7.3 One 16 A switched socket outlet shall be positioned as shown in Section B-B of the
The fitting shall have a minimum Ingress Protection rating of IP 55.
7.4 1200 mm fluorescent, double tube fitting (40 W rating) shall be positioned as shown.
7.2 DB shall be six-way. The main incoming supply shall be protected using a 32 A double Pole
7.1 A 25 mm PVC conduit with draw wire installed shall be provided from distribution board
5.2 Roof and floor slab shall be as specified by a Structural Engineer
5.4 Floor shall be screeded level with 50 mm thick 1:3 mix.
5.7 Floor slab in transformer bay shall carry a mass of 6 000 kg.
6.3 Two lifting slots 50 mm x 100 mm shall be provided in each section.
6.4 Each section shall not exceed a length of 600 mm.
Permanent vehicle access to substation, 10 000mm wide x 3000mm high
6.1 All trenching shall be covered with approved resocrete infill panels.
6.2 Recess around trench edges shall be 25 mm deep and 40 mm wide.
6.5 Pvc cable ducts in accordance with SANS 61 386-1 and SANS 61 386-24 shall be used
7.0 INSTALLATION WIRING
5.0 ROOF, WALLS AND SLAB
The recess shall be achieved using galvanized angle iron(refer to Trench recess and
under all hardened surfaces to boundary.
6.0 TRENCHING
5.1
shall be provided.
1.0 ACCESS TO SUBSTATION
7.5 The LV supply for DB shall, as far as possible, be provided by eThekwini Electricity.
7.6 The DB, all PVC piping, socket outlet and light switch shall be recessed within the
Two-way switching between transformer bay and M.V. switch room shall be provided.
6.6 Cable entry to be front entry to terminate onto road frontage as indicated.
5.6 Floor slab in MV switch room shall carry a mass of 1 000 kg per m of floor.
5.5 Floor to be level within +/- 1mm/m sq.
5.8 Where embankment's slope towards the building, the walls shall be waterproofed.
6.8 Number of ducts to be installed at cable entry are, 4 x ∅ 160mm and 2 x ∅ 100mm as indicated.
These ducts shall be capped to prevent any flow of ground water into trenches.
Din type fuse holder with neutral link, fused at 32Amp, 1x 16Amp fuse holder, fused at
drawing. The normal switched socket outlet shall be labeled "Use with portable
bricks an plaster.
11.0 CONSUMER BUS TRUNKING UNIT
11.1 One unit shall be built in as shown with the flange sides on the Consumer Meter room side.
11.2 Busbar trunking unit maybe positioned between a distance of 200 mm and 1200 mm from
11.3 Busbar trunking shall be positioned at a minimum height of
11.4 The current rating shall be as indicated in note 2 of the consumer bus trunking drawing.
drain detail' on drawing).
16Amp for the plug circuit, and 1 x 10Amp fused holder,fused at 10 Amp for light circuit.
1000mm above finished floor level.
The substation building shall be built using motar and clay bricks.
5.3 Internal roof slab and walls shall be plastered and painted white.
9.2 All vents on duct shall be covered with 10mm hot-dip galvanized wire mesh or
9.0 VENTILATION
Galvanised cable tray in transformer bay to be installed by contractor after transformer
similar (not gauze),on inside.
9.1 The transformer bays shall be vented as indicated.
has been positioned. The cable rack shall be a 600 mm wide heavy duty tray. The position,
Length and route shall be agreed upon between the Consumer's contractor and the local
eThekwini Depot Superintended or Clerk of Works.
10.0 CABLE TRAY
(DB) to the cable trench.
2.0 MEDIUM VOLTAGE SWITCH ROOM
Size: 3 800 mm (Length) x 2 050 mm (width) x 3 100 mm (Height).
8.3 All doors shall open outwards. Open door retainers shall be fitted to hold the doors
locking bolt of the barrel bolt and three pointlocking mechanism of the doors when in
8.4 Galvanised steel pipes shall be embedded into the concrete floor to accept the floor
8.2 D3 - Centre opening bottom-vented double door in two equal halves , shall have a clear
8.0 DOORS
8.5 All doors shall be adequately bonded and earthed via a flexible braided earth conductor.
8.6 Padlocks (SS) shall be fitted to medium voltage switch room door D4, transfomer bay
the closed position.
opening of 2 000 mm wide x 2 400 mm high and shall be manufactured as per drawing.
door D3 (obtainable from eThekwini Electricity's Customer Services Division).
in the open position.
The minimum cross sectional area of the earth conductor shall be less than 2,5 mm. This
earth conductor shall be be connected to the main substation earth bar which is housed
within the cable trench . The earth conductor shall be drawn trough a 20 mm PVC conduit.
This conduit shall be recessed within the concrete floor.
SPECIFICATIONS:
3.0 TRANSFORMER BAY
Size: 3900 mm (Length)x 2 300 mm (width) x 3 100 mm (Height).
9.3 In transformer bay if cross ventilation is not possible through D3 door and rear
ventilation,a mechanical fan (conection driven) shall be mounted on the wall of the
9.4 The mechanical fan and any associated equipment shall either be manufactured of 3CR12
steel,or stainless steel (marine grade 316) or hot-dip galvanized mild steel for heavy
2
substation.
duty application.
adjacent wall.
earth leakage."
4.0 METER PANEL
8.1 D4 Single door , shall have a clear opening of 900 mm wide x 2 400 mm high,and shall
be manufactured as per drawing MRD.
6.7 All trenches shall slope towards a drain outlet pipe.The slope shall be at least 1/30
gradient. The drain outlet pipe shall be connected to the storm water system in
accordance with the National Building Regulations and Municipal By-laws. The direction
of drainage shall be in accordance with the Storm Water Engineers detail.
4 x Ø160mm PVC DUCTS
2 x Ø110mm PVC DUCT
refer to note 6.8
light fitting
2way light
switch
2way light
switch
DB (refer to note 7.6)
light fitting
CB
CB
300
30
0600 w
ide,
900 deep
30
0
300
300
300
vented
refer to note 7
TRENCH DRAINAGE POINT
(SEE NOTE 6.7)
600 wide,
900 deep
D
D4
D3
scale : 1:50
PLAN VIEW
2 x Ø160mm PVC DUCTS
2 x Ø110mm PVC DUCT
refer to note 6.8
220
900 220 1260 7852000
2734 3347
220 2734 3347 220
6081
22
022
0
D
36
15
100
220
696 220
6522
6081
600
440
0
115
10
00
17
77
23
24
CU
TF
IEL
D P
LA
CE
W
E
S
T
R
I
D
I
N
G
R
O
W
SITE PLAN - 1:1000
W
E
S
T
R
I
D
I
N
G
R
O
W
PR
OP
OS
ED
S
UB
ST
AT
IO
N
1x b
ulk w
ate
r m
ete
r &
fire
ho
se
re
els
tw
in
b
oo
ste
r co
nn
ectio
n
po
st b
oxe
s
sto
rm
wa
te
r g
rid
gm
33
34
35
37
36
38
40
39
41
42
41
23
32
16
23
22
21
20
19
18
17
15
14
13
31
30
29
28
27
26
25
24
12
11
10
97
86
5
PROPOSED SUBSTATION
scale : 1:30
DOOR - D4
scale : 1:30
DOOR - D3
40
25
NGL
34
10
scale : 1:50
SECTIONAL ELEVATION A-A
GRD FLR
90
0
20
0
100.000
SUBSTATION
LEVEL
103.410
ROOF
LEVEL
90
0
859
shown dotted behind
stormwater pipe connected
to stormwater drainage
(direction of drainage to engineer`s
details (refer to note 6.7)
vented - (See note 9)
BUS COUPLING
TO ENGINEER
SPECIFICATION
TO BASEMENTPANEL
24402018
600
90
0
2 x Ø160mm PVC DUCTS
2 x Ø110mm PVC DUCT
refer to note 6.8
115
115
90
0
scale : 1:50
SECTIONAL ELEVATION B-B
NGL
16 A switched
(refer to note 7.3)
31
00
1911 1354
50
0
15
00
socket outlet see
NGL
LIGHT FITTING
shown dotted beyond
4xØ160mm pvc ducts
2xØ100mm pvc ducts
(refer to note 6.8)
904 115115
(refer to note 7.6)
DB
TYPICAL DETAILS FOR DOORS
Scale - 1:30
Section X-X
Scale - 1:40
100.000
SUBSTATION
LEVEL
103.410
ROOF
LEVEL
scale : 1:50
SECTION CC
34
10
LIGHT FITTING
20
0
NGL
1800
GROUND FLOORMETER ROOM
15
00
BUS COUPLING
RISING MAIN BUS COUPLER
2 x Ø160mm PVC DUCTS
2 x Ø110mm PVC DUCTS
refer to note 6.8
152
50
0
MAIN CIRCUIT BREAKER
CIRCUIT BREAKERTERMINATION
SECTORIALCONDUCTORS
TUFFNOL SUPPORT INSULATOR
MAIN LV PANEL
2mm MILD STEELENCLOSURE
WATER PROOFSEAL
VOID PENETRATION
TERMINATIONHATCH
HEAT SHRINKINSULATED
MUNICIPAL SIDETERMINATION ENDS
FIRST FLOOR
CONCRETE SLAB
TERMINATIONCONSUMER SIDE
98.200
SUBSTATION
LEVEL
18
00
scale : 1:50
X
D3
X
ONE COURSE
BRICKWORK
BELOW
INTERNAL
FLOOR
FRONT ELEVATION
CABINET HOOKS ON SIDES OF DOORS
SUBSTATION
LEVEL
ROOF
LEVEL
X
BACK ELEVATION
scale : 1:50
METER ROOM DOOR
2000
1700
SECTION D-D
BUS COUPLING
RISING MAIN BUS COUPLER
150
250
1800
scale : 1:50
2 x Ø160mm PVC DUCTS
2 x Ø110mm PVC DUCT
refer to note 6.8
1500
DB
1500
(refer to note 7.6)
1802
320 Smith Street1102 Mercury HouseDurban4000Telephone: 031 3012253Email: ugesiafricaconsulting.co.zaWebsite: www.ugesiafrica.co.za
Consultant Signature:___
Client Signature:__
Client:
Project By:
Title:
Sub-Station LayoutLevel:
GroundRevision:
Rev 01Scale:
As ShownDwg. No:
Drawn By:
ATANG MAPHELAChecked By:
Zaid AllyDate:
15-07-2016Sheet No.:
01 of 01
Rev. No: Description Of Project Date
BLUE HORIZONPTN 179(OF 136) OF THE FARMRIDING NO:151523A CUTFIELD PLACE , SHERWOOD
BH-S/S-2016-05