egee-ii infso-ri-031688 enabling grids for e-science gstat work plans for egee-iii joanna huang,...
TRANSCRIPT
EGEE-II INFSO-RI-031688
Enabling Grids for E-sciencE
www.eu-egee.org
GStat Work Plans for EGEE-III
Joanna Huang, ASGC/OPS
EGEE SA1 F2F Meetings, Abingdon
1-5 December, 2008
2
Enabling Grids for E-sciencE
EGEE-II INFSO-RI-031688
Core Concepts
• Monitor EGEE compatible information systems • Primary goals for GStat:
– Detect faults in the information system– Validates the information content– Displays useful information with different views
• Build a sustainable architecture– Enabling decentralized operations – In a federated environment
• Redesign GStat in modular way– Reusable components – Multi-location (site/roc)– Multi-application (certification/operations)
3
Enabling Grids for E-sciencE
EGEE-II INFSO-RI-031688
GStat Architecture
Testing Result
Glue DB
Entity DB
Monitoring
Test Validation
Validation
Visualization
NagiosChecks
Data Graphs
BDII Snapshot
Display
Data Graphs
Core
4
Enabling Grids for E-sciencE
EGEE-II INFSO-RI-031688
Component Descriptions
• Core– Provides an SQL DB snapshot of the BDII content– Maintains an entity cache of what has been seen
• Validation– Validates the information content– Provides testing results for visualization or export
• Monitoring– Detects faults in the information system– Entity DB is used to configure which entities are monitored– Prepares monitoring data and graphs ready for visualization
• Visualization– Uses entity DB to generate the main structure– Visualizes the result of validation and monitoring– Provides different views for different user groups
5
Enabling Grids for E-sciencE
EGEE-II INFSO-RI-031688
Workplans and Timelines
• Team Members:
• By March 09 – Finish software requirements analysis and design
– Finish prototyping new model
– Regional use-cases Study
• By September 09– Finish the sustainable implementation of the new model
– Finish prototyping the GStat portal for 3rd party tools
– Start to test and prepare for software transition
• By December 09– New model operated and in production
– Start to deploy distributed instances, depending on regions choice
Joanna HuangVisualization (Just beginning)
Felix EhmMonitoring (Finalizing)
Fidel AlmagroValidation (In progress)
Laurence FieldCore (Production hardening)
6
Enabling Grids for E-sciencE
EGEE-II INFSO-RI-031688
URLs for More Information
• All documentation can be found from the index page– http://goc.grid.sinica.edu.tw/gocwiki/GSIndex
• GStat 2.0 Overview – http://goc.grid.sinica.edu.tw/gocwiki/GSOverview
• GStat 2.0 Project Plan– http://goc.grid.sinica.edu.tw/gocwiki/GSProjectPlan
• A guide for developers– http://goc.grid.sinica.edu.tw/gocwiki/GSDevelopersGuide
• GStat installation guide– http://goc.grid.sinica.edu.tw/gocwiki/GSInstallationGuide