (835 NSF)
1,670 -30 $0 $0 $0
PAGE:189 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
MIMS ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing to the entire facility MIMS ELEMENTARY.
85,052 0 $505,510 $6 $0
PAGE:190 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: New Central Elementary School
Location: Southwest Viera
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY
Low Grade PRE-K E S E
High Grade GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 840 840
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 840 840
Utilization Factor 0% 100%
School Capacity 0 840
COFTE Student Membership 0 796
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $19,891,200
Estimated Total Project Cost $19,891,200
New Central Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2019 New Construction: Adding 25 units of PRIMARY CLASSROOM (K-3) (882 NSF)
28,300 450 $10,656,000 $377 $23,680
New Construction 2019 New Construction: Adding 25 units of MATERIAL STORAGE (100 NSF)
2,500 0 $0 $249 $0
New Construction 2019 New Construction: Adding 25 units of OUTSIDE STORAGE (50 NSF)
1,250 0 $0 $249 $0
New Construction 2019 New Construction: Adding 25 units of STUDENT STORAGE (40 NSF)
1,000 0 $0 $249 $0
PAGE:191 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
New Central Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2019 New Construction: Adding 25 units of STUDENT RESTROOM (BOTH SEXES) (60 NSF)
1,500 0 $0 $249 $0
New Construction 2019 New Construction: Adding 15 units of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (858 NSF)
16,170 330 $7,814,400 $483 $23,680
New Construction 2019 New Construction: Adding 15 units of MATERIAL STORAGE (100 NSF)
1,500 0 $0 $249 $0
New Construction 2019 New Construction: Adding 15 units of OUTSIDE STORAGE (50 NSF)
750 0 $0 $249 $0
New Construction 2019 New Construction: Adding 15 units of STUDENT RESTROOM (MALE) (35 NSF)
525 0 $0 $249 $0
New Construction 2019 New Construction: Adding 15 units of STUDENT RESTROOM (FEMALE) (35 NSF)
525 0 $0 $249 $0
New Construction 2019 New Construction: Adding 3 units of PRIMARY SKILLS LAB (K-3) (882 NSF)
3,246 0 $0 $249 $0
New Construction 2019 New Construction: Adding 3 units of MATERIAL STORAGE (100 NSF)
300 0 $0 $249 $0
New Construction 2019 New Construction: Adding 3 units of STUDENT STORAGE (40 NSF)
120 0 $0 $249 $0
New Construction 2019 New Construction: Adding 3 units of STUDENT RESTROOM (BOTH SEXES) (60 NSF)
180 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF)
315 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of ELEMENTARY COVERED PLAY AREA (3024 NSF)
3,024 0 $0 $249 $0
New Construction 2019 New Construction: Adding 6 units of RESOURCE ROOM (290 NSF)
2,340 0 $0 $249 $0
New Construction 2019 New Construction: Adding 6 units of MATERIAL STORAGE (100 NSF)
600 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of ART - ELEMENTARY (1000 NSF)
2,500 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of PROJECT STORAGE (150 NSF)
300 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of MUSIC - ELEMENTARY (1000 NSF)
2,540 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of REFERENCE (100 NSF)
200 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of MUSIC PRACTICE ROOM (70 NSF)
140 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of E S E PRE-K (475 NSF)
1,450 10 $236,800 $163 $23,680
New Construction 2019 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of STUDENT STORAGE (40 NSF)
80 0 $0 $249 $0
PAGE:192 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
New Central Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2019 New Construction: Adding 2 units of STUDENT RESTROOM & BATH (110 NSF)
220 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of E S E PART-TIME (975 NSF)
2,370 30 $710,400 $300 $23,680
New Construction 2019 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of STUDENT STORAGE (40 NSF)
80 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of STUDENT RESTROOM (MALE) (35 NSF)
70 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of STUDENT RESTROOM (FEMALE) (35 NSF)
70 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of E S E FULL-TIME (950 NSF)
2,540 20 $473,600 $186 $23,680
New Construction 2019 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of STUDENT STORAGE (40 NSF)
80 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of STUDENT RESTROOM (MALE) (35 NSF)
70 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of STUDENT RESTROOM (FEMALE) (35 NSF)
70 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of STUDENT RESTROOM & BATH (110 NSF)
220 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of E S E PT/OT LAB (475 NSF)
725 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MATERIAL STORAGE (100 NSF)
100 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of STUDENT STORAGE (40 NSF)
40 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of STUDENT RESTROOM & BATH (110 NSF)
110 0 $0 $249 $0
New Construction 2019 New Construction: Adding 3 units of E S E RESOURCE (380 NSF)
1,560 0 $0 $249 $0
New Construction 2019 New Construction: Adding 3 units of MATERIAL STORAGE (100 NSF)
300 0 $0 $249 $0
New Construction 2019 New Construction: Adding 3 units of STUDENT STORAGE (40 NSF)
120 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of E S E SUPPLEMENTARY INSTRUCTION (100 NSF)
400 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of E S E ITINERANT (200 NSF)
600 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $249 $0
PAGE:193 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
New Central Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2019 New Construction: Adding 14 units of ASSISTANT PRINCIPAL/OTHER OFFICE (175 NSF)
2,450 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of BOOKKEEPING OFFICE (125 NSF)
125 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of SECRETARIAL SPACE (158 NSF)
316 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of RECEPTION AREA (714 NSF)
714 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of PRODUCTION WORKROOM (336 NSF)
336 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of CONFERENCE ROOM (588 NSF)
588 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of CLINIC (252 NSF)
252 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of VAULT/STUDENT RECORDS (252 NSF)
252 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of SCHOOL STORE (84 NSF)
84 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of STUDENT ACTIVITIES (420 NSF)
420 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of COMPUTER AREA (126 NSF)
126 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of CAREERS ROOM (252 NSF)
252 0 $0 $249 $0
New Construction 2019 New Construction: Adding 2 units of ITINERANT OFFICE (125 NSF)
250 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of TEACHER PLANNING OFFICE (1680 NSF)
1,680 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of TEACHER LOUNGE/DINING (336 NSF)
336 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of CUSTODIAL RECEIVING (1260 NSF)
1,260 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of FLAMMABLE STORAGE (155 NSF)
155 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of CUSTODIAL EQUIPMENT STORAGE (500 NSF)
500 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of DINING AREA (3360 NSF)
3,360 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of KITCHEN & SERVING AREA (3696 NSF)
3,696 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (168 NSF)
168 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MULTIPURPOSE ROOM (DINING) (2604 NSF)
2,604 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (168 NSF)
168 0 $0 $249 $0
PAGE:194 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
New Central Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2019 New Construction: Adding 1 unit of STAGE (990 NSF)
990 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of STAGE STORAGE (420 NSF)
420 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of STAGE DRESSING ROOM (MALE) (210 NSF)
210 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of STAGE DRESSING ROOM (FEMALE) (210 NSF)
210 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
100 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of TEXTBOOK STORAGE (294 NSF)
294 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of LIBRARY (READING ROOM/STACKS) (3108 NSF)
3,108 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (336 NSF)
336 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of PROFESSIONAL LIBRARY (336 NSF)
336 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of AUDIO VISUAL STORAGE (504 NSF)
504 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of PERIODICAL STORAGE (168 NSF)
168 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of CLOSED CIRCUIT TV LAB (588 NSF)
588 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of CLOSED CIRCUIT STORAGE (420 NSF)
420 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MEDIA PRODUCTION LAB (420 NSF)
420 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MEDIA COPYING ROOM (168 NSF)
168 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MEDIA SMALL GROUP ROOM (84 NSF)
84 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (420 NSF)
420 0 $0 $249 $0
New Construction 2019 New Construction: Adding 1 unit of MEDIA MAINTENANCE/REPAIR (84 NSF)
84 0 $0 $249 $0
New Construction 2019 New Construction: Adding 15 units of STUDENT RESTROOM (MALE) (84 NSF)
1,260 0 $0 $249 $0
New Construction 2019 New Construction: Adding 15 units of STUDENT RESTROOM (FEMALE) (84 NSF)
1,260 0 $0 $249 $0
PAGE:195 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: New South Elementary School
Location: Northwest Palm Bay
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY
Low Grade PRE-K E S E
High Grade GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 840 840
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 840 840
Utilization Factor 0% 100%
School Capacity 0 840
COFTE Student Membership 0 796
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $19,680,360
Estimated Total Project Cost $19,680,360
New South Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 25 units of PRIMARY CLASSROOM (K-3) (882 NSF)
28,300 450 $10,543,050 $373 $23,429
New Construction 2022 New Construction: Adding 25 units of MATERIAL STORAGE (100 NSF)
2,500 0 $0 $256 $0
New Construction 2022 New Construction: Adding 25 units of OUTSIDE STORAGE (50 NSF)
1,250 0 $0 $256 $0
New Construction 2022 New Construction: Adding 25 units of STUDENT STORAGE (40 NSF)
1,000 0 $0 $256 $0
PAGE:196 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
New South Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 25 units of STUDENT RESTROOM (BOTH SEXES) (60 NSF)
1,500 0 $0 $256 $0
New Construction 2022 New Construction: Adding 15 units of INTERMEDIATE/MIDDLE CLASSROOM (4-8) (858 NSF)
16,170 330 $7,731,570 $478 $23,429
New Construction 2022 New Construction: Adding 15 units of MATERIAL STORAGE (100 NSF)
1,500 0 $0 $256 $0
New Construction 2022 New Construction: Adding 15 units of OUTSIDE STORAGE (50 NSF)
750 0 $0 $256 $0
New Construction 2022 New Construction: Adding 15 units of STUDENT RESTROOM (MALE) (35 NSF)
525 0 $0 $256 $0
New Construction 2022 New Construction: Adding 15 units of STUDENT RESTROOM (FEMALE) (35 NSF)
525 0 $0 $256 $0
New Construction 2022 New Construction: Adding 3 units of PRIMARY SKILLS LAB (K-3) (882 NSF)
3,246 0 $0 $256 $0
New Construction 2022 New Construction: Adding 3 units of MATERIAL STORAGE (100 NSF)
300 0 $0 $256 $0
New Construction 2022 New Construction: Adding 3 units of STUDENT STORAGE (40 NSF)
120 0 $0 $256 $0
New Construction 2022 New Construction: Adding 3 units of STUDENT RESTROOM (BOTH SEXES) (60 NSF)
180 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF)
315 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY COVERED PLAY AREA (3024 NSF)
3,024 0 $0 $256 $0
New Construction 2022 New Construction: Adding 6 units of RESOURCE ROOM (290 NSF)
2,340 0 $0 $256 $0
New Construction 2022 New Construction: Adding 6 units of MATERIAL STORAGE (100 NSF)
600 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of ART - ELEMENTARY (1000 NSF)
2,500 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of PROJECT STORAGE (150 NSF)
300 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of MUSIC - ELEMENTARY (1000 NSF)
2,540 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of REFERENCE (100 NSF)
200 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of MUSIC PRACTICE ROOM (70 NSF)
140 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of E S E PRE-K (475 NSF)
1,450 10 $234,290 $162 $23,429
New Construction 2022 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of STUDENT STORAGE (40 NSF)
80 0 $0 $256 $0
PAGE:197 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
New South Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 2 units of STUDENT RESTROOM & BATH (110 NSF)
220 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of E S E PART-TIME (975 NSF)
2,370 30 $702,870 $297 $23,429
New Construction 2022 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of STUDENT STORAGE (40 NSF)
80 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of STUDENT RESTROOM (MALE) (35 NSF)
70 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of STUDENT RESTROOM (FEMALE) (35 NSF)
70 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of E S E FULL-TIME (950 NSF)
2,540 20 $468,580 $184 $23,429
New Construction 2022 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of STUDENT STORAGE (40 NSF)
80 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of STUDENT RESTROOM (MALE) (35 NSF)
70 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of STUDENT RESTROOM (FEMALE) (35 NSF)
70 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of STUDENT RESTROOM & BATH (110 NSF)
220 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of E S E PT/OT LAB (475 NSF)
725 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MATERIAL STORAGE (100 NSF)
100 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of STUDENT STORAGE (40 NSF)
40 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of STUDENT RESTROOM & BATH (110 NSF)
110 0 $0 $256 $0
New Construction 2022 New Construction: Adding 3 units of E S E RESOURCE (380 NSF)
1,560 0 $0 $256 $0
New Construction 2022 New Construction: Adding 3 units of MATERIAL STORAGE (100 NSF)
300 0 $0 $256 $0
New Construction 2022 New Construction: Adding 3 units of STUDENT STORAGE (40 NSF)
120 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of E S E SUPPLEMENTARY INSTRUCTION (100 NSF)
400 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of E S E ITINERANT (200 NSF)
600 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of MATERIAL STORAGE (100 NSF)
200 0 $0 $256 $0
PAGE:198 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
New South Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 14 units of ASSISTANT PRINCIPAL/OTHER OFFICE (175 NSF)
2,450 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of BOOKKEEPING OFFICE (125 NSF)
125 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of SECRETARIAL SPACE (158 NSF)
316 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of RECEPTION AREA (714 NSF)
714 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of PRODUCTION WORKROOM (336 NSF)
336 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of CONFERENCE ROOM (588 NSF)
588 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of CLINIC (252 NSF)
252 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of VAULT/STUDENT RECORDS (252 NSF)
252 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of SCHOOL STORE (84 NSF)
84 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of STUDENT ACTIVITIES (420 NSF)
420 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of COMPUTER AREA (126 NSF)
126 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of CAREERS ROOM (252 NSF)
252 0 $0 $256 $0
New Construction 2022 New Construction: Adding 2 units of ITINERANT OFFICE (125 NSF)
250 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of TEACHER PLANNING OFFICE (1680 NSF)
1,680 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of TEACHER LOUNGE/DINING (336 NSF)
336 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of CUSTODIAL RECEIVING (1260 NSF)
1,260 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of FLAMMABLE STORAGE (155 NSF)
155 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of CUSTODIAL EQUIPMENT STORAGE (500 NSF)
500 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of DINING AREA (3360 NSF)
3,360 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN & SERVING AREA (3696 NSF)
3,696 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (168 NSF)
168 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MULTIPURPOSE ROOM (DINING) (2604 NSF)
2,604 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (168 NSF)
168 0 $0 $256 $0
PAGE:199 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
New South Elementary School
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of STAGE (990 NSF)
990 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of STAGE STORAGE (420 NSF)
420 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of STAGE DRESSING ROOM (MALE) (210 NSF)
210 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of STAGE DRESSING ROOM (FEMALE) (210 NSF)
210 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
100 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of TEXTBOOK STORAGE (294 NSF)
294 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of LIBRARY (READING ROOM/STACKS) (3108 NSF)
3,108 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (336 NSF)
336 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of PROFESSIONAL LIBRARY (336 NSF)
336 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of AUDIO VISUAL STORAGE (504 NSF)
504 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of PERIODICAL STORAGE (168 NSF)
168 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of CLOSED CIRCUIT TV LAB (588 NSF)
588 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of CLOSED CIRCUIT STORAGE (420 NSF)
420 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA PRODUCTION LAB (420 NSF)
420 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA COPYING ROOM (168 NSF)
168 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA SMALL GROUP ROOM (84 NSF)
84 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (420 NSF)
420 0 $0 $256 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA MAINTENANCE/REPAIR (84 NSF)
84 0 $0 $256 $0
New Construction 2022 New Construction: Adding 15 units of STUDENT RESTROOM (MALE) (84 NSF)
1,260 0 $0 $256 $0
New Construction 2022 New Construction: Adding 15 units of STUDENT RESTROOM (FEMALE) (84 NSF)
1,260 0 $0 $256 $0
PAGE:200 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: NORTH AREA TRANSPORTATION SERVICES
Address: 1500 DRAA ROAD, TITUSVILLE
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use TRANSPORTATION TRANSPORTATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $456,837 $0
Estimated Total Project Cost $456,837
NORTH AREA TRANSPORTATION SERVICES
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical to the entire facility NORTH AREA TRANSPORTATION SERVICES.
10,024 0 $456,837 $46 $0
PAGE:201 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: OAK PARK ELEMENTARY
Address: 3395 DAIRY ROAD, TITUSVILLE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 906 -64 842
Reloc. Stations 44 0 44
Mod. Stations 0 0 0
Total Stations 950 -64 886
Utilization Factor 100% 100%
School Capacity 950 886
COFTE Student Membership 859 671
Survey Annotation
This school is a PK ESE ClusterExpand mediaExpand dining/multipurposeBuildings 12 and 13, which are small Material Storage buildings, were constructed in 2010 and will not be included in the renovation.New construction of PT/OT Lab is the receipt of 1 relocatable from Space Coast Jr/Sr HS utilizing local funds.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $772,617 $1,991,502
Estimated Total Project Cost $2,764,119
PAGE:202 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
OAK PARK ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (177 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2116 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (177 NSF), 1 unit of STAGE STORAGE (403 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (222 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (222 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
3,417 0 $850,833 $249 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (354 NSF), 1 unit of PROFESSIONAL LIBRARY (354 NSF), 1 unit of AUDIO VISUAL STORAGE (532 NSF), 1 unit of CLOSED CIRCUIT TV LAB (620 NSF), 1 unit of CLOSED CIRCUIT STORAGE (443 NSF), 1 unit of MEDIA PRODUCTION LAB (443 NSF), 1 unit of MEDIA COPYING ROOM (177 NSF), 1 unit of MEDIA SMALL GROUP ROOM (88 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (443 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (89 NSF)
3,543 0 $882,207 $249 $0
New Construction 2018 New Construction: Adding 1 unit of E S E PT/OT LAB (788 NSF)
1,038 0 $258,462 $249 $0
Remodeling 2018 2 1 Removed NSF (3225), Added NSF (3223), Difference NSF (2), Percent (0.06%), Removed Stations (84), Added Stations (20) Remodeling: Adding 3 units of E S E PRE-K (733 NSF), 1 unit of E S E PRE-K (1024 NSF) and Removing Room 025 (734 NSF), Room 026 (733 NSF), Room 027 (734 NSF), Room 033 (1024 NSF)
-3,225 -64 $0 $0 $0
Renovation 2018 Renovating: Apply Plumbing to the entire facility OAK PARK ELEMENTARY.
107,710 0 $772,617 $7 $0
PAGE:203 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: OCEAN BREEZE ELEMENTARY
Address: 1101 CHEYENNE DRIVE, INDIAN HARBOUR BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 498 18 516
Reloc. Stations 156 -18 138
Mod. Stations 0 0 0
Total Stations 654 0 654
Utilization Factor 100% 100%
School Capacity 654 654
COFTE Student Membership 521 518
Survey AnnotationRelocatable in excess of 20 years old to be removed and replaced with 1 from Palm Bay Elem utilizing local funds.(Shown as new construction)Other= Security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $168,053 $10,000 $0 $426,240
Estimated Total Project Cost $604,293
OCEAN BREEZE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of PRIMARY CLASSROOM (K-3) (882 NSF)
1,132 18 $426,240 $377 $23,680
Remodeling 2022 74 99 Removed NSF (683), Added NSF (0), Difference NSF (683), Percent (100%), Removed Stations (18), Added Stations (0) Remodeling: Removing Room N057 (683 NSF)
-683 -18 $10,000 $15 $0
PAGE:204 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PAGE:205 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: OLD CREEL BUS COMPOUND
Address: 815 MATHERS ST, MELBOURNE
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use TRANSPORTATION TRANSPORTATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
OLD CREEL BUS COMPOUND
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:206 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: PALM BAY ELEMENTARY
Address: 1200 ALLAMANDA ROAD NE, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 829 -51 778
Reloc. Stations 176 -176 0
Mod. Stations 0 0 0
Total Stations 1,005 -227 778
Utilization Factor 100% 100%
School Capacity 1,005 778
COFTE Student Membership 656 734
Survey Annotation
Relocatables in excess of 20 years old to be removed. 1 relocatable to be transferred to Saturn, 1 to Port Malabar, 1 to Ocean Breeze, 1 to Westside and 2 to Sabal Elem to replace relocatables > 20 years old. Moves will utilize local funds.Other= fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $326,607 $90,000 $0 $821,451
Estimated Total Project Cost $1,238,058
PALM BAY ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (2984 NSF)
3,299 0 $821,451 $249 $0
PAGE:207 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PALM BAY ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2021 37 1 Removed NSF (2262), Added NSF (2337), Difference NSF (75), Percent (3.21%), Removed Stations (66), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (779 NSF) and Removing Room 017 (779 NSF), Room 018 (779 NSF), Room 029 (704 NSF)
2,337 -51 $0 $0 $0
Remodeling 2022 37 99 Removed NSF (6975), Added NSF (0), Difference NSF (6975), Percent (100%), Removed Stations (176), Added Stations (0) Remodeling: Removing Room N113 (683 NSF), Room T104 (782 NSF), Room T105 (782 NSF), Room T316 (788 NSF), Room T416 (788 NSF), Room T418 (788 NSF), Room T423 (788 NSF), Room T438 (788 NSF), Room T463 (788 NSF)
-6,975 -176 $90,000 $13 $0
PAGE:208 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: PALM BAY MAGNET SENIOR HIGH
Address: 101 PIRATE LANE, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 2,576 0 2576
Reloc. Stations 175 0 175
Mod. Stations 0 0 0
Total Stations 2,751 0 2751
Utilization Factor 95% 95%
School Capacity 2,613 2613
COFTE Student Membership 1,263 1,273
Survey Annotation Other=fencing & security & resurface PE track
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $442,503 $0 $1,585,244 $0
Estimated Total Project Cost $2,027,747
PALM BAY MAGNET SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Electrical, Plumbing, HVAC Systems to the entire facility PALM BAY MAGNET SENIOR HIGH.
338,398 0 $1,585,244 $5 $0
PAGE:209 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: PINEWOOD ELEMENTARY
Address: 3757 OLD DIXIE HIGHWAY, MIMS
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 485 18 503
Reloc. Stations 66 0 66
Mod. Stations 0 0 0
Total Stations 551 18 569
Utilization Factor 100% 100%
School Capacity 551 569
COFTE Student Membership 424 416
Survey Annotation
Other=fencing & securityAdd stageNew construction of Primary Classroom is the receipt of 1 relocatable from Space Coast Jr/Sr High using local funds for the move.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $60,000 $0 $1,283,100 $426,240
Estimated Total Project Cost $1,769,340
PAGE:210 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PINEWOOD ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of PRIMARY CLASSROOM (K-3) (788 NSF), 1 unit of STAGE (990 NSF), 1 unit of STAGE STORAGE (252 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (126 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (126 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
2,632 18 $426,240 $162 $23,680
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility PINEWOOD ELEMENTARY.
72,001 0 $1,283,100 $18 $0
PAGE:211 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: PLANT OPERATIONS AND MAINTENANCE
Address: 1254 S FLORIDA AVENUE, ROCKLEDGE
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use MAINTENANCE MAINTENANCE
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $911,014 $0
Estimated Total Project Cost $911,014
PLANT OPERATIONS AND MAINTENANCE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply HVAC Systems to the entire facility PLANT OPERATIONS AND MAINTENANCE.
46,468 0 $911,014 $20 $0
PAGE:212 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: PORT MALABAR ELEMENTARY
Address: 301 PIONEER AVENUE NE, PORT MALABAR
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 768 18 786
Reloc. Stations 84 -18 66
Mod. Stations 0 0 0
Total Stations 852 0 852
Utilization Factor 100% 100%
School Capacity 852 852
COFTE Student Membership 709 708
Survey Annotation
Relocatable in excess of 20 years old to be removed and replaced with 1 from Palm Bay Elem utilizing local funds. (shown as new construction)Other=fencing & securityExpand mediaExpand dining multipurpose
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $118,418 $10,000 $1,837,561 $1,610,982
Estimated Total Project Cost $3,576,961
PORT MALABAR ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of PRIMARY CLASSROOM (K-3) (788 NSF)
1,038 18 $426,240 $411 $23,680
PAGE:213 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PORT MALABAR ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (66 NSF), 1 unit of CLOSED CIRCUIT TV LAB (537 NSF), 1 unit of CLOSED CIRCUIT STORAGE (384 NSF), 1 unit of MEDIA PRODUCTION LAB (384 NSF), 1 unit of MEDIA COPYING ROOM (153 NSF), 1 unit of MEDIA SMALL GROUP ROOM (85 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (384 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (76 NSF)
2,069 0 $515,181 $249 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (154 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2381 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (154 NSF)
2,689 0 $669,561 $249 $0
Remodeling 2018 35 99 Removed NSF (683), Added NSF (0), Difference NSF (683), Percent (100%), Removed Stations (18), Added Stations (0) Remodeling: Removing Room N224 (683 NSF)
-683 -18 $10,000 $15 $0
Renovation 2018 Renovating: Apply Electrical, Plumbing, HVAC Systems to the entire facility PORT MALABAR ELEMENTARY.
105,457 0 $1,837,561 $17 $0
PAGE:214 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: QUEST ELEMENTARY
Address: 8751 TRAFFORD DR, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 910 -73 837
Reloc. Stations 40 -40 0
Mod. Stations 0 0 0
Total Stations 950 -113 837
Utilization Factor 100% 100%
School Capacity 950 837
COFTE Student Membership 839 796
Survey Annotation
Transfer 2 relos to Rockledge HS to replace relocatables > 20 years old. (Local funds will be used for this move)Other=fencing & security $27,903 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$103,968
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $227,871 $417,500 $932,480 $0
Estimated Total Project Cost $1,577,851
PAGE:215 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
QUEST ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 123 1 Removed NSF (3180), Added NSF (2385), Difference NSF (795), Percent (25.00%), Removed Stations (88), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (795 NSF) and Removing Room 500 (792 NSF), Room 502 (797 NSF), Room 504 (797 NSF), Room 506 (794 NSF)
-3,180 -73 $397,500 $125 $0
Remodeling 2022 123 99 Removed NSF (1576), Added NSF (0), Difference NSF (1576), Percent (100%), Removed Stations (40), Added Stations (0) Remodeling: Removing Room T297 (788 NSF), Room T431 (788 NSF)
-1,576 -40 $20,000 $13 $0
Renovation 2018 Renovating: Apply Painting, HVAC Systems, Retrofit for Technology to the entire facility QUEST ELEMENTARY.
109,797 0 $932,480 $8 $0
PAGE:216 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: RALPH M WILLIAMS JR ELEMENTARY
Address: 1700 CLUBHOUSE DRIVE, ROCKLEDGE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 627 40 667
Reloc. Stations 88 -88 0
Mod. Stations 0 0 0
Total Stations 715 -48 667
Utilization Factor 100% 100%
School Capacity 715 667
COFTE Student Membership 560 559
Survey Annotation
Relocatables in excess of 20 years old to be removed.
New construction is receipt of 4 newer relocatables from Manatee Elem utilizing local fundsThis school is a PK ESE clusterAdd PE storage & expand covered play Other = fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $417,165 $40,000 $1,980,982 $1,438,228
Estimated Total Project Cost $3,876,375
RALPH M WILLIAMS JR ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2021 New Construction: Adding 8 units of E S E PRE-K (600 NSF)
6,800 40 $947,200 $139 $23,680
PAGE:217 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
RALPH M WILLIAMS JR ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (1657 NSF)
1,972 0 $491,028 $249 $0
Remodeling 2018 115 99 Removed NSF (2732), Added NSF (0), Difference NSF (2732), Percent (100%), Removed Stations (88), Added Stations (0) Remodeling: Removing Room N056 (683 NSF), Room N163 (683 NSF), Room N181 (683 NSF), Room N245 (683 NSF)
-2,732 -88 $40,000 $15 $0
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility RALPH M WILLIAMS JR ELEMENTARY.
98,638 0 $1,980,982 $20 $0
PAGE:218 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: RIVERVIEW SCHOOL
Address: 3000 JOLLY STREET, TITUSVILLE
Existing Recommended
Capital Outlay Classification
2 - SCHOOL CONDITIONALLY RECOMMENDED FOR CONTINUED USE
3 - SCHOOL NOT RECOMMENDED FOR CONTINUED USE
Facility Use PRE-K E S E PRE-K E S E
Low Grade PRE-K E S E PRE-K E S E
High Grade PRE-K E S E PRE-K E S E
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 547 0 547
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 547 0 547
Utilization Factor 100% 100%
School Capacity 547 547
COFTE Student Membership 23 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
RIVERVIEW SCHOOL Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:219 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: RIVIERA ELEMENTARY
Address: 351 RIVIERA DRIVE NE, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 689 20 709
Reloc. Stations 88 -88 0
Mod. Stations 0 0 0
Total Stations 777 -68 709
Utilization Factor 100% 100%
School Capacity 777 709
COFTE Student Membership 595 599
Survey Annotation
Relocatables in excess of 20 years old to be removed. Convert remaining 2 to PK ESE.
New Construction of 2 PK Classrooms is the receipt of 2 relos from Meadowlane Intermediate utilizing local funds.
This school is a PK ESE Center
Other = fencing & securityAdd multipurpose & chair storageAdd covered play
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $76,354 $20,000 $574,202 $1,617,256
Estimated Total Project Cost $2,287,812
PAGE:220 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
RIVIERA ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 2 units of E S E PRE-K (788 NSF)
2,076 10 $236,800 $114 $23,680
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY COVERED PLAY AREA (1916 NSF)
1,916 0 $477,084 $249 $0
New Construction 2022 New Construction: Adding 1 unit of GENERAL SCHOOL STORAGE (236 NSF), 1 unit of VAULT/STUDENT RECORDS (210 NSF), 1 unit of SCHOOL STORE (70 NSF), 1 unit of STUDENT ACTIVITIES (350 NSF), 1 unit of COMPUTER AREA (105 NSF), 1 unit of CAREERS ROOM (210 NSF)
1,181 0 $294,069 $249 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (140 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2167 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (140 NSF)
2,447 0 $609,303 $249 $0
Remodeling 2018 44 99 Removed NSF (1576), Added NSF (1576), Difference NSF (0), Percent (0%), Removed Stations (44), Added Stations (10) Remodeling: Adding 2 units of E S E PRE-K (788 NSF) and Removing Room T317 (788 NSF), Room T421 (788 NSF)
1,576 -34 $0 $0 $0
Remodeling 2022 44 99 Removed NSF (1564), Added NSF (0), Difference NSF (1564), Percent (100%), Removed Stations (44), Added Stations (0) Remodeling: Removing Room T106 (782 NSF), Room T107 (782 NSF)
-1,564 -44 $20,000 $13 $0
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility RIVIERA ELEMENTARY.
109,711 0 $574,202 $5 $0
PAGE:221 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: ROBERT LOUIS STEVENSON ELEMENTARY SCHOOL OF THE ARTS
Address: 1450 MARTIN BOULEVARD, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 569 0 569
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 569 0 569
Utilization Factor 100% 100%
School Capacity 569 569
COFTE Student Membership 477 435
Survey Annotation Other=fencing & security $20,915 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$86,640
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $107,555 $0 $1,093,674 $0
Estimated Total Project Cost $1,201,229
ROBERT LOUIS STEVENSON ELEMENTARY SCHOOL OF THE ARTS
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Electrical, Plumbing, HVAC Systems to the entire facility ROBERT LOUIS STEVENSON ELEMENTARY SCHOOL OF THE ARTS.
60,758 0 $1,093,674 $18 $0
PAGE:222 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: ROCKLEDGE SENIOR HIGH
Address: 220 ROCKLEDGE AVE, ROCKLEDGE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,703 47 1750
Reloc. Stations 75 -75 0
Mod. Stations 0 0 0
Total Stations 1,778 -28 1750
Utilization Factor 95% 95%
School Capacity 1,689 1662
COFTE Student Membership 1,330 1,329
Survey Annotation
Relocatables in excess of 20 years old to be removed.New construction is receipt of one relo from Suntree Elementary and 2 from Quest to replace old.(These will be moved with local funds)Other=fencing & security $67,171 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$368,220 & resurface PE track $200,000Calculated renovation cost does not include building 5.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $720,191 $30,000 $5,228,762 $1,561,152
Estimated Total Project Cost $7,540,105
ROCKLEDGE SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of SENIOR HIGH CLASSROOM (9-12) (788 NSF), 2 units of BUSINESS EDUCATION LAB (788 NSF)
2,664 47 $1,561,152 $586 $33,216
PAGE:223 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
ROCKLEDGE SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 17 99 Removed NSF (2049), Added NSF (0), Difference NSF (2049), Percent (100%), Removed Stations (75), Added Stations (0) Remodeling: Removing Room N165 (683 NSF), Room N168 (683 NSF), Room N241 (683 NSF)
-2,049 -75 $30,000 $15 $0
Renovation 2022 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility ROCKLEDGE SENIOR HIGH.
256,945 0 $5,228,762 $20 $0
PAGE:224 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: RONALD MCNAIR MIDDLE
Address: 1 CHALLENGER DRIVE, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 679 0 679
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 679 0 679
Utilization Factor 90% 90%
School Capacity 611 611
COFTE Student Membership 466 444
Survey Annotation Other= fencing & security & PE track resurfacingExpand administration
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $264,056 $0 $710,034 $246,951
Estimated Total Project Cost $1,221,041
PAGE:225 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
RONALD MCNAIR MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of VAULT/STUDENT RECORDS (184 NSF), 1 unit of SCHOOL STORE (61 NSF), 1 unit of STUDENT ACTIVITIES (305 NSF), 1 unit of COMPUTER AREA (91 NSF), 1 unit of CAREERS ROOM (183 NSF), 1 unit of ITINERANT OFFICE (125 NSF), 1 unit of TEACHER LOUNGE/DINING (244 NSF)
1,193 0 $246,951 $207 $0
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems to the entire facility RONALD MCNAIR MIDDLE .
96,188 0 $710,034 $7 $0
PAGE:226 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: ROY ALLEN ELEMENTARY
Address: 2601 FOUNTAINHEAD BOULEVARD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 663 0 663
Reloc. Stations 88 0 88
Mod. Stations 0 0 0
Total Stations 751 0 751
Utilization Factor 100% 100%
School Capacity 751 751
COFTE Student Membership 567 554
Survey Annotation Other = fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $145,051 $0 $1,001,710 $0
Estimated Total Project Cost $1,146,761
ROY ALLEN ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility ROY ALLEN ELEMENTARY.
95,398 0 $1,001,710 $11 $0
PAGE:227 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SABAL ELEMENTARY
Address: 1401 N WICKHAM ROAD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 679 51 730
Reloc. Stations 106 -106 0
Mod. Stations 0 0 0
Total Stations 785 -55 730
Utilization Factor 100% 100%
School Capacity 785 730
COFTE Student Membership 542 541
Survey Annotation
Relocatables in excess of 20 years old to be removed and replaced with 2 from Palm Bay Elem utilizing local funds. (Shown as new construction). 3 to be converted to PK ESEOther=fencing & security $136,776 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$319,124Add covered play & expand PE storageAdd multipurpose & chair storage
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $758,300 $20,000 $2,306,612 $1,953,807
Estimated Total Project Cost $5,038,719
SABAL ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (1742 NSF)
2,057 0 $512,193 $249 $0
PAGE:228 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
SABAL ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (115 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2105 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (146 NSF)
2,366 0 $589,134 $249 $0
New Construction 2022 New Construction: Adding 2 units of PRIMARY CLASSROOM (K-3) (882 NSF)
2,264 36 $852,480 $377 $23,680
Remodeling 2018 52 99 Removed NSF (2364), Added NSF (2364), Difference NSF (0), Percent (0%), Removed Stations (66), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (788 NSF) and Removing Room T268 (788 NSF), Room T323 (788 NSF), Room T338 (788 NSF)
2,364 -51 $0 $0 $0
Remodeling 2022 52 99 Removed NSF (1366), Added NSF (0), Difference NSF (1366), Percent (100%), Removed Stations (40), Added Stations (0) Remodeling: Removing Room N074 (683 NSF), Room N939 (683 NSF)
-1,366 -40 $20,000 $15 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility SABAL ELEMENTARY.
74,659 0 $2,306,612 $31 $0
PAGE:229 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SATELLITE BUS COMPOUND
Address: 52 HOLLAND COURT, SATELLITE BEACH
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use TRANSPORTATION TRANSPORTATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$79,420
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $79,420 $0 $380,736 $0
Estimated Total Project Cost $460,156
SATELLITE BUS COMPOUND
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2019 Renovating: Apply Painting, Plumbing, HVAC Systems to the entire facility SATELLITE BUS COMPOUND.
6,632 0 $380,736 $57 $0
PAGE:230 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SATELLITE SENIOR HIGH
Address: 300 SCORPION COURT, SATELLITE BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,570 0 1570
Reloc. Stations 25 0 25
Mod. Stations 0 0 0
Total Stations 1,595 0 1595
Utilization Factor 95% 95%
School Capacity 1,515 1515
COFTE Student Membership 1,202 1,201
Survey Annotation Other=fencing & security $127,433 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$282,580 & PE track resurfacing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $713,013 $0 $965,990 $0
Estimated Total Project Cost $1,679,003
SATELLITE SENIOR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2021 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility SATELLITE SENIOR HIGH.
262,619 0 $965,990 $4 $0
PAGE:231 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SATURN ELEMENTARY
Address: 880 RANGE ROAD, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 848 38 886
Reloc. Stations 128 -106 22
Mod. Stations 0 0 0
Total Stations 976 -68 908
Utilization Factor 100% 100%
School Capacity 976 908
COFTE Student Membership 716 685
Survey Annotation
Relocatable in excess of 20 years old to be removed. Relocatable will be replaced with one from Palm Bay Elem utilizing local funds. (Shown as new construction)4 to be converted to PK
This school is a PK ESE Cluster
Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$75,639
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $75,639 $10,000 $4,461,043 $1,359,492
Estimated Total Project Cost $5,906,174
SATURN ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of PRIMARY CLASSROOM (K-3) (788 NSF)
1,038 18 $426,240 $411 $23,680
PAGE:232 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
SATURN ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (146 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2573 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (146 NSF), 1 unit of STAGE STORAGE (383 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (200 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (200 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
3,748 0 $933,252 $249 $0
Remodeling 2018 29 99 Removed NSF (3152), Added NSF (3152), Difference NSF (0), Percent (0%), Removed Stations (88), Added Stations (20) Remodeling: Adding 4 units of E S E PRE-K (788 NSF) and Removing Room T262 (788 NSF), Room T263 (788 NSF), Room T264 (788 NSF), Room T415 (788 NSF)
3,152 -68 $0 $0 $0
Remodeling 2018 29 99 Removed NSF (683), Added NSF (0), Difference NSF (683), Percent (100%), Removed Stations (18), Added Stations (0) Remodeling: Removing Room N204 (683 NSF)
-683 -18 $10,000 $15 $0
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility SATURN ELEMENTARY.
89,752 0 $4,461,043 $50 $0
PAGE:233 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SEA PARK ELEMENTARY
Address: 300 SEA PARK BOULEVARD, SATELLITE BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 461 -17 444
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 461 -17 444
Utilization Factor 100% 100%
School Capacity 461 444
COFTE Student Membership 315 301
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
SEA PARK ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 72 5 Removed NSF (816), Added NSF (816), Difference NSF (0), Percent (0%), Removed Stations (22), Added Stations (5) Remodeling: Adding 1 unit of E S E PRE-K (816 NSF) and Removing Room 527 (816 NSF)
816 -17 $0 $0 $0
PAGE:234 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SHERWOOD ELEMENTARY
Address: 2541 POST ROAD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 609 0 609
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 609 0 609
Utilization Factor 100% 100%
School Capacity 609 609
COFTE Student Membership 477 565
Survey AnnotationOther= fencing & securityExpand mediaAdd covered play
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $21,889 $0 $2,161,952 $688,485
Estimated Total Project Cost $2,872,326
PAGE:235 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
SHERWOOD ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (243 NSF), 1 unit of PROFESSIONAL LIBRARY (243 NSF), 1 unit of PERIODICAL STORAGE (121 NSF), 1 unit of MEDIA PRODUCTION LAB (304 NSF), 1 unit of MEDIA COPYING ROOM (121 NSF), 1 unit of MEDIA SMALL GROUP ROOM (80 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (61 NSF)
1,173 0 $292,077 $249 $0
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY COVERED PLAY AREA (1592 NSF)
1,592 0 $396,408 $249 $0
Renovation 2018 Renovating: Apply Painting, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility SHERWOOD ELEMENTARY.
85,471 0 $2,161,952 $25 $0
PAGE:236 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SOUTH AREA HEAD START
Address: 1430 Knecht Road, NE, Palm Bay
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use VACANT PRE-K E S E
Low Grade PRE-K E S E PRE-K E S E
High Grade PRE-K E S E PRE-K E S E
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 36 0 36
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 36 0 36
Utilization Factor 0% 100%
School Capacity 0 36
COFTE Student Membership 0 12
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $115,315 $0
Estimated Total Project Cost $115,315
SOUTH AREA HEAD START
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2020 Renovating: Apply HVAC Systems to the entire facility SOUTH AREA HEAD START.
3,574 0 $115,315 $32 $0
PAGE:237 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SOUTH LAKE EDUCATION CENTER
Address: 3755 GARDEN STREET, TITUSVILLE
Existing Recommended
Capital Outlay Classification
2 - SCHOOL CONDITIONALLY RECOMMENDED FOR CONTINUED USE
2 - SCHOOL CONDITIONALLY RECOMMENDED FOR CONTINUED USE
Facility Use VACANT ELEMENTARY
Low Grade ADULT EDUCATION KINDERGARTEN
High Grade ADULT EDUCATION GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 529 0 529
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 529 0 529
Utilization Factor 0% 100%
School Capacity 0 529
COFTE Student Membership 0 125
Survey Annotation This school will re-open as a "choice school" to relieve North Brevard schools.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $1,716,159 $0
Estimated Total Project Cost $1,716,159
SOUTH LAKE EDUCATION CENTER
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems to the entire facility SOUTH LAKE EDUCATION CENTER.
64,445 0 $1,716,159 $27 $0
PAGE:238 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SOUTH PINE GROVE SCHOOL
Address: 2175 N WICKHAM ROAD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use VACANT ALTERNATIVE EDUCATION
Low Grade ADULT EDUCATION GRADE 7
High Grade ADULT EDUCATION GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 92 0 92
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 92 0 92
Utilization Factor 0% 100%
School Capacity 0 92
COFTE Student Membership 0 12
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $290,571 $0
Estimated Total Project Cost $290,571
SOUTH PINE GROVE SCHOOL
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility SOUTH PINE GROVE SCHOOL.
15,471 0 $290,571 $19 $0
PAGE:239 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SOUTHWEST MIDDLE
Address: 451 ELDRON BOULEVARD SE, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,308 0 1308
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 1,308 0 1308
Utilization Factor 90% 90%
School Capacity 1,177 1177
COFTE Student Membership 872 869
Survey Annotation Other=fencing & security & PE track resurfacing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $252,353 $0 $3,778,817 $0
Estimated Total Project Cost $4,031,170
SOUTHWEST MIDDLE Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility SOUTHWEST MIDDLE.
210,841 0 $3,778,817 $18 $0
PAGE:240 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SPACE COAST JR/ SR HIGH
Address: 6150 BANYAN STREET, COCOA
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use COMBINATION COMBINATION
Low Grade GRADE 7 GRADE 7
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,975 0 1975
Reloc. Stations 38 0 38
Mod. Stations 0 0 0
Total Stations 2,013 0 2013
Utilization Factor 90% 90%
School Capacity 1,811 1811
COFTE Student Membership 1,388 1,351
Survey Annotation
Other = fencing & security & PE track resurfacingRelocatables to be moved utilizing local funds as follows:To Fairglen Elem-T-222, T-225To Atlantis T-220, T-227To Pinewood- T-230To Oak Park-T-231
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $325,513 $60,000 $1,807,252 $0
Estimated Total Project Cost $2,192,765
PAGE:241 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
SPACE COAST JR/ SR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 108 99 Removed NSF (4728), Added NSF (0), Difference NSF (4728), Percent (100%), Removed Stations (0), Added Stations (0) Remodeling: Removing Room T220 (788 NSF), Room T222 (788 NSF), Room T225 (788 NSF), Room T227 (788 NSF), Room T230 (788 NSF), Room T231 (788 NSF)
-4,728 0 $60,000 $13 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems to the entire facility SPACE COAST JR/ SR HIGH.
318,859 0 $1,807,252 $6 $0
PAGE:242 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SPESSARD L HOLLAND ELEMENTARY
Address: 50 HOLLAND COURT, SATELLITE BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 605 -17 588
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 605 -17 588
Utilization Factor 100% 100%
School Capacity 605 588
COFTE Student Membership 431 405
Survey AnnotationOther=fencing & security $86,730 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$187,720Expand administration
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $274,450 $0 $3,686,790 $473,100
Estimated Total Project Cost $4,434,340
PAGE:243 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
SPESSARD L HOLLAND ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of BOOKKEEPING OFFICE (125 NSF), 1 unit of PRODUCTION WORKROOM (242 NSF), 1 unit of CLINIC (80 NSF), 1 unit of GENERAL SCHOOL STORAGE (302 NSF), 1 unit of VAULT/STUDENT RECORDS (181 NSF), 1 unit of SCHOOL STORE (60 NSF), 1 unit of STUDENT ACTIVITIES (302 NSF), 1 unit of COMPUTER AREA (90 NSF), 1 unit of CAREERS ROOM (181 NSF), 1 unit of ITINERANT OFFICE (125 NSF), 1 unit of TEXTBOOK STORAGE (212 NSF)
1,900 0 $473,100 $249 $0
Remodeling 2018 71 1 Removed NSF (890), Added NSF (890), Difference NSF (0), Percent (0%), Removed Stations (22), Added Stations (5) Remodeling: Adding 1 unit of E S E PRE-K (890 NSF) and Removing Room 042 (890 NSF)
890 -17 $0 $0 $0
Renovation 2018 Renovating: Apply Painting, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility SPESSARD L HOLLAND ELEMENTARY.
76,328 0 $3,686,790 $48 $0
PAGE:244 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: STONE MAGNET MIDDLE
Address: 1101 E UNIVERSITY BOULEVARD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,126 0 1126
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 1,126 0 1126
Utilization Factor 90% 90%
School Capacity 1,013 1013
COFTE Student Membership 825 822
Survey Annotation Other= fencing & security & PE track resurfacingAdd multipurpose & chair storage
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $274,853 $0 $6,048,260 $691,794
Estimated Total Project Cost $7,014,907
STONE MAGNET MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (101 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (3140 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (101 NSF)
3,342 0 $691,794 $207 $0
PAGE:245 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
STONE MAGNET MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility STONE MAGNET MIDDLE.
162,920 0 $6,048,260 $37 $0
PAGE:246 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SUNRISE ELEMENTARY
Address: 1651 MARA LOMA BLVD, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 895 -32 863
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 895 -32 863
Utilization Factor 100% 100%
School Capacity 895 863
COFTE Student Membership 808 762
Survey AnnotationOther= fencing & securityNew construction is receipt of 1 relocatable (T-461)from McAuliffe. This will be moved using local funds.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $27,917 $292,750 $763,062 $355,200
Estimated Total Project Cost $1,438,929
SUNRISE ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2018 New Construction: Adding 1 unit of E S E PART-TIME (788 NSF)
998 15 $355,200 $356 $23,680
PAGE:247 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
SUNRISE ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 125 1 Removed NSF (2342), Added NSF (2340), Difference NSF (2), Percent (0.09%), Removed Stations (62), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (780 NSF) and Removing Room 603 (782 NSF), Room 604 (776 NSF), Room 605 (784 NSF)
-2,342 -47 $292,750 $125 $0
Renovation 2018 Renovating: Apply HVAC Systems to the entire facility SUNRISE ELEMENTARY.
110,191 0 $763,062 $7 $0
PAGE:248 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SUNTREE ELEMENTARY
Address: 900 JORDAN BLASS DRIVE, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 689 0 689
Reloc. Stations 66 -66 0
Mod. Stations 0 0 0
Total Stations 755 -66 689
Utilization Factor 100% 100%
School Capacity 755 689
COFTE Student Membership 646 646
Survey AnnotationTransfer 1 relo to each Surfside, Westshore, and Rockledge HS to replace old utilizing local funds.Other=fencing & security
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $219,494 $30,000 $1,870,737 $0
Estimated Total Project Cost $2,120,231
SUNTREE ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2022 56 99 Removed NSF (2364), Added NSF (0), Difference NSF (2364), Percent (100%), Removed Stations (66), Added Stations (0) Remodeling: Removing Room T326 (788 NSF), Room T357 (788 NSF), Room T436 (788 NSF)
-2,364 -66 $30,000 $13 $0
PAGE:249 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
SUNTREE ELEMENTARY Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility SUNTREE ELEMENTARY.
114,032 0 $1,870,737 $16 $0
PAGE:250 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: SURFSIDE ELEMENTARY
Address: 475 CASSIA BOULEVARD, SATELLITE BEACH
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 439 18 457
Reloc. Stations 84 -18 66
Mod. Stations 0 0 0
Total Stations 523 0 523
Utilization Factor 100% 100%
School Capacity 523 523
COFTE Student Membership 412 410
Survey Annotation
Relocatable in excess of 20 years old to be removed and replaced with a newer one from Suntree Elem (shown as new construction).New construction includes receipt of 1 relocatable from Columbia ES. These will be moved using local funds.Other = fencing & securityAdd musicAdd multipurpose & related spacesExpand media
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $148,975 $108,000 $1,009,268 $1,534,788
Estimated Total Project Cost $2,801,031
PAGE:251 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
SURFSIDE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of MUSIC - ELEMENTARY (1000 NSF), 1 unit of REFERENCE (100 NSF), 1 unit of MATERIAL STORAGE (100 NSF), 1 unit of MUSIC PRACTICE ROOM (70 NSF)
1,540 0 $383,460 $249 $0
New Construction 2022 New Construction: Adding 1 unit of KITCHEN CHAIR STORAGE (88 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (1205 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (88 NSF)
1,381 0 $343,869 $249 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (184 NSF), 1 unit of PROFESSIONAL LIBRARY (184 NSF), 1 unit of PERIODICAL STORAGE (92 NSF), 1 unit of CLOSED CIRCUIT TV LAB (323 NSF), 1 unit of CLOSED CIRCUIT STORAGE (230 NSF), 1 unit of MEDIA COPYING ROOM (92 NSF), 1 unit of MEDIA SMALL GROUP ROOM (80 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (300 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (46 NSF)
1,531 0 $381,219 $249 $0
New Construction 2022 New Construction: Adding 1 unit of PRIMARY CLASSROOM (K-3) (788 NSF)
1,038 18 $426,240 $411 $23,680
Remodeling 2021 73 8 Removed NSF (784), Added NSF (780), Difference NSF (4), Percent (0.51%), Removed Stations (0), Added Stations (0) Remodeling: Adding 2 units of RESOURCE ROOM (390 NSF) and Removing Room 015 (784 NSF)
-784 0 $98,000 $125 $0
Remodeling 2018 73 99 Removed NSF (788), Added NSF (0), Difference NSF (788), Percent (100%), Removed Stations (18), Added Stations (0) Remodeling: Removing Room N203 (788 NSF)
-788 -18 $10,000 $13 $0
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility SURFSIDE ELEMENTARY.
54,669 0 $1,009,268 $18 $0
PAGE:252 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: THEODORE ROOSEVELT ELEMENTARY
Address: 1400 MINUTEMAN CAUSEWAY, COCOA BEACH
Existing Recommended
Capital Outlay Classification
2 - SCHOOL CONDITIONALLY RECOMMENDED FOR CONTINUED USE
2 - SCHOOL CONDITIONALLY RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 599 0 599
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 599 0 599
Utilization Factor 100% 100%
School Capacity 599 599
COFTE Student Membership 365 349
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
THEODORE ROOSEVELT ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:253 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: THOMAS JEFFERSON MIDDLE
Address: 1275 S COURTENAY PARKWAY, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use MIDDLE MIDDLE
Low Grade GRADE 7 GRADE 7
High Grade GRADE 8 GRADE 8
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 949 0 949
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 949 0 949
Utilization Factor 90% 90%
School Capacity 854 854
COFTE Student Membership 616 615
Survey Annotation Other= resurface PE track
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $200,000 $0 $200,000 $0
Estimated Total Project Cost $400,000
PAGE:254 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
THOMAS JEFFERSON MIDDLE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 63 1 Renovating: Apply HVAC Systems to Room 315 (154 NSF), Room 316 (56 NSF), Room 317 (201 NSF), Room 400 (2010 NSF), Room 400A (138 NSF), Room 400B (24 NSF), Room 400C (157 NSF), Room 400D (257 NSF), Room 400E (12 NSF), Room 401 (2015 NSF), Room 401A (138 NSF), Room 401B (24 NSF), Room 401C (171 NSF), Room 401D (262 NSF), Room 401E (12 NSF), Room 401F (582 NSF)
6,213 0 $200,000 $32 $0
PAGE:255 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: TITUSVILLE HIGH
Address: 150 TERRIER TRAIL SOUTH, TITUSVILLE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,970 0 1970
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 1,970 0 1970
Utilization Factor 95% 95%
School Capacity 1,871 1871
COFTE Student Membership 1,300 1,290
Survey Annotation Other = fencing & security & track resurfacing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $388,598 $0 $2,161,474 $0
Estimated Total Project Cost $2,550,072
TITUSVILLE HIGH Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2022 Renovating: Apply Painting, Electrical, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility TITUSVILLE HIGH.
314,607 0 $2,161,474 $7 $0
PAGE:256 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: TROPICAL ELEMENTARY
Address: 885 S COURTENAY PARKWAY, MERRITT ISLAND
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 910 0 910
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 910 0 910
Utilization Factor 100% 100%
School Capacity 910 910
COFTE Student Membership 755 670
Survey AnnotationExpand multipurpose & diningExpand mediaAdd PE Storage
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $2,020,635
Estimated Total Project Cost $2,020,635
PAGE:257 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
TROPICAL ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of DINING AREA (1432 NSF), 1 unit of KITCHEN CHAIR STORAGE (91 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (2821 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (91 NSF), 1 unit of STAGE STORAGE (455 NSF), 1 unit of STAGE DRESSING ROOM (MALE) (225 NSF), 1 unit of STAGE DRESSING ROOM (FEMALE) (225 NSF), 1 unit of CONTROL BOOTH/PROJECTION ROOM (100 NSF)
5,440 0 $1,354,560 $249 $0
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF)
315 0 $78,435 $249 $0
New Construction 2022 New Construction: Adding 1 unit of MEDIA TECHNICAL PROCESSING (364 NSF), 1 unit of PROFESSIONAL LIBRARY (364 NSF), 1 unit of AUDIO VISUAL STORAGE (267 NSF), 1 unit of PERIODICAL STORAGE (182 NSF), 1 unit of MEDIA PRODUCTION LAB (455 NSF), 1 unit of MEDIA COPYING ROOM (182 NSF), 1 unit of MEDIA GROUP PROJECTS/INSTRUCTION (455 NSF), 1 unit of MEDIA MAINTENANCE/REPAIR (91 NSF)
2,360 0 $587,640 $249 $0
PAGE:258 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: UNIVERSITY PARK ELEMENTARY
Address: 500 W UNIVERSITY BOULEVARD, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade PRE-K E S E PRE-K E S E
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 679 15 694
Reloc. Stations 132 -66 66
Mod. Stations 0 0 0
Total Stations 811 -51 760
Utilization Factor 100% 100%
School Capacity 811 760
COFTE Student Membership 565 563
Survey Annotation3 relos converted to PK ESEOther=fencing & security $77,472 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$122,740
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $355,412 $0 $1,376,714 $0
Estimated Total Project Cost $1,732,126
UNIVERSITY PARK ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2018 34 99 Removed NSF (2364), Added NSF (2364), Difference NSF (0), Percent (0%), Removed Stations (66), Added Stations (15) Remodeling: Adding 3 units of E S E PRE-K (788 NSF) and Removing Room T320 (788 NSF), Room T350 (788 NSF), Room T352 (788 NSF)
2,364 -51 $0 $0 $0
PAGE:259 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
UNIVERSITY PARK ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, Electrical, Plumbing, HVAC Systems, Retrofit for Technology to the entire facility UNIVERSITY PARK ELEMENTARY .
85,272 0 $1,376,714 $16 $0
PAGE:260 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: VIERA HIGH SCHOOL
Address: 6103 STADIUM WAY, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use SENIOR HIGH SENIOR HIGH
Low Grade GRADE 9 GRADE 9
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 2,246 0 2246
Reloc. Stations 125 0 125
Mod. Stations 0 0 0
Total Stations 2,371 0 2371
Utilization Factor 95% 95%
School Capacity 2,252 2252
COFTE Student Membership 1,791 1,999
Survey Annotation Other = fencing & security & PE track resurfacing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $1,164,480 $0 $3,657,001 $0
Estimated Total Project Cost $4,821,481
VIERA HIGH SCHOOL Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, HVAC Systems, Retrofit for Technology to the entire facility VIERA HIGH SCHOOL.
330,123 0 $3,657,001 $11 $0
PAGE:261 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: WEST MELBOURNE ELEMENTARY SCHOOL FOR SCIENCE
Address: 2255 MEADOWLANE AVENUE, WEST MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 618 0 618
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 618 0 618
Utilization Factor 100% 100%
School Capacity 618 618
COFTE Student Membership 547 526
Survey Annotation
Other=fencing & security $16,869 & Site Improvement=deferred infrastructure improvements as described in 1013.01(22)$112,632
Add multipurpose & related spacesAdd covered plan & PE storage
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $129,501 $0 $1,491,270 $1,576,917
Estimated Total Project Cost $3,197,688
PAGE:262 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
WEST MELBOURNE ELEMENTARY SCHOOL FOR SCIENCE
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of SECRETARIAL SPACE (158 NSF), 1 unit of CONFERENCE ROOM (279 NSF), 1 unit of GENERAL SCHOOL STORAGE (196 NSF), 1 unit of VAULT/STUDENT RECORDS (185 NSF), 1 unit of SCHOOL STORE (62 NSF), 1 unit of STUDENT ACTIVITIES (92 NSF), 1 unit of COMPUTER AREA (92 NSF), 1 unit of ITINERANT OFFICE (125 NSF), 1 unit of TEXTBOOK STORAGE (216 NSF)
1,405 0 $349,845 $249 $0
New Construction 2022 New Construction: Adding 1 unit of DINING AREA (224 NSF), 1 unit of KITCHEN CHAIR STORAGE (124 NSF), 1 unit of MULTIPURPOSE ROOM (DINING) (1916 NSF), 1 unit of MULTIPURPOSE ROOM CHAIR STORAGE (124 NSF)
2,388 0 $594,612 $249 $0
New Construction 2022 New Construction: Adding 1 unit of ELEMENTARY P E STORAGE (315 NSF), 1 unit of ELEMENTARY COVERED PLAY AREA (2225 NSF)
2,540 0 $632,460 $249 $0
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility WEST MELBOURNE ELEMENTARY SCHOOL FOR SCIENCE.
67,378 0 $1,491,270 $22 $0
PAGE:263 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: WEST MELBOURNE MAINT COMPOUND
Address: 2255 MEADOWLANE, WEST MELBOURNE
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
7 - ANCILLARY NOT RECOMMENDED FOR CONTINUED USE
Facility Use MAINTENANCE MAINTENANCE
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation This vacant parcel will be combined with contiguous Parcel 33 and assigned to West Melbourne Elementary School for Science (Facility #30)
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
WEST MELBOURNE MAINT COMPOUND
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:264 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: WEST SHORE JR/SR HIGH
Address: 250 WILDCAT ALLEY, MELBOURNE
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use COMBINATION COMBINATION
Low Grade GRADE 7 GRADE 7
High Grade GRADE 12 GRADE 12
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 1,232 25 1257
Reloc. Stations 172 -25 147
Mod. Stations 0 0 0
Total Stations 1,404 0 1404
Utilization Factor 90% 90%
School Capacity 1,263 1263
COFTE Student Membership 900 956
Survey Annotation
Relocatable in excess of 20 years old to be removed and replaced with newer one from Suntree Elem utilizing local funds.(shown as new construction)
Building 11, which is a 3,240 NSF building constructed in 2011, will not be renovated
Other= fencing & security & PE track resurfacing
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $485,806 $10,000 $619,328 $830,400
Estimated Total Project Cost $1,945,534
WEST SHORE JR/SR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of SENIOR HIGH CLASSROOM (9-12) (788 NSF)
888 25 $830,400 $935 $33,216
PAGE:265 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
WEST SHORE JR/SR HIGH
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Remodeling 2022 47 99 Removed NSF (683), Added NSF (0), Difference NSF (683), Percent (100%), Removed Stations (25), Added Stations (0) Remodeling: Removing Room N016 (683 NSF)
-683 -25 $10,000 $15 $0
Renovation 2018 Renovating: Apply Painting, Electrical, HVAC Systems, Retrofit for Technology to the entire facility WEST SHORE JR/SR HIGH.
135,325 0 $619,328 $5 $0
PAGE:266 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: WESTSIDE BUS COMPOUND
Address: 2175 DEGROODT SW, PALM BAY
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
Facility Use TRANSPORTATION TRANSPORTATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
WESTSIDE BUS COMPOUND
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:267 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: WESTSIDE ELEMENTARY
Address: 2175 DEGROODT ROAD SW, PALM BAY
Existing Recommended
Capital Outlay Classification
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
1 - SCHOOL RECOMMENDED FOR CONTINUED USE
Facility Use ELEMENTARY ELEMENTARY
Low Grade KINDERGARTEN KINDERGARTEN
High Grade GRADE 6 GRADE 6
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 835 18 853
Reloc. Stations 22 -22 0
Mod. Stations 0 0 0
Total Stations 857 -4 853
Utilization Factor 100% 100%
School Capacity 857 853
COFTE Student Membership 701 690
Survey AnnotationOther= fencing & securityReplace relo > 20 years old with 1 from Palm Bay Elem utilizing local funds (Shown as new construction)
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $51,749 $10,000 $1,306,466 $426,240
Estimated Total Project Cost $1,794,455
WESTSIDE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
New Construction 2022 New Construction: Adding 1 unit of PRIMARY CLASSROOM (K-3) (882 NSF)
1,132 18 $426,240 $377 $23,680
Remodeling 2022 112 99 Removed NSF (782), Added NSF (0), Difference NSF (782), Percent (100%), Removed Stations (22), Added Stations (0) Remodeling: Removing Room T108 (782 NSF)
-782 -22 $10,000 $13 $0
PAGE:268 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
WESTSIDE ELEMENTARY
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
Renovation 2018 Renovating: Apply Painting, HVAC Systems, Bell/Fire Alarm Systems, Retrofit for Technology to the entire facility WESTSIDE ELEMENTARY.
108,780 0 $1,306,466 $12 $0
PAGE:269 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
District Name: BREVARD COUNTY SCHOOL DISTRICT
Survey: Number 5 - Version 1
Facility Name: WHISPERING HILLS EDUCATION CENTER
Address: 800 LANE AVENUE, TITUSVILLE
Existing Recommended
Capital Outlay Classification
6 - ANCILLARY RECOMMENDED FOR CONTINUED USE
7 - ANCILLARY NOT RECOMMENDED FOR CONTINUED USE
Facility Use COUNTY ADMINISTRATION COUNTY ADMINISTRATION
Low Grade DISTRICT SERVICES DISTRICT SERVICES
High Grade DISTRICT SERVICES DISTRICT SERVICES
Comments
ExistingStudent Stations
Added/Reduced(+ or -) Recommended
Perm. Stations 0 0 0
Reloc. Stations 0 0 0
Mod. Stations 0 0 0
Total Stations 0 0 0
Utilization Factor 0% 0%
School Capacity 0 0
COFTE Student Membership 0 0
Survey Annotation This facility/site is no longer required for instructional or ancillary purposes and will be offered for sale.
New Site Cost Site Expansion
Site Development
Site Improvement
Remodeling Cost
Renovation Cost
New Construction
Cost
$0 $0 $0 $0 $0 $0 $0
Estimated Total Project Cost $0
WHISPERING HILLS EDUCATION CENTER
Parcel Building Description Total NSF Change In Station Count
Calculated Cost
Cost Per NSF
Cost Per Station
PAGE:270 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
DISTRICTWIDE RECOMMENDATIONS
The following recommendations are made on a districtwide basis and include each school or facility where applicable.
Correct deficiencies relating to safety to life, health, and sanitation as identified in the comprehensive Safety Inspection Report pursuant to §4.4(1), §5(1), and §5(13), SREF 2014.
1.
Necessary modifications for the physically disabled in existing buildings recommended for continued use as provided for in §255.21, F.S.
2.
Additional, or replacement of, equipment for existing school buildings recommended for continued use as provided in §2.1(9)(e), SREF 2014.
3.
Replacement of roofs at existing facilities as provided in §1.2(55) and §4.1(1)(c), SREF 2014.4.
Provide storage, custodial spaces, and sanitation facilities to serve students, staff, and the general public as provided in §6.1, SREF 2014, and §423.20, FBC.
5.
Provide paved auto parking areas pursuant to §5.2(f)10, SREF 2014, and §423.10.2.7, FBC.6.
Purchase sites for educational and ancillary facilities for future use beyond the projection period of this survey pursuant to §1.4, SREF 2014.
7.
Retrofit existing schools for technology, which may include the creation, or improvement of, cable distribution points (closets in telephone parlance). Provide “clean power” and convenient access to video, data, and voice signal wiring, the built-in equipment involved in distributing video, data, and voice signals pursuant to §5, SREF 2014. This recommendation does not include new construction, remodeling, or terminal equipment (workstations, terminals, receiving equipment, and similar items).
8.
The cost estimates for these districtwide recommendations are not included in the section on Financing the Proposed Program.
PAGE:271 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Section 4: COFTE
PAGE:272 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
ANALYSIS OF STUDENT POPULATIONS
The projection of future student population change is based on empirical evidence of historical trends in the student population; annually, the Office of Economic and Demographic Research (EDR) prepares COFTE enrollment projections. The projections do not include summer school, regular pre-kindergarten, hospital/homebound, or area vocational school adults attending basic and high school classes. The projections are most accurate in counties where growth and migration occur at a reasonably constant and predictable rate and, conversely, are least accurate if major changes in the economy and development of the county occur during the projection period.
Technique for Predicting COFTE Student Membership Trends
Even though the out-year COFTE projections used for a 5-year survey period may be less (or more) than the district anticipates, the annual recalculation of COFTE projections assures that current, accurate data can be inserted into a new survey to guarantee that the most reliable projections are used for facilities planning purposes.
PAGE:273 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Year PK-3 4-8 9-12 PK-12
2017 - 2018 19,362 24,321 19,653 63,336
HISTORY
Year PK-3 4-8 9-12 PK-12
2021 - 2022 19,809 24,167 19,998 63,974
PROJECTED
PK-3 4-8 9-12 PK-12
448 -154 345 638
ANALYSIS OF CHANGE PROJECTED
5-BREVARD COUNTY SCHOOL DISTRICTORGANIZATION:
Number 5 - Version 1SURVEY:
PAGE:274 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Section 5: Student Membership
PAGE:275 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
FACILITY NAME PK-3 Memb. Proj.
4-8 Memb. Proj.
9-12 Memb. Proj.
PK-3 Memb. In
4-8 Memb. In
9-12 Memb. In
PK-3 Memb. Out
4-8 Memb. Out
9-12 Memb. Out
PK-3 Memb. Reco.
4-8 Memb. Reco.
9-12 Memb. Reco.
Total COFTE
Exist. Satis. Stud. Stat.
Pos. Remo. Sta.
Neg. Remo. Sta.
New Const. Sta.
Total Sta.
Util. Factor
Reco. Capac.
Year- Round Capac.
Elementary
APOLLO ELEMENTARY
440 320 0 0 0 0 0 0 0 440 320 0 760 902 0 0 0 902 1.00 902 1,082
ATLANTIS ELEMENTARY
280 226 0 0 0 0 0 0 0 280 226 0 506 703 0 -34 44 713 1.00 713 855
AUDUBON ELEMENTARY
325 269 0 0 0 0 0 0 0 325 269 0 594 761 0 -39 0 722 1.00 722 866
CAMBRIDGE ELEMENTARY MAGNET
335 218 0 0 0 0 0 0 0 335 218 0 553 765 0 -101 59 723 1.00 723 867
CAPE VIEW ELEMENTARY
225 145 0 0 0 0 0 0 0 225 145 0 370 548 0 -17 0 531 1.00 531 637
CHALLENGER 7 ELEMENTARY
255 198 0 0 0 0 0 0 0 255 198 0 453 573 0 0 0 573 1.00 573 687
CHRISTA MCAULIFFE ELEMENTARY
427 430 0 0 0 0 74 59 0 353 371 0 724 918 0 -105 0 813 1.00 813 975
COLUMBIA ELEMENTARY
435 340 0 0 0 0 74 59 0 361 281 0 642 751 0 -87 0 664 1.00 664 796
COQUINA ELEMENTARY
280 195 0 23 0 0 0 0 0 303 195 0 498 693 0 0 0 693 1.00 693 831
CROTON ELEMENTARY
370 268 0 0 0 0 0 0 0 370 268 0 638 795 0 0 0 795 1.00 795 954
DISCOVERY ELEMENTARY
474 406 0 0 0 0 74 58 0 400 348 0 748 980 0 -188 0 792 1.00 792 950
DR W J CREEL ELEMENTARY
542 342 0 0 0 0 0 0 0 542 342 0 884 1,154 0 -100 0 1,054 1.00 1,054 1,264
ENDEAVOUR ELEMENTARY MAGNET
480 236 0 0 0 0 0 0 0 480 236 0 716 990 0 -123 0 867 1.00 867 1,040
ENTERPRISE ELEMENTARY
199 150 0 0 0 0 0 0 0 199 150 0 349 729 0 0 0 729 1.00 729 874
FAIRGLEN ELEMENTARY
330 255 0 0 0 0 0 0 0 330 255 0 585 753 0 0 36 789 1.00 789 946
FREEDOM 7 ELEMENTARY SCHOOL OF INT
205 177 0 0 0 0 0 0 0 205 177 0 382 475 0 0 0 475 1.00 475 570
GEMINI ELEMENTARY
200 220 0 0 0 0 0 0 0 200 220 0 420 711 0 0 0 711 1.00 711 853
GOLFVIEW ELEMENTARY MAGNET
280 256 0 0 0 0 0 0 0 280 256 0 536 777 0 -59 0 718 1.00 718 861
HANS CHRISTIAN ANDERSEN ELE
412 293 0 0 0 0 0 0 0 412 293 0 705 884 0 -44 36 876 1.00 876 1,051
HARBOR CITY ELEMENTARY
232 157 0 0 0 0 0 0 0 232 157 0 389 629 0 -144 90 575 1.00 575 690
IMPERIAL ESTATES ELEMENTARY
335 205 0 0 0 0 0 0 0 335 205 0 540 729 0 0 0 729 1.00 729 874
INDIALANTIC ELEMENTARY
350 320 0 0 0 0 0 0 0 350 320 0 670 798 0 0 0 798 1.00 798 957
JOHN F TURNER SR ELEMENTARY
345 325 0 0 0 0 0 0 0 345 325 0 670 874 0 -34 0 840 1.00 840 1,008
JUPITER ELEMENTARY
522 367 0 0 0 0 74 59 0 448 308 0 756 930 0 -150 20 800 1.00 800 960
LEWIS CARROLL ELEMENTARY
320 260 0 0 0 0 0 0 0 320 260 0 580 751 0 0 0 751 1.00 751 901
LOCKMAR ELEMENTARY
526 408 0 0 0 0 74 59 0 452 349 0 801 892 0 -47 0 845 1.00 845 1,014
LONGLEAF ELEMENTARY
559 329 0 0 0 0 89 70 0 470 259 0 729 790 0 -17 0 773 1.00 773 927
MANATEE ELEMENTARY
564 417 0 0 0 0 89 70 0 475 347 0 822 954 0 -88 0 866 1.00 866 1,039
MEADOWLANE INTERMEDIATE ELEMENTARY
168 741 0 0 0 0 0 59 0 168 682 0 850 1,114 0 -220 0 894 1.00 894 1,072
MEADOWLANE PRIMARY ELEMENTARY
854 0 0 0 0 0 74 0 0 780 0 0 780 824 0 0 0 824 1.00 824 988
MILA ELEMENTARY
280 177 0 0 0 0 0 0 0 280 177 0 457 707 0 -47 0 660 1.00 660 792
PAGE:276 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
FACILITY NAME PK-3 Memb. Proj.
4-8 Memb. Proj.
9-12 Memb. Proj.
PK-3 Memb. In
4-8 Memb. In
9-12 Memb. In
PK-3 Memb. Out
4-8 Memb. Out
9-12 Memb. Out
PK-3 Memb. Reco.
4-8 Memb. Reco.
9-12 Memb. Reco.
Total COFTE
Exist. Satis. Stud. Stat.
Pos. Remo. Sta.
Neg. Remo. Sta.
New Const. Sta.
Total Sta.
Util. Factor
Reco. Capac.
Year- Round Capac.
Elementary
MIMS ELEMENTARY
220 201 0 0 0 0 0 0 0 220 201 0 421 725 0 -30 0 695 1.00 695 834
New Central Elementary School
0 0 0 445 351 0 0 0 0 445 351 0 796 0 0 0 840 840 1.00 840 1,008
New South Elementary School
0 0 0 445 351 0 0 0 0 445 351 0 796 0 0 0 840 840 1.00 840 1,008
OAK PARK ELEMENTARY
431 240 0 0 0 0 0 0 0 431 240 0 671 950 0 -64 0 886 1.00 886 1,063
OCEAN BREEZE ELEMENTARY
300 218 0 0 0 0 0 0 0 300 218 0 518 654 0 -18 18 654 1.00 654 784
PALM BAY ELEMENTARY
456 278 0 0 0 0 0 0 0 456 278 0 734 1,005 0 -227 0 778 1.00 778 933
PINEWOOD ELEMENTARY
253 163 0 0 0 0 0 0 0 253 163 0 416 551 0 0 18 569 1.00 569 682
PORT MALABAR ELEMENTARY
431 277 0 0 0 0 0 0 0 431 277 0 708 852 0 -18 18 852 1.00 852 1,022
QUEST ELEMENTARY
553 402 0 0 0 0 89 70 0 464 332 0 796 950 0 -113 0 837 1.00 837 1,004
RALPH M WILLIAMS JR ELEMENTARY
344 215 0 0 0 0 0 0 0 344 215 0 559 715 0 -88 40 667 1.00 667 800
RIVERVIEW SCHOOL
23 0 0 0 0 0 23 0 0 0 0 0 0 547 0 0 0 547 1.00 547 656
RIVIERA ELEMENTARY
361 238 0 0 0 0 0 0 0 361 238 0 599 777 0 -78 10 709 1.00 709 850
ROBERT LOUIS STEVENSON ELEMENTARY S
230 205 0 0 0 0 0 0 0 230 205 0 435 569 0 0 0 569 1.00 569 682
ROY ALLEN ELEMENTARY
328 226 0 0 0 0 0 0 0 328 226 0 554 751 0 0 0 751 1.00 751 901
SABAL ELEMENTARY
309 232 0 0 0 0 0 0 0 309 232 0 541 785 0 -91 36 730 1.00 730 876
SATURN ELEMENTARY
398 287 0 0 0 0 0 0 0 398 287 0 685 976 0 -86 18 908 1.00 908 1,089
SEA PARK ELEMENTARY
160 141 0 0 0 0 0 0 0 160 141 0 301 461 0 -17 0 444 1.00 444 532
SHERWOOD ELEMENTARY
485 240 0 0 0 0 90 70 0 395 170 0 565 609 0 0 0 609 1.00 609 730
SOUTH AREA HEAD START
12 0 0 0 0 0 0 0 0 12 0 0 12 36 0 0 0 36 1.00 36 43
SOUTH LAKE EDUCATION CENTER
79 46 0 0 0 0 0 0 0 79 46 0 125 529 0 0 0 529 1.00 529 634
SPESSARD L HOLLAND ELEMENTARY
231 174 0 0 0 0 0 0 0 231 174 0 405 605 0 -17 0 588 1.00 588 705
SUNRISE ELEMENTARY
410 352 0 0 0 0 0 0 0 410 352 0 762 895 0 -47 15 863 1.00 863 1,035
SUNTREE ELEMENTARY
447 357 0 0 0 0 89 69 0 358 288 0 646 755 0 -66 0 689 1.00 689 826
SURFSIDE ELEMENTARY
240 170 0 0 0 0 0 0 0 240 170 0 410 523 0 -18 18 523 1.00 523 627
THEODORE ROOSEVELT ELEMENTARY
200 149 0 0 0 0 0 0 0 200 149 0 349 599 0 0 0 599 1.00 599 718
TROPICAL ELEMENTARY
380 290 0 0 0 0 0 0 0 380 290 0 670 910 0 0 0 910 1.00 910 1,092
UNIVERSITY PARK ELEMENTARY
341 222 0 0 0 0 0 0 0 341 222 0 563 811 0 -51 0 760 1.00 760 912
WEST MELBOURNE ELEMENTARY S
265 261 0 0 0 0 0 0 0 265 261 0 526 618 0 0 0 618 1.00 618 741
WESTSIDE ELEMENTARY
373 317 0 0 0 0 0 0 0 373 317 0 690 857 0 -22 18 853 1.00 853 1,023
PAGE:277 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
FACILITY NAME PK-3 Memb. Proj.
4-8 Memb. Proj.
9-12 Memb. Proj.
PK-3 Memb. In
4-8 Memb. In
9-12 Memb. In
PK-3 Memb. Out
4-8 Memb. Out
9-12 Memb. Out
PK-3 Memb. Reco.
4-8 Memb. Reco.
9-12 Memb. Reco.
Total COFTE
Exist. Satis. Stud. Stat.
Pos. Remo. Sta.
Neg. Remo. Sta.
New Const. Sta.
Total Sta.
Util. Factor
Reco. Capac.
Year- Round Capac.
Middle & Junior High
ANDREW JACKSON MIDDLE
0 581 0 0 0 0 0 0 0 0 581 0 581 727 0 0 0 727 0.90 654 872
CENTRAL MIDDLE
0 1,198 0 0 0 0 0 0 0 0 1,198 0 1,198 1,694 0 0 0 1,694 0.90 1,524 2,032
DELAURA MIDDLE
0 673 0 0 0 0 0 0 0 0 673 0 673 1,046 0 0 0 1,046 0.90 941 1,255
HERBERT C HOOVER MIDDLE
0 504 0 0 0 0 0 0 0 0 504 0 504 732 0 0 0 732 0.90 658 878
JAMES MADISON MIDDLE
0 436 0 0 0 0 0 0 0 0 436 0 436 825 0 0 0 825 0.90 742 990
JOHN F KENNEDY MIDDLE
0 579 0 0 0 0 0 0 0 0 579 0 579 903 0 -66 66 903 0.90 812 1,083
LYNDON B JOHNSON MIDDLE
0 776 0 0 0 0 0 0 0 0 776 0 776 1,111 0 0 0 1,111 0.90 999 1,333
RONALD MCNAIR MIDDLE
0 444 0 0 0 0 0 0 0 0 444 0 444 679 0 0 0 679 0.90 611 814
SOUTHWEST MIDDLE
0 869 0 0 0 0 0 0 0 0 869 0 869 1,308 0 0 0 1,308 0.90 1,177 1,569
STONE MAGNET MIDDLE
0 822 0 0 0 0 0 0 0 0 822 0 822 1,126 0 0 0 1,126 0.90 1,013 1,351
THOMAS JEFFERSON MIDDLE
0 615 0 0 0 0 0 0 0 0 615 0 615 949 0 0 0 949 0.90 854 1,138
Senior High
ASTRONAUT SENIOR HIGH
0 0 1,014 0 0 0 0 0 0 0 0 1,014 1,014 1,522 0 0 0 1,522 0.95 1,445 1,826
BAYSIDE SENIOR HIGH
0 0 1,596 0 0 0 0 0 0 0 0 1,596 1,596 2,353 0 0 0 2,353 0.95 2,235 2,823
EAU GALLIE SENIOR HIGH
0 0 1,562 0 0 0 0 0 0 0 0 1,562 1,562 2,300 0 0 45 2,345 0.95 2,227 2,814
HERITAGE HIGH 0 0 1,746 0 0 0 0 0 0 0 0 1,746 1,746 2,436 0 0 0 2,436 0.95 2,314 2,923
MELBOURNE SENIOR HIGH
0 0 2,079 0 0 0 0 0 0 0 0 2,079 2,079 2,439 0 0 22 2,461 0.95 2,337 2,953
MERRITT ISLAND SENIOR HIGH
0 0 1,397 0 0 0 0 0 0 0 0 1,397 1,397 2,015 0 0 0 2,015 0.95 1,914 2,418
PALM BAY MAGNET SENIOR HIGH
0 0 1,273 0 0 0 0 0 0 0 0 1,273 1,273 2,751 0 0 0 2,751 0.95 2,613 3,301
ROCKLEDGE SENIOR HIGH
0 0 1,329 0 0 0 0 0 0 0 0 1,329 1,329 1,778 0 -75 47 1,750 0.95 1,662 2,100
SATELLITE SENIOR HIGH
0 0 1,201 0 0 0 0 0 0 0 0 1,201 1,201 1,595 0 0 0 1,595 0.95 1,515 1,914
TITUSVILLE HIGH
0 0 1,290 0 0 0 0 0 0 0 0 1,290 1,290 1,970 0 0 0 1,970 0.95 1,871 2,364
VIERA HIGH SCHOOL
0 0 1,999 0 0 0 0 0 0 0 0 1,999 1,999 2,371 0 0 0 2,371 0.95 2,252 2,845
Combination
COCOA BEACH JR/SR HIGH
0 352 722 0 0 0 0 0 0 0 352 722 1,074 1,628 0 -25 0 1,603 0.90 1,442 1,923
COCOA JR/SR HIGH
0 621 724 0 0 0 0 0 0 0 621 724 1,345 1,980 0 -57 285 2,208 0.90 1,987 2,649
EDGEWOOD JR/ SR HIGH
0 347 520 0 0 0 0 0 0 0 347 520 867 1,191 0 0 0 1,191 0.90 1,071 1,429
SPACE COAST JR/ SR HIGH
0 467 884 0 0 0 0 0 0 0 467 884 1,351 2,013 0 0 0 2,013 0.90 1,811 2,415
PAGE:278 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
FACILITY NAME PK-3 Memb. Proj.
4-8 Memb. Proj.
9-12 Memb. Proj.
PK-3 Memb. In
4-8 Memb. In
9-12 Memb. In
PK-3 Memb. Out
4-8 Memb. Out
9-12 Memb. Out
PK-3 Memb. Reco.
4-8 Memb. Reco.
9-12 Memb. Reco.
Total COFTE
Exist. Satis. Stud. Stat.
Pos. Remo. Sta.
Neg. Remo. Sta.
New Const. Sta.
Total Sta.
Util. Factor
Reco. Capac.
Year- Round Capac.
Combination
WEST SHORE JR/SR HIGH
0 319 637 0 0 0 0 0 0 0 319 637 956 1,404 0 -25 25 1,404 0.90 1,263 1,684
ESE/Alternative
GARDENDALE EDUCATION CENTER
0 10 15 0 0 0 0 0 0 0 10 15 25 681 0 0 0 681 1.00 681 817
SOUTH PINE GROVE SCHOOL
0 3 9 0 0 0 0 0 0 0 3 9 12 92 0 0 0 92 1.00 92 110
Vocational/Adult
CLEARLAKE EDUCATION CENTER
0 0 0 0 0 0 0 0 0 0 0 0 0 747 0 0 0 747 1.50 1,120 1,120
Ancillary
520 BUS COMPOUND
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
BEACHSIDE OFFICE
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
CUYLER SCHOOL
0 0 0 0 0 0 0 0 0 0 0 0 0 98 0 0 0 98 0.00 0 0
EDUCATIONAL SERVICES FACILITY
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
GIBSON PARK 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
MANATEE BUS COMPOUND
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
MCLARTY STADIUM
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
MELBOURNE BUS COMPOUND
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
MID-SOUTH AREA SUPPORT SERVICES
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
NORTH AREA TRANSPORTATION SERVICES
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
OLD CREEL BUS COMPOUND
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
PLANT OPERATIONS AND MAINTENAN
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
SATELLITE BUS COMPOUND
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
WEST MELBOURNE MAINT COMPOU
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
WESTSIDE BUS COMPOUND
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
WHISPERING HILLS EDUCATION CEN
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0
19,809 24,167 19,997 913 702 0 913 702 0 19,809 24,167 19,997 63,973 88,333 0 -2,943 2,664 88,054 85,185 105,734
out of out of out of
19,809 24,167 19,997
PAGE:279 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Section 6: Financial Summary
PAGE:280 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Facility Site Expansion Cost
Total Site Development Cost
Total Site Improvement Cost
Total Remodeling Cost
Total Renovation Cost
Total New Construction Cost
Overall Totals
Estimated Cost If Year Round School
Elementary
APOLLO ELEMENTARY $0 $0 $116,404 $1,069,000 $6,506,785 $2,660,814 $10,353,003 $2,128,651
ATLANTIS ELEMENTARY $0 $0 $182,921 $278,375 $9,398,007 $1,041,920 $10,901,223 $833,536
AUDUBON ELEMENTARY $0 $0 $21,865 $283,125 $500,000 $2,649,360 $3,454,350 $2,119,488
CAMBRIDGE ELEMENTARY MAGNET
$0 $0 $224,461 $40,000 $341,424 $3,548,729 $4,154,614 $2,838,983
CAPE VIEW ELEMENTARY $0 $0 $0 $97,500 $0 $554,523 $652,023 $443,618
CHALLENGER 7 ELEMENTARY
$0 $0 $97,722 $0 $541,079 $0 $638,801
CHRISTA MCAULIFFE ELEMENTARY
$0 $0 $214,547 $40,000 $0 $1,675,521 $1,930,068 $1,340,417
COLUMBIA ELEMENTARY $0 $0 $199,460 $20,000 $263,582 $0 $483,042
COQUINA ELEMENTARY $0 $0 $87,361 $0 $1,703,351 $869,010 $2,659,722 $695,208
CROTON ELEMENTARY $0 $0 $288,841 $0 $1,735,156 $0 $2,023,997
DISCOVERY ELEMENTARY $0 $0 $812,000 $90,000 $0 $0 $902,000
DR W J CREEL ELEMENTARY
$0 $0 $396,555 $0 $1,794,654 $734,799 $2,926,008 $587,839
ENDEAVOUR ELEMENTARY MAGNET
$0 $0 $205,480 $609,875 $980,031 $2,378,448 $4,173,834 $1,902,758
ENTERPRISE ELEMENTARY
$0 $0 $105,196 $0 $703,379 $536,844 $1,345,419 $429,475
FAIRGLEN ELEMENTARY $0 $0 $30,168 $0 $3,219,486 $852,480 $4,102,134 $681,984
FREEDOM 7 ELEMENTARY SCHOOL OF INTERNATION
$0 $0 $134,341 $0 $197,581 $1,004,217 $1,336,139 $803,374
GEMINI ELEMENTARY $0 $0 $180,830 $0 $746,847 $0 $927,677
GOLFVIEW ELEMENTARY MAGNET
$0 $0 $200,055 $0 $747,650 $1,211,883 $2,159,588 $969,506
HANS CHRISTIAN ANDERSEN ELEMENTARY
$0 $0 $182,389 $20,000 $364,996 $852,480 $1,419,865 $681,984
HARBOR CITY ELEMENTARY
$0 $0 $153,721 $60,000 $961,558 $2,131,200 $3,306,479 $1,704,960
IMPERIAL ESTATES ELEMENTARY
$150,000 $0 $58,965 $0 $1,135,512 $645,408 $1,989,885 $516,326
INDIALANTIC ELEMENTARY
$0 $0 $236,637 $0 $1,111,302 $662,340 $2,010,279 $529,872
JOHN F TURNER SR ELEMENTARY
$0 $0 $146,508 $0 $1,570,958 $1,255,956 $2,973,422 $1,004,765
JUPITER ELEMENTARY $0 $0 $216,724 $70,000 $772,617 $473,600 $1,532,941 $378,880
LEWIS CARROLL ELEMENTARY
$0 $0 $37,607 $0 $1,948,922 $602,082 $2,588,611 $481,666
LOCKMAR ELEMENTARY $0 $0 $50,557 $0 $0 $1,684,734 $1,735,291 $1,347,787
LONGLEAF ELEMENTARY $0 $0 $29,980 $0 $8,785,218 $0 $8,815,198
MANATEE ELEMENTARY $0 $0 $165,075 $40,000 $943,731 $0 $1,148,806
MEADOWLANE INTERMEDIATE ELEMENTA
$0 $0 $279,661 $120,000 $1,621,937 $0 $2,021,598
MEADOWLANE PRIMARY ELEMENTARY
$0 $0 $36,195 $0 $2,688,242 $0 $2,724,437
MILA ELEMENTARY $0 $0 $1,514,776 $239,625 $1,514,776 $1,653,858 $4,923,035 $1,323,086
MIMS ELEMENTARY $0 $0 $101,954 $0 $505,510 $0 $607,464
PAGE:281 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Facility Site Expansion Cost
Total Site Development Cost
Total Site Improvement Cost
Total Remodeling Cost
Total Renovation Cost
Total New Construction Cost
Overall Totals
Estimated Cost If Year Round School
Elementary
New Central Elementary School
$0 $0 $0 $0 $0 $19,680,360 $19,680,360 $15,744,288
New South Elementary School
$0 $0 $0 $0 $0 $19,680,360 $19,680,360 $15,744,288
OAK PARK ELEMENTARY $0 $0 $0 $0 $772,617 $1,991,502 $2,764,119 $1,593,202
OCEAN BREEZE ELEMENTARY
$0 $0 $168,053 $10,000 $0 $426,240 $604,293 $340,992
PALM BAY ELEMENTARY $0 $0 $326,607 $90,000 $0 $821,451 $1,238,058 $657,161
PINEWOOD ELEMENTARY $0 $0 $60,000 $0 $1,283,100 $426,240 $1,769,340 $340,992
PORT MALABAR ELEMENTARY
$0 $0 $118,418 $10,000 $1,837,561 $1,610,982 $3,576,961 $1,288,786
QUEST ELEMENTARY $0 $0 $227,871 $417,500 $932,480 $0 $1,577,851
RALPH M WILLIAMS JR ELEMENTARY
$0 $0 $417,165 $40,000 $1,980,982 $1,438,228 $3,876,375 $1,150,582
RIVERVIEW SCHOOL $0 $0 $0 $0 $0 $0 $0
RIVIERA ELEMENTARY $0 $0 $76,354 $20,000 $574,202 $1,617,256 $2,287,812 $1,293,805
ROBERT LOUIS STEVENSON ELEMENTAR
$0 $0 $107,555 $0 $1,093,674 $0 $1,201,229
ROY ALLEN ELEMENTARY $0 $0 $145,051 $0 $1,001,710 $0 $1,146,761
SABAL ELEMENTARY $0 $0 $758,300 $20,000 $2,306,612 $1,953,807 $5,038,719 $1,563,046
SATURN ELEMENTARY $0 $0 $75,639 $10,000 $4,461,043 $1,359,492 $5,906,174 $1,087,594
SEA PARK ELEMENTARY $0 $0 $0 $0 $0 $0 $0
SHERWOOD ELEMENTARY $0 $0 $21,889 $0 $2,161,952 $688,485 $2,872,326 $550,788
SOUTH AREA HEAD START $0 $0 $0 $0 $115,315 $0 $115,315
SOUTH LAKE EDUCATION CENTER
$0 $0 $0 $0 $1,716,159 $0 $1,716,159
SPESSARD L HOLLAND ELEMENTARY
$0 $0 $274,450 $0 $3,686,790 $473,100 $4,434,340 $378,480
SUNRISE ELEMENTARY $0 $0 $27,917 $292,750 $763,062 $355,200 $1,438,929 $284,160
SUNTREE ELEMENTARY $0 $0 $219,494 $30,000 $1,870,737 $0 $2,120,231
SURFSIDE ELEMENTARY $0 $0 $148,975 $108,000 $1,009,268 $1,534,788 $2,801,031 $1,227,830
THEODORE ROOSEVELT ELEMENTARY
$0 $0 $0 $0 $0 $0 $0
TROPICAL ELEMENTARY $0 $0 $0 $0 $0 $2,020,635 $2,020,635 $1,616,508
UNIVERSITY PARK ELEMENTARY
$0 $0 $355,412 $0 $1,376,714 $0 $1,732,126
WEST MELBOURNE ELEMENTARY SCHOOL FO
$0 $0 $129,501 $0 $1,491,270 $1,576,917 $3,197,688 $1,261,534
WESTSIDE ELEMENTARY $0 $0 $51,749 $10,000 $1,306,466 $426,240 $1,794,455 $340,992
Middle & Junior High
ANDREW JACKSON MIDDLE
$0 $0 $276,501 $0 $3,553,259 $0 $3,829,760
CENTRAL MIDDLE $0 $0 $56,797 $0 $1,659,024 $0 $1,715,821
PAGE:282 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Facility Site Expansion Cost
Total Site Development Cost
Total Site Improvement Cost
Total Remodeling Cost
Total Renovation Cost
Total New Construction Cost
Overall Totals
Estimated Cost If Year Round School
Middle & Junior High
DELAURA MIDDLE $0 $0 $405,981 $0 $3,206,623 $0 $3,612,604
HERBERT C HOOVER MIDDLE
$0 $0 $285,625 $0 $804,230 $766,314 $1,856,169 $613,051
JAMES MADISON MIDDLE $0 $0 $41,044 $0 $1,634,430 $1,249,452 $2,924,926 $999,562
JOHN F KENNEDY MIDDLE $0 $0 $619,371 $30,000 $2,922,819 $2,288,880 $5,861,070 $1,831,104
LYNDON B JOHNSON MIDDLE
$0 $0 $522,013 $0 $3,844,225 $2,243,466 $6,609,704 $1,794,773
RONALD MCNAIR MIDDLE $0 $0 $264,056 $0 $710,034 $246,951 $1,221,041 $197,561
SOUTHWEST MIDDLE $0 $0 $252,353 $0 $3,778,817 $0 $4,031,170
STONE MAGNET MIDDLE $0 $0 $274,853 $0 $6,048,260 $691,794 $7,014,907 $553,435
THOMAS JEFFERSON MIDDLE
$0 $0 $200,000 $0 $200,000 $0 $400,000
Senior High
ASTRONAUT SENIOR HIGH
$0 $0 $261,932 $0 $1,375,112 $0 $1,637,044
BAYSIDE SENIOR HIGH $0 $0 $1,325,860 $0 $2,479,609 $0 $3,805,469
EAU GALLIE SENIOR HIGH $0 $0 $282,083 $20,000 $2,060,036 $2,436,518 $4,798,637 $1,949,214
HERITAGE HIGH $0 $0 $293,029 $0 $572,284 $0 $865,313
MELBOURNE SENIOR HIGH
$0 $0 $288,999 $0 $8,804,983 $730,752 $9,824,734 $584,602
MERRITT ISLAND SENIOR HIGH
$0 $0 $1,866,455 $0 $1,841,538 $0 $3,707,993
PALM BAY MAGNET SENIOR HIGH
$0 $0 $442,503 $0 $1,585,244 $0 $2,027,747
ROCKLEDGE SENIOR HIGH
$0 $0 $720,191 $30,000 $5,228,762 $1,561,152 $7,540,105 $1,248,922
SATELLITE SENIOR HIGH $0 $0 $713,013 $0 $965,990 $0 $1,679,003
TITUSVILLE HIGH $0 $0 $388,598 $0 $2,161,474 $0 $2,550,072
VIERA HIGH SCHOOL $0 $0 $1,164,480 $0 $3,657,001 $0 $4,821,481
Combination
COCOA BEACH JR/SR HIGH
$0 $0 $609,666 $20,000 $1,651,130 $0 $2,280,796
COCOA JR/SR HIGH $0 $0 $690,299 $1,424,525 $22,637,062 $9,365,955 $34,117,841 $7,492,764
EDGEWOOD JR/ SR HIGH $0 $0 $369,818 $0 $14,189,105 $0 $14,558,923
SPACE COAST JR/ SR HIGH
$0 $0 $325,513 $60,000 $1,807,252 $0 $2,192,765
WEST SHORE JR/SR HIGH $0 $0 $485,806 $10,000 $619,328 $830,400 $1,945,534 $664,320
PAGE:283 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Facility Site Expansion Cost
Total Site Development Cost
Total Site Improvement Cost
Total Remodeling Cost
Total Renovation Cost
Total New Construction Cost
Overall Totals
Estimated Cost If Year Round School
ESE/Alternative
GARDENDALE EDUCATION CENTER
$0 $0 $0 $0 $0 $0 $0
SOUTH PINE GROVE SCHOOL
$0 $0 $0 $0 $290,571 $0 $290,571
Vocational/Adult
CLEARLAKE EDUCATION CENTER
$0 $0 $31,165 $0 $1,398,252 $0 $1,429,417
Ancillary
520 BUS COMPOUND $0 $0 $0 $0 $1,082,676 $0 $1,082,676
BEACHSIDE OFFICE $0 $0 $0 $0 $0 $0 $0
CUYLER SCHOOL $0 $0 $0 $0 $0 $0 $0
EDUCATIONAL SERVICES FACILITY
$0 $0 $0 $0 $1,723,069 $0 $1,723,069
GIBSON PARK $0 $0 $0 $0 $0 $0 $0
MANATEE BUS COMPOUND
$0 $0 $0 $0 $187,658 $0 $187,658
MCLARTY STADIUM $0 $0 $0 $0 $0 $0 $0
MELBOURNE BUS COMPOUND
$0 $0 $0 $0 $17,994 $0 $17,994
MID-SOUTH AREA SUPPORT SERVICES
$0 $0 $140,790 $0 $416,820 $0 $557,610
NORTH AREA TRANSPORTATION SERVI
$0 $0 $0 $0 $456,837 $0 $456,837
OLD CREEL BUS COMPOUND
$0 $0 $0 $0 $0 $0 $0
PLANT OPERATIONS AND MAINTENANCE
$0 $0 $0 $0 $911,014 $0 $911,014
SATELLITE BUS COMPOUND
$0 $0 $79,420 $0 $380,736 $0 $460,156
WEST MELBOURNE MAINT COMPOUND
$0 $0 $0 $0 $0 $0 $0
WESTSIDE BUS COMPOUND
$0 $0 $0 $0 $0 $0 $0
WHISPERING HILLS EDUCATION CENTER
$0 $0 $0 $0 $0 $0 $0
Total $150,000 $0 $24,097,570 $5,730,275 $191,909,263 $110,173,123 $332,060,231 $88,138,498
PAGE:284 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
PAGE:285 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
Section 7: Long Range Planning Summary
PAGE:286 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
No items meet the criteria.
Five Year Survey - Ten Year Capacity
11/27/2017
BREVARD COUNTY SCHOOL DISTRICT
Schedule of capital outlay projects projected to ensure the availability of satisfactory student stations for the projected student enrollment in K - 12 programs for the future 5 years beyond the 5-year district facilities work program.
Proposed Location of Planned New, Remodeled, or New Additions to Facilities in 6 thru 10 out years (Section 28).
Five Year Survey - Ten Year Infrastructure
11/27/2017
BREVARD COUNTY SCHOOL DISTRICT
Plans for closure of any school, including plans for disposition of the facility or usage of facility space, and anticipated revenues in the 6 thru 10 out years (Section 29).
Not Specified
Not Specified
PAGE:287 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
No items match the criteria.
Five Year Survey - Ten Year Maintenance
11/27/2017
BREVARD COUNTY SCHOOL DISTRICT
District projects and locations regarding the projected need for major renovation, repair, and maintenance projects within the district in years 6 - 10 beyond the projects plans detailed in the five years covered by the work plan.
Grade Level Projections
FISH Student Stations
Actual FISH Capacity
Actual COFTE
Actual Utilization
Actual new Student
Capacity to be added/removed
Projected COFTE
Projected Utilization
Elementary - District Totals
43,788 43,788 33,719.07 77.01 % 0 0 0.00 %
Middle - District Totals
19,586 17,621 12,922.33 73.33 % 0 0 0.00 %
High - District Totals
24,821 23,576 16,032.34 68.00 % 0 0 0.00 %
Other - ESE, etc 2,183 0 0.00 #Error 0 0 #Error
90,378 84,985 62,673.74 73.75 % 0 0 0.00 %
Five Year Survey - Ten Year Utilization
11/27/2017
BREVARD COUNTY SCHOOL DISTRICT
Schedule of planned capital outlay projects identifying the standard grade groupings, capacities, and planned utilization rates of future educational facilities of the district for both permanent and relocatable facilities.
No comments to report.
Combination schools are included with the middle schools for student stations, capacity, COFTE and utilization purposes because these facilities all have a 90% utilization factor. Use this space to explain or define the grade groupings for combination schools.
PAGE:288 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
No items match the criteria.
Five Year Survey - Twenty Year Capacity
11/27/2017
BREVARD COUNTY SCHOOL DISTRICT
Schedule of capital outlay projects projected to ensure the availability of satisfactory student stations for the projected student enrollment in K - 12 programs for the future 11 - 20 years beyond the 5-year district facilities work program.
Proposed Location of Planned New, Remodeled, or New Additions to Facilities in the 11 through 20 out years (Section 28).
Five Year Survey - Twenty Year Infrastructure
11/27/2017
BREVARD COUNTY SCHOOL DISTRICT
Plans for closure of any school, including plans for disposition of the facility or usage of facility space, and anticipated revenues in the 11 through 20 out years (Section 29).
Not Specified
Not Specified
PAGE:289 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT
No items match the criteria.
Five Year Survey - Twenty Year Maintenance
11/27/2017
BREVARD COUNTY SCHOOL DISTRICT
District projects and locations regarding the projected need for major renovation, repair, and maintenance projects within the district in years 11 - 20 beyond the projects plans detailed in the five years covered by the work plan.
Grade Level Projections
FISH Student Stations
Actual FISH Capacity
Actual COFTE
Actual Utilization
Actual new Student
Capacity to be added/removed
Projected COFTE
Projected Utilization
Elementary - District Totals
43,788 43,788 33,719.07 77.01 % 0 0 0.00 %
Middle - District Totals
19,586 17,621 12,922.33 73.33 % 0 0 0.00 %
High - District Totals
24,821 23,576 16,032.34 68.00 % 0 0 0.00 %
Other - ESE, etc 2,183 0 0.00 #Error 0 0 #Error
90,378 84,985 62,673.74 73.75 % 0 0 0.00 %
Five Year Survey - Twenty Year Utilization
11/27/2017
BREVARD COUNTY SCHOOL DISTRICT
Schedule of planned capital outlay projects identifying the standard grade groupings, capacities, and planned utilization rates of future educational facilities of the district for both permanent and relocatable facilities.
Combination schools are included with the middle schools for student stations, capacity, COFTE and utilization purposes because these facilities all have a 90% utilization factor. Use this space to explain or define the grade groupings for combination schools.
No comments to report.
PAGE:290 of 290 Report Date: 11/27/2017 6:01:31 AM
EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT
Status:
Active Pending
Survey:
Survey: 5 - Version: 1
District:
5-BREVARD COUNTY SCHOOL DISTRICT