electric system modeling to assess bay-delta flow criteria proposals

36
Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals Joint Presentation CEC, CPUC, ISO Technical Staffs SWRCB Bay-Delta Workshops November 13-14, 2012

Upload: lee

Post on 23-Feb-2016

25 views

Category:

Documents


0 download

DESCRIPTION

Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals. Joint Presentation CEC, CPUC, ISO Technical Staffs SWRCB Bay-Delta Workshops November 13-14, 2012. Overview. Achieve state policy goals while ensuring electric system reliability at reasonable cost to ratepayers - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Electric System Modelingto Assess Bay-Delta Flow Criteria

ProposalsJoint Presentation

CEC, CPUC, ISO Technical StaffsSWRCB Bay-Delta Workshops

November 13-14, 2012

Page 2: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Overview

• Achieve state policy goals while ensuring electric system reliability at reasonable cost to ratepayers

• Describe analyses needed for a complete assessment• Illustrate concerns:

– the potential loss of capacity and flexibility of resources– Shift of energy production to periods of lower value

• Communicate lead time needed for some replacement resources

2

Page 3: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Key Takeaways

• California’s electric grid relies on hydroelectric resources – roughly 11,000MW out of 61,000MW of instate generating capacity

• Resources currently dispatches to accommodate existing water policies but their operational flexibility is currently broad

• There is considerable uncertainty over the electric system impacts, but a clearly defined set of expected water flow criteria proposals will enable indepth modeling assessments

3

Page 4: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Balancing Authority Areas• The Western

interconnection is divided into manageable areas that an area operator balances supply/demand on a minute to minute basis

• Nine BAAs exist within California– Five wholly within California– Four centered outside of

California serving small portions of our state

4

Page 5: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Hydro-Electric Capacity (MW) by Balancing Authority Areas

DWR River Basin DWR Hydrologic Regions CAISO BAA BANC BAA TID BAA

Upper Sacramento Sacramento 0    Pit /McCloud Sacramento 757 746  Sacramento Valley Sacramento 20    Butte Creek Sacramento 9    Stony Creek Sacramento 4    Feather Sacramento 1,734    Yuba Sacramento 594    American Sacramento 257 946  Mokelumne San Joaquin 187    Calaveras San Joaquin 1    Stanislaus San Joaquin 459 300  Tuolumne San Joaquin 0 62 154 Merced San Joaquin 70    San Joaquin San Joaquin 1,237    Total for Bay-Delta   5,329 2,054 154 Other Various 3,645 0 0Total for BAA 8,974 2,054 154

5

Page 6: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Capacity, Energy, and Operational Flexibility

• Electricity system planning has traditionally focused on energy and capacity to meet demand

• Increasing load uncertainty combined with increased penetrations of variable renewable resources create a new need for flexible resources in addition to energy and capacity

• Flexible resources have to cover sudden production decreases from wind or solar

6

Page 7: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Modeling Approaches

• Different modeling approaches are used for specific purposes

• Five primary types of modeling– Supply/demand balances– Transmission system assessments– Local capacity assessments– System simulation– Flexibility assessment

7

Page 8: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Supply/Demand Balances

• Ensures there are sufficient resources to meet expected peak demand plus a reserve margin – The reserve margin is designed to account for

issues such as higher loads than forecast and resource outages

• Usually conducted at state, system or zonal level

Tools: Spreadsheets and DatabasesMetrics: 15-17% Planning Reserve Margin

8

Page 9: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Transmission System Assessment

• Represents the electrical connection of generation and loads via the transmission system

• Identify overloaded transmission system elements and local or regional system stability criteria

• Once problems are identified, mitigation measures (new lines, reconductoring, upgraded transformers, etc.) can be proposed

Tools: Power flow and dynamic stability analysisMetrics: Meet NERC/WECC standards

9

Page 10: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Local Capacity Assessment

• Studies to determine whether sufficient in-area generation exists in transmission constrained local areas to satisfy NERC/WECC and ISO standards

• Ten local capacity areas in the ISO Balancing Authority Area – Greater Fresno, Stockton and Sierra areas relevant to flow criteria proposals

• CPUC imposes resource adequacy requirements based on ISO study results

Tools: Power flow and dynamic stability analysisMetrics: Preventing load drop from contingencies

10

Page 11: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

System Production Simulation• Production cost simulations assume load patterns and non-

dispatchable profiles to forecast:– How a given resource build-out would be operated to minimize

operating costs while meeting modeled constraints– Optimum imports from other regions– GHG emissions– Hours of unserved load and over-generation– Optimum dispatch of use-limited resources

• Models incorporate resource characteristics and are run for 8,760 hour per year

Tool: Plexos (or other production cost models)Metrics: Resources to cover loads and reserves in every hour while minimizing operating costs or other dispatch criteria

11

Page 12: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Flexibility Assessment• Focus is on whether resources are sufficiently flexible to meet

operating needs• Shifts perspective from a total load basis to a net load, e.g.

total load forecast minus the forecast of energy production from wind and solar resources

• Determine whether the net load shape (8760 basis) can be served with available resources

• Analytic techniques are evolving to identify metrics such as ramping requirements or increased regulation

Tool: Uses production simulation tools like PlexosMetrics: Example – maximum continuous 3-hour ramp

12

Page 13: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Integrating Electricity Planning Tools with Water Flow Modeling

Modeling Approach Tools Relevance

Interaction with Flow Criteria

Supply/demand balances

spreadsheets assess need for replacing lost capacity

determine generator head reduction and whether reduced hours requires capacity derate

Transmission system assessments

PSLF identify overloaded transmission

identify whether lost capacity has transmission implications

Local Capacity Assessments

PSLF identify generation needed in load pocket

identify whether lost capacity has generation implications

System simulation

Plexos determines dispatch of generating fleet to satisfy load

indicate how revised flow patterns will influence dispatch of other generating resources

Flexibility assessment

numerous asses capability of generating fleet to ramp up and down as intermittents fluctuate

assess importance of reduced hydro flexibility on the need for additional capacity from other dispatchable resources

13

Page 14: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

General Issues for Hydro-Electric Modeling

• “Constraints” - minimum water flow, fisheries protection and linkage between facilities on the same river are well recognized by electricity modelers

• “Doing it right” - extremely challenging in production cost models which are greatly simplified compared to reality

• Assessing flow criteria proposals requires modeling greater detail than customary

14

Page 15: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Hydro-electric Capacity Modeling

• Basic Question: is sufficient capacity available to serve load under forecast conditions?

• Modeling assesses whether water is available to assure that the facility’s capacity rating can be achieved and sustained for some minimum period for the interval of interest – usually peak

• Testing whether capacity is available or constrained is different than assessing whether power will be produced

15

Page 16: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Hydro-electric Energy Modeling• Basic Question: how much energy will be generated from

a facility over a given time period?• Monthly pattern of runoff and snow melt influences this

pattern as well as the amount of storage (if any) available• Resource classifications:

– Run of river– Dispatchable from reservoir storage– Pumped

– Algorithms for dispatching hydro can be simple or complex to represent flow criteria and other constraints.

16

Page 17: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Modeling Dispatch of Hydro Resources for Energy and/or A/S

• Conventions for determining “average” hydro patterns and “adverse” hydro patterns have been established, and actual generating patterns from historic years are frequently forced into production cost modeling in lieu of actual dispatch algorithms

• Hydro-electric dispatch has to be understood to be in the context of many other resources with very different cost or controllability characteristics:– Dispatchable conventional resources have high marginal operating

costs vs. hydro’s near-zero costs– Renewables like wind, solar, and run of river hydro also have near-zero

operating costs, but cannot be dispatched and do not provide the flexibility benefits needed by the system

17

Page 18: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Consequences of Changes in the Annual Pattern of Generation

• Studies suggest climate change will modify rainfall/snowfall• Additional changes from unimpaired flow criteria will shift

water usage for dispatchable hydro toward spring months, but the extent and implications are uncertain

• Seasonal shifts mean energy generated has less value– Spring loads are lower– Spring is high production period for wind and Pacific

Northwest hydro– If spring usage constrains hydro operation, this may

increase the need for other flexible resources• Any increased chance of spill means some energy value is lost

18

Page 19: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Potential Issues with Unimpaired Flow Criteria for Hydro-Electric Facilities

• Run of River facilities -- expected impact is minimal

• Pumped facilities -- expected impact is minimal• Storage facilities -- expected impact varies:

– Change in pattern of hydro-electric generation– Change in capacity rating of facilities by season– Expected decrease in flexibility

19

Page 20: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Change in Capacity Ratings of Facilities

• A shift of water releases from summer months to spring months cannot increase spring capacity, but may decrease summer capacity

• The summer months are traditionally the period of highest system stress, because the system has needed the most capacity. However, • Flexible capacity needs are different in summer vs. winter• The flexible capacity needs in the future may be different than

those traditionally seen• Resource adequacy requirements mean that any loss of

capacity will have to be replaced, and this may increase total costs for satisfying a given customer load pattern

20

Page 21: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Issues for Replacement OptionsOption Cost Expectations Other IssuesNatural Gas Power Plants

New capacity costs and high operating costs

Criteria pollutant and GHG emission consequences

Storage Extremely high capital costs and net energy loss in operations

Battery technologies can have serious waste disposal issues

Demand Response

Existing DR programs are on/off so creating flexibility implies substantial control and telemetry costs in addition to payments to participants

DR typically thought of as load reduction, when at least some flexible increases in load would be required to mirror a generating resource

21

Page 22: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Ratepayer Costs

• Reducing flexibility of the hydroelectric fleet is likely to have impacts on ratepayers since capacity is in place and operating costs are low

• Each MW of lost hydroelectric flexibility will cost approximately $2 million to replace with a combined cycle or combustion turbine power plant

• Operational cost impacts are uncertain, but the replacement energy will be more expensive

• Increased GHG costs associated with the emissions from the new fossil generating facilities, if chosen

22

Page 23: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Preliminary Assessment of Importance of Hydro Capacity

ISO LCTA Study for 2013ISO Local Capacity

Area

Hydro Capacity

(MW)

Total Capacity

(MW)

Category C Requirements

(MW)

LCA Surplus/(Deficit

) (MW)

Stockton 217 620 567 (154)

Sierra 1531 2039 1930 (218)Greater Fresno 2093 2817 1786 1031

23

Note: These columns are independent from each other.

Page 24: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Flexibility to Integrate Renewables

• Aside from generating energy, hydro-electric facilities are dispatchable, respond quickly and can provide ancillary services:– Regulation– Load following

• Flexible alternatives to dispatchable hydro, such as natural gas power plants increase GHG, presenting challenges in meeting other State goals

• Ramping to integrate renewables is a new consideration that is still evolving

24

Page 25: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Variability in July 2020 Peak Hour Using the Net Load Perspective

•Renewable development requires a shift from a “gross load” perspective to a “net load” perspective•The net load represents the remaining load after “must take” renewables have put power into the system•Dispatchable resources have to be sufficiently flexible to ramp up and down to this “net load” shape•The “net load” peak hour is frequently later in the day, and it is much less centered around hour 1500

Source: CAISO July 2020 Plexos renewable integration analyses, Spring 2012

25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2420000

25000

30000

35000

40000

45000

50000

55000

60000

65000

70000

7/11/2020

7/2/2020

7/22/2020

7/23/2020

Page 26: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Forecast dispatch needs based on the net load demand curve – January 2020 High Load Case

Load

& N

et L

oad

(MW

)

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

20,000

22,000

24,000

26,000

28,000

30,000

32,000

34,000

36,000

38,000

40,000

42,000

44,000

46,000

0:00 1:30 3:00 4:30 6:00 7:30 9:00 10:30 12:00 13:30 15:00 16:30 18:00 19:30 21:00 22:30 0:00

Load Net Load Wind Solar

Load, Wind & Solar Profiles – High Load CaseJanuary 2020

Win

d &

Sol

ar (M

W)

+ 8,000 MW in 2 hours

- 6,300 MW in 2 hours

+ 13,500 MW in 2

hours

26

Page 27: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Increase in Monthly Maximum Net Load Ramp from 2011 to 2020

January

February

March

April May JuneJuly

August

Septem

ber

October

November

December

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

Actual 2011 Simulated 2020

Max

imum

3-H

our R

amp

27

Page 28: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Source: ISO Briefing on Renewable Integration Memorandum (Aug 2011)

Preliminary studies show need of 4,600 MW of new flexible resources. Changes in hydro production impact this assessment, but the magnitude is not yet known.

Supply variability is increasing while the flexible capability of the fleet is decreasing

Flexible resource characteristics: • fast start• fast ramping

28

Page 29: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Illustrative example of conventional generation development timeline

29

2012 2013 2014 2015 2016 2017 2018 2019 2020Long-Term Procurement PlanAuthorization

Request for Offer Design

Request for Proposal

Interconnection, Permit Preparation

Permitting

Construction

• This timeline presents a nominal development timeframe• Other resources may have shorter or much, much longer development

times depending upon the issues in the permitting process

Page 30: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Perspectives on Bay-Delta Flow Criteria Proposals

• It is critical to understand the full implications of alternative proposals on the use/capabilities of hydro-electric facilities

• Energy policies mandating renewable generation will increase the need for flexibility characteristics of storage hydro-electric facilities just as Bay-Delta flow criteria proposals may reduce this flexibility

• Energy agencies need a sufficient implementation time horizon to enable the electricity infrastructure planning process to identify, procure, and construct replacement options

30

Page 31: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Supplemental Materials

31

Page 32: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Large range of net load in summer period requires flexible capacity commitment capability

20,000

24,000

28,000

32,000

36,000

40,000

44,000

48,000

52,000

56,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Net Load hourly averages - Trajectory CaseJuly 2020 - 4 selected days

Peak net load ranges from 32,000 MW to 56,000

MW and shifts between HE14 to HE20

32

Page 33: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Load profile — sample winter day in 2020

33

Page 34: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Wind & solar profiles — sample winter day in 2020

34

Page 35: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Flexible resources will be essential to meeting the net load demand curve

Sample winter day in 202035

Page 36: Electric System Modeling to Assess Bay-Delta Flow Criteria Proposals

Forecast dispatch needs based on the net load demand curve – January 2020 High Load Case

Load

& N

et L

oad

(MW

)

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

20,000

22,000

24,000

26,000

28,000

30,000

32,000

34,000

36,000

38,000

40,000

42,000

44,000

46,000

0:00 1:30 3:00 4:30 6:00 7:30 9:00 10:30 12:00 13:30 15:00 16:30 18:00 19:30 21:00 22:30 0:00

Load Net Load Wind Solar

Load, Wind & Solar Profiles – High Load CaseJanuary 2020

Win

d &

Sol

ar (M

W)

+ 8,000 MW in 2 hours

- 6,300 MW in 2 hours

+ 13,500 MW in 2

hours

36