electronics week summary m. hansen, cern. january 2012 electronics week session summary l l token

25
Electronics Week Summary M. Hansen, CERN

Upload: cornelius-kelly

Post on 21-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

Electronics Week Summary

M. Hansen, CERN

Page 2: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

January 2012 Electronics week

Session Summary

https://indico.cern.ch/categoryDisplay.py?categId=153

Token Ring operation workshop CMS common spares workshop Radiation Effects workshop DAQ and Online: VME maintenance and uTCA upgrades uTCA low level software Firmware Maintenance Review uTCA Rack and cDCS Integration B904 workshop (Electronics integration centre)

UPO 20120316 M. Hansen, CERN. [email protected]

Page 3: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

Token Ring operation workshop

Reminder Pixels, Strips, ECAL, RPC slow control (FE

configuration) Redundant Ring architecture Pixels and ECAL highly vulnerable to TR hardware

failures Strips (multiple independent layers) and RPC (accessible) less so

General Status Pixels, ECAL, and RPC have all rings operational

ECAL has a few dead nodes for which the bypass function is successfully utilized

Strip tracker has one dead ring with B on and one dead with B off (!!!)

UPO 20120316 M. Hansen, CERN. [email protected]

Page 4: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

Token Ring operation workshop

Soft issues (or resettable) Pixels Strips

A few rings lost communication during operation on a few occasions but still early days of investigation

ECAL 39 cases of communication loss leading to data taking interruption

Mainly two different cases detected by DCC going to error

RPC All OK (Operating with non-redundant configuration)

Significant effort in Strips and ECAL to keep up with soft issues, software updates, etc.

UPO 20120316 M. Hansen, CERN. [email protected]

Page 5: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

Token Ring operation workshop

Opportunity to standardize software Move to slc5 an opportunity but time too short

Agreements All systems will evaluate Tk fecsoftware Systems will attempt to align before end 2012 Deployment of a common version beginning 2013 Hypernews for communication

Hn-cms-TokenRing

UPO 20120316 M. Hansen, CERN. [email protected]

Page 6: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

CMS common spares workshop

Goals Identify means for track-keeping

E.g. EMDB

Identify candidate equipment E.g. CAEN mainframes

Detect and mitigate “us and them” attitudes within CMS Not that there seem to be any problem…

UPO 20120316 M. Hansen, CERN. [email protected]

Page 7: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

CMS common spares workshop

Discussion The Functionality of and Interfaces to the

Equipment Management Database is almost there Spreadsheet import is laborious If the EMDB is used from the beginning of a construction project

there is no import step needed. The EMDB and its interface development team lacks resources to

react rapidly to requests

The EMDB content need consolidation Lacks a naming convention, e.g mao, A3486 and CAEN AC/DC is

the same module type but the three names are differentSuggested to allow for aliases to give a name to a type of equipment

UPO 20120316 M. Hansen, CERN. [email protected]

Page 8: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

CMS Radiation Effects workshop

Agenda Overview of CMS environment and status of SEU

mitigation COTS in radiation environment

Mainly FPGA

Goals Share experience Review requirements Review available tools for mitigation of SEU in FPGAs in

CMS Review availability of radiation facilities and their usage

at CERN

UPO 20120316 M. Hansen, CERN. [email protected]

Page 9: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

CMS Radiation Effects workshop

Discussion Run down of current CMS issues related to Radiation and on-going work to

mitigate Run down of FPGAs in radiation from RPC, CSC, DT, HCAL

Upgrade plans increasing exposureIncreasing exposure due to increasing dose rates

Short summary of a PH/ESE seminar about SEE effects Concludes that tools are effective, radiation tolerant design validation is difficult but

crucial, SRAM based FPGAs (e.g. Xilinx) radiation hard but soft error rate is high, flash based FPGAs (e.g. ACTEL ProASIC) have less upsets but total dose resistance is limited and they are ??no longer developed??

Summary of tools available at CERN and elsewhere as well as some test results Introduction to CERN mixed field radiation facility, it’s future, and a summary of

experience by a CMS userDt used the facility in 2011

N.b. FPGA in radiation is a hot subject: part of program @ e.g. TWEPP2012

UPO 20120316 M. Hansen, CERN. [email protected]

Page 10: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

DAQ workshopuTCA upgrades and VME maintenance

Status and plans for VME PC replacement Schedule: first three months of LS1 Required: Subsystems should evaluate the

PCIexpress conet2 controller card before summer Two x4 cards installed in PCs in b904 BRM will use such a card in CMS during 2012 and have ordered

two cards

UPO 20120316 M. Hansen, CERN. [email protected]

Page 11: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

DAQ workshopuTCA upgrades and VME maintenance

Current work in the cDAQ and plans was discussed Evaluation of technologies for cDAQ upgrade How to deal with legacy vs “new” cDAQ sources

Foreseen evolution of event size was reviewed Current investigations of event size dependency on

n.o. primary vertices Discussion

All upgrade projects have to produce a time line showing how many FEDs need to be read out at any given time up to LS2 and document where the FEDs are going to be located Information to the cDAQ group (Frans / Christoph)

UPO 20120316 M. Hansen, CERN. [email protected]

Page 12: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

M. Hansen, CERN. [email protected]

uTCA upgrades

Most upgrade systems target uTCA to replace legacy VME

uTCA is defined as a shelf (crate) carrying AMCs Advanced Mezzanine Cards as defined in the

ATCA specification Double or Single Width (Slot height, that is) Full, mid, or compact height (Thickness, that

is...) Double width full size AMCs are square and

have enough space on top and bottom for components and cooling

UPO 20120316

Page 13: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

uTCA upgrades

UPO 20120316 M. Hansen, CERN. [email protected]

Page 14: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

uTCA upgradesExample: Vadatech VT892

UPO 20120316 M. Hansen, CERN. [email protected]

Power Module site #2

Power Module site #1

Twin bulk supply

Commercial MCH on MCH site #1

AMC13 on MCH site #2

VerticalAir flow!

12 slotsDouble Width

Full Size

Page 15: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

uTCA upgrades

The basic backplane, the MCH, and the power module are specified in detail in the uTCA specification in order to avoid interoperability issues. Nevertheless, in order to make maintenance easier and cheaper:

CMS target Common Crates

Perhaps with variants of backplane

Common Bulk Power Supplies Common Power Modules Common CMS integration Module

A.k.a. AMC13 Providing CMS wide common interface to TTC, TTS, DAQ

UPO 20120316 M. Hansen, CERN. [email protected]

Page 16: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

uTCA UpgradesRack and cDCS Integration

Central DCS integration Has been useful to have a centralised archive of

temperatures, voltages, currents, etc. in central DCS Requires a software bridge from PVSS to IPMI and a list

of quantities to read and archive LHCb has developed such a bridge that may be evaluated

The cDCS team believes the software development effort to include uTCA systems is available

The discussion about module standardisation was deferred Shelf, backplane, power module, MCH Foresee discussion during the upgrade week at the

latest

UPO 20120316 M. Hansen, CERN. [email protected]

Page 17: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

uTCA UpgradesIP address assignment

IP address analogous with VME base address for TCA systems Need to represent physical location of the

module, either by direct addressing or through LUT (IT DNS preferred by sysadmin)

D. Newbold (Bristol) will write a short note about a proposed baseline IP assignment procedure taking current requirements into account

UPO 20120316 M. Hansen, CERN. [email protected]

Page 18: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

uTCA UpgradesFirmware Upload and Bootstrap features

Bootstrap Includes functionality of Module Management

Controller (MMC) Common design preferred

UW development, IC development, CERN/CPPM/DESY Common command set agreed

Includes on-board firmware management “golden build” with firmware upgrade features

Non-upgradable “production build” with required functionality “development build(s)” with upgraded or modified functionality

Selectable by software Greg Iles (IC) will write a short note about on-board firmware

management

UPO 20120316 M. Hansen, CERN. [email protected]

Page 19: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

uTCA low level softwareC. Schwick

Discussion about e.g. register access in uTCA Through ethernet: no defined way to access

registers in modules Proposal

Ipbus Initially defined in Minnesota Refined and Currently maintained by a UK consortium Contain software libraries and firmware demonstrator

The proposal has been adopted as the baseline for register access for XTCA in CMS

UPO 20120316 M. Hansen, CERN. [email protected]

Page 20: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

Firmware Maintenance Review

Cyclic review Latest review in 2009

Reminder about use of back-up Suggest to use a e.g. SVN repository at CERN or

elsewhere for source code development No seamless integration with development tools In particular useful when multiple developers

Recommend to store binary files on the CMS online depository As safe as other run conditions Intended to be used as communication channel between developer and “upgrade

manager” Some complaints to be worked on

Limitations in version number formatCannot delete files (but this is the whole point...)Display option requests, e.g. Explode subdirectories

UPO 20120316 M. Hansen, CERN. [email protected]

Page 21: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

M. Hansen, CERN. [email protected]

B904Electronics Integration lab

workshop

cDAQ installation almost finished Private (.cms’) network ready NAS ready configured as in CMS Quattor templates debugged User head node in place 5-6 client machine installed, more on request DAQ machines installation on-going Using the P5 “dropbox” for updating configs

in b904 Installation slowed down by the cooling works on

the building, star point power reliability, etc.

UPO 20120316

Page 22: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

M. Hansen, CERN. [email protected]

B904Electronics Integration lab

workshop

cTTC One TTC Control PC installed (ttc-904) One global TTC crate

Clock and Orbit Generator + fanouts

Few TTCci:s GCT, GT HCAL, ECAL, RPC (only soft)

cTTC Waiting for more users

UPO 20120316

Page 23: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

M. Hansen, CERN. [email protected]

B904Electronics Integration lab

workshop

DSS https://indico.cern.ch/getFile.py/access?

contribId=4&resId=0&materialId=slides&confId=164335

All racks cut on smoke Dew point monitored, currently no action Pressure + temp of cooling plant monitored

Select racks have actions based on cooling (see talk linked above) Please review and request modifications as appropriate

DSS back end installed and users enabled to acknowledge Alarms and Actions

UPO 20120316

Page 24: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

Upcoming reviews

RE4 ESR last Wednesday Minutes available in agenda under electronics Report being edited

ME1/1 EDR follow-up on the 28th of March HO PRR scheduled on the 18th of April MB SC relocation ECR to be scheduled early May

UPO 20120316 M. Hansen, CERN. [email protected]

Page 25: Electronics Week Summary M. Hansen, CERN. January 2012 Electronics week Session Summary l  l Token

Thank you