[email protected]/energogazproekt.pdfretrofitting of fuel gas preparation unit for boilers...

22
WWW.EGP-PERM.RU [email protected]

Upload: trinhanh

Post on 12-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

WWW.EGP-PERM.RU [email protected]

EnergoGazProekt LLC was founded on 10 October 2011 (OGRN Certificate No.1115902010806).

The company has a full package of approvals and permits for execution of project documentation and construction and installation activities, which influence the safety of capital construction facilities, including highly hazardous and technically complex facilities.

EnergoGazProekt LLC is authorized to sign contracts for preparation of project documentation for capital construction facilities with cost not exceeding 50 million roubles under one contract.

The company has a Quality Management System Certificate ISO 900001-2011.

EnergoGazProekt LLC has been an official member of Perm Chamber of Commerce and Industry since February 2014.

OBJECTIVE - dominant position in the field of engineering as a General Contractor both at the regional and interregional level, sustainable economic growth.

STRATEGY - sustainable competitive level, business expansion and order volume growth, continuous quality improvement, high degree of responsibility.

PRIMARY OBJECTIVE ACHIEVEMENT METHODS - mastering of new activities, business expansion, technical retrofitting, effective use of advanced management and human resources.

EnergoGazProekt LLC specializes in providing engineering services and a full range of design, construction, procurement, installation, start-up and commissioning works for the following facilities:

energy centres of various capacities; low-voltage and high-voltage power supply systems (up to 110 kV inclusive); gas distribution and consumption facilities. The company solves the following tasks as a General Contractor: total or partial project management; feasibility study; financial planning; design; coordination with customers and contractors; construction and installation activities; start-up and commissioning works; logistics.

design of energy centers of various capacities in the field of small-scale power generation, including Gas Utilization Program;

integrated design of facilities for petroleum and petrochemical industries;

design of low-voltage and high-voltage power supply systems (up to 110 kV inclusive);

conceptual design of electrical power output to the external network, feasibility study.

Main design activities

EnergoGazProekt Structure

Chief Project Engineers Group

Electrical Networks and Electrical Power Equipment Department

Process Automation Department

Process Department

Construction Department

Special Discipline Department (Environmental Specialist, Civil Defense and

Industrial Safety Specialist, Land Allocation and Reclamation Engineer, Safety

Engineer)

Cost Estimate Department

Advanced Projects Group

Projects Support Group

EnergoGazProekt COMPANY STRUCTURE

Design Department Economics and Finance Department Construction Department

DIRECTOR

Chief Project Engineers Group

Electrical Networks and Electrical Power Equipment Department

Process Automation Department

Process Department

Construction Department

Special Discipline Department (Civil Defense and Industrial Safety, HSE, Land Allocation and Reclamation)

Cost Estimate Department

Advanced Projects Group

Projects Support Group

Production area No.1 (electrical works)

Production area No.2 (civil works)

Technical Engineering Department

Cost Estimate Department

Procurement Department

Economics Department

Contracts Department

Accountant Department

CUSTOMER SUBJECT

Federal State Unitary Enterprise "Machine Building Plant named after F.E. Dzerzhinsky" (Energyresource LLC)

Installation of two Guascor Gas Engine Power Plants (SFGM 560) in water boiler house

PermTOTIneft LLC (BPC Engineering LLC)

APG Recovery System Construction, "Garyushki" Preliminary Water Removal Unit, Garyushkinskoye oilfield. 1.8 MW Energy Centre.

Togliattisyntez JSC Monitoring system implementation for partial discharges in high-voltage electric motor windings, Togliattisyntez JSC

Energy Centres The most important facilities

GTP, "Garyushki" Preliminary Water Removal Unit

Guascor Gas Engine Power Plants

Equipment – Capstone C800, С1000 Total power – 1.8 MW Customer – PermTOTIneft LLC Location – Perm Krai, Kungursky District, Garyushkinskoye oilfield

Equipment – Guascor SFGM 560 Total power – 2000 kW Customer – Energyresource LLC Location – Perm Krai, Perm, Federal State Unitary Enterprise "Machine Building Plant named after F.E. Dzerzhinsky"

CUSTOMER SUBJECT

Oil and Gas Research and Design Institute "Neftegazproekt" LLC LUKOIL-West Siberia LLC

Pyakyakhinskoye oilfield construction with land plot allocation for pilot oil production. Start-up Complex 1. Energy Complex. Installation of 2 additional power units "Ural-6000" No.5, No.6 with 10 kV closed switchgear replacement based on 6 MW Gas Turbine Plant (GTP) by Aviadvigatel JSC (total power - 24 MW)

GTES-28 (Gas Turbine Power Plant), Vostochno-Perevalnoye field, based on 4 MW and 6 MW GTP by Aviadvigatel JSC (total power - 28 MW)

Iskra-Energetika CSC Energy Centre No.2 of Central Khoreyver Uplift CPF, block 1, 2, 3, 4 based on 12 MW GTP by Aviadvigatel JSC (total power - 72 MW)

Taurus Energy LLC 7.2 MW OPRA GTPP, Khancheyskoye oilfield, based on 4 OPRA OP16 units (1800kW)

Energy Centres The most important facilities

CUSTOMER SUBJECT Oil and Gas Research and Design Institute of Ukhta State Technical University LLC (Ukhta) (LUKOIL-Komi LLC)

Project Documentation: Kharyaga oilfield construction

Project and Detail Documentation: 1) Toboyskoye oilfield power supply from GTPP 2) Myadseyskoye oilfield power supply from GTPP

Sibur-Khimprom CJSC Detail Documentation development: Technical retrofitting of Fuel Gas Preparation Unit for boilers and external interconnecting off-gas and fuel gas pipelines

Detail Documentation: Design of steam supply from P-15/2, P-15/3 to GFU-2 (Gas Plant) bld.122, Ethylene and Propylene Production, and condensate return to the networks Detail Documentation: Separation of dry gas relief into fuel network and flare system after unloading of rail tankers during their drainage

Azot Branch of URALCHEM JSC

Project Documentation: Retrofitting of Substation No.62 with electrical equipment replacement

The most important design facilities for petroleum and petrochemical industries

CUSTOMER SUBJECT Belkamneft JSC Project Documentation: Chernovskoye oilfield.

110/35/6kV "Chernushka" Substation retrofitting

Detail Documentation development: Arlanskoye oilfield Vyatskaya area construction. 1st stage. 110/35/6kV "Sukharevo-BKN" Substation retrofitting. Upgrade.

LUKOIL-ENERGOSETI LLC Cost Estimate and Detail Documentation development with state expert review: 35 kV closed switchgear retrofitting, TsRP-1 (Central Distribution Substation)

Project Documentation : LUKOIL-PNGP-2013 Upgrading, TP-7 (Transformer Substation) revamp

Tyazhpromelektromet CJSC RITEK JSC

Detail Documentation development: 110/35/6kV "Gezhskaya" Substation retrofitting Detail Documentation development: 35/6kV "Troelga" Substation retrofitting

The most important design facilities for low-voltage and high-voltage power supply systems

CUSTOMER SUBJECT LUKOIL-Perm LLC Tyazhpromelektromet CJSC

Feasibility study: Construction of process facilities, Kokuy Gas Compressor Station

NPP Test LLC LUKOIL-Perm LLC

Power distribution scheme from Modular Integrated Power Plant to Booster Pump Station 0409, Polaznenskoye oilfield into the external network. Short-circuit current calculation of 6-35 kV network as a direct-current generator

Tyazhpromelektromet CJSC Sibur-Khimprom CJSC

Option development of power plant connection to Sibur-Khimprom networks. Design of power output from 18 MW GTPP to the network, Sibur-Khimprom CJSC Block diagram of process data collection and transfer to a System Operator and Central Control System.

Region-neft LLC (Samara) Feasibility study: APG Recovery System Construction at "Pervomayskaya" Preliminary Water Removal Unit

Feasibility study, conceptual design of electrical power output to the external network

CUSTOMER SUBJECT RITEK JSC Electrical works for 6 kV switchgear retrofitting, TP-95A

Mini Gas Compressor Station Construction, Preliminary Water Removal Unit

Perm Electric Repair Company LLC

Electrical works for 6/04 kV Transformer Substation, 37-30, 37-50 Unit

Construction and installation works for TP, 35-11/300, 35-50 Unit. Installation of blocks with switching devices

Total electrical equipment overhaul within process units

6 kV cable line replacement, TP-425, 2 switchgears

UralTransCom LLC Civil and commissioning works for Modular Boiler MGK-1.5

Gazosphera LLC Civil and commissioning works for Modular Boiler MGK-4.3

The most important facilities

Recommendation letter from Energyresource LLC (Perm)

Recommendation letter from MTK Business.Optima CJSC (Moscow)

Recommendation letter from LUKOIL-ENERGOSETI LLC

Perm Regional Office (Perm)

Cooperation letter from Oil and Gas Research and Design Institute of

Ukhta State Technical University LLC (Ukhta, Komi Republic)

Recommendation letter from Sibur-Khimprom CJSC (Perm)

Appreciation letter from Azot Branch of URALCHEM JSC (Berezniki)

Cooperation letter from BPC Engineering LLC (Moscow)

Recommendation letter from Sibur-Khimprom CJSC (Perm)

EnergoGazProekt LLC

Legal / Actual address: 47, bld. B, Sovetskaya Str., Perm, Perm Krai 614000, Russia Tel.: +7 (342) 207-73-81, 207-73-82, 207-73-83, 207-73-84

+7 (342) 207-73-85, 207-73-86, 207-73-87, 207-73-12

Fax: +7 (342) 207-73-81

WWW.EGP-PERM.RU E-mail: [email protected]