egkjktiqj xokfy;jrdso.indianrailways.gov.in/works/uploads/file... · 5. check the rotor bars and...

55
(For Official Use Only) Hkkjr ljdkj GOVERNMENT OF INDIA jsy ea=ky; MINISTRY OF RAILWAYS egkjktiqj, Xokfy;j & 474 005 Maharajpur, GWALIOR - 474 005 CAMTECH/E/18-19/EP-2/OCB/Rev.0 May, 2018 End User : Maintenance Staff of 3 Phase Electric Locomotives

Upload: others

Post on 23-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • (For Official Use Only)

    Hkkjr ljdkj GOVERNMENT OF INDIA jsy ea=ky; MINISTRY OF RAILWAYS

    egkjktiqj, Xokfy;j & 474 005 Maharajpur, GWALIOR - 474 005

    CAMTECH/E/18-19/EP-2/OCB/Rev.0

    May, 2018

    End User : Maintenance Staff of 3 Phase Electric Locomotives

  • HANDBOOK ON

    OIL COOLING BLOWER (OCB) OF

    THREE PHASE ELECTRIC

    LOCOMOTIVE

    QUALITY POLICY

    “To develop safe, modern and

    cost effective Railway

    Technology complying with

    Statutory and Regulatory

    requirements, through

    excellence in Research, Designs

    and Standards and Continual

    improvements in Quality

    Management System to cater to

    growing demand of passenger and

    freight traffic on the railways”.

  • FOREWORD

    During operation of the locomotive, the traction converter

    and transformer assemblies produce a considerable amount of

    heat. As excess heat adversely affects the performance of these

    units, cooling is required to keep them operating at optimal

    performance levels. Oil cooling blower supplies air to heat

    exchanger unit to remove this excess heat from oil circulating

    through the traction converter and transformer assemblies.

    CAMTECH has prepared this hand book on Oil Cooling

    Blower (OCB) of three phase electric locomotive to cover

    general description and maintenance activities along with

    testing with the objective to create awareness among the

    maintenance personnel.

    I hope this handbook will prove to be useful for the

    staff working in electric loco sheds/ workshops maintaining

    three phase locomotives.

    CAMTECH, Gwalior Executive Director

    Date : May, 2018

  • PREFACE

    The traction converter and transformer assemblies of three

    phase electric locomotive are cooled by circulating the oil

    through heat exchanger unit and forced air is supplied by oil

    cooling blower through heat exchanger unit to remove this

    excess heat.

    The continuous working of oil cooling blower is necessary for

    safe and efficient running of locomotive which can be ensured

    by proper maintenance.

    CAMTECH has prepared this handbook on “Oil Cooling

    Blower (OCB) of three phase electric locomotive” to

    disseminate the knowledge among the maintenance personnel.

    This handbook comprises technical data of OCB,

    maintenance activities, and testing along with MUST CHECK

    POINTS with useful standards.

    It is clarified that this handbook does not supersede any

    existing provisions laid down by Railway Board, RDSO or

    Zonal Railways. This hand book is for guidance only and it is

    not a statutory document.

    I am sincerely thankful to all field personnel who helped us in

    preparing this handbook.

    Technological up-gradation & learning is a continuous

    process. Please feel free to write to us for any addition/

    modification in this handbook. We shall highly appreciate your

    contribution in this direction.

    CAMTECH, Gwalior (Peeyoosh Gupta)

    Date: 24 May, 2018 Director/ Electrical

    e-mailid: [email protected]

  • CONTENTS

    Sr.No. Description Page No.

    Foreword iii

    Preface iv

    Content v

    Correction Slip vii

    1. INTRODUCTION 01

    1.1 Technical Data 01

    1.2 Tools & Special Tools 02

    2. BEFORE-REMOVAL OF OCB FROM OPERATION 03

    3. SPECIAL CHECK POINTS FOR O/H OF OCB 07

    4. OPERATION CHART FOR OVERHAULING 11

    i. Incoming testing. 11

    ii. Remove the extended lead with flexible pipe 12

    iii. Remove the impeller 13

    iv. Remove the motor from dome 14

    v. Remove terminal box 14

    vi. Stripping of motor 14

    vii. Stripping of rotor 14

    viii. Clean the following parts 15

    ix. Checking and attending of various part 16

    x. Rotor balancing. 18

    xi. Stator varnishing. 19

    xii. Fitting of terminal box. 20

    xiii. Testing of stator. 20

    xiv. Motor assembly. 21

    xv. Light run test 22

  • Sr.No. Description Page No.

    xvi. Assembly of blower. 22

    xvii. Load testing. 23

    5. CHECK POINTS 25

    6. RELIABILITY ACTION PLAN 29

    FOR 3-PHASE LOCOMOTIVES

    (Rev. ‘10’, May.’14)

    7. MODEL QUESTIONS 33

    8. ANSWERS 41

    9. AN APPROACH TO EQUIPMENT FAILURE

    INVESTIGATION 42

    REFERENCE 44

  • ISSUE OF CORRECTION SLIP

    The correction slips to be issued in future for this

    handbook will be numbered as follows:

    CAMTECH/E/18-19/EP-2/OCB /1.0/ C.S. # XX date---

    Where “XX” is the serial number of the concerned

    correction slip (starting from 01 onwards).

    CORRECTION SLIPS ISSUED

    Sr.No. Date of

    Issue

    Page no. & Item

    no. modified

    Remarks

  • CAMTECH/E/18-19/ Loco OCB 1

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    1. INTRODUCTION

    During operation of the locomotive, the traction

    converter and transformer assemblies produce a

    considerable amount of heat. As excess heat adversely

    affects the performance of these units, cooling is

    required to keep them operating at optimal performance

    levels. To remove this heat, cooling oil is circulated

    through the traction converter and transformer

    assemblies. This oil is then passed through a heat

    exchanger which removes excess heat. This oil cooling

    unit draws air in through filter panels located in the

    pantograph roof hatch. These filters remove impurities

    and debris from the air. This debris is then removed

    from the filter panels by the scavenge system.

    1.1 TECHNICAL DATA

    Oil Cooling Unit

    Oil volume total 150L

    Volume converter oil 78L

    Volume transformer oil 72L

    Weight empty 840kg

    Painting Topcoat RAL 7030

    stone gray silky 45±

    5%

    Test excess pressure

    converter oil

    4 bar

    Test excess pressure

    transformer oil

    4 bar

  • 2 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    Oil Cooler Blower Fan Electric Meter

    Type Three phase squirrel-cage motor

    Motor model 200L55-RH2A

    Voltage 3 x 415V ± 10%

    Current 43A

    Power supply Square wave (inverter operated)

    Degree of protection IP54

    Frequency 50Hz

    Normal speed 2,930rpm

    Output 25kW

    Insulation class

    F

    Weight 265kg

    1.2 TOOLS & SPECIAL TOOLS

    In addition to conventional railways workshop

    tools and equipment, the following are also required for

    the maintenance of oil cooling blower procedures

    described in this chapter.

    Cleaning grate, part 04.882.30.500, BHER Industrie

    technik. Required for Oil Cooler Blower, refer to

    Chapter 5, Oil Blower of Volume F10, and Suppliers

    Documentation.

    A high pressure cleaner capable of delivering water at 80 bar at 70 °C.

    An industrial grade vacuum cleaner.

    An external compressed air supply capable of delivering air at 6 bar.

  • CAMTECH/E/18-19/ Loco OCB 3

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    A suitable heating oven capable of fitting the oil cooler and heating to 105-110°C.

    A fluid cleaning system with a filter with a mesh size of 25 microns.

    A lifting eye-bolt suitable for attachment and lifting of the fan wheel and motor.

    1.3 BEFORE-REMOVAL OF OCB FROM

    OPERATION

    General

    Isolate the locomotive electrical systems. Set the

    „Oil Cooling‟ circuit breaker to the Off position. Circuit

    breaker for the No.1 End is situated auxiliary circuits

    cubicle-1(HB1) and circuit breaker for the No.2 End is

    situated in auxiliary circuits cubicle-2 (HB2).

    Set the “Traction Motor Blower and oil cooling

    unit scavenge blower” circuit breaker to the Off

    position. Circuit breaker for the No.1 End situated

    auxiliary circuits cubicle-1 (HB1) and circuit breaker

    for the No.2 End is situated in auxiliary circuits cubicle-

    2 (HB2).

    Set the “Oil pump converter” circuit breaker to

    the Off position. Circuit breaker for the No.1 End

    situated auxiliary circuits cubicle-1 (HB1) and circuit

    breaker for the No.2 End is situated in auxiliary circuits

    cubicle-2 (HB2).

    Set the “Transformer oil pump” circuit breaker

    to the Off position. Circuit breaker for the No.1 End is

    situated auxiliary circuits cubicle-1 (HB1) and circuit

  • 4 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    breaker for the No.2 End is situated in auxiliary circuits

    cubicle-2 (HB2).

    Oil cooler assembly

    First drain the oil from the system. Disconnect

    the oil cooling piping from between the transformer and

    the oil cooler.

    Disconnect the oil cooling piping from between

    the traction converter and the oil cooler.

    Removed oil cooler and blower assembly

    If necessary, remove the traction converter oil pump from the cooler assembly.

    If necessary, remove the transformer oil expansion tank from the cooler assembly.

    Disconnect the electrical harness from the outside of the oil cooling unit.

    Unbolt the earth lead to the cooling unit

  • CAMTECH/E/18-19/ Loco OCB 5

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    Cut the cable ties securing the wiring to the looming bar, then move cabling out of the way.

    Unbolt and remove the looming bar, if necessary.

    Remove the three bolts, spring and plain washers along each side of the cooling assembly.

    NOTE:

    The oil must be sealed to prevent damage from

    foreign materials. Seal the oil cooler opening using a

    clean cardboard sheet and masking tape.

    All oil flanges must be sealed with dummy

    flanges before the oil cooler is moved to prevent the

    ingress materials and any possible outflow of oil.

    Lift the oil cooling unit from the locomotive

    using suitable lifting equipment attached to the lifting

    lugs. Take care not to damage any part of the assembly

    or other machine room components during the removal

    of the cooling unit assembly.

    Blower fan and motor

    The blower fan and motor may be removed

    from the oil cooling assembly without removing the

    assembly from the locomotive. Once the filter has been

    removed, the fan and motor can be removed.

  • 6 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    Oil cooler assembly

    Oil cooler

    may be unbolted and

    removed from oil

    cooler assembly if

    required. This may

    be required for the

    oil cooler cleaning

    procedures described

    in section inspection

    and repair.

    Remove the looming bars (3) if not removed previously

    Attach suitable lifting equipment to the lifting lugs (4)

    Remove the eight bolts, spring washers and washers (5,6,7) securing the oil cooler assembly (1)

    to the oil cooler (2)

    Lift the oil cooler assembly (1) from the oil cooler (2)

  • CAMTECH/E/18-19/ Loco OCB 7

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    2. SPECIAL CHECK POINTS FOR O/H OF OCB

    Sr. Check point Standard

    *. Incoming Sr.No./Make record

    *. Outgoing Sr.No./Make record

    1. Incoming test

    a. IR value with 1 KV Meggar record

    b. Check the bearing noise record

    c. Any abnormality record

    d. Vibration record

    e. Any abnormal noise normal

    f. Incoming run test parameter of VVVF

    test plant at full speed for 10 minutes

    a. Voltage record

    b. Current record

    c. Frequency record

    d. Direction OK

    2. a. Check the condition of terminal block

    and connecting leads, overheating/

    breakage of lugs & breakage of stand

    near crimped portion.

    Provision of transparent heat shrink

    sleeve near lug.

    OK

    3. Measure the shaft dia at bearing seat DE

    NDE

    record

    4. Measure the end cover bearing housing

    dia

    DE,

    NDE

    record

  • 8 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    Sr. Check point Standard

    5. Check the rotor bars and short circuiting

    end rings for any crack by means of

    growler test as per SMI-163 & rotor

    body looseness at shaft by sound test for

    healthiness/ dullness.

    done

    6. Condition of key, keyway & shaft

    threaded portion to be checked

    good/

    damage

    7. I.R. value of stator with 1 KV meggar

    after baking 10M

    (min.)

    8. Baking of stator to be done before

    varnishing & after anti track

    done

    9. perform dielectric test on stator by

    applying 1.5 KV AC supply for 1

    minute

    stand for 1

    minute

    10. Measure the winding resistance between

    the phases

    a. UV b. VW c. WV

    record

    11. Surge comparison test on stator at 2KV

    for old, SKV for new

    Wave form

    matched

    12. Bearing details:-

    a. Check the bearing as per SMI-16,23,79 & 148

    done

    b. SPM reading to be recorded as per SMI-58

    record

    c. New bearing provided Monthly/ year should be inscribed

    done

    d. Detail of the grease used in bearing GHY-72

    e. Record bearing make DE & NDE side

    record

  • CAMTECH/E/18-19/ Loco OCB 9

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    Sr. Check point Standard

    13. Light run test parameter at VVVF test

    plant at full speed for 10 minute

    a. Voltage record

    b. Current record

    c. Frequency record

    d. Speed record

    e. Direction OK

    f. Bearing Noise DE NDE

    record

    g. Check for free run No abnormality

    14. a. Check visually dome for any crack

    & damage

    No crack

    No damage

    No deformation

    b. Check impeller for any crack by

    RDPT test & also check the

    impeller blades for any dull sound

    by ring test

    No crack healthy

    sound

    15. Check the alignment of impeller with

    respect to cone

    Alignment is

    poor

    16. Check the tightness of locking bolt &

    plate securing the impeller

    Properly

    tightened/ locked

    17. Check for any abnormal noise during

    starting & running

    Normal noise.

    18. RTV compound is to be applied at

    every joint & terminal connection box

    Applied

    19. Load run test parameter at VVVF test

    plant at 3 stages

    a. Voltage record

    b. Current record

    c. Frequency record

    d. Speed record

    e. Direction OK

    f. Bearing Noise Normal

  • 10 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    Sr. Check point Standard

    20. a. Check the blower assembly for

    balancing by portable balancer

    Balancing done

    (Limit 40 cu/sec.)

    21. Check the blower assembly

    vibration level by SKF vibration

    pen

    5mm/ sec (Max.)

    22. Winding scheme for oil cooling

    blower of 3 phase loco as per SMI -

    0239

    Followed

    23. Any other remarks

  • CAMTECH/E/18-19/ Loco OCB 11

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    3. OPERATION CHART FOR OVERHAULING

    i. Incoming testing.

    a. Shift the OCB from pallet to

    the working place.

    b. Remove OCB dome

    inspection cover

    c. Remove terminal box cover

    from OCB dome.

    d. Test winding insulation resistance both.

    i. In between windings and

    ii. Between earlier body and winding by 1 KV

    meggar.

    e. Check the free movement of impeller by hand.

  • 12 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    f. Put OCB on test bench

    g. Connect the 3 phase VVVF supply to terminal and

    start from zero speed and check the

    h. Check the equipment various parameters at different

    stages of speed like frequency, current, voltage,

    bearing noise, vibration and any other abnormalities.

    i. Check visually for any defects and deficiencies.

    j. Remove 3-phase supply.

    ii. Remove the extended lead with flexible pipe

    a. Remove extended lead

    connection from dome

    terminal box.

    b. Remove dome terminal box.

  • CAMTECH/E/18-19/ Loco OCB 13

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    c. Remove clamp from flexible pipe.

    d. Remove extended lead connection from motor terminal

    box.

    e. Remove motor terminal box cover.

    iii. Remove the impeller.

    a. Put the OCB from test bench to working place.

    b. Remove the top cone.

    c. Remove the bottom cone.

    d. Put the OCB in horizontal condition with the help of

    crane.

    e. Remove the locking bolt with locking plate of impeller.

    f. Fit the hydraulic puller and remove the impeller with

    key

  • 14 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    iv. Remove the motor from dome

    a. Unscrew the 4 nos. bolt with

    washer of motor foundation.

    b. Remove the motor from

    dome by crane.

    v. Remove terminal box

    a. Remove the lead connection

    b. Remove the SB

    c. Remove terminal box

    vi. Stripping of motor

    a. Place the motor in horizontal

    condition

    b. Unscrew the hex. hd. Screw

    of end cover of DE side.

    c. Remove DE side end cover.

    d. Unscrew the hex. hd. Screw of end cover of NDE side.

    e. Remove NDE side end cover.

    vii. Stripping of rotor

  • CAMTECH/E/18-19/ Loco OCB 15

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    a. Remove circlip from NDE side rotor shaft.

    b. Remove bearing from both sides by 3 leg puller.

    c. Remove inside grease cap from both sides.

    d. Remove rotor from stator

    viii. Clean the following parts

    a) Dome b) Cone

    c) Dome Impeller

    d) Rotor

  • 16 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    e) Stator

    f) End covers

    g) Terminal box and other parts.

    ix. Checking and attending of various part

    a. Check the dome for any

    defect and damages and

    repaired if required.

    b. Check the cone for any

    defect and damages and

    repaired if required.

    c. Checking and repairing of

    dome inspection cover.

    d. Measure the shaft dia of bearing seat.

    e. Measure the bearing housing dia of end covers.

    f. Checking attending/ replacement of damage parts of

    terminal box.

    g. Prepare the rubber gasket.

  • CAMTECH/E/18-19/ Loco OCB 17

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    h. Check attending/replacement of damaged part of terminal

    box.

    i. Replace rubber gasket of

    various part

    j. Check the impeller after cleaning for DPT and MPT test.

    k. Paint the following parts.

    a) Dome

    b) Cone

    c) Stator from out side

    d) End covers

    e) Terminal box and other parts.

  • 18 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    x. Rotor balancing.

    a. Check the rotor bars for any crack with the help of

    growler test.

    b. Fit the impeller on shaft.

    c. Fit the attachment to the shaft for making it suitable

    to fit on the balancing machine.

  • CAMTECH/E/18-19/ Loco OCB 19

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    d. Send rotor with impeller for balancing.

    e. Load the impeller on balancing machine with the

    help of crane.

    f. Rotate at specified speed.

    g. Note the balancing weight value and location.

    h. Repair the balancing weight and fit the balancing

    weight at appropriate location.

    i. Re-rotate and check the balancing position.

    j. Repeat the above process if required.

    k. Get it certified by inspection and unloaded it from

    balancing machine.

    l. Bring in assembly shop.

    m. Remove attachment from shaft.

    n. Remove impeller.

    o. Paint the impeller.

    xi. Stator varnishing.

    a. Put stator into oven for

    backing.

    b. Remove stator after

    backing.

    c. Apply varnish to stator

    winding.

  • 20 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    d. Put stator into oven for backing.

    e. Remove stator after backing.

    f. Clean extra varnish.

    g. Clean the threaded portion of stator.

    xii. Fitting of terminal box.

    a. Fitting of terminal box with backside gasket.

    b. Fitting of SB.

    c. Tinning of short link and lugs.

    d. Connection of connecting lead on SB.

    xiii. Testing of stator.

    a. Bring the stator and do connection for HV test.

    b. Remove connection after HV test.

    c. Bring stator in surge testing both and connect the

    leads to do surge testing.

    d. Disconnect the connection and shift the stator on

    work bench.

    e. Measure the winding resistance of all 3-phase with

    the help of W stone bridge.

    f. Measure the insulation resistance with 1 KV

    megger.

  • CAMTECH/E/18-19/ Loco OCB 21

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    xiv. Motor assembly.

    a. Insert the rotor into the stator.

    b. Check the bearing clearance.

    c. Inscribed the date on new bearing.

    d. Heat the bearings by induction heating.

    e. Fit the bearings on both side of shaft with shims.

    f. Provide the specific quantity of grease into the

    bearing.

    g. Provide the circlip to the

    shaft in front of bearing.

    h. Fit both side end covers.

  • 22 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    i. Fit grease nipples.

    xv. Light run test.

    a. Check the insulation resistance by 1 KV meggar.

    b. Connect the 3-phase VVVF supply to motor

    terminal.

    c. Run the motor at various speeds and record the

    parameters.

    d. Check for any abnormal noise.

    e. Check the vibration.

    f. Measure the bearing noise by dBN meter.

    g. Check the bearing temp. rise.

    xvi. Assembly of blower.

  • CAMTECH/E/18-19/ Loco OCB 23

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    a. Place the dome in vertical position.

    b. Place the motor in the bracket in dome with the

    help of crane.

    c. Fit the motor in dome.

    d. Fit the key on shaft.

    e. Fit the impeller duly balanced on motor shaft if

    crank fit new impeller.

    f. Fit the locking bolt with locking plate.

    g. Fit both the cranes.

    h. Fit the flexible pipe with extended loads.

    i. Clamp the flexible pipe.

    j. Fit the insp. cover of dome with gasket.

    xvii. Load testing.

    a. Lift the blower assembly and

    put on test bench.

    b. Connect the 3-phase VVVF

    supply to the motor terminal.

    c. Run the motor at full speed.

    d. Check the bearing noise by

    SPM.

  • 24 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    e. Check the following parameters at different speed

    i.e. 1000, 2000 & full speed.

    a) Voltage b) Current c) Frequency, air flow

    by anemometer.

    f. Check the temperature rise of bearing after 2 hrs.

    load run test.

    g. Check the vibration by portable balancing machine.

    h. Check for any

    abnormal noise &

    vibration.

    i. Offer the inspection staff for checking.

    j. Attend the bookings offered by inspection staff.

    k. Disconnect the power supply from terminal box.

    l. Fit the terminal box cover.

    m. Fit the extended leads on dome with terminal box.

    n. Write the equipment No. Loco No. and location of

    equipment on blower assembly.

  • CAMTECH/E/18-19/ Loco OCB 25

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    4. CHECK POINTS :

    Auxiliary

    motors

    Rewinding of all auxiliary motors except

    MRB/SCMRB by corona resistant wire. (Ref.

    EL/2.2.8/17 dt 14/08/08)

    All new motors procurement except

    MRB/SCMRB from indigenous sources must

    be with corona resistant wire only. ( Ref.

    Amendment 3 to spec no E-10/3/09 (motor)-

    Aug‟ 1997 issued vide EL/3.2.176/1 dt

    28/1/09)

    Replace MS impeller with Aluminum impeller.(

    Ref. CLW‟s letter no ELDD/3743/CRH dated

    08/05/09. For OCB).

    Replacement of 10 mm2

    cable type 4GKW-AX

    (cable no.1147,1148 & 1149) of oil cooling unit

    with 16 mm2 cable type 4GKW-AX to improve

    the reliability of three phase loco.

    (RDSO/2011/EL/MS/0395, Rev.‟0‟ dated

    28.02.2011)

    Other Air delivery measurement in 3-phase electric

    locomotive to ascertain proper cooling and

    pressurization of machine room .(EL/SMI

    /0255 Rev.-0 date 06.05.2009)

    Motors Ensure replacement of all must change items

    during MOH, IOH & POH as per guidelines.(

    Ref. EL/3.1.35/16 dated 30/03/2007).

    Procedure for rewinding of auxiliary motors.(

    Ref. RDSO/ELRS/ SMI/3 (Rev.‟1‟) issued

    vide letter no. EL/3.2.70 dated 30.11.2000).

  • 26 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    Procedure for connecting the lead wire with the

    stator winding wires of auxiliary motors.( Ref.

    RDSO/ELRS/ SMI/5 issued vide letter no.

    EL/3.2.70/D4 dated 21.12.1977).

    Fits and limits on bearings Of auxiliary motors

    used on Electric locomotives. (Ref.

    RDSO/ELRS/SMI/16 issued vide letter no.

    EL/2.2.48/J2 dated 3.5.1978).

    Procedure for measuring the bearing clearances

    of a “free bearing” that is a bearing off the

    machine( Ref. RDSO/ELRS/SMI/23 issued

    vide letter no. EL/2.2.48/J2 dated 7.5.1978).

    Procedure for fixing the socket with the lead

    wires of auxiliary motor stator Winding. (Ref.

    RDSO/ELRS/SMI/32 issued vide letter no.

    EL/3.2.70/J2 dated 21.11.1978).

    Conditioning monitoring of bearing.( Ref.

    SMI/58 issued vide letter no. EL/8.11.12/DB3,

    dated 20.07.1979).

    Fitment of outer race of bearing in the bearing

    housing.(Ref. RDSO/ELRS/SMI/78 issued vide

    letter no. EL/2.2.48 dated 2.5.1981).

    Testing/checking of new bearings for Auxiliary

    motors .( Ref. RDSO/ELRS/SMI/79 issued vide

    letter no. EL/2.2.48 dated 11.6.1981).

    Procedure for impregnation of stator auxiliary

    motors.( Ref. RDSO/ELRS/SMI/86 (Rev.1)

    issued vide letter no. EL/3.2.70 dated

    29.11.2000).

  • CAMTECH/E/18-19/ Loco OCB 27

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    Hard chrome plating of bearing/housing shafts

    of auxiliary machines.( Ref. SMI/94 issued vide

    letter no. EL/3.2.48/JTMU, dated 15.10.1982).

    Use of button type of grease nipple on auxiliary

    motors fitted on Electric loco. (Ref.

    RDSO/ELRS/SMI/147 issued vide letter no.

    EL/3.2.70/J3 dated 30.10.1992).

    Guidelines to identify genuine and spurious/

    reconditioned bearings.( Ref.

    RDSO/ELRS/SMI/148 issued vide letter no.

    EL/2.2.48 dated 21.10.1992).

    Special instruction for surge test on 3 phase AC

    auxiliary motors.( Ref. RDSO/ELRS/SMI/149

    issued vide letter no. EL/3.2.70 dated

    Oct.‟92).

    General guidelines to follow for balancing of

    rotor and blower impellers.( Ref.

    RDSO/ELRS/SMI/152 issued vide letter no.

    EL/3.2.70/J3 dated 15.12.1992).

    Characteristic properties of enamel used on

    enameled winding wires.(Ref.

    RDSO/ELRS/SMI/153 (Revised April‟98)

    issued vide letter no. EL/2.2.8/4 dated

    20.04.1998).

    Special instructions for essential requirements

    of facilities to rewind 3 phase AC auxiliary

    motors in loco sheds and rewinding shops.( Ref.

    RDSO/ELRS/SMI/155 issued vide letter no.

    EL/3.2.70 dated 22.04.1993.

  • 28 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    Rewinding material for auxiliary motors.( Ref.

    RDSO/ELRS/ SMI/185(Rev. „1‟) with Amend

    1 &2 issued vide letter no. EL/3.2.70

    30/10/2000, 28/12/2000, 15/03/2001).

    General guidelines to follow for balancing of

    rotors and cooling blower impellers in

    position.( Ref. RDSO/ELRS/SMI/199 issued

    vide letter no. EL/3.2.70 dated 01.04.1998).

    Characteristic properties of impregnating resins

    and insulating varnishes (Superseding SMI154).

    (Ref. RDSO/ELRS/SMI/200 (Revised) issued

    vide letter no. EL/2.2.8.4 dated 30.12.1999).

    Special Instruction for essential requirements of

    facilities to rewind 3-Phase AC Auxiliary

    Motors used in Electric Locomotives in Loco

    Sheds and rewinding shops. ( Ref.

    RDSO/ELRS/SMI/222, Rev.„0‟ issued vide

    letter no. EL/3.2.70 dated 20.09.2000).

  • CAMTECH/E/18-19/ Loco OCB 29

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    5. RELIABILITY ACTION PLAN FOR 3-PHASE LOCOMOTIVES (Rev. ‘10’, May.’14)

    a All Auxiliary Blower and Motors- Visually check

    the oil cooler radiator for any oil leakage/external

    damage.

    i. Check all the auxiliary motors for any abnormal sound and proper functioning.

    ii. Measure the current of all auxiliary motors

    iii. Visual examination / RDPT of impeller of OCB.

    iv. Check tightness of foundation bolts of all auxiliary motors.

    v. Check the electrical connections of all auxiliary motors.

    vi. Check the condition of all flexible hoses connected with various auxiliary blowers and

    replace, if required.

    vii. Check tightness of SB and cable connections at terminal box.

    viii. Greasing of all motors with recommended grease

    ix. Ensure that the terminal covers of various auxiliary motors are intact and water tight.

    Special attention needs to be given to main

    compressor motor cable layout and water

    tightness of its entry point into the motor terminal.

  • 30 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    b. Oil Cooling Piping

    Replace the 'O' rings in the main transformer and main

    converter oil pipes.

    c. Oil Cooler Radiator

    Examine flange joint for sign of cracks, oil leakage and

    loose/missing screws.

    Vacuum clean the radiator chamber via the machine

    room access cover and then clean the radiator by high

    pressure hot water jet. Check that the radiator is not

    blocked.

    d. Oil Cooler Blower

    Remove and clean the oil cooler blower filter duct.

    Remove all traces of dirt, duct and debris.

    Clean the oil cooler blower fan impeller. Remove all

    traces of dirt, dust and debris.

    Remove the air cone from the oil cooler blower filter

    panel. Remove all dirt, debris and obstructions.

    Check for abnormal noise and measure vibration level

    on OCB before and after inspection.

    Air velocity measurement of OCB to be taken before

    and after inspection.

    Conduct RDPT of Impeller and check for unbalancing

    Replace the Impeller of oil cooler blower

    Check the condition of Rubber bellows of OCB duct to

    TM Scavenger Blower. If damaged, replace it.

  • CAMTECH/E/18-19/ Loco OCB 31

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    Check the condition of roof filter & OCB duct gasket

    if damaged - replaced

    Check the condition of rubber hosepipe and clamps.

    Replace if damaged. Check the tightness of clamps.

    Check the condition of the filter screen, inspect for

    cracks or damage. Rectify any faults found.

    Check the security of the bolts around the duct flanges.

    Check all flanges on the ducting for cracks around the

    hoses. Rectify any fault found.

    Remove any build up of dirt and foreign material from

    around the filter screen.

    e. Oil Cooler Blower Motor

    Checking of bearing condition by SPM/Noise and

    changing on condition basis

    Overhaul the oil cooler blower motor. Replace the

    bearings along with associate components & grease.

    Remove all dust and dirt from motor body using a

    vacuum cleaner and soft non- metallic brush.

    Conduct RDPT of motor foundation brackets.

    Securing of motors cables.

    Check Current & Voltage of OCB Motor

  • 32 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    f. Oil Cooler Blower Seals

    Replace the seals between the oil cooler blower & the

    filter duct, between the oil cooler blower filter & the

    pantograph roof hatch on the oil cooler blower unit,

    between the oil cooler blower & machine room floor,

    on the oil cooler blower filter & ducting and on the oil

    cooler blower inspection door (WAP5/WAP7)

    Replace the seals between the oil cooler blower & the

    filter duct, between the oil cooler blower filter & the

    pantograph roof hatch on the oil cooler blower unit,

    between the oil cooler blower & machine room floor,

    on the oil cooler blower filter & ducting and on the oil

    cooler blower inspection door (WAG9/ WAG9H)

    Check the seal between the filter screen and

    pantograph roof hatch. If necessary conduct a water

    test. Replace the seal if any leakage occurs.

  • CAMTECH/E/18-19/ Loco OCB 33

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    6. MODEL QUESTIONS

    OBJECTIVE

    1. Before starting work on faulty circuit it should be ensured

    that

    a. The faulty circuit has been isolated from power supply

    and earthed.

    b. The worker is capable to do the work.

    c. The connections are not approachable.

    d. None of the above.

    2. One can protect himself from electric shock by wearing

    hand gloves of good.

    a. Conducting material

    b. Insulating material

    c. Semiconductor material

    d. Any of the above.

    3. Which of the following are safety precautions?

    a. Don‟t touch live wire or equipment with bare hands.

    b. Before switching on DJ, see no one is working inside

    loco.

    c. Use insulated meting and hand gloves.

    d. All of the above.

  • 34 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    4. Which material is recommended as fire extinguisher in

    electrical cases?

    a. Carbon tetra chloride

    b. Carbon dioxide

    c. Sulphur hexafluoride

    d. Any of the above.

    5. The BDV of transformer oil should be

    a. 20kV

    b. 30kV

    c. 40kV

    d. 50kV

    6. The colour of moisturized silica gel is

    a. Pink

    b. Blue

    c. Yellow

    d. Green

    7. Which of the following is not the function of transformer

    oil

    a. Cooling of winding and core.

    b. Providing additional insulation

    c. Media for are quenching

    d. Provides inducting coupling

    8. Transformer oil should be free from

    a. Odour

    b. Gases

    c. Temperature

    d. Moisture

  • CAMTECH/E/18-19/ Loco OCB 35

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    9. Dielectric strength of oil should be performed using

    12.5 mm ball electrodes with a gap of-

    a. 04mm

    b. 05mm

    c. 2.5mm

    d. 03mm

    FILL IN THE BLANKS

    1. Transformer is a ………….device

    2. WAG-9 Loco transformer has…………….windings

    3. WAG-9 Loco transformer has………………..tank

    4. WAG-9 Loco Required variable voltage is achieved by the use of ……….………….

    5. An emf induced in a coil due to variation of flux in another coil is called……

    6. The coils of a transformer are wound on a …………core of ………….material

    7. The conductors used in HV and LV windings of loco transformer are…………

    8. In WAG-9 Loco The primary side is protected from the voltage surges by means of ………….placed on the roof

    of the locomotive.

    9. The auxiliary winding is protected from sudden rises in voltage by means of ………………connected across the

    winding.

  • 36 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    10. Ingress of moisture is prevented by means of …………….

    11. The complete cooling arrangement includes……….., ………..and…………..

    12. The oil pump and the cooler are connected to the conservator and radiator by…………………

    13. The breather is attached to ………………and contains……………

    14. Pink colour of silica gel indicates……………..

    15. The colour of transformer oil become dark brown, it indicates presence of …… ……

    16. Operating vacuum of transformer oil purification plant should be ………….

    17. DGA stands for …………………..

    18. Transformer must never be lift without its……………….

    19. Oil BDV Test six consecutive reading should not lie more than……

    20. The lifting ropes should not make a smaller angle then….with the horizontal.

    SAY ‘TRUE’ OR ‘FALSE’

    1. Transformer transforms power from one AC circuit to another AC circuit, at same frequency.

    2. Transformer can raise or lower the voltage.

    3. Transformer can raise or lower the frequency.

  • CAMTECH/E/18-19/ Loco OCB 37

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    4. Two circuits in a transformer linked by a common magnetic flux through a path of low reluctance.

    5. In case of step up transformer, the transformation ratio will be more than one.

    6. Constructional features of a loco transformer are more or less same other power transformer.

    7. 25 kV condenser/ cable head bushing is mounted on the top of the tank cover.

    8. The cooling arrangement of the loco transformer is force oil forced air type.

    9. In G-9 Loco the complete cooling equipment is mounted on the cover of the loco transformer.

    10. In G-9 Loco spring-loaded safety valve is fitted to the top of the conservator.

    11. Presence of moisture in transformer oil is highly desirable.

    12. The oxygen present in transformer reacts with insulation and forms an organic acid.

    13. The solid impurities present in insulation oil strengthen its dielectric strength as well as insulation of windings.

    14. The slackness of winding is desirable factor to create electrical and magnetic unbalance of the coils.

    15. Meggering is done to check the insulation resistance of the windings.

    16. The tightening torque of the bolts of tank and lid must be 70 Nm.

    17. To arrest the oil leakage from bushing RDSO has recommended to use ISI make gaskets.

    18. Bushing gaskets to be replaced as per TC- 076.

  • 38 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    19. New M.S. hardware may be used in transformer flange joints fitting.

    20. Periodic maintenance of transformer is essential to ensure safety, reliability and trouble free operation of

    Locomotives.

  • CAMTECH/E/18-19/ Loco OCB 39

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    Electrical GK QB

    21. For the protection of single-phase 1.5 kW motor, a MCB of ____ rating should be provided

    (a) 10 A (b) 16 A (c) 32 A (d) 63 A

    22. The low power factor results in

    (a) Increased losses

    (b) Decreased losses

    (c) No effect on losses

    (d) Better generating efficiency

    23. Low power factor

    (a) Aids the voltage regulation

    (b) Increase the voltage regulation

    (c) Decrease the voltage regulation

    (d) None of the above

    24. The power factor of the AC supply can be improved by using

    (a) Synchronous generator

    (b) Universal motor

    (c) Synchronous condenser

    (d) SCR

    25. A distribution line of 440 V is classified as

    (a) LV (b) MV (c) HV (d) EHV

    26. Which of the following reduces the power factor

    (a) Motor on no load

    (b) Tube lights

    (c) Fans

    (d) All of the above

    27. Unit of energy is

    a) Kilo volt hours

    b) Kilo watt hours

    c) Kilo watt

  • 40 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    28. As per Ohm‟s law

    a) V = IR

    b) V = I/R

    c) R = VxI

    29. Unit of resistance is

    a) Ampere

    b) Volts

    c) Ohm

    30. In three phase 415 volts 50 Hz supply, the phase to phase voltage is

    a) 220 Volts

    b) 415 volts

    c) 440 volts

    31. In three phase 415 volts 50 Hz supply, the phase to neutral voltage is

    a) 220 volts b) 230 volts c) 440 volts

    32. In 4 sq. mm PVC wire, 4 sq. mm stand for

    a) Thickness of wire

    b) Length of wire

    c) The area of thickness of wire

    33. 10 hours use of 500 watt Motor will consume the energy

    a) 10 units b) 20 units c) 5 units

    34. No. of poles in MCB/TPN is

    a) 2 poles b) 4 poles c) 3 poles

  • CAMTECH/E/18-19/ Loco OCB 41

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    7. ANSWERS

    Model Question

    1 (a), 2 (b), 3 (d), 4 (b), 5 (d), 6 (a), 7 (d), 8 (a), 9 (c).

    Fill In the Blanks

    1. Static, 2. 04,

    3. Aluminium Alloy, 4. GTO or IGBT,

    5. Metual Induction, 6. Laminated, Silicon Steel,

    7. Continuous Transposed Cu Conductor,

    8. Lightening arrester, 9. RCL Damping,

    10. Air dehumidifire, 11. Radiator & Blower,

    12. Oil Pipe, 13. Conservator, Silicagel,

    14. Humid 15. Acid & Impurties,

    16. 1Torr, 17. Incipien fault,

    18. Lid, 19. 15%,

    20. 60°.

    True or False

    (1)-T, (2)-T, (3)-F, (4)-T, (5)-T, (6)-T, (7)-T,

    (8)-T, (9)-F, (10)-F, (11)-F, (12)-T, (13)-F, (14)-T,

    (15)-T, (16)-T, (17)-F, (18)-T, (19)-F, (20)-T.

    Electrical (G.K.)

    21-a, 22-a, 23-c, 24-c, 25-a 26-d, 27-b, 28-a,

    29-c, 30-b, 31-a, 32-c, 33-c, 34-b,

  • 42 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    8. AN APPROACH TO EQUIPMENT

    FAILURE INVESTIGATION

    A. On Failure Aspects

    1. Occurrence

    2. Date of occurrence

    3. Past similar occurrences if any

    4. Analysis of failure i.e. why did it happen?

    5. Whether the rate of failure is worse than other installations?

    B. On Maintenance Aspects

    1. Whether schedule maintenance & required testing have been carried out on the failed equipment as

    per norms stipulated?

    2. Does the frequency of maintenance require change?

    3. Was the work properly supervised?

    4. Was any RDSO modification required to be done?

    5. Is any modification possible to avoid failure?

    C. About Staff

    1. Is the quality of work done satisfactorily?

    2. Is the skilled staff properly trained to carry out the work?

    3. Is the SMI available with them?

    4. Are proper tools available with the staff?

  • CAMTECH/E/18-19/ Loco OCB 43

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    D. About Material

    1. Is the material received from approved source?

    2. Whether the material is as per approved specification?

    3. Can a better material be used?

    E. About Testing

    1. Is the testing equipment available?

    2. Could testing procedure be improved to weed out the failures?

    3. Whether testing equipment are calibrated?

    F. General Points

    Whether following points were checked / performed

    properly?

    1. Proper contact

    2. Clearances

    3. Capacity

    4. Proper contact pressure

    5. Crack detections

    6. Cleaning

    7. Proper connections/alignment

    8. Cross checks/super checks

  • 44 CAMTECH/E/18-19/3 Loco OCB

    May, 2018 Handbook on Oil Cooling Blower (OCB)

    of 3 Electric Locomotive

    REFERENCE

    1. ABB Maintenance manual.

    2. Electrical Technology Books.

    3. RDSO/SMI-

    3,5,16,23,32,58,78,79,86,94,147,148,149,152,

    153,155,163,185,199,200,222,239,255.

    4. RDSO MS 0360,395.

    5. Details collected from various field units (Shed

    and workshop).

    6. Suggestions received during the seminar held on 23.04.2018 organised by CAMTECH/

    Gwalior.

  • CAMTECH/E/18-19/ Loco OCB 45

    Handbook on Oil Cooling Blower (OCB) May, 2018

    of 3 Electric Locomotive

    OUR OBJECTIVE

    CAMTECH is continuing its efforts in the documentation and up-gradation

    of information on maintenance practices of electrical assets. Over the years

    a large number of publications on electrical assets have been prepared in the

    form of handbooks, pockets books, pamphlets & video films etc. These

    publications have been uploaded on the internet as well as rail net.

    For downloading these publications please do following:

    1. On internet visit : www.rdso.indianrailways.gov.in

    Go to Directorates CAMTECH Publications for download

    Electrical Engineering

    2. On Railnet visit RDSO website at 10.100.2.19

    Go to Directorates CAMTECH Publications for download

    Electrical Engineering Year wise/ Subject wise For any further information regarding publications please contact:

    Director (Elect.) – 0751- 2470740 (O) BSNL, 9752447030 (CUG)

    SSE/Electrical - 9755549297 (CUG)

    E-mail at [email protected]

    Fax to 0751- 2470841

    Write at : Director (Electrical)

    Indian Railways

    Centre for Advanced Maintenance technology,

    In front of Hotel Adityaz,

    Airport Road, Maharajpur,

    Gwalior, Pin code – 474 005

    To upgrade maintenance technologies and

    methodologies and achieve improvement in

    productivity and performance of all Railway assets

    and manpower which inter-alia would cover

    reliability, availability, utilisation and efficiency.

    http://www.rdso.indianrailways.gov.in/

    back to content: