Page 1: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Place your chosen

image here. The four

corners must just

cover the arrow tips.

For covers, the three

pictures should be the

same size and in a

straight line.

Electricity System Operator Incentives BSUoS Seminar

Tuesday 15th February 2011

Page 2: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Welcome and Introduction

Alan Smart, Energy Operations Manager

Page 3: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

3

Agenda

� Welcome and Introduction

� Overview of SO Incentives Review – David Smith

� BSUoS methodology – Colin Williams

� BSUoS Forecasts and input assumptions:

�Energy – Katharine Clench

�Constraints – Guilherme Susteras

� BSUoS Reporting – Jo Faulkner

� Closing remarks and next steps – Alan Smart

Page 4: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

4

Things to note

� Health and Safety

� Feedback forms

Page 5: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Overview of the Electricity SO Incentives Review

Place your chosen

image here. Turn on

the Grid and Guides

option under View and

check the ‘display

drawing guides on

screen’ box for

position.

David Smith, Electricity Codes Manager

Page 6: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

6

Where are we in theSO Incentives Review process?

Phase 1 (6 weeks) Phase 2 (15 weeks)

Review of current

modelling approach

(Ofgem-led with

consultancy

support)

Development by

NGET of revised

forecasting

methodology based

on recommendations

from Phase 1

Phase 3 (8 weeks)

Examination of

NGET’s proposed

methodology,

including models and

modelling approach

Page 7: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

7

Summary of Phase 1 key findings

Ofgem and Frontier suggested clear way forward:

Aim: Multi-year scheme:

• Promote system operation efficiency

• Reduce regulatory and industry burden

New constraint model

and revised energy

models to provide reliable analysis to

support setting

scheme parameters

Ex-post treatment of

unpredictable external

factors beyond NGET’s control to remove windfall potential

Page 8: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

8

Evolution of the proposed incentivisation approach

Current Proposed

Target IBC Ex-anteEx-ante forecast updated ex-post

Adjustments to Target IBC

Two ex-post adjusters

Multiple ex-post adjustments

Adjustments to out-turn costs

Ex-post NIA None

BSUoS Charges Ex-ante forecast Ex-ante forecast

Page 9: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

9

Existing scheme

Profit

0

Loss

IBC

No (or limited) dead-band (e.g. to cover modelling errors)

Higher profit cap

Lower loss floor

Steeper sharing factors

New scheme structure

We believe the proposed approach will remove volatility and allow for sharper scheme parameters:

Page 10: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

BSUoS Charging Methodology – Impact of BSIS Initial Proposals

Colin Williams - Charging and Revenue

Page 11: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

11

Agenda

� Calculation of BSUoS Charges

� Impact as a result of BSIS 2011/13

� Internal Incentive

� External Incentive

Page 12: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

12

BSUoS – Calculation and Billing

� Charges apportioned on a £/MWh proportionality basis

� £/MWh - one price per HH period, paid by all

� Calculated half-hourly

� Billed Daily

� Two stage Financial Settlement

Daily, Settlement Day + 14 months

Reconciliation Final

RF

Daily, Settlement Day + 16 working days

Settlement FinalSF

Settlement Day + 5 working days

*No invoice sentInterim InitialII*

Processing /

Billing Timescales

DefinitionRun

Type

This will remain unchanged

Page 13: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

13

BSUoS Charges - Calculation

� Two main components of BSUoS

� Internal - internal SO costs e.g. staff, buildings, IS

� External - costs of the services used to balance the

system

�Electricity related products

� Balancing Services Contract Costs

� Balancing Mechanism Bids and Offers

� Both Internal and External Costs have an Incentive

Scheme Adjustment

Page 14: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

14

BSUoS Calculation – Simplified

BM Unit Metered VolumesContract

Costs / Other Costs

External BSUoS Charge

Customer BSUoS Charges

HH BMUVolume

£/MWhx HH BSUoSCharge

=

HH BSUoS (£)HH Volume (MWh)

= £/MWh

Total BSUoS

For all HH periods of a

Settlement Day

Internal BSUoSCosts

BSIS

BM Costs

Internal Incentive

Internal BSUoSCharge

Total BSUoSCharge

Page 15: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

15

BSUoS Calculation – Simplified

BSIS Incentive

Internal Incentive

BM Unit Metered VolumesContract

Costs / Other Costs

External BSUoS Charge

Customer BSUoS Charges†

HH BMUVolume

£/MWhx HH BSUoSCharge

=

HH BSUoS (£)HH Volume (MWh)

= £/MWh

Total BSUoS

For all HH periods of a

Settlement Day

Internal BSUoSCosts

BM Costs

Internal BSUoSCharge

Total BSUoSCharge

Page 16: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

16

Incentivised Balancing Costs –Current Methodology

� 2010/11 IBC Calculation

� To determine the value of the incentive adjustment to

BSUoS Charges the average IBC is calculated. Against this number the incentive adjustment is calculated by

comparing against the Incentivised Target

IBCd = Σj

(CSOBMj + BSCCVj + NIAj + TLICj ) + BSCCAd – OMd – RTd

Balancing Services

Contract Costs

Costs to SO of

Balancing Mechanism (Bids / Offers)

Net

Imbalance Adjustment

Transmission

Loss Adjustment

Reconciliation &

adjustment Terms

Page 17: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

17

BSIS – 2010/11 - Summary

-20

-15

-10

-5

0

5

10

15

20

350 400 450 500 550 600 650 700 750

Incentivised Balancing Costs (£m)

Pro

fit

/ L

os

s (

£m

)

Scottish Generation and IFA Adjusted Scheme

15% Upside Sharing Factor

15% Downside Sharing Factor

Max £15m Profit

Min £-15m loss

Deadband(£0 profit or loss)

Summary of Current Scheme

�One Year Scheme

�Fixed Incentivised Cost Target

�Cap and Collar

�Sharing Factors

Page 18: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

18

Impact on Incentivised Balancing Costs from Initial Proposals

� 2011/13 IBC Calculation

� Proposed changes to calculation of IBC

� Remove NIA and potential removal of RT

IBCd = (CSOBMj + BSCCVj + NIAj + TLICj ) + BSCCAd – OMd – RTd

Balancing Services

Contract Costs

Costs to SO of

Balancing Mechanism (Bids / Offers)

Transmission

Loss Adjustment

Reconciliation &

adjustment Terms

Net

Imbalance Adjustment

NIAjΣj

Page 19: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

19

BSIS – 2011/13 – Initial Proposals

Incentivised Balancing Costs (£m)

RevisedTarget

Summary of Initial Proposals�Two Year Scheme

�Ex-Post Updated Target

�Fixed variances from Target

�Cap and Collar

�Sharing FactorsUpside Sharing Factor

Downside Sharing Factor

Target - y

Target + y

Limited or no Deadband

(£0 profit or loss)

Sch

em

e P

rofit

of

Lo

ss (

£m

)

Page 20: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

20

BSUoS – Internal Incentive 2010/11

FSOINt (£)0

Fixed Target

£55,262,715

Summary of Current Scheme�Five year scheme

�Annual adoption of BSIS sharing

factors

�Fixed Target

�No Cap or Collar

�Sharing Factors15% Upside Sharing Factor

15% Downside Sharing Factor

Page 21: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

21

BSUoS – Internal Incentive 2011/12 & 2012/13

FSOINt (£)0

Fixed Target

Summary of Scheme�Remain as five year scheme

�Annual adoption of BSIS sharing

factors

�Fixed Target per year

�No Cap or Collar

�Sharing Factors

Upside Sharing Factor

Downside Sharing Factor

Page 22: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

22

BSUoS Charges – BSIS 2011/13 Impact Summary

� Sharing Factor

� Remains to be considered on an annual basis

X

Calculation of

Internal Incentive

� No Change to method

� No Change to method

� Two Year External Scheme

� Variable Target with cap, collar and sharing factors

� Removal of NIA

Change

Detail

XX�Any

Change?

Billing BSUoSMethodology of

Charging and Apportioning

Calculation of

External Incentive

Page 23: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

23

BSUoS Charging – Contact

� Any BSUoS Charging Questions please contact:

Colin Williams

[email protected]

Tel: 01926 65 5916

Page 24: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

BSUoS Forecast - Energy Components

Katharine Clench, BSIS Commercial Analyst

Page 25: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

25

Content

� Headline Energy forecast

� Ex ante/ ex post inputs and assumptions

� Model sensitivity

� Black Start and Transmission Losses

� Waterfall diagrams

Page 26: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

26

All Categories £m

2005/6

Year

End

2006/7

Year

End

2007/8

Year

End

2008/9

Year

End

2009/10

Year

End

2010/11

Latest

View

THIS

MODEL

(Apr/11 to

Mar/12)

THIS

MODEL

(Apr/12 to

Mar/13)

Energy Imbalance 6.1 -27.6 19.9 -71.5 11.6 -37.9 -28.0 -27.9

Margin 194.9 159.1 183.1 358.4 186.6 155.9 159.2 174.8Op. Reserve 126.3 59.9 100.3 205.9 78.6 46.7 42.4 45.0

STOR 47.4 69.4 57.6 75.1 85.4 87.1 88.5 99.7

BM Start Up 7.4 11.9 14.8 28.9 10.8 8.1 9.7 10.1

CMM 13.8 17.9 10.4 48.5 11.8 14.1 18.6 19.9

Energy + Margin 201.1 131.6 203.0 287.0 198.3 118.0 131.2 146.8

Footroom -5.5 9.2 5.2 5.7 30.2 13.9 28.3 31.0

Fast Reserve 51.0 58.4 58.3 60.8 63.3 69.4 75.3 77.8AS Response 65.5 124.3 126.0 129.5 111.5 139.1 126.3 126.5

BM Response 71.2 36.3 31.8 71.3 50.4 27.9 54.1 48.3

Reactive 54.5 53.1 47.0 61.9 42.8 48.1 59.3 60.5Blackstart 14.5 15.5 13.6 16.9 14.5 16.8 28.4 29.0

Total (less Constraints and TLA) 471.0 442.9 497.3 655.4 532.0 448.6 521.2 539.1

Headline Energy Forecast

Page 27: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

27

All Categories £m

2005/6

Year

End

2006/7

Year

End

2007/8

Year

End

2008/9

Year

End

2009/10

Year

End

2010/11

Latest

View

THIS

MODEL

(Apr/11 to

Mar/12)

THIS

MODEL

(Apr/12 to

Mar/13)

Energy Imbalance 6.1 -27.6 19.9 -71.5 11.6 -37.9 -28.0 -27.9

Margin 194.9 159.1 183.1 358.4 186.6 155.9 159.2 174.8Op. Reserve 126.3 59.9 100.3 205.9 78.6 46.7 42.4 45.0

STOR 47.4 69.4 57.6 75.1 85.4 87.1 88.5 99.7

BM Start Up 7.4 11.9 14.8 28.9 10.8 8.1 9.7 10.1

CMM 13.8 17.9 10.4 48.5 11.8 14.1 18.6 19.9

Energy + Margin 201.1 131.6 203.0 287.0 198.3 118.0 131.2 146.8

Footroom -5.5 9.2 5.2 5.7 30.2 13.9 28.3 31.0

Fast Reserve 51.0 58.4 58.3 60.8 63.3 69.4 75.3 77.8AS Response 65.5 124.3 126.0 129.5 111.5 139.1 126.3 126.5

BM Response 71.2 36.3 31.8 71.3 50.4 27.9 54.1 48.3

Reactive 54.5 53.1 47.0 61.9 42.8 48.1 59.3 60.5Blackstart 14.5 15.5 13.6 16.9 14.5 16.8 28.4 29.0

Total (less Constraints and TLA) 471.0 442.9 497.3 655.4 532.0 448.6 521.2 539.1

Headline Energy Forecast

£521.2m £539.1m

2011/12 2012/13

Page 28: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

28

New Modelling Approach

Scheme Target (bundled)

Forecast Inputs

Modelled Relationships

Ex-Ante

Actual Data

Inputs

Ex-Post

Ex-Ante/Ex-Post Approach

Page 29: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

29

Ex ante Inputs

Modelled relationship

STOR volume and price

Trend

2009/10 Volume Weighted Price

Reserve for wind %

Demand

Energy Imbalance

Static Response/ FFR

Constraints - CMM

Reactive Power

Margin

Fast Reserve

Footroom

Frequency Response

Page 30: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

30

Ex post Inputs

Power Price

NIV

Headroom

Wind generation

Nuclear generation

RPI

Energy Imbalance

Frequency Response

Fast Reserve

Footroom

Margin

Reactive Power

Ex a

nte

in

pu

ts

Page 31: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Assumptions and Sensitivities

Page 32: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

32

Ex

Po

st In

pu

t As

su

mp

tion

sP

ow

er P

rice

0

20

40

60

80

10

0

12

0

Apr-08

Jun-08

Aug-08

Oct-08

Dec-08

Feb-09

Apr-09

Jun-09

Aug-09

Oct-09

Dec-09

Feb-10

Apr-10

Jun-10

Aug-10

Oct-10

Dec-10

Feb-11

Apr-11

Jun-11

Aug-11

Oct-11

Dec-11

Feb-12

Apr-12

Jun-12

Aug-12

Oct-12

Dec-12

Feb-13

£/MWh

SP

NIR

P (A

vg)

BM

Pric

e (A

vg

)

FO

RE

CA

ST

AC

TU

AL

Page 33: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

33

Ex Post Input AssumptionsPower Price Scenarios

Power price by: 50%

~£79m increase to each

year

All Categories £m

THIS

MODEL

(Apr/11 to

Mar/12)

THIS

MODEL

(Apr/12 to

Mar/13)

Energy Imbalance -28.0 -27.9

Margin 159.2 174.8Operating Reserve 42.4 45.0

STOR 88.5 99.7

BM Start Up 9.7 10.1

CMM 18.6 19.9

Energy Imbalance + Margin 131.2 146.8

Footroom 28.3 31.0

Fast Reserve 75.3 77.8AS Response 126.3 126.5

BM Response 54.1 48.3Reactive 59.3 60.5Blackstart 28.4 29.0Total (less Constraints and TLA) 521.2 539.1

+36%

+25%

+~16%

Page 34: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

34

Ex Post Input AssumptionsPower Price Scenarios

Power price by: 50%

~£60m decrease to each

year

All Categories £m

THIS

MODEL

(Apr/11 to

Mar/12)

THIS

MODEL

(Apr/12 to

Mar/13)

Energy Imbalance -28.0 -27.9

Margin 159.2 174.8Operating Reserve 42.4 45.0

STOR 88.5 99.7

BM Start Up 9.7 10.1

CMM 18.6 19.9

Energy Imbalance + Margin 131.2 146.8

Footroom 28.3 31.0

Fast Reserve 75.3 77.8AS Response 126.3 126.5

BM Response 54.1 48.3Reactive 59.3 60.5Blackstart 28.4 29.0Total (less Constraints and TLA) 521.2 539.1

-36%

-15%

-27%

-21%

Page 35: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

35

Ex

Po

st In

pu

t As

su

mp

tion

sH

ea

dro

om

0

50

0

100

0

150

0

200

0

250

0

300

0

350

0

400

0

450

0

Apr-08

Jun-08

Aug-08

Oct-08

Dec-08

Feb-09

Apr-09

Jun-09

Aug-09

Oct-09

Dec-09

Feb-10

Apr-10

Jun-10

Aug-10

Oct-10

Dec-10

Feb-11

Apr-11

Jun-11

Aug-11

Oct-11

Dec-11

Feb-12

Apr-12

Jun-12

Aug-12

Oct-12

Dec-12

Feb-13

MW

He

adro

om

(Avg)

FO

RE

CA

ST

AC

TU

AL

Page 36: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

36

Ex Post Input AssumptionsHeadroom Scenarios

Headroom and by: 40%

±±±± ~£26m to each year

±±±± 6%±±±± 17%

±±±± 24%

All Categories £m

THIS

MODEL

(Apr/11 to

Mar/12)

THIS

MODEL

(Apr/12 to

Mar/13)

Energy Imbalance -28.0 -27.9

Margin 159.2 174.8Operating Reserve 42.4 45.0

STOR 88.5 99.7

BM Start Up 9.7 10.1

CMM 18.6 19.9

Energy Imbalance + Margin 131.2 146.8

Footroom 28.3 31.0

Fast Reserve 75.3 77.8AS Response 126.3 126.5

BM Response 54.1 48.3Reactive 59.3 60.5Blackstart 28.4 29.0Total (less Constraints and TLA) 521.2 539.1

Page 37: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

37

Ex Post Input AssumptionsWind Generation

0

1000

2000

3000

4000

5000

6000

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Win

d m

ean

ge

nera

tio

n (

MW

)

2012/13

2011/12

2009/10

Page 38: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

38

Ex Post Input AssumptionsWind Scenarios

Wind output and by: 15%

±±±± ~£10m to each year

±±±± ~6%

±±±± 8%

All Categories £m

THIS

MODEL

(Apr/11 to

Mar/12)

THIS

MODEL

(Apr/12 to

Mar/13)

Energy Imbalance -28.0 -27.9

Margin 159.2 174.8Operating Reserve 42.4 45.0

STOR 88.5 99.7

BM Start Up 9.7 10.1

CMM 18.6 19.9

Energy Imbalance + Margin 131.2 146.8

Footroom 28.3 31.0

Fast Reserve 75.3 77.8AS Response 126.3 126.5

BM Response 54.1 48.3Reactive 59.3 60.5Blackstart 28.4 29.0Total (less Constraints and TLA) 521.2 539.1

Page 39: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

39

Ex

Po

st In

pu

t As

su

mp

tion

sN

et Im

ba

lan

ce

Vo

lum

e (N

IV)

-12

00

-10

00

-800

-600

-400

-200 0

200

400

Apr-08

Jun-08

Aug-08

Oct-08

Dec-08

Feb-09

Apr-09

Jun-09

Aug-09

Oct-09

Dec-09

Feb-10

Apr-10

Jun-10

Aug-10

Oct-10

Dec-10

Feb-11

Apr-11

Jun-11

Aug-11

Oct-11

Dec-11

Feb-12

Apr-12

Jun-12

Aug-12

Oct-12

Dec-12

Feb-13

MW

FO

RE

CA

ST

AC

TU

AL

Page 40: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

40

Ex Post Input AssumptionsNIV Scenarios

NIV and by: 100MW

±±±± ~£90m to each year

±±±± ~300%

All Categories £m

THIS

MODEL

(Apr/11 to

Mar/12)

THIS

MODEL

(Apr/12 to

Mar/13)

Energy Imbalance -28.0 -27.9

Margin 159.2 174.8Operating Reserve 42.4 45.0

STOR 88.5 99.7

BM Start Up 9.7 10.1

CMM 18.6 19.9

Energy Imbalance + Margin 131.2 146.8

Footroom 28.3 31.0

Fast Reserve 75.3 77.8AS Response 126.3 126.5

BM Response 54.1 48.3Reactive 59.3 60.5Blackstart 28.4 29.0Total (less Constraints and TLA) 521.2 539.1

±±±± 4 %

Page 41: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

41

Ex

Po

st In

pu

t As

su

mp

tion

sN

uc

lea

r Ge

ne

ratio

n

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Apr-08

Jun-08

Aug-08

Oct-08

Dec-08

Feb-09

Apr-09

Jun-09

Aug-09

Oct-09

Dec-09

Feb-10

Apr-10

Jun-10

Aug-10

Oct-10

Dec-10

Feb-11

Apr-11

Jun-11

Aug-11

Oct-11

Dec-11

Feb-12

Apr-12

Jun-12

Aug-12

Oct-12

Dec-12

Feb-13

MW

Nucle

ar (A

vg)

FO

RE

CA

ST

AC

TU

AL

Page 42: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

42

Ex Post Input AssumptionsNuclear Scenarios

Nuclear output to and to 8800MW

-£33m and+£10m to each

year

- 43% and +14%

- 47% and +13%

All Categories £m

THIS

MODEL

(Apr/11 to

Mar/12)

THIS

MODEL

(Apr/12 to

Mar/13)

Energy Imbalance -28.0 -27.9

Margin 159.2 174.8Operating Reserve 42.4 45.0

STOR 88.5 99.7

BM Start Up 9.7 10.1

CMM 18.6 19.9

Energy Imbalance + Margin 131.2 146.8

Footroom 28.3 31.0

Fast Reserve 75.3 77.8AS Response 126.3 126.5

BM Response 54.1 48.3Reactive 59.3 60.5Blackstart 28.4 29.0Total (less Constraints and TLA) 521.2 539.1

4500MW

Page 43: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

43

Ex

Po

st In

pu

t As

su

mp

tion

sR

PI

-2.0

0%

-1.0

0%

0.0

0%

1.0

0%

2.0

0%

3.0

0%

4.0

0%

5.0

0%

6.0

0%

Apr-08

Jun-08

Aug-08

Oct-08

Dec-08

Feb-09

Apr-09

Jun-09

Aug-09

Oct-09

Dec-09

Feb-10

Apr-10

Jun-10

Aug-10

Oct-10

Dec-10

Feb-11

Apr-11

Jun-11

Aug-11

Oct-11

Dec-11

Feb-12

Apr-12

Jun-12

Aug-12

Oct-12

Dec-12

Feb-13

FO

RE

CA

ST

AC

TU

AL

Page 44: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

44

Black Start and Transmission Losses

Transmission Losses

£29m

2012/13

£28.4m

2011/12

Black Start

£57.4m

Total

� Availability fees

� Capital

� Testing

5.5TWh ± 0.5TWh

Page 45: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

45

Energy Forecast - Range

£448.6m

(latest view)2010/11

£539.1m

£521.2m

Mid

£785m£377m2012/13

£767m£361m2011/12

HighLow

� Low = combined output of lower case scenarios

� High = combined output of upper case scenarios

Page 46: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

46

Waterfall 2010/11 to 2011/12

£9.9£3.3

£14.4

£5.8£26.1

£11.2

£11.6£2.9

£521.2

£448.6

£12.7

£400

£420

£440

£460

£480

£500

£520

£5402

01

0/1

1

En

erg

y

Imb

ala

nce

Ma

rgin

Fo

otr

oo

m

Fa

st

Re

se

rve

AS

Re

sp

on

se

BM

Re

sp

on

se

Re

active

Bla

cksta

rt

Oth

er

20

11

/12

£m

Page 47: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

47

Waterfall 2011/12 to 2012/13

£0.1

£15.6

£2.7

£2.5

£1.2£0.6 £1.0

£539.1

£521.2

£0.1

£5.8

£510

£515

£520

£525

£530

£535

£540

£5452

01

1/1

2

En

erg

y

Imb

ala

nce

Ma

rgin

Fo

otr

oo

m

Fa

st

Re

se

rve

AS

Re

sp

on

se

BM

Re

sp

on

se

Re

active

Bla

cksta

rt

Oth

er

20

12

/13

£m

Page 48: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

48

Energy Summary

� Energy forecast for 2011/12 and 2012/13

� Ex ante and ex post inputs

� Ex post assumptions

� Model sensitivities

� Waterfall diagrams

£539.1m

£521.2m

Mid

£785m£377m2012/13

£767m£361m2011/12

HighLow

Page 49: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Constraints Forecast

Gil Susteras, Future Requirements Manager

Page 50: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

50

Agenda

� Model overview

� Unconstrained calibration

� Ex-ante assumptions

� Ex-post assumptions

� Forecast

� Scenarios and waterfalls

Page 51: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

51

1. Unconstrained Run (simplified)

Ex-ante

Ex-post

Model output

Generator FPNs and Interconnector flows to meet forecast demand (assuming infinite Transmission System

capability)

Simulation of

interconnected (non-GB) markets

Generator Availability

Generator Dynamic

Parameters,

efficiencies etc

Fuel/ Carbon

Prices

Wind

Output

Demand Forecast

Page 52: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

52

2. Constrained Run (simplified)

Generator FPNs and Interconnector flows to meet forecast demand (assuming infinite Transmission System

capability)

Transmission System modelled by a number of zones

divided by

boundaries

Each

boundary has a limit

Forecast generation and demand levels

assigned to

each zone

IF: zone generation – zone demand >

zone boundary capability

The model re-despatches generation in order to satisfy

each boundary limit (or constraint) based on BM Prices

Page 53: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Unconstrained calibration results

Sample results for key boundaries

Page 54: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

54

Scotland

20 30 40 50 60

20

00

30

00

40

00

50

00

60

00

70

00

Scotland Peaks

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

20 30 40 50 60

20

00

30

00

40

00

50

00

60

00

70

00

Scotland Off-peaks

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

Page 55: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

55

Thames Estuary

20 30 40 50 60

10

00

20

00

30

00

40

00

Thames Estuary Peaks

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

20 30 40 50 60

10

00

20

00

30

00

40

00

Thames Estuary Off-peaks

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

Page 56: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

56

South Wales

20 30 40 50 60

10

00

15

00

20

00

25

00

30

00

35

00

South Wales Peaks

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

20 30 40 50 60

10

00

15

00

20

00

25

00

30

00

35

00

South Wales Off-peaks

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

Page 57: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

57

French Interconnector

20 30 40 50 60

-20

00

-10

00

01

00

02

00

0

France (IFA) off-peak [Positive=flow into GB]

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

20 30 40 50 60

-20

00

-10

00

01

00

02

00

0

France (IFA) peak [Positive=flow into GB]

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

Page 58: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

58

Moyle Interconnector

20 30 40 50 60

-40

0-2

00

02

00

40

0

Ireland (Moyle) peak [Positive=flow into GB]

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

20 30 40 50 60

-40

0-2

00

02

00

40

0

Ireland (Moyle) off-peak [Positive=flow into GB]

solid=FPN 2009/10; dashed=Plexos 2009/10

Week

MW

Page 59: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Assumptions

Page 60: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

60

Ex-ante assumptions

Generator Availability: OC2 + stochastic failure rate

Generator Dynamic Parameters, efficiencies etc: BM submissions + publicly available information

Simulation of interconnected (non-GB) markets: simplified stack (Redpoint’s experience)

Demand Forecast: National Grid well established process

Transmission zones and boundaries: National Grid experience and expected outage plan

Generation/demand per zone: Diagrams + GSP historic levels

Boundary limits: Power System Studies and operational experience

Page 61: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

61

Ex-post assumptions

Fuel/ Carbon Prices: Argus forward curve and Bloomberg

Wind Output: 2009/10 metered output scaled for expected installed capacity (Gone Green scenario)

BM Prices: scaled from SRMC

Page 62: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Forecast

Page 63: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

63

Like-for-like run (SRMC based)

2009/10 = 120

2011/12 = 268

2012/13 = 229

Page 64: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

64

Pro-rata of values

2009/10 = 120 = £140m

2011/12 = 268 = £313m

2012/13 = 229 = £267m

Page 65: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

65

Simplified waterfall (1)

140

313

154

19

-

50

100

150

200

250

300

350

2009/10 Fuel Prices &

Generation changes

Boundary limits 2011/12

To

tal

Co

ns

tra

int

Co

sts

m)

Page 66: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

66

Simplified waterfall (2)

140

267

104

23

-

50

100

150

200

250

300

2009/10 Fuel Prices &

Generation changes

Boundary limits 2012/13

To

tal

Co

ns

tra

int

Co

sts

m)

Page 67: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

67

Drivers for variations

� System boundaries

� Evolving transmission system

� Fuel Prices

� Snapshot based on forward curve; in reality, ex-post input

� Wind generation

� Snapshot based on best view of connections; in reality, ex-post input

Page 68: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

68

Commodity prices effect

0

10

20

30

40

50

60

70

804 5 6 7 8 9

10

11

12 1 2 3 4 5 6 7 8 9

10

11

12 1 2 3 4 5 6 7 8 9

10

11

12 1 2 3

2009 2010 2011 2012 2013

SR

MC

/MW

h)

Old CCGT Typical coal unit Coal unit (LCPD opted out) New CCGT

Page 69: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

69

Wind generation

0

1000

2000

3000

4000

5000

6000

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Win

d m

ea

n g

en

era

tio

n (

MW

)

2012/13

2011/12

2009/10

Page 70: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

70

Sensitivity analysis

� Commodity prices

� Wind

Page 71: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

71

Effect of Movements in Gas Prices (up by 15% in summer)

0

10

20

30

40

50

60

70

804 5 6 7 8 9

10

11

12 1 2 3 4 5 6 7 8 9

10

11

12 1 2 3 4 5 6 7 8 9

10

11

12 1 2 3

2009 2010 2011 2012 2013

SR

MC

(£/M

Wh

)

Old CCGT Typical coal unit Coal unit (LCPD opted out) New CCGT

2011/12 forecast up by 60%

2012/13 forecast up by 50%

Page 72: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

72

Effect of Movements in Gas Prices (down by 15% in winter)

0

10

20

30

40

50

60

70

804 5 6 7 8 9

10

11

12 1 2 3 4 5 6 7 8 9

10

11

12 1 2 3 4 5 6 7 8 9

10

11

12 1 2 3

2009 2010 2011 2012 2013

SR

MC

/MW

h)

Old CCGT Typical coal unit Coal unit (LCPD opted out) New CCGT

2011/12 forecast down by 9%

2012/13 forecast down by 3%

Page 73: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

73

Wind sensitivity 2011/12 (±±±±15%)

0

500

1000

1500

2000

2500

3000

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Win

d m

ea

n g

en

era

tio

n (

MW

)

2011/12

2009/10

2011/12 forecast up/down by ± 8%

Page 74: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

74

Wind sensitivity 2012/13 (±±±±15%)

0

500

1000

1500

2000

2500

3000

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Win

d m

ea

n g

en

era

tio

n (

MW

)

2012/13

2009/10

2012/13 forecast up/down by ± 8%

Page 75: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

75

Constraints Forecast - Range

£161m

(latest view)2010/11

£267m

£313m

Mid

£422m£238m2012/13

£526m£260m2011/12

HighLow

� Low = combination of all low scenarios

� High = combination of all high scenarios

Page 76: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

76

Summary

� Transmission system evolving in response to new connections

� Constraint management is a key aspect of the value added by National Grid as System Operator

� Sharper incentives + Higher requirements = potential increase in CMS contracts

� Forecast presented is a snapshot based on current best view of controllable and un-controllable drivers

Page 77: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

BSUoS Reporting

Jo Faulkner, Balancing Services Manager

Page 78: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

78

Wa

terfa

ll Ex

am

ple

Intitial

Scheme

Target

Market

Length

Wholesale

Power Price

Other Ex-

Post

Adjustment

Agreed

Scheme

Target

SC+CH

Constraints

EW -

Constraints

Response

Outturn

6

-3.5

+2

+2

6.5

+1

-2

-0.5

5

Page 79: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

79

Monthly Forecast & Outturn Example

0

20

40

60

80

100

120

140

Apr-

11

May-1

1

Jun-1

1

Jul-11

Aug-1

1

Sep-1

1

Oct-

11

Nov-1

1

Dec-1

1

Jan-1

2

Feb-1

2

Mar-

12

Apr-

12

May-1

2

Jun-1

2

Jul-12

Aug-1

2

Sep-1

2

Oct-

12

Nov-1

2

Dec-1

2

Jan-1

3

Feb-1

3

Mar-

13

Month

Mo

nth

ly IB

C (

£m

)

0

200

400

600

800

1000

1200

Cu

mu

lati

ve I

BC

m)

Intital Scheme Forecast Agreed Scheme Forecast Latest Forecast Outturn

Cumu. Initial Cumu. Revised Cumu. Outturn+Forecast

Page 80: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

80

Sc

he

me

Ch

art E

xa

mp

le

Scheme Profit or Loss (£m)

Page 81: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

81

Mo

nth

ly B

SU

oS

Ex

am

ple

20

11

/12

: £0

.95

/MW

h

20

12

/13

: £1

.02

/MW

h

-

0.2

0

0.4

0

0.6

0

0.8

0

1.0

0

1.2

0

1.4

0

1.6

0

1.8

0

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

Jan-13

Feb-13

Mar-13

Mo

nth

BSUoS charge £/MWh

La

st Y

ea

r Va

lue

Pro

vis

ion

al O

uttu

rn

La

test F

ore

ca

st

Page 82: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

Closing remarks

Alan Smart, Energy Operations Manager

Page 83: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

83

Next Steps

� Models to be ‘refreshed’ with most recent data prior to scheme start

� CUSC Modification to update Charging Methodology by removing the NIA concept from the BSUoS calculation

� Licence methodology statements to be developed

� Ofgem to publish Final Proposals in March 2011

Page 84: Electricity System Operator Incentives BSUoS Seminar · 350 400 450 500 550 600 650 700 750 Incentivised Balancing Costs (£m) Profit / Loss (£m) ... NIA Change Detail Any X X Change?

84

Contact us

On the web:

Our dedicated web pages for electricity SO incentives are available at

the following addresses:

http://www.nationalgrid.com/uk/Electricity/soincentives/

Talk to us:

Ian Pashley: Tel: 01926 653446 [email protected]