ELECTRIC GENERATION AND TRANSMISSION ON THE RAILBELT 1 Joe Griffith Chief Executive Officer, ARCTEC Alaska Conference of Mayors Energy Summit Juneau, Alaska February 18, 2014

Upload: others

Post on 27-Apr-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

ELECTRIC GENERATION AND TRANSMISSION ON THE RAILBELT

1

Joe GriffithChief Executive Officer, ARCTEC

Alaska Conference of Mayors Energy SummitJuneau, Alaska

February 18, 2014

Page 2: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

RAILBELT MAKEUP

2

• Electrical utilities are all cooperatives or government-owned

• Anchorage Municipal Light & Power (gov’t)

• Seward Electric System (gov’t)

• Chugach Electric Association

• Golden Valley Electric Association

• Homer Electric Association

• Matanuska Electric Association

Page 3: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

RAILBELT TRANSMISSION SYSTEM

• Connects all utilities

• Facilitates economic dispatch

• Transfers power

• Shares reserves

3

Page 4: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

4

RAILBELT ELECTRICAL GENERATIONRAILBELT ELECTRICAL GENERATION1 – Eklutna Generation Station (EGS)2 – Bradley Lake3 – Soldotna4 – Nikiski5 – Fire Island6 – SPP7 – ML&P Plants 2 & 2A8 – Beluga9 – Mount Spurr Geothermal Project10 – Watana11 – Eva Creek12 – Healy 2 (HCC)13 – Battery Energy Storage System (BESS)14 – Zehnder15 – North Pole

Page 5: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

RAILBELT GENERATION SUITE

5

• Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro

• AML&P – Plant 1, 2, & 2A (on drawing board), Eklutna hydro

• GVEA – North Pole, Eva Creek Wind, Healy 1 & 2, Aurora (IPP), BESS, Zehnder

• MEA – Eklutna Generation Station, Eklutna hydro, + 2 small IPPs

• HEA – Nikiski combined cycle, Soldotna, Bernice Lake

• SES – Seward plant

Note: All above participate in Bradley Lake hydro (state-owned IPP)- 124 mW capacity

Page 6: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

RAILBELT SITUATION

6

• New generation system changes playing field due to transmission constraints

• Limits Bradley Lake power deliveries when needed most.

• Railbelt economy demands reasonably-priced power (as does the rest of Alaska).

• RCA insists on “cost-causer, cost-payer” concept.

Page 7: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

AEA TRANSMISSION STUDY (2012)

7

• Southern section upgrades proposed:

• Quartz creek to University (AC)

• Additional conductor from Quartz Creek to Daves Creek

• 230 kV upgrade from Daves Creek to University s/s

• DC tie line from Bernice Lake to Beluga

• 2nd 115kV line from Bradley Junction to Soldotna

• Anchorage battery

• Northern Upgrades

• 230 kV Lake Lorraine to Douglas upgrade

• Douglas to Healy upgrade to 230 kV

Page 8: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

8

Current Railbelt Transmission System

Page 9: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

9

Proposed Upgrades toTransmission System

Page 10: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

10

Proposed Upgrades toTransmission System –

Northern Projects

Page 11: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

Slater Consulting August 2013 11

Proposed Upgrades toTransmission System –

Southern Projects

Page 12: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

TRANSCO• A transmission-owning entity• Regulated entity that owns, constructs, and maintains

transmission lines used to transmit wholesale power• May handle power dispatch and coordination• Secures financing • Executes projects

12

Page 13: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

ISO• Description

• Owns no assets• Neutral party responsible for planning, management and control of the

electric transmission grid in a region

• Characteristics• Ensures non-discriminatory access• Possesses operational authority for all transmission facilities under the ISO’s

control• Exclusive authority to maintain short-term reliability• Operates under a regulatory compact• Plans, conditions and approves projects

13

Page 14: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

COULD BE RAILBELT MODEL• TRANSCO = Alaska Railbelt Cooperative Transmission & Electric Company

(ARCTEC)• Non-discriminatory open access• Existing assets from transmission providers are pooled for joint use with

full cost recovery for all users• Universal rates based on system load that will encourage economic

transfer of generation across network• Transition to full implementation

• Single control area• Economic dispatch• Centralized planning for all future transmission

14

Page 15: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

CONCLUSION• Without a program to rectify transmission shortcomings asap

• Cost of electricity will continue to rise

• Possible savings will be forfeited

• Alaska will not achieve its alternative energy goal

• Railbelt will be captive to Cook Inlet natural gas pricing and supply issues

• NEXT STEPS

• Continue 50/50 deal between State and utilities for Bradley Lake upgrades

• Reliability standards and Open Access proceeding through RCA process

• ARCTEC proceeding with TRANSCO/ISO options

15

Page 16: ELECTRIC GENERATION AND TRANSMISSION ON THE ......RAILBELT GENERATION SUITE 5 • Chugach – Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro • AML&P – Plant 1,

DISCUSSION / QUESTIONSDISCUSSION / QUESTIONS

16