Emergency Action Plan for Krishnarajasagara Dam

KA06HH0020

Water Resources Department State of Karnataka.

EMERGENCY ACTION PLAN OF

KRISHNARAJASAGARA DAM [KA06HH0020] Prepared for

Karnataka Water Resources Department (Cauvery Neeravari Nigam Limited)

Prepared by

Chief Engineer, Irrigation South Zone,

Mysuru.

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

KRISHNARAJASAGARA DAM

Project ID Code [KA06HH0020]

Mandya, Karnataka

DISCLAIMER

Every effort has been taken to estimate the severity of flooding and inundation areas likely to be

affected by Krishnarajasagara Dam in an emergency condition. These estimates are based on available

primary and secondary data. Every effort has been made to foresee varied emergency possibilities and

develop appropriate notification procedures for timely rescue and relief operations. However,

implementation of the Emergency Action Plan (EAP) involves many agencies, who are required to work

in a coordinated manner to reduce the consequences of the emergency triggered by the dam site

condition. Effectiveness of the rescue and relief operations depend on many factors including the

adequacy and accuracy of the estimation of the severity of flooding, coordinated efforts of all the

agencies involved in rescue and relief efforts and availability of facilities like power, telephones, road

communications, etc. EAP developer may therefore, not be held responsible for the efficacy of the EAP.

For any information, please contact

(Shankare Gowda) Chief Engineer, Irrigation (South) Zone, Cauvery Neeravari Nigam Limited Karnataka Water Resources Department Mysuru Mobile Phone: +91 9632393263 E-mail: [email protected]

[email protected]

KARNATAKA WATER RESOURCES DEPARTMENT I

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

II DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

TABLE OF CONTENT APPROVAL AND IMPLEMENTATION .................................................................................................. 1

EAP DISTRIBUTION LIST ..................................................................................................................... 3

LOG SHEET OF CHANGES ................................................................................................................ 11

1. PURPOSE ................................................................................................................... 13

2. DAM DESCRIPTION ................................................................................................... 13

2.1 General ................................................................................................................... 13

2.2 Reservoir Operations ............................................................................................ 15

2.3 Gate Operations Schedule for +80Ft level Surplus Sluices ............................... 16 2.4 Gate Operations Schedule for +103ft level Surplus Sluices .............................. 23

2.5 Gate Operations Schedule for +106ft level Surplus Sluices .............................. 24

2.6 Gate Operations Schedule for +114ft level Surplus Sluices .............................. 26

2.7 Rule Curve of Reservoir Operations .................................................................... 36

2.8 Operation of Gates when reservoir level range from +122 ft to +124 ft ............ 36

2.9 Operation of Gates when reservoir level during excess flood .......................... 36

2.10 Sequence of Opening or Closing of Gates .......................................................... 37

3. RESPONSBILITIES .................................................................................................... 37

3.1 Dam Owner’s Responsibilities ............................................................................. 37 3.2 Dam Safety Organization’s Responsibilities ....................................................... 41

3.3 Responsibilities for Notification ........................................................................... 41

3.1 Responsibilities for Evacuation ........................................................................... 43

3.2 Responsibilities for Termination and Follow-Up ................................................ 45

4. COMMUNICATION NETWORKS ............................................................................... 46

5. EMERGENCY DETECTION, EVALUATION AND CLASSIFICATION ....................... 46

5.1 Emergency Detection ............................................................................................ 46 5.2 Emergency Evaluation and Classification ........................................................... 47

5.3 Previously Known Problems ................................................................................ 49

6. PREPAREDNESS ....................................................................................................... 49

6.1 Surveillance ........................................................................................................... 49 6.2 Response on forecast of excessive inflow .......................................................... 49

6.3 Response during emergency situations .............................................................. 50

6.4 Response during weekends and holidays .......................................................... 50

6.5 Response during periods of darkness and adverse weather ............................ 50

6.6 Access to Site ........................................................................................................ 50

6.1 Remedial Actions................................................................................................... 51

7. SUPPLIES AND RESOURCES .................................................................................. 52

KARNATAKA WATER RESOURCES DEPARTMENT III

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

7.1 Contracts ................................................................................................................ 52

7.2 Equipment and Supplies ....................................................................................... 52 7.3 Reports ................................................................................................................... 52

8. EMEREGENCY OPERATION CENTRE ..................................................................... 53

8.1 Activity Log ............................................................................................................ 53

8.2 Costs of the Emergency Operation Centre ......................................................... 53 9. INUNDATION AREA ................................................................................................... 53

9.1 Local Evacuation Plan ........................................................................................... 55 10. IMPLEMENTATION .................................................................................................... 56

10.1 Development .......................................................................................................... 56

10.2 Updating ................................................................................................................. 56

10.3 Testing .................................................................................................................... 56

10.1 Training .................................................................................................................. 58 ANNEXURE 1 : VICINITY MAP ........................................................................................................... 59

ANNEXURE 2 : WATCH CONDITION NOTIFICATION FLOWCHART .................................................... 61

ANNEXURE 3 : FAILURE CONDITION FLOWCHART .............................................................................. 63

ANNEXURE 4: DISTRICT-WISE NOTIFICATION FLOWCHART ............................................................. 65

ANNAXURE 5 : DISTRICT-WISE NOTIFICATION FLOWCHART ............................................................ 67

ANNEXURE 6 : DISTRICT-WISE NOTIFICATION FLOWCHART ............................................................ 69

ANNEXURE 7 : DISTRICT-WISE NOTIFICATION FLOWCHART ............................................................ 71

ANNEXURE 8 : LOCAL EVACUATION PLAN FOR THE AFFECTED VILLAGES AND SAFE SHELTER ARRANGEMENTS 73

ANNEXURE 9 : SHELTERS / RELIEF CAMPS AVAILABLE OUTSIDE THE INUNDATION AREA ... 77

ANNEXURE 10 : INUNDATION MAPS ......................................................................................................... 79

ANNEXURE 11 : UNUSAL OR EMERGENCY EVENT LOG ..................................................................... 81 ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX ........... 87

ANNEXURE 13 : SUPPLIES AND RESOURCES .....................................................................................133

ANNEXURE 14 : SAMPLE PUBLIC ANNOUNCEMENTS .......................................................................139

ANNEXURE 15 : ANNUAL EAP EVALUATION CHECKLIST .................................................................141

ANNEXURE 16 : DAM DESCRIPTION........................................................................................................143

ANNEXURE 17 : TRAINING RECORD .......................................................................................................145

ANNEXURE 18 : PLAN REVIEW AND UPDATE ......................................................................................147

ANNEXURE 19: ADDITIONAL CONTACT DETAILS ...............................................................................149

IV DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

LIST OF TABLES

Table 1 : Notch flow discharge in Cusecs through +80 ft gates upto +102' level .......................... 16

Table 2 : The values of C√(2g) for +80 ft gates for various levels of gate openings ..................... 17

Table 3 :The values of C√(2g) for +80 ft gates interpolated for intermediate levels of gate

openings ............................................................................................................................... 18

Table 4 : Discharge in Cusecs through each gate at +80 Ft level above +102Ft level ................... 19

Table 5 : Total discharge in Cusecs through all 16 gates at +80ft level above +102ft ................... 21

Table 6 : Values of C√(2g) for Orifice flow above RL +112.3 ft ........................................................ 23

Table 7 : Total Combined Discharge in Cusecs for Notch Flow through +103ft gates upto +112.3'

level ....................................................................................................................................... 23

Table 8 : Total Combined Discharge in Cusecs for Orifice flow through +103ft Gates from +112.3’

to +124’ level ......................................................................................................................... 24

Table 9 : Values of C*√(2g) for Orifice flow for +106’ gates upto 124’ level ................................... 25

Table 10 : Total Discharge in Cusecs for Notch flow through +106ft Gates upto 119.5’ level ...... 25

Table 11 : Total Discharge in Cusecs for Orifice flow through +106ft Gates above 119.5’ level .. 26

Table 12 : Total Discharge in Cusecs for Notch flow of +114ft Gates upto +124’ level ................. 26

Table 13 : Upper Limit and Lower Limit of Reservoir Operations Rule Curve for

Krishnarajasagara Dam ....................................................................................................... 36

Table 14 : Trigger level of Alert for Normal Discharges of KR Sagara Dam ................................... 37

Table 15 : Dam Owner's Responsibilities .......................................................................................... 38

Table 16 : Responsibilities for Notification ....................................................................................... 42

Table 17 : Districts potentially affected by an Emergency event in Krishnarajasagara dam ........ 43

Table 18 : Termination and Follow-Up Responsibilities ................................................................... 45

Table 20 : Conditions of Accesses to Krishnarajasagara Dam under Emergency Conditions ..... 51

Table 21 : Scenario included in the Emergency Action Plan ........................................................... 54

Table 22 : List of Main Crossing Structures ...................................................................................... 54

Table 24 : Krishnarajasagara Dam's EAP exercise / testing requirements .................................... 57

Table 25 : Details of Shelters / Relief Camps available outside the inundation area ...................... 77

Table 26 : Emergency Level Determination - Action Data Sheet Index .............................................. 87

Table 27 : Details of Fire Stations.............................................................................................................. 149

Table 28 : Details of Helipads ..................................................................................................................... 149

Table 29 : Details of Information & Public Relations Dept. Officials and Media Personnel ......... 150

Table 30 : Details of Health Department Officials .................................................................................. 151

Table 31 : Details of Transport Facilities ................................................................................................. 151

KARNATAKA WATER RESOURCES DEPARTMENT V

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 32 : Details of Education Department Officials ........................................................................... 151

Table 33 : Details of Medical Facilities ..................................................................................................... 153

Table 34 : Details of Ambulance Service Providers .............................................................................. 154

Table 35 : Details of Blood Bank Facilities .............................................................................................. 155

VI DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

LIST OF FIGURES

Figure 1 : General Layout of Krishnarajasagara Dam ...................................................................... 14

Figure 2 : Gate Operation Schedule for +80' level surplus sluices of KR Sagara Dam ................. 27

Figure 4 : Gate Operations Schedule for +103' level surplus sluices of KR Sagara Dam

(Discharge thorugh each gate - Orifice flow when adjacent gates open) ..................... 29

Figure 5 : Gate Operations Schedule for +103’ level surplus sluices of KR Sagara Dam

(Discharge through all 48 gates) ...................................................................................... 30

Figure 6 :Gate Operation Schedule for +106’ level surplus sluices of KR Sagara Dam (Discharge

through each gate) ............................................................................................................ 31

Figure 7 : Gate Operation Schedule for +106' level surplus sluices of KR Sagara Dam (Discharge

through all 40 Gates) ......................................................................................................... 32

Figure 8 : Gate Operation Schedule for +114’ level surplus sluices of KR Sagara Dam (Discharge

through each gate) ............................................................................................................ 33

Figure 9 : Gate Operation Schedule for +114’ level surplus sluices of KR Sagara dam (Discharge

through all 48 gates) ......................................................................................................... 34

Figure 10 :Gate Operations Schedule for +12’ level scouring sluices of KR Sagara Dam ............ 35

Figure 11 : Rule Curve of Krishnarajasagara Dam ........................................................................... 36

KARNATAKA WATER RESOURCES DEPARTMENT VII

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

KRISHNARAJASAGARA DAM

Project ID Code [KA06HH0020]

Mandya, Karnataka

APPROVAL AND IMPLEMENTATION

The Emergency Action Plan has been prepared by Karnataka Water Resourced Department in

collaboration with Central Project Management Unit. This version of the document is hereby approved

and is effective immediately and supersedes all previous editions.

I have received a copy of this Emergency Action Plan and concur with the notification procedures

KARNATAKA WATER RESOURCES DEPARTMENT 1

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

2 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

KRISHNARAJASAGARA DAM

Project ID Code [KA06HH0020]

Mandya, Karnataka

EAP DISTRIBUTION LIST

By my signature, I acknowledge that I, or my representative, have reviewed this plan and concur with

the tasks and responsibilities assigned therein for my organization and me.

Authority Name, Title, Phone Acceptance Signature

Name: Kishore Kumar K

Title: Assistant Engineer

Mobile Ph: 9945700936

Office Ph: 08172-225427

Email: [email protected]

Name: Vasudev C Dam Operator / Site Title: Assistant Executive Engineer

Officials

Mobile Ph: 9448871009

Office Ph: 08172-225427

Email: [email protected]

Name: ThammeGowda

Title: Assistant Executive Engineer

Mobile Ph: 9448740401

Office Ph:

Email: [email protected]

Name: M B Raju

Emergency Planning Title: Executive Engineer

Manager

Mobile Ph: 9448755039

Office Ph: 08236-257976

Email: [email protected]

Name: Raghupathi

Title: Executive Engineer,

No.2 Varuna Canal Construction Division,

Mysuru

Mobile Ph:

Cauvery Neeravari Office Ph:0821-2515598

Nigam Limited

Email: eevccn2@gmail,com

Name: K.G Vijay Kumar

Title: Superintending Engineer, KRS M &

MIP Circle, Mandya

Mobile Ph: 9448457178

Office Ph: 08232-228696

Email: [email protected]

KARNATAKA WATER RESOURCES DEPARTMENT 3

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Authority Name, Title, Phone Acceptance Signature

Name: Chandrakumar

Title: Superintending Engineer, Kabini &

Varuna Circle, Mysuru

Mobile Ph: 9449680008

Office Ph: 0821-2567674

Email: [email protected]

Name: Hemanth Kumar

Title: Superintending Engineer, Design

Wing, Irrigation (South) Zone, Mysuru

Mobile Ph:

Office Ph: 0821-2477719

Email: [email protected]

Name: Shankare Gowda , KES

Title: Chief Engineer (I/C), Irrigation

(South) Zone, Mysuru

Mobile Ph: 9632393263

Office Ph: 0821-2443900

0821-2443603

Email: [email protected]

[email protected]

Name: Jaiprakash, KES

Title: Managing Director, CNNL

Mobile Ph:

Office Ph:22352997

Email: [email protected]

Name: Rakesh Singh, IAS

Title: Principal Secretary to Govt, Water

Resources Department, Bengaluru

Mobile Ph:

Office Ph: 080-22257064

Email: [email protected]

Name: N Lakshmanarao Peshve, KES

Karnataka Water

Title: Secretary to Govt, Water Resources Department, Bengaluru

Resources Department Mobile Ph:

Office Ph: 080-22255524

Email: [email protected]

Name: Anil Kumar

Title: Additional Secretary to Govt, Water

Resources Department, Bengaluru

Mobile Ph: 9980083074

Office Ph: 08022259985& 08022034003

Email: [email protected] 4 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Authority Name, Title, Phone Acceptance Signature

Name: B.K Rajendra, KES

Title: Chief Engineer, WRDO, Bengaluru

Mobile Ph: 9902815928

Office Ph: 080-22871174 Email: [email protected]

Name: T.N Chikkarayappa, KES

Title: Director, KERS

Mobile Ph:

Office Ph: 08236-257223 / 257224 Email: [email protected]

Name: Gulshan Raj

Title: Chief Engineer

Mobile Ph: 9999277474

Office Ph: Central Dam Safety Email: [email protected]

Organization

Name: Pramod Narayan

Title:

Director, Dam Safety &

Rehabilitation, CWC, New Delhi

Mobile Ph: 9958975921

Office Ph: 011-29583480 Email: [email protected]

Name: Dr. G.S Srinivasa Reddy

Title: Director, KNSDMC

Mobile Ph:

Karnataka Disaster

Office Ph: 080-67355000 / 67355198 Email: [email protected]

Management Authority [email protected]

Name: GangaramBaderiya, IAS

Title: Director

Off No: 080-22032995 Email: [email protected]

Name: A K Sanghi

National

Disaster

Title: Joint Secretary

Mitigatiion,IT and comn

Management Authority Office Number:011-26701718

Office Number: 011-26701864 Email: [email protected]

State Public Works

Name: Harsha Title: Executive Engineer, Mandya

Department Mobile Ph:9483375511

Office Ph:

Email: [email protected]

Name: Ramesh babu

Title: Executive Engineer, Mysuru

Mobile Ph:

Office Ph:08212524224,08212520644

Email: [email protected]

KARNATAKA WATER RESOURCES DEPARTMENT 5

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Authority Name, Title, Phone Acceptance Signature

Name: surendra N

Title: Executive Engineer,

Chamarajanagar

Mobile Ph:9449821499

Office Ph:08226-222027

Email: [email protected]

Name: G.D Kumar

Title: Executive Engineer, Ramanagara

Mobile Ph:9844437174

Office Ph:

Email: [email protected]

Name: Dr. M V Venkatesh, IAS

Title: Deputy Commissioner

Off No: 08232-224600

Mobile no: 8277863520

Email: [email protected]

Name: Shiva Prakash Devaraju, IPS

Titile: Superintendent of Police

Mobile Ph:

Office Ph: 08232-224500

08232-224888

Email: [email protected]

Name: Yogesh, KAS [Mandya District] Title: Additional Deputy Commissioner

District Disaster Mobile Ph:

Management Authoirty Office Ph:08232224698

& Police Department Email: [email protected]

Name: D Nagesh

Title: Tehsildar, Srirangapattana Taluk

Phone No: 08236-252029, 9448394923

Email: [email protected]

Name: Pramod L Patil

Title: Tehsildar, Pandavapura Taluk

Phone No: 08236-255128, 7259705464

Email: [email protected]

Name: Chandramouli

Title: Tehsildar, Malavalli Taluk

Mobile Ph:9448625194

Office Ph:08231242277 Email: [email protected]

Name: Abhiram G Shankar, IAS

[Mysuru District]

Title: Deputy Commissioner Mob: 9480724754

Off No: 08212422302

Email: [email protected] 6 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Authority Name, Title, Phone Acceptance Signature

District Disaster Name: C B Rishyanth, IPS

Management Authority Title: Superintendent of Police & Police Department Mobile Ph: 9480805001

Office Ph: 0821-2520040

0821-2444800

Email:

Name: T Yogesh

Title: Additional Deputy Commissioner

Mobile Ph:

Office Ph: 0821-2422110

Email:

Name: Nagaprashanth P N

Title: Tehsildar, T.Narasipura Taluk

Phone No: 08227261233

Email: [email protected]

Name: Mahesh Kumar K.M

Title: Tehsildar, Nanjanagudu Taluk

Mobile Ph: 9448899455

Office Ph: 08221-226252

Email: [email protected]

Name: B B Cauvery, IAS

Title: Deputy Commissioner

Mobile Ph:

Office Ph: 08226-223170

08226-222055

Email: [email protected]

Name: H D Ananda Kumar, IPS

Title: Superintendent of Police

Mobile Ph:

Office Ph: 08226-222243

[Chamarajanagar 08226-222383

District] Email:

District Disaster

Name: Gayathri

Title: Additional Deputy Commissioner

Management Authority

Mobile Ph:

& Police Department

Office Ph: 08226-226535

Email: [email protected]

Name: K Siddu

Title: Tehsildar, Yelanduru Taluk

Mobile Ph: 9448625194

Office Ph: 08226-240029

Email: [email protected]

Name: Mahadevaiah

Title: Tehsildar, Kollegala Taluk

Phone No: 08224252042

Email: [email protected]

KARNATAKA WATER RESOURCES DEPARTMENT 7

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Authority Name, Title, Phone Acceptance Signature

Name: M.S Archana, IAS

Title: Deputy Commissioner

Mobile Ph:

Office Ph: 080-27273777

Email: [email protected]

Name: Anoop Shetty, IAS

Title: Superintendent of Police

[Ramanagara District]

Mobile Ph: 9480802800 Office Ph: 080-27273700

District Disaster 080-27271100

Email:

Management Authority

Name: B.P. Vijay, K.A.S

& Police Department

Title: Additional Deputy Commissioner

Mobile Ph:

Office Ph: 080-27273777

Email: [email protected]

Name: Anandaiah

Title: Tehsildar, Kanakapura Taluk

Mobile Ph:9448881613

Office Ph:

Email: [email protected]

Name: S Ramamoorthy

Title: Chief Engineer, PWD, Trichy

Mobile:

Office Ph: 0431-2331148

Email:

Name:

Title: Superintending Engineer, Dam

Safety Directorate

Mobile:

Mettur Dam, Water

Office Ph: 044-28443034 Email:

Resources Department,

Name: P. Devaraju

Tamil Nadu Title: Executive Engineer, Mettur Dam

Division, Mettur

Mobile:

Office Ph: 04298-244042

Email:

Name: D. Subramanian

Title: Assistant Executive Engineer,

Stanley Dam Sub-Division, Mettur

Mobile: 9944967455

Office Ph: 04298-242200

Email:

Name: Sundar Mahadev Metri

Indian Meteorological Title: Scientist E, Bengaluru Department, Bengaluru Mobile:

Office Ph: +9180-22211118

Email: [email protected]

8 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Authority Name, Title, Phone Acceptance Signature

Name: L Ramesh Babu

Title: Scientist E, Bengaluru

Mobile:

Office Ph: +9180- 22019927

Email: [email protected]

Name: Dr. Geetha Agnihotri

Title: Scientist E

Mobile:

Office Ph: +9180-22244419

Email: [email protected]

Name:

Title: Director General, NDRF

Office Ph: 011-23438091

Fax No: 011-23438136 Email: [email protected]

Name: Zahid Khan

Title: Commandant, 10th Battalion, NDRF Office Ph: 0863-2293178

Fax No: 0863-2293050

Control Room No: 8333068559 National Disaster Email:

Response Force Name: D.N Singh Title: Assistant Commandant, NDRF

Mobile:

Office Oh:

Email:

Name: Rekha Nambhiyar

Title: Commandant, 4th Battalion, NDRF, Mobile: 9442140269

Office Ph: 04177-246269

Fax No: 04177-246594

Control Room No: 04177-246594

Email: [email protected]

KARNATAKA WATER RESOURCES DEPARTMENT 9

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

10 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

KRISHNARAJASAGARA DAM

Project ID Code [KA06HH0020]

Mandya, Karnataka

LOG SHEET OF CHANGES

The following changes have been made to the EAP and revisions have been provided to the people

shown on the EAP distribution list.

DATE CHANGES MADE SIGNATURE

KARNATAKA WATER RESOURCES DEPARTMENT 11

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

DATE CHANGES MADE SIGNATURE

12 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

1. PURPOSE

The purpose of this Emergency Action Plan (EAP) is to identify emergency situations that could threaten

Krishnarajasagara Dam [KA06HH0020] and to plan for an expedited, effective response to prevent

failure of the dam and warn downstream residents of impending danger. This plan defines the

notification procedures to be followed in the event of a potentially hazardous situation. The procedures

are intended to protect lives and prevent property damage from an excessive release of water from the

dam spillway or an uncontrolled outflow of water from the breached portion of the dam.

2. DAM DESCRIPTION

2.1 General

Krishnarajasagara Dam and Reservoir are owned and operated by Cauvery Neeravari Nigam Limited

(CNNL) under Karnataka Water Resources Department. The reservoir is constructed on Cauvery river in

Mandya district, approximately 15 Kms upstream of the historic town of Sriangapattana, 45 km

southwest of Mandya city and 20 km northwest of Mysuru city, Karnataka. The dam is constructed below

the confluence of river Cauvery with its two tributaries, the Hemavathy and the Lakshmanathirtha. The

construction of dam was commenced in 1911 and completed in 1931. The reservoir was constructed to

serve for multiple purposes.

The catchment area of the river above the dam is 10619 square kms and lies in the region which receives an

annual precipitation of 635 cms (250 inches) in the western ghat portion having an area of 4871.79 Sq.Kms

and 71.12 cms. (28 inches) to 101.6 cms (40 inches) in the plain areas having an area of 5747.21 Sq.Kms.

The flow of the river at the site of the dam fluctuates from a normal high flood of 2831.66 Cumecs (1,00,000

cusecs) during the monsoon season to a low flow of 2.83 cumecs (100 cusecs) during summer. The highest

flood occurred in river is in the year 1924 which was 8210.65 Cumecs (2,90,000 Cusecs).

The dam is 2621 metres (860 feet) long and 39.62 metres (130 feet) high above the river bed and is intended

to store 37.79 meters (124 feet) depth of water at full reservoir level (Figure 1). The height above the

deepest foundation is 42.672 meters (140 feet). The live storage capacity of the reservoir is 1244.06 MCM.

(43.934 TMC) above the cill of the irrigation supply sluices which are at 18.29 meters (60 ft.) above bed level

and the gross storage capacity is 1368 68 MCM. (48.335 TMC). A motorable roadway of 4.42 metres wide is

formed on top of the dam with ornamental parapets on both side with electric lights.

There are in all 173 sluices in the dam, of different sizes at various levels provided for 1. flood disposal

and scouring, 2. irrigation and 3. power generation.The flood disposal and scouring sluices comprises of

a) 40 vents of 2.44 metre (8 feet) X 3.66 metre (12 feet) at cill level of 32.31 metre (106 ft.) above bed

level is situated immediately after the entrance gate at the south end. These are provided with lift

gates which operates electrically by a travelling crane.

KARNATAKA WATER RESOURCES DEPARTMENT 13

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Figure 1 : General Layout of Krishnarajasagara Dam

b) 48 vents measuring 3 meter (10 feet) X 2.44 meter (8 feet) at cill level 31.39 meters (103 ft.) above

bed level are provided with lift gates operates electrically by another travelling crane. c) 48 vents of 3 metre (10 feet) X 3 meter (10 feet) at cill level of 34.75 meter (114 feet) above bed

level provided with automatic gates with six batteries each. These gates were designed to operate

automatically when water level reaches 37.8 metre (124 feet) and close automatically when it falls

below that level. As per the available old records, these gates were operated by lifting with the help

of cranes d) 16 sluices of 3 meter (10 feet) X 6 meter (20 feet) at cill level of 24.38 meter (80 feet) above bed

level, each provided with a gate operated electrically by an independent crab winch. e) 8 deep level scouring sluices of 1.83 meter (6 feet) X 3.66 meter (12 feet) at cill level of 3.66 meter

(12 feet) above bed level are provided at the center of the dam i.e., at the original river course.

These gates operate mechanically by independent crab winches.

14 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

f) 3 scouring sluices of 1.83 meter (6 feet) X 4.57 meter (15 feet) at cill level of 15.24 meter (50 feet)

above bed level on the north bank of the river operates mechanically by independent crab winches.

The maximum discharge which can be passed through all the above sluices is 9910.8 cumecs (3,50,000

cusecs). The surplus water is released through suitable waste weir channels with necessary protective

works.

The irrigation sluices comprise of;

a. 3 vents of 1.83 meters (6 feet) X 3.66 meter (12 feet) at cill level of 18.29 meters (60 feet) above

bed level is situated on the north bank of the river to feed the North Bank High Level Canal known

as the Visvesvaraya Canal which is irrigating 77,193 Ha (1,90,753 acres) and also a Right Bank

Low Level Channel having command area of 579 hectares (1430 acres). These irrigation sluice

gates operate independently mechanically by crab winches. b. 1 vent of 1.83 meters (6 feet) X 2.44 meter (8 feet) at cill level of 18.29 meter (60 feet) above bed is

located at the south end of the Dam. The Right Bank Low Level Channel takes off from this vent

emerging through a tunnel immediately below the entrance gate of the Dam. This channel is

designed to irrigate an area of 1533 Ha (3789 acres). These irrigation sluice gates operate

independently mechanically by crab winches. c. 1 vent of 2 gates each of 3.5 meters (11.5 feet) X 3.5 meter (11.5 feet) size at cill level of 18.29

meter (60 feet) above bed is located at the south end of the dam known as DD Urs Canal (Varuna

Canal ) is the Right Bank High level Canal of Krishnarajasagara Dam takes off through a tunnel of

135 m length. It runs for a length of 126.50 kms with carrying capacity of 980 cusecs to irrigate

command area of 31728 Ha (78400 acres).

The power generation sluice comprises of;

a) Turbine sluices consisting of four pen-stock pipes of 1.83 meter (6 feet) diameter with centers fixed

at 16.15 meter (53 feet) above bed.

A vicinity map showing the location of the Krishnarajasagara dam is presented in ANNEXURE 1 :

VICINITY MAP and its salient features are summarized in ANNEXURE 16 : DAM DESCRIPTION. Inundation

maps showing the areas subject to flooding as a result of a dam failure along with other recurrent flood

scenarios are provided in the ANNEXURE 10 : INUNDATION MAPS of this document.

2.2 Reservoir Operations

Krishnarajasagara dam though conceived as multi-purpose project with an emphasis on irrigation and

hydropower generation, due to increase in habitats in the downstream areas, flood control is also

considered as one of the important purposes of the project. Flood forecasting of Krishnarajasagara dam

is done by observing the rise in the water level of the river with respect to a gauge post established at

the Chunchanakatte for Cauvery river, at Akkihebbal for Hemavathy river and at Hundavadi for

KARNATAKA WATER RESOURCES DEPARTMENT 15

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Lakshmanatheertha river on the upstream side of the reservoir. By observing the hourly reservoir level,

the flood is calculated and gates are operated accordingly to release the flood water and to maintain the

safe water level in the reservoir. A gate operating schedule and sequence of opening and closing of the

gates and methodology of regulation of flood is prepared and the scheduled is followed.

2.3 Gate Operations Schedule for +80Ft level Surplus Sluices

In case of notch flow, the discharge (Q) through each gate is given by Q=Lh1.5C√(2g), h is the head

measured from the crest level of the spillway up to the reservoir water level below RL+102’. In case of

Orifice Flow, the discharge (Q) through each gate is given by Q=C*A√(2gh), h is the head measured

from the centre of the orifice opening up to the reservoir water level above RL+102’. Basic Values of

C√(2g) is taken from the Book titled “Krishnarajasagara Dam Sluices” authored By Shri. M C Sampath

Iyengar - 1948. Discharge coefficients (C) for notch flow through +80‘level surplus sluices of K R Sagara

dam up to RL +102’ recommended in the Book are considered in computation of Discharge using the

equation Q=C√ (2g) LH1.5 where H= head over the crest, L = length of Spillway; =10’

Table 1 : Notch flow discharge in Cusecs through +80 ft gates upto +102' level

RL In Feet C√(2g) as recommended HEAD Discharge through Discharge through

each gate(q) all 16 gates (Q)

80 3.04 0 0 0

81 3.04 1 30 480

82 3.04 2 86 1376

83 3.04 3 158 2528

84 3.04 4 243 3888

85 3.04 5 340 5440

86 3.04 6 447 7152

87 3.04 7 563 9008

88 3.04 8 688 11008

89 3.04 9 821 13136

90 3.04 10 961 15376

91 3.03 11 1105 17680

92 3.03 12 1260 20160

93 3.02 13 1416 22656

94 3.02 14 1582 25312

95 3.03 15 1760 28160

96 3.03 16 1939 31024

97 3.04 17 2131 34096

98 3.04 18 2322 37152

99 3.05 19 2526 40416

100 3.05 20 2728 43648

101 3.06 21 2945 47120

102 3.06 22 3158 50528

16 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 2 : The values of C√(2g) for +80 ft gates for various levels of gate openings

Gate opening in feet

L in feet 1.5 3 4.5 6 7.5 9 10.5 12 13.5 15 16.5 18 19.5 20

Values of C√(2g)

102 5.41 5.34 5.22 5.16 5.1 5.05 5.01 4.95 4.91 4.87 4.82 4.78 4.77 4.74

105 5.42 5.36 5.25 5.18 5.14 5.09 5.05 5.01 4.97 4.95 4.92 4.92 4.95 5.06

107 5.43 5.37 5.26 5.2 5.16 5.13 5.1 5.06 5.03 5.02 5.02 5.04 5.1 5.29

109 5.45 5.38 5.29 5.22 5.18 5.17 5.14 5.11 5.1 5.09 5.11 5.14 5.24 5.48

111 5.46 5.4 5.3 5.24 5.22 5.2 5.18 5.17 5.15 5.16 5.2 5.25 5.37 5.65

113 5.48 5.42 5.32 5.27 5.24 5.24 5.22 5.21 5.22 5.23 5.27 5.34 5.48 5.81

115 5.49 5.43 5.34 5.29 5.26 5.27 5.26 5.26 5.26 5.3 5.34 5.43 5.6 5.96

117 5.5 5.44 5.35 5.3 5.3 5.3 5.31 5.3 5.33 5.37 5.42 5.52 5.71 6.1

119 5.51 5.45 5.36 5.33 5.33 5.34 5.34 5.36 5.38 5.43 5.5 5.6 5.82 6.25

121 5.53 5.46 5.37 5.35 5.35 5.37 5.39 5.4 5.44 5.5 5.57 5.69 5.92 6.38

124 5.54 5.47 5.39 5.37 5.38 5.4 5.43 5.45 5.49 5.55 5.64 5.77 6.03 6.52

KARNATAKA WATER RESOURCES DEPARTMENT 17

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 3 :The values of C√(2g) for +80 ft gates interpolated for intermediate levels of gate openings

Gate opening in feet

RL

20 in feet 1.5 3 4.5 6 7.5 9 10.5 12 13.5 15 16.5 18 19.5

102 5.410 5.340 5.220 5.160 5.100 5.050 5.010 4.950 4.910 4.870 4.820 4.780 4.770 4.740

103 5.416 5.346 5.228 5.170 5.113 4.992 5.029 4.973 4.936 4.901 4.851 4.825 4.833 4.829

104 5.422 5.352 5.236 5.180 5.126 5.007 5.048 4.996 4.962 4.932 4.888 4.870 4.895 4.917

105 5.428 5.358 5.244 5.189 5.139 5.022 5.067 5.019 4.989 4.963 4.925 4.915 4.957 5.004

106 5.434 5.364 5.251 5.199 5.151 5.038 5.086 5.041 5.015 4.994 4.962 4.960 5.018 5.091

107 5.440 5.370 5.259 5.208 5.164 5.053 5.106 5.064 5.041 5.025 5.000 5.005 5.079 5.176

108 5.446 5.376 5.267 5.218 5.177 5.068 5.125 5.087 5.068 5.056 5.037 5.050 5.139 5.261

109 5.452 5.382 5.274 5.227 5.189 5.083 5.144 5.109 5.094 5.087 5.074 5.095 5.198 5.345

110 5.457 5.387 5.282 5.237 5.202 5.098 5.163 5.132 5.121 5.117 5.111 5.140 5.257 5.428

111 5.463 5.393 5.290 5.246 5.215 5.114 5.182 5.155 5.147 5.148 5.149 5.185 5.316 5.511

112 5.469 5.399 5.298 5.256 5.228 5.129 5.201 5.178 5.173 5.179 5.186 5.230 5.373 5.592

113 5.475 5.405 5.305 5.266 5.240 5.144 5.220 5.200 5.200 5.210 5.223 5.275 5.431 5.673

114 5.481 5.411 5.313 5.275 5.253 5.159 5.239 5.223 5.226 5.241 5.260 5.320 5.488 5.754

115 5.487 5.417 5.321 5.285 5.266 5.174 5.258 5.246 5.252 5.272 5.297 5.365 5.544 5.833

116 5.493 5.423 5.329 5.294 5.279 5.189 5.277 5.269 5.279 5.303 5.335 5.410 5.600 5.912

18 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Gate opening in feet

RL

in feet 1.5 3 4.5 6 7.5 9 10.5 12 13.5 15 16.5 18 19.5

117 5.499 5.429 5.336 5.304 5.291 5.205 5.296 5.291 5.305 5.334 5.372 5.455 5.655

118 5.505 5.435 5.344 5.313 5.304 5.220 5.316 5.314 5.331 5.365 5.409 5.500 5.710

119 5.511 5.441 5.352 5.323 5.317 5.235 5.335 5.337 5.358 5.396 5.446 5.545 5.765

120 5.517 5.447 5.359 5.332 5.329 5.250 5.354 5.359 5.384 5.427 5.483 5.590 5.819

121 5.522 5.452 5.367 5.342 5.342 5.265 5.373 5.382 5.411 5.457 5.521 5.635 5.872

122 5.528 5.458 5.375 5.352 5.355 5.281 5.392 5.405 5.437 5.488 5.558 5.680 5.925

123 5.534 5.464 5.383 5.361 5.368 5.296 5.411 5.428 5.463 5.519 5.595 5.725 5.978

124 5.540 5.470 5.390 5.370 5.380 5.400 5.430 5.450 5.490 5.550 5.640 5.770 6.030

Table 4 : Discharge in Cusecs through each gate at +80 Ft level above +102Ft level Gate opening in

1.5 3 4.5 6 7.5 9 10.5 12 13.5 15 16.5 18 19.5 feet

Reservoir RL Discharge in cusecs per gate of +80‘level surplus sluices of K R Sagara Dam

102 374 725 1043 1348 1633 1898 2149 2371 2580 2772 2939 3093 3244

103 383 743 1072 1386 1682 1959 2221 2457 2680 2887 3073 3249 3426

104 392 762 1099 1423 1729 2019 2292 2541 2778 3001 3205 3402 3606

105 401 779 1127 1459 1776 2077 2362 2624 2874 3112 3336 3554 3784

106 409 797 1153 1495 1822 2135 2430 2706 2969 3223 3464 3703 3961

20

5.990

6.068

6.145

6.221

6.297

6.372

6.446

6.519

20

3284

3499

3713

3926

4137

KARNATAKA WATER RESOURCES DEPARTMENT 19

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Gate opening in 1.5 3 4.5 6 7.5 9 10.5 12 13.5 15 16.5 18 19.5

feet

Reservoir RL Discharge in cusecs per gate of +80‘level surplus sluices of K R Sagara Dam

107 418 814 1179 1530 1867 2192 2498 2786 3063 3332 3591 3851 4136

108 426 831 1205 1564 1912 2248 2565 2866 3155 3440 3717 3998 4310

109 434 848 1230 1598 1956 2303 2631 2944 3247 3546 3841 4143 4482

110 443 864 1255 1632 1999 2357 2696 3022 3338 3652 3964 4286 4653

111 451 880 1280 1665 2042 2411 2761 3098 3428 3756 4086 4429 4823

112 459 896 1304 1698 2084 2464 2825 3174 3517 3860 4207 4570 4991

113 466 912 1327 1730 2126 2516 2888 3250 3605 3963 4326 4709 5157

114 474 927 1351 1762 2168 2568 2951 3324 3692 4065 4445 4847 5323

115 482 942 1374 1794 2209 2619 3013 3398 3779 4166 4563 4984 5487

116 489 957 1396 1825 2249 2670 3075 3471 3865 4267 4679 5120 5649

117 497 972 1419 1856 2290 2720 3136 3544 3951 4367 4795 5254 5811

118 504 987 1441 1887 2330 2770 3197 3616 4036 4466 4909 5387 5970

119 511 1001 1463 1917 2369 2819 3258 3688 4121 4564 5023 5519 6129

120 519 1015 1484 1947 2409 2868 3318 3759 4204 4662 5136 5650 6285

121 526 1029 1505 1977 2448 2916 3378 3829 4288 4760 5248 5779 6441

122 533 1043 1526 2007 2486 2964 3437 3899 4371 4857 5359 5907 6594

123 540 1057 1547 2036 2525 3012 3496 3969 4454 4953 5468 6033 6747

124 547 1070 1567 2065 2563 3059 3555 4038 4536 5049 5578 6158 6897

20

4348

4556

4763

4969

5173

5375

5574

5772

5968

6161

6351

6539

6724

6906

7085

7261

7434

7602

20 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 5 : Total discharge in Cusecs through all 16 gates at +80ft level above +102ft Gate opening in feet

Reservoir RL in feet 1.5 3 4.5 6 7.5 9 10.5 12 13.5 15 16.5 18 19.5 20

102 5984 11600 16688 21568 26128 30368 34384 37936 41280 44352 47024 49488 51904 52544

103 6128 11888 17152 22176 26912 31344 35536 39312 42880 46192 49168 51984 54816 55984

104 6272 12192 17584 22768 27664 32304 36672 40656 44448 48016 51280 54432 57696 59408

105 6416 12464 18032 23344 28416 33232 37792 41984 45984 49792 53376 56864 60544 62816

106 6544 12752 18448 23920 29152 34160 38880 43296 47504 51568 55424 59248 63376 66192

107 6688 13024 18864 24480 29872 35072 39968 44576 49008 53312 57456 61616 66176 69568

108 6816 13296 19280 25024 30592 35968 41040 45856 50480 55040 59472 63968 68960 72896

109 6944 13568 19680 25568 31296 36848 42096 47104 51952 56736 61456 66288 71712 76208

110 7088 13824 20080 26112 31984 37712 43136 48352 53408 58432 63424 68576 74448 79504

111 7216 14080 20480 26640 32672 38576 44176 49568 54848 60096 65376 70864 77168 82768

112 7344 14336 20864 27168 33344 39424 45200 50784 56272 61760 67312 73120 79856 86000

113 7456 14592 21232 27680 34016 40256 46208 52000 57680 63408 69216 75344 82512 89184

114 7584 14832 21616 28192 34688 41088 47216 53184 59072 65040 71120 77552 85168 92352

115 7712 15072 21984 28704 35344 41904 48208 54368 60464 66656 73008 79744 87792 95488

116 7824 15312 22336 29200 35984 42720 49200 55536 61840 68272 74864 81920 90384 98576

117 7952 15552 22704 29696 36640 43520 50176 56704 63216 69872 76720 84064 92976 101616

118 8064 15792 23056 30192 37280 44320 51152 57856 64576 71456 78544 86192 95520 104624

119 8176 16016 23408 30672 37904 45104 52128 59008 65936 73024 80368 88304 98064 107584

KARNATAKA WATER RESOURCES DEPARTMENT 21

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Gate opening in feet Reservoir

RL in feet 1.5 3 4.5 6 7.5 9 10.5 12 13.5 15 16.5 18 19.5 20

120 8304 16240 23744 31152 38544 45888 53088 60144 67264 74592 82176 90400 100560 110496

121 8416 16464 24080 31632 39168 46656 54048 61264 68608 76160 83968 92464 103056 113360

122 8528 16688 24416 32112 39776 47424 54992 62384 69936 77712 85744 94512 105504 116176

123 8640 16912 24752 32576 40400 48192 55936 63504 71264 79248 87488 96528 107952 118944

124 8752 17120 25072 33040 41008 48944 56880 64608 72576 80784 89248 98528 110352 121632

22 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

2.4 Gate Operations Schedule for +103ft level Surplus Sluices

In case of Notch Flow the discharge (Q) through each gate is given by Q=Lh1.5C√(2g), h is the head

measured from the crest level of the spillway up to the reservoir water level below RL+112.3’. Value of

C√(2g) =3.02 for all levels up to RL +112.3’ for notch Flow. In case of Orifice Flow, the discharge (Q)

through each gate is given by Q=C*A√(2gh), h is the head measured from the centre of the orifice

opening up to the reservoir water level above RL+112.3 ft. Basic Values of C√(2g) is taken from the

Book titled “Krishnarajasagara Dam Sluices” authored By Shri. M C Sampath Iyengar -1948.

Table 6 : Values of C√(2g) for Orifice flow above RL +112.3 ft

Elevation in Feet When adjacent gates are When alternate gates are opened

opened

112.3 4.67 4.7

113 4.67 4.7

114 4.95 4.99

115 5.23 5.27

116 5.51 5.54

117 5.77 5.8

118 6.00 6.02

119 6.18 6.19

120 6.31 6.31

121 6.4 6.4

122 6.46 6.46

123 6.476 6.476

124 6.476 6.476

Table 7 : Total Combined Discharge in Cusecs for Notch Flow through +103ft gates upto +112.3' level

Elevation Discharge through each gate; Combined Discharge through

in feet Q=C√(2g) LH^1.5 48 gates=48*Q

103 0 0

104 30 1440

105 85 4080

106 157 7536

107 242 11616

108 338 16224

KARNATAKA WATER RESOURCES DEPARTMENT 23

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Elevation Discharge through each gate; Combined Discharge through

in feet Q=C√(2g) LH^1.5 48 gates=48*Q

109 444 21312

110 559 26832

111 683 32784

112.3 857 41136

Table 8 : Total Combined Discharge in Cusecs for Orifice flow through +103ft Gates from +112.3’

to +124’ level

Elevation in When alternate gates are opened When adjacent gates are opened

feet Discharge through each gate; Discharge through each Total Discharge

Q=C*A√(2gh) gate; Q=C*A√(2gh) = 48*Q

112.3 866 860 41280

113 921 915 43920

114 1056 1048 50304

115 1192 1183 56784

116 1330 1322 63456

117 1467 1460 70080

118 1597 1592 76416

119 1715 1713 82224

120 1820 1820 87360

121 1916 1916 91968

122 2002 2002 96096

123 2072 2072 99456

124 2136 2136 102528

2.5 Gate Operations Schedule for +106ft level Surplus Sluices

In case of Notch Flow the discharge (Q) through each gate is given by Q=Lh1.5C√(2g), h is the head

measured from the crest level of the spillway up to the reservoir water level below RL+119.5’. Value of

C√(2g) =3.09 for all levels up to RL +119.5’ for notch Flow. In case of Orifice Flow, the discharge (Q)

through each gate is given by Q=C*A√(2gh), h is the head measured from the centre of the orifice

opening up to the reservoir water level above +119.5’. Basic Values of C√(2g) is taken from the Book

titled “Krishnarajasagara Dam Sluices” authored By Shri. M C Sampath Iyengar -1948.

24 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 9 : Values of C*√(2g) for Orifice flow for +106’ gates upto 124’ level

Elevation in feet Values of C*√(2g) for Orifice flow

119.5 5

120 5

121 5

122 5

123 5.321

124 5.321

Table 10 : Total Discharge in Cusecs for Notch flow through +106ft Gates upto 119.5’ level

Discharge through Combined Discharge RL in feet

each gate; Q through 40 gates=40*Q

106 0 0

107 25 1000

108 70 2800

109 128 5120

110 198 7920

111 276 11040

112 363 14520

113 458 18320

114 559 22360

115 667 26680

116 782 31280

117 902 36080

118 1028 41120

119 1159 46360

119.5 1226 49040

KARNATAKA WATER RESOURCES DEPARTMENT 25

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 11 : Total Discharge in Cusecs for Orifice flow through +106ft Gates above 119.5’ level

RL in feet Discharge through

Combined Discharge

through 40 gates = 40 * Q each gate; Q

119.5 1315 52600

120 1358 54320

121 1440 57600

122 1518 60720

123 1694 67760

124 1770 70800

2.6 Gate Operations Schedule for +114ft level Surplus Sluices

In case of Notch Flow the discharge (Q) through each gate is given by Q=Lh1.5C√(2g), h is the head

measured from the crest level of the spillway up to the reservoir water level below RL+119.5’. Value of

C√(2g) =3.00 for all levels up to RL +124’ for notch Flow. Basic Values of C√(2g) is taken from the Book

titled “Krishnarajasagara Dam Sluices” authored By Shri. M C Sampath Iyengar -1948.

Table 12 : Total Discharge in Cusecs for Notch flow of +114ft Gates upto +124’ level

RL in feet Discharge through each gate; Q Combined Discharge through 40 gates=40*Q

114 0 0

115 30 1440

116 85 4080

117 156 7488

118 240 11520

119 335 16080

120 441 21168

121 556 26688

122 679 32592

123 810 38880

124 948 45504

26 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

GATE OPERATION SCHEDULE FOR +80' LEVEL SURPLUS SLUICES OF K R SAGARA DAM (DISCHARGE THROUGH ALL 16 GATES )

FRL:124.80 ft

Re

serv

ior

Ele

vati

on

(ft

)

124

123

122

121

120

119

118

117

116

115

114

113

112

111

110

109

108

107 GO 1.5

106 GO 3

GO 4.5

105 GO 6

104 GO 7.5

103 GO 10.5

GO 16.5

102 GO 18

101 GO 19.5

100 GO 20

99 FREE FLOW THROGH ALL GATES Note: 1) The Chart should be used for Uniform /Equal

GO 12

98

opening of all the 16 gates. GO 13.5

97 GO 15 96 2) Vent size - (10' X 20')

95

94 GO =GATE OPENING

93 92

91

90

89

88

87

86

85

84

83

82

81

80 SILL LEVEL OF SLUICE 80 ft

0 4000 8000 12000 16000 20000 24000 28000 32000 36000 40000 44000 48000 52000 56000 60000 64000 68000 72000 76000 80000 84000 88000 92000 96000 100000 104000 108000 112000 116000 120000

Discharge (cusecs)

Figure 2 : Gate Operation Schedule for +80' level surplus sluices of KR Sagara Dam

KARNATAKA WATER RESOURCES DEPARTMENT 27

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

28 DAM REHABILITATION AND IMPORVEMENT PROJECT

FRL:124.80

ftEmerge

ncy Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

GATE OPERATION SCHEDULE FOR +103' LEVEL SURPLUS SLUICES OF K R SAGARA DAM (DISCHARGE THROUGH EACH GATE-ORIFICE FLOW WHEN

ADJACENT GATES OPEN )

Re

serv

oir

ele

vati

on

(ft

)

124

123

122

121

120

119

118

117

116

115

114

113

112

111

NOTCH FLOW 110

109

ORIFICE FLOW WHEN

ADJACENT GATES OPEN

108

NOTE: 1) Discharge through each gate.

107 2) Vent size - (10' X 8')

106

105

104

SILL LEVEL OF SLUICE 103 ft 103

0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200

Discharge (cusecs)

Figure 3 : Gate Operations Schedule for +103' level surplus sluices of KR Sagara Dam (Discharge thorugh each gate - Orifice flow when adjacent gates open)

KARNATAKA WATER RESOURCES DEPARTMENT 29

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

GATE OPERATION SCHEDULE FOR +103' LEVEL SURPLUS SLUICES FRL:124.80 ft

OF K R SAGARA DAM (DISCHARGE THROUGH ALL 48 GATES )

124

123

122

121

120

119

(ft)

118

elev

a

tion

117

Res

ervo

ir

116

114 115

113

112

111

110 NOTCH FLOW

109

108

ORIFICE FLOW

Note: 1) The Chart should be used for Uniform /Equal

107 opening of all the 48 gates. 2) Vent size - (10' X 8')

106

105

104 SILL LEVEL OF SLUICE

103

103 ft

0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 110000

Discharge(cusecs)

Figure 4 : Gate Operations Schedule for +103’ level surplus sluices of KR Sagara Dam (Discharge

through all 48 gates)

30 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

GATE OPERATION SCHEDULE FOR +106' LEVEL

SURPLUS SLUICES

OF K R SAGARA DAM (DISCHARGE THROUGH

FRL:124.80 ft EACH GATE ) 124

123

122

121

120

119

118

117

(f t)

116

Elev

a

tion

115

114

Rese

rvio

r

113

112

NOTE: 1) Discharge

through each gate.

2) Vent size - (8'

X 12')

108

107

106 SILL LEVEL OF SLUICE 106 ft

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Discharge (cusecs)

Figure 5 :Gate Operation Schedule for +106’ level surplus sluices of KR Sagara Dam (Discharge

through each gate)

KARNATAKA WATER RESOURCES DEPARTMENT 31

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

GATE OPERATION SCHEDULE FOR +106' LEVEL SURPLUS SLUICES OF K R SAGARA DAM (DISCHARGE THROUGH ALL 40 GATES )

FRL:124.80 ft

Re

serv

ior

Ele

vati

on

(ft

)

124

123

122

121

120

119

118

117

116

115

114

113

112 Note: 1) The Chart should be used for Uniform /Equal

111 opening of all the 40 gates. 2) Vent size - (8' X 12')

110

109

108

107 SILL LEVEL OF SLUICE 106 ft

106

0 8000 16000 24000 32000 40000 48000 56000 64000 72000

Discharge (cusecs)

Figure 6 : Gate Operation Schedule for +106' level surplus sluices of KR Sagara Dam (Discharge through all 40 Gates)

32 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

GATE OPERATION SCHEDULE FOR +114' LEVEL SURPLUS SLUICES OF K R SAGARA DAM (DISCHARGE THROUGH EACH GATE )

FRL:124.80 ft

124

123

122

121

(ft)

120

Elev

atio

n

119

Re

serv

ior

118

NOTE: 1)Discharge through each

gate.

117 2) Vent size - (10' X 10')

116

115

SILL LEVEL OF SLUICE 114 ft

114

0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950

Discharge (cusecs)

Figure 7 : Gate Operation Schedule for +114’ level surplus sluices of KR Sagara Dam (Discharge

through each gate)

KARNATAKA WATER RESOURCES DEPARTMENT 33

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

GATE OPERATION SCHEDULE FOR +114' LEVEL SURPLUS SLUICES OF K R SAGARA DAM FRL:124.80 ft (DISCHARGE THROUGH ALL 48 GATES )

Re

serv

ior

Elev

atio

n (

ft)

124

123

122

121

120

119

118

Note: 1) The Chart should be used for Uniform /Equ opening of all the 48 gates.

2) Vent size - (10' X 10') 117

116

115

SILL LEVEL OF SLUICE 114 ft

114 0 4000 8000 12000 16000 20000 24000 28000 32000 36000 40000 44000 48000

Discharge (cusecs)

Figure 8 : Gate Operation Schedule for +114’ level surplus sluices of KR Sagara dam

(Discharge through all 48 gates)

34 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

GATE OPERATION SCHEDULE FOR +12' LEVEL SCOURING SLUICES OF K R SAGARA DAM (DISCHARGE THROUGH EACH GATE )

128

124 FRL:124.80 ft

120

116

112

108

104

100

96

92

88

)

84

(ft

80

Elev

atio

n

76

72

68

Res

ervo

ir

64

60

56 NOTE: 1)Discharge 52 through each gate.

2) Vent size -

48 (6' X 12')

44

40

36

32

28

24

20

16 SILL LEVEL OF SLUICE 12 ft

12 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 3600 3900

Discharge in cusecs

Figure 9 :Gate Operations Schedule for +12’ level scouring sluices of KR Sagara Dam

KARNATAKA WATER RESOURCES DEPARTMENT 35

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

2.7 Rule Curve of Reservoir Operations

The Krishnarajasagara reservoir rule curve is developed month vs storage capacity and month vs

reservoir level for the Full Reservoir Level of 124.80 feet (752.32) and same is shown below;

Figure 10 : Rule Curve of Krishnarajasagara Dam

Table 13 : Upper Limit and Lower Limit of Reservoir Operations Rule Curve for Krishnarajasagara Dam

2.8 Operation of Gates when reservoir level range from +122 ft to +124 ft

+80ft sluice gates are operated either fully or partially but operate all other gates only for full opening of

vents and never open the gates partially. Operate the +80ft, +103ft, +106ft and +114 ft gates which are

automatic in the same manner when the reservoir levels are ranging from +92ft upto +122ft.

2.9 Operation of Gates when reservoir level during excess flood

Water level in the lake is not allowed to rise above +123ft when the flood is rising and exceeds one lakh

cusecs in the months of July and August, which is peak monsoon period in the Cauvery river basin,

Impounding of water in the reservoir from +123ft to +124ft is when the flood begins to fall and inflow is

less than one lakh cusecs.

36 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Reservoir level is reduced to +123ft when the reservoir is full or nearly full when the flood exceeding one

lakh is observed and full reservoir level +124ft is attained when the flood recedes below one lakh cusecs.

Opening of the +50ft sluice gates for full height when the intensity of the flood is seen to rise above 2½

lakh cusecs and in addition, +12ft sluice gates are also opened when the intensity of flood further

increases above three lakhs cusecs.

2.10 Sequence of Opening or Closing of Gates

During the time of discharge, vertical surplus sluice gates shall be opened to release the flood in the

following sequence. Out of 156 flood gates, initially 40 numbers of +106’ level gates are operated through

gantry crane alternately.The sequence of Gate No’s are 2, 4, 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26, 28, 30,

32, 34, 36, 38, 40 from ‘0’ M chainage to ‘160’ & 39, 37, 35, 33, 31, 29, 27, 25, 23, 21, 19, 17, 15, 13,

11, 9, 7, 5, 3, 1 and vice-versa.

Secondly flood shall be released through 48 numbers of +103’ level gates operated through crane (lifting

mechanism) alternately. The sequence of Gate No’s are 2, 4, 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26, 28,

30, 32, 34, 36, 38, 40, 42, 44, 46, 48 from ‘160’ M chainiage to ‘370’ M & 47, 45, 43, 41,39, 37, 35, 33,

31, 29, 27, 25, 23, 21, 19, 17, 15, 13, 11, 9, 7, 5, 3, 1 and vice-versa.

Thirdly excess flood shall be released through 16 numbers of +80’ level gates to be operated individually

by electric motor. The sequence of Gate No’s are Gate No 16 & Gate No 1, Gate No 15 & Gate No 2, Gate No 14 & Gate No 3, Gate No 13 & Gate No 4. Gate No 12 & Gate No 5, Gate No 11 & Gate No 6,

Gate No 10 & Gate No 7, Gate No 9 & Gate No 8.

Table 14 : Trigger level of Alert for Normal Discharges of KR Sagara Dam

SL No Discharge (m3/s) Discharge Duration (Hrs) Level of Alert

1 < 5,000 Any Blue

2 > = 5,000 48 Orange

3 < 10,000 24 Orange

4 > = 10,000 Any Red

3. RESPONSBILITIES

3.1 Dam Owner’s Responsibilities

The Dam Owner, Cauvery Neeravari Nigam Limited is responsible for all dam operation and maintenance.

This EAP is not intended to designate a specific person for a specific responsibility but instead will designate

the person’s duties or job description for both, before and during Emergency event (Table 15).

KARNATAKA WATER RESOURCES DEPARTMENT 37

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 15 : Dam Owner's Responsibilities

Office Designation Responsibilities (During Preparedness and Emergency Events)

Preparedness Responsibilities:

▪ Coordinate routine inspections and Dam’s operations.

▪ Ensure effective transmission of hydro-metrological and stream flow

data through different means.

▪ Ensure proper accessibility to all vulnerable points for constant

monitoring during emergency situations.

▪ Identify primary and secondary communication systems, both internal

(between persons at the dam) and external (between dam personnel

and outside entities)

▪ Provide security measures at the dam (CCTV surveillance, security

guards, fencing).

▪ Ensure the availability of adequate staff at dam site during holidays,

nights and round the clock in weekdays.

▪ Ensure that the EAP is functional and staffs are familiar with their

responsibilities.

▪ Ensure that a signboard is installed and clearly visual in different

locations at dam site and operation room, with the most common

evidence of distress and corresponding levels of alert and remedial

Executive Engineer actions.

(Emergency Planning ▪ Ensure all the equipment / means at dam site to response to an

emergency are easily accessible and well maintained (generators, Manager)

vehicles, lanterns, radios, heavy equipment, etc.)

▪ Ensure the installation and proper maintenance of a warning system

(sirens, horns) in the critical areas within the floodplain (less than 2

hours of wave arrival time)

▪ Ensure the current approved version of the EAP is available to all

relevant stakeholders (those who have a functional role in the

emergency response)

▪ Ensure all necessary means to manage the emergency response are

available and operative in the Emergency Operation Centre.

▪ Participate in exercises for test / improvement of this EAP.

▪ In charge of organizing publicity at strategic points KR Sagara,

Mandya and Mysuru for forewarning people on opening of gates.

During Emergency Responsibilities:

▪ Ensure a continuous and reliable communication with dam site officers

▪ Receive and assess any distress condition as notified by site

engineers, observer or regular inspection.

▪ Classify the incident / distress condition reported by the observer into

the different Emergency levels (Blue, Orange, Red) based on the ANNEXURE-12.

38 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Office Designation Responsibilities (During Preparedness and Emergency Events)

▪ Initiate / Implement the Emergency Action Plan and the Emergency

Operation Centre if it is deemed necessary.

▪ Identify the areas that would be potentially impacted by the

emergency events.

▪ Provide updates of the situation to the District(s) Disaster

Management Authority to assist them in making timely and accurate

decisions regarding warnings and evacuations.

▪ Propagate the emergency information to other relevant

stakeholders.

▪ Support the communication needs of local emergency authority.

Preparedness Responsibilities:

▪ Monitor & surveillance of dam and appurtenant structures looking for

evidence of distress as mentioned in ANNEXURE 12 : EMERGENCY

LEVEL DETERMINATION – ACTION DATA SHEET INDEX

▪ Conduct Pre and Post monsoon inspections under the direction of

Emergency Planning Manager

▪ Inform the Emergency Planning Manager about any irregular / unusual

condition at dam site and keep him / her posted about any progression

/ change

Dam Site Engineers ▪ Operate dam’s gates/under sluices, under the express direction of

Chief Engineer / Superintending Engineer / Executive Engineer

(Assistant Executive ▪ Conduct routine dam maintenance

Engineers, Assistant ▪ Collect instrumentation measurements Engineers and Junior ▪ Ensure effective working conditions of the warning systems (Sirens) Engineers)

▪ Participate in exercises for test / improvement of this EAP

During Emergency Responsibilities:

▪ Monitor the emergency event at dam site and keep posted the

Emergency Planning Manager about any change in the development

▪ Contact the suppliers / contractors

▪ Supervise the work of the labour contractors and machineries

engaged in the site for rehabilitation / remedial works

▪ Conduct the remedial actions as per Action Data Sheets as per

ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION

DATA SHEET INDEX

Preparedness Responsibilities:

▪ Ensure an annual review of the EAP

▪ Coordinate the annual / regular testing events of the EAP such as table

Superintending Engineer top exercises, mock drills, stakeholder’s consultation

▪ Coordinate training events in problem detection, evaluation and

appropriate corrective measures

▪ Supervise the functioning control room and ensure to be well equipped

with all type of information to facilitate the rescue and relief operations

KARNATAKA WATER RESOURCES DEPARTMENT 39

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Office Designation Responsibilities (During Preparedness and Emergency Events)

▪ Ensure proper access to site at the earliest possible

▪ Ensure that all related machinery / equipment are in running condition and can be deployed as per requirement at emergency site

▪ Formation of Purchase Committee / Committee in consultation with

Chief Engineer, Irrigation (South) Zone, CNNL, Mysuru for

procurement of material from appropriate source through spot

purchase. ▪ Ensure the correctness of Gauge-Discharge sites under his control

every year well before monsoon

During Emergency Responsibilities:

▪ Provide decision support and technical support to Emergency

Planning Manager as appropriate

▪ Have a constant liaison with Indian Meteorological Department (IMD)

during emergency periods related with flood events

▪ Advise the Emergency Planning Manager of the emergency level

determination, if time permits

▪ Disseminate information and make contact to utilize media as

appropriate at the time of emergency on behalf of Chief Engineer,

Irrigation (South) Zone, CNNL, Mysuru

Preparedness Responsibilities:

▪ Assist the dam owner’s officers in preparation of Action Data Sheets

ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION

DATA SHEET INDEX

▪ Recommend specific actions in order to improve the readiness of

emergency actions.

▪ Support and Monitor the remedial construction activities such as earth

moving, special investigation, etc.

▪ Decide depending upon the quantum of repair / reconstruction work,

whether the work is to be got executed through large construction firms

or purely through the department or small contractors

▪ Undertake an engineering assessment of the safety hazard at the dam

Chief Engineer in collaboration with the State Dam Safety Organization

During Emergency Responsibilities: ▪ Advice the dam’s Emergency Planning Manager / Superintending

Engineer with the emergency level determination, if time permits ▪ Advice the dam’s Emergency Planning Manager / Superintending

Engineer with remedial actions to take if Blue / Orange events occur, and if time permits

▪ Direct specific and appropriate procedures to open / close the

spillway’s gates during the reservoir operation ▪ Play the role of “Public Affair’s Officer” in case of external / public

notification should be released.

▪ Keep close watch on the different activities being carried out by different agencies at the time of emergency.

40 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

3.2 Dam Safety Organization’s Responsibilities

The following are the basic emergency planning and response roles and responsibilities for the dam

safety authorities (State and National Level). The Dam Safety Organization (DSO) is the first point of

contact for BLUE alert.

a) It is the responsibility of the Dam Safety Organization undertaking an engineering assessment of the

safety hazard at the dam. b) The DSO may inspect the Dam at its discretion and inform the Emergency Planning Manager if

Krishnarajasagara dam is considered to be BLUE alert. c) The DSO may advice the Dam Owner / Emergency Planning Manager of remedial actions to take if

BLUE / ORANGE events occur. d) The DSO may have an active role in ORANGE / RED levels of alert. The DSO may advise the Dam

Owner / Emergency Planning Manager of the emergency level determination. e) A DSO’s officer may be called on to the subject matter expert at the Emergency Operation /

Response Centre. f) The DSO is responsible for reviewing and accepting the Emergency Action Plan, before its final

publication. g) Karnataka Water Resources Department shall constitute a Dam Safety Review Panel consisting of

engineers, geologist and hydrologist to analyze the distress conditions of Dam periodically. h) Support for the preparation of asset management plans, emergency preparedness plans,

emergency warning systems, flood plain mapping, preparation of flood inundation maps in different

areas for Cauvery basin and downstream impact mitigation measures. i) Focus on legal, regulatory and technical frameworks for dam safety assurance. j) Participate / Conduct a public hearing program before finalization of the Emergency Action Plan.

3.3 Responsibilities for Notification

After an event level has been determined appropriate notification should be made in accordance with

the corresponding notification Flow Chart provided in this EAP (See Notification Flow Chart). These

Notification Flowcharts list the names and contact information and identifies who is to notified of a dam

safety incident, by whom, and in what order. Alternate contacts and their confirmed telephone number is

also listed, in case primary contact is unavailable. Each official listed in the notification flowcharts should

be familiar with it and immediately notify the Emergency Planning Manager in case of cessation of

his/her functions within the organization.

KARNATAKA WATER RESOURCES DEPARTMENT 41

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 16 : Responsibilities for Notification

Officer Designation Responsibilities

▪ Notify the District Disaster Management Authority (Deputy

Commissioner) in case of ORANGE / RED alert

▪ Notify the District Authorities about any emergency response actions

at dam site and their impacts in the downstream area (e.g. large

release)

Executive Engineer ▪ Assist the deputy Commissioners / Relief Authorities involved in the

emergency response actions with information about condition at dam

(Emergency Planning site.

Manager) ▪ Where the residences located immediately downstream of a dam that

would be inundated within minutes of a dam failure, wherein the

available warning time is very limited, in that cases, Emergency

Planning Manager will arrange to notify the residences directly without

waiting for the local administration to act upon before an emergency

situation develops.

Dam Site Engineers ▪ Keep inform the Emergency Planning Manager about the progress of the situation at dam site. ▪ Notify Dam Safety Organization and request technical advice as per

required.

▪ Notify / inform higher authorities on the mishap as per notification flow

Superintending Engineer chart of particular alert level as per situation at site.

▪ Notify / inform media representatives about the emergency situation. / Chief Engineer

▪ Define emergency situations for which each medium will be utilized

and include an example of a news release that would be the most

effective for each possible emergency, avoiding disseminate false /

overstates messages among the population.

▪ Implement the Notification Flowchart for Regional and State Disaster

Management Contacts.

▪ Contact local law enforcement authorities and relief authorities under

their jurisdiction.

Deputy Commissioner(s) ▪ Liaising and coordinating with early warning agencies like IMD, CWC, / District Disaster INCOIS, etc. for disaster specific information and disseminating the

Management Authority information for coordinating with the State Govt. and facilitating the

deployment of NDRF in the disaster affected districts during disaster

▪ Issue public announcements in coordination with Dam Owner’s

officials and media representatives about the status of the emergency

event.

▪ Notify downstream residents in vulnerable areas

Relief Authorities (Police ▪ Provide precise and accurate feedback information about the progress

Department, Civil of relief actions to the District Disaster Management Authority and

Defence, Army Forces) advice when the emergency can be terminated.

▪ Notify to their corresponding command the necessity to deploy more

resources to attend the rescue and relief actions.

42 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Officer Designation Responsibilities

▪ Disseminate wide public awareness during emergency condition of

Dam through Social Media Platform such as Facebook, Twitter,

WhatsApp & Instagram

▪ The news media, including radio, television and newspaper should be

Media Representatives utilized to the extent available and appropriate

▪ Pre-plan in coordination with Chief Engineer / Superintending

Engineer the most effective way to disseminate the most delicate and

common emergency situations among the population. Pre-defined

news shall be available in order to improve readiness of the decision-

making process.

3.4 Responsibilities for Evacuation

Evacuation and relief actions are exclusive responsibilities of Districts Authorities and Emergency Relief

Forces at local and state level. For Krishnarajasagara dam, two districts would be directly affected by a

potential failure / emergency event at the dam site and therefor, each district’s representative is

responsible for evacuation / relief actions in their jurisdiction.

Deputy Commissioner(s) acting as District’s Disaster Management Authority is responsible to

coordinate actions along with the flowing specialized teams / forces: Police and Fire Departments,

National Disaster Management Authority (Response force), Civil Defence, Army Forces.

Within their responsibilities are:

UNDER NO EMERGECNY (Preparedness)

▪ Participate in review, updates and exercise of the EAP. ▪ Dissemination among the population making them

aware about their own tasks. ▪ Conduct training/education programs among the

population in regard how to act before, during and

after emergency events such as flash floods

UNDER ORANGE ALERT

Table 17 : Districts potentially

affected by an Emergency event in

Krishnarajasagara dam

SL No District Name

1 Mandya

2 Mysuru

3 Chamarajanagar

4Ramanagar

▪ Prepare emergency response personnel for possible evacuations that may be needed if a RED alert

is declared. ▪ Provide resources as necessary to the dam owners. ▪ Serve as the primary contact responsible for coordination of all emergency actions for potentially

affected communities. ▪ Consider drafting a State of Local Emergency in preparation for RED alert. ▪ Maintain close liaison with the district and the State Governments as well as the nearest units of

Armed Forces/Central Police organizations and other relevant Central Government Organizations like KARNATAKA WATER RESOURCES DEPARTMENT 43

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Ministries of Communications, Water Resources, Health, Drinking Water, Surface Transport who

could supplement the efforts of the district administration in the rescue and relief operations.

▪ Decide in coordination with the Emergency Planning Manager when to terminate the emergency.

UNDER RED ALERT

▪ Initiate warnings and other evacuation of people under vulnerable areas as per inundation maps

enclosed in ANNEXURE 10 : INUNDATION MAPS ▪ Direct local emergency response services (may include local law enforcement) to carry out the

evacuation of people and close roads / crossings within the evacuation area (see local evacuation plan,

ANNEXURE 10 : INUNDATION MAPS and ANNEXURE 9 : SHELTERS / RELIEF CAMPS AVAILABLE

OUTSIDE THE INUNDATION AREA ▪ Declare a state of local emergency if required. ▪ Provide resources as necessary to the dam owners. ▪ Decide in coordination with the Emergency Planning Manager when to terminate the Emergency.

Police Department(s) Responsibilities:

▪ Warn the public under vulnerable areas in their jurisdiction as per the inundation maps (ANNEXURE

10 : INUNDATION MAPS) ▪ Secure and control access to evacuated areas. ▪ Install barricades in the affected bridges and crossings as per Table 21 : List of Main Crossing

Structures ▪ Assist in conducting rescue and recovery operations as required ▪ Ensure proper access to the emergency services. ▪ Prioritize the vehicle movement to the emergency site. ▪ Control the traffic and divert through alternative routes. ▪ Ensure no unauthorized persons entering into the emergency site. ▪ Permit with minimum delay the entry of authorized personnel and recognized outside agencies

vehicles etc. involved in the emergency operations that come to help. ▪ Any other responsibility as entrusted by the high officers.

Fire Department(s) and Defence Responsibilities: ▪ Assist in evacuation operations and initiate the evacuation of impact areas in cooperation with

Emergency Management Agency and Police Department. ▪ Request mutual aid for boats and initiate rescue of trapped residents as needed. ▪ Supply special equipment / teams to support rescue operations (e.g. Helicopters, divers, off-road and

amphibious vehicles) 44 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

3.5 Responsibilities for Termination and Follow-Up

Once EAP operations have begun under BLUE, ORANGE or RED alert levels, the EAP operations must

eventually be terminated and follow-up procedures are completed. EAP operations can only be

terminated after completing operations under RED or BLUE alert levels. If ORANGE event level is

declared, the operations must be designated to RED event level or BLUE before terminating the EAP

operations. Please check the Annexure: 12 for further details in when to declare an emergency event

terminated. Table 18 below shows the main responsibilities in the termination and follow-up process.

Table 18 : Termination and Follow-Up Responsibilities

Officer Designation Responsibilities (Termination and Follow-Up)

▪ Declare the termination of the emergency operations in coordination

with District Disaster Management Authority and Relief / Response

Forces

▪ Conduct a review process of the EAP procedures

Executive Engineer ▪ Identify EAP procedures that were followed effectively, as well as any

ways that the EAP could be improved.

(Emergency Planning ▪ Identify the causes that could have triggered the emergency event and Manager) propose actions to improve readiness and early detection. Support

from the Dam Safety Organizations may be requested in this regard.

▪ For major emergencies, the Emergency Planning Manager will

maintain detailed records of cost expended and will prepare a detailed

report in this regard (See 7.3, Reports, Page 52)

▪ Ensure that all the parties that participated in the EAP activities are

involved in the review process.

▪ Impose a time frame within which the EAP review is to be completed.

Superintending Engineer / ▪ Propose any ways that the EAP could be improved.

Chief Engineer ▪ Present the final results of the EAP evaluation in a documented report

to the Principal Secretary of Karnataka Water Resources Department.

Ensure that there is no danger of spread of any epidemics or water-

borne diseases after the floods.

Dam Safety Organization ▪ Identify in coordination with the Emergency Planning Manager the

causes that could have triggered the emergency event and propose

(State / Central Level) actions to improve readiness and early detection. A report should be

presented to the dam owner’s authorities in this regard.

District(s) – All Districts ▪ Declare the termination of the emergency operations in coordination

and National Disaster with Emergency Planning Manager and Relief / Response Forces.

▪ Identify EAP procedures that were followed effectively, as well as any Management Authority

ways that the EAP could be improved.

KARNATAKA WATER RESOURCES DEPARTMENT 45

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

4. COMMUNICATION NETWORKS

Every monsoon Krishnarajasagara dam authority notifies the local officials and downstream residents by

landline telephone if available, otherwise via cell phone or using Print Media / Visual Media / Radios.

The various networks for emergency use include the networks of the following:

▪ Flood Control Room, Mandya (Ph No: 08232-224600)

▪ Indian Meteorological Department

▪ Central Water Commission

▪ All affected District Police and Fire Department (Table 17)

▪ Karnataka State Natural Disaster Management Authority

▪ Defence Forces

Sample public announcement appear in ANNEXURE 14 : SAMPLE PUBLIC ANNOUNCEMENTS and

internal suggested phone messages are also available in each notification flow chart. Verification or

authentication of the situation can be made by contacting The Emergency Planning Manager and the

corresponding district disaster management officials (See District-wise Notification Flowchart).

Television, Radio and bulk SMS facilities of the local Mobile Network Operators can be used as much as

possible to notify the area residents of the possible dangers.

As per Responsibilities for Notification (Section 3.3) public announcements are to be made by the

concerned District Disaster Management Officials and the Superintending Engineer, KRS M & MIP

Circle, CNNL, Mandya in coordination with media representatives.

5. EMERGENCY DETECTION, EVALUATION AND CLASSIFICATION

5.1 Emergency Detection

5.1.1 Situations

Many dam conditions can lead to emergency situations, not all of which will require the implementation

of the EAP. However, if any of them occur, the appropriate actions must be taken. ANNEXURE 12 :

EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX of this EAP shows that most

common emergency situations that may emerge in Krishnarajasagara dam and appurtenances, along

with the corresponding specific actions to be done by each of the dam’s officials. Some of these

emergency situations are as follows:

▪ Severe Storms / Inclement Weather: Although generally not in themselves a threat to the dam,

severe storms and other inclement weather conditions can contribute to an existing problem and

hinder any remediation efforts. Severe storms also cause the uncontrolled release of floodwater and

increase flow in already rain-swollen areas.

46 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

▪ Tropical Cyclones: Tropical cyclones do occur in the area, with the potential for structural damage to

the dam, possibly resulting in its failure. If a tropical cyclone has stuck in the area, an inspection of

the dam for any signs of damage will be appropriate. ▪ Earthquakes: Krishnarajasagara dam is located in the Seismic Zone II. This zone is classified as

Low Damage Risk Zone which is liable to MSK VI or less. The IS Code assigns zone factor of 0.10

(maximum horizontal acceleration that can be experienced by a structure in this zone is 10% of

gravitational acceleration). However, appropriate post-earthquake inspections should be performed. ▪ Sabotage: A threat to damage that has been made. Appropriate actions must be taken to protect the

dam.

5.1.2 Signs of Failure

Site Engineers in coordination with the Executive Engineer are responsible for conducting routine

inspections and identifying conditions that could indicate the onset of problems leading to a dam failure. The

early identification of potentially dangerous conditions can allow time for the implementation of the EAP. The

following section describe some of the different types of failure which could lead to a dam failure.

▪ Foundation Sliding: Sliding is usually first apparent when cracks appear. Slides with progressive

movement can cause failure of the embankment. ▪ Structural Failure: The structural failure or collapse of any non-overflow portion of the dam, spillway

or spillway gates could result in loss of the reservoir. A structural failure of a portion of the spillway

could cause piping and possibly embankment failure. ▪ Overtopping Failure: Overtopping of the embankment results in erosion of the dam crest. Once

erosion begins, it is very difficult to stop. ▪ Piping Failure: Piping in the body of the dam is also results in failure of the dam. However, failure of

dam can be avoided if early noticing and rectifying the piping is carried out.

5.2 Emergency Evaluation and Classification

This section lists the conditions and actions which may be used to classify the level of emergency

response, as a guide for The Emergency Planning Manager (Executive Engineer, KRS Division).

Specific dam observations and corresponding emergency classification levels can be found in

Annexure-12 along with appropriate and recommended actions to follow in each case.

Internal Alert Condition (BLUE) – A Watch condition – A problem has been detected at the dam that

requires constant monitoring. At this time, the distress condition is manageable by dam personnel. The

Emergency Planning Manager (Executive Engineer, KRS Division) along with the support of site

engineers will be responsible for monitoring and repaid as soon as possible and implementing the

appropriate Notification Flowchart. The following is a list of condition that would initiate the condition:

KARNATAKA WATER RESOURCES DEPARTMENT 47

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

▪ Cloudy or dirty seepage or seepage with an increase in flow, boils, piping or bogs ▪ Cracking or movement of any masonry / concrete structure ▪ An increase in the reservoir level leading to engagement of the flood gates ▪ Exceptionally heavy rainfall in the catchment of the dam

External Alert Condition (ORANGE) –This is indicative of a dam condition that is progressively getting

worse; and there is a high probability of dam failure. Although there is no immediate danger, the dam

could fail if condition continue to deteriorate. The Emergency Planning Manager (Executive

Engineer, KRS Division) will be responsible for initiating immediate repairs, including lowering the

reservoir if appropriate and implementing the appropriate Notification Flowchart. The following is a list of

conditions that would initiate this condition.

▪ Any flood release matching with the flood release capacity of the dam. ▪ Large boils, increasing size and flow rate, especially if there is flowing muddy water. ▪ Significantly increasing seepage, especially flowing muddy water. ▪ Slides involving a large mass of material that impairs the crest of the dam and is continuing to move. ▪ Sinkholes with seepage flowing muddy water. ▪ Large cracks, movement or failure of a portion of any major concrete / masonry structure that forms

an integral part of the dam. ▪ An increase in the reservoir level to near the top of the dam. ▪ Near to ‘Design Flood’ inflow forecast.

External Alert Condition (RED) - These are “failure” conditions – Either the dam is in immediate

danger of failing or has already failed. No time remains to implement measures to prevent the failure

hence evacuate immediately. Evacuation efforts will continue until the situation is stabilized. The

Emergency Planning Manager (Executive Engineer, KRS Division) is responsible for implementing

the appropriate Notification Flowchart. The following is a list of conditions that would initiate “imminent

dam failure” or “dam failure” conditions.

▪ Any flood release higher than the flood releasing capacity of the dam ▪ Rapidly increasing boils of the presence of new, significantly flowing boils, particularly muddy ones

near previously identified ones. ▪ Rapidly increasing seepage, especially flowing muddy water ▪ Slides involving a large mass of material or if significant seepage is observed through the slide area. ▪ Settlement that is predicted to degrade to the reservoir level. ▪ Cracks that extend to the reservoir level. ▪ Significant movement of failure of any structure that forms an integral part of the dam. ▪ Overtopping of the masonry dam.

48 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

5.3 Previously Known Problems

▪ Sweating on the downstream face of the dam was observed in the reach Ch. 700m to 1800m when

the reservoir level reaches +100m and above. ▪ Water springs are observed in the downstream area about 8m downstream of the toe of the dam at

Ch. 2160m ▪ Damages occurred to the apron provided downstream of waste weir sluices ▪ The guide wall constructed on the right side of the draft channel of scouring sluices having sill at +50

has been damaged. ▪ The profile of the dam is undulating presenting a look of bulging and depressions on the surface. ▪ Leakages are seen in different portions on the downstream face in the reach from right abutment to

the boating pond. ▪ Lime leaching has occurred on downstream face of the dam ▪ Joints in the masonry have opened sufficiently due to erosion of the pointing material. ▪ The upstream faces generally appear in good condition except in few places below +100 ft near

Visvesvaraya canal.

6. PREPAREDNESS

Preparedness actions are to be taken both before and following the development of emergency

condition and should identify ways of preparing for an emergency, increasing response readiness in a

uniform and coordinated manner and helping to reduce the effects of a dam failure. The following are

some steps that could prevent or delay failure after an emergency is first discovered.

6.1 Surveillance

Round the clock surveillance at the dam and its appurtenant (all along the reservoir) will be carried out by

site engineers during the emergency situations. To ensure that the whole system (including civil structures

& mechanical installation) is being maintained well up to satisfactory level, the repair maintenance must

be carried out by Executive Engineer, Assistant Executive Engineer and Assistant Engineers as per

requirements of O & M manual of Krishnarajasagara Dam. In addition, it must be ensured that

maintenance and upkeep of different components is carried out and will be only possible through

deployment of well procedure conversant and trained staff. The list of such persons should be displayed

on a photo frame mounting at convenient safe place at dam site and list of local telephone numbers

inside the dam & outside the dam area and it will be updated from time to time for any change.

6.2 Response on forecast of excessive inflow

Flood forecasting of Krishnarajasagara dam is done by observing the rise in the water level of the river

with respect to a gauge post established at the Chunchanakatte for Cauvery river, at Akkihebbal for

Hemavathy river and at Hundavadi for Lakshmanatheertha river on the upstream side of the reservoir. KARNATAKA WATER RESOURCES DEPARTMENT 49

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

By observing the hourly reservoir level, the flood is calculated and gates are operated accordingly to

release the flood water and to maintain the safe water level in the reservoir. A gate operating schedule is

prepared and sequence of opening and closing of the gates and methodology of regulation of flood

described in the gate operating schedule is followed. Trigger level of Alert for Normal Discharges of KR

Sagara Dam listed in Table 14 to be followed in declaring the alert level.

Central Water Commission has established a gauge-discharge site at downstream for assisting in flood

warning in the Cauvery River Basin. Based on the rainfall in the catchment area and flow observed in

the Cauvery river and its tributaries, CWC will furnish flood forecasting reports and trend of flow to the

dam authorities.

6.3 Response during emergency situations

A siren is used for flood warning in Krishnarajasagara Dam. Siren alert will be given to the people

residing in the downstream area of the dam 72 hours before releasing of the flood water from the

reservoir. Flood warning messages are also broadcasted and telecasted through Television and Radios.

Wireless and Mobile phones are also used to transmit the information to the people residing in the

downstream areas of river and evacuation of these people is done if necessary. Responsible officers are

kept in alert round the clock to manage the flood situation. All members of the committee are provided

with wireless and mobile phones for easy access and communication.

6.4 Response during weekends and holidays

The standard Operating Procedure with Reservoir Operation & Maintenance Manual and Gate

Operations Manual are strictly followed throughout the year whether it is weekends / holidays / night.

Executive Engineer, KRS Division will be available for emergency response during weekends and

holidays and can be present at the dam site within 15 minutes of detection of an emergency condition. In

case of non-availability of the Executive Engineer, KRS Division, the Assistant Executive Engineer, Dam

Sub-Division will take his responsibilities.

6.5 Response during periods of darkness and adverse weather

The Executive Engineer (KRS Division) and Site Engineers will arrange for access to generators and

lights to adequacy monitor the situation. Site Engineers will ensure the generation and emergency light

are well maintained and available under any circumstances. The Executive Engineer, KRS Division will

be able to access the site during adverse weather condition by off road vehicle.

6.6 Access to Site

The following accesses to the dam are available and depending on the emergency situations, some of

them should be used with cautions or totally avoided. (See Table 19 and Annexure-1)

50 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 19 : Conditions of Accesses to Krishnarajasagara Dam under Emergency Conditions

Approximate

Spillway Discharge / Emergency

Access

Condition

From Distance in

Description

Kms Under 5,000 Above Main Dam

m3/s 5,000 m3/s Failure Pandavapura –

Use with Use with

Pandavapura Yelekere – Haravu – 14.00 Not Safe Caution Caution

Left Side of Dam

Srirangapattana –

Srirangapattana Palahalli – Belagola –

18.00 Use with

Not Safe Not Safe Hulikere – Right Side Caution

of Dam

Krisnarajapete -

Krisnarajapete Thagadur –

35.00 Safe to Use Safe to Use Safe to Use Chinakuruli – Beby -

Left side of Dam

Mysuru – Ilavala –

Mysuru KRS Road – Hulikere 20.00 Safe to Use Safe to Use Safe to Use

– Right Side of Dam

Krishnarajanagara –

Kumbar Kopplu –

Krishnarajanagara Mydanahalli –

35.00 Safe to Use Safe to Use Safe to Use Bettadur

Rattanahalli – Yelwala

– Right Side of Dam

6.1 Remedial Actions

Preparedness and remedial actions can be taken in an emergency to prevent the catastrophic failure of

the dam, but such repairs should be undertaken with extreme caution. The repairs are only temporary

and a permanent repair should be designed by an engineer as soon as possible.

Specific actions for different emergency situations are described in the ANNEXURE 12 : EMERGENCY

LEVEL DETERMINATION – ACTION DATA SHEET INDEX. Examples of the actions to be taken for dam’s

officials under the direction of a professional engineer or contractor are described below. In all cases, the

appropriate Notification Flowchart must be implemented and the personnel of the Karnataka Dam Safety

Organization must be notified.

Consider the following remedial actions if the dam’s integrity is threatened by:

Seepage Failure:

▪ Plug the flow with whatever material is available (hay, bentonite or plastic) if the entrance is in the

reservoir. ▪ Consider lowering the water level in the reservoir

KARNATAKA WATER RESOURCES DEPARTMENT 51

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

▪ Place an inverted filter (a protected layer of sand and gravel) on the exit area to hold the material

in place. ▪ Continue operating at a lower level until a repair is made.

Dam Body or Foundation Failure:

▪ Lower the water level in the reservoir at an elevation considered safe for given slide condition. ▪ Stabilize the slide, if on the downstream slope, by weighting the toe area below the slide with

soil, rock or gravel. ▪ Continue operating at a lower level until a repair is made.

Structural Failure:

▪ Implement temporary measures to protect the damaged structure, such as placing rock riprap in

the damaged area. ▪ Lower the water level to a safe elevation through the low flow outlet.

7. SUPPLIES AND RESOURCES

7.1 Contracts

If Krishnarajasagara project’s personnel and resources prove to be inadequate during an emergency,

requests will be made for assistance from other local jurisdiction, other agencies and industries as needed.

Such assistance may include equipment, supplies or personnel. All necessary agreements will be entered

into by the following authorized officials as deemed necessary to prevent the failure of the dam.

▪ Emergency Planning Manager & Executive Engineer, KRS Dam Division, K.R Sagara

▪ Superintending Engineer, KRS M & MIP Circle, Mandya

▪ Chief Engineer, Irrigation (South) Zone, CNNL, Mysuru

▪ Managing Director, CNNL, Bengaluru

7.2 Equipment and Supplies

Equipment that is available for use and local contractors that can be contacted to provide equipment

during an emergency event are listed in ANNEXURE 13 : SUPPLIES AND RESOURCES

7.3 Reports

Pre-monsoon and Post-monsoon inspections of the dam are made every year during the month of May

and December respectively by the Site Engineer in coordination with the Emergency Planning

Manager (Executive Engineer, KRS Division, Mandya) to evacuate its structural safety, stability and

operational adequacy. In the event of an abnormal occurrence, reference to these reports, particularly

the photographs can be beneficial in the evaluation of a potential problem.

52 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Technical records such as drawings and inspection reports are stored and carefully maintained at the Control

room in dam site and in the Emergency Planning Manager’s office. Site Engineers are familiar

with the location of the documents in the event of an emergency situation.

8. EMEREGENCY OPERATION CENTRE

8.1 Activity Log

Any usual or emergency condition should be documented, including the following:

▪ Significant changes in the emergency.

▪ Activation or Deactivation of emergency facilities.

▪ Telephone calls will be recorded in chronological order.

▪ Emergency notification to other local governments and to state and central government agencies.

▪ Major commitments of resources or requests for additional resources from external source

8.2 Costs of the Emergency Operation Centre

For major emergencies, the Emergency Operations Centre will maintain detailed records of costs

expended. These records may be used to recover costs from the responsible party or insurers or as a

basis for requesting financial assistance for certain allowable response and recovery costs from the

state or central government. Documented cost should include:

▪ Personnel costs, especially overtime

▪ Equipment operation

▪ Equipment leasing and rental

▪ Contract services to support emergency operations

▪ Specialized supplies expended in emergency operations.

9. INUNDATION AREA

Inundation maps in ANNEXURE 10 : INUNDATION MAPS illustrates the areas subject to flooding from

a failure of the main dam for Large Controlled Release, Overtopping and Piping scenarios (Table 20).

The maps were prepared using the results of a two-dimensional flow analysis and contain profiles of the

peak flood levels expected, as well as an estimation of the time from the beginning of the breach to the

moment the location start to be inundated. More hazard reference values such as Arrival Time, Depth,

Velocity and Water Surface Elevation are included in ANNEXURE 10 : INUNDATION MAPS in both tabular

and map format for each of the affected locations.

KARNATAKA WATER RESOURCES DEPARTMENT 53

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020]

Table 20 : Scenario included in the Emergency Action Plan

Annexure Scale

Scenario Hazard Parameters No. Tiles

Index

(A3 size Sheet)

10-A Overtopping Arrival Time, Depth, Velocity, Water 30 1:50,000

Surface Elevation

10-B Piping Arrival Time, Depth, Velocity, Water 30 1:50,000

Surface Elevation

10-C Large Controlled Arrival Time, Depth, Velocity, Water 30 1:50,000

Release Surface Elevation

After examining the results of the breach analysis of the Krishnarajasagara dam, it has been determined

that there were a significant number of structures that could be affected due to a large discharge from

the dam or dam breach scenarios. These structures are located along the river Cauvery and its

tributaries such as Lokapavani and Kabini rivers. The most important crossing structures susceptible to

the failure scenario are summarized in Table 21 below and are labelled in the Annexure: 1.

Table 21 : List of Main Crossing Structures

SL District Bridge Name / Location Map Tile ID No.

No (Annexure 1)

1 KRS – Pandavapura Road 1-1

2 Bengaluru – Mysuru National Highway (NH 275) 1-1

3 Mandya Bengaluru – Mysuru National Highway (NH 275) 1-1

4 Kallikoppalu – Ganjam Road 1-1

5 T Narasipura – Srirangapattana Road – 1-2

Mahadevapura Road (Sh 79)

6 Malavalli – Mysuru Road (SH 33) 1-2

7 Mysuru Belakavadi – T Narasipura Road (SH 84) 1-2

8 T Narasipura – Sira Road (SH 84) 1-2

9 Mysuru – Trichy National Highway (NH 212) 1-2

10 T Narasipura – Talakadu Road 1-2

11 Belakavadi – Kollegala National Highway (NH 209) 1-2

12 Chamarajanagara Barachukki Falls Road 1-2

13 Dasanapura – Kaveripura Road 1-2

54 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

The potential consequences either due to a hypothetical breach scenario of Krishnarajasagara dam or

due to a large controlled release from the spillways (> 10000 m3/sec) involves Mandya, Mysuru,

Chamarajanagar and Ramanagara districts located downstream of the dam. The Villages which can

suffer a significant impact are listed in ANNEXURE 8 : LOCAL EVACUATION PLAN FOR THE AFFECTED

VILLAGES AND SAFE SHELTER ARRANGEMENTS. The most affected areas in a failure scenario are those

located near the river banks where the hydraulic conditions are extreme.

9.1 Local Evacuation Plan

If imminent failure of Krishnarajasagara dam with uncontrolled downstream flooding is anticipated, local

disaster management and law enforcement personnel should notify those downstream villages listed in ANNEXURE 8 : LOCAL EVACUATION PLAN FOR THE AFFECTED VILLAGES AND SAFE SHELTER

ARRANGEMENTS for evacuation in the most expedient manner possible following the procedure given in the

Notification flowchart of this document. Local law enforcement officials along with local mobile network

operators, radio and media representatives can best spread the notice for evacuation. (Responsibilities for

Notification and Responsibilities for Evacuation). In addition, ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX can be used as support in the decision-making proves

either to escalate or downgrade an emergency event. The most important actions that should be taken

during an evacuation process are:

▪ Police Departments will barricade all bridges and roads that could possibly be flooded to

prevent access to the affected area. These bridges include all crossings of river Cauvery and its

tributaries downstream of the dam and as well as those affected roads shown in ANNEXURE 1 :

VICINITY MAP. These structures were identified by superimposing the flood inundation maps over

the bridge locations

▪ The Districts Disaster Management Authorities (Deputy Commissioners) will assist with the

notification of all persons and agencies involved (relief authorities) with the possibility of

additional support – including contacting others not accessible by radio or telephone.

▪ Relief Authorities (Police, Fire, Defence) are generally familiar with developed areas in their

jurisdiction. Such knowledge coupled with the requirement of state law that they respond to

disaster make them the logical officials to be notified and to spread the warning message to all

areas subject to flooding.

Based on the specific results of the dam breach analysis (wave arrival time), a complete list of relief

camps (shelters) is included in ANNEXURE 9 : SHELTERS / RELIEF CAMPS AVAILABLE OUTSIDE THE

INUNDATION AREA to provide a safe shelter for evacuated people.

KARNATAKA WATER RESOURCES DEPARTMENT 55

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

10. IMPLEMENTATION

10.1 Development

This EAP version of the Krishnarajasagara dam is prepared by Cauvery Neeravari Nigam Limited. This

document is sent to State Project Management Unit, Central Project Management Unit and Disaster

Management Authority for review and their comments will be incorporated into the document for final

publication.

10.2 Updating

Copies of the EAP have been provided to all authorities / officials included in the EAP DISTRIBUTION LIST

and the document has been approved and signed by the Additional Chief Secretary to Government, Water

Resources Department, Karnataka and the Chief Engineer of Dam Safety Organization. This plan will be

reviewed and updated annually before the 1st June of every year by the Emergency Planning Manager

(Executive Engineer, KRS Division, KR Sagara) and the Superintending Engineer. This

review will involve corresponding personnel from local disaster management agencies in conjunction

with Dam Safety Organization’s staff.

The Superintending Engineer will organize every year prior to monsoon an orientation meeting to

introduce the revised EAP to local officials, emergency responders. This meeting will give an opportunity

to all the stakeholders to review and comment on EAP document and their respective roles.

The Emergency Planning Manager (Executive Engineer, KRS Division) will review and complete all

items on the Annual EAP Evaluation Checklist in ANNEXURE 15 : ANNUAL EAP EVALUATION CHECKLIST.

After the annual update is complete, a new Approval and Implementation sheet will be attached and the

annual update will be documented on the ANNEXURE 18 : PLAN REVIEW AND UPDATE. If revisions to the

EAP are made as a result of the annual update, such changes will be recorded on the log sheet of changes

form at the front of the report. A copy of the updated portions of the EAP will be sent to all concerned offcials

as per the EAP DISTRIBUTION LIST. If the EAP was reviewed and revisions were not required, The

Emergency Planning Manager (Executive Engineer, KRS Division) will submit written notification to all

concerned that no updates to the EAP have been adopted or implemented.

10.3 Testing

The Superintending Engineer shall organize the following exercise as specified below:

Orientation (Stakeholder’s Consultation): The Superintending Engineer will organize an orientation

meeting every year with local responders and stakeholders to solicit input, established roles during

emergency situation and facilitate reliable response to the emergencies. In orientation meeting, the

Executive Engineer (Emergency Planning Manager) will introduce the revised EAP to local officials

56 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

and emergency responders and provide those entities the opportunity to review and comment on the

documents and on their roles, responsibilities described in EAP.

Table-top Exercises: The Superintending Engineer and The Executive Engineer (Emergency

Planning Manager) will organize a table-top drill once in 2 years to discuss and review the simulated

or imaginary emergency situation. The table-top drill involves a meeting of Emergency Planning

Manager with local and state Disaster Management Officials in a conference room. The drill begins

with a description of simulated event and proceeds with discussions by the participants to evaluate

the EAP and response procedures and to resolve concerns regarding coordination and

responsibilities. Any problems identified during a drill should be included in revision to the EAP.

Before the table-top exercise begins, meeting participants will visit the dam to familiarize with the dam

site. Executive Engineer (Emergency Planning Manager) will present a scenario of an unusual or

emergency event at the dam site. The scenario will be developed prior to the exercise with the support

of the Dam Safety Organization.

Once the scenario has been presented, the participants will discuss the risk involved, responses and

related actions that they would take to address and resolve the scenario throughout the exercise. The

exercise provides an opportunity to discuss EAP and response procedures and resolve the questions

throughout the exercise. It will also clarify roles and responsibilities and will identify additional threat

mitigation and preparedness actions.

Records and reporting of the main conclusions / findings of both meetings will be maintained in

ANNEXURE 17 : TRAINING RECORD and following the deadline given in Table 22.

Table 22 : Krishnarajasagara Dam's EAP exercise / testing requirements

Exercise Schedule Reporting Deadlines

Orientation ▪ Pre-Event: Submit agenda to stakeholders 30 days

Annual

before meeting

Stakeholder ▪ Post-Event: Update

Consultation)

▪ Form 3: Training Record within 30 days after meeting

▪ Pre-Event: Submit Exercise Plan and Schedule to

Ove every 2 years

participants 90 days before exercise

Table Top Exercise (Before monsoon ▪ Post-Event: Update

▪ Form 3: Training Record and submit evaluation report season)

within 60 days after exercise

KARNATAKA WATER RESOURCES DEPARTMENT 57

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

10.1 Training

The Superintending Engineer will ensure all people involved in the EAP be trained to guarantee that

they are thoroughly familiar with its elements, the availability of equipment and their responsibilities and

duties under the plan. Personnel will be trained in problem detection, evaluation and appropriate

corrective measures. This training is essential for proper evaluation of developing situations at all levels

of responsibility. Training records will be maintained also in ANNEXURE 17 : TRAINING RECORD.

58 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 1 : VICINITY MAP

KARNATAKA WATER RESOURCES DEPARTMENT 59

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

60 DAM REHABILITATION AND IMPORVEMENT PROJECT

76°20'0"E 76°30'0"E 76°40'0"E

Vicinity Map of

Krishnarajasagara,

Dam Karnataka

¯

Legend

Roads

12

°30

'0"N

(# Talasasana River Chikkade

" (# " (# `ú

Nelamane " Bridges

Puttasomanahalli

" Kadathanalu (# Sabbanakuppe "( Shelters Kyathan ahalli (# (#

Aralakuppe Haravu " " #

# " (# "( Makanakoppalu

(#

Katteri " (#

" (# T M Hosur

" "

(# Saathapura (#

" Locator Map

Bengaluru-Mysuru Highway (NH 275)

Kallikoppalu-Ganjam Road

KRS-Pandavapura Road Bengaluru-Mysuru Highway (NH-275 ) Allaptna `ú

Palahalli ú `ú ú

"

`

` (#

(#

" T Narasipura- Srirangapattana Road-M ahadevapur a(SH 79)

Belagola

Laxmipura ú 1 2 4 Hosahalli "( "(# "(# `

#

Naganahalli

"(# Hebbadi

Belavadi Hebbadi Hundi (# Taripura 3

5 (# "(# " "

Siddali ngapur a " (#

"

(#

Sources: Esri, HERE, Garmin, USGS, Intermap,

12°2

0'0"

N

Map No .1 / 5

INCREMENT P, NRCan, Esri Japan, METI, Esri China

3 1.5 0 3 6 9 Km

WATER RESOURCES DEPARTMENT GOVT. OF KARNATAKA

Alathuru DAM REHABILITATION AND Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, #

Thandavapura Moodahalli "( IMPROVEMENT PROJECT(DRIP)

Esri (Thailand), NGCC, © OpenStreetMap contributors, and the GIS User Community "( "(#

# 76°20'0"E 76°30'0"E 76°40'0"E

76°50'0"E 77°0'0"E 77°10'0"E 77°20'0"E

12°3

0'0

"N

12°2

0'0

"N

12

°10

'0"N

Vicinity Map of

Krishnarajasagara,

Dam Karnataka

¯

Legend

Roads

River

`ú Bridges

"(#

Shelters

Locator Map

Arkere

"

Vadiyandahalli (# Ballekere

" "

T Narasipura(#-Srirangapattana Road-Mahadevapura(SH(# 79)

ú Gandehosahalli B Seehalli

1

2

4

" (# "

(# Aravattige Koppal(#

" Kodagahalli

# (# 3 5

"( Hanumanal

" Madaganahalli "

(# Makanahalli Sources: Esri, HERE, Garmin, "

(# Chamanahalli USGS, Intermap,

Bannuru

(# INCREMENT P, NRCan, Esri

" Map No .2 / 5 Japan, METI, Esri China #

Malavalli-Mysuru Road (SH-33)"( Uttali B Bettahalli

` (#

ú

#

(#

"( Megalakoplu"

Rangasamudra "

(#

Kethupura "

"

(# Kullana Koppalu Ukkalagere

"( (# # 31.50 3 6 9

# "

Kol athur u

Thammadipura

"(

Barachukki Falls Road

Km

#

"( Chikkabagilu Purigali B G Pura

Belakavadi ú Horala Halli (# (# (# " " # " ú "(

"(# Belakavadi-Kollegala Road (NH209)

``

Belakavadi-T Narasipura Road (SH 84)

T `

Biligerehundi Mysuru-Trichy Road (NH 212)

# ̀

T Megadahalli

ú

Kuppegala "( ú #

"(#

ú "( Koppalu

Narasipura "

# "

(#

T Narasipura-Sira Road (SH 84) (

T Narasipura-Talakadu Road

`

ú Hosa Kukkuru WATER RESOURCES DEPARTMENT

Talakadu # Dasanapura-Kaveripura Road Jodihariharapura ` (# "(

`ú GOVT. OF KARNATAKA

"(#

" Gundegala (#

DAM REHABILITATION AND

Sources: Esri, HERE, Garmin, USGS, Intermap," INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea,

Sutturu Gejjiganahalli IMPROVEMENT PROJECT(DRIP)

Esri (Thailand), NGCC, © OpenStreetMap contributors, and the GIS User Community

"(# "(

#

76°50'0"E 77°0'0"E 77°10'0"E 77°20'0"E

12°1

0'0

"N

12°0

'0"N

11°5

0'0

"N

76°40'0"E 76°50'0"E 77°0'0"E 77°10'0"E

(#

(# "

Barachukki Falls Road Vicinity Map of Kolathuru

Thammadipura

" Chikkabagilu Purigali B G Pura

Belakavadi ú Horala Halli (# (# (# " " # " ú "(

Krishnarajasagara, "(# Belakavadi-Kollegala Road (NH209)

``

Belakavadi-T Narasipura Road (SH 84) Dam Karnataka T `

Biligerehundi Mysuru-Trichy Road (NH 212) ̀

T Megadahalli

"(# úú

Kuppegala #

"(#

ú "( Kopp alu

Narasipura

"

# "

(#

T Narasipura-Sira Road (SH 84) (

T Narasipura-Talakadu Road

`

¯ ú Hosa Kukkuru Talakadu # Dasanapura-Kaveripura Road

Jodihariharapura ` " "(

(#

Alathuru "(# Gundegala Legend

Thandavapura Moodahalli "(# "(# " "

Sutturu Gejjiganahalli

(# (#

Hullimavu

# # "( "(

# (#

#

Roads " Hosamalangi

(# Madarhalli Kannahalli " Kollegala Madhuvanahalli

"( "

"(# "(

# Nagarle (# "

Kempisidanahundi (# Belagunda

River "(

(# Saragooru " Moogooru

(# (# Kunthur Nanjanagudu " " (# ú Bridges "( "

Kinakanahalli

# Golur (# "(# "(# ̀

Surapura

" "( Shelters

#

Locator Map

1 2 4

3 5

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri

Map No .3 / 5 Japan, METI, Esri China

3 1.50 3 6 9 Km

WATER RESOURCES DEPARTMENT GOVT. OF KARNATAKA

DAM REHABILITATION AND

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, IMPROVEMENT PROJECT(DRIP) Esri (Thailand), NGCC, © OpenStreetMap contributors, and the GIS User Community

76°40'0"E 76°50'0"E 77°0'0"E 77°10'0"E

12

°30

'0"N

12°2

0'0

"N

12°1

0'0

"N

77°30'0"E 77°40'0"E 77°50'0"E

Vicinity Map of

Krishnarajasagara,

Dam Karnataka

¯

Legend

Roads

River

`ú Bridges

"(#

Shelters

Locator Map

1 2 4

3 5

Sources: Esri, HERE, Garmin, USGS, Intermap,

Map No .4 / 5 INCREMENT P, NRCan, Esri Japan, METI, Esri China

3 1.50 3 6 9 Km

WATER RESOURCES DEPARTMENT GOVT. OF KARNATAKA

DAM REHABILITATION AND

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, IMPROVEMENT PROJECT(DRIP) Esri (Thailand), NGCC, © OpenStreetMap contributors, and the GIS User Community

77°30'0"E 77°40'0"E 77°50'0"E

12°1

0'0

"N

12°0

'0"N

11°5

0'0

"N

77°30'0"E 77°40'0"E 77°50'0"E

Vicinity Map of

Krishnarajasagara,

Dam Karnataka

¯

Legend

Roads

River

`ú Bridges

"(#

Shelters

Locator Map

1 2 4

3 5

Sources: Esri, HERE, Garmin, USGS, Intermap,

Map No .5 / 5 INCREMENT P, NRCan, Esri Japan, METI, Esri China

3 1.50 3 6 9 Km

WATER RESOURCES DEPARTMENT GOVT. OF KARNATAKA

DAM REHABILITATION AND

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, IMPROVEMENT PROJECT(DRIP) Esri (Thailand), NGCC, © OpenStreetMap contributors, and the GIS User Community

77°30'0"E 77°40'0"E 77°50'0"E

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 2 : WATCH CONDITION NOTIFICATION FLOWCHART

(INTERNAL ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 61

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

62 DAM REHABILITATION AND IMPORVEMENT PROJECT

WATCH CONDITION NOTIFICATION FLOWCHART OF KRISHNARAJASAGARA DAM (INTERNAL ALERT)

Dam Site Office Name: Kishore Kumar K Designation: Assistant Engineer Email: [email protected]

Mobile No: 9945700936

Name: Vasudev C Designation: Assistant Executive Engineer Email: [email protected] Mobile No: 9448871009

Name: Thammegowda Designation: Assistant Executive Engineer

Email: [email protected] Mobile No: 9448740401

(1)

Event Level Determination / Escalation based on Action Data Sheet

BLUE ALERT (3)

(2)

Indian Meteorological Dept Name: Sundar Mahadev Metri Designation: Scientist E Email: [email protected] Mobile No: Office No: 080-22211118

Name: L Ramesh Babu Designation: Scientist E Email: [email protected]

Office No: 080-22019927

Available Resources Civil Works Mechanical Works

Name: Anil, Infosys Limited Name: Afsar Ahmed

Email: Email: Mobile No: 9845072776 Mobile No: 9343381667

Name: S Narayanareddy Name: Transpede Engineers

Email: Email: Mobile No: 9945262610 Mobile No: 9945066431

Name: V Krishnareddy Name: Mohammed Ajaz

Email: Email: Mobile No: 9845229482 Mobile No: 9448245970

Emergency Planning Manager

Superintending Engineer Office

Name: M B Raju

Name: K G Vijay Kumar Designation: Executive Engineer

Designation: Superintending Engineer

(1) Email: [email protected]

Email: [email protected] Mobile No:(1)9448755039 Mobile No: 9448457178 Office No: 08236-257976

Name: Parameshwarappa Name: Raghupathi

Designation: Technical Assistant Designation: Executive Engineer

Email: [email protected] Email: [email protected]

Mobile No: 9980852156 Mobile No: 8762064820

(5)

(1) (4)

Chief Engineer Office Nigam Office State Dam Safety Office Name: Shankare Gowda Name: K. Jaiprakash, KES Name: B.K Rajendra, KES Designation: Chief Engineer Designation: Managing Director, CNNL Designation: Nodal Officer Email: [email protected]

(1) Email: [email protected]

(1) Email: [email protected]

Mobile No: 9632393262 Mobile No: 9741125715 Mobile No: 9902815928

Name: Hemanth Kumar Name: Name: Vijay Kumar Designation: Superintending Engineer, Designs Designation: Designation: Project Director Email: [email protected] Email: Email: [email protected] Mobile No: 0821-2477719 Mobile No: Mobile No: 9481902779

NOTES: (1), (2), (3) - Denotes Call Sequence/ Priority

- Compulsory Communication

- Alternative Communication

Consultants / Expert Others Name: Texmaco, Kolkata Name: Unique instruments Email: Email: Mobile No: 91332-5691500 Mobile No: 080-28362765

Name: Ramachandra Name: K Janardhana Email: Email: Mobile No: 9880347238 Mobile No: 9945493365

Name: Nandi Steels Name: BEML Limited Email: Email:

Mobile No: 8192234712 Mobile No: 0821-2402616

Entire list of Contractors/Suppliers can be found in Annexure-

Suggested Phone Message (Red Alert)

This is [Identify, Yourself, Name, Designation].

An unusual event has been detected at Krishnarajasagra dam. The EAP has been

activated, currently at BLUE alert.

The situation is being monitored to determine if any evacuation warnings will be

necessary. We will keep you appraised of the situation.

I can be contacted at the following number [Phone No]. If you cannot reach me. Please

call the following alternative number [Alternative No.]

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 3 : FAILURE CONDITION FLOWCHART

(EXTERNAL ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 63

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

64 DAM REHABILITATION AND IMPORVEMENT PROJECT

FAILURE CONDITION NOTIFICATION FLOWCHART OF KRISHNARAJASAGARA DAM (EXTERNAL ALERT)

Dam Site Office

Indian Meteorological Dept

Name: Kishore Kumar K

RED ALERT Name: Sundar Mahadev Metri

Available Resources

Designation: Assistant Engineer

Designation: Scientist E

Civil Works Mechanical Works

Email: [email protected]

Email: [email protected]

Event Level Determination / Escalation Name: Anil, Infosys Limited Name: Afsar Ahmed

Mobile No: 9945700936

Office No: 080-22211118 (1)

based on Action Data Sheet Email: Email:

Name: Vasudev C

Name: L Ramesh Babu

Mobile No: 9845072776

Mobile No: 9343381667

Designation: Assistant Executive Engineer

ORANGE ALERT

(4)

Designation: Scientist E Name: S Narayanareddy

Name: Transpede Engineers

Email: [email protected] Email: [email protected]

Mobile No: 9448871009 Email: Email:

Office No: 080-22019927

Mobile No: 9945262610

Mobile No: 9945066431

Name: Thammegowda

Name: V Krishnareddy

Name: Mohammed Ajaz

Designation: Assistant Executive Engineer (3)

Email:

Email:

Email: [email protected]

Mobile No: 9845229482

Mobile No: 9448245970

Mobile No: 9448740401 (2)

(1) (5)

District Representatives / Relief Authorities

Downstream Dam

Emergency Planning Manager

Name: Dr. M V Venkatesh, IAS

Name: B B Cauvery, IAS

Name: S Ramamoorthy

Superintending Engineer Office

Name: M B Raju

Designation: Chief Engineer, Trichy

Name: K G Vijay Kumar

Designation: Executive Engineer

Designation: Deputy Commissioner,

Designation: Deputy Commissioner,

See District-Wise Email:

Designation: Superintending Engineer

Email: [email protected]

Mandya

Chamarajanagar

Notification Mobile No:

Email: [email protected]

Mobile No: 9448755039

(1) Email: [email protected]

Email: [email protected]

flowcharts for

Office No: 0431-2331148

Mobile No: 9448457178 Office No: 08236-257976 Mobile No: 8277863520 Mobile No: 08226-223170 further details Name: P Devaraju

(2)

Name: Abhiram G Shankar, IAS

Name: Dr. K Rajendra, IAS

Name: Raghupathi

Name: Parameshwarappa Designation: Executive Engineer, Mettur Designation: Deputy Commissioner, Designation: Deputy Commissioner

Designation: Technical Assistant

Designation: Executive Engineer

Email:

Mysuru Ramanagara

Email: [email protected]

Email: [email protected]

Mobile No:

Email: [email protected] Email: [email protected]

Mobile No: 9980852156

Mobile No: 8762064820

(1)

Office No: 04298-244042

Mobile No: 9480724754 Mobile No: 080-2727377

(1)

(6)

Chief Engineer Office

State Dam Safety Office Central Dam Safety Office Name: Shankare Gowda Name: B.K Rajendra, KES Name: Gulshan Raj Designation: Chief Engineer Designation: Nodal Officer Designation: Chief Engineer Email: [email protected]

(1) Email: [email protected]

(1) Email: [email protected] Mobile No: 9632393262 Mobile No: 9902815928 Mobile No: 9999277474

Name: Hemanth Kumar Name: Vijay Kumar Name: Pramod Narayan Designation: Superintending Engineer, Designs Designation: Project Director Designation: Project Director Email: [email protected] Email: [email protected] Email: [email protected] Mobile No: 0821-2477719 Mobile No: 9481902779 Mobile No: 9958975921

Karnataka DMA National DMA

Name: Dr. G.S. Srinivas Reddy Name: A.K Sanghi Designation: Director, KSNDMC Designation: Joint Secretary Email: [email protected] Email: [email protected]

Mobile No: (1) Mobile No: Office No: 080-67355000

Office No: 011-26701718

Name: Gangaram Baderiya, IAS Name: Zahid Khan

Designation: Secretary, DMA Designation: Commandant, 10th Btln Email: [email protected] Email: Mobile No: Mobile No: 8333068559 Office No: 080-22032995 Office No: 0863-2293178

NOTES: (1), (2), (3) - Denotes Call Sequence/ Priority

- Compulsory Communication

- Alternative Communication

Suggested Phone Message (Orange Alert)

This is [Identify, Yourself, Name, Designation]. I am making this call in accordance with the KRS

Emergency Action Plan

We have an emergency at Krishnarajasagra dam. The EAP has been activated, currently at Orange alert.

We are implementing predetermined actions to respond to a rapidly developing situation that could result in

dam failure. The situation is being monitored to determine if any evacuation warnings will be necessary.

Reference your copy of the EAP to prepare for possible evacuation.

I can be contacted at the following number [Phone No]. If you cannot reach me. Please call the following

alternative number [Alternative No.]

Suggested Phone Message (Red Alert) This is an emergency. This is [Identify, Yourself, Name, Designation].

Krishnarajasagra dam is failing. The downstream area must be evacuated immediately

according to the evacuation map in your copy of the Emergency Action Plan. The EAP has

been activated, currently at Red alert.

I can be contacted at the following number [Phone No]. If you cannot reach me. Please call

the following alternative number [Alternative No.]

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 4: DISTRICT-WISE NOTIFICATION FLOWCHART

(MANDYA DISTRICT)

KARNATAKA WATER RESOURCES DEPARTMENT 65

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

66 DAM REHABILITATION AND IMPORVEMENT PROJECT

MANDYA DISTRICT – FAILURE CONDITION NOTIFICATION FLOWCHART (EXTERNAL ALERT)

Emergency Planning Manager Name: M B Raju Designation: Executive Engineer Email: [email protected] Mobile No: 9448755039 Office No: 08236-257976

Name: Vasudev C Designation: Assistant Executive Engineer Email: [email protected]

Mobile No: 9448871009 Office No: 08127-225427

Media

Name: Designation: Director, Dept. off Information

Email: [email protected] Mobile No: Office No: 080-22028001

Name: N S Mahesh

Designation: Assistant Director, Dept of Information

Email: [email protected] Mobile No: 9480841230 Office No: 08232-224153

Name: Ravi, TV9 Kananda Mobile No: 9980914147

Name: Ananad, Digvijaya TV Mobile No: 9019935313

Name: Rohith, Public TV Mobile No: 9900060827

Name: Nandan Ramakrishna, Suvarna TV

Mobile No: 9632201503

Name: Yogesh, BTV Mobile No: 9900026155

Name: Raghu, ETV Kannada Mobile No: 9945779714

NOTES: (1), (2), (3)… Denotes Call Sequence/

Priority

Compulsory Communication

District Representatives

Name: Dr. M V Venkatesh, IAS

(1) Designation: Deputy Commissioner, Mandya

Email: [email protected]

Mobile No: 8277863520

Office No: 08232-224600

Name: Yogesh, KAS

Designation: Additional Deputy Commissioner

Email: [email protected]

Mobile No:

(5) Office No: 08232-224698

(3)

Taluk Representatives

Name: D Nagesh

Designation: Tahasildar, Srirangapattna Taluk Email: [email protected]

Mobile No: 9448394923

Office No: 08236-252029

(4)

Name: Pramod L Patil

Designation: Tahasildar, Pandavapura Taluk

Email: [email protected]

Mobile No: 7259705464

Office No: 08236-255128

Name: Chandramouli

Designation: Tahasildar, Malavalli Taluk

Email: [email protected]

Mobile No: 9448625194

Office No: 08231-242277

Health / Hospitals

Name: District Health Officer, Mandya Email: [email protected]

Contact No: 08232-224027

Name: District Surgeon, Mandya Email: [email protected] Contact No: 08232-224040

Karnataka DMA

Name: Dr. G.S Srinivasa Reddy Designation: Director, KSNDMC

(1) Email: [email protected]

Mobile No: Office No: 080-67355000

Name: Honnamba Designation: Director, KSNDMA Email: [email protected] Mobile No: 9008405955 Office No: 080-22032995

Name: Control Room Toll Free No: 1070

(2)

(1)

Police Department

Name: Shiva Prakash Devaraju, IPS Designation: Superintendent of Police, Mandya Email: [email protected] Mobile No:

Office No: 08232-224500

Name: Designation: Deputy Superintendent of Police

Email: Mobile No: Office No:

Fire Department

Name: District Fire Officer, Mandya Contact No: 08232-216028

Name: Mandya Fire Station Contact No: 08232-224818

Name: Malavalli Fire Station Contact No: 08231-242600

Name: Pandavapura Fire Station Contanct No: 08236-205101

Name: Srirangapatna Fire Station

Contact No: 08236-253101

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNAXURE 5 : DISTRICT-WISE NOTIFICATION FLOWCHART

(MYSURU DISTRICT)

KARNATAKA WATER RESOURCES DEPARTMENT 67

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

68 DAM REHABILITATION AND IMPORVEMENT PROJECT

MYSURU DISTRICT – FAILURE CONDITION NOTIFICATION FLOWCHART (EXTERNAL ALERT)

Emergency Planning Manager Name: M B Raju

Designation: Executive Engineer Email: [email protected] Mobile No: 9448755039 Office No: 08236-257976

Name: Vasudev C Designation: Assistant Executive Engineer Email: [email protected] Mobile No: 9448871009 Office No: 08127-225427

Media

Name: Designation: Director, Dept. off Information Email: [email protected] Mobile No: Office No: 080-22028001

Name: N S Mahesh

Designation: Assistant Director, Dept of Information

Email: [email protected] Mobile No: 9480841230 Office No: 08232-224153

Name: Ravi, TV9 Kananda Mobile No: 9980914147

Name: Ananad, Digvijaya TV Mobile No: 9019935313

Name: Rohith, Public TV Mobile No: 9900060827

Name: Nandan Ramakrishna, Suvarna TV

Mobile No: 9632201503

Name: Yogesh, BTV Mobile No: 9900026155

Name: Raghu, ETV Kannada Mobile No: 9945779714

NOTES: (1), (2), (3)… Denotes Call Sequence/

Priority

Compulsory Communication

District Representatives

Name: Abhiram G Shankar, IAS

(1) Designation: Deputy Commissioner, Mysuru Email: [email protected]

Mobile No: 9480724754

Office No: 0821-2422302

Name: T Yogesh

Designation: Additional Deputy Commissioner

Email:

Mobile No:

Office No: 0821-2422110

(4) (3)

Taluk Representatives

Name: Nagaprashanth P N

Designation: Tahasildar, T Narasipura Taluk

Email: [email protected]

(5) Mobile No:

Office No: 08227-261233

Name: Mahesh Kumar K M

Designation: Tahasildar, Nanjanagudu Taluk

Email: [email protected]

Mobile No: 9448899455

Office No: 08221-226252

Health / Hospitals

Name: District Health Officer, Mysuru Email: [email protected] Contact No: 0821-2435575 Mobile No: 9449843059

Name: District Surgeon, Mysuru Email: [email protected] Contact No: 0821-2497303 Mobile No: 9448166767

Karnataka DMA

Name: Dr. G.S Srinivasa Reddy

Designation: Director, KSNDMC (1) Email: [email protected]

Mobile No: Office No: 080-67355000

Name: Honnamba Designation: Director, KSNDMA Email: [email protected] Mobile No: 9008405955

Office No: 080-22032995

Name: Control Room Toll Free No: 1070

(2)

(1)

Police Department

Name: C B Rishyanth, IPS

Designation: Superintendent of Police, Mysuru Email:

(1) Mobile No: 9480805001 Office No: 0821-2520040

Name:

Designation: Deputy Superintendent of Police Email:

Mobile No: Office No:

Fire Department

Name: Regional Fire Station Contact No: 0821-2540116

Name: Saraswathipuram Fire Station Contact No: 0821-2540970

Name: Bannimantapa Fire Station Contact No: 0821-2495101

Name: T. Narasipura Fire Station Contact No: 08227-260601

Name: Nanjangud Fire Station Contact No: 08221-224144

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 6 : DISTRICT-WISE NOTIFICATION FLOWCHART

(CHAMARAJANAGARA DISTRICT)

KARNATAKA WATER RESOURCES DEPARTMENT 69

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

70 DAM REHABILITATION AND IMPORVEMENT PROJECT

CHAMARAJANAGAR DISTRICT – FAILURE CONDITION NOTIFICATION FLOWCHART (EXTERNAL ALERT)

Emergency Planning Manager Name: M B Raju

Designation: Executive Engineer Email: [email protected] Mobile No: 9448755039 Office No: 08236-257976

Name: Vasudev C Designation: Assistant Executive Engineer Email: [email protected] Mobile No: 9448871009 Office No: 08127-225427

Media

Name: Designation: Director, Dept. off Information Email: [email protected] Mobile No: Office No: 080-22028001

Name: N S Mahesh

Designation: Assistant Director, Dept of Information

Email: [email protected] Mobile No: 9480841230 Office No: 08232-224153

Name: Ravi, TV9 Kananda Mobile No: 9980914147

Name: Ananad, Digvijaya TV Mobile No: 9019935313

Name: Rohith, Public TV Mobile No: 9900060827

Name: Nandan Ramakrishna, Suvarna TV

Mobile No: 9632201503

Name: Yogesh, BTV Mobile No: 9900026155

Name: Raghu, ETV Kannada Mobile No: 9945779714

NOTES: (1), (2), (3)… Denotes Call Sequence/

Priority

Compulsory Communication

District Representatives

Name: B B Cauvery, IAS

Designation: Deputy Commissioner,

(1) Chamarajanagara Email: [email protected]

Mobile No:

Office No: 08226-223170

Name: Gayathri

Designation: Additional Deputy Commissioner

Email: [email protected]

Mobile No:

Office No: 08226-226535

(4) (3)

Taluk Representatives

Name: K Siddu Designation: Tahasildar, Yelanduru Taluk

Email: [email protected] (5) Mobile No: 9448625194

Office No: 08226-240029

Name: Mahadevaiah Designation: Tahasildar, Kollegala Taluk Email: [email protected] Mobile No:

Contact No: 08224-252042

Health / Hospitals

Name: District Health Officer, Chamaraja Nagar

Email: [email protected]

Contact No: 08226-222421 Mobile No: 9449843047

Name: District Surgeon, Chamaraja Nagar Email: [email protected] Contact No: 08226-222067 Mobile No: 9008969221

Karnataka DMA

Name: Dr. G.S Srinivasa Reddy

Designation: Director, KSNDMC (1) Email: [email protected]

Mobile No: Office No: 080-67355000

Name: Honnamba Designation: Director, KSNDMA Email: [email protected] Mobile No: 9008405955

Office No: 080-22032995

Name: Control Room Toll Free No: 1070

(2)

(1)

Police Department

Name: H D Ananda Kumar, IPS Designation: Superintendent of Police,

Chamarajanagar Email: Mobile No:

Office No: 08226-222243

Name: Designation: Deputy Superintendent of Police Email: Mobile No: Office No:

Fire Department

Name: Chamaraja Nagar Fire Station Contact No: 08226-222661

Name: Regional Fire Station, Mysuru Contact No: 0821-2540116

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 7 : DISTRICT-WISE NOTIFICATION FLOWCHART

(RAMANAGARA DISTRICT)

KARNATAKA WATER RESOURCES DEPARTMENT 71

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020]

72 DAM REHABILITATION AND IMPORVEMENT PROJECT

RAMANAGARA DISTRICT – FAILURE CONDITION NOTIFICATION FLOWCHART (EXTERNAL ALERT)

Emergency Planning Manager Name: M B Raju

Designation: Executive Engineer Email: [email protected] Mobile No: 9448755039 Office No: 08236-257976

Name: Vasudev C Designation: Assistant Executive Engineer Email: [email protected] Mobile No: 9448871009 Office No: 08127-225427

Media

Name: Designation: Director, Dept. off Information Email: [email protected] Mobile No: Office No: 080-22028001

Name: N S Mahesh

Designation: Assistant Director, Dept of Information

Email: [email protected] Mobile No: 9480841230 Office No: 08232-224153

Name: Ravi, TV9 Kananda Mobile No: 9980914147

Name: Ananad, Digvijaya TV Mobile No: 9019935313

Name: Rohith, Public TV Mobile No: 9900060827

Name: Nandan Ramakrishna, Suvarna TV

Mobile No: 9632201503

Name: Yogesh, BTV Mobile No: 9900026155

Name: Raghu, ETV Kannada Mobile No: 9945779714

NOTES: (1), (2), (3)… Denotes Call Sequence/

Priority

Compulsory Communication

District Representatives

Name: M S Archana, IAS Designation: Deputy Commissioner, Ramanagara

(1) Email: [email protected]

Mobile No: Office No: 080-27273777

Name: B.P Vijay, KAS

Designation: Additional Deputy Commissioner Email: [email protected] Mobile No:

Office No: 080-27273777

(4) (3)

Taluk Representatives

Name: Anandaiah Designation: Tahasildar, Kanakapura Taluk

Email: [email protected] (5) Mobile No: 9448881613

Office No:

Health / Hospitals

Name: District Health Officer, Ramanagara Email: [email protected] Contact No: 080-27276058

Mobile No: 9449843061

Name: District Surgeon, Mysuru

Email: [email protected] Contact No: 080-27272248

Mobile No: 980579219

Karnataka DMA

Name: Dr. G.S Srinivasa Reddy

Designation: Director, KSNDMC

(1) Email: [email protected] Mobile No:

Office No: 080-67355000

Name: Honnamba Designation: Director, KSNDMA Email: [email protected] Mobile No: 9008405955

Office No: 080-22032995

Name: Control Room Toll Free No: 1070

(2)

(1)

Police Department

Name: Anoop Shetty, IPS

Designation: Superintendent of Police, Ramanagara Email:

Mobile No: 9480802800 Office No: 080-27273700

Name: Designation: Deputy Superintendent of Police

Email: Mobile No: Office No:

Fire Department

Name: Ramanagra Fire Station Contact No: 080-27273101

Name: Kanakapura Fire Station Contact No: 080-27502565

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 8 : LOCAL EVACUATION PLAN FOR THE AFFECTED VILLAGES AND SAFE SHELTER ARRANGEMENTS

Priority Evacuation

Order Settlement Name Evacuation Route Shelter Location

Time No

1 KRS Garden < 15 Min KRS Dam Road Krishnarajasagar

2 KRS < 15 Min KRS - Mysuru Road Hulikere

3 Chikkayarahalli < 15 Min KRS - Pandavapura Road Katteri

4 Belagola < 15 Min KRS - Mysuru Road Mogarahalli

5 Hosa Koppal < 15 Min Exisiting Village Road Haravoo

6 Haravoo < 15 Min Exisiting Village Road Haravoo

7 Chaluvarasanakoppal < 15 Min Exisiting Village Road Kyathanahalli

8 Kyathanahalli < 15 Min Exisiting Village Road Kyathanahalli

9 Dodddegowdanakoppalu < 15 Min Exisiting Village Road Kadathalu

10 Srirangapatna < 15 Min Mysuru - Bengaluru Highway Mysuru

11 Karimanti < 15 Min Mysuru - Bengaluru Highway Siddalingapura

12 Brampura < 30 Min Existing Village Road Naganahalli

13 Kirangur < 30 Min Srirangapatna - Jewargi

Mahanakoppalu Road (SH19)

14 Kalasthavadi < 30 Min Nagunahalli Road - Village

Kamanakerehundi Road

15 Naguvanahalli < 30 Min Existing Village Road Kamanakerehundi

16 Kadalkuppe < 45 Min Nagunahalli Road - Village

Kamanakerehundi Road

17 Chinnayakanahalli < 45 Min Existing Village Road Neelana Koppalu

18 Malapura < 45 Min Existing Village Road Taripura

19 Palahalli < 60 Min Existing Village Road Laxmipura

20 Darasaguppe < 60 Min Existing Village Road Nelamane

21 Brahmapur < 60 Min Existing Village Road Naganahalli

22 Nelamane < 60 Min Existing Village Road Nelamane

23 Ballenahalli < 60 Min Existing Village Road Nelamane

24 Chandagalu < 60 Min Existing Village Road Hebbadi Hundi

25 Maralagola < 60 Min Existing Village Road Neelana Koppalu

26 Mundagadore < 60 Min Existing Village Road Neelana Koppalu

27 Mahadevapura < 60 Min Existing Village Road Taripura

28 Hangarahalli < 60 Min Exisiting Village Road Arakere

29 Allapatna < 90 Min Existing Village Road Neelana Koppalu

30 Arakere < 90 Min Exisiting Village Road Arakere

31 Vadiyandahalli < 90 Min State Highway 17 Arakere

32 Gendehosahalli < 90 Min Village Road - State Highway

Aravatiige Koppal 79

33 Channahalli < 90 Min Exisiting Village Road Harohalli

34 Bidarahalli < 90 Min Exisiting Village Road Harohalli

35 Bannur Rural < 2 Hour Exisiting Village Road Hanumanal

KARNATAKA WATER RESOURCES DEPARTMENT 73

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Priority

Evacuation

Order Settlement Name Evacuation Route Shelter Location Time

No

36 Rangachari Hundi < 2 Hour Exisiting Village Road Harohalli

37 Bannur TMC < 3 Hour State Highway 33 Kirugavalu

38 Ranganathapura < 3 Hour State Highway 33 Harohalli

39 Kanchanahalli < 3 Hour State Highway 33 Harohalli

40 Rangasamudra < 3 Hour Exisiting Village Road Madegowdanahundi

41 Hittuvalli < 3 Hour Exisiting Village Road Madhavagere

42 Bevinahalli < 3 Hour Exisiting Village Road Megalakoppalu

43 Thumbale < 3 Hour Exisiting Village Road Agasthapura

44 Muthathi < 3 Hour Existing Village Road Agasthapura

45 Induvalu < 3 Hour National Highway 212 Bommanayakanhalli

46 Somanathapura < 3 Hour State Highway 84 Kirugavalu

47 Yadadore < 3 Hour National Highway 212 Meegalapura

48 Sosale < 3 Hour State Highway 84 Naragyathanahalli

49 Hunsur < 3 Hour State Highway 84 Yaraganahalli

50 Gargeswari < 3 Hour State Highway 84 Yaraganahalli

51 T N Pura < 3 Hour National Highway 212 Muguru

52 Binakanahalli < 3 Hour Existing Village Road Naragyathanahalli

53 Byrapura < 3 Hour State Highway 84 Gejjiganahalli

54 Algodu < 3 Hour Existing Village Road Vatalu

55 Kethahalli < 3 Hour Existing Village Road Vatalu

56 Chowhalli < 3 Hour National Highway 212 Kuruburu

57 S Megadahalli < 3 Hour Existing Village Road Horalahalli

58 Nilasoge < 3 Hour Existing Village Road Kuruburu

59 Hosapura < 3 Hour Existing Village Road Kuruburu

60 Kiragasur < 3 Hour Existing Village Road Gejjiganahalli

61 Muthalavadi < 4 Hour Existing Village Road Horalahalli

62 Hiriyur < 4 Hour Existing Village Road Kuruburu

63 Madapura < 4 Hour Existing Village Road Kuruburu

64 Kayyambahalli < 4 Hour Existing Village Road Naragyathanahalli

65 Thayur < 4 Hour Existing Village Road Gejjiganahalli

66 Maradipuram < 4 Hour Existing Village Road Muguru

67 Hosakote < 4 Hour National Highway 212 Varuna

68 Karagahalli < 4 Hour Existing Village Road Mudukanapura

69 Danayakanapura < 4 Hour National Highway 212 Varuna

70 Horalahalli < 4 Hour Existing Village Road Mudukanapura

71 Doddabbagilu < 4 Hour Existing Village Road Kolathuru

72 Akkur < 4 Hour Existing Village Road Kuruburu

73 Hullamballi < 4 Hour Existing Village Road Basavana Halli

74 Yadakola < 4 Hour Existing Village Road Kuppegala

75 Purigali < 5 Hour Existing Village Road Mallinathapura

76 Jodihariharapura < 5 Hour Existing Village Road Aldur

74 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Priority Evacuation

Order Settlement Name Evacuation Route Shelter Location Time

No

77 Somanahalli < 5 Hour Muttanahalli - Mudukuthore

B G Pura Rd

78 Bilugali < 5 Hour Existing Village Road Gejjiganahalli

79 Nandigunda < 5 Hour Existing Village Road Kuppegala

80 Hemmige < 5 Hour Existing Village Road Kuruburu

81 T Bettahalli < 5 Hour Muttanahalli - Mudukuthore

Kodagahalli Rd

82 Suthur < 5 Hour Existing Village Road Gejjiganahalli

83 Hosakote 1 < 5 Hour State Highway 88A Mosambayanahalli

84 T Doddapura < 5 Hour Village Road - National

Madarhalli Highway 212

85 Alathur < 5 Hour State Highway 88A Mosambayanahalli

86 Talakad < 5 Hour Existing Village Road T Megadahalli

87 Moodahalli < 6 Hour Existing Village Road Nandigundapura

88 Thottavadi < 6 Hour Existing Village Road Muguru

89 Kothegala < 6 Hour Existing Village Road Muguru

90 Kupparavalli < 6 Hour Existing Village Road Alaganchi

91 Hosamalangi < 6 Hour Existing Village Road Tagarapura

92 Madarahalli < 6 Hour Existing Village Road Muguru

93 Kanahalli < 6 Hour Existing Village Road Muguru

94 Saragooru < 6 Hour Existing Village Road Gundegala

95 Malangi < 6 Hour Existing Village Road Madarhalli

96 Hadinaru < 7 Hour Existing Village Road Ayarahalli

97 Kaliyur < 7 Hour Existing Village Road Tagarapura

98 Horalavadi < 7 Hour Existing Village Road Hebbaya

99 Teramballi < 7 Hour National Highway 212 Chilukavadi

100 Kunthur < 7 Hour National Highway 213 Chilukavadi

101 Mullur 1 < 7 Hour Existing Village Road Tagarapura

102 Agara < 7 Hour State Highway 79 Doddinduvadi

103 Mullur < 7 Hour National Highway 212 Tagarapura

104 Uttamballi < 7 Hour National Highway 212 Tagarapura

105 Kollegal TMC < 7 Hour State Highway 79 Doddinduvadi

106 Holesalu < 8 Hour Existing Village Road T Megadahalli

107 Thoramavu < 8 Hour National Highway 212 Kadakola

108 Hampapura < 8 Hour State Highway 79 Doddinduvadi

109 Harale < 8 Hour State Highway 79 Doddinduvadi

110 Nanjangud TMC < 8 Hour National Highway 212 Mysuru

111 Hondarabalu < 9 Hour State Highway 79 Doddinduvadi

112 Agrahara (Beecharag) < 9 Hour Existing Village Road Gundegala

113 Dhanagere < 9 Hour National Highway 209 -

Gundegala Village Road

114 Kallahalli < 9 Hour National Highway 212 Kadakola

115 Madavadi < 9 Hour Existing Village Road Kaggalipura

KARNATAKA WATER RESOURCES DEPARTMENT 75

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Priority

Evacuation

Order Settlement Name Evacuation Route Shelter Location Time

No

116 C M Samudra < 9 Hour Existing Village Road Madegowdanahundi

117 Kaggalipura < 9 Hour Existing Village Road Vasuvalli

118 Kiragasur 1 < 10 Hour Existing Village Road Vasuvalli

119 Sathegala < 10 Hour National Highway 209 -

Gundegala Village Road

120 Belekavadi MP < 10 Hour Kollegala Road Vasuvalli

121 Belakavadi Rural < 12 Hour Kollegala Road Vasuvalli

122 Tallanur < 12 Hour Kollegala Road Vasuvalli

123 Shagya < 12 Hour State Highway 92 Hegganuru

124 Mahalli < 12 Hour State Highway 92 Hegganuru

125 Unknown 1 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

126 Unknown 2 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

127 Unknown 3 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

128 Unknown 4 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

129 Unknown 5 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

130 Unknown 6 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

131 Unknown 7 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

132 Unknown 8 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

133 Unknown 9 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

134 Unknown 10 < 18 Hour Dharmapuri - Hogenakal

Pennagaram Road

135 Unknown 11 < 22 Hour Dharmapuri - Hogenakal

Pennagaram Road

136 Unknown 12 < 22 Hour Dharmapuri - Hogenakal

Pennagaram Road

137 Unknown 13 < 22 Hour Dharmapuri - Hogenakal

Pennagaram Road

138 Unknown 14 < 22 Hour Dharmapuri - Hogenakal

Pennagaram Road

139 Unknown 15 < 22 Hour Dharmapuri - Hogenakal

Pennagaram Road

76 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 9 : SHELTERS / RELIEF CAMPS AVAILABLE OUTSIDE THE INUNDATION AREA

Table 23 : Details of Shelters / Relief Camps available outside the inundation area

SL DISTRICT TALUK VILLAGE SHELTER

No

1 Mandya Pandavapura Saathapura Saathapura

2 Mandya Pandavapura Katteri Katteri

3 Mandya Pandavapura Kyathanahalli Kyathanahalli

4 Mandya Pandavapura Aralakuppe Aralakuppe

5 Mandya Pandavapura Haravu Haravu

6 Mandya Pandavapura Talasasana Talasasana

7 Mandya Pandavapura Puttasomanahalli Puttasomanahalli

8 Mandya Pandavapura Chikkade Chikkade

9 Mandya Shrirangapattana Taripura Taripura

10 Mandya Shrirangapattana Belavadi Belavadi

11 Mandya Shrirangapattana Hebbadi Hundi Hebbadi Hundi

12 Mandya Shrirangapattana Hebbadi Hebbadi

13 Mandya Shrirangapattana Gandehosahalli Gandehosahalli

14 Mandya Shrirangapattana Hosahalli Hosahalli

15 Mandya Shrirangapattana Belagola Belagola

16 Mandya Shrirangapattana Palahalli Palahalli

17 Mandya Shrirangapattana Vadiyandahalli Vadiyandahalli

18 Mandya Shrirangapattana Ballekere Ballekere

19 Mandya Shrirangapattana Arkere Arkere

20 Mandya Shrirangapattana Allaptna Allaptna

21 Mandya Shrirangapattana T M Hosur T M Hosur

22 Mandya Shrirangapattana Makanakoppalu Makanakoppalu

23 Mandya Shrirangapattana Sabbanakuppe Sabbanakuppe

24 Mandya Shrirangapattana Kadathanalu Kadathanalu

25 Mandya Shrirangapattana Nelamane Nelamane

26 Mandya Malavalli B G Pura B G Pura

27 Mandya Malavalli Chikkabagilu Chikkabagilu

28 Mandya Malavalli Belakavadi Belakavadi

29 Mandya Malavalli Purigali Purigali

30 Mysuru Mysuru Kuppegala Kuppegala

31 Mysuru Mysuru Siddalingapura Siddalingapura

32 Mysuru Mysuru Naganahalli Naganahalli

33 Mysuru Mysuru Laxmipura Laxmipura

34 Mysuru Nanjangudu Golur Golur

35 Mysuru Nanjangudu Nanjanagudu Nanjanagudu

36 Mysuru Nanjangudu Saragooru Saragooru

37 Mysuru Nanjangudu Belagunda Belagunda

38 Mysuru Nanjangudu Kempisidanahundi Kempisidanahundi

KARNATAKA WATER RESOURCES DEPARTMENT 77

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

SL DISTRICT TALUK VILLAGE SHELTER

No

39 Mysuru Nanjangudu Nagarle Nagarle

40 Mysuru Nanjangudu Hullimavu Hullimavu

41 Mysuru Nanjangudu Sutturu Sutturu

42 Mysuru Nanjangudu Gejjiganahalli Gejjiganahalli

43 Mysuru Nanjangudu Thandavapura Thandavapura

44 Mysuru Nanjangudu Moodahalli Moodahalli

45 Mysuru Nanjangudu Alathuru Alathuru

46 Mysuru Nanjangudu Jodihariharapura Jodihariharapura

47 Mysuru T Narasipura Moogooru Moogooru

48 Mysuru T Narasipura Madarhalli Madarhalli

49 Mysuru T Narasipura Kannahalli Kannahalli

50 Mysuru T Narasipura Talakadu Talakadu

51 Mysuru T Narasipura Hosa Kukkuru Hosa Kukkuru

52 Mysuru T Narasipura T Narasipura T Narasipura

53 Mysuru T Narasipura Koppalu Koppalu

54 Mysuru T Narasipura T Megadahalli T Megadahalli

55 Mysuru T Narasipura Biligerehundi Biligerehundi

56 Mysuru T Narasipura Horala Halli Horala Halli

57 Mysuru T Narasipura Thammadipura Thammadipura

58 Mysuru T Narasipura Kolathuru Kolathuru

59 Mysuru T Narasipura Ukkalagere Ukkalagere

60 Mysuru T Narasipura Kullana Koppalu Kullana Koppalu

61 Mysuru T Narasipura Kethupura Kethupura

62 Mysuru T Narasipura Rangasamudra Rangasamudra

63 Mysuru T Narasipura Megalakoplu Megalakoplu

64 Mysuru T Narasipura Uttali Uttali

65 Mysuru T Narasipura B Bettahalli B Bettahalli

66 Mysuru T Narasipura Bannuru Bannuru

67 Mysuru T Narasipura Chamanahalli Chamanahalli

68 Mysuru T Narasipura Makanahalli Makanahalli

69 Mysuru T Narasipura Madaganahalli Madaganahalli

70 Mysuru T Narasipura Hanumanal Hanumanal

71 Mysuru T Narasipura Kodagahalli Kodagahalli

72 Mysuru T Narasipura Aravattige Koppal Aravattige Koppal

73 Mysuru T Narasipura B Seehalli B Seehalli

74 Chamarajanagar Kollegal Surapura Surapura

75 Chamarajanagar Kollegal Kunthur Kunthur

76 Chamarajanagar Kollegal Hosamalangi Hosamalangi

77 Chamarajanagar Kollegal Kollegala Kollegala

78 Chamarajanagar Kollegal Madhuvanahalli Madhuvanahalli

79 Chamarajanagar Kollegal Gundegala Gundegala

80 Chamarajanagar Yelandur Kinakanahalli Kinakanahalli

78 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 10 : INUNDATION MAPS

(ENCLOSED SEPARATELY)

KARNATAKA WATER RESOURCES DEPARTMENT 79

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

KARNATAKA WATER RESOURCES DEPARTMENT 80

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 11 : UNUSAL OR EMERGENCY EVENT LOG

(To be completed during the emergency)

Dam Name: Krishnarajasagara Dam District: Mandya

When and how was the event detected? : __________________________________________________

__________________________________________________________________________________

__________________________________________________________________________________

Weather Conditions: _________________________________________________________________

General description of the emergency situation: _____________________________________________

__________________________________________________________________________________

Emergency level determination: ___________________________ Made By: _____________________

Actions and Event Progression

Date Time Action / Event Progression Recorded By

KARNATAKA WATER RESOURCES DEPARTMENT 81

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Date Time Action / Event Progression Recorded By

82 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Date Time Action / Event Progression Recorded By

KARNATAKA WATER RESOURCES DEPARTMENT 83

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Date Time Action / Event Progression Recorded By

84 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Date Time Action / Event Progression Recorded By

KARNATAKA WATER RESOURCES DEPARTMENT 85

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Date Time Action / Event Progression Recorded By

86 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET

INDEX

Table 24 : Emergency Level Determination - Action Data Sheet Index

Event / General

Specific Observation / Condition

Emergency Action Data

Observation Level Sheet

Unexpected Dam unexpectedly and without warning begins RED SHEET #1

Failure

to fail

No active erosion in the downstream areas. BLUE SHEET A1

Discharge are below 5,000 m3/sec.

Spillway Release,

Active erosion in downstream areas. Spillway’s

increasing ORANGE SHEET A2

discharge is above 5,000 m3/sec.

reservoir Water

Active erosion in downstream areas or

Surface Elevation

advancing head cut that is threatening the dam RED SHEET A3

toe. Discharge is above 10,000 m3/sec.

Potential Dam Overtopping, Reservoir Water

Dam Overtopping Surface Elevation in one (1) meter below the top ORANGE SHEET B1

of the dam.

Water from the reservoir is flowing over the top RED SHEET B2

of the dam

Seepage through the dam body, new or minor

seepage at toe, on the slope of body, abutments, BLUE SHEET C1

water flowing clear

New, seriously or rapidly increasing seepage Seepage flow rate at toe, on slope of the dam body, ORANGE SHEET C2

abutments, water flowing cloudy

Serious seepage at toe, on slope of the dam

body, abutments uncontrollable muddy water, RED SHEET C3

failure of the dam is imminent

Minor cracks (bigger than ¼ cm) in the masonry BLUE SHEET D1

/ concrete structure, without leakage

Enlarging cracks (bigger than ¼ cm) and active Masonry Structure movement in the masonry / concrete structure, ORANGE SHEET D2

Cracking with leakage passing through

Enlarging cracks with sudden or rapidly

proceeding movements / displacements in the RED SHEET D3

masonry / concrete structure, with severe

leakage passing through

Instrumentation readings are beyond

predetermined / thresholds values

Instrumentation Structural member of a gate, gate operator BLUE SHEET F1

broken or severely damaged, which prevents

operation or malfunction of the gate(s). No

leakage or uncontrolled discharge is detected.

KARNATAKA WATER RESOURCES DEPARTMENT 87

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Event / General Specific Observation / Condition

Emergency Action Data

Observation

Level Sheet

Flood can be routed without damaged / non-

operational gate(s)

Structural member of a gate, gate operator

broken or severely damaged, which prevents

operation or malfunction of the gate(s). BLUE SHEET F1

considerable leakage or uncontrolled discharge

is detected. Flood cannot be routed without

damaged / non-operational gate(s)

Structural member of a gate, gate operator

broken or severely damage, which prevents Malfunction of operation or malfunction of the gate(s).

ORANGE SHEET F2 Gates unexpected high discharge is occurring. Flood

cannot be routed without damaged / non-

operational gate(s)

Structural member of a gate, gate operator

broken or severely damage, which prevents

operation or malfunction of the gate(s). RED SHEET F3

unexpected high discharge is occurring. Flood

cannot be routed without damaged / non-

operational gate(s)

Measurable earthquake felt or reported and dam BLUE SHEET G1

appears to be stable

Earthquake resulting in visible damage to the

Earthquake dam or appurtenances which can cause a ORANGE SHEET G2

potentially dangerous situation

Earthquake resulting in uncontrolled release of

water over dam or rapidly developing flow

through cracks or rapidly developing flow RED SHEET G3

through cracks or rapidly developing erosion

through increased seepage

Unverified bomb threat or verified damage to the

dam / appurtenances with no impacts in the BLUE SHEET H1

functioning of the dam

Verified bomb threat that if carried out, could

Security Threat / result in damaging the dam / appurtenances that

Sabotage / impacts the functioning of the dam or verified ORANGE SHEET H2

Vandalism damages due to vandalism that impacts the

normal operation of the dam

Detonated bomb resulting in visible damage to

the dam or appurtenances or verified damage RED SHEET H3

due to vandalism causing an uncontrolled water

release

88 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020]

Description: RED ALERT SHEET #1 Unexpected Failure

RECOMMENDED ACTIONS

Emergency Planning Manager

a) Implement the “Failure Condition Notification Flowchart” using pre-scripted message. b) Activate the Emergency Operation Centre. c) Recommend to the concerned Deputy Commissioner(s) and Disaster Management

Authorities for IMMEDIATE EVACUATION downstream of the dam and affected areas as per Local

Evacuation Plan. d) Stay at a safe distance away from the dam. The immediate concern is the safety of the downstream

public.

Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY EVENT LOG

Site Engineer’s

g) Stay a safe distance away from the dam h) Observe conditions in site periodically and provide decision support as appropriate.

Superintending / Chief Engineer

i) Communicate and keep informed the Principal Secretary of Water Resources Department Dam Safety Organization’s Staff

j) Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions continuously, determine if:

a. The event warrants downgrade if there is not longer an impending threat of dam failure with no

additional rainfall occurring yet there is damage to the dam that prevents safe impoundment of water.

All contacts on Event Level 1 Notification Flowchart shall be notified of downgrade to Event Level 3. b. Event may be terminated only when either: There is no longer an impending threat of dam failure with no additional rainfall occurring and it has been determined by NC Dam Safety staff safe to impound water or; The dam has failed and there is no longer threat to the downstream public.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL DOWNSGRADE B. TERMINATION

Monitor conditions until damage is Go to Responsibilities for

repaired Termination and Follow-Up

KARNATAKA WATER RESOURCES DEPARTMENT 89

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

90 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Flood gates release, increasing reservoir Water Surface Elevation. No active erosion in the SHEET

BLUE ALERT

downstream areas. Spillway Discharge is below 5,000

A1

m3/sec

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

a) Implement the “Watch Condition Notification Flowchart” using pre-scripted message. b) Make careful observation and inspection of every part of the dam; this should be done without compromising the safety of anyone performing these tasks. c) Monitor water levels in the reservoir and spillway area for erosion every two hours d) Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY EVENT

LOG

▪ Contact the Superintending / Chief Engineer at least daily to report the latest observations and

conditions. If conditions change significantly, go to re-evaluation / decision section and follow relevant

steps immediately. Site Engineer’s

▪ Observe conditions in site periodically and provide decision support as appropriate. ▪ Provide oversight to corrective actions or work as required.

Superintending / Chief Engineer

▪ Direct specific and appropriate procedures to open / close the flood gates during the reservoir operation. Dam Safety Organization’s Staff

i) Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions continuously using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION –

ACTION DATA SHEET INDEX. Determine whether:

▪ The event can be terminated when spillway flows cease. ▪ The event remains at the current event level (No change in situation) ▪ The event warrants escalation when flood gate flows produce either active erosion of channel or

flow that may result in flooding of people downstream. Discharge above 5,000m3/sec for more than 100 hours duration warrants escalation to ORANGE alert. Link to ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX ORANGE level conditions.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

C. EVENT LEVEL A. EVENT LEVEL DOWNSGRADE B. TERMINATION ESCALATION

Monitor conditions until damage is Go to Responsibilities for Go to SHEET A2 (ORANGE

repaired Termination and Follow-Up ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 91

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

92 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Flood gates release, increasing reservoir Water Surface Elevation. No active erosion in the SHEET

ORANGE ALERT

downstream areas. Spillway Discharge is above 5,000

A2

m3/sec

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

1 Implement the “Failure Condition Notification Flowchart” using pre-scripted message. 1 Identify the areas that would be potentially impacted by the emergency events. 1 Make careful observations and inspection of every part of the dam, this should be done without compromising the safety of anyone performing these tasks. 1 Monitor water levels in the reservoir and spillway area for erosion every hour 1 Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG 1 Contact the Superintending / Chief Engineer at least daily to report the latest observations and

conditions. If conditions change significantly, go to re-evaluation / decision section and follow relevant

steps immediately. Site Engineer’s

2 Observe conditions in site periodically and provide decision support as appropriate. 2 Provide oversight to corrective actions or work as required. Superintending / Chief Engineer

3 Direct specific and appropriate procedures to open / close the flood gates during the reservoir operation. Dam Safety Organization’s Staff J. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions continuously using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX. Determine whether:

▪ The event warrants downgrade to BLUE alert if “flood gate flow is decreasing with no additional

rainfall occurring”. All contacts in the Notification Flowchart shall be notified of downgrade from

ORANGE to BLUE alert. ▪ The event remains at the current event level (No change in situation) ▪ The event warrants escalation to RED alert if either erosion of channel is advancing towards the dam or spillway is flooding people downstream.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

F. EVENT LEVEL D. EVENT LEVEL DOWNSGRADE E. TERMINATION ESCALATION

Monitor conditions until damage is Continue recommended Go to SHEET A3 (RED

repaired action on this Sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 93

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

94 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Flood gates release, increasing reservoir Water Surface Elevation. Active erosion in the downstream SHEET

RED ALERT

areas or advancing head cut that is threatening the dam toe.

A3

Discharge is above 10,000 m3/sec

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

▪ Implement the “Watch Condition Notification Flowchart” using pre-scripted message. ▪ Identify the areas that would be potentially impacted by the emergency events. ▪ Recommend to the concerned District Deputy Commissioner(s) and Disaster Management

Authorities for IMMEDIATE EVACUATON downstream of the dam and affected areas as per Local

Evacuation Plan ▪ Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public.

Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY EVENT LOG

Site Engineer’s ▪ Observe conditions from a safe place at dam site periodically and provide decision support as appropriate. Superintending / Chief Engineer

▪ Provide decision support and technical support to Emergency Planning Manager as appropriate. Dam Safety Organization’s Staff

▪ Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions continuously using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION –

ACTION DATA SHEET INDEX. Determine whether:

▪ The event warrants downgrade to BLUE alert if “flood gate flow is decreasing with no additional

rainfall occurring”. All contacts in the Notification Flowchart shall be notified of downgrade from

RED to BLUE alert. ▪ The event remains at the current event level (No change in situation) ▪ Event may be terminated only when : Flood gate flow has stopped with no additional rainfall occurring and it has been determined by Dam Safety Organization’s staff to impound water or; The dam has failed and there is no threat to the downstream public.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL C. EVENT LEVEL

B. TERMINATION

DOWNSGRADE

ESCALATION

Monitor conditions until damage is Continue recommended

Go to Responsibilities for

Termination and Follow-

repaired

action on this sheet

Up

KARNATAKA WATER RESOURCES DEPARTMENT 95

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

96 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020]

ORANGE

Description: Dam Overtopping SHEET

ALERT

Potential Dam Overtopping, Reservoir Water Surface B1

Elevation in One(1) meter below the top of the dam.

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

▪ Implement the “Failure Condition Notification Flowchart” using pre-scripted message. ▪ Identify the areas that would be potentially impacted by the emergency events. ▪ Make careful observations and inspection of every part of the dam, this should be done without compromising the safety of anyone performing these tasks. ▪ Monitor water levels and flood gate areas for erosion every 15 minutes ▪ Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG ▪ Use “a bottom drain, installed siphon or pumps located on-site” to provide additional drawdown

of the reservoir level. ▪ Contact the Superintending / Chief Engineer at least daily to report the latest observations and conditions. If conditions change significantly, go to re-evaluation / decision section and follow

relevant steps immediately. Site Engineer’s

▪ Observe conditions in site periodically and provide decision support as appropriate. ▪ Provide oversight to corrective actions or work as required. Superintending / Chief Engineer

▪ Direct specific and appropriate procedures to open / close the flood gates during the reservoir operation. Dam Safety Organization’s Staff

K. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON Error! Not a valid result for table.

Evaluate conditions continuously determine if:

▪ The event warrants downgrade to BLUE alert if rainfall stopped and showing additional inflow to

reservoir. Reservoir level are below Maximum Water Level. All contacts in the Notification Flowchart

shall be notified of downgrade from ORANGE to BLUE alert. ▪ The event remains at the current event level (No change in situation) ▪ The event warrants escalation to RED alert if water begin to overtop the dam body.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL C. EVENT LEVEL

B. TERMINATION

DOWNSGRADE

ESCALATION

Declare BLUE alert and Monitor Continue recommended

Go to SHEET B2 (RED

conditions until reservoir levels go ALERT)

action on this Sheet

below Full Reservoir Level (FRL)

KARNATAKA WATER RESOURCES DEPARTMENT 97

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

98 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Dam Overtopping SHEET

RED ALERT Potential Dam Overtopping, Water from the reservoir is

B2 flowing over the top of the dam

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling on

site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION DATA

SHEETS)

▪ Implement the “Failure Condition Notification Flowchart” using pre-scripted message. ▪ Identify the areas that would be potentially impacted by the emergency events. ▪ Recommend to the concerned District Deputy Commissioner(s) and Disaster Management

Authorities for IMMEDIATE EVACUATON downstream of the dam and affected areas as per Local

Evacuation Plan ▪ Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public. ▪ Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG

Site Engineer’s F. Observe conditions in site periodically and provide decision support as appropriate.

Superintending / Chief Engineer

▪ Direct specific and appropriate procedures to open / close the flood gates during reservoir

operations. Dam Safety Organization’s Staff

H. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate the situation as events progress, or whenever conditions change. Determine whether:

▪ The event remains at the current event level (No change in situation) ▪ Event may be terminated only when either: Flood stopped with no additional rainfall occurring and it has been determined by Dam Safety

Organization’s staff is safe to impound water or; The dam has failed and there is no threat to the downstream public.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL B. TERMINATION

C. EVENT LEVEL ESCALATION

DOWNSGRADE

Monitorconditions until Continue recommended GotoResponsibilitiesfor

damage is repaired action on this sheet Termination and Follow-Up

KARNATAKA WATER RESOURCES DEPARTMENT 99

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

100 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Seepage SHEET

BLUE ALERT Seepage through the dam body, new or minor seepage at

C1 toe, on the slope of body, abutments, water flowing clear

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)

▪ Implement the “Watch Condition Notification Flowchart” using pre-scripted message. ▪ Make careful observation and inspection of every part of the dam; this should be done without compromising the safety of anyone performing these tasks. ▪ Monitor water levels and seepage points for cloudy discharge or increased flow rates every two hours. Attempt to determine source of seepage ▪ Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG ▪ Contact the Superintending / Chief Engineer at least daily to report the latest observations and conditions. If conditions change significantly, go to re-evaluation / decision section and follow relevant steps immediately.

Site Engineer’s & Observe conditions in site periodically and provide decision support as appropriate. Try to channel and measure the flow & Use wooden stakes or flagging to delineate seepage area. Look for upstream whirlpools Superintending / Chief Engineer

& Review all pertinent information in order to recommend appropriate actions to the Emergency Planning Manager in conjunction with Dam Safety Organization staff. Provide oversight to corrective actions or work as required. Observe conditions in site periodically and provide decision support as appropriate.

Dam Safety Organization’s Staff ▪ Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions at least daily or whenever conditions change significantly using ANNEXURE 12 :

EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX. Determine whether:

▪ The event can be terminated if seepage flow has been remedied and it has been determined by Dam Safety Organization’s staff safe to impound water.

▪ The event remains at the current event level (No change in situation) ▪ The event warrants escalation to ORANGE alert if discharge becomes cloudy or increased flow rate.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL C. EVENT LEVEL B. TERMINATION

DOWNSGRADE ESCALATION

Goto Responsibilitiesfor Continue recommended Go to SHEET C2 (ORANGE

Termination and Follow-Up action on this sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 101

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

102 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Seepage

ORANGE New, seriously or rapidly increasing seepage flow rate at

SHEET

ALERT toe, on slope of the dam body, abutments, water flowing C2

cloudy

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

▪ Implement the “Failure Condition Notification Flowchart” using pre-scripted message. ▪ Identify the areas that would be potentially impacted by the emergency events. ▪ Make careful observations and inspection of every part of the dam, this should be done without compromising the safety of anyone performing these tasks. ▪ Monitor water levels and flood gate areas for erosion every 15 minutes ▪ Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG ▪ Contact the Superintending / Chief Engineer at least daily to report the latest observations and

conditions. If conditions change significantly, go to re-evaluation / decision section and follow relevant

steps immediately.

▪ Observe conditions in site periodically and provide decision support as appropriate. ▪ If conditions permit, plug the flow from upstream side with available material (bentonite or plastic sheeting). Place an invert filter (layered sand and gravel) over the exit area to hold the soil material in place. ▪ Construct a large ring dike around the seepage area as appropriate ▪ Provide oversight to corrective actions or work as required. ▪ Study an emergency lowering of the reservoir. Dam Safety Organization’s Staff

▪ Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions at least twice daily or whenever conditions change significantly. Using ANNEXURE

12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX, determine whether:

▪ The event warrants downgrade to BLUE alert if water level in lake is lowered below level of seepage ▪ The event remains at the current event level (No change in situation) ▪ The event warrants escalation to RED alert if the integrity of the dam appears to be threatened. All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL C. EVENT LEVEL

B. TERMINATION

DOWNSGRADE

ESCALATION

Go to SHEET C1 (BLUE Alert)

Continue recommended Go to SHEET C3 (RED

action on this Sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 103

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

104 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Seepage

Serious seepage at toe, on slope of the dam body,

SHEET RED ALERT

abutments, uncontrollable muddy water, failure of the dam C3

is imminent

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

1. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. 2. Identify the areas that would be potentially impacted by the emergency events. 3. Recommend to the concerned District Deputy Commissioner(s) and Disaster Management

Authorities for IMMEDIATE EVACUATON downstream of the dam and affected areas as per Local

Evacuation Plan 4. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public. 5. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG

Site Engineer’s ▪ Observe conditions from a safe place at dam site periodically and provide decision support as appropriate. ▪ Construct a large ring dike around the seepage areas as appropriate. Superintending / Chief Engineer

• Provide decision support and technical support to Emergency Planning Manager as appropriate Dam Safety Organization’s Staff

• Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate the situation as events progress, or whenever conditions change. Determine whether:

• The event remains at the current event level (No change in situation) • Event may be terminated only when either: Flood stopped with no additional rainfall occurring and it has been determined by Dam Safety Organization’s staff is safe to impound water or; The dam has failed and there is no threat to the downstream public.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL B. TERMINATION

C. EVENT LEVEL ESCALATION

DOWNSGRADE

Monitorconditions until Continue recommended GotoResponsibilitiesfor

damage is repaired action on this sheet Termination and Follow-Up

KARNATAKA WATER RESOURCES DEPARTMENT 105

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

106 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Masonry Structure Cracking SHEET

BLUE ALERT

Minor cracks (bigger than ¼ cm) in the masonry / concrete D1

structure, without leakage

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)

• Implement the “Watch Condition Notification Flowchart” using pre-scripted message. • Make careful observation and inspection of every part of the dam; this should be done without compromising the safety of anyone performing these tasks. • Monitor water levels in the reservoir. Install a measurement device to monitor progress / movement in crack(s). • Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG • Contact the Superintending / Chief Engineer at least daily to report the latest observations and conditions. If conditions change significantly, go to re-evaluation / decision section and follow

relevant steps immediately. Site Engineer’s

• Photograph and record the location, direction (longitudinal, vertical, diagonal, etc.), depth, length, width and offset of each crack that has been discovered. Compare observations with earlier results. • Closely monitor the cracks for changes and look for structural damage including misalignment, settlement, vertical and horizontal displacement Superintending / Chief Engineer

• Review all pertinent information in order to recommend appropriate actions to the Emergency Planning Manager in conjunction with Dam Safety Organization staff. Provide oversight to corrective actions or work as required. Observe conditions in site periodically and provide decision support as appropriate. Dam Safety Organization’s Staff (9) Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions at least daily or whenever conditions change significantly using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX. Determine whether:

A. The event can be terminated if its determined that the dam no longer poses an immediate threat to downstream by Dam Safety Organization staff.

B. The event remains at the current event level (No change in situation) C. The event warrants escalation to ORANGE alert if cracks are enlarging and leakage begins to

flow from cracks All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL C. EVENT LEVEL

B. TERMINATION

DOWNSGRADE ESCALATION

Goto Responsibilitiesfor Continue recommended Go to SHEET D2 (ORANGE

Termination and Follow-Up action on this sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 107

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

108 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ORANGE Description: Masonry Structure Cracking

SHEET Enlarging cracks (bigger than ¼ cm) and active movement

ALERT in the masonry / concrete structure, with leakage passing D2

through

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

A. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. B. Identify the areas that would be potentially impacted by the emergency events.

C. Make careful observations and inspection of every part of the dam, this should be done without

compromising the safety of anyone performing these tasks. Look closely for changes in the

spillways and outlet structures that may be affected by the cracks. Items to check also include

vertical, horizontal and lateral displacement, structural cracking and tilting of the spillway walls. D. Monitor water levels and flood gate areas for erosion every 15 minutes E. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG F. Contact the Superintending / Chief Engineer at least daily to report the latest observations and

conditions. If conditions change significantly, go to re-evaluation / decision section and follow

relevant steps immediately. Site Engineer’s

G. Observe conditions in site periodically and provide decision support as appropriate.

H. If conditions permit, dump large rock on downstream of moving concrete structure monolith to

resist the movement. Lower burlap on upstream face of crack(s) to reduce flow of soil particles. I. Construct a large ring dike around the seepage area as appropriate J. Provide oversight to corrective actions or work as required. Superintending / Chief Engineer K. Study an emergency lowering of the reservoir. Dam Safety Organization’s Staff

L. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX Evaluate conditions at least twice daily or whenever conditions change significantly. Using ANNEXURE

12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX, determine whether: A. The event warrants downgrade to BLUE alert if water level in reservoir is lowered to safe levels.

Event may not be terminated until repairs are made and causes of cracking / movement has been determined

B. The event remains at the current event level (No change in situation) C. The event warrants escalation to RED alert if the integrity of the dam appears to be threatened

by sudden or rapidly proceeding movement / displacements All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

C. EVENT LEVEL A. EVENT LEVEL DOWNSGRADE B. TERMINATION ESCALATION

Go to SHEET D1 (BLUE Alert)

Continue recommended Go to SHEET D3 (RED

action on this Sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 109

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

110 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Masonry Structure Cracking

Enlarging cracks with sudden or rapidly proceeding

SHEET RED ALERT

movements / displacements in the masonry / concrete D3

structure, with severe leakage passing through

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

A. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. B. Identify the areas that would be potentially impacted by the emergency events.

C. Recommend to the concerned District Deputy Commissioner(s) and Disaster Management

Authorities for IMMEDIATE EVACUATON downstream of the dam and affected areas as per

Local Evacuation Plan D. Stay a safe distance away from the dam. The immediate concern is the safety of the

downstream public. E. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG

Site Engineer’s F. Observe conditions from a safe place at dam site periodically and provide decision support as

appropriate. Superintending / Chief Engineer G. Provide decision support and technical support to Emergency Planning Manager as appropriate

Dam Safety Organization’s Staff H. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate the situation as events progress, or whenever conditions change. Determine whether:

A. The event warrants downgrade to BLUE alert if there is no longer an immediate impending threat of dam failure and water level in the reservoir is lowered to a safe level. (Confirmed by Dam Safety Organization’s staff)

B. The event remains at the current event level. (No change in situation) C. Event may be terminated only when either:

The dam has failed and there is no longer a threat to the downstream public. (Confirmed by Disaster Management Authorities)

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

D. EVENT LEVEL E. TERMINATION

F. EVENT LEVEL ESCALATION

DOWNSGRADE

Monitorconditions until Continue recommended GotoResponsibilitiesfor

damage is repaired action on this sheet Termination and Follow-Up

KARNATAKA WATER RESOURCES DEPARTMENT 111

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

112 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Instrumentation SHEET BLUE ALERT

Instrumentation readings are beyond predetermined / E1

threshold values

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

A. Implement the “Watch Condition Notification Flowchart” using pre-scripted message. B. Make careful observation and inspection of every part of the dam related with the instruments

measurements C. Monitor water levels in the reservoir and instrument readings for changes or anomalies D. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG E. Contact the Superintending / Chief Engineer at least daily to report the latest observations and

conditions. F. If instrumentation readings at the dam are determined to indicate a potentially dangerous

situations, go to the re-evaluation / decision section and follow relevant steps immediately. Site Engineer’s G. Contact the Quality assurance / monitoring divisions to inform the anomalies H. Closely monitor the instrument’s performance and increase frequency readings to determine

negative / dangerous trends Superintending / Chief Engineer I. Review all pertinent information in order to recommend appropriate actions to the Emergency

Planning Manager in conjunction with Dam Safety Organization staff. Provide oversight to corrective actions or work as required. Observe conditions in site periodically and provide decision support as appropriate.

Dam Safety Organization’s Staff J. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions at least daily or whenever conditions change significantly using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX. Determine whether: A. The event can be terminated if the instrumentation readings are back to normal or if instrument

reading determined to be invalid. B. The event remains at the current event level (No change in situation) C. The event warrants escalation, if instrumentation readings at the dam are determined to indicate

a potentially dangerous situation. All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions A. EVENT LEVEL C. EVENT LEVEL ESCALATION B. TERMINATION

DOWNSGRADE Go to ANNEXURE 12 : EMERGENCY

Go to Responsibilities for Continue recommended LEVEL DETERMINATION – ACTION DATA

SHEET INDEX to determine type of

Termination and Follow-Up action on this sheet event/dangerous situation revealed by

the instrument’s anomalies

KARNATAKA WATER RESOURCES DEPARTMENT 113

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

114 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Malfunction of Gates

Structural member of a gate, gate operator broken or SHEET

severely damaged, prevents operation or malfunction of the BLUE ALERT

gate(s). No leakage or uncontrolled discharge is detected. F1

Flood can be routed without damaged / non-operational

gate(s)

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS) A. Implement the “Watch Condition Notification Flowchart” using pre-scripted message. B. Make careful observation and inspection of every part of the spillway mechanisms C. Monitor water levels and flood forecasting reports continuously. Verify the rest of spillway’s gates

are operative

D. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY EVENT LOG

E. Contact the Superintending / Chief Engineer at least daily to report the latest observations and conditions.

F. If leakage or uncontrolled release is detected at the dam and indicate a potentially dangerous situation, go to the re-evaluation / decision section and follow relevant steps

immediately. Site Engineer’s G. Contact the Hydro-Mechanical / Maintenance Division to inform the anomalies H. Monitor and supervise any remedial action and inform the Emergency Planning Manager about

the progress I. Assure gauge stations and forecast data is transmitted with a higher frequency than during

normal operations. Superintending / Chief Engineer J. Review all pertinent information in order to recommend appropriate actions to the Emergency

Planning Manager in conjunction with Dam Safety Organization staff. Provide oversight to corrective actions or work as required. Observe conditions in site periodically and provide decision support as appropriate.

Dam Safety Organization’s Staff K. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions at least daily or whenever conditions change significantly using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX. Determine whether: D. The event can be terminated gate(s) are back to normal operations or anomalies/damages have

been repaired. E. The event remains at the current event level (No change in situation) F. The event warrants escalation if:

Considerable leakage or uncontrolled discharge is detected Forecast data indicates that it is impossible to handle the flood without the operation of the

damaged / non-operational gates. All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions C. EVENT LEVEL A. EVENT LEVEL DOWNSGRADE B. TERMINATION ESCALATION

GotoResponsibilitiesfor Continue recommended Go to SHEET F2 (ORANGE

Termination and Follow-Up action on this sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 115

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

116 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Malfunction of Gates

ORANGE Structural member of a gate, gate operator broken or

SHEET severely damaged, which prevents operation or malfunction

ALERT of the gate(s). considerable leakage or uncontrolled F2

discharge is detected. Flood cannot be routed without

damaged / non-operational gate(s)

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

A. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. B. Identify the areas that would be potentially impacted by the emergency events. C. Make careful observations and inspection of every part of the spillway mechanism.

D. Monitor water levels and flood forecasting reports continuously. Verify rest of flood gates are

operative. E. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG F. Contact the Superintending / Chief Engineer hourly to report the latest observations and

conditions. If conditions change significantly, go to re-evaluation / decision section and follow relevant steps immediately.

Site Engineer’s G. Observe conditions in site periodically and provide decision support as appropriate. H. Provide oversight to corrective actions or work as required. Superintending / Chief Engineer I. Study an emergency lowering of the reservoir. Dam Safety Organization’s Staff

J. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions at least twice daily or whenever conditions change significantly. Using ANNEXURE

12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX, determine whether: A. The event warrants downgrade to BLUE alert if leakage was stopped but still repair actions

should be done. Event may not be terminated until repairs are made. B. The event remains at the current event level (No change in situation) C. The event warrants escalation to RED alert if the leakage is rapidly increasing through the

gate(s) or the failure of the gate(s) is imminent. Unexpected discharges during non-flood season should be considered as high risk events where an escalation in the level of alert is necessary.

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

C. EVENT LEVEL A. EVENT LEVEL DOWNSGRADE B. TERMINATION ESCALATION

Go to SHEET F1 (BLUE Alert)

Continue recommended Go to SHEET F3 (RED

action on this Sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 117

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

118 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Malfunction of Gates

RED ALERT Structural member of a gate, gate operator broken SHEET or severely damage, which prevents operation or

F3 malfunction of the gate(s). unexpected high

discharge is occurring. Flood cannot be routed

without damaged / non-operational gate(s)

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

A. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. B. Identify the areas that would be potentially impacted by the emergency events.

C. Recommend to the concerned District Deputy Commissioner(s) and Disaster Management

Authorities for IMMEDIATE EVACUATON downstream of the dam and affected areas as per

Local Evacuation Plan D. Stay a safe distance away from the dam. The immediate concern is the safety of the

downstream public. E. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG

Site Engineer’s F. Observe conditions from a safe place at dam site periodically and provide decision support as

appropriate. Superintending / Chief Engineer G. Provide decision support and technical support to Emergency Planning Manager as appropriate

Dam Safety Organization’s Staff H. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate the situation as events progress, or whenever conditions change. Determine whether:

A. The event warrants downgrade to BLUE alert if there is no longer an immediate impending threat of dam failure and water level in the reservoir is lowered to a safe level. (Confirmed by Dam Safety Organization’s staff)

B. The event remains at the current event level. (No change in situation) C. Event may be terminated only when:

The gate(s) have been failed and there is no longer a threat to the downstream public. (Confirmed by Disaster Management Authorities)

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL B. TERMINATION

C. EVENT LEVEL ESCALATION

DOWNSGRADE

Monitorconditions until Continue recommended GotoResponsibilitiesfor

damage is repaired action on this sheet Termination and Follow-Up

KARNATAKA WATER RESOURCES DEPARTMENT 119

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

120 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020]

Description: Earthquake SHEET

BLUE ALERT Measurable earthquake felt or reported and dam appears to G1

be stable

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS) A. Implement the “Watch Condition Notification Flowchart” using pre-scripted message.

B. Make careful observation and inspection of every part of the dam. This should be done without

compromising the safety pf anyone performing these tasks. C. Be prepared for additional aftershocks D. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG E. Contact the Superintending / Chief Engineer at least daily to report the latest observations and

conditions. F. If inspection has determined a potentially dangerous situation (Error! Not a valid result for table.),

g o to the re-evaluation / decision section below and follow relevant steps immediately. Site Engineer’s

G. Contact a comprehensive site inspection of the dam and appurtenant elements and prepare a

report with the most important findings. H. Monitor and supervise any remedial action and inform the Emergency Planning Manager about

the progress I. Observe conditions in site periodically and provide decision support as appropriate. Superintending / Chief Engineer J. Review all pertinent information in order to recommend appropriate actions to the Emergency

Planning Manager in conjunction with Dam Safety Organization staff. Provide oversight to corrective

actions or work as required. Observe conditions in site periodically and provide decision

support as appropriate. Dam Safety Organization’s Staff K. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions at least daily or whenever conditions change significantly using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX. Determine whether: A. The event can be terminated if the dam is determined to be stable and a sufficient amount of

time has passed. Additional aftershocks are not expected B. The event remains at the current event level (No change in situation) C. The event warrants escalation if inspection has determined a potentially dangerous situation. All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions F. EVENT LEVEL D. EVENT LEVEL DOWNSGRADE E. TERMINATION ESCALATION

GotoResponsibilitiesfor Continue recommended Go to SHEET G2 (ORANGE

Termination and Follow-Up action on this sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 121

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

122 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Malfunction of Gates

ORANGE Structural member of a gate, gate operator broken or

SHEET severely damaged, which prevents operation or malfunction

ALERT of the gate(s). considerable leakage or uncontrolled G2

discharge is detected. Flood cannot be routed without

damaged / non-operational gate(s)

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS) A. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. B. Identify the areas that would be potentially impacted by the potential failure of the damaged areas. C. Be prepared for the additional aftershocks D. Make careful observation and inspection of every part of the dam, this should be done without

compromising the safety of anyone performing these tasks. E. Monitor water levels and development of new damages or movement on hourly basis F. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG G. Contact the Superintending / Chief Engineer hourly to report the latest observations and

conditions. H. If visible damages aggravate rapidly go to re-evaluation / decision section and follow relevant steps

immediately. Site Engineer’s I. Observe conditions in site periodically and provide decision support as appropriate. J. If conditions permit; conduct a comprehensive site inspection of the dam and appurtenant

elements and prepare a report with the most important findings K. Provide oversight to corrective actions or work as required. Superintending / Chief Engineer L. Analyze and decide if an emergency lowering of the reservoir is required. Dam Safety Organization’s Staff M. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX Evaluate conditions at least twice daily or

whenever conditions change significantly. Using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX, determine whether:

A. The event warrants downgrade to BLUE alert if water level in the reservoir is lowered below

bottom level of the dam damaged section. Event may not be terminated until repairs are made. B. The event remains at the current event level (No change in situation) C. The event warrants escalation to RED alert if one or multiple of the following conditions have been

observed: Uncontrolled release of water over dam or rapidly developing flow through cracks or rapidly developing erosion through increased seepage are observed.

All contacts on Notification Flowchart shall be updated of changes Based on this Determination, Follow the appropriate actions

C. EVENT LEVEL A. EVENT LEVEL DOWNSGRADE B. TERMINATION ESCALATION

Go to SHEET G1 (BLUE Alert)

Continue recommended Go to SHEET G3 (RED

action on this Sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 123

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

124 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Earthquake

Earthquake resulting in uncontrolled release of water over

SHEET RED ALERT

dam or rapidly developing flow through cracks or rapidly

G3 developing flow through cracks or rapidly developing

erosion through increased seepage

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

A. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. B. Identify the areas that would be potentially impacted by the emergency events.

C. Recommend to the concerned District Deputy Commissioner(s) and Disaster Management

Authorities for IMMEDIATE EVACUATON downstream of the dam and affected areas as per

Local Evacuation Plan D. Stay a safe distance away from the dam. The immediate concern is the safety of the

downstream public. E. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG

Site Engineer’s F. Observe conditions from a safe place at dam site periodically and provide decision support as

appropriate. Superintending / Chief Engineer G. Provide decision support and technical support to Emergency Planning Manager as appropriate

Dam Safety Organization’s Staff H. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate the situation CONTINUOUSLY. Determine whether:

A. The event warrants downgrade if there is no longer an immediate impending threat of dam failure and water level in reservoir is lowered below the seepage / leakage zone level of the dam. This action shall be confirmed by the Dam Safety Organization’s staff

B. The event remains at the current event level. (No change in situation) C. Event may be terminated only when:

The dam has failed and there is no longer a threat to the downstream public. (Confirmed by the Disaster Management Authorities)

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL B. TERMINATION C. EVENT LEVEL ESCALATION

DOWNSGRADE

Monitorconditions until Continue recommended GotoResponsibilitiesfor

damage is repaired action on this sheet Termination and Follow-Up

KARNATAKA WATER RESOURCES DEPARTMENT 125

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

126 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Security Threat / Sabotage / Vandalism

Unverified bomb threat or verified damage to the dam /

SHEET BLUE ALERT

appurtenances with no impacts in the functioning of the H1

dam

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)

A. Implement the “Watch Condition Notification Flowchart” using pre-scripted message. B. Notify local law enforcement authorities to help in evaluating the situation C. Make careful observation and inspection of every part of the dam. This should be done without

compromising the safety pf anyone performing these tasks. D. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG E. Contact the Superintending / Chief Engineer at least daily to report the latest observations and

conditions. F. If inspection has determined a potentially dangerous situation (ANNEXURE 12 : EMERGENCY

LEVEL DETERMINATION – ACTION DATA SHEET INDEX) go to the re-evaluation / decision section below and follow relevant steps immediately.

Site Engineer’s G. Access the dam only if areas have been cleared by Law enforcement (in case of bomb threat) H. Observe conditions in site periodically and provide decision support as appropriate. Superintending / Chief Engineer I. Review all pertinent information in order to recommend appropriate actions to the Emergency

Planning Manager in conjunction with Dam Safety Organization staff. Provide oversight to corrective actions or work as required. Observe conditions in site periodically and provide decision support as appropriate.

Dam Safety Organization’s Staff J. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate conditions at least daily or whenever conditions change significantly using ANNEXURE 12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX. Determine whether:

D. The event can be terminated if the dam is determined to be stable and damages have been repaired. Local law enforcement authority has confirmed there is not threat in the dam structure and surroundings.

E. The event remains at the current event level (No change in situation) F. The event warrants escalation if inspection has determined a potentially dangerous situation

(bomb threat is confirmed) All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL C. EVENT LEVEL

B. TERMINATION

DOWNSGRADE ESCALATION

Goto Responsibilitiesfor Continue recommended Go to SHEET H2 (ORANGE

Termination and Follow-Up action on this sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 127

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

128 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description:

Security Threat / Sabotage / Vandalism

ORANGE Verified bomb threat that if carried out, could result in SHEET

ALERT damaging the dam / appurtenances that impacts the H2

functioning of the dam or verified damages due to

vandalism that impacts the normal operation of the dam

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)

A. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. B. Notify local law enforcement authorities to help in evaluating the situation C. Make careful observation and inspection of every part of the dam, this should be done

without compromising the safety of anyone performing these tasks. D. Monitor water levels and development of new damages or movement on hourly basis E. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG F. Contact the Superintending / Chief Engineer hourly to report the latest observations and

conditions. G. If inspection has determined a potentially dangerous situation, go to the re-evaluation /

decision section and follow relevant steps immediately. Site Engineer’s H. Access the dam only if areas have been cleared by Law enforcement (in case of bomb threat) I. If conditions permit; conduct a comprehensive site inspection of the dam and appurtenant

elements and prepare a report with the most important findings J. Provide oversight to corrective actions or work as required. Superintending / Chief Engineer

K. Analyze and decide if an emergency lowering of the reservoir is required. Dam Safety Organization’s Staff

L. Provide decision support and technical support to Emergency Planning Manager as

appropriate RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX Evaluate conditions at least twice daily or whenever conditions change significantly. Using ANNEXURE

12 : EMERGENCY LEVEL DETERMINATION – ACTION DATA SHEET INDEX, determine whether: A. The event warrants downgrade to BLUE alert if water level in the reservoir is lowered below

bottom level of the dam damaged section. Event may not be terminated until repairs are made. B. The event remains at the current event level (No change in situation) C. The event warrants escalation to RED alert if one or multiple of the following conditions have been

observed: Uncontrolled release of water over dam or rapidly developing flow through cracks or rapidly developing erosion through increased seepage are observed.

All contacts on Notification Flowchart shall be updated of changes Based on this Determination, Follow the appropriate actions

A. EVENT LEVEL DOWNSGRADE B. TERMINATION C. EVENT LEVEL

ESCALATION

Go to SHEET H1 (BLUE Alert) Continue recommended Go to SHEET H3 (RED

action on this Sheet ALERT)

KARNATAKA WATER RESOURCES DEPARTMENT 129

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

130 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Description: Security Threat / Sabotage / Vandalism SHEET

RED ALERT Detonated bomb resulting in visible damage to the dam or

H3 appurtenances or verified damage due to vandalism

causing an uncontrolled water release

RECOMMENDED ACTIONS

Emergency Planning Manager (May be split responsibilities i.e., One person at the dam handling

on site actions and a different person who can make notifications. APPLICABLE TO ALL ACTION

DATA SHEETS)

A. Implement the “Failure Condition Notification Flowchart” using pre-scripted message. B. Identify the areas that would be potentially impacted by the emergency events.

C. Recommend to the concerned District Deputy Commissioner(s) and Disaster Management

Authorities for IMMEDIATE EVACUATON downstream of the dam and affected areas as per

Local Evacuation Plan D. Stay a safe distance away from the dam. The immediate concern is the safety of the

downstream public. E. Record all information, observation and actions on ANNEXURE 11 : UNUSAL OR EMERGENCY

EVENT LOG

Site Engineer’s F. Advise The Emergency Planning Manager of dangerous condition at the dam Superintending / Chief Engineer G. Provide decision support and technical support to Emergency Planning Manager as appropriate

Dam Safety Organization’s Staff H. Provide decision support and technical support to Emergency Planning Manager as appropriate

RE-EVALUATION / DECISION BASED UPON ANNEXURE 12 : EMERGENCY LEVEL

DETERMINATION – ACTION DATA SHEET INDEX

Evaluate the situation CONTINUOUSLY. Determine whether:

A. The event warrants downgrade if there is no longer an immediate impending threat of dam failure

and water level in reservoir is lowered below the seepage / leakage zone level of the dam. This

action shall be confirmed by the Dam Safety Organization’s staff B. The event remains at the current event level. (No change in situation) C. Event may be terminated only when:

The dam has failed and there is no longer a threat to the downstream public. (Confirmed by the Disaster Management Authorities)

All contacts on Notification Flowchart shall be updated of changes

Based on this Determination, Follow the appropriate actions

D. EVENT LEVEL E. TERMINATION F. EVENT LEVEL ESCALATION

DOWNSGRADE

Monitorconditions until Continue recommended GotoResponsibilitiesfor

damage is repaired action on this sheet Termination and Follow-Up

KARNATAKA WATER RESOURCES DEPARTMENT 131

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

132 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 13 : SUPPLIES AND RESOURCES

The following equipment and supplies may be necessary for use during a dam emergency. Contact

information for local / national contractors who can provide the following items during an emergency is

listed below. For supplies owned by the dam owner, the dam owner’s name and specific location of the

supplies have been denoted.

Contractor Type Name, Title, Phone Remarks

Name: Anil, Civil project Manager Services: Specialized In Civil Works

Company: Infosys Limited Mysore

Mobile: 9845072776 Mobilization / Response Time: Immediate

Phone: Pre-Agreement: Yes / No

Email:

Name: S. Narayanreddy Services: : Specialized In Civil Works

Company:

Civil Works

Mobile: 9945262610 Mobilization / Response Time: Immediate

Phone: Pre-Agreement: Yes / No

Email:

Name: V Krishnareddy Services: Specialized In Civil Works

Company:

Mobile: 9845229482

9620259599

Phone: Mobilization / Response Time: Immediate

Email: Pre-Agreement: Yes / No

Name: Mahadevaiah Services: Mechanical Contractors

Company: Bhadra Reservoir Project

Badravati Taluk Shimoga

Mobile: 9880965858

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Services: Mechanical Contractors

Electro / Company: Transpede Engineers

Mechanical Works Mobile: 9945066431

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Afsar Ahmed Services: Mechanical Contractors

Company:

Mobile: 9343381667

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Mohammed Ajaz Services: Electrical Contractors

Company: Karnataka Electrical

Electrical Works

Winders,

Mobile: 9448245970

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

KARNATAKA WATER RESOURCES DEPARTMENT 133

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Contractor Type Name, Title, Phone Remarks

Name: Siddu Services: Electrical Contractors

Company: 9980114241

Mobile:

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Octec Technologies CCTV Services: Electrical Contractors

Service

Company:

Mobile: 9886979444

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Services: Instrumentation

Company: Aimil Limited

Mobile:

Phone: 080-30080129

080-25435003 Mobilization / Response Time:

Instrumentation

Email: [email protected] Pre-Agreement: Yes / No

Name: Services: Instrumentation

Company: Unique Instruments &

Manufacturers Private Limited

Mobile: 080-2836 2765

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Services: Materials, Earthmoving

Company: BEML equipment and civil works

Mobile:

Phone: 0821-2402616 Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Manjunath Services: Materials, Earthmoving

Special Works /

Company: Siddramu & sons equipment and civil works

Mobile:

Equipment

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: K Janardhana Services: Materials, Earthmoving

Company: JNK Constructions, equipment and civil works

Mobile: 9945493365

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Consultants

Name: Services: Mechanical Consultants

Company: Nandi Steels

(Hydraulic,

Mobile: 8192234712

Geotechnical,

Phone: Mobilization / Response Time:

Mechanical,

Email: Pre-Agreement: Yes / No

Structural)

Name: Services: Mechanical Consultants

134 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for version 2.0 KRISHNARAJASAGARA (KRS) DAM [KA06HH0020]

Contractor Type Name, Title, Phone Remarks

Company: Texmaco Kolkata

Mobile:

Phone: 913325691500/

91332541 / 2448 / 2452 Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Ramachandra Services: Mechanical Consultants

Company:

Mobile: 9880347238 Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: V Krishnareddy Services: Materials, Earthmoving

Company: equipments

Mobile: 9845229482

9620259599 Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Abhilash Babu Services: Materials, Earthmoving

Mobile: 9916966400 equipments

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Services: Earthmoving equipments

Company: BEML

Phone: 0821-2402616 Mobilization / Response Time:

0821-2402422 Pre-Agreement: Yes / No

Email:

Name: Mr. Baily Services: Earthmoving equipments

Company: Karnataka Crane

Heavy Equipment Services

(Cranes, Phone: 0821-2402246 Mobilization / Response Time:

Bulldozers, etc.) Pre-Agreement: Yes / No Mobile: 98455-65557

Email:

Name: S. Satish / S. Rakesh Services: Earthmoving equipments

Company: Swastik Crane Services

Phone: 0821-2433998 Mobilization / Response Time:

0821-2443284 Pre-Agreement: Yes / No

Mobile: 98451-12444

94483-53998

Email:

Name: Divisional Controller Services: Earthmoving equipments

Company: KSRTC, Mysuru Division

Phone: 0821-2494184 Mobilization / Response Time:

0821-2497603 Pre-Agreement: Yes / No

KARNATAKA WATER RESOURCES DEPARTMENT 135

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Contractor Type Name, Title, Phone Remarks

Mobile:

Email:

Name: Services: Earthmoving equipments

Company: Sudhir Crane Pvt. Ltd,

Mysore Mobilization / Response Time:

Phone: 0821-2301818 Pre-Agreement: Yes / No

0821-2497603

Mobile:

Email:

Name: Services: Earthmoving equipments

Company: Sri Lakshmi

Venkateshwara Cranes, Mysore Mobilization / Response Time:

Phone: 0821-2410745 Pre-Agreement: Yes / No

0821-2511431

Mobile: 94480-51745

94480-61431

Email:

Company: D’souza Cranes, Mysuru Services: Earthmoving equipments

Phone: 0821-2475079 Mobilization / Response Time:

Pre-Agreement: Yes / No

Mobile: 98454-81014

Email:

Company: Industrial Crane Services: Earthmoving equipments

Services, Mysuru Mobilization / Response Time:

Phone:

Pre-Agreement: Yes / No

Mobile: 98450-43107

98800-49658

Email:

Communications Name: Services: CCTV Surveillance & wireless

Company: EZONE fire, Security & communications (Warning

Automation solution

Systems, CCTV,

Mobile:

IT, Wireless

Phone: 040-65298383 Mobilization / Response Time: Communications)

Email: Pre-Agreement: Yes / No

136 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Contractor Type Name, Title, Phone Remarks

Name: Services: CCTV Surveillance & Wireless

Company: SVEN Communication communications

Mobile: 9538070070

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

Name: Raghu G B Services: CCTV Surveillance, &wireless

Company: Samruddhi computers communications

Mobile: 9844303202

Phone: Mobilization / Response Time:

Email: Pre-Agreement: Yes / No

KARNATAKA WATER RESOURCES DEPARTMENT 137

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 14 : SAMPLE PUBLIC ANNOUNCEMENTS

Note: These messages are communicated to downstream residents to alert the public of impending

danger. The Emergency Planning Manager should coordinate with the India Meteorological

Department, the District Disaster Management Authority and the Deputy Commissioner(s) (Table 3,

Page No. 30) prior to release. Messages can be communicated via radio, television, bulk SMS of local

mobile networks and other media outlets.

Announcement for Slowly Developing “Watch” Condition (BLUE Emergency Level)

Cauvery Neeravari Nigam Limited has declared a BLUE level, “Watch” condition for Krishnarajasagara Dam

(KRS Dam), Project Identification Code: KA06HH0020 as of [time and date]. [Briefly describe the problem or

condition]. Although there is no immediate danger of the dam failing. [Describe what actions are being taken

to monitor and control the situation].[State the quantity of any release from the reservoir].

Announcement for Worsening “Watch” Condition (BLUE Emergency Level)

Cauvery Neeravari Nigam Limited has declared a BLUE level, “Watch” condition for Krishnarajasagara

Dam (KRS Dam), Project Identification Code: KA06HH0020 as of [time and date]. [Briefly describe the

problem or condition]. Although there is no immediate danger of the dam failing a possibility now exists

that the dam will fail. [Describe any other consequence] if correction efforts are unsuccessful. [Describe

what actions are being taken to monitor and correct the situation]. [State the quantity of any release from

the reservoir]. Additional news will be made available as soon as it is received.

Announcement for a Probable “Failure” Condition (ORANGE Emergency Level)

Urgent! This is an emergency message. Cauvery Neeravari Nigam Limited has declared an ORANGE

level, Probable “Failure” condition for Krishnarajasagara Dam (KRS Dam), Project Identification Code:

KA06HH0020 is probably going to fail [or describe any other consequence]. [Describe what actions are

being taken to monitor and control the situation]. It is possible that the dam will fail in [## ##] hours.

Residents in low lying areas along the Cauvery lower basin, as well as the town of Srinrangapattana [Or

indicate the specific towns/villages to be evacuated according to the expected scenario], should prepare

for immediate evacuation. Additional news will be made available as soon as it is received.

KARNATAKA WATER RESOURCES DEPARTMENT 139

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Announcement for an Impending “Failure” Condition (RED Emergency Level)

Emergency! This is an emergency message. Krishnarajasagara dam (KRS Dam), Project Identification

Code: KA06HH0020 is going to fail at any moment [or describe any other consequence]. Residents who

have not yet done so should be immediately evacuate the town of Srirangapattana and low laying areas

along the Lower Cauvery Basin [Or Indicate the specific towns / villages to be evacuated according to

the expected scenario]. The flood waters have already reached [Highway] and [Road]. Additional news

will be made available as soon as it is received.

Announcement for an Ongoing “Failure” Condition (RED Emergency Level)

Emergency! This is an emergency message. Krishnarajasagara dam (KRS Dam), Project Identification

Code: KA06HH0020 is failed [or describe any other consequence] at [time and date]. Residents who

have not yet done so should be immediately evacuate the town of Srirangapattana and low laying areas

along the Lower Cauvery Basin [Or Indicate the specific towns / villages to be evacuated according to

the expected scenario]. The flood waters have already reached [Highway] and [Road]. Additional news

will be made available as soon as it is received.

140 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 15 : ANNUAL EAP EVALUATION CHECKLIST

Evaluation Year: Evaluation done by:

Ws the annual dam inspection conducted? Yes If Yes, has the EAP been Yes

No revised to include any signs of No failures observed during the

inspection

Was weed clearing, animal burrow removal or Yes If Yes, describe the actions taken and

other maintenance required? No date:

Was the outlet gate operable? Yes If No, describe the actions taken and date:

No

Does the Notification Flowchart require Yes If Yes, list the dates of the contact

revisions? No information revision and redistribution:

(Note that revisions of the contact information

will not require EAP approval; however, the

revised contact information pages will need to

be redistributed as replacement pages)

Was annual training or a table top drill Yes If Yes, Specify Date conducted

conducted? No Training

Drill

Are inspection and training records included in Yes

the EAP? No

Was the EAP reviewed? Yes If Yes, review date:

No

Were changes required to the EAP? Yes If Yes, date of revise EAP approval:

No

KARNATAKA WATER RESOURCES DEPARTMENT 141

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

142 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 16 : DAM DESCRIPTION

Official Dam Name Krishnarajasagara Dam

Name of River / Stream Cauvery River

Dam Location Mandya, Karnataka

Latitude / Longitude 120 25’ 00” N / 760 33’ 30” E

Seismic Zone

II Year of Staring of Dam

1911 Construction

Year of First Impoundment

1921 Year of Commissioning of

1932 Dam Project

Name of Immediate Upstream Hemavathy

Name of Immediate Grand Anecut

Dam

Downstream Dam

Contact No. of Executive Engineer: Phone Number: 08236-257227

(Emergency Planning Manager) Mobile Number:

Main Dam

Type Masonry Gravity Dam

Length 2621.00 m

Maximum Height 39.87 m

Top Width 4.12 m

Top of Embankment Elevation 754.32 m

Drainage Area 10680 Sq.Kms

Reservoir

Full Reservoir Level 752.48 m

Live Storage Capacity 1275.38 MCM

Gross Storage Capacity 1400.00 MCM

Reservoir Spread Area at FRL 129.24 Sq.Kms

Sluice Gates Total No. of

Present Discharge Capacity in Cusecs Gates

+12 Level Sluices 8 ---

+80 Level Sluices 16 1,21,632

+103 Level Sluices 48 68,192

+106 Level Sluices 40 46,280

Total 112 2,36,106

KARNATAKA WATER RESOURCES DEPARTMENT 143

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

144 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 17 : TRAINING RECORD

Use this form to record training session. All items in the EAP should be thoroughly reviewed during

training. Appropriate Karnataka Water Resources Department employees and personnel responsible in

carrying out EAP should attend a training session annually (or participate in simulation drill).

TRAINING LOCATION:

DATE: TIME: INSTRUCTOR:

CLASS SIGN-IN:

Type of Simulation Conducted Specify Emergency Type

Emergency Water Release

Watch Condition

Possible Dam Failure

Imminent Dam Failure

Actual Dam Failure

Comments, Results of Drill:

Revisions Needed to EAP based on results of Drill? If Yes, list revisions required

Yes

No

KARNATAKA WATER RESOURCES DEPARTMENT 145

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

146 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 18 : PLAN REVIEW AND UPDATE

This plan will be reviewed and updated annually and table top drills will be carried out at least once in

every five years. Document these reviews below.

Date of Review: _____________ Participants:

Date of Review: _____________ Participants:

Date of Review: _____________ Participants:

Date of Review: _____________ Participants:

Date of Review: _____________ Participants

Date of Table Top Drill: _____________ Participants:

KARNATAKA WATER RESOURCES DEPARTMENT 147

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

148 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

ANNEXURE 19: ADDITIONAL CONTACT DETAILS

Table 25 : Details of Fire Stations

Sl. No. Name of the Dire Station & Officer-In-Charge Contact Number

1 Regional Fire Station, Mysuru 0821-2540116

2 Saraswathipuram Fire Station, Mysuru 0821-2540970

3 Bannimantapa Fire Station, Mysuru 0821-2495101

4 Bharathiya Note Mudranalaya – RBI, Metagalli, Mysuru 0821-2582103

5 Rare Materials Plant, Mysuru 0821-2402544

6 Fire Station, Hunsuru 958222-253300

7 Fire Station, Najanagudu 958222-225280

8 APMC Yard, Nanjanagudu 958221-224144

Table 26 : Details of Helipads

SL. Name of Helipad Longitude

Latitude

Remarks

No.

1 Mandakalli aerodrome, Mysuru Taluk 760 58’ 30” E 120 13’ 30” N Permanent

2 Lalithamahal Palace, Mysuru 760 41’ 41” E 120 17’ 48” N Permanent

3 Karnataka Engineering Research 760 34’ 38.8” E 120 24’ 5.1” N Temporary Station, KRS, Srirangapattana Taluk

4 K.R Nagar College Ground, K.R 760 22’ 39” E 120 25’ 43” N Temporary Nagar

5 Govt. Junior College Playground, 760 20’ 00” E 120 00’ 06” N Temporary Periyapattana

6 Bannur Footbal Ground, Bannur, T 750 51’ 46” E 120 19’ 40” N Temporary Narasipura Taluk

7 Vidyodaya College Playground, T. 760 54’ 06” E 120 18’ 00” N Temporary Narasipura Town

8 Govt. Junior College Playground, 760 17’ 00” E 120 18’ 00” N Temporary Hunasuru

KARNATAKA WATER RESOURCES DEPARTMENT 149

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 27 : Details of Information & Public Relations Department Officials and Media Personnel

SL. Name of Officer & Designation Contact Number

Email ID

No.

Department of Information and Public Relations

Director, 080-22028001 [email protected]

1 Department of Information and 080-22028002

[email protected]

Publica Relations, Bengaluru 080-22863794

D.P Muralidhar 9480841207

2 Deputy Director (Press & News), [email protected]

080-22028107

Bengaluru

3 N.S Mahesh 08232-224153

[email protected]

Assistant Director, Mandya 9480841230

4 Raju 9480841229

[email protected]

Assistant Director, Mysuru 0821-242325

Ramesh

5 Assistant Director, 08226-224731 [email protected]

Chamarajanagar

Visual Media Personnel

6 Ravi

9980914147

TV 9 Kannada

7 Rohith

9900060827

Public TV

8 Nandan Ramakrishna

9632201503

Suvarna TV

9 Raghu

9945779714

ETV Kannada

10 Anand

9019935313

Digvijaya News

11 Yogesh

9900026155

BTV

Print Media Personnel

12 Yogesh

9448470143

Prajavani

13 Naveen

9880820747

Vijaya Karnataka

14 Raju, Vijayavani 8904997260

Deepak, Vijayavani 9900252445

15 Ravi K B

9742504916

Kannadaprabha

16 Shivakumar

9945596965

The Hindu

150 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 28 : Details of Health Department Officials

SL Name of Officer, Designation Contact Email ID

No Number

Jawaid Akhtar, IAS 080-22255324 [email protected]

1 Principal Secretary to Govt 080-22034234

Health & Family Welfare Services

080-22353915 [email protected]

2 Joint Secretary to Govt

Health & Family Welfare Services

080-22263744 [email protected]

3 Deputy Secretary to Govt 080-22092573

Health & Family Welfare Services

4 9449843059 [email protected]

District Health Officer, Mandya

08232-224027

9449843060 [email protected]

5 District Health Officer, Mysuru 0821-2529205

0821-2435575

9448345267 [email protected]

6 District Surgeon, District Hospital, 08232-224040

Mandya

7 District Surgeon, District Hospital, 9448166767 [email protected]

Mysuru 0821-2497303

Table 29 : Details of Transport Facilities

SL No Name of the Transport Contact Number

1

Bharath International Travels 0821-2333362

0821-2333669

2

S.R.S Travels, Mysore 0821-2441913

0821-2441939

3 Unity Cabs Tours & Travels, Mysore 0821-2412136

4 Sri Durgamba Tours & Travels, Mysore 0821-2463397

5 KSRTC City Depot – 1 0821-2497603

6 KSRTC Moffusil Depot-1, Mysore 0821-2497603, Ext: 233

7 KSRTC Moffusil Depot-2, Mysore 0821-2497603, Ext: 238

8 KSRTC Depot, Kuvempunagar 0821-2362240

9

Safe Wheels, Mysore 0821-2342543

0821-2547543

Table 30 : Details of Education Department Officials

KARNATAKA WATER RESOURCES DEPARTMENT 151

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

SL No. Name & Designation Contact

Email Address Number

1 Raghunandan R 08232-224085 [email protected]

DDPI (Admin), Mandya

B T Chandrakantha

2 Block Education Officer, Mandya 08232-221021 [email protected]

(S)

Shivappa

3 Block Education Officer, Keragodu, 08232-221905 [email protected]

Mandya (N)

4 S Revanna 08231-262210 [email protected]

Block Education Officer, K.R Pete

5 Renukamma 08232-232045 [email protected]

Block Education Officer, Maddur

6 A T Shivalingaiah 08231-242034 [email protected]

Block Education Officer, Malavalli

G N Nagesh

7 Block Education Officer, 08234-286604 [email protected]

Nagamangala

Malleshwari

8 Block Education Officer, 08236-255111 [email protected]

Pandavapura

Ruksana Nasmeen

9 Block Education Officer, 08236-252079 [email protected]

Srirangapattana

152 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 31 : Details of Medical Facilities

SL

Name of Hospital Contact Number No.

1 Aditya Hospital, Mysore 0821-2512532

2 Ayurvedic Hospital, Mysore 0821-2520741

3 Ashakiran Hospital, Mysore 0821-4280466

4 B G S Appollo Hospital, Mysore 0821-2566666

5 Basappa Memorial Hospital, Mysore 0821-2512401

6 Bharat Hospital and Institute of Oncology, Mysore 0821-4280011

7 Chandrakala Hospital, Mysore 0821-2517809

8 Cheluvamba Hospital, Mysore 0821-2428950

9 ED Hospital, Mysore 0821-2510131

10 ESI Hospital, Mysore 0821-2512298

11 Gopalagowda Shanthaveri Memorial Hospital, Mysore 0821-2520534

0821-2445037

12 Holds Worth Memorial Hospital (Mission Hospital), Mysore 0821-2446644

13 J.S.S Hospital, Mysore 0821-2563843

0821-2420102

14 K.R Hospital, Mysore 0821-2423300

15 Kamakshi Hospital, Mysore 0821-2545981

16 Labour Welfare Hospital, Mysore 0821-2451740

17 Vikram Hospital, Mysore 0821-2412121

18 Railway Hospital, VV Mohalla, Mysore 0821-2517238

19 Railway Hospital, Ashokapuram, Mysore 0821-2482700

KARNATAKA WATER RESOURCES DEPARTMENT 153

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 32 : Details of Ambulance Service Providers

SL No. Name of the Service Provider Contact Number No. of Vehicles

1 K.R Hospital, Mysore 0821-2423300 3

2 Kamakshi Hospital, Mysore 0821-2545981 1

3 Gopalagowda Shnthaveri Memorial Hospital, Mysore 0821-2447745

1 0821-2445037

4 Holds Worth Memorial Hospital, Mysore 0821-2446644 2

5 J.S.S Hospital 0821-2563843

2 0821-2420102

6 Basappa Memorial Hospital, Mysore 0821-2512401 2

0821-2447160

7 Bharat Cancer Hospital, Irwin Road, Mysore 0821-2402068 2

0821-5280011

8 Railway Hospital, VV Mohalla, Mysore 0821-2517238 2

9 J K Industries Ltd (VTP-1), Mysore 0821-2582727 1

10 Automative Axles Ltd, Mysore 0821-2402585 1

11 Bharath Earth Moves Limited, Mysore 0821-2402422 1

12 Falcon Tyres Limited, Mysore 0821-2582453 1

13 Jubilant Organosys Limited, Nanjanagudu 0821-228402

1 0821-228408

14 ESI Hospital, KRS Road, Mysuru 0821-2512298 1

15 Fire Brigade, Saraswathipuram, Mysore 0821-2540970 1

16 Fire Brigade, Bannimantap, Mysore 0821-2495101 1

17 BGS Hospital, Mysore 0821-2568888 1

18 Aryamithra Trust, Mysore 9448533002 1

19 Kamakshi Hospital, Mysore 0821-2545981 1

20 Vikram Hospital, Mysore 0821-2412121 1

21 Helpline Number 102

1 0821-2426262

154 DAM REHABILITATION AND IMPORVEMENT PROJECT

Emergency Action Plan for KRISHNARAJASAGARA (KRS) DAM [KA06HH0020] version 2.0

Table 33 : Details of Blood Bank Facilities

SL No Name of the Blood Bank Facility Contact Number

1 J.S.S Blood Bank, Ramanuja Road, Mysore 0821-2563845

0821-2563843

2 K.R Hospital Blood Bank, Mysore 0821-2429800

3 Kamakshi Hospital Blood Bank, Mysore 0821-2545981

4 B.M Hospital Blood Bank, Mysore 0821-2511771

5 Holds Worth Memorial Hospital, Mysore 0821-2446644

6 Gopalgowda Shanthaveri Memorial Hospital, Mysore 0821-2445037

7 Bharath Hospital Institute of Oncology, Mysore 0821-5280011

8 E.S.I Hospital, KRS Road, Mysore 0821-2512298

9 B.G.S Apollo Hospital, Mysore 0821-2566666

10 Vikram Hospital and Heart Centre, Mysore 0821-2412121

11 Life Line, Mysore 0821-2444936

KARNATAKA WATER RESOURCES DEPARTMENT 155

ACIWRM

The Advanced Centre for Integrated Water Resources Management (ACIWRM)

was established to become a Global Centre of Excellence by Government of

Karnataka in February 2012. ACIWRM acts as a think tank to the government’s Water

Resources Department (WRD). It is engaged in policy analysis, research, planning,

capacity building and developing the knowledge base for gearing up the department

up to its future vision 2030. The ACIWRM works with the various departments, civil

society, the private sector, farmers and water user associations and other organizations

to produce integrated advice to the WRD for managing the State’s water resources.

KEY AREAS

Karnataka Water Resources Information System (K-WRIS)

IWRM Training and Capacity Building

River Basin Planning & Management

River Basin Modelling

Communication, Awareness Raising and Participation

Water Use Efficiency, Water Accounting and Water Productivity

State IWRM Policy and Strategy

Sustainable Groundwater Management

Participative Land and Water Management Plans (LWMP)

Climate Change / Variability / Adaptability for Water Sector

Advanced Centre for Integrated Water Resources Management

Water Resources Department, Govt. of Karnataka No. 1/1, 1st

Floor, K.S.F.C Bhawan, Thimmaiah Road Bengaluru – 560052 Phone No:

080-22262042/43/44 Fax No: 080-22262045