    CABLE ROUTE SURVEY REPORT

    4.1 Shallow water Survey

    For the

    EIG

    Fibre Optic Submarine Cable System

    Survey conducted between 18th Nov to 27th Nov 2009

    S/V. Ayat

    By EIG Purchasers Representative

    Chris Straley

    1

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    2/17

    CONTENTS

    1.1 INTRODUCTION

    THE EUROPE INDIA GATEWAY SUBMARINE FIBER OPTIC CABLE SYSTEM (EIG)

    EIG 4.1 - SHALLOW WATER SURVEY ZAFARANA,EGYPT

    VESSEL AYAT

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    3/17

    1- Name: Ayat2- Length: 14.5m3- Width: 4.45m4- Gross Tonnage: 35.61 Tones.

    1.2 SCOPE OF WORK

    The following is the scope of work for EIG 4.1 Zafarana, EgyptShallow water survey

    2

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    4/17

    Confirm the Landing site and BMH.Mobilization of the S/V Ayat for Geophysical survey (Beach Manhole 0m to20 meters water depth)

    Conduct current measurement shallow water out to 20mConduct speed boat echo sounding for shallow waterComplete Landfall survey and de-mobilization of S/V Ayat

    2.1

    Vessel Mobilisation/ Calibrations

    Prior to the start of EIG seg 4.1 survey operations, the following pre-sailingchecks and calibrations were performed:

    All computer systems were demonstrated to be receiving data fromthe various positioning and survey systems. Software checks will beconducted to demonstrate the operability of the system.

    Gyro calibration checks were conducted by comparison of readingstaken simultaneously with measurement of offsets from the vessels

    centreline to a baseline of known azimuth on the quayside.

    Towed sensors were wet tested to prove operability of the systemand of the deployment arrangements. The echo sounder (ifapplicable) transducer depth will be determined.

    DGPS health check

    Motion sensor health check

    Installation Photos

    3

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    5/17

    Transducer mount

    Bridge Navigation Station

    4

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    6/17

    Survey operating station

    2.2 Equipment Function Checks for EIG seg. 4.1

    Testing of on-line computer systems to ensure that all navigationsystems are being logged and computed with positions being displayedand plotted.

    Verification of positioning systems.

    Wet testing of side scan sonar to check tuning of recorder/transceiver.

    Wet testing of sub-bottom profiler to check tuning ofrecorder/transceiver

    Full calibration of sensors

    Checking of interfacing between the on-line computer and surveysystems to ensure that echo sounder data is being logged correctly andthat sounder, sonar and profiler records are being properly annotated.

    5

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    7/17

    2.3 Survey Equipment Performance (Quality & Reliability)

    Upon arrival on location the EGS survey team started the mobilization ofthe S/V Ayat, all equpment was installed and in working order with theexception of the Side scan sonar Edgetech 272 TD low Freq wasunoperatable. Repair parts were dispatched from EGS office Hong Kongand repairs were completed without the loss of downtime.

    The Following Equipment was provided and maintainedthrough the EIG 4.1 Shallow water project with no downtime

    VESSEL: S/V AYATLocally contracted vessel.

    Positioning andNavigation systems:

    C-Nav GcGPS system and EGS proprietyNavigation Software.

    Topography: Total station and electronic data logger.Bathymetry: MBES ELAC 1180 multibeam system (or equivalent) and

    associated heave and gyro systems.

    SSS Edgetech 272 TD and winch

    SBP C-Boom high resolution low Voltage boomersystem (LVB)

    Geophysical OperatingSystem:

    C-View SDMP, geophysical acquisition andprocessing system.

    Sampling: Hand held Van Veen Grab sampler

    Diver Swim Survey: Diver probe and underwater video (ambientvisibility depending)

    6

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    8/17

    2.4 Performance and Suitability of the Survey Vessel

    The S/V Ayat had no downtime and ship was capable of completing alltasks assigned. The crew was helpful and worked well with all personnelonboard.

    2.5 Performance of the Survey Personnel

    EGS Survey personnel showed a high level of expertise and werecommitted to completing the EIG seg 4.1 shallow water survey in a timelyand professional manor. EGS sidescan sonar was damaged duringshipping. A quick decision to contact their office and have parts handcarried to the job site saved possible delays. The survey team stayed one

    step ahead of the operation this resulting in smooth transitions in allphases of the survey.

    7

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    9/17

    2.6 OTHER OPERATIONAL OBSERVATIONS

    EIG SEG.4.1 LANDING AREA ZAFARANA, EGYPT

    8

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    10/17

    ZAFARANA LANDING TO BMH

    BMH MARKER

    9

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    11/17

    .

    Current measurementfloats

    10

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    12/17

    FISHING TRAWLER AT ANCHOR NEAR LANDING SITE

    NAVY JETTY

    11

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    13/17

    3.1 DIARY OF EVENTS AND SUMMARY OF DOWNTIME

    18 Nov 09Start Project - Mob S/V Ayat

    0:00 Vessel along side

    8:00 Survey team leaving from Hotel

    10:45 Confirm EIG BMH by CNAV DGPS

    12:00 Topo team start the landing site survey, marine team start the vessel mobilization for geophysicalsurvey

    13:00 Continue the vessel mobilization

    18:00 End of day

    23:59 Vessel along side

    19-Nov-09

    0:00 Vessel along side

    7:00 Survey team leaving from Hotel

    10:45 Arrive vessel, continue the equipment mobilization

    12;00 Wet test of the equipment, found the side scan sonar was not working well. Check and repair on site

    13:00 Set up tide gauge at Navy jetty

    17:30 The side scan sonar is working after the checking and changed two spare board

    18:00 End of day, Vessel along side

    23:59 Vessel along side

    20-Nov-09

    0:00 Vessel along side

    6:00 Vessel start transit to Navy jetty, survey team standby

    14:30 Survey team arrive Navy jetty and onboard vessel

    14:40 Start transit to site for sea trial

    15:10 Sea condition is too tough for survey (NNE wind 20 knots), transit back to near Navy jetty for sea trial

    15:30 Deploy C-boom and side scan into water for sea trial

    15:50 Side scan sonar was not working

    16:10 Recover side scan fish for checking

    17:30 Back to jetty, de-mob the side scan fish to hotel for further inspection

    18:00 Vessel standby at jetty

    23:59 Vessel along side

    21-Nov0:00 Vessel along side

    7:30 Meet dive team at the hotel lobby

    7:40 Start transit to site by road

    8:30 Arrive landing site, start the dive swim survey from LP to WD5m along center line

    12:00 Sea condition is too tough for marine survey (NNE wind 16 knots)

    13:00 Continue the dive swim survey

    15:50 Complete the dive swim survey18:00 Vessel standby at jetty

    23:59 Vessel standby at jetty

    12

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    14/17

    22-Nov-09

    0:00 Vessel along side

    7:00 Leave from Hotel

    7:30 Onboard survey vessel at Navy Jetty

    7:40 Transit to site for current measurement survey

    8:30On site, start the current measurement survey, three location with two "float" at KP1.5 KP2.5 andKP3.3

    16:00 Complete the current measurement survey, transit back to Navy jetty

    17:00 Vessel arrive Navy jetty

    23:59 Vessel standby at jetty

    23 Nov 09

    00:00 Vessel along side7:00 Leave from Hotel

    7:30 Onboard survey vessel at Navy Jetty

    7:40 Sea trial for side scan sonar fish, not working and found the fish was leaking

    8:00 Checking and repair the leaking problem of the SSS fish

    15:00 Fixed the leaking problem ,sea trial for side scan sonar

    17:00 Completed the sea trial for side scan sonar, vessel standby at jetty

    23:59 Vessel standby at jetty

    24-Nov-09

    0:00 Vessel along side

    6:30 Leave from Hotel

    7:00 Onboard survey vessel at Navy Jetty, transit to site

    8:00 Arrive site ~CH5000, bar check for echo sounder

    8:30 Deploy side scan and boomer, data tuning

    8:45 Start the route survey along wing ling L300 from CH5000 to CH500

    9:30 Continues the route survey along wing line L225, L150, L75, CL, R75, R150, R225 and R30015:10 Re-run wing line L150 from CH500 to CH1800

    15:30 Re-run CL from CH1800 to CH500

    15:40 Completed nine line from CH500 to CH5000 with 500m survey corridor

    15:50 Cross line at CH1000

    16:00 Cross line at CH1500

    16:20 End of day, bar check for echo sounder

    16:30 Vessel transit back to jetty

    17:30 Vessel standby at jetty

    23:59 Vessel standby at jetty

    13

  • 8/14/2019 EIG Template Purchasers Reps Report 4.1 in Progress

    15/17

    25-Nov-09

    0:00 Vessel along side

    6:30 Leave from Hotel

    7:00 Onboard survey vessel at Navy Jetty, transit to site8:00 Arrive site ~CH5000, bar check for echo sounder

    9:10 Cross line survey at CH5000 to CH2500, 500m spacing six lines done

    9:15 Carry out grab sampling from CH500 to CH5000, 250m spacing from CH500 to CH2000 & 500mspacing from CH2500 to CH5000, total 13 # of samples.

    11:15 End of geophysical survey and grab sampling

    11:30 Transit back to jetty for preparation work of the speed boat sounding

    12:30 Vessel along at jetty

    17:00 Vessel standby at jetty

    23:59 Vessel standby at jetty

    26-Nov-09

    0000 Vessel along side

    0700 Leave from Hotel

    0730 Onboard survey vessel at Navy Jetty, transit to site

    0830 Meet speed boat on site, ~CH600 WD6m

    0845 Mobilization of the speed boat

    0930 Carry out the shallow water survey from WD1m to WD4m

    1300 Completed the speed boat survey

    1400 Vessel transit back to Jetty

    1500 Vessel along at jetty

    2359 Vessel standby at jetty

    27-Nov-09

    0000 Vessel along side

    0800 Start the de-mobilization of the vessel1000 Off load all of the equipment from vessel

    1300 Vessel off hire

    2359 Vessel along side