elmridge golf course pv solar facility greenskies … · 5/19/2020 · elmridge road east site...
TRANSCRIPT
FA
IRW
AY
C
OU
RT
ELM RIDGE ROAD
N. A
NG
UIL
LA
RO
AD
60
55
50
50
5560
65
60
45 50
55
55
57
42
43
42
44
45
50
45
50
53
50
55
60 65
65
65
65
60
60
60
60
55
55
50
50
55
50
45
45 50
55
60
55
50
50
50
50
50
45
45
50
50
50
55
55
60
60
55
65
70
65
70
70
75
75
80
7570
70
65
60
55
60
65
70
65
75
75
80
85
90
90
85
80
75
70
65
65
70
80
757065
60
60
95
100
105
110
115
120
125
130
135
140
145 15
0
155
160
165
165
170
175
180
175
170
165
160
155
160
165
155
155
150
145
140
135
130
120
115
110
105
100
95
80
85
90
95 100
105
110
115
120
125
130
135
140 145
150
155
140
145
150
155 160
165
170
175
170
165
160
120
115
120 125
110115
120
10510095
130
135
140
145
150
155
160
165
170
170
UP/3
754
UP/3696
UP/3755
UP/65K 3223
UP/3423
UP/6486
UP/3422
UP/6425
UP/3421
UP/6484
UP/3419
WELL (INHOUSING)
WOODLANDCOURT
E
E
ELMRIDGE ROAD
EAST SITE
WEST SITE
N. A
NG
UILLA
ROA
D
N. A
NG
UIL
LA
RO
AD
INTERSTATE 95
WO
OD
LA
ND
CT
FAIR
WA
Y C
T
HIGH RIDGE DRIVE
PROJECT SITE VICINITY MAP:
PREPARED BY:
LOCATION MAP:
ELMRIDGE GOLF COURSE PV SOLAR FACILITYGREENSKIES CLEAN ENERGY LLC
229 ELMRIDGE ROADSTONINGTON, CONNECTICUT
PERMIT DRAWINGS
MMI PROJECT No. 6763-10MAY 19, 2020
PREPARED FOR:
127 WASHINGTON AVENUEWEST BUILDING, GARDEN LEVELNORTH HAVEN, CT 06473
LIST OF DRAWINGSNO. NAME TITLE01 -- TITLE SHEET02 LD LEGEND & NOTES03 IN INDEX PLAN04 - 06 EX-1 - EX-3 EXISTING CONDITIONS PLANS07 - 09 LA-1 - LA-3 SITE LAYOUT & GRADING PLANS10 - 12 SE-1 - SE-3 SEDIMENT & EROSION CONTROL PLANS13 - 15 SD-1 - SD-3 MISCELLANEOUS SITE DETAILS
0' 100' 200'
SCALE 1" = 200'0 1/2" 1"
0' 500' 1000'
SCALE 1" = 1000'0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
Know what's below.before you dig.Call
R
www.cbyd.com
1350 MAIN STREET, SUITE 1012
SPRINGFIELD, MA
413.241.6920
WWW.MMINC.COM
DRAFT 5/19/2020
EAST SITE
WEST SITE
ZONING DATA (WEST SITE)ZONING DISTRICT
DIMENSIONAL / DENSITY CRITERIA REGULATION
MIN. LOT AREA 130,000 SF
YARD SETBACKS
FRONT 75 FT
SIDE 30/100 FT
REAR 100 FT
MAX HEIGHT 30 FT
SHEET NAME
DATE
LD
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
MAY 19, 2020
6763-10
N.T.S.
LEG
END
& N
OTE
S
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.02 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
IPF
SURVEY NOTES
EXISTING CONDITIONS LEGEND
GRADING NOTES
THE RESHAPING OF THE GROUND SURFACE WITH EXCAVATION AND
FILLING OR A COMBINATION OF, TO OBTAIN PLANNED GRADES,
SHALL PROCEED IN ACCORDANCE WITH THE SEDIMENT AND EROSION
MEASURES IN ADDITION THE FOLLOWING CRITERIA:
1. THE CUT FACE OF EARTH EXCAVATION SHALL NOT BE STEEPER
THAN TWO HORIZONTAL TO ONE VERTICAL (2:1).
2. THE PERMANENT EXPOSED FACES OF FILLS SHALL NOT BE
STEEPER THAN TWO HORIZONTAL TO ONE VERTICAL (2:1).
3. THE CUT FACE OF ROCK EXCAVATION SHALL NOT BE STEEPER
THAN ONE HORIZONTAL TO TWO VERTICAL (1:2).
4. PROVISIONS SHOULD BE INCLUDED TO CONVEY SURFACE WATER
SAFELY TO STORM DRAINS TO PREVENT SURFACE RUNOFF FROM
DAMAGING CUT FACES AND FILL SLOPES.
5. NO FILL SHOULD BE PLACED WHERE IT WILL SLIDE OR WASH
INTO ADJACENT WETLANDS, WATERCOURSES, OR WATER BODIES.
6. PRIOR TO ANY RE-GRADING, A STABILIZED CONSTRUCTION
ENTRANCE SHALL BE PLACED AT THE ENTRANCE TO THE WORK
AREA IN ORDER TO REDUCE MUD AND OTHER SEDIMENTS FROM
LEAVING THE SITE.
7. GRADING SHALL BE COMPLETED TO 95% COMPACTION PER THE
SPECIFICATIONS.
SITE LAYOUT LEGEND
SEDIMENT & EROSION LEGEND
SILT FENCE
SILT FENCE & STAKED STRAW BALES
COMPOST FILTER TUBE
LIMIT OF CLEARING
CONSTRUCTION ENTRANCE PAD
1. THIS PLAN IS BASED ON THE PLAN AND SURVEY PROVIDED BY
NORTHEAST SURVEY CONSULTANTS DATED DECEMBER 16, 2019.
SUPPLEMENTAL INFORMATION WAS PROVIDED ON JANUARY 23,
2020.
2. HORIZONTAL DATUM IS NAD83. VERTICAL DATUM IS NAVD88.
3. BOUNDARY LINES SHOWN HEREIN WERE TAKEN FROM PLANS &
DEEDS OF RECORD AND MONUMENTS FOUND.
4. ALL CONTOURS SHOWN HEREIN WERE GENERATED IN ARCMAP FROM
DIGITAL ELEVATION MODELS OF THE 2016 CRCOG LIDAR DATA (10'
GRID SIZE/TIN GRID METHOD) AS DISTRIBUTED BY NOAA.
5. ACCORDING TO FEDERAL EMERGENCY MANAGEMENT AGENCY MAPS,
THE LOCUS PARCELS ARE LOCATED IN AREAS DESIGNATED AS ZONE
X (UNSHADED), ZONE X (SHADED) AND ZONE AE. COMMUNITY PANEL
NO. 09011C 0413 G, EFFECTIVE DATE: 07/18/2011. FLOOD ZONE
LINES SHOWN HEREON ARE TAKEN FROM THE NATIONAL FLOOD
HAZARD GIS LAYER PROVIDED BY FEMA.
6. THE FOLLOWING FEATURES WERE TRACED FROM AERIAL
PHOTOGRAPHY AND ARE APPROXIMATE ONLY: CART PATHS,
FAIRWAYS, GREENS, SAND TRAPS, PARKING AREAS, DRIVES,
TREELINES AND WATER FEATURES.
7. LOCATIONS OF UTILITIES SHOWN HEREIN ARE THE RESULT OF
SURFACE EVIDENCE AS LOCATED BY FIELD SURVEY AND ANECDOTAL
KNOWLEDGE OF THE SITE. THIS PLAN DOES NOT DEPICT THE EXACT
LOCATIONS OF ALL UTILITIES WHICH MAY EXIST AT THIS TIME
WITHIN THE PREMISES SURVEYED.
8. THE PROJECT PROPERTY IS LOCATED WITHIN THE LI-130 AND
GBR-130 ZONING DISTRICTS. A MAJORITY OF THE PROJECT,
INCLUDING THE ENTIRE PV ARRAY FIELD, STORMWATER
MANAGEMENT BASINS, AND GRADING, ARE LOCATED WITHIN THE
GBR-130 ZONING DISTRICT. WORK IN THE LI-130 ZONING DISTRICT
CONSISTS OF WORK ASSOCIATED WITH THE NORTHERLY
INTERCONNECTION TO TAUGWONK ROAD AND MAINTENANCE OF THE
EXISTING GRAVEL ACCESS ROAD.
9. WETLAND DELINEATION PERFORMED BY MILONE & MACBROOM, INC.
ON NOVEMBER 26, 2019 AND JANUARY 13, 2020.
250
260.20
E
GENERAL NOTES
1. ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THE
FIELD (V.I.F.) PRIOR TO CONSTRUCTION. ANY DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S
REPRESENTATIVE.
2. THE CONTRACTOR SHALL PERFORM NECESSARY CONSTRUCTION
NOTIFICATIONS, APPLY FOR AND OBTAIN NECESSARY PERMITS,
PAY FEES, AND POST BONDS ASSOCIATED WITH THE WORK AS
REQUIRED BY THE CONTRACT DOCUMENTS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE AND
SAFETY OF TRAFFIC ON THE PUBLIC AND PRIVATE WAYS AFFECTED
BY THE CONSTRUCTION OF THE PROJECT.
4. ALL SLOPES, VEGETATION, PAVING, WALKS, AND IMPROVEMENTS
OUTSIDE THE AREAS TO BE AFFECTED BY THE CONSTRUCTION OF
THE PROJECT SHALL BE PROTECTED. DAMAGES RESULTING FROM
CONSTRUCTION ACTIVITIES OUTSIDE THE PROJECT LIMITS SHALL
BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR IS RESPONSIBLE FOR SITE SECURITY AND JOB
SAFETY. PERFORM CONSTRUCTION ACTIVITIES IN ACCORDANCE
WITH O.S.H.A. STANDARDS AND LOCAL REQUIREMENTS.
6. ALL STUMPS SHALL BE DISPOSED OF AT AN APPROVED OFFSITE
LOCATION. THE BURYING OF STUMPS ON SITE SHALL NOT BE
PERMITTED.
1. CONTRACTOR TO STAKE OUT LIMIT OF DISTURBANCE. NO DISTURBANCE IS TO
TAKE PLACE BEYOND THE LIMITS OF WORK SHOWN.
2. CONTRACTOR TO INSTALL SEDIMENT AND EROSION CONTROLS ALONG THE
PERIMETER, AS SHOWN ON THE SEDIMENT CONTROL PLAN AND STABILIZED
CONSTRUCTION ENTRANCES.
3. CLEAR AND GRUB SITE AND STOCKPILE TOPSOIL AS NECESSARY. PLACE
COMPOST FILTER TUBES AROUND STOCKPILES.
4. CONSTRUCT STORMWATER MANAGEMENT BASINS AFTER THE SITE IS CLEARED
AND GRUBBED.
5. SLOPES ARE TO BE ESTABLISHED AS SOON AS PRACTICAL BEFORE PV ARRAY
INSTALLATION. STABILIZE ALL SLOPES IMMEDIATELY AFTER THEIR
ESTABLISHMENT.
6. THE SEDIMENT CONTROL PLAN SHALL BE MODIFIED BY THE CONTRACTOR AT
THE DIRECTION OF THE OWNER'S REPRESENTATIVE AND THE MUNICIPALITY
DESIGNATED REPRESENTATIVE AS NECESSITATED BY CHANGING SITE
CONDITIONS.
7. ROUTINE SEDIMENT AND EROSION CONTROL INSPECTIONS SHALL CONTINUE
UNTIL ALL DISTURBED AREAS HAVE STABILIZED PURSUANT TO THE
CONNECTICUT STORMWATER GENERAL PERMIT.
8. ALL DEWATERING WASTE WATERS SHALL BE DISCHARGED IN A MANNER WHICH
MINIMIZES THE DISCOLORATION OF THE RECEIVING WATERS.
9. THE SITE SHOULD BE KEPT CLEAN OF LOOSE DEBRIS, LITTER, AND BUILDING
MATERIALS SUCH THAT NONE OF THE ABOVE ENTER WATERS OR WETLANDS.
10. A COPY OF ALL PLANS AND REVISIONS, AND THE SEDIMENT CONTROL PLAN
SHALL BE MAINTAINED ON-SITE AT ALL TIMES DURING CONSTRUCTION.
SEDIMENT & EROSION CONTROL NOTES
TREELINE
EDGE OF PAVEMENT
370
MAJOR CONTOUR
BUILDING / STRUCTURE
PROPERTY LINE
GBR-130 (GREENBELT RESIDENTIAL)
1, 2
WETLAND FLAG
100' WETLAND BUFFER
FLAGGED WETLAND LIMIT
WETLAND BUFFER
369
MINOR CONTOUR
ABUTTERS LINE
EASEMENT LINE
OVERHEAD WIRES
STONE WALL
CHAIN LINK FENCE
ASSESSOR'S ID
NOW OR FORMERLY
IRON PIPE FOUND
BOUND FOUND
CALCULATED POINT
UTILITY POLE
GUY WIRE ANCHOR
N/F
PROPOSED MAJOR CONTOUR
SPOT ELEVATION
GRAVEL SURFACE
PROPOSED ELECTRICAL
SERVICE (UNDERGROUND)
PROPOSED CHANLINK
FENCE / GATE
PHOTOVOLTAIC ARRAY
PROPOSED LIMIT OF WORK
PROPOSED ELECTRICAL
SERVICE (OVERHEAD)
248
PROPOSED MINOR CONTOUR
PROPOSED INVERTER PAD
PROPOSED UTILITY POLE
ZONING DATA (EAST SITE)ZONING DISTRICT
DIMENSIONAL / DENSITY CRITERIA REGULATION
MIN. LOT AREA 80,000 SF
YARD SETBACKS
FRONT 50 FT
SIDE 25 FT
REAR 50 FT
MAX HEIGHT 30 FT
RR-80 (RURAL RESIDENTIAL)
1, 2
1, 2
1, 2
DRAFT 5/19/2020
FEMA ZONE X
FEMA ZONE AE
HIGH RIDGE DRIVE
WO
OD
LA
ND
C
OU
RT
FA
IRW
AY
C
OU
RT
HIG
H R
IDG
E DRIV
E
ARBO
R
COU
RT
NO
RT
H
AN
GU
ILL
A
RO
AD
ELM RIDGE ROAD
N. A
NG
UIL
LA
RO
AD
60
55
50
50
50
45
45
45
45
45
50
55
55
6065
60
60
45
45 50
55
55
57
42
43
42
44
43
45
50
45
50
53
50
55
60 65
65
65
65
60
60
60
60
55
55
50
50
55
50
45
45 50
55
60
55
50
5050
50
50
45
45
50
50
50
55
55
60
60
55
65
70
65
70
70
75
75
80
7570
70
65
60
55
60
65
70
65
75
75
80
85
90
90
85
80
75
70
65
65
70
80
757065
60
60
95
100
105
110
115
120
125 13
0
135
140
145 15
0
155
160
165
165
170
175
180
175
170
165
160
155
160
165
155
155
150
145
140
135
130
120
115
110
105
100
95
80
85
90
95 100
105
110
115
120
125
130
135
140 145
150
155
140
145
150
155 160
165
170
170
175
180
175
170
165
160
120
115
120 125
110115
120
10510095
130
135
140
145
150
155
160
165
170
170
UP/3
754
UP/36
96
UP/3755
UP/65K 3223
UP/3423
UP/6486
UP/3422
UP/6425
UP/3421
UP/6484
UP/3419
"CROSSWALK""STOP"
5
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
F
R
O
N
T
)
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
50' PRO
PERTY S
ETBACK (
RR-8
0 REA
R)
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
7
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
F
R
O
N
T
)
5
0
' P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(G
B
R
-1
3
0
S
ID
E
)
5
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
S
I
D
E
)
1
0
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
R
E
A
R
)
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
WOODLANDCOURT
E
E
SHEET NAME
DATE
IN
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=200'
IND
EX S
HEE
T
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.03 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 100' 200'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
SEE SHEETS: EX-2, LA-2 & SE-2
SEE SHEETS: EX-3, LA-3 & SE-3
SEE SHEETS: EX-1, LA-1 & SE-1
DRAFT 5/19/2020
EAST SITE
WEST SITE
N. A
NG
UIL
LA
RO
AD
FAIRWAY
GREEN
GREEN
SAND
SANDSAND
SAND
SAND
SAND
SAND
SAND
PATH
PATH
PATH
PATH
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
50
50
55
60 65
65
65
65
60
6060
60
55
55
50
50
55
50
5050
50
50
45
45
50
50
50
55
55
60
60
55
65
70
65
70
70
75
75
80
7570
70
65
60
55
60
65
90
85
80
75
70
65
65
70
80
757065
60
60
95
UP/3
754
UP/3696
"CROSSWALK""STOP"
FEMA ZONE X(SHADED)
FEMA ZONE AE
FEMA ZONE X
SAND
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
7
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
F
R
O
N
T
)
5
0
' P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(G
B
R
-1
3
0
S
ID
E
)
1
0
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
R
E
A
R
)
1
0
0
' W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
' W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
IPF
IPFIPF
PATH
WOODED
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
TREES
SHEET NAME
DATE
EX-1
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
EXIS
TIN
G C
ON
DIT
ION
S PL
AN
- W
EST
SITE
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.04 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MA
TC
HLIN
E - S
EE S
HEET EX
-2
MA
TC
HLIN
E - S
EE S
HEET EX
-3
DRAFT 5/19/2020
ELM RIDGE ROAD
100
105
110
115
120
125 13
0
135
140
145 15
0
155
160
165
165
160
165
155
155
150
145
140
135
130
120
115
110
105
100
95
165
160
120
115
120 125
110115
120
10510095
130
135
140
145
150
155
160
165
170
UP/3423
UP/6486
UP/3422
UP/6425
UP/3421
UP/6484
UP/3419
5
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
F
R
O
N
T
)
BARN
SHED
HOUSE
PATH
PATH
BIT.PARKING
LOT
BIT. DR
IVE
PATH
20' WID
E R.O
.W.
DEED
720~64 PLAN 2528B
SAND
SAND
SAND
SAND
SAND
SAND
SA
ND
SAND
SANDSAND
FAIRWAY
FAIRWAY
FAIRWAY
FAIRWAY
GREEN
GREEN
GREEN
GREEN
WOODED
WOODED
20' WIDE EASEMENTTO CL&P & PAWTUCKET
FIRE DISTRICTDEED 512~604DEED 793~1060DEED 793~1063
PLAN 3545
SILO W/ CELL ANTENNASSUBJECT TO RIGHTS OF OTHERSLEASE DOCS / PLANS NOT FOUND
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
TREES
TREES
SHEET NAME
DATE
EX-2
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
EXIS
TIN
G C
ON
DIT
ION
S PL
AN
- EA
ST S
ITE
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.05 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MATCHLINE - SEE SHEET EX-3
MA
TC
HLIN
E - S
EE S
HEET EX
-1
DRAFT 5/19/2020
80
85
90
95 100
105
110
115
120
125
130
135
140 14
5
150
155
140
145
150
155 160
165165
160
50' PRO
PERTY SETBACK (RR-80 REAR)
PATH
SAND
SAND
FAIRWAY
WATER
GREENFAIRWAY
GREEN
WOODED
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
WOODLANDCOURT
SHRUBS
SHEET NAME
DATE
EX-3
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
EXIS
TIN
G C
ON
DIT
ION
S PL
AN
- EA
ST S
ITE
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.06 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MATCHLINE - SEE SHEET EX-2
MA
TC
HLIN
E - S
EE S
HEET EX
-1
DRAFT 5/19/2020
N. A
NG
UIL
LA
RO
AD
FAIRWAY
GREEN
GREEN
SAND
SANDSAND
SAND
SAND
SAND
SAND
SAND
PATH
PATH
PATH
PATH
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
50
50
55
60 65
65
65
65
60
6060
60
55
55
50
50
55
50
5050
50
50
45
45
50
50
50
55
55
60
60
55
65
70
65
70
70
75
75
80
7570
70
65
60
55
60
65
90
85
80
75
70
65
65
70
80
757065
60
60
95
UP/3
754
UP/3696
"CROSSWALK""STOP"
FEMA ZONE X(SHADED)
FEMA ZONE AE
FEMA ZONE X
SAND
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
7
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
F
R
O
N
T
)
5
0
' P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(G
B
R
-1
3
0
S
ID
E
)
1
0
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
R
E
A
R
)
1
0
0
' W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
' W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
IPF
IPFIPF
PATH
WOODED
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
TREES
52
53
5
1
5
0
5
3
5
4
5
5
5
6
5
6
55
54
53
52.5
53
54
55
56
56
55
54
5
7
5
8
5
9
6
0
6
1
62
6
3
64
5
6
5
7
5
5
5
6
5
7
58
5
9
6
0
6
0
5
8
5
9
6
4
6
4
6
3
6
2
6
1
6
0
4
9
5
7
7' CHAIN LINK FENCE (TYP.)
ELECTRICAL EQUIPMENT
PAD ARRAY A
ELECTRICAL SERVICE PAD
PHOTOVOLTAIC ARRAY (TYP.)
15' GRAVEL
ACCESS ROAD
7' CLF SWING GATE
STORMWATER MANAGEMENT
BASIN NO. 1
(STORAGE=1.25 ACRE-FT)
WEIR WALL
MEET EXIST ROAD
TP-1
TP-2
1
5
'
M
I
N
(
T
Y
P
)
OVERHEAD
ELECTRICAL
SERVICE
UTILITY RECLOSER POLE
UTILITY PRIMARY METER POLE
POINT OF ELECTRICAL
INTERCONNECTION
WEST SITE
UTILITY GOAB POLE
15' MIN (TYP)
ARBORVITAE BUFFER
PLANTINGS 4'-5' HT
SHEET NAME
DATE
LA-1
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
SITE
LA
YOU
T &
GR
AD
ING
PLA
N -
WES
T SI
TE
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.07 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MA
TC
HLIN
E - S
EE S
HEET LA
-2
MA
TC
HLIN
E - S
EE S
HEET LA
-3
DRAFT 05/19/2020
ELM RIDGE ROAD
100
105
110
115
120
125 13
0
135
140
145 15
0
155
160
165
165
160
165
155
155
150
145
140
135
130
120
115
110
105
100
95
165
160
120
115
120 125
110115
120
10510095
130
135
140
145
150
155
160
165
170
UP/3423
UP/6486
UP/3422
UP/6425
UP/3421
UP/6484
UP/3419
5
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
F
R
O
N
T
)
BARN
SHED
HOUSE
PATH
PATH
BIT.PARKING
LOT
BIT. DR
IVE
PATH
20' WID
E R.O
.W.
DEED
720~64 PLAN 2528B
SAND
SAND
SAND
SAND
SAND
SAND
SA
ND
SAND
SANDSAND
FAIRWAY
FAIRWAY
FAIRWAY
FAIRWAY
GREEN
GREEN
GREEN
GREEN
WOODED
WOODED
20' WIDE EASEMENTTO CL&P & PAWTUCKET
FIRE DISTRICTDEED 512~604DEED 793~1060DEED 793~1063
PLAN 3545
SILO W/ CELL ANTENNASSUBJECT TO RIGHTS OF OTHERSLEASE DOCS / PLANS NOT FOUND
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
TREES
TREES
E E E E
EE
E
EE
EE
EE
E
1
3
9
1
4
0
1
4
1
153
154
155
156
157
158
1
4
5
1
4
6
1
4
7
1
4
8
1
4
9
1
5
0
1
5
1
134
133
132
1
3
1
130
1
2
9
1
2
8
135
136
137
138
130.5
2
0
'
M
I
N
(
T
Y
P
)
ELECTRICAL EQUIPMENT PAD
ARRAY B1
ELECTRICAL EQUIPMENT PAD
ARRAY B2
ELECTRICAL
SERVICE PAD
15' GRAVEL
ACCESS ROAD
7' CHAIN LINK FENCE WITH
GREEN PRIVACY SCREEN (TYP.)
7' CLF SWING GATE
LIMIT OF CLEARING (TYP.)
APPROXIMATE EXIST TREELINE (TYP.)
PHOTOVOLTAIC ARRAY (TYP.)
MEET EXIST
DRIVE
STORMWATER MANAGEMENT
BASIN NO. 2
(STORAGE=1.5± ACRE-FT)
EARTH DIVERSION BERM
8' BITUMINOUS
CONCRETE CART PATH
TP-4
TP-3
POINT OF ELECTRICAL
INTERCONNECTION EAST SITE
UTILITY PRIMARY METER &
RISER POLES
OVERHEAD ELECTRICAL
SERVICE & UTILITY POLES (TYP)
UTILITY RECLOSER POLE
WEIR WALL
SHEET NAME
DATE
LA-2
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
SITE
LA
YOU
T &
GR
AD
ING
PLA
N -
EAST
SIT
E
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.08 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MATCHLINE - SEE SHEET LA-3
MA
TC
HLIN
E - S
EE S
HEET LA
-1
DRAFT 5/19/2020
80
85
90
95 100
105
110
115
120
125
130
135
140 14
5
150
155
140
145
150
155 160
165165
160
50' PRO
PERTY SETBACK (RR-80 REAR)
PATH
SAND
SAND
FAIRWAY
WATER
GREENFAIRWAY
GREEN
WOODED
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
WOODLANDCOURT
SHRUBS
30'
20'
MIN
(TYP)
15' GRAVEL
ACCESS ROAD
7' CHAIN LINK FENCE WITH GREEN
PRIVACY SCREEN (TYP.)
APPROXIMATE EXIST TREELINE (TYP.)
LIMIT OF CLEARING (TYP.)
PHOTOVOLTAIC ARRAY (TYP.)
8' BITUMINOUS
CONCRETE CART PATH
CLEAR WOODED AREA
TP-5
Wpt 007
Wpt 008
SHRUB HEDGE (TYP.)
ABIES CONCOLOR/ WHITE FIR AND PICEA
GLAUCA/ FAT ALBERT SPRUCE NOT TO BE
MAINTAINED UNDER 10' HEIGHT, PLANTED
FAR ENOUGH FROM ARRAY.
SHEET NAME
DATE
LA-3
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
SITE
LA
YOU
T &
GR
AD
ING
PLA
N -
EAST
SIT
E
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.09 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MATCHLINE - SEE SHEET LA-2
MA
TC
HLIN
E - S
EE S
HEET LA
-1
DRAFT 5/19/2020
PLANTING NOTES
1. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATING PLANT PITS.
2. THE LANDSCAPE CONTRACTOR SHALL PROVIDE A 6" MINIMUM DEPTH OF TOPSOIL FOR ALL SEEDED AND LANDSCAPED AREAS.
3. ALL PLANTING BEDS SHALL HAVE 12" MINIMUM DEPTH OF TOPSOIL.
4. THE LANDSCAPE CONTRACTOR SHALL PROVIDE A 4" MIN. DEPTH OF SHREDDED MULCH OVER ALL PLANTING BEDS AND TREEPLANTINGS.
5. ALL PLANT MATERIAL IS SUBJECT TO INSPECTION AND APPROVAL BY THE OWNER'S REPRESENTATIVE PRIOR TO AND AFTER PLANTING.PLANT SPECIES MAY BE ADJUSTED BASED ON AVAILABILITY AT TIME OF PLANTING.
6. ALL PLANT MATERIAL SUBSTITUTIONS ARE SUBJECT TO REVIEW AND APPROVAL BY THE OWNER'S REPRESENTATIVE.
7. TREE SPACING AS SHOWN ON PLAN. SYMBOLS SHOWN AT 50-75% MATURE WIDTH.
8. ALL PLANT MATERIALS SHALL CARRY A FULL GUARANTEE FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE, TO INCLUDEPROMPT TREATMENT OR REMOVAL AND REPLACEMENT OF ANY PLANTS FOUND TO BE IN AN UNHEALTHY CONDITION BY THE OWNER'SREPRESENTATIVE. ALL REPLACEMENTS SHALL BE OF THE SAME KIND AND SIZE OF PLANTS SPECIFIED IN THE PLANT LIST.
9. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER PLANTING AND SHALL CONTINUE UNTIL ACCEPTANCE BY THE OWNER'SREPRESENTATIVE. MAINTENANCE SHALL INCLUDE WATERING, MULCHING, TIGHTENING & REPLACING OF TREE GUYS, REPLACEMENT OFSICK OR DEAD PLANTS, RESETTING PLANTS TO PROPER GRADE OR UPRIGHT (PLUMB) POSITION, RESTORATION OF SAUCERS, AND ALLOTHER CARE NEEDED FOR PROPER GROWTH OF THE PLANTS.
10. WHERE A SIZE RANGE IS SPECIFIED AT LEAST 50% OF PLANTS PROVIDED SHALL BE OF THE LARGER SIZE.
11. CONTRACTOR TO REMOVE TREE STAKES AFTER ONE GROWING SEASON.
12. LANDSCAPING SHALL BE KEPT AND MAINTAINED FOR SCREENING PURPOSES IN PERPETUITY BY ELMRIDGE GOLF COURSE AND/OR ITSSUCCESSORS, SO LONG AS A SOLAR ARRAY IS LOCATED ON THIS SITE. MAINTENANCE WILL INCLUDE THE REPLACEMENT OF ANYDEAD/DYING TREES, MAINTAINING SHRUBS AT 10' HT, OR PLANTING OF ADDITIONAL TREES TO FILL IN SPACES.
®
PLANT LIST
NOTE: ALL TREES SHALL BE INSTALLED WITH 6' DIAMETER MULCH BED. MULCH SHALL NOT TOUCH THE TRUNK, SEE DETAIL.
N. A
NG
UIL
LA
RO
AD
FAIRWAY
GREEN
GREEN
SAND
SANDSAND
SAND
SAND
SAND
SAND
SAND
PATH
PATH
PATH
PATH
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
50
50
55
60 65
65
65
65
60
6060
60
55
55
50
50
55
50
5050
50
50
45
45
50
50
50
55
55
60
60
55
65
70
65
70
70
75
75
80
7570
70
65
60
55
60
65
90
85
80
75
70
65
65
70
80
757065
60
60
95
UP/3
754
UP/3696
"CROSSWALK""STOP"
FEMA ZONE X(SHADED)
FEMA ZONE AE
FEMA ZONE X
SAND
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
7
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
F
R
O
N
T
)
5
0
' P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(G
B
R
-1
3
0
S
ID
E
)
1
0
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
G
B
R
-
1
3
0
R
E
A
R
)
1
0
0
' W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
' W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
IPF
IPFIPF
PATH
WOODED
2
5
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
S
I
D
E
)
TREES
52
53
5
1
5
0
5
3
5
4
5
5
5
6
5
6
55
54
53
52.5
53
54
55
56
56
55
54
5
7
5
8
5
9
6
0
6
1
62
6
3
64
5
6
5
7
5
5
5
6
5
7
58
5
9
6
0
6
0
5
8
5
9
6
4
6
4
6
3
6
2
6
1
6
0
4
9
5
7
CONSTRUCTION
ENTRANCE PAD
TEMPORARY SOIL
STOCKPILE
EROSION CONTROL
BLANKET
LIMIT OF WORK (TYP)
SILT FENCE & COMPOST
FILTER TUBE (TYP)
SHEET NAME
DATE
SE-1
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
SED
IMEN
T &
ER
OSI
ON
CO
NTR
OL
PLA
N -
WES
T SI
TE
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.10 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MA
TC
HLIN
E - S
EE S
HEET S
E-2
MA
TC
HLIN
E - S
EE S
HEET S
E-3
DRAFT 5/19/2020
ELM RIDGE ROAD
100
105
110
115
120
125 13
0
135
140
145 15
0
155
160
165
165
160
165
155
155
150
145
140
135
130
120
115
110
105
100
95
165
160
120
115
120 125
110115
120
10510095
130
135
140
145
150
155
160
165
170
UP/3423
UP/6486
UP/3422
UP/6425
UP/3421
UP/6484
UP/3419
5
0
'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
(
R
R
-
8
0
F
R
O
N
T
)
BARN
SHED
HOUSE
PATH
PATH
BIT.PARKING
LOT
BIT. DR
IVE
PATH
20' WID
E R.O
.W.
DEED
720~64 PLAN 2528B
SAND
SAND
SAND
SAND
SAND
SAND
SA
ND
SAND
SANDSAND
FAIRWAY
FAIRWAY
FAIRWAY
FAIRWAY
GREEN
GREEN
GREEN
GREEN
WOODED
WOODED
20' WIDE EASEMENTTO CL&P & PAWTUCKET
FIRE DISTRICTDEED 512~604DEED 793~1060DEED 793~1063
PLAN 3545
SILO W/ CELL ANTENNASSUBJECT TO RIGHTS OF OTHERSLEASE DOCS / PLANS NOT FOUND
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
TREES
TREES
E E E E
EE
E
EE
EE
EE
E
1
3
9
1
4
0
1
4
1
153
154
155
156
157
158
1
4
5
1
4
6
1
4
7
1
4
8
1
4
9
1
5
0
1
5
1
134
133
132
1
3
1
130
1
2
9
1
2
8
135
136
137
138
130.5
CONSTRUCTION
ENTRANCE PAD
LIMIT OF WORK (TYP)
COMPOST FILTER TUBE (TYP)
EROSION CONTROL
BLANKET
SILT FENCE & COMPOST
FILTER TUBE (TYP)
SHEET NAME
DATE
SE-2
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
SED
IMEN
T &
ER
OSI
ON
CO
NTR
OL
PLA
N -
EAST
SIT
E
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.11 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MA
TC
HLIN
E - S
EE S
HEET S
E-1
MATCHLINE - SEE SHEET SE-3
DRAFT 5/19/2020
80
85
90
95 100
105
110
115
120
125
130
135
140 14
5
150
155
140
145
150
155 160
165165
160
50' PRO
PERTY SETBACK (RR-80 REAR)
PATH
SAND
SAND
FAIRWAY
WATER
GREENFAIRWAY
GREEN
WOODED
1
0
0
'
W
E
T
L
A
N
D
B
U
F
F
E
R
WOODLANDCOURT
SHRUBS
TEMPORARY SOIL
STOCKPILE
LIMIT OF WORK (TYP)
SILT FENCE & COMPOST
FILTER TUBE (TYP)
SHEET NAME
DATE
SE-3
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
1"=40'
SED
IMEN
T &
ER
OSI
ON
CO
NTR
OL
PLA
N -
EAST
SIT
E
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.12 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 20' 40'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
MATCHLINE - SEE SHEET SE-2
MA
TC
HLIN
E - S
EE S
HEET S
E-1
DRAFT 5/19/2020
SHEET NAME
DATE
SD-1
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
MAY 19, 2020
6763-10
N.T.S.
SITE
DET
AIL
S
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.13 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
GENERAL:
THESE GUIDELINES SHALL APPLY TO ALL WORK CONSISTING OF ANY AND ALL TEMPORARY
AND/OR PERMANENT MEASURES TO CONTROL WATER POLLUTION AND SOIL EROSION, AS
MAY BE REQUIRED, DURING THE CONSTRUCTION OF THE PROJECT.
IN GENERAL, ALL CONSTRUCTION ACTIVITIES SHALL PROCEED IN SUCH A MANNER SO AS
NOT TO POLLUTE ANY WETLANDS, WATERCOURSE, WATER BODY, AND CONDUIT CARRYING
WATER, ETC. THE CONTRACTOR SHALL LIMIT, INSOFAR AS POSSIBLE, THE SURFACE AREA
OF EARTH MATERIALS EXPOSED BY CONSTRUCTION METHODS AND IMMEDIATELY PROVIDE
PERMANENT AND TEMPORARY POLLUTION CONTROL MEASURES TO PREVENT
CONTAMINATION OF ADJACENT WETLANDS, WATERCOURSES, AND WATER BODIES, AND TO
PREVENT, INSOFAR AS POSSIBLE, EROSION ON THE SITE.
LAND GRADING:
THE RESHAPING OF THE GROUND SURFACE BY EXCAVATION AND FILLING OR A
COMBINATION OF BOTH, TO OBTAIN PLANNED GRADES, SHALL PROCEED IN ACCORDANCE
WITH THE FOLLOWING CRITERIA:
a. THE CUT FACE OF EARTH EXCAVATION SHALL NOT BE STEEPER THAN TWO HORIZONTAL
TO ONE VERTICAL (2:1).
b. THE PERMANENT EXPOSED FACES OF FILLS SHALL NOT BE STEEPER THAN TWO
HORIZONTAL TO ONE VERTICAL (2:1).
c. THE CUT FACE OF ROCK EXCAVATION SHALL NOT BE STEEPER THAN ONE HORIZONTAL
TO TWO VERTICAL (1:2).
d. PROVISIONS SHOULD BE INCLUDED TO CONVEY SURFACE WATER SAFELY TO STORM
DRAINS TO PREVENT SURFACE RUNOFF FROM DAMAGING CUT FACES AND FILL SLOPES.
e. NO FILL SHOULD BE PLACED WHERE IT WILL SLIDE OR WASH UPON THE INTO
ADJACENT WETLANDS, WATERCOURSES, OR WATER BODIES.
f. PRIOR TO ANY RE-GRADING, A STABILIZED CONSTRUCTION ENTRANCE SHALL BE
PLACED AT THE ENTRANCE TO THE WORK AREA IN ORDER TO REDUCE MUD AND OTHER
SEDIMENTS FROM LEAVING THE SITE.
TOPSOILING:
TOPSOIL SHALL BE SPREAD OVER ALL EXPOSED AREAS IN ORDER TO PROVIDE A SOIL
MEDIUM HAVING FAVORABLE CHARACTERISTICS FOR THE ESTABLISHMENT, GROWTH, AND
MAINTENANCE OF VEGETATION.
UPON ATTAINING FINAL SUBGRADES, SCARIFY SURFACE TO PROVIDE A GOOD BOND WITH
TOPSOIL.
REMOVE ALL LARGE STONES, TREE LIMBS, ROOTS AND CONSTRUCTION DEBRIS.
APPLY LIME ACCORDING TO SOIL TEST OR AT THE RATE OF TWO (2) TONS PER ACRE.
MATERIAL:
1. TOPSOIL SHOULD HAVE PHYSICAL, CHEMICAL, AND BIOLOGICAL CHARACTERISTICS
FAVORABLE TO THE GROWTH OF PLANTS.
2. TOPSOIL SHOULD HAVE A SANDY OR LOAMY TEXTURE.
3. TOPSOIL SHOULD BE RELATIVELY FREE OF SUBSOIL MATERIAL AND MUST BE FREE OF
STONES (OVER 1" IN DIAMETER), LUMPS OF SOIL, ROOTS, TREE LIMBS, TRASH, OR
CONSTRUCTION DEBRIS. IT SHOULD BE FREE OF ROOTS OR RHIZOMES SUCH AS
THISTLE, NUTGRASS, AND QUACKGRASS.
4. AN ORGANIC MATTER CONTENT OF SIX PERCENT (6%) IS REQUIRED. AVOID LIGHT
COLORED SUBSOIL MATERIAL.
5. SOLUBLE SALT CONTENT OF OVER 500 PARTS PER MILLION (PPM) IS LESS SUITABLE.
AVOID TIDAL MARSH SOILS BECAUSE OF HIGH SALT CONTENT AND SULFUR ACIDITY.
6. THE pH SHOULD BE MORE THAN 6.0. IF LESS, ADD LIME TO INCREASE pH TO AN
ACCEPTABLE LEVEL.
APPLICATION:
1. AVOID SPREADING WHEN TOPSOIL IS WET OR FROZEN.
2. SPREAD TOPSOIL UNIFORMLY TO A DEPTH OF AT LEAST SIX INCHES (6"), OR TO THE
DEPTH SHOWN ON THE PLANS.
TEMPORARY VEGETATIVE COVER:
TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED ON ALL UNPROTECTED AREAS
THAT PRODUCE SEDIMENT, AREAS WHERE FINAL GRADING HAS BEEN COMPLETED, AND
AREAS WHERE THE ESTIMATED PERIOD OF BARE SOIL EXPOSURE IS LESS THAN 12
MONTHS. TEMPORARY VEGETATIVE COVER SHALL BE APPLIED IF AREAS WILL NOT BE
PERMANENTLY SEEDED BY SEPTEMBER 1.
SITE PREPARATION:
1. INSTALL REQUIRED SURFACE WATER CONTROL MEASURES.
2. REMOVE LOOSE ROCK, STONE, AND CONSTRUCTION DEBRIS FROM AREA.
3. APPLY LIME ACCORDING TO SOIL TEST OR AT A RATE OF ONE (1) TON OF GROUND
DOLOMITIC LIMESTONE PER ACRE (5 LBS. PER 100 SQ. FT.).
4. APPLY FERTILIZER ACCORDING TO SOIL TEST OR AT THE RATE OF 300 LBS. OF 10-10-10
PER ACRE (7 LBS. PER 1,000 SQ. FT.) AND SECOND APPLICATION OF 200 LBS. OF
10-10-10 (5 LBS. PER 1,000 SQ. FT.) WHEN GRASS IS FOUR INCHES (4") TO SIX
INCHES (6") HIGH. APPLY ONLY WHEN GRASS IS DRY.
5. UNLESS HYDROSEEDED, WORK IN LIME AND FERTILIZER TO A DEPTH OF FOUR (4")
INCHES USING A DISK OR ANY SUITABLE EQUIPMENT.
6. TILLAGE SHOULD ACHIEVE A REASONABLY UNIFORM LOOSE SEEDBED. WORK ON
CONTOUR IF SITE IS SLOPING.
ESTABLISHMENT:
1. SELECT APPROPRIATE SPECIES FOR THE SITUATION. NOTE RATES AND SEEDING DATES
(SEE VEGETATIVE COVER SELECTION & MULCHING SPECIFICATION BELOW).
2. APPLY SEED UNIFORMLY ACCORDING TO THE RATE INDICATED BY BROADCASTING,
DRILLING, OR HYDRAULIC APPLICATION.
3. UNLESS HYDROSEEDED, COVER RYEGRASS SEEDS WITH NOT MORE THAN 1/4 INCH OF
SOIL USING SUITABLE EQUIPMENT.
4. MULCH IMMEDIATELY AFTER SEEDING IF REQUIRED. (REFER TO TEMPORARY OR
PERMANENT VEGETATIVE COVER REQUIREMENTS.) APPLY STRAW MULCH AND ANCHOR
TO SLOPES GREATER THAN 3% OR WHERE CONCENTRATED FLOW WILL OCCUR.
PERMANENT VEGETATIVE COVER:
PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED AS VARIOUS SECTIONS OF THE
PROJECT ARE COMPLETED IN ORDER TO STABILIZE THE SOIL, REDUCE DOWNSTREAM
DAMAGE FROM SEDIMENT AND RUNOFF, AND TO ENHANCE THE AESTHETIC NATURE OF THE
SITE. IT WILL BE APPLIED TO ALL CONSTRUCTION AREAS SUBJECT TO EROSION WHERE
FINAL GRADING HAS BEEN COMPLETED AND A PERMANENT COVER IS NEEDED.
SITE PREPARATION:
1. INSTALL REQUIRED SURFACE WATER CONTROL MEASURES.
2. REMOVE LOOSE ROCK, STONE, AND CONSTRUCTION DEBRIS FROM AREA.
3. PERFORM ALL PLANTING OPERATIONS PARALLEL TO THE CONTOURS OF THE SLOPE.
4. APPLY TOPSOIL AS INDICATED ELSEWHERE HEREIN.
5. APPLY FERTILIZER ACCORDING TO SOIL TEST OR:
· SPRING SEEDING: WORK DEEPLY IN SOIL, BEFORE SEEDING, 300 LBS. OF 10-10-10
FERTILIZER PER ACRE (7 LBS. PER 1,000 SQ. FT.); THEN SIX (6) TO EIGHT (8)
WEEKS LATER, APPLY ON THE SURFACE AN ADDITIONAL 300LBS. OF 10-10-10
FERTILIZER PER ACRE. AFTER SEPTEMBER 1, TEMPORARY VEGETATIVE COVER
SHALL BE APPLIED.
· FALL SEEDING: WORK DEEPLY IN SOIL, BEFORE SEEDING, 600 LBS. OF 10-10-10
FERTILIZER PER ACRE (14 LBS. PER 1,000 SQ. FT.).
EROSION CHECKS:
GENERAL:
TEMPORARY PERVIOUS BARRIERS USING GEOTEXTILE FABRIC FASTENED TO A FENCE POST
AND BURIED INTO THE GROUND, COMPOST FILTER TUBE HELD IN PLACE WITH STAKES, AND
EROSION CONTROL BLANKET SHALL BE INSTALLED AND MAINTAINED AS REQUIRED TO
CHECK EROSION AND REDUCE SEDIMENTATION.
CONSTRUCTION:
GEOTEXTILE FABRIC SHALL BE SECURELY ANCHORED AT THE TOP OF A THREE FOOT (3')
HIGH FENCE AND BURIED A MINIMUM OF FOUR INCHES (4") TO THE SOIL. SEAMS BETWEEN
SECTIONS OF FILTER FABRIC SHALL OVERLAP MINIMUM OF TWO FEET (2').
COMPOST FILTER TUBES SHOULD BE PLACED WITH A MINIMUM OVERLAP OF THREE FEET (3')
OR SLEEVED TO JOIN IN A CONTINUOUS BARRIER. COMPOST TUBES SHALL BE TAMPED IN
PLACE TO ENSURE GOOD CONTACT WITH SOIL SURFACE.
COMPOST TUBES SHALL BE STAKED OR LEANED AGAINST SUPPORTS ON SLOPES 2:1 OR
GREATER. STAKES SHALL BE LOCATED AS REQUIRED TO SECURE TUBES IN PLACE UP TO
FIVE FEET (5') APART. COMPOST TUBES SHALL BE PLACED AS CLOSE TO THE LIMITS OF
SOIL DISTURBANCE AS POSSIBLE.
INSTALLATION AND MAINTENANCE:
1. GEOTEXTILE FENCE, EROSION CONTROL BLANKET AND COMPOST FILTER TUBE SHALL
BE INSTALLED AT THE LOCATIONS INDICATED ON THE PLAN AND IN ADDITIONAL AREAS
AS MAY BE DEEMED APPROPRIATE DURING CONSTRUCTION.
2. ALL EROSION CHECKS SHALL BE MAINTAINED UNTIL ADJACENT AREAS ARE STABILIZED.
3. INSPECTIONS SHALL BE FREQUENT (AT MINIMUM EVERY 7 CALENDAR DAYS AND AFTER
EVERY RAINFALL EVENT GREATER THAN ONE HALF INCH) AND REPAIR OR REPLACEMENT
SHALL BE MADE PROMPTLY AS NEEDED.
4. EROSION CHECKS SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFULNESS
SO AS NOT TO BLOCK OR IMPEDE STORM WATER FLOW OR DRAINAGE.
VEGETATIVE COVER SELECTION &
MULCHING:
TEMPORARY VEGETATIVE COVER:
PERENNIAL RYEGRASS 3 LBS./1,000 SQ.FT. (IOLUIUM PERENNE)
PERMANENT VEGETATIVE COVER:
1. NEW ENGLAND CONSERVATION/WILDLIFE MIX OR EQUAL:
RECOMMENDED APPLICATION RATE: 1 POUND PER 1,750 SF
SEED MIX SPECIES: Virginia Wild Rye (Elymus virginicus), Little Bluestem
(Schizachyrium scoparium), Big Bluestem (Andropogon gerardii), Creeping Red Fescue
(Festuca rubra), Switch Grass (Panicum virgatum), Partridge Pea (Chamaecrista
fasciculata), Deer Tongue (Panicum clandestinum), Indian Grass (Sorghastrum nutans),
Ox Eye Sunflower (Heliopsis helianthoides), Common Milkweed (Asclepias syriaca),
Spotted Joe Pye Weed (Eupatorium maculatum), Grass Leaved Goldenrod (Euthamia
graminifolia), Blue Vervain (Verbena hastata), New England Aster (Aster novae-angliae),
Early Goldenrod (Solidago juncea).
2. TEMPORARY MULCHING: STRAW AT 70-90 LBS./1,000 SQ.FT. (TEMPORARY VEGETATIVE
AREAS) WOOD FIBER IN HYDROMULCH SLURRY 25-50 LBS./1,000 SQ. FT.
ESTABLISHMENT:
1. SMOOTH AND FIRM SEEDBED WITH CULTIPACKER OR OTHER SIMILAR EQUIPMENT
PRIOR TO SEEDING (EXCEPT WHEN HYDROSEEDING).
2. SELECT ADAPTED SEED MIXTURE FOR THE SPECIFIC SITUATION. NOTE RATES AND THE
SEEDING DATES (REFER TO TEMPORARY OR PERMANENT VEGETATIVE COVER
REQUIREMENTS).
3. APPLY SEED UNIFORMLY ACCORDING TO RATE INDICATED, BY BROADCASTING,
DRILLING, OR HYDRAULIC APPLICATION.
4. COVER GRASS AND LEGUME SEED WITH NOT MORE THAN 1/4 INCH OF SOIL WITH
SUITABLE EQUIPMENT (EXCEPT WHEN HYDROSEEDING).
5. MULCH IMMEDIATELY AFTER SEEDING, IF REQUIRED, ACCORDING TO TEMPORARY
MULCHING SPECIFICATIONS. (REFER TO TEMPORARY OR PERMANENT VEGETATIVE
COVER REQUIREMENTS).
6. USE PROPER INOCULANT ON ALL LEGUME SEEDINGS, USE FOUR (4) TIMES NORMAL
RATES WHEN HYDROSEEDING.
7. THE USE OF SOD IS AN ACCEPTABLE ALTERNATIVE WHERE THERE IS A HEAVY
CONCENTRATION OF WATER AND IN CRITICAL AREAS WHERE IT IS IMPORTANT TO GET
A QUICK VEGETATIVE COVER TO PREVENT EROSION.
MAINTENANCE:
1. TEST FOR SOIL ACIDITY EVERY THREE (3) YEARS AND LIME AS REQUIRED.
2. ON SITES WHERE GRASSES PREDOMINATE, BROADCAST ANNUALLY 500 POUNDS OF
10-10-10 FERTILIZER PER ACRE (12 LBS. PER 1,000 SQ. FT.) OR AS NEEDED
ACCORDING TO ANNUAL SOIL TESTS.
3. ON SITES WHERE LEGUMES PREDOMINATE, BROADCAST EVERY THREE (3)YEARS OR AS
INDICATED BY SOIL TEST 300 POUNDS OF 0-20-20 OR EQUIVALENT PER ACRE (8 LBS
PER 1,000 SQ. FT.).
CONSTRUCTION SEQUENCE & SCHEDULE
CONSTRUCTION IS ANTICIPATED TO COMMENCE IN SUMMER 2020 AND WILL LAST
APPROXIMATELY THREE MONTHS. THE GENERAL SEQUENCE OF CONSTRUCTION IS AS
FOLLOWS:
1. STAKE OUT THE LIMIT OF WORK. NO DISTURBANCE IS TO TAKE PLACE BEYOND THE
LIMITS OF WORK SHOWN.
2. INSTALL S&E CONTROLS FOR SITE CLEARING ACTIVITIES AS SHOWN ON THE
DRAWINGS.
3. CLEAR AND GRUB THE WOODED AREA OF THE SITE WITHIN THE LIMITS SHOWN ON THE
PLANS.
4. CONSTRUCT THE STORMWATER MANAGEMENT BASINS, OUTLET WEIR WALLS, AND
APPURTENANCES.
5. ANY DISTURBED SLOPES ARE TO BE ESTABLISHED TO FINISHED GRADE WITH
PLACEMENT OF TOPSOIL BEFORE PV ARRAY RACKING INSTALLATION. STABILIZE ALL
SLOPES OUTSIDE OF THE PV ARRAY COMPOUND AREA WITH TOPSOIL AND SEED.
INSTALL EROSION CONTROL BLANKET AS SHOWN ON THE DRAWINGS.
6. INSTALL PV SOLAR PANEL ARRAYS, ELECTRICAL COMPONENTS, CONDUIT, AND
PERIMETER FENCING.
7. REMOVE S&E CONTROLS ONCE ALL DISTURBED AREAS HAVE COMPLETELY STABILIZED.
SEDIMENT & EROSION CONTROL SPECIFICATIONS
5.
1.
3.
2.
4.
APPLICATION OF EROSION
CONTROL BLANKET ON SLOPES
NOTES:
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF
LIME, FERTILIZER, AND SEED. NOTE: WHEN USING SCC225, DO NOT SEED
PREPARED AREA. SCC225 MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6"
DEEP BY 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER
STAPLING.
3. ROLL THE BLANKETS DOWN THE SLOPE IN THE DIRECTION OF THE WATER
FLOW.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH
APPROXIMATELY 2" OVERLAP.
5. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS
END OVER END (SHINGLE STYLE) WITH APPROXIMATELY 6" OVERLAP.
STAPLE THROUGH OVERLAP AREA, APPROXIMATELY 12" APART.
REFER TO GENERAL STAPLE PATTERN GUIDE IN NORTH AMERICAN GREEN
CATALOG FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE
INSTALLATIONS.
NOT TO SCALE
1
6
'
M
I
N
.
E
d
g
e
R
o
a
d
w
a
y
5
0
'
M
I
N
.
NOTE: STABILIZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED AND
MAINTAINED DURING OPERATIONS WHICH PROMOTE VEHICULAR TRACKING OF MUD
6" MIN. - 2" CRUSHED STONE
(CTDOT M.01.01 No. 3)
CONSTRUCTION ENTRANCE PAD
NOT TO SCALE
DIRECTION OF FLOW
COMPOST FILTER TUBEMINIMUM 12 INCHES (300mm) IN DIAMETER WITH ANEFFECTIVE HEIGHT OF 9.5 INCHES (240mm).
TUBES FOR COMPOST FILTERS SHALL BE JUTE MESH ORAPPROVED BIODEGRADABLE MATERIAL, HOWEVERPHOTO-BIODEGRADABE FABRIC SHALL BE REMOVED AT ENDOF CONTRACT.
TAMP TUBES IN PLACE TO ENSURE GOOD CONTACT WITHSOIL SURFACE. IT IS NOT NECESSARY TO TRENCH TUBESINTO EXISTING GRADE.
UNDISTURBED SOIL & VEGETATION.TUBES SHALL BE PLACED AS CLOSE TO LIMITS OF SOILDISTURBANCE AS POSSIBLE.
LIMIT OF WORK
COMPOST TUBES SHALL BE STAKED OR LEANED AGAINSTSUPPORTS (TREES, CINDER BLOCKS) ON SLOPES 2:1 ORGREATER.
WHERE NECESSARY, STAKING SHALL BE MIN. 1 INCH X 1 INCHX 3 FEET UNTREATED HARDWOOD STAKES, UP TO 5 FT. (1.5m)APART OR AS REQUIRED TO SECURE TUBES IN PLACE. TUBESSHALL BE STAKED ACCORDING TO MANUFACTURER'SSPECIFICATIONS.
GENERAL NOTES:1. PROVIDE A MINIMUM TUBE DIAMETER OF 12 INCHES (300mm) FOR SLOPES UP TO 50 FEET (15.24m)
IN LENGTH WITH A SLOPE RATIO OF 3H:1V OR STEEPER. LONGER SLOPES OF 3H:1V MAY REQUIRELARGER TUBE DIAMETER OR ADDITIONAL COURSING OF FILTER TUBES TO CREATE A FILTERBERM. REFER TO MANUFACTURER'S RECOMMENDATIONS FOR SITUATIONS WITH LONGER ORSTEEPER SLOPES.
2. INSTALL TUBES ALONG CONTOURS AND PERPENDICULAR TO SHEET OR CONCENTRATED FLOW.3. TUBE LOCATION MAY BE SHIFTED TO ADJUST TO LANDSCAPE FEATURES, BUT SHALL PROTECT
UNDISTURBED AREA AND VEGETATION TO MAXIMUM EXTENT POSSIBLE.4. DO NOT INSTALL IN PERENNIAL, EPHEMERAL OR INTERMITTENT STREAMS.5. ADDITIONAL TUBES SHALL BE USED AT THE DIRECTION OF THE ENGINEER.6. ADDITIONAL STAKING SHALL BE USED AT THE DIRECTION OF THE ENGINEER.
COMPOST FILTER TUBENOT TO SCALE
B A
B
A
WOOD STAKE JOINT DETAIL
STAPLE
STAPLE
PROTECTED AREA
5
'
(
M
A
X
.
)
WORK AREA
FLOW
TOP OF GROUND
GENERAL NOTES
1. FOR SLOPE & SWALE INSTALLATIONS, EXTEND FENCE UP SLOPE SUCH THAT BOTTOM ENDS OF FENCE WILL BE HIGHER
THAN THE TOP OF THE LOWEST PORTION OF FENCE.
2. FOR FENCE INSTALLED ON LEVEL TERRAIN INSTALL WING SECTIONS PERPENDICULAR TO MAIN BARRIER AT 50'-100'
INTERVALS.
30" (M
AX.)
12" (MIN.)
1
1
2
"x1
1
2
"x42" MIN. WOOD
STAKE OR STEEL POST
SILT FENCE
BACKFILL AND COMPACT
4"x4" TRENCH
PLACE 4" OF FABRIC ALONG
TRENCH AWAY FROM
PROTECTED AREA
SILT FENCE BARRIER
NOT TO SCALE
B A
B
A
WOOD STAKE JOINT DETAIL
STAPLE
STAPLE
PROTECTED AREA
5
'
(
M
A
X
.
)
WORK AREA
FLOW
TOP OF GROUND
GENERAL NOTES
1. FOR SLOPE & SWALE INSTALLATIONS, EXTEND FENCE UP SLOPE SUCH THAT BOTTOM ENDS OF FENCE WILL BE HIGHER
THAN THE TOP OF THE LOWEST PORTION OF FENCE.
2. FOR FENCE INSTALLED ON LEVEL TERRAIN INSTALL WING SECTIONS PERPENDICULAR TO MAIN BARRIER AT 50'-100'
INTERVALS.
30" (M
AX.)
12" (MIN.)
1
1
2
"x1
1
2
"x42" MIN. WOOD
STAKE OR STEEL POST
SILT FENCE
BACKFILL AND COMPACT
4"x4" TRENCH
PLACE 4" OF FABRIC ALONG
TRENCH AWAY FROM
PROTECTED AREA
SILT FENCE BARRIER &
COMPOST FILTER TUBE
NOT TO SCALE
12" (MIN.)
24" HARDWOOD STAKE
10' O.C. DOWNSLOPE
OF THE FILTER TUBE
12" FILTREXX SILTSOXX OR
APPROVED EQUAL. FILLED WITH
BIODEGRADABLE COMPOST MATERIAL.
24" ±
DRAFT 5/19/2020
S
W
N
E
0' 30' 60'
SCALE 1" = 60'H1" = 6'V
0 1/2" 1"
SHEET NAME
DATE
SD-2
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
S
W
N
E
MAY 19, 2020
6763-10
N.T.S.
SITE
DET
AIL
S
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.14 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
0' 15' 30'
0 1/2" 1"
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
PHOTOVOLTAIC ARRAY
NOT TO SCALE
±8'
3' M
IN
.
FINISHED GRADE
13'-0" ROW SPACING
CANADIAN 395W OR EQUAL PHOTOVOLTAIC
MODULE
±10' OR VARIES
FRONT ELEVATION
TYPICAL SIDE ELEVATION
REFER TO ELECTRICAL
DRAWINGS AND RACKING
DETAILS B.O. FOR
SPECIFIC DIMENSIONS.
6
.
5
6
'
6
.
5
6
'
25°
7' HIGH CHAIN LINK FENCE
NOT TO SCALE
NOTES:
1. FABRIC FOR FENCES 4' OR LESS IN HEIGHT: TOP SELVAGE TO HAVE KNUCKLED FINISH. BOTTOM
SELVAGE TO HAVE TWISTED AND BARBED FINISH UNLESS OTHERWISE NOTED.
FABRIC FOR FENCES 5' OR OVER IN HEIGHT: BOTH TOP AND BOTTOM SELVAGE TO HAVE TWISTED
AND BARBED FINISH UNLESS OTHERWISE NOTED.
2. GRADE OF FENCE TO BE PARALLEL WITH THE GRADE OF SIDEWALKS, CURBING, GROUND OR TOP OF
WALL.
3. INTERMEDIATE POST INTERVALS NOT TO EXCEED 500 FEET.
4. FOR DESCRIPTION, MATERIALS AND CONSTRUCTION METHODS, SEE STANDARD SPECIFICATIONS.
5. SPRING TENSION WIRE TO BE FASTENED TO FABRIC WITH 11 GAUGE HOG RINGS AT 1' INTERVALS.
6. SPRING TENSION WIRE TO BE FASTENED TO LINE POSTS WITH CLIPS.
7. LINE POSTS TO BE DRIVEN EXCEPT WHERE NOTED ABOVE.
8. 6"-8" GAP BENEATH FENCE TO ALLOW SMALL WILDLIFE TO PASS THROUGH.
6"-8"
HINGE
LATCH
TRUSS
ROD
DROP ROD
7'-0"
TENSION BAND
20' FACE TO FACE OPENING
FINISHED GROUND
CHAIN LINK SWING GATE
NOT TO SCALE
NO TRESPASSING SIGN
NOT TO SCALE
NOTE: SIGN SHALL HAVE OVERALL DIMENSIONS OF 18" x 12".
GRANULAR BASE (CTDOT M.02.03)
COMPACTED SUB GRADE
FINISHED GRADE
6"
4"
SECTION - PROPOSED GRAVEL DRIVE
NOT TO SCALE
PROCESSED AGGREGATE BASE
(CTDOT M.05.01)
SCORE JOINT - SAWCUT
1" DEPTH SAWCUT
xx x x x x
NOTES:
1. PROVIDE PREFORMED EXPANSION JOINT AT ALL CONSTRUCTION
JOINT, EXPANSION CONTROL JOINT, SAWCUT, AND OTHER
LOCATIONS WHERE CONCRETE ABUTS EXISTING CONCRETE.
CO
NCRETE PAVEM
EN
T
SECTIO
N SEE D
ETAIL
xx
4000 PSI CONCRETE WITH 5%-7% AIR
ENTRAINMENT AND 6x6 W5.4xW5.4 W.W.F.
HAUNCH SHALL BE CONTINUOUS ALONG
ENTIRE EDGE
2"
8"
8"
15"
STIFF BROOM FINISH
COMPACTED GRANULAR FILL
COMPACTED SUB GRADE
CONCRETE UTILITY PAD
NOT TO SCALE
NOTES:
1. EXPANSION JOINTS EVERY 20LF MAXIMUM OR EVERY 144SF UNLESS OTHERWISE INDICATED
ON PLANS (SEE JOINT DETAILS)
2. SCORE JOINTS 5' ON CENTER UNLESS OTHERWISE INDICATED ON PLANS.
CEMENT CONCRETE EXPANSION JOINT
NOTES:
1. PROVIDE PREFORMED EXPANSION JOINT AT ALL CONSTRUCTION JOINT, SAWCUT,
AND OTHER LOCATIONS WHERE CONCRETE ABUTTS EXISTING CONCRETE.
DIAMOND SHAPED LOAD PLATE
FINISHED GRADE
3/4" WIDTH FIBER BOARD & POLYETHYLENE
JOINT FILLER. JOINT FILLER SHALL BE 1" DEPTH
CO
NCRETE PAVEM
EN
T
SECTIO
N SEE D
ETAIL
CONCRETE PAVEMENT SECTION - SEE DETAIL
ELECTRICAL CONDUIT TRENCH
NOT TO SCALE
18"
MIN.
24" CO
MPACTED
NATIVE M
ATERIAL
FINISHED GRADE
ELECTRICAL MARKING TAPE
ELECTRICAL CONDUITS AS
SPECIFIED ON PLANS
12"
MASON SAND
6"
COMPACTED SUBGRADE
COMPACTED GRAVEL
SUB-BASE
PROCESSED AGGREGATE
BASE BROKEN STONE
CLASS 2 HOTMIX ASPHALT
WEARING COURSE
CLASS 1 HOTMIX ASPHALT
BINDER COURSE
HOTMIX ASPHALT DRIVE
NOT TO SCALE
1 1/2"
1 1/2"
4"
10"
OUTLET WEIR WALL
NOT TO SCALE
TOP OF BASIN
EMBANKMENT
ELEV. 56.00
STORMWATER
MANAGEMENT BASIN
PLAN VIEW - SMB 1
+
BASIN ELEVATION
OVERFLOW SPILLWAY
BOTTOM OF BASIN
ELEV. AS SHOWN
'A'
'B'
WEIR CREST ELEV. 'C'
WEIR NOTCH ELEV. 'D'
MAX
2
1
6"
TOP OF BASIN
EMBANKMENT
3'
18"
3'
'F'
12" MODIFIED RIPRAP
SECTION A-A
TOP OF BASIN
EMBANKMENT
BOTTOM
OF BASIN
12"
WEIR WALL SCHEDULEBASIN ID 'A' 'B' ELEV 'C' ELEV 'D' 'E' 'F' 'G'
SMB-1 0'-9" 0'-0" 55.50 54.00 18' TBD TBDSMB-2 2'-4" 0'-6" 90.50 88.00 18' TBD TBD
A
A
CONCRETE
WEIR WALL
6"
'E'
3.5' - 4.5'
12" MODIFIED RIPRAP
16'
'F'
12"
CONCRETE
WEIR WALL
WEIR NOTCH
OVERFLOW
SPILLWAY
54
56
56
55
54
53
54
56
56
55
54
53
52.5
'G
'
5555
53 53
TOP OF BASIN
EMBANKMENT
ELEV. 120.00
STORMWATER
MANAGEMENT BASIN
PLAN VIEW - SMB 2
+
12" MODIFIED RIPRAP
16'
'F'
12"
CONCRETE
WEIR WALL
WEIR NOTCH
OVERFLOW
SPILLWAY
117
120
120
119
118
116
117
120
120
119
118
116
115.5
118118
116 116
119
117117
119
OUTLET WEIR WALL
NOT TO SCALE
TOP OF BASIN
EMBANKMENT
ELEV. 56.00
STORMWATER
MANAGEMENT BASIN
PLAN VIEW - SMB 1
+
BASIN ELEVATION
OVERFLOW SPILLWAY
BOTTOM OF BASIN
ELEV. AS SHOWN
'A'
'B'
WEIR CREST ELEV. 'C'
WEIR NOTCH ELEV. 'D'
MAX
2
1
6"
TOP OF BASIN
EMBANKMENT
3'
18"
3'
'F'
12" MODIFIED RIPRAP
SECTION A-A
TOP OF BASIN
EMBANKMENT
BOTTOM
OF BASIN
12"
WEIR WALL SCHEDULEBASIN ID 'A' 'B' ELEV 'C' ELEV 'D' 'E' 'F' 'G'
SMB-1 0'-9" 0'-0" 55.50 54.00 18' TBD TBDSMB-2 2'-8" 1' 133.50 131.00 22.5' TBD TBD
A
A
CONCRETE
WEIR WALL
6"
'E'
3.5' - 4.5'
12" MODIFIED RIPRAP
16'
'F'
12"
CONCRETE
WEIR WALL
WEIR NOTCH
OVERFLOW
SPILLWAY
54
56
56
55
54
53
54
56
56
55
54
53
52.5
'G
'
5555
53 53
TOP OF BASIN
EMBANKMENT
ELEV. 134.50
STORMWATER
MANAGEMENT BASIN
PLAN VIEW - SMB 2
+
12" MODIFIED RIPRAP
16'
'F'
12"
CONCRETE
WEIR WALL
WEIR NOTCH
OVERFLOW
SPILLWAY
132
134.5
134.5
134
133
131
132
134.5
134.5
134
133
131
130.5
133133
131 131
134
132132
134
DRAFT 5/19/2020
SHEET NAME
DATE
SD-3
PROJECT NO.
DESIGNED
MRG
SCALE
DRAWN
HMMCHECKED
MRA
MAY 19, 2020
6763-10
N.T.S.
SITE
DET
AIL
S
STO
NIN
GTO
N, C
ON
NEC
TIC
UT
ELM
RID
GE
GO
LF C
OU
RSE
PV
SOLA
R F
AC
ILIT
YG
REE
NSK
IES
CLE
AN
EN
ERG
Y LL
C
229
ELM
RID
GE
RO
AD
SHEET NO.15 OF 15
DES
CR
IPTI
ON
BY
DA
TE
NO
T FO
R C
ON
STR
UC
TIO
N
Copyright Milone & MacBroom, Inc - 2020
13
50
M
AIN
S
TR
EET
, S
UIT
E 1
01
2
SP
RIN
GFIELD
, M
A
41
3.2
41
.6
92
0
WW
W.M
MIN
C.C
OM
DRAFT 5/19/2020
GENERAL NOTES:
1. PROVIDE A MINIMUM TUBE DIAMETER OF 12 INCHES (300mm) FOR SLOPES UP TO 50FEET (15.24m) IN LENGTH WITH A SLOPE RATIO OF 3H:1V OR STEEPER. LONGERSLOPES OF 3H:1V MAY REQUIRE LARGER TUBE DIAMETER OR ADDITIONAL COURSINGOF FILTER TUBES TO CREATE A FILTER BERM. REFER TO MANUFACTURER'SRECOMMENDATIONS FOR SITUATIONS WITH LONGER OR STEEPER SLOPES.
2. INSTALL TUBES ALONG CONTOURS AND PERPENDICULAR TO SHEET ORCONCENTRATED FLOW.
3. TUBE LOCATION MAY BE SHIFTED TO ADJUST TO LANDSCAPE FEATURES, BUT SHALLPROTECT UNDISTURBED AREA AND VEGETATION TO MAXIMUM EXTENT POSSIBLE.
4. DO NOT INSTALL IN PERENNIAL, EPHEMERAL OR INTERMITTENT STREAMS.5. ADDITIONAL TUBES SHALL BE USED AT THE DIRECTION OF THE ENGINEER.6. ADDITIONAL STAKING SHALL BE USED AT THE DIRECTION OF THE ENGINEER.7. PHASE-2 INSTALLATION SHALL BE CONDUCTED AFTER MARCH 15TH OR WHEN
CONDITIONS PERMIT.
MID-SLOPE BERMNOT TO SCALE
DIRECTION OF FLOW3H:1V
3H:1V
3H:1V
PHASE-2TOPSOIL COVER & STABILIZATION
PHASE-1INITIAL INSTALLATION
18"
1
8
"
PLACE 4" MIN TOPSOIL OVER GRAVEL WEDGE ANDCOMPOST FILTER TUBE. APPLY FERTILIZER, SEEDAND STRAW MULCH. REFER TO SHEETS LD AND SD-1OF THE CONTRACT DRAWINGS FOR SITEPREPARATION, FERTILIZER AND SEEDREQUIREMENTS.
COMPOST FILTER TUBEMINIMUM 12 INCHES (300mm) IN DIAMETER WITH ANEFFECTIVE HEIGHT OF 9.5 INCHES (240mm).
TUBES FOR COMPOST FILTERS SHALL BE JUTE MESHOR APPROVED BIODEGRADABLE MATERIAL,HOWEVER PHOTO-BIODEGRADABE FABRIC SHALL BEREMOVED AT END OF CONTRACT.
TAMP TUBES IN PLACE TO ENSURE GOOD CONTACTWITH SOIL SURFACE. IT IS NOT NECESSARY TOTRENCH TUBES INTO EXISTING GRADE.
COMPOST TUBES SHALL BE STAKED WITH #4 REBARX 30" LONG, UP TO 5 FT. APART OR AS REQUIRED TOSECURE TUBES IN PLACE. TUBES SHALL BE STAKEDACCORDING TO MANUFACTURER'SSPECIFICATIONS. DRIVE REBAR TO BE FLUSH WITHTOP OF GRAVEL WEDGE.
UNDISTURBED SOIL & VEGETATION.TUBES SHALL BE PLACED AS CLOSE TO LIMITSOF SOIL DISTURBANCE AS POSSIBLE.
COMPACTED GRAVEL BORROW WEDGE. GRAVELBORROW SHALL CONFORM TO M1.03.0 TYPE d (1 12INCH LARGEST STONE DIMENSION) OF THEMASSDOT MATERIAL SPECIFICATIONS.
CIRCULAR CURVE
COMPOST FILTER TUBE ASPREVIOUSLY INSTALLED
COMPOST TUBES SHALL BE STAKED WITH #4 REBARX 30" LONG, UP TO 5 FT. APART OR AS REQUIRED TO
SECURE TUBES IN PLACE.
COMPACTED GRAVEL BORROW WEDGE. GRAVELBORROW SHALL CONFORM TO M1.03.0 TYPE d (1 12
INCH LARGEST STONE DIMENSION) OF THEMASSDOT MATERIAL SPECIFICATIONS.
PAVED TRAIL
NOT TO SCALE
COMPACTED SUBGRADE
COMPACTED GRAVEL BASE
BITUMINOUS CONCRETE
WEARING COURSE (CLASS 2)
BITUMINOUS CONCRETE
BINDER COURSE (CLASS 1)
PROCESSED AGGREGATE