I. PROFILE: 1. Name : EFRIZON 2. Place, date of birth : Padang, September 09 th , 1975 3. Sex : Male 4. Religion : Islam 5. Passport : B 2783247, Issue date: 28 Dec 2015, Expire date: 28 Dec 2020. 6. Address : Pisangan Baru II, RT. 04/08, No. 27 Matraman, Jakarta Timur 12110. 7. Citizenship : Indonesian 8. Marrital Status : Married, 2 (two) Children. 9. Phone : +62 81380340688 / +62 81210365958 10. e-mail : [email protected] II. EDUCATION : 1. University : Sekolah Tinggi Teknologi Nasional Jogjakarta, Mechanical Engineering Faculty, Graduate 2001 2. Senior Middle School : STM Negeri Serang – Banten, Graduate 1994 3. Junior Middle School : SMP Negeri Pulo Merak – Banten, Graduate 1991. 4. Elementary School : SD Negeri Tanjung Sekong – Merak, Graduate 1988.. III. JOB SUMMARY : More Fifteen (15) years of work experience in Onshore Project and Offshore Projects for Oil & Gas Industry and Petrochemicals expansion plant project. With 10 years in Project Implementation & Detail Engineering for wheel pump / Centrifugal Pump or Reda pump, Automatic Water Treatment (AWT), Central Gathering System (CGS), Steam Station (SS), Refinery and Filling Plant. Also 5 years in Maintenance System. Scope Project Implementation Managed and oversaw engineering, Preparation of Equipment Technical Specifications and Material Requisitions, such as Mechanical Specification and Mechanical Data Sheet, Progress Monitoring and Testing Commisioning. Provide specialist mechanical engineering support to global projects in a major engineering contractor organization. Project technical support and familiarity with risk assessments, design reviews, constructability and HAZOPs. Application Mechanical Plant By Efrizon 2 CURRICULUM VITAE

Upload: efrizon-

Post on 13-Jan-2017

142 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Efrizon CV Project and Maintenance Job Detail

I. PROFILE:1. Name : EFRIZON2. Place, date of birth : Padang, September 09th, 19753. Sex : Male4. Religion : Islam5. Passport : B 2783247, Issue date: 28 Dec 2015, Expire date: 28 Dec 2020.6. Address : Pisangan Baru II, RT. 04/08, No. 27 Matraman,

Jakarta Timur 12110.7. Citizenship : Indonesian8. Marrital Status : Married, 2 (two) Children.9. Phone : +62 81380340688 / +62 8121036595810. e-mail : [email protected]

II. EDUCATION :1. University : Sekolah Tinggi Teknologi Nasional Jogjakarta,

Mechanical Engineering Faculty, Graduate 20012. Senior Middle School : STM Negeri Serang – Banten, Graduate 19943. Junior Middle School : SMP Negeri Pulo Merak – Banten, Graduate 1991.4. Elementary School : SD Negeri Tanjung Sekong – Merak, Graduate 1988..

III. JOB SUMMARY :More Fifteen (15) years of work experience in Onshore Project and Offshore Projects for Oil & Gas Industry and

Petrochemicals expansion plant project. With 10 years in Project Implementation & Detail Engineering for wheel pump / Centrifugal Pump or Reda pump, Automatic Water Treatment (AWT), Central Gathering System (CGS), Steam Station (SS), Refinery and Filling Plant. Also 5 years in Maintenance System.

Scope Project Implementation Managed and oversaw engineering, Preparation of Equipment Technical Specifications and Material Requisitions, such as Mechanical Specification and Mechanical Data Sheet, Progress Monitoring and Testing Commisioning. Provide specialist mechanical engineering support to global projects in a major engineering contractor organization. Project technical support and familiarity with risk assessments, design reviews, constructability and HAZOPs.

Scope Testing & Commisioning include Hydro Test, Visual Test, Radiography and Pree Welding Heat Treatment (PWHT). Routinely actvity, check, review and validate the discipline scope of work against the appropriate Contract Requisition to ensure the Contractors correctly interpret and comply with the latest revision AFC drawings, quantities, and specifications. Ensure all quality control checks and tests are instigated, with records maintained and available as required for underground metallic and non-metallic checks, pre and post test checks, hydrostatic testing, flushing and drying, safety relief valve installation etc., all in accordance with contractors’ agreed ITP, method statements and project specifications.

Identify the hand over sequence on a system by system, area by area basis, all scheduled to produce logically planned work completions for commissioning and start-up requirements. In conjunction with the Commissioning Manager ensure pre-commissioning requirements are undertaken in accordance with project specifications and procedures, and coordinated with ongoing construction activities.

Scope Maintenance includes routine and non routine. Maintenance Routine is carried out every day of the examination Utilities against damage, corrosive (tickness), data retrieval performance, lubrication, sand blasting, painting and coating. Maintenance Non-routine is emergancy works related to the production, implementation should be timely with completion as soon as possible, so that requires a shut down. Among others:- Repair leaks installation, Install sleeve (welding joint),- Replacement of spare parts: Gasket, Bolt and Tightening bolt,- Replacement of Utilities and join to Manifold.

IV. EXPERIENCE : A. Rekind Worley Parsons (RW) Consortium by Chevron Indonesia, Duri – Pekan Baru.

1. Position as : Senior Mechanical Engineer in Shared Facility Group.Application Mechanical Plant By Efrizon 2

CURRICULUM VITAE

Page 2: Efrizon CV Project and Maintenance Job Detail

2. Date Of Job : Since March 18, 2012 until March 17, 2015.3. Reason of service : Contract Complete.4. Work Office : Pari Office, Duri IM Project for HOU – Facility Operation5. Site Project :,

a. Central Gathering Station (CGS) for: CGS area 01, CGS area 03 and CGS area 04, Job description: Implementation for maintenance system routine and non routine. External report to Project Coordinator (Corep), Engineer and QC Coordinator of Client Chevron Indonesia

for project implementation: problem solve, material status and site progress. Internal Report to Project Manager (PM) and Engineering Manager, for Project implementation: Problem

Solve, Material Status and daily activities. Internal coordination to QC and Superintendent for job planning, scheduling, Standard Operation

Procedure (SOP), NDT procedure, testing and commissioning Coordinator contractors for job planning, scheduling, Standard Operation Procedure (SOP), develop a

schedule of tie-in, interface and terminal points, testing and commissioning. Review and aprovel received document by contractors, for monthly and weekly progress report, work

document: Permit to Work (PTW), shop drawing, confine space, excavation and critical lifting plan. Scope of engineering work consist, supervision maintenance crew, implementation for :

CGS-1 Tubes Exchanger Bundles Replacement 2013Piping analysis using code ASME B31.3 (Piping thickness calculation), ASME B16.5 (Pressure-Temperature Rating), ASME B36.10 (for taking information on of dimensions standardization of welded & seamless wrought steel pipe), API 6D Pipeline Valve.It is contractor/SBS responsibility to prepare report and documentation regarding the scope and actives mentioned on this EWP. The documentation shall include (but not limited to):- Manufacturer Data Record (MDR), - Gasket Detail as Built Drawing- Tubes Bundles detail as built drawing - Material certificates- QC, Inspiraction report.- Material certificates Construction Plan

Field installation coordination with facility owner (Area Team Leaders) shall be conducted prior to execution. To perform the Project Construction work scope, Contractor will dedicate its construction work force in accordance with the required manpower. Contractors will also provide tools and equipment as required to execute this work. Contractors will provide detail of Manpower, Equipment, and Schedule.

Isolation Plan Instead of installation work, all hot work and welding activities of construction/fabrication will be performed outside CGS-5 area (shop fabrication). Individual equipment shut down is required during installation and shall follow LOTO and isolation plan drawing as attached.

Inspection PlanTo ensure that the construction work is safety and efficiently carried out, and to ensure good coordination with CPI Operations, CPI will contractors. The CPI Team will be responsible for the following:- Construction Safety, - Contract Administration- Coordination with Area Team Leader Operations - QA/QC- Coordination of CPI supplied services. - Work Facilitations.

CGS-1 Wash Tank Repair 2013.Scope of Inspection work will cover tank repair compliance with API 653. The tank shall be given an out-of-service of internal inspection. For tank inspection, the contractor shall perfome wall thickness measurement by UT for roof and shell, by mfl for bottom, settelment, roundness, recommendation drawing, etc as per API 653 and MIGAS certification requirement. The vendor must be avaible for discussion, explantion and presentation related with this inspection job.Piping analysis using code ASME B31.3 (Piping thickness calculation), ASME B16.5 (Pressure-Temperature Rating), ASME B36.10 (for taking information on of dimensions standardization of welded & seamless wrought steel pipe), API 6D Pipeline Valve. Construction Plan :- The repair work of thosetanks will be done when the tanks are shut down condition. All materialsrequired for

repair should be completed prior to execution.- This repair shall involve facility owner, and shall keep good communication among project executor, project

coordinator and facility owner,to make sure that the job will be executed in timely and safety manner.- The contractor will prepare the manpower requirement for the scope mentioned above, and also provide

tools and equipment.- Please note that the scope of repair will be refer to inspection result. The scope in thia document is

developed based on internal inspection and experience from the previous Tank Cleaning Project.Scope of tank cleaning is to remove oily waste, sludge, and clean the tank to the level that an internal inspection using MFL (Magnetic Flux Leakage) can be performed. This requires that no sludge, oil, slippery surface, or other product residue left on the bottom plat of the tank. For tank cleaning, it shall consider the following:

Application Mechanical Plant By Efrizon 3

Page 3: Efrizon CV Project and Maintenance Job Detail

- Less exposure to portential risk, especially for tank cleaning crew.- No man entry and work in a closed loop system hall be pursued. When it is not avaible, a tight procedure for

safe tank entry must be applied, including safety for hazardous materials exposure.- Disposal of hardous waste, consider using SFI facility. Temporary containment before sending to SFI will use

existing API pit or slurry tank.The scope of repair will be based on the inspection result that may consist of: Repair bottom plates, including patching, and/or bottom plates replacement. The fix scope shall refer to internal

inspection result which will be conducted after tank cleaning completes. Repair roof plates, including patching, and or/roof plates replacement. The fix scope shall refer to internal

inspection result which will be conducted after tank cleaning completes. Repair shell plates, including patching, and shell replacement. The fix scope shall refer to internal inspection

result which will be conducted after tank cleaning completes. Internal coating for roof, bottom plates and shell. - External coating for tank shell and roof.

Storage tanks repair will involve some uncertainties, and the scope will be developed based on inspection findings which may include:

- Rafter replacement, - Tank Columns,- Tank Internal, e.g.,spreader box, - Tank appurtenance,- Sampling box repair (separated from tank shell), - Water leg box repair - Safety in Design items.- Scaffolding installation (internal and or/ external) based on the repair and coating work requirement- Non Destructive Examination (NDE)- Overflow line installation(separated MOC)- Emergency vent installation(separated MOC)- Additional sampling point installation (separated MOC)- Platform fabrication and installation (separated MOC)

Complete repair scope will be developed after tank inspection completed and the recommendation based on the tank inspection result received. Certification completion

After completion of tank repair, the tank shall be certified as per Migas regulation. The cetified shall be done by current “Perusahaan Jasa Inspeksi Teknis (PJIT)”appointed as Certification Company under contract no. 7337-OK. The document that shall be provided for repaired tank certification:- Out of service tank inspection report including thickness measurement, settlement, grounding, roundness,

plumbness, etc.- Material certificate - WPS/PQR- Welding test calibration document and specification. - Welder certificate- Welding test procedures,report, and inspector certificate.

CGS-3 Waste Water Line Pipe Support Modification, Recommended Action: Modify the existing pipe support at node 500 (16” existing waste water line pipe support) by bracing it to new

concrete pipe footing. Previously proposed to install new pipe supports (pilling), however there is safety concern from IM (Construction Division) about the hazard of pilling in location which are surrounded by many facilities.Instll new pipe guide into the existing pipe support. Please do soil syrvey by digging the soil to investigate the pipe support foundation condition.

Install one pipe guide into node 160 – 14” existing waste waterline pipe support, Install one anchor into node 360 – 14” existing waste water line pipe support, Install one pipe guide into node 400 – 14”existing waste water line pipe support, Install one pipe guide into node 450-14”existing waste water line pipe support, Install one pipe guide into node 530-16” existing waste water line pipe support, Construction scope work will consist of- Concrete foundation of fabrication and installation, - Fabrication and installation of pipe supports,- Installation of several pipe guides and anchor into existing pipe supports.- Nondestructive examination (X-ray, UT, etc) and hydrostatic testing of the line are needed to be conducted

(currently the line has been shut down,by the time the consruction completed, there is possibility the waste water line leaks due to long periods of shut down.

- The scope will cover also pipe pile fabrication at the shop, field tie-in to existing line.Other Utlity Repair and Replacement: Rotary Equipment:

- Vent Cooler, - Main Vessel Unit (MVU),- Gas Compressor, - Sand Plant Unit,- Crude Oil distribution Pump, - Water Softener Pump,- Fire Water Pump for Fire Water System,- Waste Water Pump and Submersible Pump for Waste Water System.

Static Equipment :

Application Mechanical Plant By Efrizon 4

Page 4: Efrizon CV Project and Maintenance Job Detail

- Water Storage tank,- Vent Stock, - Pressure tank,- Shipping Tank, - Reservoir,- Piping installation and hot tapping for tie inch point on line system : oil spill distribution line, gas distribution

system, cvc condensate line, chemical injection, water sprayer, fire water system and waste water, including road crossing and manifold.

- Oil Removal Filter Tank (ORF).b. Central Steam Station (CSS) and Steam Station (SS) for: CSS area 04, SS area 05 T and SS area 05 S.

Job description : Implementation for maintenance system routine and non routine. External report to Project Coordinator (Corep), Engineer and QC Coordinator of Client Chevron Indonesia

for project implementation: problem solve, material status and site progress. Internal report to Project Manager (PM) and Engineering Manager, for project implementation: problem

solve, material status and daily activities. Internal coordination to QC and Superintendent for job planning, scheduling, Standard Operation

Procedure (SOP), NDT procedure, testing and commissioning. Coordinator contractors for job planning, scheduling, Standard Operation Procedure (SOP), develop a

schedule of tie-in, interface and terminal points, testing and commissioning. Review and aprovel received document by contractors, for monthly and weekly progress report, work

document: Permit to Work (PTW), shop drawing, confine space, excavation and critical lifting plan for erection piping spool and valve 12”, cap 1,5 tons for crane 150 tons rad 21 m.

Scope of engineering work consist, supervision maintenance crew, implementation for :Steam Boiler.Rotating Engineering using code API 610 (Centrifugal Pumps), API 675 (Positive Displacement Pump), API 618 (Reciprocating Compressor) and other related codes,Piping analysis using code ASME B31.3 (Piping thickness calculation), ASME B16.5 (Pressure-Temperature Rating), ASME B36.10 (for taking information on of dimensions standardization of welded & seamless wrought steel pipe), API 6D Pipeline Valve.Material Selection using ASME II Part A (Ferrous Material Specification) Ballpark Estimate/Cost Estimation for Oil and Gas Projects Construction Plan

Field installation coordination with facility owner (Area Team Leaders) shall be conducted prior to execution. To perform the Project Construction work scope, Contractor will dedicate its construction work force in accordance with the required manpower. Contractors will also provide tools and equipment as required to execute this work. Contractors will provide detail of Manpower, Equipment, and Schedule.

Isolation Plan Instead of installation work, all hot work and welding activities of construction/fabrication will be performed outside CSS area (shop fabrication). Individual equipment shut down is required during installation and shall follow LOTO and isolation plan drawing as attached.

Inspection PlanTo ensure that the construction work is safety and efficiently carried out, and to ensure good coordination with CPI Operations, CPI will contractors. The CPI Team will be responsible for the following:- Construction Safety, - Contract Administration- Coordination with Area Team Leader Operations - QA/QC- Coordination of CPI supplied services. - Work Facilitations.

The scope of repair will be based on the inspection result that may consist of :- Repair bottom plates, including patching, and/or bottom plates replacement. The fix scope shall refer to

internal inspection result which will be conducted after stem boiler cleaning completes.- Repair roof plates, including patching, and or/roof plates replacement. The fix scope shall refer to internal

inspection result which will be conducted after tank cleaning completes.- Repair shell plates, including patching, and shell replacement. The fix scope shall refer to internal

inspection result which will be conducted after steam boiler cleaning completes.- Internal coating for roof, bottom plates and shell,- External coating for tank shell and roof. - Boiler tube pipe Replacement.

Pigging Installation.Piping analysis using code ASME B31.3 (Piping thickness calculation), ASME B16.5 (Pressure-Temperature Rating), ASME B36.10 (for taking information on of dimensions standardization of welded & seamless wrought steel pipe), API 6D Pipeline Valve.Pigging operation refers to maintenance practice for pipelines using ‘pipeline pigs’, for cleaning or inspection of pipeline without stopping operation of the pipeline. The pig is inserted into a pig launcher, which is essentially a vessel used to for launching the pig into a pipeline using by creating a pressure differential. Construction Plan

Application Mechanical Plant By Efrizon 5

Page 5: Efrizon CV Project and Maintenance Job Detail

Field installation coordination with facility owner (Area Team Leaders) shall be conducted prior to execution. To perform the Project Construction work scope, Contractor will dedicate its construction work force in accordance with the required manpower. Contractors will also provide tools and equipment as required to execute this work. Contractors will provide detail of Manpower, Equipment, and Schedule.

Isolation Plan Instead of installation work, all hot work and welding activities of construction/fabrication will be performed outside CSS area (shop fabrication). Individual equipment shut down is required during installation and shall follow LOTO and isolation plan drawing as attached.

Inspection PlanTo ensure that the construction work is safety and efficiently carried out, and to ensure good coordination with CPI Operations, CPI will contractors. The CPI Team will be responsible for the following:- Construction Safety, - Contract Administration.- Coordination with Area Team Leader Operations- QA/QC - Work Facilitations

Safety attention:- Exposure to high pressure hydrocarbon gas or condensate.- Physical exertion required to operate manual process valves or handling pig.- Potential loss of containment of hydrocarbons through leaking flanges or opened valves.- Risk of igniting released hydrocarbon gas or condensate.

Safety regulation :- Wear standard Personal Protective Equipment (PPE).- All personnel should minimize their exposure to the open launcher barrel.- Never assume that a launcher barrel is depressurized, as pressure can accumulate over time.- Never attempt to open the barrel unless it is certain that it is at atmospheric pressure.- Always check that the launcher barrel is completely depressurized before draining to the drain/vent K.O.

vessel.- Use a trolley to assist on the insertion or removal of the pig where possible.- Follow manual handling requirement to avoid injuries.

Other Utlity Repair and Replacement. Rotary Equipment :- Gas Compressor, - Air Compressor,- Blower.

Static Equipment :- Piping installation and hot tapping for tie inch point on line system : gas distribution system, fire water

system, steam distribution and injection, including road crossing and manifold.- Gas Boiler, - Piping Insulation

B. Tripatra-Fluor Consortium (tf), Flexible Programe Management (FPM) by Chevron Indonesia, Duri – Pekan Baru.1. Position as : Senior Mechanical Engineer in Shared Facility Group2. Date Of Job : Since May 18, 2011 until March 17, 2012.3. Reason of service : Contract Complete.4. Work Office : Pari Office, Duri IM Project for HOU – Facility Operation.5. Site Project :.Central Gathering Station (CGS) for: CGS area 05 and CGS area

10. 6. Job description :

Implementation for maintenance system routine and non routine. External Report to Project Coordinator (Corep), Engineer and QC Coordinator of Client Chevron Indonesia

for Project implementation: Problem Solve, Material Status and site progress. Internal Report to Project Manager (PM) and Engineering Manager, for Project implementation: Problem

Solve, Material Status and site progress. Internal Coordination to QC and Superintendent for job planning, Scheduling, Standard Operation Procedure

(SOP), NDT procedure, Testing and commisioning. Coordinator contractors for job planning, Scheduling, Standard Operation Procedure (SOP), develop a

schedule of tie-in, interface and terminal points, Testing and commisioning. Review and Aprovel for Work Document: Permit to Work (PTW), Shop drawing, Confine space, Excavation

and Critical Lifting Plan for erection Tube bundle: Cap 10 Tons for Crane 250 Tons, swing radius 10 m. Scope of engineering work consist, supervision maintenance crew, implementation for :

CGS-5 Tubes Exchanger Bundles Replacement 2011.Piping analysis using code ASME B31.3 (Piping thickness calculation), ASME B16.5 (Pressure-Temperature Rating), ASME B36.10 (for taking information on of dimensions standardization of welded & seamless wrought steel pipe), API 6D Pipeline Valve.It is contractor/SBS responsibility to prepare report and documentation regarding the scope and actives mentioned on this EWP. The documentation shall include (but not limited to): Manufacturer Data Record (MDR), - Gasket Detail as Built Drawing

Application Mechanical Plant By Efrizon 6

Page 6: Efrizon CV Project and Maintenance Job Detail

Tubes Bundles detail as built drawing - Material certificates QC, Inspiraction report.

Construction PlanField installation coordination with facility owner (Area Team Leaders) shall be conducted prior to execution. To perform the Project Construction work scope, Contractor will dedicate its construction work force in accordance with the required manpower. Contractors will also provide tools and equipment as required to execute this work. Contractors will provide detail of Manpower, Equipment, and Schedule.

Isolation Plan Instead of installation work, all hot work and welding activities of construction/fabrication will be performed outside CGS-5 area (shop fabrication). Individual equipment shut down is required during installation and shall follow LOTO and isolation plan drawing as attached.

Inspection PlanTo ensure that the construction work is safety and efficiently carried out, and to ensure good coordination with CPI Operations, CPI will contractors. The CPI Team will be responsible for the following:- Construction Safety, - Contract Administration- Coordination with Area Team Leader Operations - QA/QC- Coordination of CPI supplied services. - Work Facilitations.

CGS-5 Waste Water Line Pipe Support Modification, Recommended Action: Modify the existing pipe support at node 500 (16” existing waste water line pipe support) by bracing it to new

concrete pipe footing. Previously proposed to install new pipe supports (pilling), however there is safety concern from IM (Construction Division) about the hazard of pilling in location which are surrounded by many facilities.Instll new pipe guide into the existing pipe support. Please do soil syrvey by digging the soil to investigate the pipe support foundation condition.

Install one pipe guide into node 160 – 14” existing waste waterline pipe support, Install one anchor into node 360 – 14” existing waste water line pipe support, Install one pipe guide into node 400 – 14”existing waste water line pipe support, Install one pipe guide into node 450-14”existing waste water line pipe support, Install one pipe guide into node 530-16” existing waste water line pipe support, Construction scope work will consist of- Concrete foundation of fabrication and installation, - Fabrication and installation of pipe supports- Installation of several pipe guides and anchor into existing pipe supports.- Nondestructive examination (X-ray, UT, etc) and hydrostatic testing of the line are needed to be conducted

(currently the line has been shut down,by the time the consruction completed, there is possibility the waste water line leaks due to long periods of shut down.

- The scope will cover also pipe pile fabrication at the shop, field tie-in to existing line.CGS-10 Slury Tank Repair 2011.Scope of Inspection work will cover tank repair compliance with API 653. The tank shall be given an out-of-service of internal inspection. For tank inspection, the contractor shall perfome wall thickness measurement by UT for roof and shell, by mfl for bottom, settelment, roundness, recommendation drawing, etc as per API 653 and MIGAS certification requirement. The vendor must be avaible for discussion, explantion and presentation related with this inspection job.Piping analysis using code ASME B31.3 (Piping thickness calculation), ASME B16.5 (Pressure-Temperature Rating), ASME B36.10 (for taking information on of dimensions standardization of welded & seamless wrought steel pipe), API 6D Pipeline Valve. Construction Plan : The repair work of thosetanks will be done when the tanks are shut down condition. All materialsrequired for

repair should be completed prior to execution. This repair shall involve facility owner, and shall keep good communication among project executor, project

coordinator and facility owner,to make sure that the job will be executed in timely and safety manner. The contractor will prepare the manpower requirement for the scope mentioned above, and also provide tools

and equipment. Please note that the scope of repair will be refer to inspection result. The scope in thia document is developed

based on internal inspection and experience from the previous Tank Cleaning Project.Scope of tank cleaning is to remove oily waste, sludge, and clean the tank to the level that an internal inspection using MFL (Magnetic Flux Leakage) can be performed. This requires that no sludge, oil, slippery surface, or other product residue left on the bottom plat of the tank. For tank cleaning, it shall consider the following: Less exposure to portential risk, especially for tank cleaning crew. No man entry and work in a closed loop system hall be pursued. When it is not avaible, a tight procedure for

safe tank entry must be applied, including safety for hazardous materials exposure. Disposal of hardous waste, consider using SFI facility. Temporary containment before sending to SFI will use

existing API pit or slurry tank.The scope of repair will be based on the inspection result that may consist of:- Repair bottom plates, including patching, and/or bottom plates replacement. The fix scope shall refer to internal

inspection result which will be conducted after tank cleaning completes.

Application Mechanical Plant By Efrizon 7

Page 7: Efrizon CV Project and Maintenance Job Detail

- Repair roof plates, including patching, and or/roof plates replacement. The fix scope shall refer to internal inspection result which will be conducted after tank cleaning completes.

- Repair shell plates, including patching, and shell replacement. The fix scope shall refer to internal inspection result which will be conducted after tank cleaning completes.

- Internal coating for roof, bottom plates and shell.- External coating for tank shell and roof.Storage tanks repair will involve some uncertainties, and the scope will be developed based on inspection findings which may include:- Rafter replacement, - Tank Columns,- Tank Internal, e.g.,spreader box, - Tank appurtenance,- Sampling box repair (separated from tank shell), - Water leg box repair- Safety in Design items- Scaffolding installation (internal and or/ external) based on the repair and coating work requirement- Non Destructive Examination (NDE)- Overflow line installation(separated MOC)- Emergency vent installation(separated MOC)- Additional sampling point installation (separated MOC)- Platform fabrication and installation (separated MOC)Complete repair scope will be developed after tank inspection completed and the recommendation based on the tank inspection result received. Certification completion

After completion of tank repair, the tank shall be certified as per Migas regulation. The cetified shall be done by current “Perusahaan Jasa Inspeksi Teknis (PJIT)”appointed as Certification Company under contract no. 7337-OK. The document that shall be provided for repaired tank certification:- Out of service tank inspection report including thickness measurement, settlement, grounding, roundness,

plumbness, etc.- Material certificate - WPS/PQR- Welding test calibration document and specification. - Welder certificate- Welding test procedures,report, and inspector certificate.

Other Utility Repair and Replacement. Rotary Equipment:- Vent Cooler, - Main Vessel Unit (MVU),- Gas Compressor, - Sand Plant Unit,- Crude Oil distribution Pump, - Water Softener Pump,- Fire Water Pump for Fire Water System,- Waste Water Pump and Submersible Pump for Waste Water System.

Static Equipment :- Heat Theater Gas Boiler. - Vent Stock,- Water Storage tank, - Shipping Tank,- Pressure tank, - Reservoir.- Piping installation and hot tapping for tie inch point on line system : oil spill distribution line, gas distribution

system, cvc condensate line, chemical injection, water sprayer, fire water system and waste water, including road crossing and manifold.

- Oil Removal Filter Tank (ORF), - Gas Boot Instalallation.C. Lippo Karawaci Tbk. Lippo Group Company, (Owner) - Jakarta

1. Position as : Assistant Manager in Engineering Department Head.2. Date Of Job : Since June 01, 2009 until April 30, 2011.3. Reason of service : Finish Project (Contract Completed).4. Site Project : Utility Project - High Rise Building Project, 5000 m2 x 42 Floor,

Cosmo Appartments Lippo Kemang Village.

5. Job Description : Build project management for Implementation plan, as per item. Internal Report to Project Manager (PM) and Engineering Manager, for Project implementation: Problem

Solve, Material Status and daily activities. Coordinator to contractors for job planning and job implementation:: scheduling, shop drawing and Standard

Operation Procedue (SOP), testing and commissioning. Review and aprovel received document by contractors, for monthly and weekly progress report, work

document: Permit to Work (PTW), shop drawing, confine space, excavation and lifting plan erection piping spool and valve 10”.

Scope of engineering work consist, supervision contractors crew, implementation for : Rotary Equipment:

Application Mechanical Plant By Efrizon 8

Page 8: Efrizon CV Project and Maintenance Job Detail

- Elevator and Escalator,- Generator Set, - Diesel Pump for Fire Water System,- Water Pump for Fire Water System and Drinking water System,- Submersible Pump for Waste Water System.

Static Equipment :- Water Storage tank / Roof Tank, - Pressure tank,- Ground Water Tank (Reservoir),- Piping Installation for Line System for : Gas Distribution System, Fire Water System, Drinking Water

and Waste Water System. Build management system for training utility operation.

D. Mohammad Almojil Group (MMG) Company, Al-Damam, Saudi Arabia:1. Position as : Mechanical Engineer II, in Engineering Department.2. Date Of Job : Since April 13, 2008 until May 04, 2009.3. Reason of service : Contract Complete.4. Site Project :a. Water Injection Pump Station (WIPS) Haradh Maintenance Project, Owner by Saudi Aramco Government

Company, Project Consultant by SNC Lavalin-Saipem s.a, Job Description : External report to Engineer, Site Supervisor and Project Coordinator of Project Consultant and Client Saudi

Aramco for project implementation: problem solve, material status and site progress. Build and submited document to project consultant for monthly and weekly progress report, work document:

shop drawing, confine space, excavation and critical lifting plan for erection pump injection: cap 500 tons for crane 1500 tons swing radius 5 m.

Internal report to Project Manager (PM) and Engineering Manager, for project implementation: problem solve, material status and daily activities.

Internal coordination to QC and Superintendent for job planning, scheduling, Standard Operation Procedure (SOP), develop a schedule of tie-in, interface and terminal points, NDT procedure, testing and commissioning.

Supervision for Technical Query / Site Query, RFA (Request For Aprovel), As Built Drawing. Scope of engineering work consist, supervision maintenance crew, implementation for :

Repair Gas Turbine Product by Nouvo Pignone.Rotating Engineering using code API 610 (Centrifugal Pumps), API 675 (Positive Displacement Pump), API 618 (Reciprocating Compressor) and other related codes.Piping analysis using code ASME B31.3 (Piping thickness calculation), ASME B16.5 (Pressure-Temperature Rating), ASME B36.10 (for taking information on of dimensions standardization of welded & seamless wrought steel pipe), API 6D Pipeline Valve.Material Selection using ASME II Part A (Ferrous Material Specification) Ballpark Estimate/Cost Estimation for Oil and Gas Projects.- Repair Rotor Generator. - Cooling system (Lube Oil).- Power Buttery Room - Electrical Motor for Turbine

Stater.- Piping joint for Discharge 30” to Manifold 60”, for 2500 Psi.- Gas Distribution. - Smoke Stock.Other Utlity Repair and Replacement : Rotary Equipment :- Water Injection Pump for 2500 Psi,- Instrument Air Compressor, - Cooling System Pump,- Water Pump for Fire Water System. - Recycle Gas Compressor

Static Equipment :- KO Drum for Gas Distribution line,- Reservoir Installation, - Piping Support.

b. Saudi Polyolefins Company (SPC) - Polypropylene Expansion Project (PPX), Owner by Al-Tasnee Government Company, Project Consultant by Fluor Corporation, Job Description : External report to Engineer and Site Supervisor of Project Consultant and Client Al-Tasnee Company for project

implementation: problem solve, material status and site progress. Control Test package report (Piping Installation, Mechanical Rotary and Static) for implementation and close

document. Build and submited document to project consultan for work document: shop drawing, confine space, excavation

and critical lifting plan for erection buffel vessel, cap 150 tons for crane 1000 tons, swing radius 8 m. Internal report to Project Manager (PM) and Engineering Manager, for project implementation: problem solve,

material status and daily activities. Internal coordination to QC and Superintendent for job planning, scheduling, Standard Operation Procedure

(SOP), develop a schedule of tie-in, interface and terminal points, NDT procedure, testing and commissioning. Scope of engineering work consist, supervision maintenance crew, implementation for :

Application Mechanical Plant By Efrizon 9

Page 9: Efrizon CV Project and Maintenance Job Detail

Heat Exchangers, Coolers, Heaters, Condensers and Reboilers:- Verify nameplate data.- Check that inlet and outlet piping has been installed correctly.- Check that allowance for thermal expansion has been provided.- Check that thermal safety valves have been installed correctly.- Check that full insulation has been installed where specified.- Check that all permanent blinds and spacers have been installed.- Check that earthing has been completed to specification.Vessels and Tanks:- Verify nameplate data.- Verify nozzle sizes and orientation.- Check that all nozzles are open from inside of vessel and that they are not plugged or restricted with foreign

articles, dirt, etc.- Check that all permanent blinds and spacers have been installed.- Check that all internals such as demisters, inlet devices, support grids and vortex breakers installed as per

vendor drawings. Where demisters installed middle segments must be removed and an inspection will be made to verify that no foreign objects are left lying on top of the demister pads.

- Check that the filters elements have been installed correctly. - Check that the man way gaskets except of entry man way have been installed to correct specification. S tud

bolts are properly tightened.- Check that external instrumentation has been installed.- Check that all services have been connected.- Check that relief valves have been correctly installed, tagged and seals are intact. - Check that platforms/ladders/rails have been installed correctly.- Verify that satisfactory access has been provided to all valves, drains and vents where required for

operational purposes.- Verify that external construction equipment and material has been cleared.- Verify that scaffolding has been removed.- Verify that no temporary piping and closures is remaining.- After inspection vessel/tank shall be boxed up using temporary gaskets and tightened with at least 4 bolts.Other Utility for Install: Rotary Equipment :- Recycle Gas Compressor, - Generator Set,- Instrument Air Compressor - Water Pump for Fire Water System,- Compressor for High Pressure Nitrogen.

Static Equipment :- Polymerization Reactor,- KO Drum for Gas Distribution line - Piping Support.

Piping interconnection Oil and Water Cooling tower system. Supervision for build Test Package, Technical Query / Site Query, RFA (Request For Aprovel), As Built Drawing

and Documentation. Turn Over System Package for Piping & Mechanical Equipment.

E. PT. YIN Rekayasa Industries - Jakarta:1. Position as : Senior Mechanical Engineer Department Head.2. Date Of Job : Since April 13th, 2006 until April 12th, 20083. Reason of service : Contract Complete.4. Site Project :

a. Tangguh LNG Project – West Papua, Owner By BP Petrolium, Project Consultant by KJP-JO (KBR, JGC and Pertafeniki - Joint Operation), Contractors By KYP-JO (Kelsri, YIN, Promits – Joint Operation). Job Description:

Internal Report to Project Manager (PM) and Engineering Manager, for Project implementation: Problem Solve, Material Status and site progress.

Internal coordination to QC and Superintendent for job planning, scheduling, Standard Operation Procedure (SOP), develop a schedule of tie-in, interface and terminal points, NDT procedure, testing and commissioning.

External report to Site Supervisor and Project Coordinator of Project Consultant KJP-JO (KBR, JGC and Pertafeniki - Joint Operation), for project implementation: problem solve, material status and site progress.

Build project implementation plan, as per Item. Build and submited document to project consultan for work document: Permit to Work (PTW), shop

drawing, confine space, excavation and lifting plan for piping spool and valve 30” erection 25 tons crane 500 tons, swing radius 20 m.

Supervision for Technical Query / Site Query, RFA (Request For Aprovel), As Built Drawing.

Application Mechanical Plant By Efrizon 10

Page 10: Efrizon CV Project and Maintenance Job Detail

Scope of engineering work consist, supervision maintenance crew, implementation for static equipment :- Pressure Vessel, - Piping Support,- KO Drum for Gas Distribution,- Piping interconection for Gas Compressor and Boiler system,- Piping installation for line system for: dehydration system, fractionation system, acid gas removal, ORF

Main Pipe Sleeper System, ORF Pig Receiver System, high pressure nitrogen, cooling system, instrument air system, low and high pressure steam and fire water system.

b. Great Jakarta Distribution Line-PGN (Perusahaan Gas Negara) Goverment Company, Pipe Line Project, Job description:

Internal report to Project Manager (PM), for project implementation: problem solve, material status and progress with project control.

Internal coordination to QC anda Site Superintendent for job planning, scheduling, Standard Operation Procedure (SOP), develop a schedule of tie-in, interface and terminal points, NDT procedure, testing and commissioning.

Remote area project control, supervision and inspection for implementation.F. PT. Plammeka Selaras Contractors - Jakarta:

1. Position as : Mechanical & Piping Engineer in Engineering Department.2. Reason of service : Contract Complete.3. Date Of Job : Since September 01st, 2003 until March 30st, 2006.4. Site Project : Utility Project Grand Trade Center, Tanjung Bunga – Makassar, South Sulawesi,

Indonesia, owner by Lippo Group.5. Job Description :

Internal report to Project Manager (PM) and Engineering Manager, for project implementation: problem solve, material status daily activities.

Internal coordination to QC anda Site Superintendent for job planning, scheduling, Standard Operation Procedure (SOP), testing and commisioning.

External report to Site Supervisor and Project Coordinator of Client by Lippo Group, for Project implementation: problem solve, material status and site progress.

Supervision for Technical Query / Site Query, RFA (Request For Aprovel), As Built Drawing. Scope of engineering work consist, supervision maintenance crew, implementation for :

Rotary Equipment:- Diesel Pump for Fire Water System,- Water Pump for Fire Water System and Drinking water System,- Submersible Pump for Waste Water System.

Static Equipment :- Water Storage tank, - Pressure tank,- Reservoir.- Piping Installation for Line System for : Gas Distribution System, Fire Water System, Drinking Water

and Waste Water System. Build and submited document to project consultan for work document: Permit to Work (PTW), shop

drawing, confine space, excavation and lifting plan erection piping spool and valve 10”. Build Poject Implementation plan, as per Item.

G. PT. Daya Sarana Terpadu Contractors - Jakarta :1. Position as : Site Engineer in Engineering Department2. Reason of service : Contract Complete.3. Date Of Job : Since September 26th, 2001 until August 25th, 2003.4. Site Project : Sub Contractor LPG Filling Plant Pertamina

Government Company, Maintenance for LPG Installation Distribution Pipe Line from LPG Port to Stock Area, Plumpang, Jakarta – Indonesia.

5. Job Description : Internal report to Project Manager (PM) and Engineering Manager, for project implementation: problem

solve, line status and site progress. Internal coordination to QC and Superintendent for job planning, Scheduling, Standard Operation

Procedure (SOP), develop a schedule of tie-in, interface and terminal points, testing and commissioning. Scope of engineering work consist, supervision maintenance crew in implementation, for:- Re install gas compressor,- Re install water pump for fire water sytem and drainage system,- Re install piping installation from corrosion pipe change to new installation pipe for liquid and vapour

distribution system and Fire Water System. External report to Site Supervisor and Project Cordinator of Client by Pertamina Government Company, for

project implementation: problem solve, line status and site progress.

Application Mechanical Plant By Efrizon 11

Page 11: Efrizon CV Project and Maintenance Job Detail

Build and submited document to Project Coordinator Pertamina, for work document: Permit to Work (PTW), shop drawing, confine space, excavation and critical lifting plan for erection piping spool and valve 8”. cap 0,8 tons for crane 100 tons, swing radius 17 m.

Project Report for Technical Query / Site Query, RFA (Request for Aprovel), As Built Drawing.

V. ADDITIONAL SKILL :1. Training for Serious A bout Zero Exident at PT. Rekind Worley Parsons.2. Training for fire watcher at PT. CPI (Chevron Pacific Indondesia).3. Job Training in Coal Handling System, PLTU (Power Plant Unit) Suralaya – Merak - Banten, Maintenance

Mechanical Equipment for :a. Belt Conveyor, d. Magnetic Sperator,b. Chain Conveyor, e. Steam Boiler,c. Feeder Bunker. f. Blower.