º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCE LETTER No.W.496/LDRJ/ROB438/01 dt. 17/01/2017 Ref: Tender Notice no. : CAO/CN/BNC/081/16 dated 08/09/2016 (LDRJ/ROB‐438/01) Technical Bid Opened on : 20/10/2016 Price bid Opened on: 23/12/2016. Dear Sir(s) 1. Your offer for the above work for Rs.10,90,83,362/‐ (RUPEES TEN CRORE NINETY LAKH EIGHTY THREE THOUSAND THREE HUNDRED AND SIXTY TWO ONLY ) is accepted by the competent authority. The accepted schedule of items showing the rates and quantities is enclosed herewith. The completion period of the work is 12 (TWELVE) months from the date of issue of this letter. This Letter of Acceptance constitutes a binding contract between you and the Railway Administration. Please quote UCC in all further correspondence. 2. The Security Deposit (SD) for the contract is Rs.54,54,168/‐ (RUPEES FIFTY FOUR LAKH FIFTY FOUR THOUSAND ONE HUNDRED AND SIXTY EIGHT ONLY). The Earnest Money Deposit of Rs.7,41,910/- remitted vide DR of Kuber Yojana Deposit Scheme No.123115 dated 18/10/2016 issued by UCO BANK, HYDERABAD, by you along with the offer is adjusted towards a part of the SD. The balance SD of Rs.47,12,258/-will be recovered from the running bills of the contract @ 10% of bill amount from each bill. Please note that no interest will accrue on the Security Deposit. 3. A Performance Guarantee (PG) for Rs.54,54,168/‐ (RUPEES FIFTY FOUR LAKH FIFTY FOUR THOUSAND ONE HUNDRED AND SIXTY EIGHT ONLY) is to be submitted by you within 30 (thirty) days from the date of issue of this letter in the forms mentioned in clause 4.0 (b) of Special Conditions of Contract. The PG shall be valid up to 60 days beyond the stipulated date of completion. 4. Please report to Dy. Chief Engineer/II/CN/UBL. along with the detailed programme of work. Other conditions, details and milestones are mentioned overleaf. This letter consists of two enclosures as given below. Please acknowledge the receipt of this letter. ENCL: 1. PG Form, Yours faithfully 2. Schedule of items. (V. SRIDHAR) Dy. Chief Engineer/Works/Construction South Western Railway, Bangalore46 for and on behalf of President of India (Please Turn over) UCC 74242 Name of work: Londa Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches Value of work : Rs.10,90,83,362/‐ Completion period : 12 months To M/s TSR NIRMAAN PRIVATE LIMITED PLOT NO 2, H.NO.8-2-277/2, ROAD NO.3, BANJARA HILLS HYDERABAD - 500 034 TELANGANA nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä SOUTH WESTERN RAILWAY Office of the Chief Administrative Officer (Construction), 18, Millers’ Road, BANGALORE – 560 046

Upload: others

Post on 16-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

`

º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCE LETTER No.W.496/LDRJ/ROB­438/01 dt. 17/01/2017

Ref: Tender Notice no.                :  CAO/CN/BNC/081/16  dated   08/09/2016  (LDRJ/ROB‐438/01)           Technical Bid Opened on  : 20/10/2016    Price bid Opened on: 23/12/2016.    

Dear Sir(s)  1.     Your   offer      for    the     above   work      for   Rs.10,90,83,362/‐ (RUPEES   TEN CRORE NINETY LAKH EIGHTY THREE 

THOUSAND    THREE HUNDRED AND  SIXTY  TWO ONLY  )  is  accepted  by  the  competent  authority.  The  accepted schedule of items showing the rates and quantities is enclosed herewith.  The completion period of the work is 12 (TWELVE) months  from the date of  issue of  this  letter.   This Letter of Acceptance  constitutes a binding contract between you and the Railway Administration.  Please quote UCC in all further correspondence. 

 2.   The Security  Deposit (SD) for the contract is Rs.54,54,168/‐ (RUPEES FIFTY FOUR LAKH FIFTY FOUR THOUSAND 

ONE HUNDRED AND SIXTY EIGHT ONLY). The Earnest Money Deposit of Rs.7,41,910/- remitted vide DR of Kuber Yojana Deposit Scheme No.123115 dated 18/10/2016 issued by UCO BANK, HYDERABAD, by you along with the offer is adjusted towards a part of the SD.  The balance SD of Rs.47,12,258/-will be recovered from the running bills of the contract @ 10% of bill amount from each bill. Please note that no interest will accrue on the Security Deposit. 

 3.    A  Performance  Guarantee  (PG)  for    Rs.54,54,168/‐  (RUPEES  FIFTY  FOUR  LAKH  FIFTY  FOUR  THOUSAND  ONE 

HUNDRED AND SIXTY EIGHT ONLY) is to be submitted by you within 30 (thirty) days from the date of issue of this letter in the forms mentioned in clause 4.0 (b) of Special Conditions of Contract. The PG shall be valid up to 60 days beyond the stipulated date of completion. 

 4.    Please  report  to  Dy.  Chief  Engineer/II/CN/UBL.  along  with  the  detailed  programme  of  work.  Other  conditions, 

details  and  milestones  are  mentioned  overleaf.  This  letter  consists  of  two  enclosures  as  given  below.  Please acknowledge the receipt of this letter. 

  ENCL:  1. PG Form,                     Yours faithfully                 2. Schedule of items.                     

                 (V. SRIDHAR) 

                                                                                                                        Dy. Chief Engineer/Works/Construction                                                               South Western Railway, Bangalore­46                                                                                                      for and on behalf of  President of India 

(Please Turn over) 

UCC 74242 Name  of  work:  Londa  ‐ Miraj  Section: Construction of Road Over Bridge (ROB) in  lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli  station  as  (1x36.00)  Bowstring  Girder (Railway portion) and RE panels for Approaches   Value of work : Rs.10,90,83,362/‐ Completion period  : 12 months

To M/s TSR NIRMAAN PRIVATE LIMITED PLOT NO 2, H.NO.8-2-277/2, ROAD NO.3, BANJARA HILLS HYDERABAD - 500 034 TELANGANA

nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä       SOUTH WESTERN RAILWAY

Office of the  Chief Administrative Officer  

(Construction), 18, Millers’ Road, 

BANGALORE – 560 046 

Page 2: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

   

º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER No.W.496/LDRJ/ROB­438/01  dt. 17/01/2017  Other conditions and details:  1.   Extension of time for submission of PG beyond 30 (thirty) days and up to 60 (sixty) days from the date of issue of this letter may 

be accorded by the Contract Agreement signing Authority. However, a penal interest of 15% per annum shall be charged for the delay beyond 30 (thirty) days on a daily basis i.e., from 31st day of the date of issue of LOA. In case you fail to submit the requisite PG even after 60 days  from the date of  issue of LOA,  the contract shall be  terminated duly  forfeiting  the EMD and other dues, if any payable against the contract and you shall also be debarred from participating in re‐tender for the work. The PG will be released after satisfactory completion of the work as per the contract conditions. If the contract is rescinded, the SD shall  be  forfeited  and,  the  PG  shall  also  be  encashed.  Further,  you  will  be  debarred  from  participating  in  the  tender  for executing the balance work  

 2.      You  shall  execute  an  agreement  for  the work within  seven  days  from  the  date  of  receipt  of  notice  by  Railways  regarding 

readiness of  the agreement.       The detailed programme of work to be submitted by you      in conformity with  the milestones given below or even earlier, shall be as stipulated in the special conditions. The programme shall indicate the time schedule of various  items of works  in the  form of Bar Chart/PERT Chart/CPM Chart.   The programme should also  include the details of organization (in terms of labour and supervisors), plant and machinery intended to be utilized from time to time for execution of the work within the stipulated date of completion.  In case of non‐submission of acceptable programme of work within 15 days of issue of this letter, you are liable for penal action including levying fine up to Rs. 50,000/‐. 

  MILE STONE CHART

       

             

‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Copy to: CAO/CN,  CE/CN/UBL, DY.FA&CAO/CN/UBL,  HQ‐Vigilance branch/UBL,   Ch.OS/Contracts,                  The Regional Labour Commissioner (Central) BUDA complex, Opp. Mothi Talkies,                     BELLARY‐583101  for information.  Copy to :  Dy.CE/II/CN/UBL,  XEN/CN/UBL – for  information and necessary action.                     NOTE: The  rates  of  Schedule­B  are  SPECIAL  RATES  and  shall  not  be  compared  for  future                                   tenders. In case of any increase in quantities beyond agreement quantities, negotiation                                   shall be conducted  for reduction of  rates.  However effort should  be  made  to  execute                                   quantities upto agreement quantities only.                    (Encl: 1 copy of TC minutes & LOA with  copy of  schedule and conditions).  

SL.No.  ACTIVITY TDC 

1  Mobilisation & site clearance 1st to 2nd  Month 

2  Excavation of foundation 2nd to 4th  Month 

3  Construction of Abutments & Casting Bowstring Girder 

4th to 8th  Month 

4  Making of RE panels 3rd to 7th Month 

5  Execution of approaches 5th to 10th Month 

6  Launching of Bowstring Girder 10th Month 

7  Miscellaneous works 11th to 12th   Month 

Page 3: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

South Western Railway (Construction)

Annexure -I

LOA No. W496/LDRJ/ROB-438/01 Date : 17/01/2017 of UCC Code :74242

 Print Date : 17/01/2017

Name of Work :

Londa  ‐  Miraj  Section:  Construction  of  Road  Over  Bridge  (ROB)  in  lieu  of  LC  No.  438  at  Km.  698/000‐100 between  Raybag  ‐  Chinchli  station  as  (1x36.00)  Bowstring  Girder  (Railway  portion)  and  RE  panels  forApproaches. (TWO PACKET SYSTEM)  

Name of the Contractor : T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

ABSTRACT

Sl. No.

Departmental Value asper Tender

Contractor % ScheduleTotal

Schedule

Description

1

A

Items of works covered by USSOR 2011 60,32,762.47 ‐5% 57,31,124.35

2

B

Items of works pertains to Earthwork

1,44,715.00 +5% 1,51,950.75

3

C

Items of works pertains to Supply of Cement

74,51,850.00 ‐1% 73,77,331.50

4

D

Items of works pertains to Concrete works

1,36,05,800.00 ‐5% 1,29,25,510.00

5

E

Items of works pertains to Supply of Steel

1,89,03,350.00 ‐5% 1,79,58,182.50

6

F

Items of Blanketting of formation,COE & Bridge approaches

12,66,000.00 ‐5% 12,02,700.00

7

H

Items of Collection & Supply of Ballast

49,600.00 ‐5% 47,120.00

8

L

Items of Supply, Fabrication & Erection/ Launching of Steel girder

1,67,32,910.00 ‐19% 1,35,53,657.10

9

M

Items of works pertains to RE Panel items

3,72,68,200.00 ‐9% 3,39,14,062.00

10

N

Items of works pertains to Road works 

1,02,18,600.00 ‐1% 1,01,16,414.00

11

O

Items  pertains to Miscellaneous Bridge works

66,86,595.00 ‐9% 60,84,801.45

12

P

Items of works pertains to track linking works( During Non-

20,716.00 ‐1% 20,508.84

Total Value : 10,90,83,362.49

Discount 0 % 0.00

10,90,83,362.49

Net Value :

( Rupees Ten Crore Ninety Lakh Eighty Three Thousand Three Hundred and Sixty Two ONLY)

 Signature of Contractor                                                             Schedule Page No: 1  of  

32                                  Signature of Contract Signing Authority

Page 4: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

1

181021

Demolishing  plain  cement  concrete  including  disposal  of  material  within  50m  lead  :  1:2:4  orricher mix with max. 20 mm coarse aggregate 

Quantity

Rate

Unit

Amount

25.00

555.62

1 CUM

13,890.50

( Rupees  Five Hundred and Fifty Five And Paise  Sixty Two )

Contractor's % : 0       Discount : 0

 

2

181030

Demolishing R.C.C. work including cutting and stacking of steel bars and disposal of unserviceablematerial within 50m lead. (Extra payment for scraping, cleaning and straightening of bars to be made separately) 

Quantity

Rate

Unit

Amount

25.00

810.58

1 CUM

20,264.50

( Rupees  Eight Hundred and Ten And Paise  Fifty Eight )

Contractor's % : 0       Discount : 0

 

3

182033

Demolishing  stone  rubble  masonry  including  stacking  of  serviceable  material  and  disposal  ofunserviceable material within 50m lead : In cement mortar 

Quantity

Rate

Unit

Amount

15.00

560.34

1 CUM

8,405.10

( Rupees  Five Hundred and Sixty And Paise  Thirty Four )

Contractor's % : 0       Discount : 0

 

4

183062

Dismantling  including  stacking  of  serviceable  material  and  disposal  of  unserviceable  materialwithin 50m lead : Bituminous top layer of road 

Quantity

Rate

Unit

Amount

3000.00

98.72

1 SQM

2,96,160.00

( Rupees  Ninety Eight And Paise  Seventy Two )

Contractor's % : 0       Discount : 0

 

5

183061

Dismantling  including  stacking  of  serviceable  material  and  disposal  of  unserviceable  materialwithin 50m lead : Under layer of road of water bound macadam/ stone soling etc. 

Quantity

Rate

Unit

Amount

3000.00

50.52

1 SQM

1,51,560.00

( Rupees  Fifty And Paise  Fifty Two )

Contractor's % : 0       Discount : 0

 

6

192011

Earth work in excavation for foundations and floors of the bridges, retaining walls etc., includingsetting out, dressing of sides, ramming of bottom, getting out the excavated material, back fillingin  layers with approved material and consolidation of  the  layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with alllabour and material complete as per drawing and technical specification as directed by Engineer in charge : All kinds of soils 

Quantity

Rate

Unit

Amount

2500.00

182.73

1 CUM

4,56,825.00

( Rupees  One Hundred and Eighty Two And Paise  Seventy Three )

Contractor's % : 0       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 2  of  

32                                  Signature of Contract Signing Authority

Page 5: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

7

192012

Earth work in excavation for foundations and floors of the bridges, retaining walls etc., including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back fillingin  layers with approved material and consolidation of  the  layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineerin charge : Ordinary rock 

Quantity

Rate

Unit

Amount

300.00

237.64

1 CUM

71,292.00

( Rupees  Two Hundred and Thirty Seven And Paise  Sixty Four )

Contractor's % : 0       Discount : 0

 

8

192014

Earth work in excavation for foundations and floors of the bridges, retaining walls etc., includingsetting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in  layers with approved material and consolidation of  the  layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with alllabour and material complete as per drawing and technical specification as directed by Engineerin charge : Hard rock (  blasting prohibited ) 

Quantity

Rate

Unit

Amount

150.00

451.19

1 CUM

67,678.50

( Rupees  Four Hundred and Fifty One And Paise  Nineteen )

Contractor's % : 0       Discount : 0

 

9

192020a

Extra for the quantity of works, executed in or underwater and/ or liquid mud including pumpingout water as required : All kinds of soils (corresponding to item no.192011) 

Quantity

Rate

Unit

Amount

850.00

36.55

1 CUM

31,067.50

( Rupees  Thirty Six And Paise  Fifty Five )

Contractor's % : 0       Discount : 0

 

10

252390

Stone Boulder Weighing minimum 35 Kg Each 

Quantity

Rate

Unit

Amount

125.00

455.40

1 CUM

56,925.00

( Rupees  Four Hundred and Fifty Five And Paise  Forty )

Contractor's % : 0       Discount : 0

 

11

222280

Supplying,  spreading  and  filling  coarse  sand  (No  cohesive  materials  to  be  used)  of  approvedquality  including watering and  ramming  in  foundation, plinth, behind  the abutment, wing wall, retaining wall  in layers not exceeding 150mm thick including its compaction as per direction ofEngineer‐in‐charge. The rate  includes all  lead,  lift, ascent, descent,  crossing of Railway  line,  etc.complete with contractors labour, materials, tools and plant 

Quantity

Rate

Unit

Amount

350.00

1,270.33

1 CUM

4,44,615.50

( Rupees  One Thousand Two Hundred and Seventy And Paise  Thirty Three )

Contractor's % : 0       Discount : 0

 

12

222140

Providing,  cutting,  fabricating,  treating,  fixing  structural  steel  as  per  IS:  2062  in  access  ladders (top  of  girder/slab  to  pier  cap),  inserts,  platforms,  railing,  trolley  refuges,  drain  pipes  etc.  bydrilling  holes  and  grouting with  C.C  as  per  specifications  including  painting with  two  coats  ofapproved paint over two coats of  primer. (Cement for grouting shall be paid separately) 

Quantity

Rate

Unit

Amount

0.50

73,927.14

1 MT

36,963.57

( Rupees  Seventy Three Thousand Nine Hundred and Twenty Seven And Paise  Fourteen )

Contractor's % : 0       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 3  of  

32                                  Signature of Contract Signing Authority

Page 6: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

13

222170

Providing and fixing of Drainage Spouts of 100 mm UPVC complete as per drawing and Technicalspecification 

Quantity

Rate

Unit

Amount

26.00

447.75

1 METRE

11,641.50

( Rupees  Four Hundred and Forty Seven And Paise  Seventy Five )

Contractor's % : 0       Discount : 0

 

14

211141

Supplying,  fitting and  fixing  in position  true  to  line and  level POT‐PTFE bearing consisting of ametal  piston  supported  by  a  disc  or  un  reinforced  elastomer  confined within  a metal  cylinder,sealing  rings,  dust  seals,  PTFE  surface  sliding  against  stainless  steel  mating  surface,  completeassembly to be of cast steel / fabricated structural steel, metal and elastomer elements completeas  per  IS  2062,  IS:1030,  AISI:304,  AISI:316,  IS:6911,  BS:3784,  IS:3400,  IS:226,  BS‐5400,  Bridge code and  as per drawing and approved Technical Specifications. The design of the bearings shallbe submitted by the manufacturers/contractor and got approved from Railway before fixing. Test report  of  the  bearings  should  be  got  approved  before  the  materials  are  lifted  from  themanufacturer premises. Payment is based on 250 MT capacity of Bearing : POT‐PTFE Bearing 

Quantity

Rate

Unit

Amount

1800.00

437.58

1 MT BEARING C

7,87,644.00

( Rupees  Four Hundred and Thirty Seven And Paise  Fifty Eight )

Contractor's % : 0       Discount : 0

 

15

242030

Providing 1.8m high fencing with 2.5m sal balli posts, 30cm girth (min) placed every 2.5m apart,embedded in cement concrete blocks and  every 15th post (or nearer if there is abrupt change ofground slope) , last but one end post and corner post shall be strutted on both sides and end post one side only, and struts embedded in cement concrete blocks,  provided with 5 horizontal linesand two diagonals of G.I. barbed wire 9.38kg per 100metres (min) between the two posts fittedand  fixed  with  G.I.  staples  driven  into  the  posts  including  two  coats  of  coal  tarring  of  balliescomplete (cost of posts, struts and concrete to be paid for separately). 

Quantity

Rate

Unit

Amount

500.00

69.41

1 METRE

34,705.00

( Rupees  Sixty Nine And Paise  Forty One )

Contractor's % : 0       Discount : 0

 

16

061013

Random  rubble masonry with  hard  stone  in  foundation  and  plinth  including  levelling  up withconcrete  as  per  specifications,  upto  plinth  level with  :  :  Cement mortar  1:6  (1cement:  6coarse sand) 

Quantity

Rate

Unit

Amount

50.00

2,023.44

1 CUM

1,01,172.00

( Rupees  Two Thousand Twenty Three And Paise  Forty Four )

Contractor's % : 0       Discount : 0

 

17

114041

Pointing on stone work with cement mortar 1:3 (1cement: 3fine sand) : Flush/ Ruled pointing 

Quantity

Rate

Unit

Amount

20.00

84.82

1 SQM

1,696.40

( Rupees  Eighty Four And Paise  Eighty Two )

Contractor's % : 0       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 4  of  

32                                  Signature of Contract Signing Authority

Page 7: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

18

051032

Brick work with machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222  ‐1991  in  superstructure  from  beyond  plinth  level  upto  6m  above  plinth  level  in  cementmortar 1:6 (1 cement  : 6 coarse sand) : With Modular bricks 

Quantity

Rate

Unit

Amount

30.00

3,115.97

1 CUM

93,479.10

( Rupees  Three Thousand One Hundred and Fifteen And Paise  Ninety Seven )

Contractor's % : 0       Discount : 0

 

19

111011

12 mm cement plaster of mix ‐ : 1:4 (1cement: 4 fine sand) 

Quantity

Rate

Unit

Amount

100.00

75.30

1 SQM

7,530.00

( Rupees  Seventy Five And Paise  Thirty )

Contractor's % : 0       Discount : 0

 

20

111031

20 mm cement plaster of mix ‐ : 1:4 (1cement: 4 fine sand) 

Quantity

Rate

Unit

Amount

100.00

102.19

1 SQM

10,219.00

( Rupees  One Hundred and Two And Paise  Nineteen )

Contractor's % : 0       Discount : 0

 

21

222160

Providing weep  holes  by making  suitable  opening  or  drilling  in  existing  Brick masonry/Plain/Reinforced  concrete  abutment,  wing  wall/  return  wall  with  100  mm  dia  AC  pipe,  extendingthrough the full width of the structure complete 

Quantity

Rate

Unit

Amount

10.00

459.23

1 METRE

4,592.30

( Rupees  Four Hundred and Fifty Nine And Paise  Twenty Three )

Contractor's % : 0       Discount : 0

 

22

237050

Supplying  and  laying  precast  Kerb  Stone  of  concrete  M25  Grade  30cmX  20  cm    (In  Section  /including  chamfering  as  per  design  if  any)    including  fixing  in  1:6  cement  sand  mortar    andpointing with 1:2  cement mortar  (1cement:2  Sand ordinary)  including  all  excavation /refilling, ramming and other incidental works as required. 

Quantity

Rate

Unit

Amount

1200.00

391.42

1 METRE

4,69,704.00

( Rupees  Three Hundred and Ninety One And Paise  Forty Two )

Contractor's % : 0       Discount : 0

 

23

141012

Providing, laying and jointing glazed stoneware pipes grade `A' as per IS:651 including bends etc.with  stiff mixture  of  cement mortar  in  the  proportion  of  1:1  (1cement  :  1fine  sand)  includingtesting of joints etc. complete : 150mm diameter 

Quantity

Rate

Unit

Amount

50.00

271.76

1 METRE

13,588.00

( Rupees  Two Hundred and Seventy One And Paise  Seventy Six )

Contractor's % : 0       Discount : 0

 

24

192030

Providing  and  laying  Plain  Cement  Concrete    1:3:6  with  graded  stone  aggregate  of  40  mmnominal size,  in foundation and floors,   retaining walls of bridges    including mechanical mixing,vibrating,    pumping  and bailing out   water where  ever  required   with  all materials  and  labour complete  but  excluding  the  cost  of  cement  and  shuttering  as  per  drawings  and  technicalspecifications as directed by Engineer 

Quantity

Rate

Unit

Amount

400.00

1,538.08

1 CUM

6,15,232.00

( Rupees  One Thousand Five Hundred and Thirty Eight And Paise  Eight )

Contractor's % : 0       Discount : 0

 Signature of Contractor                                                             Schedule Page No: 5  of  

32                                  Signature of Contract Signing Authority

Page 8: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

 

25

211170

Painting steel works (New bridges) with two cover coats of red oxide paint conforming to IS 123‐62 as per  IRS‐B1‐2001  to given an even  shade with all  labour & material  including scaffolding, shuttering and strutting along with provision of Jhoola/ hanging scaffolding where required. 

Quantity

Rate

Unit

Amount

750.00

93.01

1 SQM

69,757.50

( Rupees  Ninety Three And Paise  One )

Contractor's % : 0       Discount : 0

 

26

238050

Providing  and  applying  2.5mm  thick  road marking  strips  (retro‐reflective)  of  specified  shade/colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicatormachine  fitted  with  profile  shoe,  glass  beads  dispenser,  propane  tank  heater  and  profile  shoe heater, driven by experienced operator on road surface  including cost of material,  labour, T&P,cleaning  the  road  surface of  all  dirt,  seals,  oil,  grease and  foreign material  etc.  complete  as perdirection of Engineer‐in‐charge and in accordance with applicable specifications 

Quantity

Rate

Unit

Amount

150.00

479.92

1 SQM

71,988.00

( Rupees  Four Hundred and Seventy Nine And Paise  Ninety Two )

Contractor's % : 0       Discount : 0

 

27

238060

Providing  and  fixing  of  raised  pavement  markers  made  of  polycarbonate  moulded  body  andreflective  panels  with  micro  prismatic  lens  made  of  polycarbonate  with  abrasion  resistantcoating.  The  length,  weight  and  width  of  body  shall  not  exceed  95  mm,  18mm  and  105mmrespectively.  The  lower  surface  of  the RPM  shall  be  supported with  two nylon  shanks,  each  oflength  not  less  than  25mm.  Fixed  to  the  road  by  using  twin  nylon  shanks  using  bituminousadhesive on bitumen roads or without nylon shanks with epoxy resin adhesive on concrete roads as per directions of Engineer Incharge. The RPM should conform to the quality standards as laiddown in IR Standard Specifications 

Quantity

Rate

Unit

Amount

250.00

669.14

1 EACH

1,67,285.00

( Rupees  Six Hundred and Sixty Nine And Paise  Fourteen )

Contractor's % : 0       Discount : 0

 

28

222290

Providing  Boulder  backing  behind  wing  wall,  return  wall,  retaining  wall  with  hand  packedboulders & cobbles with smaller  size boulders  toward  the back  including all  lead,  lift,  labour &other  incidental charges as complete work  in all respect. Payment  for boulder / cobbles will bedone extra. 

Quantity

Rate

Unit

Amount

50.00

178.76

1 CUM

8,938.00

( Rupees  One Hundred and Seventy Eight And Paise  Seventy Six )

Contractor's % : 0       Discount : 0

 

29

221070

Providing  and  laying  Filter material  As  Per  RDSO  Specifications  underneath  pitching  in  slopescomplete as per drawing and Technical specification 

Quantity

Rate

Unit

Amount

850.00

1,648.61

1 CUM

14,01,318.50

( Rupees  One Thousand Six Hundred and Forty Eight And Paise  Sixty One )

Contractor's % : 0       Discount : 0

 

30

231010

Preparation  of  subgrade  by  excavating  earth  upto    22.5cm  depth,  dressing  to  camber  andconsolidating  with  power  road  roller  of  8  to  12  tonne  capacity  including  making  good  the undulations etc. and disposal of surplus earth with lead upto 50 metres 

Quantity

Rate

Unit

Amount

6000.00

49.66

1 SQM

2,97,960.00

( Rupees  Forty Nine And Paise  Sixty Six )

Contractor's % : 0       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 6  of  

32                                  Signature of Contract Signing Authority

Page 9: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

31

231070

Providing  and  laying  4  cm  thick  moorum  surfacing  (Consolidated  Thickness)  on  platforms,pathways,  etc  including  spreading  watering  and  consolidation  with  3  T  Roller  or  light  power roller complete 

Quantity

Rate

Unit

Amount

1500.00

22.17

1 SQM

33,255.00

( Rupees  Twenty Two And Paise  Seventeen )

Contractor's % : 0       Discount : 0

 

32

233011

Providing  and  applying  tack  coat  using  bitumen  emulsion  (Rapid  setting)  complying  with  IS:8887‐ 1995, spraying the bitumen emulsion with mechanically operated spray unit, cleaning andpreparing the existing road surface as per specification : On W.B.M. @ 0.4kg/ sqm 

Quantity

Rate

Unit

Amount

9000.00

19.49

1 SQM

1,75,410.00

( Rupees  Nineteen And Paise  Forty Nine )

Contractor's % : 0       Discount : 0

 

60,32,762.47

(No. of Items 32 ONLY)

Schedule A Departmental Value : 

-3,01,638.12

BELLOW ‐5 %

57,31,124.35

Schedule A Total :

Rupees in Words ( Rupees  Fifty Seven Lakh Thirty One Thousand One Hundred and Twenty Four And Paise  Thirty 

 Signature of Contractor                                                             Schedule Page No: 7  of  

32                                  Signature of Contract Signing Authority

Page 10: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

EW03‐301

Mechanical  compaction  of  earth  work:  Mechanical  compaction  of  embankment, approaches  to bridges etc., in specified layers using specified capacity vibratory power rollers as per type of soil,to  achieve  specified dry density of  earth/other material  using  contractor`s  power  rollers,  toolsand  plants,  consumables,  labour,  watering  etc.,  all  complete  as  per    specification  &  special conditions  and  as  directed  by  Engineer‐in‐charge. Note:  If  any other  roller or other equipment  is used  for  compaction, payment  for  the completelayer shall be reduced by 20 percent of the accepted rate for mechanical compaction. 

Quantity

Rate

Unit

Amount

10000.00

10.50

1 cu.m

1,10,250.00

( Rupees  Ten And Paise  Fifty )

Contractor's % : 5       Discount : 0

2

EW03‐304

Fixing reference pegs: Striking out of centre  line of railway alignment using total station or anyother  latest  survey  equipment  and  fixing  centre  line  pegs  of  adequate  size  with  Railway's  tie bars/cut  rails  at  every  100m  on  straight  and  25m  in  curves,  at  bridges  etc.,  with  contractorssurveyor,  equipment,  all  consumables,  labour  etc. Note  :  (i)  The  reference  pegs  shall  be  fixed  along  the  alignment  at  appropriate  locations  to provide  information  for  execution  of  formation,  bridges,  ballasting  and  linking  of  trackthroughout  the  period  of  construction. (ii)  Contractor  is  responsible  for  maintaining  the  reference  pegs  including  shifting  in  case  ofshifting  of  alignment  or  to  facilitate  construction. (iii) The reference pegs shall be usable as temporary bench marks wherever required. 

Quantity

Rate

Unit

Amount

50.00

154.30

1 EACH

8,100.75

( Rupees  One Hundred and Fifty Four And Paise  Thirty )

Contractor's % : 5       Discount : 0

 

3

SE03‐101

Soil  investigation  in  all  types  of  soil  including  soft  rock  at  cutting  locations  up  to    2m  below proposed  formation  level  or  hard  rock  or  at  embankments  upto  2m below  the  natural  groundlevel or the formation level as per RDSO guide lines and IS Specifications  including collection ofsamples  (Disturbed/undisturbed)  at  each    location  at  arate  of  one  number/2m  depth  andconducting the following field tests on each sample. (i) Classification of soil. (ii) Specific gravity ofsoil. (iii) Bulk density and water content. (iv) Grain site analysis (sieve & hydrometer). (v) Liquid and plastic limits. (vi) Chemical tests on soil for Choloride, Sulphur and pH value. (vii) MDD andOMC.  (viii)  Swelling  index.  (ix)  C&Phi  analysis  of  soil  and  Standard  penetration  Test  (SPT)  atevery 1.5m interval or where there is change in strata. (x) crushing strength test additionally on soft rock at 1.0 m depth of rock.(xi) Bore chart should show the layers of soil with SPT value etc.The  report  should  be  submitted  with  recommendations  for  use  of  cut  spoil  for  fillingembankment in case of cutting and recommendations for forming embankment over the existingsub‐soil including the necessity and mode of special treatment to be done, if any. 

Quantity

Rate

Unit

Amount

30.00

437.00

1 RM

13,765.50

( Rupees  Four Hundred and Thirty Seven )

Contractor's % : 5       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 8  of  

32                                  Signature of Contract Signing Authority

Page 11: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

4

SE03‐102

Soil investigation in hard rock at Cutting/other locations up to  2m below formation level as perRDSO guide lines and IS  Specifications including collection of samples (Disturbed/undisturbed)at  each    location  at  one  sample/2m  depth  or  less  and  conducting  the  following  field  tests.  (i)Crushing strength test. (ii) Specific gravity of rock. (iii) Water absorption of rock. (iv) KRD & CWCrecovery values of rock. (v) Bore chart should show the layers of rock with SPT value / Recoveryetc.  Report should be submitted with recommendations on slope stability and on use of cut spoil for filling embankment. 

Quantity

Rate

Unit

Amount

10.00

1,419.00

1 RM

14,899.50

( Rupees  One Thousand Four Hundred and Nineteen )

Contractor's % : 5       Discount : 0

 

5

DD03‐101

Plotting  initial  levels:  Computer  Plotting  of  the  theoretical  cross  section  profile  based  on  theinitial levels of ground, recorded in the level books for cuttings/embankments at intervals of 25mor  less  including  computation  of  theoritical  profile/quantities  duly  deducting  quantities  for bridges  and  any  other  structure  not  requiring  execution  of  earthwork  in  A4  size  sheet  withcontractor's  material,  man  power,    consumables,  tools  and  plants  etc.,      and  as  directed  byEngineer‐in‐charge.  Note:  i)  Plottings  and  calculations  are  to  be  submitted  to  Railway  in  3  sets. (ii) One cross section in one A4 size sheet is required. 

Quantity

Rate

Unit

Amount

0.50

4,700.00

1 KM

2,467.50

( Rupees  Four Thousand Seven Hundred )

Contractor's % : 5       Discount : 0

 

6

DD03‐102

Plotting  final  levels:  Computer  plotting  of  the  theoretical  &  actual  final  finished  cross  sectionprofile, duly indicating different type of strata available/ excavated in the x‐section, based on the final levels recorded in the level books for banks/ cuttings at intervals of 25m or less, including computation  of  theoritical/actual  quantities  done  as  per  classification  of  different  types  ofsoil/blanketing material as certified by Engineer‐in‐charge duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor'smaterial, man power, consumables, tools and plants etc.,  and as directed by Engineer‐in‐charge. Note:  i)  Plottings  and  calculations  are  to  be  submitted  to  Railway  in  3  sets ii)  One  cross  section  in  one  A4  sheet  is  required. iii)  For  embankments,  computation  of  different  soils  viz.,  cut  spoils,  contractor's  own  earth,blanketing material are to be shown separately as per measurement recorded. 

Quantity

Rate

Unit

Amount

0.50

4,700.00

1 KM

2,467.50

( Rupees  Four Thousand Seven Hundred )

Contractor's % : 5       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 9  of  

32                                  Signature of Contract Signing Authority

Page 12: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1,51,950.75

(No. of Items 6 ONLY)

Schedule B Departmental Value : 

0.00

1,51,950.75

Schedule B Total :

Rupees in Words ( Rupees  One Lakh Fifty One Thousand Nine Hundred and Fifty And Paise  Seventy Five ONLY )

SPECIAL  RATES  and  shall  not  be  compared  for  future tenders. In case of any increase in quantities beyond agreement quantities  negotiation shall be conducted  for reduction of  rates.  However effort should  be  made  to  execute quantities up to agreement quantities only

 Signature of Contractor                                                             Schedule Page No: 10  of  

32                                  Signature of Contract Signing Authority

Page 13: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'C'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

CE1‐01A

Supply of Ordinary Portland  cement of  43  / 53 grade  conforming  to  IS 8112 /  IS 12269  (uptodate)and/or Portland Pozzolana Cement conforming to IS/1489 (upto date), at site of work to the extent of the quantities required for various items of works in schedule items including all cost ofloading,  unloading,leading,  transporting,  stacking,  storing  including  making  proper  storagearrangements and all consumables, machinery, vehicles, labour etc., complete and as directed by the  Engineer‐in‐charge. (a)  Ordinary  Portland  Cement  (43/53  Grade) NOTE  :1)    Use  of  Portland  Pozzolona  cement  shall  be  restricted  strictly  to  the  permittedconstruction  items  only.    Pozzolana  cement  shall  not  be  used  in  PSC  construction.  2)  Admixtures  such  as  super  plasticizers  will  be  permitted  based  on  specific  designs  forpermitted  construction  items with  the  approval  of  the  DY.Chief  Engineer‐in‐charge.    However, admixtures proposed shall be supplied free of cost by the Contractor and no compensation will be payable.  3. 33 Grade cement shall not be used in railway construction works. 

Quantity

Rate

Unit

Amount

1175.00

6,342.00

1 T

73,77,331.50

( Rupees  Six Thousand Three Hundred and Forty Two )

Contractor's % : ‐1       Discount : 0

 

73,77,331.50

(No. of Items 1 ONLY)

Schedule C Departmental Value : 

0.00

73,77,331.50

Schedule C Total :

Rupees in Words ( Rupees  Seventy Three Lakh Seventy Seven Thousand Three Hundred and Thirty One And Paise  

 Signature of Contractor                                                             Schedule Page No: 11  of  

32                                  Signature of Contract Signing Authority

Page 14: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

BRPC1

Plain  Cement  Concrete  (M15  to  M30  design  mix)  Cast‐in‐situ  work  (cement  will  be  paid separately) with Contractors all materials  including 40mm or below graded hard crushed stoneaggregate, sand, admixture, water, etc., of approved quality in foundations, abutments, piers, wing walls, return walls etc., of bridges and other structures as required, including fixing and removalof contractors shutter/  form work/ supports, vibrating/compacting, providing weep holes withcontractors  AC  pipes  75  to  100mm  dia  wherever  necessary,  providing  normal/approved expansion  joints  with  necessary  materials  as  per  design/drawings,  curing  of  concrete,pumping/bailing out of water  wherever necessary with Contractors own pump, power, fuel etc;,finishing the surfaces wherever required, etc., complete, with all lead, lift, transport, consumables,labour, tools and plant, materials, etc., as per approved drawings/specification /conditions and asdirected  by  the  Engineer‐in‐charge. NOTES: (1)  Single  rate will  apply  for  all mixes  (M15,M20,M25  and M30)  irrespective  of  proportion  ofmaterials  used  (per  cubic  metre  (  cum)  of  concrete).(2)  All  concrete  shall  be weigh  batched, machine mixed,  compacted with mechanical  vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and other relevant  specifications  as  prescribed.   Weigh  batching  is  mandatory  for  all  PCC,  RCC  and  PSCworks. (3) Rates shall include all materials, operations, etc.,   complete except for Cement, which will bepaid for separately.  Steels including fabrication, if used, and excavations for foundations will bepaid  under  relevant  SSR  or  other  schedules  separately.(4) Shuttering and supporting  form work shall be of good quality materials only.   For PSC/RCCgirders/slabs/beams/columns,  only  rigid  plate  steel  shutters  shall  be  used.(5)  Mix  design  with  requirement  of  all  tests  shall  be  arranged  by  the  Contractor  at  his  cost.(6)  Admixtures  as  required/  as  per  designs  shall  be  arranged  by  the  Contractor  at  his  cost.(7) All material  and  concrete  tests  as  required  shall  be  arranged  by  the  contractor  at  his  cost.(8) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc., 

Quantity

Rate

Unit

Amount

75.00

2,500.00

1 CUM

1,78,125.00

( Rupees  Two Thousand Five Hundred )

Contractor's % : ‐5       Discount : 0

 

2

BRPC2

Plain  Cement  Concrete  (M15  to  M30  design  mix)  Cast‐in‐situ  work  (cement  will  be  paid separately) with Contractors all materials  including 20mm/12.5mm graded hard crushed stoneaggregate, sand, admixture, water, etc., of approved quality  in bed blocks, wearing coat, coping, ballast  walls  etc.  of  bridges  and  other  structures  as  required,  including  fixing  and  removal  ofcontractors  shutter/form  work/  supports,  vibrating/compacting,  providing  weep  holes  withcontractors  AC  pipes  75  to  100mm  dia  wherever  necessary,  providing  normal/approved expansion joints with necessary materials as per design/drawings, curing of concrete, pumping/bailing out of water  wherever necessary with Contractors own pump, power, fuel etc;, finishingthe surfaces wherever required, etc., complete, with all lead,  lift, transport, consumables, labour, tools  and  plant,  materials,  etc.,  as  per  approved  drawings/specification  /  conditions  and  asdirected  by  the  Engineer‐in‐charge. NOTES: (1)  Single  rate will  apply  for  all mixes  (M15,M20,M25  and M30)  irrespective  of  proportion  of materials  used  (per  cubic  metre  (cum)  of  concrete)(2)  All  concrete  shall  be weigh  batched, machine mixed,  compacted with mechanical  vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and other relevant specifications as prescribed.  Weigh batching is mandatory for all PCC, RCC and PSC 

 Signature of Contractor                                                             Schedule Page No: 12  of  

32                                  Signature of Contract Signing Authority

Page 15: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

works. (3) Rates shall include all materials, operations, etc.,   complete except for Cement, which will be paid for separately.  Steels including fabrication, if used, and excavations for foundations will bepaid  under  relevant  SSR  or  other  schedules  separately.(4) Shuttering and supporting  form work shall be of good quality materials only.   For PSC/RCC girders/slabs/beams/columns,  only  rigid  plate  steel  shutters  shall  be  used.(5)  Mix  design  with  requirement  of  all  tests  shall  be  arranged  by  the  Contractor  at  his  cost.(6)  Admixtures    as  required/  as  per  designs  shall  be  arranged  by  the  Contractor  at  his  cost.(7)     All material and concrete tests as required shall be arranged by the contractor at his cost.(8) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc., 

Quantity

Rate

Unit

Amount

50.00

2,600.00

1 CUM

1,23,500.00

( Rupees  Two Thousand Six Hundred )

Contractor's % : ‐5       Discount : 0

 

3

BRRC1

Reinforced  Cement  Concrete  (M20  to  M40    design  mix)  work  (Cement  &    Steel  will  be  paidseparately),with Contractors all materials including 20mm graded hard crushed stone aggregate, sand,  admixture,  water  etc.,  of  approved  quality  in  foundations  including  below  ground  level,abutments,  piers,  pile  caps,  bed  blocks,  trestle  beams,  girders,  pedestals,  retaining  walls,boxes/slabs for flat top bridges, deck slabs, girders, kerb walls, diaphrams, cross frames etc., ongirder bridges and other structures of any design/shape as required, above or below ground levelof any size and shape, including fixing and removal of contractors shutters/form work/ supports, vibrating/compacting,  and  providing  weep  holes  with  AC  pipes  75mm  to  100mm  dia  andnormal/approved expansion joints with necessary materials as per designs/drawings wherevernecessary, curing of concrete, pumping/bailing out of water wherever necessary with Contractors own pump, power, fuel etc., finishing the surfaces wherever required etc., complete and includinghandling,  uncoiling,  cutting,  bending,  cranking,  tying  M.S./Tor  Rods/wires/other  steel  to  formreinforcement with Contractors galvanizsed binding wire of size 18/20 SWG(0.90mm) to IS280, etc.,  fixing  in  position  reinforcement  gauge  complete  as  required  with  all  lead,  lift,  transport,materials, consumables, labour, tools and plant, etc., and including 2 coats of cement painting asper  approved  drawings/specifications/  conditions  and  as  directed  by  the  Engineer‐in‐charge. Plant produced Ready‐mix concrete shall be used only with the specific approval of the Dy.ChiefEngineer.  NOTES: (1) Single rate will apply for all mixes (M20,M25, M30, M35 and M40) irrespective of proportion of materials used (per cubic metre  (cum) of concrete). Rate is for site mixed concrete.  For plantproduced  Ready‐mix  concrete,  an  extra  payment  of  Rs.500/‐  per  cum  will  be  applicable. (2)  All  concrete  shall  be weigh  batched, machine mixed,  compacted with mechanical  vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and otherrelevant  specifications  as  prescribed.   Weigh  batching  is  mandatory  for  all  PCC,  RCC  and  PSCworks.  (3) Rates shall  include all materials, operations, etc.,   complete except for Cement and Steel andexcavation for foundations and substructure, if required, which will be paid for separately underrelevant  SSR/other  schedules.    Similarly,  neoprene  bearing  pads,  expansion  joints  and  steelladders  attached  to  the  PSC  girder/slab  will  also  be  paid  for  separately. (4) Shuttering and supporting  form work shall be of good quality materials only.   For PSC/RCCgirders/slabs/beams/columns,  only  rigid  plate  steel  shutters  shall  be  used. (5)  Mix  design  with  requirement  of  all  tests  shall  be  arranged  by  the  Contractor  at  his  cost. (6) Admixtures, binding wires, clamps/anchors etc., as required/ as per designs shall be arrangedby  the  Contractor  at  his  cost. (7)   75% of the value of the work completed will be paid initially and remaining 25% will be paidafter all tests connected with concrete including materials and 7 days cube tests are 

 Signature of Contractor                                                             Schedule Page No: 13  of  

32                                  Signature of Contract Signing Authority

Page 16: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

completed  and  results  are  accepted.    Any  concrete  which  is  not  passing  the  design/codal requirements  shall  be  summarily  rejected. (8)   Rates include cost of  launching, lifting and placing of slabs/ girders on bearings if required. (9) This item will apply for all standard/special designs required in the work where such design is  not    specially  provided  for  in  any  other  schedule/item. (10) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc., 

Quantity

Rate

Unit

Amount

3250.00

3,600.00

1 CUM

1,11,15,000.00

( Rupees  Three Thousand Six Hundred )

Contractor's % : ‐5       Discount : 0

 

4

BRGL1A

Supply and laying of RCC Hume pipes of dia 900mm/1200mm of NP4/RDSO designs suitable forall types of Railway loading standards including providing levelling course, jointing, compactionas  per  approved  drawings  with  contractor's  fixing  materials,  collars,  aggregates  and  all  othermaterials  as  required  with  all  lead,  lift,  transport,  consumables,  labour,  tools  and  plant,  etc.,complete as directed by the Engineer‐in‐charge. (per running metre length of pipe to be quoted). (a)  Laying  with  900mm  pipe NOTES:  (1) Rates include all materials, operations etc., complete except cement used which will be paidfor  separately. (2)  Contractor  shall  produce  design/  test  reports  to  prove  the  suitability  of  the  Hume  Pipe. Decision regarding standard of pipe to be used by the Engineer‐in‐charge is final and binding onthe  contractor. (3)  Rates  include  local  transport  within  the  section  only.    Transport  from  factory  upto  thesection/office of the Engineer‐in‐charge will be paid under relevant SSR items. 

Quantity

Rate

Unit

Amount

25.00

5,000.00

1 RM

1,18,750.00

( Rupees  Five Thousand )

Contractor's % : ‐5       Discount : 0

 

5

BRGL1B

Supply and laying of RCC Hume pipes of dia 900mm/1200mm of NP4/RDSO designs suitable for all types of Railway loading standards including providing levelling course, jointing, compactionas  per  approved  drawings  with  contractor's  fixing  materials,  collars,  aggregates  and  all  othermaterials  as  required  with  all  lead,  lift,  transport,  consumables,  labour,  tools  and  plant,  etc.,complete as directed by the Engineer‐in‐charge. (per running metre length of pipe to be quoted). (b)  Laying  with  1200mm  pipe NOTES:  (1) Rates include all materials, operations etc., complete except cement used which will be paid for  separately. (2)  Contractor  shall  produce  design/  test  reports  to  prove  the  suitability  of  the  Hume  Pipe.Decision regarding standard of pipe to be used by the Engineer‐in‐charge is final and binding on the  contractor. (3) Rates include local transport within the section only.  Transport from factory upto the 

 Signature of Contractor                                                             Schedule Page No: 14  of  

32                                  Signature of Contract Signing Authority

Page 17: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

section/office of the Engineer‐in‐charge will be paid under relevant SSR items. 

Quantity

Rate

Unit

Amount

25.00

5,800.00

1 RM

1,37,750.00

( Rupees  Five Thousand Eight Hundred )

Contractor's % : ‐5       Discount : 0

 

6

BRGL2

Supplying and providing special  type of Elastomeric strip seal  type Expansion  joints capable ofmovement of +/‐ 40mm to 60mm complete as per drawing/as per specifications in bridges with PSC  BOX/  I  or  U  girders  for  the  complete  width  of  the  deck  slab  as  per  approved  drawings/specifications with contractorãs steel, dowels, plates, rubber pads, elastomers, bitumen and othermaterial,  including  fabrication,  galvanising and  fixing with all  lead,  lift,  transport,  consumables,labours,  tools & plants etc., as directed by the Engineer‐in‐charge. (per running metre  length of expansion  joint  to  be  quoted) NOTE: (1)  Rate  shall  include  all  materials,  operations,  etc.,  except  cement  which  will  be  paid  for separately.  (2) All tests as required shall be carried out by the contractor at his cost. 

Quantity

Rate

Unit

Amount

26.00

10,800.00

1 RM

2,66,760.00

( Rupees  Ten Thousand Eight Hundred )

Contractor's % : ‐5       Discount : 0

 

7

BRGL4

Drilling  of  25mm/40mm  dia  holes  in  concrete/stone  masonry/hard  rock  underground/overground,  to  a  depth  of  400mm  for  dowelling/  anchoring  including  fixing  of  steeldowels/angles/flats    and  grouting  with  cement  mortar  (1:3)  with  Contractors  all  materials, drilling  equipment,  lead,  lift,  labour,  transport,  tools  &  plant,  consumables,  etc.,  complete(excluding  cement  &  steel)  as  per  specifications  and  as  directed  by  the  Engineer‐in‐charge. NOTES:‐  (1)  Rate  includes  all materials,  operations  etc.,  excluding  cement  and  steel, which will  be  paidunder other relevant schedules. 

Quantity

Rate

Unit

Amount

250.00

150.00

1 NOS

35,625.00

( Rupees  One Hundred and Fifty )

Contractor's % : ‐5       Discount : 0

 

8

BRGL5

Supplying, providing and removing heavy duty shoring for excavation in foundation trenches forbridges and buildings only near existing bridge/track/building  to a depth not  less than 3.0m asper  specific  shoring plans  issued by  the Dy.Chief  Engineer‐in‐charge based on Railways  Sketch No:ST/CN/BNC/06‐2009, with Contractorãs all materials  (excluding  rails  to be  supplied by  theRailways  free of cost but to be returned by the Contractor), with all  lead,  lift,  labour,  transport,tools  &  plant,  consumables,  etc.,  complete  and  as  directed  by  the  Engineer‐in‐charge. NOTES:‐   (1)  Rate  is  per  square  metre  (sqm)  of  elevational  area  of  the  shoring. (2)  The  item  shall  be  operated with  the  specific  approval  and  drawing  issued  by  the  Dy.ChiefEngineer and shall be used only in unsafe/instability conditions involving depth of excavations tomore  than  3.0m  below  the  ground  level/existing  foundations/to  slope  of  existing  formationsleeper  than  1:1. (3) Total payment under this  item shall be restricted to a maximum of 10% of  the payment for earthwork  and/or  concreting  done  upto  3.0m  below  ground  level/existing  foundation  levelonly.as specified. 

 Signature of Contractor                                                             Schedule Page No: 15  of  

32                                  Signature of Contract Signing Authority

Page 18: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

Quantity

Rate

Unit

Amount

1000.00

1,000.00

1 SQM

9,50,000.00

( Rupees  One Thousand )

Contractor's % : ‐5       Discount : 0

 

1,29,25,510.00

(No. of Items 8 ONLY)

Schedule D Departmental Value : 

0.00

1,29,25,510.00

Schedule D Total :

Rupees in Words ( Rupees  One Crore Twenty Nine Lakh Twenty Five Thousand Five Hundred and Ten And Paise  

 Signature of Contractor                                                             Schedule Page No: 16  of  

32                                  Signature of Contract Signing Authority

Page 19: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'E'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

ST02‐001

Supply of High Yield Strength Deformed reinforcement steel bars / Fe 415 / Fe 415D / Fe 415S /Fe  500D  /  Fe  500S  /  Fe  550  /  Fe  550D  /  Fe  600  conforming  to  IS  1786:2008  (with  latest amendment)  at  site  of  work  to  the  extent  actually  required  for  the  work  including  all  cost  ofloading,  unloading,  leading,  transporting,  stacking,  storing,  labour,  consumables,  machinery,vehicles  etc.,  complete  and  as  directed  by  the  Engineer‐in‐charge. NOTE:  (1)  The  rate  quoted  for  this  item  is  applicable  for  Fe500,  Fe550  and  Fe  600  and  theirvariants viz. Fe 500D, Fe 500S and Fe 550D.  If Fe 415 grade or its variants Fe 415D or Fe 415Sare  used,  they  will  be  paid  at  a  reduction  of  Rs.2000/‐  per  MT  from  agreed  rates.  (2)  Stage  payment  for  supply  of  steel  shall  be  limited  to  75%  of  the  agreed  rates  subject  toproduction  of  Bank  Guarantee/  Indemnity  Bond  as  specified,  Test  certificates,  Insurance,limitation  in  quantity  supplied  at  a  time,  conditions  for  stacking/storing/  preserving  at  site. However, this payment will be restricted to a maximum of 30% of the Schedule quantity at anypoint  of  time. (3) Payment for reinforcement rods will be made as per actual used including over laps, cranks,bends,  etc.,  if  any,  as  per  approved  drawing  and  as  per  Special  Conditions  for  use  of  steel.However,  no  payment  will  be  made  for  any  wastage.  Quantity  will  be  calculated  for  nominaldiameter  of  the  bars  using  standard  weights  per  running  metre  or  as  per  actual  weights whichever  is  less. (4) Binding wire,  clamping materials etc., used  in construction        shall not be  treated as supplyitems under this schedule and   shall be governed by the Schedule and Special Conditions underthe  relevant  items  of  concreting  etc.,  and  no  extra  payment  shall  be  made.  (5)  Reinforcement  steel  shall  be  supplied  and  used  as  per  approved  drawings  and  as  perinstructions of the Engineer‐in‐charge 

Quantity

Rate

Unit

Amount

365.00

51,790.00

1 T

1,79,58,182.50

( Rupees  Fifty One Thousand Seven Hundred and Ninety )

Contractor's % : ‐5       Discount : 0

 

1,79,58,182.50

(No. of Items 1 ONLY)

Schedule E Departmental Value : 

0.00

1,79,58,182.50

Schedule E Total :

Rupees in Words ( Rupees  One Crore Seventy Nine Lakh Fifty Eight Thousand One Hundred and Eighty Two And Paise  

 Signature of Contractor                                                             Schedule Page No: 17  of  

32                                  Signature of Contract Signing Authority

Page 20: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'F'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

EW03‐202

Earth work in filling with COE: Earthwork in embankment in making formation  with contractorsown earth of approved quality in specified layers not exceeding 300mm thickness from approved earth  quarries  outside  railway  limits  in  all  soils  with  loading,  unloading,  all  lead  and  lifts,rehandling, transportation, spreading in layers, benching of slopes, sectioning to profile, clearingof debris/garbage/ vegetation/shrubs etc.,  in  the railway alignment using contractor's vehicles, machinery,  labour,  consumables  etc.,  as  per  technical  specification &  special  conditions  and  asdirected  by  Engineer‐in‐charge. Note:  (i)  Payment  shall  be  made  based  on  cross  section  measurement  only. (ii) The rate includes all charges, taxes, royalty, seignorage etc., and for pretesting of soil qualityat quarry for every 20000 cum or change of layer and testing at site for every 5000 cum or changeof  layer  for  assessing  the  suitability  of  the  soil  for  use  in  embankments  and  all  other  tests  as specified  in  the  specifications. (iii)  No  extra  payment  for  lead  etc.,  is  admisible. (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially. 15percent    of  the  balance  amount  shall  be  released  after  the  L  section  and  profile  are  prefectlyreached and  the  formation  is handed over  to Railways. Remaining 10 percent shall be releasedonly after the formation in the full block section or identitifed length is completed in all respectsand  handed  over. (v)  Only  soils  of  category  I  or  II  or  III  or  IV  as  per  clause  15  of  Technical  Specifications  ispermitted.  Payment  for  category  III will  be  reduced  by  5  percent  and  for  cateogory  IV will  bereduced by 10 percent of the accepted rates.  Accepted rates apply to soil with PI upto 7.  For PI beyond  7  and  upto  20,  a  further  reduction  of  10  percent  in  accepted  rates  shall  apply.  Use  ofcategory    V    soil    as  per  clause  15  of  Technical  Specifications  is  banned. (vi)  Formation width  at  top  shall  be made with  500mm extra  on  either  side  initially  and  aftercompaction be cut  to  standard profile. No extra payment  shall be made  for  this purpose.  If  theextra width is not made at any single location of  less than 100 m length, payments due shall bereduced by 5% for that entire 100 m stretch. 

Quantity

Rate

Unit

Amount

10000.00

126.60

1 cu.m

12,02,700.00

( Rupees  One Hundred and Twenty Six And Paise  Sixty )

Contractor's % : ‐5       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 18  of  

32                                  Signature of Contract Signing Authority

Page 21: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'F'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

12,02,700.00

(No. of Items 1 ONLY)

Schedule F Departmental Value : 

0.00

12,02,700.00

Schedule F Total :

Rupees in Words ( Rupees  Twelve Lakh Two Thousand Seven Hundred And Paise  Twelve ONLY )

 Signature of Contractor                                                             Schedule Page No: 19  of  

32                                  Signature of Contract Signing Authority

Page 22: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'H'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

BA12‐1A

Collection,  Supply  and  stacking  of  MACHINE  CRUSHED  50mm  hard,  durable,    graded  angular,cubical graded stone ballast of Granite geological variety, conforming to Railway specifications atspecified Depots and/or on cess/formation along the alignment at places within the railway limitincluding making of approach roads , crossing of railway line/nallahs/any obstructions, clearing of shrubs/bushes/rubble, making the ground level, preparing stacking area, handling/rehandlingwhere ever required, observing all safety precautions, furnishing test  reports of ballast samplesat each stage of measurements, assisting   railways  in measurement of stacks and sieve analysisand  tests,  numbering  stacks,  sprinkling    lime  after  measurement  and  resprinkling  whenevernecessary for identification, including  Seignorage /Royalty charges , sales tax and any other taxes /octroi  /duties  leviable  by  the  local  bodies/State  /Central Govt. with  the  contractor's material,labour, crew, tools, plant, machinery , rail/road vehicles, consumables, with all ascents, descents,lead,  lift, etc., complete as per special conditions, specifications and regulations   and as directed by  the  Engineer‐in‐Charge.  a)  For  supply  along  the  alignment    between  Km....  to  Km...... NOTES:  1.1  Each  tenderer  at  the  time  of  tendering  shall  submit  the  test  report  of  ballast  forimpact value, abrasion value and water absorption value from railway laboratories or approvedlaboratories mentioned in tender document in accordance with the Railway specification and IScodes as per provision of "Specification of Track Ballast, IRS‐GE‐1, failing which the offer is liable to  be  rejected.  Test  report  shall  indicate  the  name  of  the  quarry  from  where  the  sample  issubmitted.  1.2    Tenderer  shall  submit  along  with  offer,  adequate  proof  of  having  made  sufficientarrangements by way of tie up of either existing quarries or new quarries intended to be setup for timely  supply  of  ballast. 1.3    The  tenderer  shall  also  furnish  an  undertaking  that  the  ballast  supply  at  all  times  willconform  to  Specification  for  track  Ballast  as  specified  by  Railways. 1.4  Ballast's sample should satisfy the following physical properties in accordance with IS 2386Pt‐IV‐1963 when tested as per the procedure laid down in Specification of Ballast IRS‐GE‐1 June 2004  and  amended  from  time  to  time. Abrasion  Value      ‐  30%  maxImpact  Value          ‐  20%  maxWater  absorption  ‐    1%. 1.5    Ballast  should  satisfy  the  following  size  and  gradation: a)  Retained  on  65mm  sq  mesh  sieve  ‐  5%  Maximumb)  Retained  on  40mm  sq  mesh  sieve  ‐  40%  to  60%c)  Retained  on  20mm  sq  mesh  sieve  ‐  Not  less  than                                    98%.  1.6 In case gradation of ballast in a stack does not conform to required gradation, payment for thestack  will  be  reduced  as  below: i) In case ballast retained on 65mm sieve exceeds   5% but does not exceed 10% payment at 5%reduction  in  agreement  rate  shall  be  made  for  full  stack. ii) In case ballast retained on 40mm square mesh sieve exceeds 60% limit prescribed payment 

 Signature of Contractor                                                             Schedule Page No: 20  of  

32                                  Signature of Contract Signing Authority

Page 23: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'H'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

at the following reduced rates shall be made for the full stack in addition to the reduction worked out  at  (i)  above. a)  5%  reduction  in  agreement  rates  if  retention  on  40mm  sq.mesh  sieve  is  between  60%(excluding)  and  65%  (including). b)  10%  reduction  in  contracted  rates  if  retention  on  40mm  sq.  mesh  sieve  is  between  65% (excluding)  and  70%  (including). iii)  In  case  retention  on  40mm  square  mesh  sieve  exceeds  70%,  the  stack  shall  be  rejected. 1.7    Ballast  in  the  satck,  deviating  in  size  and  gradation  shall  be  rejected  under  any  of  thefollowing:  i)  Retention  on  65mm  square  mesh  sieve  is  more  than  10%.ii)  Retention  on  40mm  square  mesh  sieve  is  more  than  70%.iii)  Retention  on  40mm  Sq.mesh  sieve  is  les  than  40%.iv)  Retention  on  20mm  square  mesh  sieve  is  less  than  98%. 1.8    All  reduction  in  payments  as  above  shall  apply  over  the  agreemental  rates. 1.9  The contractor shall have no claims whatsoever for the reduced 

Quantity

Rate

Unit

Amount

50.00

992.00

1 CUM

47,120.00

( Rupees  Nine Hundred and Ninety Two )

Contractor's % : ‐5       Discount : 0

 

47,120.00

(No. of Items 1 ONLY)

Schedule H Departmental Value : 

0.00

47,120.00

Schedule H Total :

Rupees in Words ( Rupees  Forty Seven Thousand One Hundred and Twenty And Paise  Forty Seven ONLY )

 Signature of Contractor                                                             Schedule Page No: 21  of  

32                                  Signature of Contract Signing Authority

Page 24: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'L'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

BRGR‐1A

SUPPLY  ,FABRICATION  AND  ERECTION/LAUNCHING  OF    STEEL  GIRDER  (PLATE GIRDER/BOWSTRING  GIRDER):Supply  of  structural  steel  viz  steel  plates  conforming  to  quality    B0  or  BR  or  C  of  Gradedesignation  E250  or higher Grade designation as per Approved Drawing,   Steel  sections such as channels, angles,  I‐Beams  conforming  to  Quality  A  E250  of  IS:2062  or  of  higher  Grade  designation  as  per  ApprovedDrawing.   Stud Steel  conforming  to  IS 3935‐66, MS Rivets  conforming  to  IS 1148  ‐ 1962,  IS 2155  ‐ 1962, bolts  conforming  to  IS  3640,  IS  1363,    Fabrication,  assembling,  transportation,  erection/launching (launching during traffic/ and power block ) of Steel girder  ( to be utilized as composite girder) including  riveting,  welding  (MMAW/SAW/CO2),  bolting  (HSFG/Normal  bolts),  drifts  withcontractors  materials,  consumables,  fuel,  labour,  taxes/levies,  lead  lift,  plant  and  machinery,  hire  chargesequipments,  staging,  scaffolding,  temporary  arrangements,  deployment  of  caution  watchman,Non destructive  testing of  raw materials  and welds and other  tests  as  required etc.,  templates, zigs,  fixtures,  backup  supports,  accessories,  transporting  various  components  from  fabricationshop  to  the  site  including  loading,  unloading,  lift  etc.,    launching  by  means  of  road  crane  ofadequate  capacity  (  including  a  standby  working  crane  of  the  same  or  higher  capacity  )  etc., complete  as  per  the  relevant  IS  specifications,  IRS    B1  ‐2001,  IRS    BS‐110  (with  up‐to  date correction slip) issued by RDSO and as per the other relevant IRS/IS/IRC as detailed in Additionalspecial conditions ( ASC‐FAB‐ERC‐CG‐1 & ASC‐FAB‐ERC‐CG‐2), as directed by Engineer‐in‐charge. The  launching  has  to  be  done  as  per  the  scheme  supplied  by  the  contractor  and  approved  byRailways.  The launching has to be done with help of contractor's road cranes of suitable capacity/ launching nose  etc.  as  approved  by  Railway  during  traffic  block  and  /or  power  block  as  approved  byRailway. The  Rates  quoted  is    inclusive  of  :‐a.Cost  of  steel  materials,  Rivets,  nuts,  bolts  and  welding  etc.  Including  fabrication,  fabricationmaterials,  templates,  fixtures,  equipments,  tools  &  plants  required  for  the  work.b.Transportation  of  raw  materials.c.Skilled/  Unskilled  labourers  required  for  the  work.d.  Excise  Duty,  Octori,  Sales  Tax  and  other  taxes  as  applicable.e.All  lead  and  lift  etc.  complete.f.Transportation  of  fabricated  girder  parts  to  site.g.Cold  straightening  of  deformed  and  bent  girder  parts  before  their  assembling  and  otherancillary  steel  structures  wherever  necessary  for  proper  level  and  alignment.h. Supply, erection and dismantling of staging and scaffolding and other temporary arrangementswherever  required  for  the  purpose  of  assembly  and  erection  and  launching  of  girders.i.All  required  number  of  non‐destructive  testing  as  per  the  directions  of  Engineer‐in‐charge  / TPIA  (Third  Party  Inspecting  Agency),  such  as  dye  penetration  test  (D.P.T).  Radiographic  Test(R.T)  and  Ultrasonic  Test  (U.T)j.Hiring  and  deployment  of  plant  and  machinery  including  road  cranes.NOTE: 1.For launching of steel girders, the contractor has to submit the launching scheme of the girder after  award  of  contract  to  Railway  and  obtain  the  approval  of  the  competent  authority.2.If the launching is done with help of Road cranes, the contractor has to arrange stand‐by 

 Signature of Contractor                                                             Schedule Page No: 22  of  

32                                  Signature of Contract Signing Authority

Page 25: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'L'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

cranes  before  commencement  of  the  block.3.The  entire  launching  has  to  be  done  within  specified  line/  power  block.4.The fabrication has to be done  in a well established covered  factory/workshop having guided submerged  arc  welding  facilities.5.The  work  should  be  done  as  per  the  welding  processing  Standards  System  (WPSS),  Qualityassurance  Programme  (QAP)  prepared  by  the  agency  and  approved  by  TPIA  (Third  PartyInspecting Agency)  like WRI‐BHEL/Trichy,  or  any  other  agency with  specific  approval  of  Chief Engineer/Construction. 6.No extra payment will be made  for  idling of men and machineries of  the programmed  trafficand/power block is not granted 

Quantity

Rate

Unit

Amount

140.00

1,13,983.00

1 MT

1,29,25,672.20

( Rupees  One Lakh Thirteen Thousand Nine Hundred and Eighty Three )

Contractor's % : ‐19       Discount : 0

 

2

BRGR‐3

DECK  SHEETING:1.  Designing, supplying, fabricating and providing of trapezoidal roll formed deck sheetingprofiles  of  50mm  depth  made  of  galvanised  steel  troughed  metal  decking  plate  over  crossgirders/supports  for  cast‐in‐situ  deck  slab  of  ROB.    Thickness  of  deck  plate  shall  be  1.00mm(minimum)  and  shall  serve  as  permanent  shuttering  to  deck  slab  of  250mm  (max)  thicknessmeasured over crest of metal decking and shall have adequate strength to support the weight ofgreen concrete and imposed loads during concreting over a span of 2000mm between supports.Deck sheets to be embossed to facilitate enhanced sheet to concrete bonding with contractor's allmaterials, men, equipment, tools and plant, fixing arrangements, all lead and lift and the work tobe  carried  out  above Railway  tracks  and 25 KV OHE  electrified  area without  affecting Railway traffic  and  damage  to  Railway  properties  as  directed  by  Engineer‐in‐charge.NOTE: 1.  The  rate  includes  submission  of  manufacturers  design  calculations/test  reports,technical  details  and  the  supply  to  be  taken  from  reputed  manufacturing  firms. 

Quantity

Rate

Unit

Amount

430.00

1,803.00

1 SQM

6,27,984.90

( Rupees  One Thousand Eight Hundred and Three )

Contractor's % : ‐19       Discount : 0

 

1,35,53,657.10

(No. of Items 2 ONLY)

Schedule L Departmental Value : 

0.00

1,35,53,657.10

Schedule L Total :

Rupees in Words ( Rupees  One Crore Thirty Five Lakh Fifty Three Thousand Six Hundred and Fifty Seven And Paise  

 Signature of Contractor                                                             Schedule Page No: 23  of  

32                                  Signature of Contract Signing Authority

Page 26: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  : Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'M'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

BRRE‐1

RE  PANELS:Designing, supplying and erecting diamond shaped or any other architectural finish as directed,precast  concrete  facia  panels  of  suitable  thickness  and  a  concrete  grade  of  M30/M35    as approved, including supplying and providing required reinforcing stripes (hot dipped galvanised)of suitable section with all fixtures accessories, bolts, nuts , joint fillers for vertical joints betweenpanels  for horizontal  joints between panels bearing plates  for  horizontal  joints between panelscomplete  all  as  per  relevant  IS  codes,  MOST  specifications  and  IRC  codes  and  technicalspecifications  of  reinforced  earth  and  as  directed  by  Engineer‐in‐charge. NOTE:  1  Design of the structure shall be carried out based on locally available    back fill materialor a practically achievable blended material. Preliminary designs shall be submitted along withthe  tender.2   Rate for this item shall include the cost of the cement and reinforcement steel requiredfor  the  work. 

Quantity

Rate

Unit

Amount

6200.00

4,711.00

1 SQM

2,65,79,462.00

( Rupees  Four Thousand Seven Hundred and Eleven )

Contractor's % : ‐9       Discount : 0

 

2

BRRE‐2

Supplying and  providing  well graded crushed aggregate of size varying from 19.5mm to 9.1mmas  drainage  bay  backing  provide  along  the  retaining  wall/  RE  Wall    including  supplying  and providing perforated drainage pipes connecting to the nearby drain including compaction of thefilled material at a specified layer thickness as per approved by the Engineer‐in‐charge. 

Quantity

Rate

Unit

Amount

2000.00

1,140.00

1 CUM

20,74,800.00

( Rupees  One Thousand One Hundred and Forty )

Contractor's % : ‐9       Discount : 0

 

3

BRRE‐3

EARTH  WORK  BEHIND    PRECAST  FACIA  PANELS:Filling  coarse  grained  soil/earth  in  embankment  for  road  approach  as  per  approvedreinforcement earth technology behind the precast facia panels with contractors supply of backfill materials which shall be free from organic or other deleterious materials and shall conform tothe  mechanical  and  physio‐chemical  requirements  including  mechanical  compaction  as  perreinforced  earth  technology  specification. NOTE:  This work shall be carried out as per approved reinforced earth technology which shall besubmitted by the contractor and got approved from railways. The work is to be done along withreinforcing  strips  provided  with  concrete  facia  panels.   

Quantity

Rate

Unit

Amount

20000.00

289.00

1 CUM

52,59,800.00

( Rupees  Two Hundred and Eighty Nine )

Contractor's % : ‐9       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 24  of  

32                                  Signature of Contract Signing Authority

Page 27: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'M'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

3,39,14,062.00

(No. of Items 3 ONLY)

Schedule M Departmental Value : 

0.00

3,39,14,062.00

Schedule M Total :

Rupees in Words ( Rupees  Three Crore Thirty Nine Lakh Fourteen Thousand Sixty Two And Paise  Thirty Three ONLY )

 Signature of Contractor                                                             Schedule Page No: 25  of  

32                                  Signature of Contract Signing Authority

Page 28: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'N'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

BRRD‐01

Construction of granular sub‐base by providing close graded Material, mixing in a mechanical mix plant  at OMC,  carriage  of mixed Material  to work  site,  spreading  in  uniform  layers with motorgrader on prepared surface and compacting with vibratory power  roller  to achieve  the desireddensity, complete  as per drawings and specifications and as directed by the Engineer‐in‐charge. 

Quantity

Rate

Unit

Amount

2000.00

770.00

1 cu.m

15,24,600.00

( Rupees  Seven Hundred and Seventy )

Contractor's % : ‐1       Discount : 0

 

2

BRRD‐2

Supplying  ,  providing,  laying,  spreading  &  compacting  specified  graded  hard  granite  stoneaggregate  wet mix macadam as per specifications including pre mixing the materials with water to OMC in mechanical mixer (pugmill) carriage of mixed material by tipper to site with all lead &lift laying in uniform layers complete as per specifications. 

Quantity

Rate

Unit

Amount

1500.00

1,250.00

1 CUM

18,56,250.00

( Rupees  One Thousand Two Hundred and Fifty )

Contractor's % : ‐1       Discount : 0

 

3

BRRD‐3

Supplying,  providing  applying  primer  coat  over  prepared  surface  of  deck  slab  and  wet  mixmacadam with  bitumen  heated  in  bitumen  boiler  fitted  with  sprayer          with  spray  set  usingcutback MC 70 emulsion at 10kg/10sqm. Including all lead and lift as per specifications. 

Quantity

Rate

Unit

Amount

9200.00

38.00

1 SQM

3,46,104.00

( Rupees  Thirty Eight )

Contractor's % : ‐1       Discount : 0

 

4

BRRD‐4

Supplying, providing & laying 75 mm thick  bituminous macadam on                     prepared surfacewith specified graded crushed hard granite aggregates for base/binding course including loading of  aggregate with  FE  loader  and  not mixing  of  stone  aggregate  and  80/100  grade  bitumen  ofapproved grade with 3.5% by weight in 40‐60 TPH hot mix plant transporting the mixed material in tipper to paver and laying mixed material with mechanical paver finished to the required level and grade, roller by power roller and vibratory roller to achieve the desired density including thecost of labour, material, hire  charges of machinery including all lead & lift loading  unloading etc.,as  per  specifications.hard  granite  aggregates  for  base/binding  course  including  loading  ofaggregate  with  FE  loader  and  not  mixing  of  stone  aggregate  and  80/100  grade  bitumen  ofapproved grade with 3.5% by weight in 40‐60 TPH hot mix plant transporting the mixed materialin tipper to paver and laying mixed material with mechanical paver finished to the required leveland grade, roller by power roller and vibratory roller to achieve the desired density including thecost of labour, material, hire  charges of machinery including all lead & lift loading  unloading etc., as per specifications. 

Quantity

Rate

Unit

Amount

650.00

6,741.00

1 CUM

43,37,833.50

( Rupees  Six Thousand Seven Hundred and Forty One )

Contractor's % : ‐1       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 26  of  

32                                  Signature of Contract Signing Authority

Page 29: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'N'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

5

BRRD‐5

Supplying providing and laying 40mm thick bituminous concrete with 5% bitumen & 3% filler onprepared surface with specified graded stone aggregate for wearing course including loading ofaggregate with FE  loader and hot mix of bitumen filler of 60/70 grade with aggregate in hot mix plant 40/60 TPH capacity, including transporting mixed  material with tipper to paver and layingwith mechanical paver                     finishing to the required level and grade and rolling wit2h powerroller  &  vibratory  roller/pneumatic  roller  to  achieve  the  desired  density  including  cost  of  all materials labour hire charges of machinery all lead & lift loading unloading stacking etc., completebut excluding cost of primer/tack coat. 

Quantity

Rate

Unit

Amount

350.00

5,921.00

1 CUM

20,51,626.50

( Rupees  Five Thousand Nine Hundred and Twenty One )

Contractor's % : ‐1       Discount : 0

 

1,01,16,414.00

(No. of Items 5 ONLY)

Schedule N Departmental Value : 

0.00

1,01,16,414.00

Schedule N Total :

Rupees in Words ( Rupees  One Crore One Lakh Sixteen Thousand Four Hundred and Fourteen ONLY )

 Signature of Contractor                                                             Schedule Page No: 27  of  

32                                  Signature of Contract Signing Authority

Page 30: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'O'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

BRMS‐1

BASE  PIPE  FOR  FIXING  OF  ELECTRICAL  POLES  : Providing and fixing MS/GI pipes 150mm dia(inner dia) for fixing the electrical poles to the crashbarrier  including  all  materials,  labour,      lead  and  lift  with  two  coats  of  red‐oxide  paint  and basement, poles   should be welded with base plate complete as per the direction  of Engineer‐in‐charge  

Quantity

Rate

Unit

Amount

686.00

2,150.00

1 EACH

13,42,159.00

( Rupees  Two Thousand One Hundred and Fifty )

Contractor's % : ‐9       Discount : 0

 

2

BRMS‐2

JUNCTION  BOX:Supplying and fixing junction box of size 18"x9"x6" made of 18 gauge MS platewith  clamping  arrangement  to  fix  the  connectors  inside  the  box  as  per  the  drawing  andinstruction  of  Engineer‐in‐charge. 

Quantity

Rate

Unit

Amount

8.00

953.00

1 EACH

6,937.84

( Rupees  Nine Hundred and Fifty Three )

Contractor's % : ‐9       Discount : 0

 

3

BRMS‐3

HAND  RAIL  WITH  PIPESupplying, hand rail comprising one row of MS pipe of 100mm dia (as per IS 1239) fixed to the vertical supporting MS brackets 16mm thick and of height 30cm above crash barrier which  arefixed to the crash barrier parapet  at 2.0m intervals including painting the hand rail/MS bracketsby one coat of    red   oxide primer and two coats of synthetic enamel painting of suitable colourwith contractor's all materials, tools & plants, labour, consumables, all lead & lift, etc complete asdirected  by  Engineer‐in‐charge  

Quantity

Rate

Unit

Amount

17.00

76,383.00

1 MT

11,81,645.01

( Rupees  Seventy Six Thousand Three Hundred and Eighty Three )

Contractor's % : ‐9       Discount : 0

 

4

BRMS‐13

Excavation along the alignment of signalling cable/OFC/power cable carefully and exposing thesame without any damage, and excavating the new trench along the railway alignment or alongthe alignment as specified by the railway Engineer‐in‐charge, laying or removed cable, filling up all complete with sand and laying a layer of brick with contractor's own material, tools and plantsetc.,  as  directed  by  the  Engineer‐in‐charge. NOTE:‐ 1  In case the cable is damaged cost of restoration and the cost of cable will be recoveredfrom  the  contractor.  The  decision  of  the  railways with  regard  the  cost  to  be  recovered will  befinal.  

Quantity

Rate

Unit

Amount

200.00

207.00

1 MTR

37,674.00

( Rupees  Two Hundred and Seven )

Contractor's % : ‐9       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 28  of  

32                                  Signature of Contract Signing Authority

Page 31: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'O'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

5

BRMS‐14

Dismantling  of  lifting  barriers  of  the  level  crossing  including  dismantling  of  booms  (twonumbers),  winches,  wire  ropes,  winch  platform,  AC  sheet  roofing  if  any  complete  to  thesatisfaction  of  Engineer‐in‐charge  and  transporting  the  same  and  handing  over  toSE/PWAY/stores  with  Contractor's  men  tools  and  plants  complete.  (Note:  Both  side  liftingbarrier) 

Quantity

Rate

Unit

Amount

1.00

13,333.00

1 SET

12,133.03

( Rupees  Thirteen Thousand Three Hundred and Thirty Three )

Contractor's % : ‐9       Discount : 0

 

6

BRMS‐15

COMPLETION  DRAWING: Preparation  and  submission  of  GAD/Completion  drawing  for  the  Major  bridges/ROBS/RUBsbased on soil exploration and water way calculation for fixing suitable span as per RDSO designand drawing in AutoCAD on 100micon film double mat finish as per Railway standard approved by the Engineer‐in‐charge to specified scales including submission of check print for proof checkto incorporate suggested corrections and modifications and supply final copy in compact disk and6  copies  in  ammonia print  in A0  size with  all  contractor's materials,  labours,  tools,  plants  etc.,complete.     

Quantity

Rate

Unit

Amount

1.00

14,427.00

1 EACH

13,128.57

( Rupees  Fourteen Thousand Four Hundred and Twenty Seven )

Contractor's % : ‐9       Discount : 0

 

7

BRMS‐16

Supplying  and    providing UPVC  rainwater  pipe  of  150mm dia  of  6kg/sq  cm working  pressure(type  B)  conforming  to  IS13592  including  specials  as  required  and  jointing  with  contractorsmaterials and fixing accessories. 

Quantity

Rate

Unit

Amount

160.00

390.00

1 MTR

56,784.00

( Rupees  Three Hundred and Ninety )

Contractor's % : ‐9       Discount : 0

 

8

BRMS‐17

METAL  BEAM  CRASH  BARRIER:‐Providing  and  erecting  a  "W"  metal  beam  crash  barrier  comprising  of  3 mm  thickcorrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channelvertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/roadlevel,  all  steel parts  and  fitments  to be galvanised by hot dip process,  all  fittings  to  conform  toIS:1367  and  IS:1364, metal  beam  rail  to  be  fixed on  the  vertical  post with  a  spacer  of  channelsection  150  x  75  x  5  mm,  330  mm  long  complete  as  per  specifications  and  drawingNo.Dy.CE/CN/HAS/16‐2014  A  &  B 

Quantity

Rate

Unit

Amount

1500.00

2,516.00

1 MTR

34,34,340.00

( Rupees  Two Thousand Five Hundred and Sixteen )

Contractor's % : ‐9       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 29  of  

32                                  Signature of Contract Signing Authority

Page 32: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'O'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

60,84,801.45

(No. of Items 8 ONLY)

Schedule O Departmental Value : 

0.00

60,84,801.45

Schedule O Total :

Rupees in Words ( Rupees  Sixty Lakh Eighty Four Thousand Eight Hundred and One And Paise  Forty Five ONLY )

 Signature of Contractor                                                             Schedule Page No: 30  of  

32                                  Signature of Contract Signing Authority

Page 33: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

LDRJ/ROB-438/01

Notice Date :-

08/09/2016

Dept : ENGINEERING

Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438

Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED

Name  of  the  Work  :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'P'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

PWNB‐

(i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom ofhigh  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion with extra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's  skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading,  unloading with  all  incidental  charges  and  in  all  kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas  instructed; 2. While operating sub‐items d, e and f, sub‐ items a, b and c need not be and shall not be operated as sub‐items d, e and f are all‐inclusive and not extra over sub‐ items a, b and c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated as sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) furtherdumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;  6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in  case no  such prior written permission  is obtained by  thecontractor.  In addition, penal action shall be  taken  for disturbing  the ballast stacks without  thepermission  of  the  competent  authority  of  Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. For  dumping  of  ballast  on  track  for  lead  up  to  150  m 

Quantity

Rate

Unit

Amount

50.00

68.00

1 cu.m

3,366.00

( Rupees  Sixty Eight )

Contractor's % : ‐1       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 31  of  

32                                  Signature of Contract Signing Authority

Page 34: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE · Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00)

Schedule of Items   LOA No. W496/LDRJ/ROB­438/01 Date 17/01/2017 of UCC 74242 

Schedule 'P'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

2

PWNB‐030

(i) Fixing guard rails on bridges with 60 kg / 52 kg / 90R rails (supplied by Railways) as per the provisions of IRPWM without rail traffic block during day / night including cutting and bending ofrails  with  all  fittings  and  fastenings  and  drilling  of  holes  in  PSC  sleepers  (if  necessary)  withcontractors  drilling  machine  and  contractors  drill  bits; (ii)  Fixing Railways wooden nose blocks  at  the  ends of  guard  rails  on  either  end of  the bridgeincluding  fixing  grip  expansion  bolts  and  nuts,  M.S.  clips,  washers  etc. All of  the above shall be executed with contractor's  skilled personnel,  tools and plant, vehicles, machinery,    fuel, consumables,  loading, unloading with all  incidental charges and  in all kinds ofweather  conditions  and  site    conditions    including  crossing  of  tracks  wherever  required  dulyobserving  all  safety  precautions  and  including  all  lead,  ascent,  descent,  taxes,  duties,  cess,surcharges,  fees  etc.  completely  as    per  the  special  conditions  /  specifications  /  regulations,  asdirected  by  the  Engineer‐in‐Charge  and  as  per  the  note(s)  below. Note: Drilling of holes in sleepers (if executed) shall be paid separately. 

Quantity

Rate

Unit

Amount

52.00

333.00

1 track metre

17,142.84

( Rupees  Three Hundred and Thirty Three )

Contractor's % : ‐1       Discount : 0

 

20,508.84

(No. of Items 2 ONLY)

Schedule P Departmental Value : 

0.00

20,508.84

Schedule P Total :

Rupees in Words ( Rupees  Twenty Thousand Five Hundred and Eight And Paise  Eighty Four ONLY )

 Signature of Contractor                                                             Schedule Page No: 32  of  

32                                  Signature of Contract Signing Authority