Embedded System Design Framework for
Minimizing Code Size and
Guaranteeing Real-Time Requirements
Insik Shin, Insup Lee, & Sang Lyul Min
CIS, Penn, USA CSE, SNU, KOREA
2
Agenda
Background
Period Calibration Method (PCM)
Code size reduction technique
Design framework overview
Optimization problem formulation
Heuristic solutions and evaluations
Conclusion
3
Period Calibration Method (PCM)
Design methodology that transforms real-time system requirements into real-time task scheduling parameters
Example
Drawback : it may not generate schedulable solutions
R. Gerber et al. “Guaranteeing End-to-End Timing Constraints by Calibrating Intermediate Processes”, RTSS ’94.
4
Code Size Reduction Technique
Code size is a critical design factor for many embedded systems.
Reduced bit-width instructions
ARM microprocessor normal mode : 32-bit instruction set
Thumb mode : 16-bit instruction set
code size can be reduced by 30%, while # of instructions can increase by 40%.
5
Code Size vs Execution Time Tradeoff
A program contains both 16/32 bit instructions in functions or basic blocks.
Compile-time tradeoff between code size (s) and execution time (e) of a task
s
e
6
Tradeoff Function
Tradeoff function for each task i
s = fi(e) (linear or discrete)
s
e
A
B
7
Embedded Real-Time System Design
Problem: design a system satisfying real-time system requirements while minimizing the total code size of the task system
Task 1 Task 2 Task n…
X1
X2Y1
1
2
d1 3
d2 4
F(Y1|X1)=30, F(Y1|X2)=25, C(Y1|X1,X2) = 4,
u(Y1)=40, l(Y1)=30
Real-time System Requirements Tradeoff
8
Design Framework
Goal : deriving task code size and scheduling parameters while minimizing the system code size and guaranteeing real-time requirements
X1
X2Y1
1
2
d1 3
d2 4
F(Y1|X1)=30, F(Y1|X2)=25, C(Y1|X1,X2) = 4,
u(Y1)=40, l(Y1)=30
Real-time System Requirements
PCM
0 5 10
Task Scheduling Parameters
0 5 10Task 1 Task 2 Task n
…
Tradeoff
Design Framework
9
Design Framework Overview
Real-Time System Requirements
Task Code Size
Feasibility Constraints
Task Exec. Time
Min. Task Exec. Time
PCMTask Scheduling
Parameters
Task Tradeoff
FeasibilityAnalysis
Optimization Framework
Design Framework
Task Code Size & Scheduling Parameters
10
Design Framework Overview
Real-Time System Requirements
Task Code Size
Feasibility Constraints
Task Exec. Time
Min. Task Exec. Time
PCMTask Scheduling
Parameters
Task Tradeoff
FeasibilityAnalysis
Optimization Framework
Design Framework
Task Code Size & Scheduling Parameters
11
Optimization Problem Formulation Given linear or discrete tradeoff functions and
task scheduling parameters, determine task execution time solving the following optimization problem:
Optimization problem: objective: minimizing
constraint: feasibility
n
i
ii
n
i
i efs1
)(
1
12
Feasibility Analysis Task model : asynchronous periodic tasks with
pre-period deadlines under EDF scheduling For the task model, an exact feasibility
condition is
for all , where is the number of jobs of task that must be completely scheduled in [t1, t2).
Feasibility Analysis is NP-hard [Baruah ’90].
n
i
ii ttett1
221 1),(
max21 20 OTtt LCM ),( 21 ttii
13
Feasibility Analysis Our contribution: another exact feasibility
condition that can be more efficiently evaluated.
for all (t1, t2) ODALL , where ODALL is a set of
possible pair of (offset, deadline) between 0 and 2TLCM + Omax.
n
i
ii ttett1
221 1),(
14
Optimization Framework Optimization Problem
Objective : minimizing Constraint :
for all (t1, t2) ODALL .
Complexity of optimization problem Linear tradeoff : the optimization problem can
be solved through linear programming. Discrete tradeoff: we prove the problem is
NP-hard and present three heuristics.
n
i
ii ttett1
221 1),(
n
i
ii
n
i
i efs1
)(
1
15
Heuristic Algorithms Consider the following three tasks
1 2 3
Ti 9 7 5
ei 2 1 2
1
2
30 5 10 15 20
16
Heuristic Algorithms Each job can increase its execution time if there
is an empty slot in its execution window
1
2
30 5 10 15 20
0 5 10 15 20
EDF Schedule
17
Heuristic Algorithms Each job can increase its execution time if there
is an empty slot in its execution window
1
2
30 5 10 15 20
0 5 10 15 20
EDF Schedule
18
Heuristic Algorithms Each job can increase its execution time if there
is an empty slot in its execution window Cumulative amount of execution time each job can
increase
1
2
30 5 10 15 20
19
Heuristic Algorithms Each job can increase its execution time if there
is an empty slot in its execution window The maximum amount of execution time a task can
increase is the maximum amount of execution time all of its jobs can increase together.
1
2
30 5 10 15 20
20
Heuristic Algorithms Highest Best Reduction-Ratio First (HBRF)
reduction ratio
choose a task with the highest reduction ratio
1
20 5 10 15 20
ei i
i
iiiii efef
)()(
21
Heuristic Algorithms Longest Period First (LPF)
choose a task with the longest period. In general, increasing the execution time of
this task has the least impact on the schedulability of task set
1
20 5 10 15 20
T1
T2
22
Heuristic Algorithms Highest Best Weighted-Reduction-Ratio First (HBWF)
Weighted reduction ratio
choose a task with the highest weighted reduction ratio
1
20 5 10 15 20
ei i
i
iiiii
LCM
i efef
T
T
)()(
T1
T2
23
Evaluation of Heuristic Algorithms Closeness to OPT
S(init) – initial system code size S(alg) – system code size obtained with
an heuristic algorithm S(opt) – optimal system code size Closeness to OPT
)()(
)()(
optSinitS
algSinitS
24
Performance of algorithms with 8 tasks
0
0.2
0.4
0.6
0.8
1
60 70 80 90 100
Den
sity
BEST
HBRF
HBWF
LPF
Closeness to OPT (%)
25
Performance of BEST with various task numbers
0
0.2
0.4
0.6
0.8
1
60 70 80 90 100
Den
sity 4 tasks
6 tasks
8 tasks
10 tasks
12 tasks
Closeness to OPT (%)
26
Conclusion Design framework taking advantage of
the code size vs. execution time tradeoff Future work
Energy consumption is another critical design factor of embedded systems.
Extends this framework so as to utilize tradeoffs among code size, execution time, and energy consumption.
27
Real-Time System Requirements
Task graph
dataflow & task precedence
End-to-end timing constraints
freshness from input to output
input correlation
output separation
28
Task Graph
Dataflow & task precedence
X1
X2
Y11
2
d1
d2
4
X3 3 d3
d45
Y26
29
End-to-end timing Constraints
Freshness from input to output: F(Y1|X1)
Input correlation : C(Y1|X1,X2)
Output separation : u(Y1), l(Y1)
X1
X2
Y11
2
d1
d2
4
30
Example – System Requirements
X1
X2
Y11
2
d1
d2
4
X3 3 d3
d45
Y26
F(Y1|X1)=30, F(Y1|X2)=30, F(Y2|X2)=20, F(Y2|X3)=15
C(Y1|X1,X2)=3, C(Y2|X2,X3)=4
l(Y1)=21, u(Y1)=32, l(Y2)=29, u(Y2)=41
e1=2, e2=2, e3=1, e4=3,e5=2, e6=3
31
Example – Solution Process
1. deriving the period of each task
minimizing utilization ( )
2. deriving the offset and deadline of each task
3. deriving the fixed priority of each task
i
i
T
e
32
Example – Task Scheduling Parameters
1 2 3 4 5 6
period 26 13 39 26 39 39
offset 0 0 0 21 0 13
deadline 21 12 13 26 13 15
priority 1 2 3 4 5 6
33
Real-Time Task Scheduling Parameters
Period (Ti)
Offset (Oi)
Deadline (Di)
Fixed priority