Projects completed in the past & Ongoing:

➢Singapore:

➢ LTA MRT Projects C706, C854, Advance DTSS Access Tunnel, DTSS Phase 1 T-06 (1999). DTSS T06

➢ Circle Line Stage 4&5 C854, C855, C856 , JT Metro Dubai.

➢ DTL C905, C913, C915, C916, C917, C918, C923, C925, C926, C927, C933, C935, C937.

➢ TSN Line T202, T207, T208, T211, T217.➢ TEL Line T302, T307,T308, T309➢ DTSS Phase 2: T07, T08, T09 , T10, T11➢ CCL 6 : C882

“Our Professional Team has more than 25 years working experience in Singapore, Malaysia, Hong Kong , Qatar , Philippines & Vietnam “

Email: [email protected]: www.smarttunnelling.com

Page 3: Email: naseer@smarttunnelling.com Website:

➢Malaysia:➢ KLCC Car & Truck Tunnel Project 1996, Port Klang Jetty Project,

Sabah Port Authority Jetty Project.➢ Pahang Selangor 45km Tunnel Project.➢ Ulu Jelai Hydro Power Project. ( Salini Impregilo)➢ KVMRT Line 1 – Pudu Station CEC Malaysia.➢ Protext – Tunnel Fan & Ducting.➢ OTA Tunnel Squad Sdn Bhd

➢Hong Kong:➢ Dragages- Nishimatsu JV , ➢ XRL C825 Penta Ocean.

Qatar:Doha Metro Projects. 1- Gold line Doha Metro Project.2-Greenline Doha Metro Project.3-Redline North Doha Metro Project.4- Redline South Doha Metro Project.Abu Humur Tunnel Project ( Impregilo / Salini).

Philippines: CMC Water Tunnel Project (AWTIP)NovaBala JV Corp – Water Transfer Tunnel Project Manila

Vietnam: BESSAC – Pipe Jacking Project Ho Chi Minh City

➢ United Kingdom (UK)➢ In Progress

Email: [email protected]: www.smarttunnelling.com

Page 4: Email: naseer@smarttunnelling.com Website:

Tunnel Steel Pipes.(Victaulic type, Grooved Cut/Rolled, Shoulder Pipe ShoulderCollar, Welded Victaulic Ends.We can supply all types of Steel Pipes like ERW or seamless black SteelPipes , Hot Dip Galvanized Pipes in standard length of 6M, 5.9M and5.8M. The size range from 1” to 12”inch in Diameter with end connectiontype of shoulder collars, Grooved Type & Victaulic Collar ends.

Shoulder Collar Ends Pipes

Victaulic Collar Ends Pipes

Roll Grooved Pipes

Pipe Coupling and Elbow & Tee Joints, Spare Collars

STS have pipe coupling flexile or rigid type in size range from 1” inch to 12” inch for both shoulder and Victaulic ends pipes. We can supply all types of Elbows like 90degree or 45degree in short radius or long radius with both shoulder ends and Victaulic grooved ends.

Email: [email protected]: www.smarttunnelling.com

Our Products:

Page 5: Email: naseer@smarttunnelling.com Website:

Steel Structure Fabrication

DESIGN | FABRICATION |

As a leading supplier of high-quality steel structures, our primaryfocus and challenge is on our customers.Customer's needs and the specific requirements and conditionsunder which our pre-engineering steel Buildings are going to beincluded. We specialize in the design , manufacture and Supply ofsteel structures.

A wide range of applications.

Email: [email protected]: www.smarttunnelling.com

Page 6: Email: naseer@smarttunnelling.com Website:

STS is specialized in suppling Tunnel Walkway board and Tunnel Supportssystem and brackets for pipes &Cables. We also support our customerwith design and drawing of Tunnel supports.

➢ Pipe Supports/ Hangers ➢ Handrail, Handrail Pipe & Support

➢ Cable Hanger ➢ Ventilation Duct Hanger

➢ Walkway Board Support➢ Walkway Board

Email: [email protected]: www.smarttunnelling.com

Page 7: Email: naseer@smarttunnelling.com Website:

Rolling Stock, RAIL and ACCESSORIES

➢All Size of Rail and Rail Clip , Nut & Bolt and Washer

➢Fish Plate Nut & Bolt and Washer

➢ Steel Rail Sleepers

We fabricate steel sleepers as percustomer requirement and drawings.We provide full technical supports forthe design and selection of beam typelike H-Beam, Curve Beam sleepers etc.

Email: [email protected]: www.smarttunnelling.com

Page 8: Email: naseer@smarttunnelling.com Website:

https://claytonequipment.co.uk/agents/

Low Cost Tunnelling Locomotive (LoCo™)

· 40% less capital cost· Adjustable track gauge, so can be moved to other tunnel projects· 100% increase in haulage capacity· 100% reduction in braking distance· Operates on 1:10 (10%) gradients

Low emission Diesel Locomotive (CD40)

· The world’s first, EU Stage IV (USA EPA Tier 4) emission compliant tunnelling locomotive

· Improved safety with better line of sight and braking· Less ventilation costs· Compact, flexible gauge design · Operates on 1:15 (6.7%) gradients

Battery Auxiliary Supply (BAS™)

· Self-contained, battery auxiliary supply· No fuel costs – these can replace Diesel generators· Lower operational costs – you can now reduce your ventilation

requirements· No Diesel or noise emissions to monitor· Ideal for providing power to your onsite Mess and Welfare units

Tunnel Loco Motives from UK

Battery or Diesel

Email: [email protected]: www.smarttunnelling.com

Page 9: Email: naseer@smarttunnelling.com Website:

Rolling Stock

Locomotive (Electrical/Diesel)Flat car –Muck skip with bogieSegment Car Loco battery charging pointMen RidersMuck Skip Lifting Gear Training and commission for locomotive.All Spare parts

Email: [email protected]: www.smarttunnelling.com

Page 10: Email: naseer@smarttunnelling.com Website:

Refuge Chambers for Tunnels

MINEARC SYSTEMS AUSTRALIA

ph: +61 (8) 9333 4966

fax:+61(8)9333 4900

email: [email protected]

Email: [email protected]: www.smarttunnelling.com

Page 11: Email: naseer@smarttunnelling.com Website:

Email: [email protected]: www.smarttunnelling.com

TUNNELLING BLOCKED AND MOBILE ELECTRICAL SUBSTATION AND ELECTRICAL MV & LV PANNELS

TUNNELLING BLOCKED SUBSTATION“ TBS ” series

GENERALITYThe electrical mobile substations our “ TBS “ series have been designed in order to satisfy the requirements relative toan environment where the working conditions are particularly heavy and with space very reduced as for exampleTunnels , Mines , Querries , Shafts … etc.

MOBILE ELECTRICAL SUBSTATION

BLOCKED ELECTRICAL SUBSTATION

MV/LV cast resin control substation

Page 12: Email: naseer@smarttunnelling.com Website:

FIRE CABINETS.

SURFACE MOUNTED CABINET. Swing Hose Reel

Fire Extinguisher Cabinet

.

Email: [email protected]: www.smarttunnelling.com

FIRE HOSES All SIZES FIRE HOSES

Fire Extinguisher all Type

Page 13: Email: naseer@smarttunnelling.com Website:

SPRINKLER and SMOKE, HEAT DETECTORS & SIRENS

All Types of VALVES For All Sizes

ALARM CHECK VALVE. GATE VALVE

Email: [email protected]: www.smarttunnelling.com

PRESSURE RELIEF VALVE

SMOKE DETECTOR.

SIRENS / Alarm BELL.

HEAT DETECTOR.

Page 14: Email: naseer@smarttunnelling.com Website:

A complete ventilation system

A complete ventilation system

Highpressure tunnelling fans

Flexible ducting

System design

Project monitoring

+

+

+

=

Email: [email protected]: www.smarttunnelling.com

Page 15: Email: naseer@smarttunnelling.com Website:

Specialized in solutions for mining transport

Overview of the product range

After-Sales (Spare parts and service)

Railway systemsMonorail hanging railways and

floor-bound railways

Chairlifts Rubber-tire vehicles

SMT Scharf E-Cruiser

SMT Scharf GmbH Römerstr. 10459075 Hamm, Germany

P +49 2381 96001F +49 2381 960324 [email protected] smtscharf.com

Email: [email protected]: www.smarttunnelling.com

Page 16: Email: naseer@smarttunnelling.com Website:

Titan Machinery Ltd. founded in 1997 in Ankara Turkey. Concrete spraying machine is the main product of our company. We have sold more than 300 concrete spreying machines. Firstly we started to produce truck mounted concrete spreying machine. In 2010 we started IS26 Concrete Spraying Machine with the main features of: 4x4 all-wheel drive, powershift transmission, 4 wheel steering together with crab steering, 180°pivoting operator’s seat. 55kW screw air- compressor can be added to the machine.At the same time we started to produce the rigit chassis: Concrete Mixer TM05 and YTM05, Dump Truck DK16, Anfo Charger AC500, Crane Truck VK10, Personnel Carrier PT16, Basket Boom Truck SP1500, Scissor Lift MP2x3, Emulsion Charger Truck EC2x350. All of the machines work tunnel projects and underground mines all around the world.

CONSTRUCTION EQUIPMENT

https://titanltd.com/?lang=en

Email: [email protected]: www.smarttunnelling.com

Page 17: Email: naseer@smarttunnelling.com Website:

Singapore Head Office

Smart Tunnelling Solutions Pte. Ltd.

Reg. No. 201725362H

101 Cecil Street #08-06

Tong Eng Building Singapore 069533

Warehouse Address:

One Tannery Road #06-04 Singapore 347719

Email: [email protected]

Website: www.smarttunnelling.com

Contact Mr Pauly +65-8247 3778

[email protected]

France Office

Smart Tunnelling Solutions SAS (891 200 362

R.C.S. Paris)v25-27 rue Tronchet 75008 Paris,

France Contact No:+33 7 83 54 62 84Email: [email protected]

Qatar Branch Office

West-bay Lagoon, Doha, Qatar

Email: [email protected]

• Corporate Member of TUCSS ( Tunnelling and Underground Construction Society (Singapore)

• Corporate Member of British Tunnelling Society

* Member of Lighthouse Club Singapore, Malaysia & UK

Kuala Lumpur, Malaysia Contact Office

+60-11 26186943

Email: [email protected]

Email: [email protected]: www.smarttunnelling.com