egn_5623 pp-ds final

50
Production Planning and Production Planning and Detailed Scheduling (PP/DS) Detailed Scheduling (PP/DS) in SCM in SCM EGN 5623 Enterprise Systems Optimization EGN 5623 Enterprise Systems Optimization (Professional MSEM) (Professional MSEM) Fall, 2011 Fall, 2011

Upload: jagan-mohan-reddy

Post on 27-Dec-2015

32 views

Category:

Documents


0 download

DESCRIPTION

PPDS

TRANSCRIPT

Page 1: Egn_5623 Pp-ds Final

Production Planning and Production Planning and Detailed Scheduling (PP/DS) Detailed Scheduling (PP/DS)

in SCMin SCM

EGN 5623 Enterprise Systems Optimization EGN 5623 Enterprise Systems Optimization(Professional MSEM)(Professional MSEM)

Fall, 2011 Fall, 2011

Page 2: Egn_5623 Pp-ds Final

Production Planning and Production Planning and Detailed Scheduling (PP/DS) Detailed Scheduling (PP/DS)

in SCM in SCM

Theories & ConceptsTheories & Concepts

EGN 5623 Enterprise Systems Optimization EGN 5623 Enterprise Systems Optimization(Professional MSEM)(Professional MSEM)

Fall, 2011 Fall, 2011

Page 3: Egn_5623 Pp-ds Final

Production Process (review)Production Process (review)

Purposes for Production Planning: to meet the demand

to consider the resource capacities and the material availabilities

to improve utilisation of the resourcesto low set up timeto minimise the stock, andto minimise the work in process (WIP)to improve stability of the plan

Page 4: Egn_5623 Pp-ds Final

Hierarchical Planning Framework Hierarchical Planning Framework (review)(review)

Long term-Material programs- Supplier selection- Cooperation

- Plant location- Production systems- Subcontractors

- Physical distribution structure- Transportation strategy

- Product program- Strategic sales planning

-- Personnel training-- Contracts-- Material Requirements Planning

-- Master production Scheduling-- Capacity planning -- Distribution planning -- Mid-term sales planning

Mid term

-- Personnel scheduling-- Material ordering

-- lot-sizing- operations scheduling- shop floor control

- Warehouse replenishment- Transportation planning -- Mid-term sales planning

Short term

EXECUTION

Information FeedbackFlow of goods

Page 5: Egn_5623 Pp-ds Final

Process Chain for a Make-to Stock Process Chain for a Make-to Stock Production (review)Production (review)

Page 6: Egn_5623 Pp-ds Final

PP/DS Scope in SNPPP/DS Scope in SNP

Page 7: Egn_5623 Pp-ds Final

PP/DS Scope in SNPPP/DS Scope in SNP

SNP determines the sequence of the locations to be planned and starts with the location that only has inbound transportation lanes.

There is a demand at the customer location. The net requirements calculation before planning does not find any planned receipts to cover the demand at this location.

The product in a DC is procured externally. The system analyzes the possible transportation lanes and comes to the distribution center.

Page 8: Egn_5623 Pp-ds Final

PP/DS Scope in SNPPP/DS Scope in SNPAssumingly, there are no planned receipts at the distribution center at the beginning of planning, SNP runs a check using the possible transportation lanes which arrive at the plant.

There are also no planned receipts available at the plant, and the product is produced in-house, so the SNP explodes PDS and creates planned orders for each finished product, which is decomposed into dependent demands for its components.

SNP turns the demand for components into purchase requisitions using possible transportation lanes and quota arrangements or priorities.

Page 9: Egn_5623 Pp-ds Final

SNP Heuristics used for PPSNP Heuristics used for PPThree interactive PP planning methods:1.The location heuristic

• Only plans for selected products in a location on one level.

2.The network heuristic• Plans for all selected products in all locations on one

level. • SNP defines the sequence of locations internally.

3. The multilevel heuristic• Plans for selected products in all locations on all levels. • The location sequence is determined automatically for

each product. • Note that all components of the selected product are

planned. This corresponds to a multilevel cross-plant MRP run.

Page 10: Egn_5623 Pp-ds Final

Basics of PP/DSBasics of PP/DSPP/DS prerequisites:

• Master data for products• Resources• PPM or PDS

Planned order life cycle (see Figure 15.1)• Creation of a planned order to balance demand

requirement• Conversion to a production order• Release of a production order• Confirmation (completion) of production order

Page 11: Egn_5623 Pp-ds Final

Planned Order Life CyclePlanned Order Life Cycle

Page 12: Egn_5623 Pp-ds Final

Planned Order PropertiesPlanned Order Properties

Properties of planned orders and production orders (Tables 15.1 and 15.2):

•Order Status & Category•Fixing indicators•Schedule status•Other flags reflecting order status

Page 13: Egn_5623 Pp-ds Final

Order Status Order Status for for PlannedPlanned Orders Orders in PP/DSin PP/DS

Page 14: Egn_5623 Pp-ds Final

Order Status Order Status for for ProductionProduction Orders in PP/DSOrders in PP/DS

Page 15: Egn_5623 Pp-ds Final

PP/DS categoriesPP/DS categories

Page 16: Egn_5623 Pp-ds Final

Indicator and Schedule StatusIndicator and Schedule Status

Indicator:•“PP Firmed” indicates either the output (target) or the input (source) is firmed for the date.

Schedule status types: Fully scheduled*Partly scheduledFully de-allocated

*”full scheduled” means all operations of an order are allocated with resources. “full de-allocated” means all operations are de-allocated with resources.

Page 17: Egn_5623 Pp-ds Final

Scheduling Strategy ProfileScheduling Strategy Profile

Scheduling strategy profile defines the parameters as below: 1.Scheduling mode

• (e.g. find slot, insert operation, etc)2.Planning direction

• (backwards, forwards, or reverse)3.Priority restriction,

• regarding the alternative PPM mode 4.Operation validity

Page 18: Egn_5623 Pp-ds Final

Scheduling Strategy ProfileScheduling Strategy ProfileA strategy profile contains one or more strategies which are processed in a given order until a solution is found.

• Schedule backwards or forwards, each with a finite number of time intervals.

• Prioritise resources for production, e.g. automated machines are loaded with a higher priority.

Note: Each used strategy profile must be flagged, in order to

re-create the schedule. (see table 15.4)

Page 19: Egn_5623 Pp-ds Final

Strategy ProfilesStrategy Profiles

Page 20: Egn_5623 Pp-ds Final

Cross-Plant PlanningCross-Plant Planning

Page 21: Egn_5623 Pp-ds Final

Use Fixing Horizon to Ensure Use Fixing Horizon to Ensure Pegging RelationPegging Relation

Page 22: Egn_5623 Pp-ds Final

Bottom-up HeuristicBottom-up HeuristicBottom-up heuristic reschedules dependent demands to the earliest receipt date first for the fix pegged elements. The dependent demands are sorted according to their requirement dates.

The bottom-up heuristic should be executed from the lowest level on which scheduling problems exists (see Figure 15.7).

For bottom-up heuristic, forward scheduling in profile strategy is suggested.

Page 23: Egn_5623 Pp-ds Final

Bottom-up HeuristicBottom-up Heuristic

Page 24: Egn_5623 Pp-ds Final

Alternative Resource Modelling Alternative Resource Modelling using Classificationusing Classification

Page 25: Egn_5623 Pp-ds Final

Alternative Resources in Routing & Alternative Resources in Routing & PPM/PDS using Resource ClassificationPPM/PDS using Resource Classification

Page 26: Egn_5623 Pp-ds Final

Mode LinkageMode Linkage

The mode linkage determines the dependencies between adjacent operations regarding modes.

By default, the mode linkage is “0” and no mode restrictions (see Figure 19.3).

If the duration of operation depends on the selected resource, alternative sequences must be maintained in SAP ERP (see Figure 19.4). The number of operations in the alternative sequence must be the same as in the original sequence.

Page 27: Egn_5623 Pp-ds Final

Mode Linkage – no Mode Mode Linkage – no Mode RestrictionRestriction

Page 28: Egn_5623 Pp-ds Final

Modelling of Production in a Modelling of Production in a Different LocationDifferent Location

Page 29: Egn_5623 Pp-ds Final

Overlap for Orders: Continue FlowOverlap for Orders: Continue Flow

Continue flow is characterised by the output rate against the consumption rate. It is calculated by the duration of the operation, the quantity and the offset.

The total of consumed quantities has to be less than the total of the produced quantities (see Figure 19.7).

Page 30: Egn_5623 Pp-ds Final

Modelling of Production at the Modelling of Production at the same locationsame location

Page 31: Egn_5623 Pp-ds Final

Push ProductionPush Production

Push production is a functionality that is mostly required in the process industries, e.g. a semi-finished product (bulk) is created with fixed or minimum lot sizes and needs to be processed further due to technical or storage capacity issue.

Push production functionality provides a list of products that have the bulk as input and allows creating orders for these interactively (see Figure 19.13).

Page 32: Egn_5623 Pp-ds Final

Push ProductionPush Production

Page 33: Egn_5623 Pp-ds Final

Production Planning and Production Planning and Detailed Scheduling (PP/DS) Detailed Scheduling (PP/DS)

in SCM in SCM

SAP Implementation SAP Implementation

EGN 5623 Enterprise Systems Optimization EGN 5623 Enterprise Systems Optimization(Professional MSEM)(Professional MSEM)

Fall, 2011 Fall, 2011

Page 34: Egn_5623 Pp-ds Final

SAP SCM ModulesSAP SCM Modules

THEORY AND PRACTICE OF ADVANCED PLANNER AND OPTIMIZER IN SUPPLY CHAIN DOMAIN by Sam Bansal

Page 35: Egn_5623 Pp-ds Final

SCM Product View (Elements)SCM Product View (Elements)

APO – Production Planning – Interactive Production Planning – APO – Production Planning – Interactive Production Planning – Product View (APO/RRP3) Product View (APO/RRP3)

Page 36: Egn_5623 Pp-ds Final

SCM Product View (Quantities)SCM Product View (Quantities)

APO – Production Planning – Interactive Production Planning – APO – Production Planning – Interactive Production Planning – Product View (APO/RRP3) Product View (APO/RRP3)

Page 37: Egn_5623 Pp-ds Final

SCM Product View (Semi-finished SCM Product View (Semi-finished Product)Product)

Page 38: Egn_5623 Pp-ds Final

SCM Product View (Raw Materials)SCM Product View (Raw Materials)

Page 39: Egn_5623 Pp-ds Final

SCM Receipt View SCM Receipt View

APO – Production Planning – Interactive Production Planning – APO – Production Planning – Interactive Production Planning – Receipt View (APO/RRP4) Receipt View (APO/RRP4)

Page 40: Egn_5623 Pp-ds Final

SCM Requirement View SCM Requirement View

APO – Production Planning – Interactive Production Planning – APO – Production Planning – Interactive Production Planning – Requirement View (APO/RRP1) Requirement View (APO/RRP1)

Page 41: Egn_5623 Pp-ds Final

SCM Product OverviewSCM Product Overview

APO – Production Planning – Interactive Production Planning – APO – Production Planning – Interactive Production Planning – Product Overview (APO/POV1) Product Overview (APO/POV1)

Page 42: Egn_5623 Pp-ds Final

SCM Reporting InterfaceSCM Reporting Interface

APO – Production Planning – Interactive Production Planning – APO – Production Planning – Interactive Production Planning – Product Overview (APO/POV1) Product Overview (APO/POV1)

Page 43: Egn_5623 Pp-ds Final

SCM Reporting (Order List)SCM Reporting (Order List)

APO – Production Planning – Reporting– Order and Resource APO – Production Planning – Reporting– Order and Resource Reporting (APO/CDPS_REPT) Reporting (APO/CDPS_REPT)

Page 44: Egn_5623 Pp-ds Final

SCM Reporting (Production SCM Reporting (Production Overview)Overview)

APO – Production Planning – Reporting– Order and Resource APO – Production Planning – Reporting– Order and Resource Reporting (APO/CDPS_REPT) Reporting (APO/CDPS_REPT)

Page 45: Egn_5623 Pp-ds Final

SCM Reporting (Resource SCM Reporting (Resource Utilization)Utilization)

APO – Production Planning – Reporting– Order and Resource APO – Production Planning – Reporting– Order and Resource Reporting (APO/CDPS_REPT) Reporting (APO/CDPS_REPT)

Page 46: Egn_5623 Pp-ds Final

SCM Production List (Interface)SCM Production List (Interface)

APO – Production Planning – Reporting– Production List APO – Production Planning – Reporting– Production List (APO/PPL1) (APO/PPL1)

Page 47: Egn_5623 Pp-ds Final

SCM Production ListSCM Production List

APO – Production Planning – Reporting– Production List APO – Production Planning – Reporting– Production List (APO/PPL1) (APO/PPL1)

Page 48: Egn_5623 Pp-ds Final

SCM Definition of Key Figures for SCM Definition of Key Figures for Plan MonitorPlan Monitor

APO – Supply Chain Monitoring– Current Settings– Define Current APO – Supply Chain Monitoring– Current Settings– Define Current Key Figure Schema (APO/PMONDEF) Key Figure Schema (APO/PMONDEF)

Page 49: Egn_5623 Pp-ds Final

SCM Supply Chain CockpitSCM Supply Chain Cockpit

APO – Supply Chain Monitoring– Supply Chain Cockpit APO – Supply Chain Monitoring– Supply Chain Cockpit (APO/SCC02) (APO/SCC02)

Page 50: Egn_5623 Pp-ds Final

Exercises:Exercises:Module 10: Supply Network Planning (SNP) - (Section 3)

10.5 Supply Network Planning Heuristic10.5.6 Location heuristic for multiple materials on multiple levels10.5.7 Run SNP heuristic – network at the plant level10.5.8 Run SNP heuristic – multilevel at the plant level 10.5.9 Review Production Plan in Product view10.5.10 Network planning with heuristic10.5.11 Network plan with multilevel heuristic10.5.12 The planning board

10.6 Check the results in SAP ERP