embankment dams instrumentation
TRANSCRIPT
Embankment Dams – Instrumentation
Installation of Vibrating Wire (VW) Piezometers
Below : Installation of Standpipe Piezometers
Mon
itor
ing
of S
eepa
ge flo
w r
ate
and
Par
ticle
Mig
ration
Above : Reservoir Level Gauges Above : Weather Station
Attachment to the CV of Bandula Kendaragama, Mobile +61403204066
Below : Dam Safety Training at Lotsane Dam, Botswana
Above : Horizontal Movement
Gauges, designed and manufactured
by SMEC
Above : Hydraulic
Piezometers, designed
and manufactured by
SMEC
Left : Hydraulic
Piezometers, designed
and manufactured by
SMEC
Above : Measurement
of Artesian Pressure in
Foundation
Bi-A
xia
l In
clin
omet
er w
ith
a “T
rave
lling
Pro
be”
Above : Survey of
Embankment Movements
Survey Monitoring Point (SMP)
Above : Solar panels to
power instrumentation
systems installed at
remote sites