University of Southampton Elstree to St John’s Wood 400 kV Cable Tunnel Professor Steve Swingler

Upload: others

Post on 15-Jun-2020

14 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

University ofSouthampton

Elstree to St John’s Wood 400 kV Cable Tunnel

Professor Steve Swingler

Page 2: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

System Overlay Philosophy

275 kV system is over 40 years oldNew build to be at 400 kVMinimise public impactMinimise disruption to existing system during construction

Page 3: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

St John’s Wood: Aerial Shot

Page 4: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Construction Issues: Substations

SpaceSite accessTraffic managementSite clearanceConstruction worksImpact on local communityArchitecture

Page 5: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Why Dig a Tunnel?

Reduced public disruption during constructionReduced programme risk Secure environment for cableFuture provision for second circuit

Page 6: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

The Tunnel Route

Page 7: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Technical Details

400kV XLPE cable circuit2500 mm2 Copper conductorForced air coolingDTS monitoring and controlPD Couplers installed in accessoriesSingle circuit

Page 8: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

The Tunnel

Page 9: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Construction Issues: Tunnel Shaft Sites

Site availabilitySite accessTraffic managementSpoil removalImpact on local communityHeadworks

Page 10: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Kilburn Grange Park:Aerial Shot

Page 11: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Kilburn Grange Park:Headhouse and New Entrance

Page 12: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Tunnel Layout

Page 13: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Consultations and Communications Strategy

Introductory open meetingsOngoing discussion forumsFreephone serviceProgramme updatesAdvertsLocal community support

Page 14: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

Project Identity

Page 15: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build

London Infrastructure Project: Summary

System installed and operatingCommissioning test from ElstreePD measurements during testMajor consultation exercise