electricity infrastructure and transmission · electricity infrastructure and transmission ......

23
Imperfect Markets versus Imperfect Regulation Electricity Infrastructure and Transmission Steve Cicala University of Chicago June 18, 2016 Steve Cicala June 18, 2016

Upload: truongkiet

Post on 21-Jul-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Electricity Infrastructure and

Transmission

Steve Cicala

University of Chicago

June 18, 2016

Steve Cicala June 18, 2016

Page 2: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

What’s so Hard about Expanding Renewable

Generation?

• Background on Electricity Dispatch

• Institutions that have Shaped the Grid

• Renewable Resources & Non-Dispatchability

• Matching Supply and Demand:

• Across Space (Transmission)• Over Time (Storage)

Steve Cicala Introduction June 18, 2016

Page 3: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Outline of Talk

1. Background on Electricity Dispatch

2. Institutions that have Shaped the Grid

3. Renewable Resources and Non-Dispatchability

4. Matching Supply and Demand

Steve Cicala Introduction June 18, 2016

Page 4: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Outline

1. Background on Electricity Dispatch

2. Institutions that have Shaped the Grid

3. Renewable Resources and Non-Dispatchability

4. Matching Supply and Demand

Steve Cicala Background on Electricity Dispatch June 18, 2016

Page 5: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Demand Fluctuations Over the Week350

400

450

500

GW

h

0 24 48 72 96 120 144 168

Hour of Week

Steve Cicala Background on Electricity Dispatch June 18, 2016

Page 6: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Demand Fluctuations Over the Year350

400

450

500

550

GW

h

0 100 200 300 400Day of Year

Steve Cicala Background on Electricity Dispatch June 18, 2016

Page 7: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Agile Units for Peak Times: 50MW

Steve Cicala Background on Electricity Dispatch June 18, 2016

Page 8: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

High Capacity Units for Base Load: 1750MW

Steve Cicala Background on Electricity Dispatch June 18, 2016

Page 9: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Cost Minimization: Order Generating Units0

200

400

600

800

$/M

Wh

0 10000 20000 30000Cumulative Nameplate

NEISO 1aug2005 0:00

Steve Cicala Background on Electricity Dispatch June 18, 2016

Page 10: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Outline

1. Background on Electricity Dispatch

2. Institutions that have Shaped the Grid

3. Renewable Resources and Non-Dispatchability

4. Matching Supply and Demand

Steve CicalaInstitutions that have Shaped the

Grid June 18, 2016

Page 11: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Power Control Areas in 1997

Steve CicalaInstitutions that have Shaped the

Grid June 18, 2016

Page 12: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

A Brief History of the Electricity Sector

• Was long believed to be a natural monopoly.

• Grew up as a balkanized patchwork of regulated,vertically integrated utilities.

• Rates were set by State Public Utility Commissions.

• “Prudent” cost recovery ensured regulation ofinvestments and operations.

• Units dispatched based on engineering estimates ofcost within ∼ 100 Power Control Areas.

Steve CicalaInstitutions that have Shaped the

Grid June 18, 2016

Page 13: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

A Brief History of the Electricity Sector

• Federal Energy Regulatory Commission (FERC)begins encouraging competitive generation as part ofbroader deregulatory push in late 1970’s.

• Late 1990s: Independent System Operators (ISO) /Regional Transmission Organizations (RTO) begintaking over dispatch in select areas areas.

• ISO/RTOs consolidate Power Control Areas in to asingle dispatch algorithm.

• Generating units are scheduled according to bids inday-ahead, uniform price auctions instead ofengineering estimates.

• Real-time auctions determine who actually produceselectricity.

Steve CicalaInstitutions that have Shaped the

Grid June 18, 2016

Page 14: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Balancing Authorities in 1999

NPCC

ERCOT

FRCC

SPP

MAPP

WECC

ECARMAIN

MAAC

SERC

Steve CicalaInstitutions that have Shaped the

Grid June 18, 2016

Page 15: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Wholesale Electricity Markets in the U.S.

Steve CicalaInstitutions that have Shaped the

Grid June 18, 2016

Page 16: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Outline

1. Background on Electricity Dispatch

2. Institutions that have Shaped the Grid

3. Renewable Resources and Non-Dispatchability

4. Matching Supply and Demand

Steve CicalaRenewable Resources and

Non-Dispatchability June 18, 2016

Page 17: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Old System: Bring the Fuel to the Generators

Steve CicalaRenewable Resources and

Non-Dispatchability June 18, 2016

Page 18: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Steve CicalaRenewable Resources and

Non-Dispatchability June 18, 2016

Page 19: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Steve CicalaRenewable Resources and

Non-Dispatchability June 18, 2016

Page 20: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Outline

1. Background on Electricity Dispatch

2. Institutions that have Shaped the Grid

3. Renewable Resources and Non-Dispatchability

4. Matching Supply and Demand

Steve Cicala Matching Supply and Demand June 18, 2016

Page 21: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Supply is Location-Specific

• Problem 1: No power where people want it

• Wind is in Iowa, We’re in Chicago.• Solution: Transmission

• HVDC• Allow areas to produce more than they consume (i.e.

Wyoming coal)

Steve Cicala Matching Supply and Demand June 18, 2016

Page 22: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Supply is Time-Specific

• Problem 2: No power when people want it

• Lots of wind at night.• Solution: Storage

• Hydro Reservoirs (and pumped)• Molten Salt• Batteries• Fly Wheels, etc. etc.• Transmission! (Time Zones, aggregation)

Steve Cicala Matching Supply and Demand June 18, 2016

Page 23: Electricity Infrastructure and Transmission · Electricity Infrastructure and Transmission ... Matching Supply and Demand: Across Space ... Solution: Storage Hydro

Imperfect Markets versus Imperfect Regulation

Transmission Constraints

Steve Cicala Matching Supply and Demand June 18, 2016