Power System Power System ProtectionProtection

1

Page 2: Electrical Power System Protection Services India

ContentsContentsIntroductionFunctions of Equipment ProtectionFunctions of Protective RelaysRequired Information for Protective SettingProtection Settings ProcessFunctional Elements of Protective RelaysOperating Characteristics of Protective RelaysOver current and Directional Protection

ElementsDistance Protection Function

2

Page 3: Electrical Power System Protection Services India

Protection Settings: IntroductionProtection Settings: IntroductionA power system is composed of a number of

sections (equipment) such as generator, transformer, bus bar and transmission line.

These sections are protected by protective relaying systems comprising of instrument transformers (ITs), protective relays, circuit breakers (CBs) and communication equipment.

In case of a fault occurring on a section, its associated protective relays should detect the fault and issue trip signals to open their associated CBs to isolate the faulted section from the rest of the power system, in order to avoid further damage to the power system.

3

Page 4: Electrical Power System Protection Services India

4

Below Fig. 1 is an typical example of power system sections with their protection systems. Where:G1 is a generator. T1 is a transformer. B1,...,B5 are bus bars. L45 is a transmission line (TL). RG is a generator protective relay. RT is a transformer protective relay. RB is a bus protective relay. RL-4,...,RL-9 are TL protective relays. C1,..., C9 are CBs.

Protection Settings: Introduction

Page 5: Electrical Power System Protection Services India

Protection Settings: IntroductionProtection Settings: IntroductionMaximum fault clearance times are usually

specified by the regulating bodies and network service providers.

The clearing times are given for local and remote CBs and depend on the voltage level and are determined primarily to meet stability requirements and minimize plant damage.

The maximum clearance times of the backup protection are also specified.

e.g. the clearing times for faults on the lines specified by one network service provider in Australia are presented in Table I (next slide).

5

Page 6: Electrical Power System Protection Services India

Table I: Fault clearance timesTable I: Fault clearance timesVoltage

level [kV]CB operate correctly

[ms]CB fail [ms]

Local Remote Local Remote

500 80 100 175 175330 100 120 250 250275 100 120 250 250220 120 140 430 430132 120 160 430 430110 120 160 430 43066 120 160 430 430

≤ 33 1160 - 1500 -6

Page 7: Electrical Power System Protection Services India

Functions of Equipment ProtectionFunctions of Equipment ProtectionProtection schemes are generally divided into equipment protection and system protection. The main function of equipment protection is to selectively and rapidly detect and disconnect a fault on the protected circuit to:◦ensure optimal power quality to customers;◦minimize damage to the primary plant;◦prevent damage to healthy equipment that

conducts fault current during faults;◦restore supply over the remaining healthy network;◦sustain stability and integrity of the power system;◦limit safety hazard to the power utility personnel

and the public.

7

Page 8: Electrical Power System Protection Services India

Functions of Protective RelaysFunctions of Protective Relays The protection functions are considered adequate when

the protection relays perform correctly in terms of: Dependability: The probability of not having a failure to

operate under given conditions for a given time interval. Security: The probability of not having an unwanted

operation under given conditions for a given time interval. Speed of Operation: The clearance of faults in the

shortest time is a fundamental requirement (transmission system), but this must be seen in conjunction with the associated cost implications and the performance requirements for a specific application.

8

Page 9: Electrical Power System Protection Services India

……Functions of Protective RelaysFunctions of Protective RelaysSelectivity (Discrimination):

The ability to detect a fault within a specified zone of a network and to trip the appropriate CB(s) to clear this fault with a minimum disturbance to the rest of that network.

Single failure criterion: A protection design criterion whereby a protection system must not fail to operate even after one component fails to operate. With respect to the protection relay, the single failure criterion caters primarily for a failed or defective relay, and not a failure to operate as a result of a performance deficiency inherent within the design of the relay.

9

Page 10: Electrical Power System Protection Services India

……Functions of Protective RelaysFunctions of Protective Relays

The setting of protection relays is not a definite science.

Depending on local conditions and requirements, setting of each protective function has to be optimized to achieve the best balance between reliability, security and speed of operation.

Protection settings should therefore be calculated by protection engineers with vast experience in protective relaying, power system operation and performance and quality of supply.

10

Page 11: Electrical Power System Protection Services India

required information for Protective Settingrequired information for Protective Setting

Line Parameters: For a new line: final total line length as well as the

lengths, conductor sizes and tower types of each section where different tower types or conductors have been used.

This information is used to calculate the parameters (positive and zero sequence resistance, reactance and susceptance) for each section.

Maximum load current or apparent power (MVA) corresponding to the emergency line which can be obtained from the table of standard conductor rating (available in each utility).

The number of conductors in a bundle has to be taken into consideration.

11

Page 12: Electrical Power System Protection Services India

……required information for Protective Settingrequired information for Protective Setting

Transformer Parameters: ◦The manufacturer's positive and zero sequence

impedance test values have to be obtained. ◦The transformer nameplate normally provides the

manufacturer's positive sequence impedance values only.

Terminal Equipment Rating: ◦The rating of terminal equipment (CB, CT, line trap,

links) of the circuit may limit its transfer capability therefore the rating of each device has to be known.

◦Data can be obtained from the single line diagrams.

12

Page 13: Electrical Power System Protection Services India

……required information for Protective required information for Protective SettingSetting

Fault Studies ◦Results of fault studies must be provided. ◦The developed settings should be checked on future

cases modelled with the system changes that will take place in the future (e.g. within 5 years).

◦Use a maximum fault current case. CT & VT Ratios: ◦Obtain the CT ratios as indicated on the protection

diagrams. ◦For existing circuits, it is possible to verify the ratios

indicated on the diagrams by measuring the load currents on site and comparing with a known ratio.

13

Page 14: Electrical Power System Protection Services India

……required information for Protective Settingrequired information for Protective Setting

Checking For CT Saturation: ◦ Protection systems are adversely affected by CT saturation.

It is the responsibility of protection engineers to establish for which forms of protection and under what conditions the CT should not saturate.

CTs for Transformer Differential Protection: ◦ MV, HV and LV CTs must be matched as far as possible

taking into consideration the transformer vector group, tap changer influence and the connection of CTs.

CTs for Transformer Restricted Earth Fault (REF) Protection: ◦All CT ratios must be the same (as with the bus zone

protection), except if the relay can internally correct unmatched ratios.

14

Page 15: Electrical Power System Protection Services India

PROTECTION SETTINGS PROCESSPROTECTION SETTINGS PROCESS

The Protection Settings team obtains all the information necessary for correct setting calculations.

The settings are then calculated according to the latest philosophy, using sound engineering principles. Pre-written programs may be used as a guide.

After calculation of the settings, it is important that another competent person checks them.

The persons who calculate and who check the settings both sign the formal settings document.

The flowchart in Fig. 2 indicates information flow during protection setting preparation for commissioning of new Transmission plant.

15

Page 16: Electrical Power System Protection Services India

16

Project leader of the Protection Settings team determines scope of work and target dates

Summary and comparison of inputs

IED manufacturers provide bay specific IED details

Engineering team provides bay specific proformas and drawings

Corrective actions and re-issue of drawings

Study new protection and create necessary setting templates in liaison with engineering team and IED manufactureres

OK Not OK

Calculation and verification of settings

Settings stored in central database and formal document issued

Implementation date and responsible field person stored in the central database -> implementation actionImplementation sheet completedby field staff and returned to Protection Settings team

Interface with the Expansion Planing team and IED manufacturers to obtain relevant equipment parameters for correct system modelling

Centralised Settings Management System sends the action documents to the field staff

Corrective actions required to ensure implementation

Fig. 2 Information flow during protection settings preparation

Page 17: Electrical Power System Protection Services India

FUNCTIONAL ELEMENTS OF PROTECTIVE FUNCTIONAL ELEMENTS OF PROTECTIVE RELAYSRELAYS

To achieve maximum flexibility, relays is designed using the concept of functional elements which include protection elements, control elements, input and output contacts etc.

The protection elements are arranged to detect the system condition, make a decision if the observed variables are over/under the acceptable limit, and take proper action if acceptable limits are crossed.

Protection element measures system quantities such as voltages and currents, and compares these quantities or their combination against a threshold setting (pickup values).

If this comparison indicates that the thresholds are crossed, a decision element is triggered.

This may involve a timing element, to determine if the condition is permanent or temporary. If all checks are satisfied, the relay (action element) operates.

17

Page 18: Electrical Power System Protection Services India

18

FaultPickup of protection element

Operation of protection element

Assertion of relay trip logic signal

Action of relay trip contact

Circuit breakeropening

Fault cleared

Sequence of protection operation initiated by a fault is shown in Fig. 3.

Page 19: Electrical Power System Protection Services India

OPERATING CHARACTERISTICS OF OPERATING CHARACTERISTICS OF PROTECTIVE RELAYSPROTECTIVE RELAYS

Protective relays respond and operate according to defined operating characteristic and applied settings.

Each type of protective relay has distinctive operating characteristic to achieve implementation objective: sensitivity, selectivity, reliability and adequate speed of operation.

Basic operating characteristics of protective elements is as follows:

Overcurrent protection function: the overcurrent element operates or picks up when its input current exceeds a predetermined value.

Directional function: an element picks up for faults in one direction, and remains stable for faults in the other direction.

19

Page 20: Electrical Power System Protection Services India

……OPERATING CHARACTERISTICS OF PROTECTIVE OPERATING CHARACTERISTICS OF PROTECTIVE RELAYSRELAYS

Distance protection function: an element used for protection of transmission lines whose response is a function of the measured electrical distance between the relay location and the fault point.

Differential protection function: it senses a difference between incoming and outgoing currents flowing through the protected apparatus.

Communications-Assisted Tripping Schemes: a form of the transmission line protection that uses a communication between distance relays at opposite line ends resulting in selective clearing of all line faults without time delay.

20

Page 21: Electrical Power System Protection Services India

OVERCURRENT AND DIRECTIONAL OVERCURRENT AND DIRECTIONAL PROTECTION ELEMENTSPROTECTION ELEMENTSAn over current condition occurs when the

maximum continuous load current permissible for a particular piece of equipment is exceeded.

A phase overcurrent protection element continuously monitors the phase current being conducted in the system and issue a trip command to a CB when the measured current exceeds a predefined setting.

The biggest area of concern for over-current protection is how to achieve selectivity.

Some possible solutions have been developed, including monitoring current levels (current grading), introducing time delays (time grading) or combining the two as well as including a directional element to detect the direction of current flow.

21

Page 22: Electrical Power System Protection Services India

Current gradingCurrent grading

Current grading will achieve selectivity by determine the location of a fault using purely magnitude of current.

It is difficult to implement this in practice unless feeder sections have sufficient differences in impedance to cause noticeable variations in fault current.

In a network where there are several sections of line connected in series, without significant impedances at their junctions there will be little difference in currents, so discrimination or selectivity cannot be achieved using current grading.

22

Page 23: Electrical Power System Protection Services India

time delaystime delays An alternate means of grading is introducing time delays

between subsequent relays. Time delays are set so that the appropriate relay has

sufficient time to open its breaker and clear the fault on its section of line before the relay associated with the adjacent section acts.

Hence, the relay at the remote end is set up to have the shortest time delay and each successive relay back toward the source has an increasingly longer time delay.

This eliminates some of the problems with current grading and achieves a system where the minimum amount of equipment is isolated during a fault.

However, there is one main problem which arises due to the fact that timing is based solely on position, not fault current level.

So, faults nearer to the source, which carry the highest current, will take longer to clear, which is very contradictory and can prove to be quite costly.

23

Page 24: Electrical Power System Protection Services India

directional elementsdirectional elements

Selectivity can be achieved by using directional elements in conjunction with instantaneous or definite-time overcurrent elements.

Directional overcurrent protection schemes respond to faults in only one direction which allows the relay to be set in coordination with other relays downstream from the relay location.

This is explained using example in Fig. 4.

24

Page 25: Electrical Power System Protection Services India

directional elementsdirectional elements

By providing directional elements at the remote ends of this system, which would only operate for fault currents flowing in one direction we can maintain redundancy during a fault.

This is in line with one of the main outcomes of ensuring selectivity, which is to minimize amount of circuitry that is isolated in order to clear a fault.

25

Fig. 4: Use of direction element example

Page 26: Electrical Power System Protection Services India

direction of current flowdirection of current flow In AC systems, it is difficult to determine the direction of

current flow and the only way to achieve this is to perform measurements with reference to another alternating quantity, namely voltage. The main principle of how directional elements operate is based on the following equations for torque:

If current is in the forward direction, then the sign of the torque equation will be positive and as soon as the direction of current flow reverses, the sign of the torque equation becomes negative. These calculations are constantly being performed internally inside directional element.

26

)cos( ABCABCA IVIVT

)cos( BCABCAB IVIVT

)cos( CABCABC IVIVT

Page 27: Electrical Power System Protection Services India

DISTANCE PROTECTION FUNCTIONDISTANCE PROTECTION FUNCTION

A distance protection element measures the quotient V/I (impedance), considering the phase angle between the voltage V and the current I.

In the event of a fault, sudden changes occur in measured voltage and current, causing a variation in the measured impedance.

The measured impedance is then compared against the set value.

Distance element will trip the relay (a trip command will be issued to the CB associated with the relay) if the measured value of the impedance is less then the value set.

27

Page 28: Electrical Power System Protection Services India

……DISTANCE PROTECTION FUNCTIONDISTANCE PROTECTION FUNCTION

We can see that the impedance value of a fault loop increases from zero for a short circuit at the source end A, up to some finite value at the remote end B. We can use this principle to set up zones of distance protection as well as to provide feedback about where a fault occurred (distance to fault).

Operating characteristics of distance protection elements are usually represented using R-X diagrams.

Fig. 6 shows an example of Mho R-X operating characteristic. The relay is considered to be at the origin.

28

Page 29: Electrical Power System Protection Services India

……DISTANCE PROTECTION FUNCTIONDISTANCE PROTECTION FUNCTION

29

Region ofoperationZone 1

Region ofnon-operationoutside the circle

Loadregion

R

X

Zone 2

A

B

80%

120%

Line P

Line Q

RSZ

Fig. 6 Mho positive-sequence R-X operating characteristic of a distance element.

Page 30: Electrical Power System Protection Services India

……DISTANCE PROTECTION FUNCTIONDISTANCE PROTECTION FUNCTION

The need for zones shown in Fig. 6 arises from the need of selective protection; i.e. the distance element should only trip faulty section.

We can set the distance element to only trigger a trip signal for faults within a certain distance from the relay, which is called the distance element reach.

The setting impedance is represented by , where ZL is the line impedance. The distance element will only trip when the measured impedance ZR is less than or equal to the setting impedance hsZL.

30

RS s LZ h Z

Page 31: Electrical Power System Protection Services India

……DISTANCE PROTECTION FUNCTIONDISTANCE PROTECTION FUNCTIONTypically hs is set to protect 80% of the line between

two buses and this forms protection Zone 1. Errors in the VTs and CTs, modeled transmission line

data, and fault study data do not permit setting Zone 1 for 100% of the transmission line.

If we set Zone 1 for 100% of the transmission line, unwanted tripping could occur for faults just beyond the remote end of the line.

31

Page 32: Electrical Power System Protection Services India

……DISTANCE PROTECTION FUNCTIONDISTANCE PROTECTION FUNCTION

Zone 2 is set to protect 120% of the line, hence making it over-reaching, because it extends into the section of line protected by the relay at point B. To avoid nuisance tripping, any fault occurring in Zone 1 is cleared instantaneously, while faults which occur in Zone 2 are cleared after a time delay in order to allow relay B to clear that fault first.

This provides redundancy in the protection system (backup), whilst maintaining selectivity.

32

Page 33: Electrical Power System Protection Services India

ABOUT SYSTEM PROTECTIONABOUT SYSTEM PROTECTION

33

Page 34: Electrical Power System Protection Services India

RELAY TESTING SERVICESRELAY TESTING SERVICES

34

Page 35: Electrical Power System Protection Services India

Click Here ForClick Here ForPower System Protection

35

Page 36: Electrical Power System Protection Services India

THANK YOUTHANK YOUFOR MORE INFORMATIONFOR MORE INFORMATION

VISIT OUR WEBSITE ....VISIT OUR WEBSITE ....

36