embassy storm drainge upgrade€¦ · tbm-1. 5.00. 01 03 04 10 11 12 13 07 06 05 09 08 16 15 14 02...
TRANSCRIPT
PANTAI KELAPA, DILI, TIMOR LESTE
EMBASSY STORM DRAINGE UPGRADE
US EMBASSY COMPOUND
TABLE OF CONTENT
DRAWING No. DRAWING TITLE SCALE NOTE
01 EXISITNG SITE STORMWATER DRAINAGE LAYOUT
02
03
04
05
06
1: 1000
TOPOGRAPHIC SURVEY
00 TABLE OF CONTENT NTS
SITE STORMWATER RUNOFF LAYOUT AND PROPOSED NEW HOLDING TANKS
07
08
09
10
11
12
STRUCTURAL GENERAL NOTES NTS
PROPOSED SITE STORMWATER DISCHARGE POINTS
DETAILED SECTIONS PART 1 1:25
13
14
15
1: 1000
1: 1000
1: 1000
1:30HT-4 / ROOF AND FLOOR PLAN
1:30HT-3/HT3b / ROOF AND FLOOR PLAN, AND SECTION E
1:30HT-2 / ROOF PLAN
1:30HT-2 / FLOOR PLAN AND SECTION F
1:30HT-1 / ROOF AND FLOOR PLAN
1:20STEEL GRATING COVER AND SECTION D
1:1000SITE POWER SUPPLY LAYOUT
NTSSCHEDULE OF LOADS AND PULL BOXES
NTSSINGLE LINE DIAGRAM
16 NTSSUMP PUMP AND MASTER CONTROLLER, SPECIFICATION AND DETAILS
01
03
04
10
11
12
13
06
07
05
09
08
16
15
14
02
18
EXISTING 400MM WIDE CSD
EXISTING 400MM WIDE CSD
EXISTING 400MM WIDE CSD
EXISTING 200MM WIDE CSD
EXIS
TING
WID
E O
SD
EXISTING 100MM Ø PSDP
EXIS
TING
1000
MM W
IDE
OSD
EXISTING 600MM WIDE OSD
EXIS
TING
1.0 M
WID
E O
SD
EXIS
TING
1.0 M
WID
E O
SD
EXIS
TING
200 M
M W
IDE
OSD
EXIS
TING
200 M
M W
IDE
OSD
EXISTING 400MM WIDE CSD
NOTES:1. ALL LINEAR MEASUREMENTS ARE IN MILLIMETER
W A
L K
W A
Y
W A
L K
W A
Y
R O
A D
R O
A D
R O A D
R O A D
R O
A D
R O
A D
C O
N C.
K E
R B
C O
N C.
K E
R B
C O N C. K E R B
C O N C. K E R B
C O
N C.
K E
R B
C O
N C.
K E
R B
C O
N C.
K E
R B
C O
N C.
K E
R B
EXISTING HT-22800W x 3900L x 1200D EXISTING HT-1 1200W x 2400L x 1800D TO BE DEMOLISHED & CONSTRUCT NEW & UPGRADE PUMP
EXISTING HT-32000W x 2300L x 1200D
W A
L K
W A
Y
W A L K W A Y
W A L K W A Y
W A L K W A Y
P A
R K
I N
G
P A R K I N G
R O A D
R O A D
R O
A D
PERIMETER FENCE
PERIMETER FENCE
PERIMETER FENCE
W A L K W A Y
W A L K W A Y
UNLESS OTHERWISE NOTED.
M
AIN
ENTR
ANCE
TO BE DEMOLISHED & CONSTRUCT NEW & UPGRADE PUMP
EXISTING HT-41200W x 1200L x 1200D TO BE DEMOLISHED & CONSTRUCT NEW & UPGRADE PUMP
UPGRADED AS PERDESIGN
EXISTING 5 - 100Ø PVCSTORMWATER OUTLETTO REMAIN
EXISTING SITE STORMWATER DRAINAGE LAYOUT
2. ALL EXISTING OPEN AND COVERED STORMWATERDRAIN SHALL REMAIN.
EXISTING 1000MM WIDE OSD
LEGEND OPEN STORMWATER DRAIN
CSDOSD
HT HOLDING TANK
GRASS
EXISTING BUILDING
PSDP
HOLDING TANKHT
OSD
COVERED STORMWATER DRAINCSD
PSDP uPVC STORMWATER DRAIN PIPE
EXISTING 3 - 100Ø PVCSTORMWATER OUTLETTO REMAIN
EXISTING 100MM Ø PSDP
EXISTING 2-100MM Ø PSDPTO BE CLOSED
TO BE CLOSED
EXISTING 100MM Ø PSDPTO BE CLOSED
SCALE 1: 1000
C A
N A
L
EXISTING 400MM WIDE CSD
1 CMR2
4
6 BACK BUILDING B
8 MEDICAL UNIT9
10MOTOR POOL
ANNEX3 CHANCERY
5 BACK BUILDING A
7 WAREHOUSE
11CARPENTRY SHOP12
13 UTILITIES BUILDING14 GYM15 TENNIS COURT16 BASKETBALL COURT17 PLAYGROUND18 SWIMMING POOL
CAC
IT STORAGETENNIS BUILDING
19 DECONTAMINATION FACILITY20
22
24 LGF OFFICE
FUEL STORAGE21 FAC OFFICE 2
23 GARDENER STORAGE
25 MAIN FUEL TANK
FAC OFFICE 1
17
19
23
21
20
22
24
25
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
EXISTING SITE STORMWATER
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
MDC
Sensitive but Unclassified
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
1:1000
01/16
Project Title:
MMP
DRAINAGE LAYOUT
EMBASSY STORM DRAINAGE UPGRADE
15MAY2020
4.75
4.53
5.01
4.63
5.08
5.07
5.08
5.08
4.85
4.76
5.07
5.03
4.97
5.04
5.01
5.03
5.10
5.23
5.04
5.12
5.31
5.29
5.31
5.41
5.30
5.33
5.13
5.08
5.18
5.06
5.03
5.27
4.78
4.91
5.26
5.03
5.164.94
4.93
5.23
5.31
5.23
5.13
5.17
5.07
5.27
5.10
5.10
5.47
5.18
5.34
5.32
4.93
5.03
5.17
5.26
5.16
5.18
5.47
5.50
5.29
5.25
5.19
5.18
5.21
5.35
5.39
5.46
5.32
5.35
5.41
5.51
5.40
5.48
5.51
5.59
5.48
5.59
5.59
5.43
5.48
5.58
5.50
5.47
5.66
5.62
5.47
5.41
5.46
5.63
5.37
5.24
5.22
5.47
5.46
5.31
5.18
5.06
5.39
5.41
5.19
5.18
4.77
5.27
5.02
5.65
5.27
5.28
4.84
5.25
5.03
5.36
5.39
LEGEND
5.50 ELEVATION
5.00
TBM-1
5.00
GROUND/ PAVEMENT/ COVER SPOT
IL 5.3
0DRAIN INVERT ELEVATION
OPEN STORMWATER DRAIN
CSD
OSD
HT HOLDING TANK
TEMPORARY BENCHMARK
EXISTING BUILDING
(ASSUMPTION)
PSDP
HOLDING TANKHT
OSD
COVERED STORMWATER DRAINCSD
STORMWATER RUNOFF DIRECTION
PSDP uPVC STORMWATER DRAIN PIPE
TBM-15.00
5.000
5.250
4.750
5.000
5.250
5.500
01
03
04
10
11
12
13
06
07
05
09
17
08
16
15
14
02
18
5.250
5.25
400MM WIDE CSD
EXISTING 200MMWIDE OSD
EXISTING 200MM WIDE CSD
EXIS
TING
WID
E O
SD
EXISTING 100MM Ø SDP
EXISTING 600MM WIDE OSDEXISTING 100MM Ø PSDP
EXISTING 2-100MM Ø PSDP
EXISTING 100MM Ø PSDP
EXIS
TING
1.0 M
WID
E O
SD
EXIS
TING
1.0 M
WID
E O
SD
4.750
4.875
5.500 5.250
5.125
5.375
5.6255.625
5.125
5.125
5.125
EXIS
TING
200 M
M W
IDE
OSD
EXIS
TING
200 M
M W
IDE
OSD
F E N C EW
A L
K W
A Y
W A
L K
W A
Y
R O
A D
R O
A D
R O A D
R O A D
R O
A D
R O
A D
C O
N C.
K E
R B
C O
N C.
K E
R B
C O N C. K E R B
C O N C. K E R B
C O
N C.
K E
R B
C O
N C.
K E
R B
C O
N C.
K E
R B
C O
N C.
K E
R B
PERIMETER FENCE
PERIMETER FENCE
PERIMETER FENCE
P A
R K
I N
G
P A R K I N G
CONTOUR
TOPOGRAPIC SURVEY
CONTOUR INTERVAL : 0125 M
EXISTING 400MM WIDE CSDEX
ISTI
NG 40
0MM
WID
E C
SD
EXISTING 400MM WIDE CSD40
0MM
WID
E C
SD
5.375
EXIS
TING
1000
MM W
IDE
OSD
SLOP
E 1:2
00
EXISTING 400MM WIDE CSD
TO BE CLOSED
TO BE CLOSED
TO BE CLOSED
SCALE 1: 1000
4.81
4.71
4.81
4.76
4.99
5.06
4.98
4.98
5.12
5.15
5.17
5.29
17
19
23
21
20
22
24
25
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
TOPOGRAPHIC SURVEY
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
1:1000
02/16
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
TBM-15.00
01
03
04
10
11
12
13
06
07
05
09
08
16
15
14
02
18
EXIS
TING
400M
M W
IDE
CSD
EXISTING 400MM WIDE CSD
EXISTING 400MM WIDE CSD
EXIS
TING
400M
M W
IDE
CSD
EXIS
TING
400M
M W
IDE
CSD
EXISTING 200MMWIDE CSD
EXISTING CSD
EXIS
TING
OSD
2-NEW 100MM Ø PSDP
EXIS
TING
1000
MM W
IDE
OSD
EXISTING 600MM WIDE OSD
100 Ø POLYPIPE
EXIS
TING
1.0 M
WID
E O
SD
EXIS
TING
1.0 M
WID
E O
SD
EXIS
TING
200 M
M W
IDE
OSD
EXIS
TING
200 M
M W
IDE
OSD
F E N C E
W A
L K
W A
Y
W A
L K
W A
Y
R O
A D
R O
A D
R O A D
R O A D
R O
A D
R O
A D
C O
N C.
K E
R B
C O
N C.
K E
R B
C O N C. K E R B
C O N C. K E R B
C O
N C.
K E
R B
C O
N C.
K E
R B
C O
N C.
K E
R B
C O
N C.
K E
R B
PERIMETER FENCE
PERIMETER FENCE
PERIMETER FENCE
SITE STORMWATER RUNOFF LAYOUT
LEGEND
5.50 ELEVATION
5.00
TBM-1
5.00
GROUND/ PAVEMENT/ COVER SPOT
IL 5.3
0DRAIN INVERT ELEVATION
OPEN STORMWATER DRAIN
HT HOLDING TANK
TEMPORARY BENCHMARK
GRASS
EXISTING BUILDING
(ASSUMPTION)
SDPP
OSD
COVERED STORMWATER DRAINCSD
STORMWATER RUNOFF DIRECTION
CONTOUR
AND PROPOSED NEW HOLDING TANKS
CSD
OSD
NOTES:1. ALL LINEAR MEASUREMENTS ARE IN MILLIMETER
UNLESS OTHERWISE NOTED.2. ALL DIMENSIONS FOR TANKS ARE INSIDE
MEASUREMENTS.
2-100 Ø POLYPIPE P2 (2.0 M³/ min)
NEW HT-1 2500W x 3000L x 1500D PUMPS: P1 (1.5 M³/ min) P2 (2.5 M³/ min)
CONSTRUCTED/UPGRADED HT-23000W x 3500L x 1500DPUMPS: P1 (2.5 M³/ min) P2 (2.0 M³/ min)
NEW HT-3 2500W x 3000L x 1500D PUMPS: P1 (1.5 M³/ min)
P2 (2.5 M³/ min)
NEW HT-4 3000W x 4000L x 1500D PUMPS: P1 (2.5 M³/ min)
PSDP uPVC STORMWATER DRAIN PIPE
2-100 Ø POLYPIPE
EXISTING 400MM WIDE CSDTO REMAIN
EXISTING 400MM WIDE CSDTO REMAIN
80 Ø POLYPIPE
100 Ø POLYPIPE80 Ø POLYPIPE
EXISTING 3-100MM Ø PSDPTO REMAIN
4-100 Ø POLYPIPE2-80 Ø POLYPIPE
SCALE 1: 1000
PROPOSED PROPOSED
PROPOSED
1 CMR2
4
6 BACK BUILDING B
8 MEDICAL UNIT9
10MOTOR POOL
ANNEX3 CHANCERY
5 BACK BUILDING A
7 WAREHOUSE
11CARPENTRY SHOP12
13 UTILITIES BUILDING14 GYM15 TENNIS COURT16 BASKETBALL COURT17 PLAYGROUND18 SWIMMING POOL
CAC
IT STORAGETENNIS BUILDING
19 DECONTAMINATION FACILITY20
22
24 LGF OFFICE
FUEL STORAGE21 FAC OFFICE 2
23 GARDENER STORAGE
25 MAIN FUEL TANK
FAC OFFICE 1
17
19
23
21
20
22
24
25
P2 (2.0 M³/ min)
NEW HT-3b 2500W x 3000L x 1500D PUMPS: P1 (1.5 M³/ min)
PROPOSED
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
SITE STORMWATER RUNOFF AND
PROPOSED NEW HOLDING TANKS
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
1:1000
03/16
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
TANK
LENGTH
INSIDE DIMENSION (M)
WIDTH HEIGHT
HT-1
SCHEDULE OF HOLDING TANKS & SUMP PUMPS
SUMP PUMP
DISCHARGE
TANK
HT-2
HT-3
3
LOCATION
AREA I
AREA II
AREA III
VOLUME BRANDOUTPUT POWER FULL LOADCURRENT
2.5 1.5 11.25
(M³)
3 2.5 1.5 11.25
4 3 1.5 18.00
1.5
2.5
1.5
(kW) (Amp)
DAVEY
DAVEY
DAVEY
DT37V
DT75V
DT37V
3.7 7.5
3.7 7.5
7.5 16.5
P1
(M³/MIN)MODEL DISCHARGE OUTPUT POWER FULL LOAD
CURRENT
2.0
2.5
(kW) (Amp)
DT55V
DT75V
DT55V
5.5 12.3
7.5 16.5
P2
(M³/MIN)MODEL
2.0 12.3
AR
EA
V
AR
EA
VI
AR
EA
I A
RE
A II
AR
EA
III
AR
EA
IV
AR
EA
VIII
PROPOSED SITE STORMWATER DISCHARGE POINTS
4,0
12 M
²
9,5
40 M
²
3,8
17 M
²
2,3
32 M²
4,2
39 M
²
1,4
85 M
²
1,9
84 M
²
HT-42-100mm Ø POLYPIPE
HT-3 HT-2
HT-1
DISCHARGE: BY GRAVITY
R O
A
D
EXISTING 400MM WIDE CSD
EXISTING 400MM WIDE CSD
D
AR
EA
VII
2,5
29 M²
EXISTING 400MM WIDE CSD
LEGEND
5.50 ELEVATION
GROUND/ PAVEMENT/ COVER SPOT
IL 5.3
0DRAIN INVERT ELEVATION
HT
POLYPIPE
HOLDING TANKHT
PROPOSED CSD
EXISTING CSD
THROUGH EXISTING 3-100mm ØPOLYPIPE
EXISTING 400MM WIDE CSD
EXISTING 400MM WIDE CSD
EXISTING 3 - 100Ø PVCSTORMWATER OUTLET
OPEN STORMWATER DRAINOSD
COVERED STORMWATER DRAINCSD
TRIBUTARY AREAAREA IV
NOTES:1. THE METHOD OF DISCHARGE FOR AREA VII
IS BY GRAVITY THROUGH THE HOLES OF EXISTINGCOVERED STORMWATER DRAIN.
2. LIKEWISE, THE METHOD OF DISCHARGE FOR AREA VIII IS BY GRAVITY THROUGH THE 3-100MM DIAMETER PVCPIPE LEADING TO EXISTING COVERED STORMWATERDRAIN.
SCALE 1: 1000
5.5
3.THE REST IS BY PUMP.
HT-3b
HT-4 AREA IV 4 3 1.5 18.00 2.5 DAVEYDT75V7.5 16.5 2.5 DT75V7.5 16.5
HT-3b AREA II 3 2.5 1.5 11.25 1.5 DAVEYDT37V3.7 7.5 DT55V2.0 12.35.5
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
PROPOSED SITE STORMWATER
DISCHARGE POINTS
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
1:1000
04/16
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
ELEMENT
STRE
NGTH
SLUM
P (m
ax.)
35 MPa 20mm 70mm
15 MPa
CONCRETE
C1.
C2.
C3.
C4.
REINFORCEMENT SYMBOLS:C5.R
Y
C6.
C7.
C8.
CONCRETE COVER TO REINFORCEMENT SHALL BE AS FOLLOWS UNO.
SLABS
USE IMMERSION TYPE VIBRATING VERTICALLY.
C9.
F1.
F2.
FOUNDATIONS
DENOTES DEFORMED BARS GRADE 420 MPa
70mm20mm
CURING OF SLABS SHALL BE ACHIEVED BY KEEPING SURFACESCONTINUOUSLY WET FOR AT LEAST 7 DAYS BY PONDING ORAND PREVENTION OF MOITURE LOSS FOR A FURTHER 3 DAYS
SLABS AND WALLS
WHERE NOT SHOWN, MINIMUM SPLICES FOR REINFORCINGALL EXCAVATION IS TO BE INSPECTED AND APPROVED BY THEPROJECT MANAGER BEFORE ANY REINFORCEMENT ORCONCRETE IS PLACED.
DENOTES STRUCTURAL GRADE PLAIN BAR GRADE 210 MPa
ANY AREA OF UNSUITABLE MATERIAL FOUND TO BEPRESENT BELOW UNDERSIDE OF FOOTING LEVEL, AS CALLED FORON THE DRAWINGS SHALL BE REMOVED DOWN TO ACCEPTABLEFOUNDING AND REPLACED WITH SELECTED FILL BACKFILL IN LAYERSNOT EXCEEDING 150MM CONSOLIDATED THICKNESS. THE MATERIAL IN EACH LAYER SHALL BE COMPACTED TO MINIMUM95 % OF MAXIMUM DRY DENSITY FOR THE MATERIALS ASDETERMINED BY THE STANDARD COMPACTION METHOD.
VIBRATION IN EACH LOCATION SHOULD CONTINUE UNTIL AIRBUBBLES CEASE TO APPEAR, GENERALLY AFTER 20-30SECONDS.
ALL OTHERELEMENTS
USE IMMERSION TYPE VIBRATORS VERTICALLY,NOT HORIZONTALLY, IN OVERLAPPING SPOTPATTERN AND/OR VIBRATING SCREED
ALL CONCRETE SHALL BE COMPACTED USING VIBRATINGEQUIPMENT AS FOLLOWS:
THE CONCRETE SHALL BE TESTED FOR COMPLIANCE BY THEPROJECT CONTROL TESTING IN ACCORDANCE WITH NATIONALSTANDARDS. CONCRETE NOT COMPLYING SHALL BE REJECTED.
CONCRETE SHALL BE SUPPLIED ON A PERFORMANCE BASISWITH THE FOLLOWING CHARACTERISTICS:
ALL REINFORCEMENT SHALL BE SUPPORTED IN ITS CORRECTPOSITION DURING CONCRETING BY APPROVED MORTAR BLOCKS,BAR CHAIRS, SPACERS OR SUPPORT BARS.
CONCRETE SHALL BE FROM AN APPROVED SOURCE AND SHALLCOMPLY WITH THE REQUIREMENTS OF THE SPECIFICATION.
MAXI
MUM
AGGR
EGAT
E SI
ZE
LEAN CONCRETE
USE IN CHB WALL REINFORCEMENTS, UNLESS OTHERWISE NOTED
FOR MAIN BARS IN SLABS, BEAMS AND WALLS.
SLABS ON LEAN CONCRETE 50
BEAMS 50SUSPENDED SLABS 50
WALLS 50
STRUCTURAL GENERAL NOTES:
BARS SHALL BE 50 TIMES THE DIAMETER.
Wate
r/Cem
ent
Ratio
0.40
0.50
D. ALL EXPOSE METAL/STEEL SECTION SUCH AS STEEL GRATINGS, EMBEDS, ACHORAGE & ETC.SHALL BE COATED WITH EPOXY PRIMER WITH ANTI-CORROSION FINISH.
E.. OBO-ICS2018, ASCE7-10AC1318-14 - BUILDING CODEAC1350-06 - ENVIRONMENTAL STRUCTURES
MISC. METALS
DESIGN CODE:
SOIL
ANGLE OF REPOSE, 8 = 34°UNIT WEIGHT, W = 1,600 KG/M3
LOADING CRITERIA
DEAD LOADREINFORCED CONCRETE = 2,400 KG/M3
LIVE LOAD:LL = 500 KG/M2LL= 3,000 KG/M2 (VEHICLE)
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
STRUCTURAL GENERAL NOTES
NTS
05/16
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
500 500 500 500
HT-1 HT-2 HT-3/HT-3b HT-4
AT FENCE SECTION
EXISTING CONC. WALKWAY
BOTTOM SLAB OF COVERED STORMWATER DRAIN
EXCAVATED MATERIAL
BORE HOLE 120 MM Ø ANDFILL GAP WITH APPROVEDFILLER
PERIMETER FENCE
EXISTING CONC. WALKWAY
EXISTING COVEREDSTORMWATER DRAIN
TYPICAL DISCHARGE POINT AND OUTLETFROM HT-2/HT-3 TO STORM DRAIN
2850
VARI
ESMA
X=30
0mm
EXISTING ROADWAY LEVELADDITIONALCONCRETE WALLFOR STORM DRAIN
EXSITING LEVEL OFSTORM DRAIN
2960
FROM HT-2 /HT-3
BORE HOLE 120 MM Ø ANDFILL GAP WITH APPROVEDFILLER
PERIMETER FENCE
EXISTING CONC. WALKWAY
EXISTING COVEREDSTORMWATER DRAIN
TYPICAL DISCHARGE POINT AND OUTLETFROM HT-1/HT-4 TO STORM DRAIN
2900
VARI
ESMA
X=30
0mm
EXISTING ROADWAY LEVELADDITIONALCONCRETE WALLFOR STORM DRAIN
EXSITING LEVEL OFSTORM DRAIN
2950
FROM HT-1 /HT-4
EXIS
TING
STOR
M DR
AIN
HT-1
300
GROUND LEVEL
SECTION 1
50 50 502
1
EXCAVATION LINE
340( APPROX.)
HT-3HT-2
300
GROUND LEVEL
BACKFILL FROM EXCAVATED MATERIAL
SECTION 2
50 50 502
1
EXCAVATION LINE
360( APPROX.)
SECTION 1
HT-4
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
DETAILED SECTIONS PART 1
1:25
06/16
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
200 3000 200 100 200 3000 200 100
100
200
4000
200
100
700800
225
160 P2
P1
1000
200 MM THICK RC ROOF SLAB 200 MM THICK RC FLOOR SLAB
INLE
T
200
4000
200
400
LEAN CONC.
SUPPORT BASECONTROL PANEL
600
ROOF PLANHT-4 FLOOR PLAN
HT-4
250
SLOPE =2.5%
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
HT - 4
1:30
07/16
ROOF PLAN AND FLOOR PLAN
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
Y12-150 VERT.
Y10-250 HOR.
15MAY2020
600
INLE
T
400
700
800
225 160
P2
P1
200 3000 200
150
2500
200
200 MM THICK RC ROOF SLAB
200 MM THICK RC FLOOR SLAB
LEAN CONC.
8E
8E
3000200 200
1500
200
1700
400
200
1002006002002521998200100
250
600
250
200
160
Y10 - 250 HOR.
Y10 - 200 VERT.
Y10 - 200
Y10 - 200
2020
50 MM THICK LEAN CONC.
P2P1
Y10 - 250 TOP
Y10 - 170 BOT
22515
010
0
400GROUND LEVEL
200
INLET
200 3000 200
200
2500
200
600
600
80 MMØx4.5MMGALV. IRON PIPE
200
ROOF PLANHT-3/HT-3b
FLOOR PLANHT-3/HT-3b
SECTION EHT-3/HT-3b
100 MMØx4.5MMGALV. IRON PIPE
POLYPIPE
GALV. IRON PIPE
NOTES:1. MEASUREMENTS AND STRUCTURAL DETAILS
ARE SIMILAR TO HT- 1.
200
2500
200
250400
20 - Y12
5 - Y16
WATER STOP
SLOPE =2.5%
SLOPE =2.5%
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
HT - 3 / HT- 3b
08/16
ROOF PLAN, FLOOR PLAN & SECTION E
1:30
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
Y12-150 VERT.
Y10-250 HOR.
15MAY2020
200 3500 200
STEEL GRATINGCOVER IN 2 MODULES
SUPPORT BASECONTROL PANEL
600
200
3000
200
10F
1000
INLE
T
301
200 MM THICK RC FLOOR SLAB
ROOF PLANHT-2
SLOPE =2.5%
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
HT - 2
09/16
ROOF PLAN
1:30
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
200600
3500 200
200
3000
200
17F
700
800
225 160
P2
P1
100
100 100
100
3500200 200
1500
200
1500
400
200
100200600200252249820010025
0
600
180
400
160
Y10 - 250 HOR.
Y10 - 200 VERT.
Y10 - 200
Y10 - 200
2050
50 MM THICK LEAN CONC.
P2P1
Y12- 180 TOP
Y12 - 120 BOT
225
150
100
400
GROUND LEVEL
200
INLET
5 - Y16
3 - Y10
ASPHALT PAVEMENT LEVEL
4-Y10
50
200
2 - 100MMØx4.5MMGALV. IRON PIPE
200 MM THICK RC FLOOR SLAB
FLOOR PLANHT-2
SECTION FHT-2
20 - Y12
WATER STOP
250
SLOPE =2.5%
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
HT - 2
10/16
FLOOR PLAN & SECTION F
1:30
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
Y12-150 VERT.
Y10-250 HOR.
15MAY2020
600
INLE
T
700
800
225 160
P2
P1
200 3000 200
200
2500
200
200 MM THICK RC ROOF SLAB
200 MM THICK RC FLOOR SLAB
LEAN CONC.
15E
15F
200 3000 200
200
2500
200
600
600
ROOF PLANHT-1
FLOOR PLANHT-1
NOTES:1. MEASUREMENTS AND STRUCTURAL DETAILS
ARE SIMILAR TO HT- 3.
SLOPE =2.5%
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
HT - 2
11/16
FLOOR PLAN & ROOF PLAN
1:30
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
8 120
WELD ALL-AROUND SYMBOLLENGTH OF WELD IN mmBASIC WELD SYMBOL ( FILLET)
SIZE OF WELD
WELDING SYMBOLS
OTHER SIDE
NOTES:1. ALL MEASUREMENTS SHALL BE VERIFIED
ON SITE.58514
35
1
2
3-M WIDE TANK STEEL GRATING
50x50x6 STEEL ANGLE BAR RAMESWITH 40x5 STEEL FLAT BAR GRATING@ 50 O.C. ALL COATED WITH APPROVEDANTI-RUST PRIMER AND 2 COATS OF FULL GLOSS LATEXPAINT GREY COLOR
SECTION 2
SECTION 1
2.5-M WIDE TANK STEEL GRATING
585
1435
150 600
250
200
160225
6
4 - Y12 x 100 WELDED TO120x120x8 GALV. STEELPLATE
100 MMØ x 4MM GI PIPE
40x5 GALV. STEEL STRAPWITH 12 MMØ GALV. STEEL BOLT
2 - 16 MMØ GALV. STEEL BOLT
2 - Y10
2 - Y16 WITH TIE BAR R8-140
225 160
P2
P1
8069
0
80x80x8 GALV. STEELANGLE BAR
40x5 GALV. STEEL STRAPWITH 12 MMØ GALV. STEEL BOLT
40x5 GALV. STEEL STRAPWITH 12 MMØ GALV. STEEL BOLT
585
1185
80x80x8 GALV. STEELANGLE BAR
80x80x8 GALV. STEELANGLE BAR
50x50x6 STEEL ANGLE BAR RAMESWITH 50x6 STEEL FLAT BAR GRATING@ 45 O.C. ALL COATED WITH APPROVEDANTI-RUST PRIMER AND 2 COATS OF FULL GLOSS LATEXPAINT GREY COLOR
12D
SECTION D(TYPICAL)
4 - 16 MMØ GALV. STEEL BOLT
145 142
145152
HORIZONTAL ANGLE SUPPORT DETAIL
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
STEEL GRATING
1:20
12/16
SECTION D
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
01
03
04
10
11
12
13
06
07
05
09
08
16
15
14
02
18
SITE POWER SUPPLY LAYOUTSCALE 1: 1000
3. SUPPLY AND INSTALL SUMP PUMP AUTOMATIC LEVEL SWITCH CONTROL PANEL WHERE SHOWN. 4. ALL CABLING SHALL BE CONCEALED AND INSTALLED NEATLY TO AUSTRALIAN STANDARD (WIRING RULE)
AS 3000.
1. ALL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH THE AUSTRALLIAN WIRING RULES. AS 3000:2000 AS 3008. 1. 1. AND LOCAL POWER SUPLAY AUTHORITY REGULATIONS.
2. ALL WORKS SHALL BE EXECUTED IN A NEAT AND TRADESMANLIKE MANNER, CARRIED OUT BY COMPETENT EXPERIENCED TRADES PERSONS, POSSESING CURRENT ELECTRICAL WORKERS LICENCES SUITABLY INDORSED FOR THE TYPE OF WORK. THE COMPLETE INSTALLATION, WHICH SHALL BE READILY ACCESIBLE AND ABLE TO BE INSPECTED.
LEGEND
SYMBOL DETAILS
POWER CIRCUIT
DISTRIBUTION BOARDDB
ELECTRICAL GENERAL NOTES:
CONTROL PANELCP
1 CMR2
4
6 BACK BUILDING B
8 MEDICAL UNIT9
10MOTOR POOL
ANNEX3 CHANCERY
5 BACK BUILDING A
7 WAREHOUSE
11CARPENTRY SHOP12
13 UTILITIES BUILDING14 GYM15 TENNIS COURT16 BASKETBALL COURT17 PLAYGROUND18 SWIMMING POOL
CAC
IT STORAGETENNIS BUILDING
3DB POWER CONTROL CIRCUIT NUMBER. TOP HALF INDICATES
DISTRIBUTION BOARD NUMBER, BOTTOM HALF INDICATESCIRCUIT NUMBER.
PULL BOX
CONDUIT WITH CABLE INSTALLED
PB-1
HT-4
HT-3
HT-2
HT-1
CP-4CP-3
5-8DBB
CP-21-4DB
CP-1 (80Ø)
CP-2 (80Ø)
CP-4 (80Ø)CP-3 (80Ø)
E PB-2
PB-1
E PB-3 PB-4
19 DECONTAMINATION FACILITY20
22
24 LGF OFFICE
FUEL STORAGE21 FAC OFFICE 2
23 GARDENER STORAGE
25 MAIN FUEL TANK
FAC OFFICE 1
17
19
23
21
20
22
24
25
CP-1 HT-3bCP-3b
F PB-3b
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
SITE POWER SUPPLY LAYOUT AND
1:1000
13/16
ELECTRICAL GENERAL NOTES
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
PULL BOX SCHEDULE
NoNOMINAL DIMENSIONS
RATING/DUTY BODY COVER REMARKSL (mm) W (mm) D (mm)
PB-1 900 LIGHT DUTY HDPE GSCP or CP ACO CABLE MATE
LIGHT DUTY HDPE GSCP or CP ACO CABLE MATE
LIGHT DUTY HDPE GSCP or CP ACO CABLE MATE
ABBREVIATIONS NOTES
HDPE HIGH DENSITY POLYETHYLENE LABELED ELECTRICALGSCP GALVANISED STEEL CHECKER PLATECP CONCRETE POLYMERCISC CAST IN SITU CONCRETE
450 450
NOTES:1. REFER TO LAYOUT FOR NUMBER AND DIMATER OF CONDUIT FOR EACH APPLICATION
2. DETERMINE TRENCH WIDTH TO SUIT NUMBER AND DIAMETER OF CONDUITS
PB-2
PB-3
900450 450
900450 450
NOTE:CP2 - EXISTING UPGRADED/INSTALLEDCONTROL PUMP FOR HT-2
LIGHT DUTY HDPE GSCP or CP ACO CABLE MATEPB-3b 900450 450
LIGHT DUTY HDPE GSCP or CP ACO CABLE MATEPB-4 900450 450
DB-1
CKT. NO.
25 AMP
3 PHASE
100AMP
DB-2
LOAD POWER VOLTAGERATING
P1
P2
P1
P2
DB-3
P1
P2
DB-4
P1
P2
3700
5500
7500
7500
3700
5500
7500
7500
AMPRATING
380
380
380
380
380
380
380
380 16
16
16
16
11
7.5
11
7.5
25 AMP
CONTROLPANEL
CP1
CP2
CP3
CP4
SIZE OF WIRE(PUMP TO CP)
4mm2 X 4C +E X 1Ipe/CU/ PVCSHEATHEAD 0.6/1 AC, I1C 502
6mm2 X 4C +E X 1Ipe/CU/ PVCSHEATHEAD 0.6/1 AC, I1C 502
4mm2 X 4C +E X 1Ipe/CU/ PVCSHEATHEAD 0.6/1 AC, I1C 502
6mm2 X 4C +E X 1Ipe/CU/ PVCSHEATHEAD 0.6/1 AC, I1C 502
SIZE OF WIRE(PUMP TO CP)
80mm2 ELECTRICALGRADE
80mm2 ELECTRICALGRADE
80mm2 ELECTRICALGRADE
80mm2 ELECTRICALGRADE
SCHEDULE OF LOADS
25 AMP
25 AMP
25 AMP
25 AMP
25 AMP
25 AMP
150AMP
380/230V 50Hz
UTILITY BLDG.MAIN PANEL BOARD
25mm CABLE
4CTC NVY
25mm CABLE
4CTC NVY
4mm CABLE
4CTC NVY
DB-3b
P1
P2
3700
5500
380
380 11
7.5
CP3b
4mm2 X 4C +E X 1Ipe/CU/ PVCSHEATHEAD 0.6/1 AC, I1C 502
80mm2 ELECTRICALGRADE
25 AMP
25 AMP
NEW PANEL
OLD PANEL
TO C
P-1
ELEC
TRIC
AL
DETAILUNDERGROUND CONDUIT INSTALLATION
PULL BOX 4DETAILS
TO CP-2
DBa
50
50 50
600
HEAVY DUTY PVC CONDUITS FOR POWER
"ELECTRICITY" MARKER (ORANGE PVC TAPE OR CABLE BLOCKS)
50
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
SCHEDULE OF LOADS AND
NTS
14/16
PULL BOX SCHEDULE
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
380/230V 50Hz
UTILITY BLDG.MAIN PANEL BOARD
L1 L2 L3
25m
m C
AB
LE
4C
TC
N
VY
IT STORAGE
L1 L2 L3
25m
m C
AB
LE
4C
TC
N
VY
BACK
BUILDING
100amp
30ma
150amp
30ma
BACK BLDG.PANEL BOARD
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
25amp
30ma
25amp
30ma
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
25amp
30ma
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
5.5Kw
25amp
30ma
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
3.7Kw
150amp
30ma
25mm CABLE
4CTC NVY
IT STORAGEPANEL BOARD
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
7.5Kw
25amp
30ma
25amp
30ma
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
7.5Kw
25amp
30ma
L1 L2 L34m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
5.5Kw
25amp
30ma
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
3.7Kw
100amp
30ma
25mm CABLE
4CTC NVY
SUMP PUMP
MASTER CONTROL
TO DB
P1
FLOAT SWITCH 1
P1
FLOAT SWITCH 2
WAT
ER M
IN. L
EVEL
WAT
ER M
ID LE
VEL
WAT
ER M
AX LE
VEL
HOLDING TANK
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
7.5Kw
25amp
30ma
L1 L2 L3
4m
m C
AB
LE
4C
TC
N
VY
SUMP PUMP
7.5Kw
25amp
30ma
HT-3 HT-3b HT-4
HT-1 HT-2
5.5Kw3.7Kw
NEW PANEL
OLD PANEL
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
SINGLE LINE DIAGRAM
NTS
15/16
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
EMBASSY STORM DRAINAGE UPGRADE
MDC
MMP
Sensitive but Unclassified
15MAY2020
GROUND LEVEL
PIT FLOOR
TANK FLOOR
GALV. STEEL GRATINGCOVER
P2 P1
100MMØx4.5MM GALV.IRON LONG CURVE ELBOW
CONNECTOR
100 MMØ POLYPIPE
100MMØx4.5MM GALV.IRON PIPE
FLANGE WITH4-12Ø BOLT
W2
W1
CWL
LWLB
d
D
A1
A
MODEL OUTLET(BSP F) A A1 B D H
W1 W2
NETWEIGHT
(KG)
OPERATING NETWATER LEVEL
D150V 395 205 230 195 600 545 200 24
DT15V 395 205 230 195 515 460 200 23
DT37V 430 240 265 255 670 585 240 50
DT75V 660 425 360 315 825 760 310 80
3"
4"
2 3 41 5 6 7 8 9 10 11 12 13 14
15
16 17
2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
NTS
16/16
B
C
D
E
A
J
I
H
G
F
O
N
M
L
K
P
Classification:
Checked By:
Drawn By:
Date:
Sheet Number:
Drawing Title:
CBC Project Number:
Drawing Scale:
Phase:
Release for Construction:
Date:
Rev. Number Description:
WARNING:
United States Department of State
OFFICE OF OVERSEAS BUILDINGS OPERATIONS
Washington, D.C.
This document is the property of the U.S.
Government. Further reproduction and/or
distribution is prohibited without the express
written consent of : Overseas Buildings
Operations, U.S. Department of State,
Washington, D.C., 20522-0820. Information
on this document is not to be offered except
with the written approval of the individual
whose seal appears herein.
35% 60% 100%
Project Title:
SUMP PUMP AND MASTER CONTROLLER
MDC
MMP
SPECIFICATION AND DETAILS
Sensitive but Unclassified
EMBASSY STORM DRAINAGE UPGRADE
15MAY2020