email it back to kdot, even if not bidding. or you may still … · 2017-06-20 · promptly sign...

12
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result in your bid being declared irregular. If these changes affect any of your subcontractors or suppliers, IT IS YOUR RESPONSIBILITY to inform them. These changes are part of the contract for this project(s). Please contact me at (785) 296-3576, if there are questions. Thank you for your cooperation. _____________________________________________________________________________________ (Company Name) (Signature) (Date) C: District 2 & Belleville Office U0473.doc Kansas Department of Transportation Bureau of Construction and Maintenance Estimating Section To: Prime Contractor Bid Holders From: Shane Houser, P.E. - Estimating Engineer Date: June 20, 2017 Proposal/Contract No.: 517062262 Subject: Project Notice for the June 21, 2017 Letting 62 U-0473-01 MITCHELL COUNTY PEDESTRIAN & BICYCLE PATHS Many quantities have been changed. This revised the Unit Prices List. Included are several revised sheets. Revised plans will be sent out after the letting. To view this project’s documents, choose Addendum #1from KDOT’s website: https://kdotapp.ksdot.org/Proposal/Proposal.aspx. You must update your EBS file by going to the Bid Express website: http://www.bidx.com, choose the correct Letting, locate and select the Proposal number to download 21jun226.002”. The Contractor is responsible for ensuring the EBS file that the Contractor uses to prepare its Proposal and submits to KDOT contains any amendments. We also recommend that you check the Bid Express “Questions and Answers” (https://www.bidx.com/ks/lettings) to review any questions that may have been posted for this project.

Upload: others

Post on 17-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result in your bid being declared irregular. If these changes affect any of your subcontractors or suppliers, IT IS YOUR RESPONSIBILITY to inform them. These changes are part of the contract for this project(s). Please contact me at (785) 296-3576, if there are questions. Thank you for your cooperation.

_____________________________________________________________________________________ (Company Name) (Signature) (Date) C: District 2 & Belleville Office

U0473.doc

4BKansas Department of Transportation

3BBureau of Construction and Maintenance 0BEstimating Section

1BTo: Prime Contractor Bid Holders

2BFrom: Shane Houser, P.E. - Estimating Engineer

5BDate: June 20, 2017 Proposal/Contract No.: 517062262 Subject: Project Notice for the June 21, 2017 Letting 62 U-0473-01 MITCHELL COUNTY – PEDESTRIAN & BICYCLE PATHS Many quantities have been changed. This revised the Unit Prices List. Included are several revised sheets. Revised plans will be sent out after the letting. To view this project’s documents, choose “Addendum #1” from KDOT’s website: https://kdotapp.ksdot.org/Proposal/Proposal.aspx. You must update your EBS file by going to the Bid Express website: http://www.bidx.com, choose the correct Letting, locate and select the Proposal number to download “21jun226.002”. The Contractor is responsible for ensuring the EBS file that the Contractor uses to prepare its Proposal and submits to KDOT contains any amendments. We also recommend that you check the Bid Express “Questions and Answers” (https://www.bidx.com/ks/lettings) to review any questions that may have been posted for this project.

Page 2: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

1000

1010

1000

1010

21+25 21+40 21+60 21+80 22+00 22+20 22+30

----

June

16,

201

7

AutoCAD SHX Text
Install Steps Wrap Retaining Wall as Shown Sheet 4 Sta. 21+75.63 to Sta. 21+79.57
AutoCAD SHX Text
KANSAS DEPARTMENT OF TRANSPORTATION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
TRACE CK.
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
QUANTITIES
AutoCAD SHX Text
QUAN. CK.
AutoCAD SHX Text
DETAILED
AutoCAD SHX Text
DETAIL CK.
AutoCAD SHX Text
FHWA APPROVAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN CK.
AutoCAD SHX Text
KANSAS
AutoCAD SHX Text
STATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
Plotted By :
AutoCAD SHX Text
Plot File :
AutoCAD SHX Text
Plot Date :
AutoCAD SHX Text
62 U-0473-01U-0473-01-0473-01
AutoCAD SHX Text
2017
AutoCAD SHX Text
15
AutoCAD SHX Text
Retaining Wall Profile
AutoCAD SHX Text
Sh. No. 15 . No. 15 No. 15 . 15
AutoCAD SHX Text
37
AutoCAD SHX Text
Existing Ground
AutoCAD SHX Text
Top Capstone Retaining Wall
AutoCAD SHX Text
135 SF
AutoCAD SHX Text
139 SF
AutoCAD SHX Text
NOTE: Landscape Retaining Wall will require stair-step pattern to match grade changes along the top of the Retaining Wall.
shane
Text Box
NEW SHEET - RELEASED BY ADDENDUM DATE 6/20/2017 VOID PREVIOUS ISSUE
Page 3: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

2 1-14-08 S.W.K.Rem. Drainage Structure summary

RECAPITULATION OF ROAD QUANTITIESITEM QUANTITY UNIT

1 1-9-91 R.J.S J.O.B.Detailed on CADD

J.O.B.

STATE

KANSAS

YEARPROJECT N0.SHEETS

TOTALSHEET NO.

17 rd050

B.d

gn

File :

Dra

wn B

y :

hdougherty

Plotted :19-J

UN-2

017 1

4:0

2

DATE REVISIONS BY APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

FHWA APPROVAL 5-28-08

DESIGNED

DETAILED

DESIGN CK. DETAIL CK. QUAN.CK.

RD050

TRACED B.N.B.

TRACE CK. S.W.K.

QUANTITIES

APP'D. James O. Brewer

2017 17 37

BASE BID

STATION DESCRIPTION

13+64.99 Lt.

13+67.71 Lt.

20+71.69 Lt.

22+63.01 Lt.

38+33.13 Lt.

38+87.08 Lt.

39+00.69 Lt.

42+02.99 Lt.

Fire Hydrant

Street Sign

Fire Hydrant

Street Sign

Street Sign

Gas Meter

Water Meter

Mailbox Row

BASE BID

STATION INTERSECTION

10+06.85 Lt.

13+34.10 Lt.

13+60.96 Lt.

17+04.79 Lt.

17+42.83 Lt.

20+80.43 Lt.

21+31.22 Lt.

22+65.97 Lt.

38+34.84 Lt.

38+66.22 Lt.

42+02.70 Lt.

45+75.72 Lt.

46+05.34 Lt.

49+46.53 Lt.

49+75.94 Lt.

4th/Logan

QUADRANT

4th/Chestnut

54+11.65 Lt.

54+41.17 Lt.

57+61.68 Lt.

57+77.42 Lt.

61+25.54 Lt.

61+33.91 Lt.

61+63.34 Lt.

67+07.56 Lt.

70+62.09 Lt.

70+76.58 Lt.

4th/Independence

STATION INTERSECTION

71+06.89 Lt.

71+21.81 Lt.

74+28.77 Lt.

74+39.47 Lt.

74+78.56 Lt.

74+88.79 Lt. 4th/Bell

QUADRANT

ADDITIVE #1

STATION INTERSECTION

85+69.27 Lt.

86+02.81 Lt.

86+23.06 Lt.

89+45.52 Lt.

QUADRANT

ADDITIVE #2

12th/Bell

12th/Mill

12th/Mill

12th/Hersey

12th/Hersey

12th/Campbell

12th/Campbell

12th/Walnut

4th/Highland

4th/Highland

4th/Broadway

4th/Boradway

4th/Central

4th/Central

4th/Woodland

4th/Woodland

4th/Kansas

4th/Kansas

4th/Independence

4th/Independence

4th/Lincoln

4th/Chestnut

NE

NW

NE

NW

NE

NW

NE

NW

NW

NE

NW

NW

NE

NW

NE

NW

NE

NW

NW

NW

NW

NE

NW

NW

NW

4th/Chestnut

4th/Chestnut

4th/Bell

4th/Bell

4th/Bell

4th/Campbell

4th/Campbell

4th/Campbell

4th/Walnut

NE

NE

NW

NW

NE

NE

NW

NE

NE

NW

21+27.74 Lt.

21+79.57 Lt.

45+52.63 Lt.

46+05.93 Lt.

49+02.04 Lt.

74+17.21 Lt.

74+90.47 Lt.

86+26.08 Lt.

21+75.63 Lt.

22+25.91 Lt.

45+63.71 Lt.

46+25.46 Lt.

49+46.04 Lt.

74+26.20 Lt.

75+04.18 Lt.

86+36.18 Lt.

STATION

BEGIN

STATION

END

(IN.)

WALL AVG. HT

(FT.)

WALL LENGTH

STATION

BEGIN

STATION

END

(FT.)

WALL LENGTH

STATION

BEGIN

STATION

END

(FT.)

WALL LENGTH

STATION

BEGIN

STATION

END

(FT.)

WALL LENGTH

53

51

BASE BID

ADDITIVE #1

SUMMARY OF LANDSCAPE RETAINING WALLS

(SF)

WALL SURFACE

135.3

138.6

CLEARING AND GRUBBING

COMPACTION OF EARTHWORK (TYPE B) (MR 90)

ROCK EXCAVATION

1 LS

1 LS

CY

CY

CY

SY

SY

SY

LF

SF

285

282

139

274

1

22+56.75 Lt. 22+65.97 Lt.

BASE BID

ADDITIVE #1

ADDITIVE #2

COMMON EXCAVATION

82

SIDEWALK CONSTRUCTION (4")(AE) 2308

SIDEWALK CONSTRUCTION (6")(AE)

LANDSCAPE RETAINING WALL

CONTRACTOR CONSTRUCTION STAKING LS

COMPACTION OF EARTHWORK (TYPE B) (MR 90)

ROCK EXCAVATION

CY

CY

CY

SY

SY

SY

LF

COMMON EXCAVATION

8

SIDEWALK CONSTRUCTION (4")(AE) 133

SIDEWALK CONSTRUCTION (6")(AE)

40

ADDITIVE #2

CY

CY

CY

SY

SY

SY

13

326

CLEARING AND GRUBBING

COMPACTION OF EARTHWORK (TYPE B) (MR 90)

ROCK EXCAVATION

1 LS

LF

COMMON EXCAVATION

SIDEWALK CONSTRUCTION (4")(AE)

SIDEWALK CONSTRUCTION (6")(AE)

18

4

23

22

44

11

48

61

41

62 U-0473-01

BASE BID - RETAINING WALL

BASE BID, ADD. #1 & ADD. #2

SUMMARY OF QUANTITIES

19.5

17.7

11.1

44.0

16.5

23.4

17.6

TOTAL BASE BID = 273.9 SF

AREA (SY)

3.3

3.3

6.1

3.3

3.3

3.3

7.2

7.9

3.3

3.3

3.3

6.1

6.1

6.1

3.3

6.1

8.9

3.3

7.7

8.9

3.9

6.1

6.9

9.6

8.6

AREA (SY)

AREA (SY)

7.2

10.2

7.8

4.7

5.9

7.8

7.2

8.9

8.9

7.2

TOTAL BASE BID = 139.4 SY

TOTAL ADDITIVE #1 = 43.6 SY

TOTAL ADDITIVE #2 = 41.1 SY

12+59.92 Lt. 12+64.91 Lt.

12+54.92 Lt. 5.0

5.0

12+49.94 Lt.

8.985+48.96 Lt. 4th/Campbell NW

LF

CY

CURB AND GUTTER, COMBINED (AE)

CONCRETE (GRADE 3.0) (AE) 1.2

BASE BID

STATION

12+57.43 Lt.

21+77.60 Lt.

0.6

0.6

(GRADE 3.0) (AE)

CONCRETE

(LBS)

23.8

19.9

(INFORMATION ONLY)

& RELOCATIONS

SUMMARY OF REMOVALS

TOTAL BASE = 102.3 LF

TOTAL ADD. #1 = 39.9 LF

TOTAL ADD. #2 = 17.6 LF

REINFORCING STEEL (GRADE 60) LBS

Sheet No. 17

12+54.78 Lt. 12+73.68 Lt.

BASE BID

(FT.)

LENGTH

STATION

BEGIN

STATION

END

TYPE I (2'-6" Width)

CURB & GUTTER

SUMMARY OF COMBINED

18.9

TOTAL BASE BID = 18.9 LF

STEEL

REINFORCING

BASE BID

102

19

C.Y.

44

40

LS1CONTRACTOR CONSTRUCTION STAKING

LS1CONTRACTOR CONSTRUCTION STAKING

CURB, EDGE (AE) (Special)

CURB, EDGE (AE) (Special)

CURB, EDGE (AE) (Special)

(AE) (SPECIAL)

SUMMARY OF CURB, EDGE

1WATER (GRADING) (SET PRICE) MGAL

SY119CONCRETE PAVEMENT (6" UNIFORM) (AE)

SUMMARY OF SIDEWALK RAMPS

MOBILIZATION (DBE)

SIDEWALK RAMP

SIDEWALK RAMP

SIDEWALK RAMP

LS1MOBILIZATION

shane
Text Box
NEW SHEET - RELEASED BY ADDENDUM DATE 6/20/2017 VOID PREVIOUS ISSUE
Page 4: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

111 111 111

111 111111

111 111 111

111111

111

111111

111

6/15/2016

SOIL EROSION MIX

Erosion Control (Class 1, Type Y)

CU YD

CU YD

LF

LF

CU YD

P.L.S. RATE/ ACRE

CLT CLTSL/CH SL/CH

Soil Erosion Mix

undisturbed native sod or other desirable vegetation shall be fertilized (limed when required), seeded, and mulched.

Soil preparation shall conform to the Standard Specifications.

2 25

Temporary Sediment Basin

Temporary Slope Drain

Temporary Stream Crossing

Temporary Inlet Sediment Barrier

1ƒ - 2‚ Tons per Acre = 1•"loose depth spread uniformly over acre.

TYPICAL SECTION - DUAL PAVEMENT

FILL SECTION CUT SECTION

RAMP FILL SECTION

RAMP CUT SECTION

Fertilize, Seed & Mulch

ACRESBID ITEM QUANTITY UNIT

* - N = Nitrogen Rate of Application

** - P O = Phosphorous Rate of Application

*** - K O = Potassium Rate of Application

Mulch Tacking Slurry

PLS RATE NAME QTY (lb)

Total (lb)

TEMPORARY EROSION AND

LA852A

MRD

MRD

Sediment Removal (Set Price)

MRD

LF

4/06/15

ì

ì

ì

SURFACE

FUTURE

be required.

and seeding shall not

it shall be left in place

the bottom of a ditch,

If rock is exposed at

SURFACE

FUTURE

Fertilize, Seed & MulchFertilize, Seed & Mulch

SURFACE

FUTURE

SURFACE

FUTURE

Fertilize, Seed & Mulch Fertilize, Seed & Mulch

SURFACE

FUTURE

SURFACE

FUTURE

Fertilize, Seed & Mulch Fertilize, Seed & Mulch Fertilize, Seed & Mulch

the plans. The rate of application per acre, thickness in place, for the mulching materials is as follows:

MULCHING: Mulch shall be spread uniformly over all disturbed areas and punched in the soil, unless otherwise noted on

The entire disturbed area, excepting the paved or surfaced areas, steep rocky slopes and areas of

GENERAL NOTES

based mulch, shall meet the North American Weed Free Forage Standards.

Agricultural products, such as native prairie hay, used for mulching and erosion control practices, excluding wood

acceptable.

N, P O , K O listed in Summary of Quantities will be

or exceeds the required minimum rate per acre of

FERTILIZER: A ratio and application rate that equals

the Engineer.

section shown on the plans or as established by

close conformity to the alignment, grade and cross

pollution control items will be finished in reasonable

installation or construction of temporary water

with the specifications. Areas that require

excavation, borrow and embankment in accordance

The Contractor will be required to finish areas of

52

2

STATE

KANSAS

PROJECT NO. YEARSHEET

NO.

TOTAL

SHEETS

KANSAS DEPARTMENT OF TRANSPORTATION

DATE REVISIONS BY APP'DNO.

DESIGNED

DESIGN CK.

DETAILED

DETAIL CK.

QUANTITIES

QUAN.CK.

APP'DFHWA APPROVAL

CADD

CADD CK.

Std.

Base

File:

19 la

852a - B

AS

EBID.d

gn

16-J

UN-2017 15:4

3

hdougherty

Plotte

d

By:

File:

Plot

Locatio

n:

Plot

Date:

NO.

1

2

3

SHS SHS

Revised Standard SHS

Revised Standard SHS

Revised Standard SHS

or other material

Exposed rock, shale,

measurement.

(i.e. pavement, gravel, riprap, etc.) shall not be included in this

erosion control measures to be placed. Any impervious areas

entire disturbed area of the project that requires seeding and

CLT = Construction Limit Tract. This area is defined by the

LF

LF

Regreen and Quick Guard are the approved sterile wheatgrass products.

MRD MRD

Temporary Berm (Set Price)

Temporary Ditch Check (Rock)

TON

Silt Fence

LB

LB

LB

LB

EACH

EACH

LB

Erosion Control (Class 2, Type Y) SQ YD

drilling is not possible.

Drilling seed is preferred, however, broadcasting is acceptable if

using the Soil Erosion Mix prior to placement of the material.

erosion control material to be placed. This area shall be seeded

Slope = Defined by the area of the project that requires Class 1

drilling is not possible.

Drilling seed is preferred, however, broadcasting is acceptable if

using the Soil Erosion Mix prior to placement of the material.

erosion control material to be placed. This area shall be seeded

Channel = Defined by the area of the project that requires Class 2

LSSWPPP Design à

SWPPP Inspection à

fertilized and mulched at the listed rate per acre. The acres are estimated.

NOTE: Projects less than 1 acre shall be bid as ''Seeding'' by the lump sum. All disturbed areas shall be seeded,

Other vegetative mulches are acceptable only with the Engineer's concurrence.

LFSynthetic Sediment Barrier

**** List size of material.

Water Pollution Control Manager à

Sheet No.

Scott H. Shields

Sheet No.

2017

900 lbs / acre

Temporary Seed (Sterile Wheatgrass)

LB

Temporary Seed (Grain Oats)

Temporary Seed (Canada Wildrye)

2 tons / acre

EACH

MGALWater (Erosion Control) (Set Price)

must be included.

disturbed area of the project, not just the seeding area, is 1 acre or more, then these bid itemstotalà If the

seeding has been completed on the entire project, permanent seeding shall be done during the normal seeding season.

Temporary seeding shall be done during any time of the year that the soil can be cultivated. After the temporary

Biodegradable Log (12")

Biodegradable Log (20")

Biodegradable Log (9")

LF

LF

Geotextile (Erosion Control) SQ YD

EACH

material.

the Class 1 and/or Class 2 erosion control

The Soil Erosion Mix is to be placed under

SUMMARY OF SEEDING / EROSION CONTROL QUANTITIES

Geotextile (Erosion Control) shall be removed prior to placement of permanent slope protection.

Mulching

2/01/17

to the Standard Specifications.

required shall be determined in the field. The bid item for mulching and mulch tacking slurry shall be paid for according

mulching associated with both temporary and permanent seeding operations. The total mulch and mulch tacking slurry

The amount of mulch and mulch tacking slurry in the bid quantities is estimated. The estimated quantity includes

protection of newly seeded areas.

The above rate is a guide. It will be at the discretion of the Engineer to determine what rate is sufficient for adequate

Temporary Seeding LS

SQ YD

6/01/16

LS

45

180

Filter Sock (8")

0.12

BASE BID

POLLUTION CONTROL

1962 U-0473-01 37

19

CA

Dconform C

ertify T

his File

CADconform Certify This File

Temporary Fertilizer ( 16 - 20 - 0 )

0.12

0.12

0.12

150

20

45

45

1

1

1

shane
Text Box
NEW SHEET - RELEASED BY ADDENDUM DATE 6/20/2017 VOID PREVIOUS ISSUE
Page 5: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

111 111 111

111 111111

111 111 111

111111

111

111111

111

6/15/2016

SOIL EROSION MIX

Erosion Control (Class 1, Type Y)

CU YD

CU YD

LF

LF

CU YD

P.L.S. RATE/ ACRE

CLT CLTSL/CH SL/CH

Soil Erosion Mix

undisturbed native sod or other desirable vegetation shall be fertilized (limed when required), seeded, and mulched.

Soil preparation shall conform to the Standard Specifications.

2 25

Temporary Sediment Basin

Temporary Slope Drain

Temporary Stream Crossing

Temporary Inlet Sediment Barrier

1ƒ - 2‚ Tons per Acre = 1•"loose depth spread uniformly over acre.

TYPICAL SECTION - DUAL PAVEMENT

FILL SECTION CUT SECTION

RAMP FILL SECTION

RAMP CUT SECTION

Fertilize, Seed & Mulch

ACRESBID ITEM QUANTITY UNIT

* - N = Nitrogen Rate of Application

** - P O = Phosphorous Rate of Application

*** - K O = Potassium Rate of Application

Mulch Tacking Slurry

PLS RATE NAME QTY (lb)

Total (lb)

TEMPORARY EROSION AND

LA852A

MRD

MRD

Sediment Removal (Set Price)

MRD

LF

4/06/15

ì

ì

ì

SURFACE

FUTURE

be required.

and seeding shall not

it shall be left in place

the bottom of a ditch,

If rock is exposed at

SURFACE

FUTURE

Fertilize, Seed & MulchFertilize, Seed & Mulch

SURFACE

FUTURE

SURFACE

FUTURE

Fertilize, Seed & Mulch Fertilize, Seed & Mulch

SURFACE

FUTURE

SURFACE

FUTURE

Fertilize, Seed & Mulch Fertilize, Seed & Mulch Fertilize, Seed & Mulch

the plans. The rate of application per acre, thickness in place, for the mulching materials is as follows:

MULCHING: Mulch shall be spread uniformly over all disturbed areas and punched in the soil, unless otherwise noted on

The entire disturbed area, excepting the paved or surfaced areas, steep rocky slopes and areas of

GENERAL NOTES

based mulch, shall meet the North American Weed Free Forage Standards.

Agricultural products, such as native prairie hay, used for mulching and erosion control practices, excluding wood

acceptable.

N, P O , K O listed in Summary of Quantities will be

or exceeds the required minimum rate per acre of

FERTILIZER: A ratio and application rate that equals

the Engineer.

section shown on the plans or as established by

close conformity to the alignment, grade and cross

pollution control items will be finished in reasonable

installation or construction of temporary water

with the specifications. Areas that require

excavation, borrow and embankment in accordance

The Contractor will be required to finish areas of

52

2

STATE

KANSAS

PROJECT NO. YEARSHEET

NO.

TOTAL

SHEETS

KANSAS DEPARTMENT OF TRANSPORTATION

DATE REVISIONS BY APP'DNO.

DESIGNED

DESIGN CK.

DETAILED

DETAIL CK.

QUANTITIES

QUAN.CK.

APP'DFHWA APPROVAL

CADD

CADD CK.

Std.

Base

File:

20 la

852a - add 1.d

gn

16-J

UN-2017 15:4

3

hdougherty

Plotte

d

By:

File:

Plot

Locatio

n:

Plot

Date:

NO.

1

2

3

SHS SHS

Revised Standard SHS

Revised Standard SHS

Revised Standard SHS

or other material

Exposed rock, shale,

measurement.

(i.e. pavement, gravel, riprap, etc.) shall not be included in this

erosion control measures to be placed. Any impervious areas

entire disturbed area of the project that requires seeding and

CLT = Construction Limit Tract. This area is defined by the

LF

LF

Regreen and Quick Guard are the approved sterile wheatgrass products.

MRD MRD

Temporary Berm (Set Price)

Temporary Ditch Check (Rock)

TON

Silt Fence

LB

LB

LB

LB

EACH

EACH

LB

Erosion Control (Class 2, Type Y) SQ YD

drilling is not possible.

Drilling seed is preferred, however, broadcasting is acceptable if

using the Soil Erosion Mix prior to placement of the material.

erosion control material to be placed. This area shall be seeded

Slope = Defined by the area of the project that requires Class 1

drilling is not possible.

Drilling seed is preferred, however, broadcasting is acceptable if

using the Soil Erosion Mix prior to placement of the material.

erosion control material to be placed. This area shall be seeded

Channel = Defined by the area of the project that requires Class 2

LSSWPPP Design à

SWPPP Inspection à

fertilized and mulched at the listed rate per acre. The acres are estimated.

NOTE: Projects less than 1 acre shall be bid as ''Seeding'' by the lump sum. All disturbed areas shall be seeded,

Other vegetative mulches are acceptable only with the Engineer's concurrence.

LFSynthetic Sediment Barrier

**** List size of material.

Water Pollution Control Manager à

Sheet No.

Scott H. Shields

Sheet No.

2017

900 lbs / acre

Temporary Seed (Sterile Wheatgrass)

LB

Temporary Seed (Grain Oats)

Temporary Seed (Canada Wildrye)

2 tons / acre

EACH

MGALWater (Erosion Control) (Set Price)

must be included.

disturbed area of the project, not just the seeding area, is 1 acre or more, then these bid itemstotalà If the

seeding has been completed on the entire project, permanent seeding shall be done during the normal seeding season.

Temporary seeding shall be done during any time of the year that the soil can be cultivated. After the temporary

Biodegradable Log (12")

Biodegradable Log (20")

Biodegradable Log (9")

LF

LF

Geotextile (Erosion Control) SQ YD

EACH

material.

the Class 1 and/or Class 2 erosion control

The Soil Erosion Mix is to be placed under

SUMMARY OF SEEDING / EROSION CONTROL QUANTITIES

Geotextile (Erosion Control) shall be removed prior to placement of permanent slope protection.

Mulching

2/01/17

to the Standard Specifications.

required shall be determined in the field. The bid item for mulching and mulch tacking slurry shall be paid for according

mulching associated with both temporary and permanent seeding operations. The total mulch and mulch tacking slurry

The amount of mulch and mulch tacking slurry in the bid quantities is estimated. The estimated quantity includes

protection of newly seeded areas.

The above rate is a guide. It will be at the discretion of the Engineer to determine what rate is sufficient for adequate

Temporary Seeding LS

SQ YD

6/01/16

LS

20

10

0.01

ADDITIVE #1

POLLUTION CONTROL

Filter Sock (8")

62 U-0473-01 20 37

20

CA

Dconform C

ertify T

his File

CADconform Certify This File

Temporary Fertilizer ( 16 - 20 - 0 )

0.01

0.01

0.01

150

20

45

45

shane
Text Box
NEW SHEET - RELEASED BY ADDENDUM DATE 6/20/2017 VOID PREVIOUS ISSUE
Page 6: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

111 111 111

111 111111

111 111 111

111111

111

111111

111

6/15/2016

SOIL EROSION MIX

Erosion Control (Class 1, Type Y)

CU YD

CU YD

LF

LF

CU YD

P.L.S. RATE/ ACRE

CLT CLTSL/CH SL/CH

Soil Erosion Mix

undisturbed native sod or other desirable vegetation shall be fertilized (limed when required), seeded, and mulched.

Soil preparation shall conform to the Standard Specifications.

2 25

Temporary Sediment Basin

Temporary Slope Drain

Temporary Stream Crossing

Temporary Inlet Sediment Barrier

1ƒ - 2‚ Tons per Acre = 1•"loose depth spread uniformly over acre.

TYPICAL SECTION - DUAL PAVEMENT

FILL SECTION CUT SECTION

RAMP FILL SECTION

RAMP CUT SECTION

Fertilize, Seed & Mulch

ACRESBID ITEM QUANTITY UNIT

* - N = Nitrogen Rate of Application

** - P O = Phosphorous Rate of Application

*** - K O = Potassium Rate of Application

Mulch Tacking Slurry

PLS RATE NAME QTY (lb)

Total (lb)

TEMPORARY EROSION AND

LA852A

MRD

MRD

Sediment Removal (Set Price)

MRD

LF

4/06/15

ì

ì

ì

SURFACE

FUTURE

be required.

and seeding shall not

it shall be left in place

the bottom of a ditch,

If rock is exposed at

SURFACE

FUTURE

Fertilize, Seed & MulchFertilize, Seed & Mulch

SURFACE

FUTURE

SURFACE

FUTURE

Fertilize, Seed & Mulch Fertilize, Seed & Mulch

SURFACE

FUTURE

SURFACE

FUTURE

Fertilize, Seed & Mulch Fertilize, Seed & Mulch Fertilize, Seed & Mulch

the plans. The rate of application per acre, thickness in place, for the mulching materials is as follows:

MULCHING: Mulch shall be spread uniformly over all disturbed areas and punched in the soil, unless otherwise noted on

The entire disturbed area, excepting the paved or surfaced areas, steep rocky slopes and areas of

GENERAL NOTES

based mulch, shall meet the North American Weed Free Forage Standards.

Agricultural products, such as native prairie hay, used for mulching and erosion control practices, excluding wood

acceptable.

N, P O , K O listed in Summary of Quantities will be

or exceeds the required minimum rate per acre of

FERTILIZER: A ratio and application rate that equals

the Engineer.

section shown on the plans or as established by

close conformity to the alignment, grade and cross

pollution control items will be finished in reasonable

installation or construction of temporary water

with the specifications. Areas that require

excavation, borrow and embankment in accordance

The Contractor will be required to finish areas of

52

2

STATE

KANSAS

PROJECT NO. YEARSHEET

NO.

TOTAL

SHEETS

KANSAS DEPARTMENT OF TRANSPORTATION

DATE REVISIONS BY APP'DNO.

DESIGNED

DESIGN CK.

DETAILED

DETAIL CK.

QUANTITIES

QUAN.CK.

APP'DFHWA APPROVAL

CADD

CADD CK.

Std.

Base

File:

21 la

852a - add 2.d

gn

16-J

UN-2017 15:4

3

hdougherty

Plotte

d

By:

File:

Plot

Locatio

n:

Plot

Date:

NO.

1

2

3

SHS SHS

Revised Standard SHS

Revised Standard SHS

Revised Standard SHS

or other material

Exposed rock, shale,

measurement.

(i.e. pavement, gravel, riprap, etc.) shall not be included in this

erosion control measures to be placed. Any impervious areas

entire disturbed area of the project that requires seeding and

CLT = Construction Limit Tract. This area is defined by the

LF

LF

Regreen and Quick Guard are the approved sterile wheatgrass products.

MRD MRD

Temporary Berm (Set Price)

Temporary Ditch Check (Rock)

TON

Silt Fence

LB

LB

LB

LB

EACH

EACH

LB

Erosion Control (Class 2, Type Y) SQ YD

drilling is not possible.

Drilling seed is preferred, however, broadcasting is acceptable if

using the Soil Erosion Mix prior to placement of the material.

erosion control material to be placed. This area shall be seeded

Slope = Defined by the area of the project that requires Class 1

drilling is not possible.

Drilling seed is preferred, however, broadcasting is acceptable if

using the Soil Erosion Mix prior to placement of the material.

erosion control material to be placed. This area shall be seeded

Channel = Defined by the area of the project that requires Class 2

LSSWPPP Design à

SWPPP Inspection à

fertilized and mulched at the listed rate per acre. The acres are estimated.

NOTE: Projects less than 1 acre shall be bid as ''Seeding'' by the lump sum. All disturbed areas shall be seeded,

Other vegetative mulches are acceptable only with the Engineer's concurrence.

LFSynthetic Sediment Barrier

**** List size of material.

Water Pollution Control Manager à

Sheet No.

Scott H. Shields

Sheet No.

2017

900 lbs / acre

Temporary Seed (Sterile Wheatgrass)

LB

Temporary Seed (Grain Oats)

Temporary Seed (Canada Wildrye)

2 tons / acre

EACH

MGALWater (Erosion Control) (Set Price)

must be included.

disturbed area of the project, not just the seeding area, is 1 acre or more, then these bid itemstotalà If the

seeding has been completed on the entire project, permanent seeding shall be done during the normal seeding season.

Temporary seeding shall be done during any time of the year that the soil can be cultivated. After the temporary

Biodegradable Log (12")

Biodegradable Log (20")

Biodegradable Log (9")

LF

LF

Geotextile (Erosion Control) SQ YD

EACH

material.

the Class 1 and/or Class 2 erosion control

The Soil Erosion Mix is to be placed under

SUMMARY OF SEEDING / EROSION CONTROL QUANTITIES

Geotextile (Erosion Control) shall be removed prior to placement of permanent slope protection.

Mulching

2/01/17

to the Standard Specifications.

required shall be determined in the field. The bid item for mulching and mulch tacking slurry shall be paid for according

mulching associated with both temporary and permanent seeding operations. The total mulch and mulch tacking slurry

The amount of mulch and mulch tacking slurry in the bid quantities is estimated. The estimated quantity includes

protection of newly seeded areas.

The above rate is a guide. It will be at the discretion of the Engineer to determine what rate is sufficient for adequate

Temporary Seeding LS

SQ YD

6/01/16

LS

40

10

0.02

Filter Sock (8")

ADDITIVE #2

POLLUTION CONTROL

62 U-0473-01 21 37

21

CA

Dconform C

ertify T

his File

CADconform Certify This File

0.02

0.02

0.02

150

20

45

45

Temporary Fertilizer ( 16 - 20 - 0 )

shane
Text Box
NEW SHEET - RELEASED BY ADDENDUM DATE 6/20/2017 VOID PREVIOUS ISSUE
Page 7: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 12 UNIT PRICES LIST

STATE CONTRACT NO: 517062262 PREPARED DATE: 05-25-17 STATE PROJECT NO: 062 U 0473-01 REVISED DATE: 06-19-17

SECTION 01 COMMON ITEMS

---------------------------------------------------------------------------

| LINE/| | UNITS/ | UNIT BID | AMOUNT BID | | ITEM| |ESTIMATED |-IN NUMBERS- |-IN NUMBERS- | |NUMBER|ITEM DESCRIPTION | QUANTITY | DOLLARS |CTS| DOLLARS |CTS| --------------------------------------------------------------------------- |1 |MOBILIZATION |LSUM | | | | | | | | | | | | | |025323| | 1.00| | | --------------------------------------------------------------------------- |2 |MOBILIZATION (DBE) |LSUM | | | | | | | | | | | | | |070626| | 1.00| | | --------------------------------------------------------------------------- |3 |CONTRACTOR CONSTRUCTION |LSUM | | | | | | |STAKING | | | | | | |020100| | 1.00| | | --------------------------------------------------------------------------- |4 |TRAFFIC CONTROL |LSUM | | | | | | | | | | | | | |025324| | 1.00| | | --------------------------------------------------------------------------- |5 |FLAGGER (SET PRICE) |HOUR | | | | | | | | | | | | | |070580| | 1.00| 25.000| $25.00| ---------------------------------------------------------------------------

SECTION 02 ROAD ITEMS

--------------------------------------------------------------------------- |6 |CLEARING AND GRUBBING |LSUM | | | | | | | | | | | | | |025361| | 1.00| | | --------------------------------------------------------------------------- |7 |COMPACTION OF EARTHWORK |CUYD | | | | | | |(TYPE B) (MR-90) | | | | | | |012332| | 40.00| | | --------------------------------------------------------------------------- |8 |WATER (GRADING) (SET |MGAL | | | | | | |PRICE) | | | | | | |010114| | 1.00| 35.000| $35.00| --------------------------------------------------------------------------- |9 |COMMON EXCAVATION (URB) |CUYD | | | | | | | | | | | | | |012412| | 285.00| | | ---------------------------------------------------------------------------

- CONTRACTOR Check: 00000000

Page 8: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 13 UNIT PRICES LIST

STATE CONTRACT NO: 517062262 PREPARED DATE: 05-25-17 STATE PROJECT NO: 062 U 0473-01 REVISED DATE: 06-19-17

SECTION 02 ROAD ITEMS

---------------------------------------------------------------------------

| LINE/| | UNITS/ | UNIT BID | AMOUNT BID | | ITEM| |ESTIMATED |-IN NUMBERS- |-IN NUMBERS- | |NUMBER|ITEM DESCRIPTION | QUANTITY | DOLLARS |CTS| DOLLARS |CTS| --------------------------------------------------------------------------- |10 |ROCK EXCAVATION |CUYD | | | | | | | | | | | | | |012420| | 82.00| | | --------------------------------------------------------------------------- |11 |SIDEWALK CONSTRUCTION ( |SQYD | | | | | | |4") (AE) | | | | | | |025026| | 2,308.00| | | --------------------------------------------------------------------------- |12 |SIDEWALK CONSTRUCTION ( |SQYD | | | | | | |6") (AE) | | | | | | |025041| | 282.00| | | --------------------------------------------------------------------------- |13 |SIDEWALK RAMP |SQYD | | | | | | | | | | | | | |022625| | 139.00| | | --------------------------------------------------------------------------- |14 |CONCRETE (GRADE 3.0) (AE)|CUYD | | | | | | | | | | | | | |013398| | 1.20| | | --------------------------------------------------------------------------- |15 |REINFORCING STEEL (GRADE |LBS. | | | | | | |60) | | | | | | |025100| | 44.00| | | ---------------------------------------------------------------------------

SECTION 03 RETAINING WALL

--------------------------------------------------------------------------- |16 |LANDSCAPE RETAINING WALL |SQFT | | | | | | | | | | | | | |025992| | 274.00| | | ---------------------------------------------------------------------------

SECTION 04 TEMP PROJ WTR POL CTL-SOIL EROS

--------------------------------------------------------------------------- |17 |TEMPORARY SEEDING |LSUM | | | | | | | | | | | | | |072226| | 1.00| | | ---------------------------------------------------------------------------

- CONTRACTOR Check: 00000000

Page 9: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 14 UNIT PRICES LIST

STATE CONTRACT NO: 517062262 PREPARED DATE: 05-25-17 STATE PROJECT NO: 062 U 0473-01 REVISED DATE: 06-19-17

SECTION 04 TEMP PROJ WTR POL CTL-SOIL EROS

---------------------------------------------------------------------------

| LINE/| | UNITS/ | UNIT BID | AMOUNT BID | | ITEM| |ESTIMATED |-IN NUMBERS- |-IN NUMBERS- | |NUMBER|ITEM DESCRIPTION | QUANTITY | DOLLARS |CTS| DOLLARS |CTS| --------------------------------------------------------------------------- |18 |SEDIMENT REMOVAL (SET |CUYD | | | | | | |PRICE) | | | | | | |071291| | 1.00| 35.000| $35.00| --------------------------------------------------------------------------- |19 |TEMPORARY BERM (SET |LNFT | | | | | | |PRICE) | | | | | | |072400| | 1.00| 1.000| $1.00| --------------------------------------------------------------------------- |20 |BIODEGRADABLE LOG ( 9") |LNFT | | | | | | | | | | | | | |070894| | 180.00| | | --------------------------------------------------------------------------- |21 |FILTER SOCK ( 8") |LNFT | | | | | | | | | | | | | |070827| | 45.00| | | --------------------------------------------------------------------------- |26 |WATER (EROSION CONTROL) |MGAL | | | | | | |(SET PRICE) | | | | | | |010123| | 1.00| 35.000| $35.00| ---------------------------------------------------------------------------

SECTION 05 CONCRETE SURFACING ITEMS

--------------------------------------------------------------------------- |27 |CURB, EDGE (SPECIAL) (AE)|LNFT | | | | | | | | | | | | | |061374| | 102.00| | | --------------------------------------------------------------------------- |28 |CURB AND GUTTER, COMBINED|LNFT | | | | | | |(AE) | | | | | | |061597| | 19.00| | | ---------------------------------------------------------------------------

SECTION 06 ADDITIVE #1 ITEMS

--------------------------------------------------------------------------- |29 |CONTRACTOR CONSTRUCTION |LSUM | | | | | | |STAKING | | | | | | |020100| | 1.00| | | ---------------------------------------------------------------------------

- CONTRACTOR Check: 00000000

Page 10: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 15 UNIT PRICES LIST

STATE CONTRACT NO: 517062262 PREPARED DATE: 05-25-17 STATE PROJECT NO: 062 U 0473-01 REVISED DATE: 06-19-17

SECTION 06 ADDITIVE #1 ITEMS

---------------------------------------------------------------------------

| LINE/| | UNITS/ | UNIT BID | AMOUNT BID | | ITEM| |ESTIMATED |-IN NUMBERS- |-IN NUMBERS- | |NUMBER|ITEM DESCRIPTION | QUANTITY | DOLLARS |CTS| DOLLARS |CTS| --------------------------------------------------------------------------- |30 |COMPACTION OF EARTHWORK |CUYD | | | | | | |(TYPE B) (MR-90) | | | | | | |012332| | 4.00| | | --------------------------------------------------------------------------- |31 |COMMON EXCAVATION (URB) |CUYD | | | | | | | | | | | | | |012412| | 23.00| | | --------------------------------------------------------------------------- |32 |ROCK EXCAVATION |CUYD | | | | | | | | | | | | | |012420| | 8.00| | | --------------------------------------------------------------------------- |33 |SIDEWALK CONSTRUCTION ( |SQYD | | | | | | |4") (AE) | | | | | | |025026| | 133.00| | | --------------------------------------------------------------------------- |34 |SIDEWALK CONSTRUCTION ( |SQYD | | | | | | |6") (AE) | | | | | | |025041| | 22.00| | | --------------------------------------------------------------------------- |35 |SIDEWALK RAMP |SQYD | | | | | | | | | | | | | |022625| | 44.00| | | --------------------------------------------------------------------------- |36 |CURB, EDGE (SPECIAL) (AE)|LNFT | | | | | | | | | | | | | |061374| | 40.00| | | --------------------------------------------------------------------------- |37 |TEMPORARY SEEDING |LSUM | | | | | | | | | | | | | |072226| | 1.00| | | --------------------------------------------------------------------------- |38 |BIODEGRADABLE LOG ( 9") |LNFT | | | | | | | | | | | | | |070894| | 20.00| | | --------------------------------------------------------------------------- |39 |FILTER SOCK ( 8") |LNFT | | | | | | | | | | | | | |070827| | 10.00| | | ---------------------------------------------------------------------------

- CONTRACTOR Check: 00000000

Page 11: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 16 UNIT PRICES LIST

STATE CONTRACT NO: 517062262 PREPARED DATE: 05-25-17 STATE PROJECT NO: 062 U 0473-01 REVISED DATE: 06-19-17

SECTION 07 ADDITIVE #2 ITEMS

---------------------------------------------------------------------------

| LINE/| | UNITS/ | UNIT BID | AMOUNT BID | | ITEM| |ESTIMATED |-IN NUMBERS- |-IN NUMBERS- | |NUMBER|ITEM DESCRIPTION | QUANTITY | DOLLARS |CTS| DOLLARS |CTS| --------------------------------------------------------------------------- |41 |CONTRACTOR CONSTRUCTION |LSUM | | | | | | |STAKING | | | | | | |020100| | 1.00| | | --------------------------------------------------------------------------- |42 |CLEARING AND GRUBBING |LSUM | | | | | | | | | | | | | |025361| | 1.00| | | --------------------------------------------------------------------------- |43 |COMPACTION OF EARTHWORK |CUYD | | | | | | |(TYPE B) (MR-90) | | | | | | |012332| | 11.00| | | --------------------------------------------------------------------------- |44 |COMMON EXCAVATION (URB) |CUYD | | | | | | | | | | | | | |012412| | 48.00| | | --------------------------------------------------------------------------- |45 |ROCK EXCAVATION |CUYD | | | | | | | | | | | | | |012420| | 13.00| | | --------------------------------------------------------------------------- |46 |SIDEWALK CONSTRUCTION ( |SQYD | | | | | | |4") (AE) | | | | | | |025026| | 326.00| | | --------------------------------------------------------------------------- |47 |SIDEWALK CONSTRUCTION ( |SQYD | | | | | | |6") (AE) | | | | | | |025041| | 61.00| | | --------------------------------------------------------------------------- |48 |SIDEWALK RAMP |SQYD | | | | | | | | | | | | | |022625| | 41.00| | | --------------------------------------------------------------------------- |49 |CURB, EDGE (SPECIAL) (AE)|LNFT | | | | | | | | | | | | | |061374| | 18.00| | | --------------------------------------------------------------------------- |50 |TEMPORARY SEEDING |LSUM | | | | | | | | | | | | | |072226| | 1.00| | | ---------------------------------------------------------------------------

- CONTRACTOR Check: 00000000

Page 12: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-06-20 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 17 UNIT PRICES LIST

STATE CONTRACT NO: 517062262 PREPARED DATE: 05-25-17 STATE PROJECT NO: 062 U 0473-01 REVISED DATE: 06-19-17

SECTION 07 ADDITIVE #2 ITEMS

---------------------------------------------------------------------------

| LINE/| | UNITS/ | UNIT BID | AMOUNT BID | | ITEM| |ESTIMATED |-IN NUMBERS- |-IN NUMBERS- | |NUMBER|ITEM DESCRIPTION | QUANTITY | DOLLARS |CTS| DOLLARS |CTS| --------------------------------------------------------------------------- |51 |BIODEGRADABLE LOG ( 9") |LNFT | | | | | | | | | | | | | |070894| | 40.00| | | --------------------------------------------------------------------------- |52 |FILTER SOCK ( 8") |LNFT | | | | | | | | | | | | | |070827| | 10.00| | | ---------------------------------------------------------------------------

GRAND TOTAL : $131.00

- CONTRACTOR Check: 00000000