emergency generator

16
TICE ST I-75 COUNTRY LAKES DR VICINITY MAP N.T.S. SUBJECT PROPERTY GENERAL NOTES 1. ALL ELEVATIONS SHOWN ARE NAVD 2. NAVD + 1.15' = NGVD - TO BE VERIFIED BY SURVEYOR 3. ZONED: RPD 4. FOLIO #10242164 5. SITE ADDRESS: 5301 TICE ST, FORT MYERS FL CONSTRUCTION PLANS SECTION 2, TOWNSHIP 44 SOUTH, RANGE 25 EAST LEE COUNTY, FLORIDA COVER SHEET C-00.01 4365 Radio Road, Suite 201 Naples, Florida 34104 P: 239.434.6060 Company Cert. of Authorization No. 00009496 SHEET TITLE: PROJECT: REVISIONS: CLIENT: DATE REV. DESCRIPTION SITE LOCATION MAP TLC ENGINEERING SERVICES, INC. 13099 CLEVELAND AVE, SUITE 500 FORT MYERS, FL 33907 PROJECT NO.: 20-0141 SHEET NO: SCALE: MANATEE ELEMENTARY SCHOOL EMERGENCY GENERATOR TICE ST I-75 HWY 80 ORANGE RIVER BLVD NOTE: 2021-05-31 - NOT FOR CONSTRUCTION JEFF L. DAVIDSON, P.E NO. 47161 LEE A. DAVIDSON, P.E. NO. 90969 ANDREW E. RATH, P.E. NO. 73996 RYAN A. WHITE, P.E. NO. 67400 SPRINGS BONITA KEY WEST LEE COUNTY MIAMI FT.MYERS NAPLES TAMPA GULF OF MEXICO TO PUNTA GORDA TO ARCADIA TO NAPLES TO IMMOKALEE SUBJECT PROPERTY CAPE CORAL MYERS FORT MANATEE ELEMENTARY SCHOOL EMERGENCY GENERATOR INDEX OF DRAWINGS COVER SHEET GENERAL NOTES AERIAL VIEW EXISTING CONDITIONS & DEMOLITION PLAN CONSTRUCTION PLAN & DETAILS C-00.01 C-00.10 C-00.20 C-10.00 C-20.00 DESCRIPTION DWG. NO. 13099 S CLEVELAND AVE SUITE 500 FORT MYERS, FL 33907 PREPARED FOR: TLC ENGINEERING SOLUTIONS, INC. 2855 COLONIAL BLVD FORT MYERS, FL 33966 OWNER: LEE COUNTY DISTRICT SCHOOL BOARD

Upload: others

Post on 02-Mar-2022

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EMERGENCY GENERATOR

TICE ST

I-75

CO

UN

TRY LAKES D

R

VICINITY MAPN.T.S.

SUBJECTPROPERTY

GENERAL NOTES1. ALL ELEVATIONS SHOWN ARE NAVD2. NAVD + 1.15' = NGVD - TO BE VERIFIED BY SURVEYOR3. ZONED: RPD4. FOLIO #102421645. SITE ADDRESS: 5301 TICE ST, FORT MYERS FL

CONSTRUCTION PLANSSECTION 2, TOWNSHIP 44 SOUTH, RANGE 25 EAST

LEE COUNTY, FLORIDA

COVER SHEET

C-00.01

4365 Radio Road, Suite 201Naples, Florida 34104

P: 239.434.6060Company Cert. of Authorization No. 00009496

SHEET TITLE:

PROJECT:

REVISIONS:

CLIENT:

DATEREV. DESCRIPTION

SITE LOCATION MAP

TLC ENGINEERING SERVICES, INC.13099 CLEVELAND AVE,

SUITE 500FORT MYERS, FL 33907

PROJECT NO.:20-0141

SHEET NO:

SCALE:

MANATEE ELEMENTARYSCHOOL EMERGENCY

GENERATOR

TICE ST

I-75

HWY 80

ORANGE RIVER BLVD

NOTE: 2021-05-31 - NOT FOR CONSTRUCTION

JEFF L. DAVIDSON, P.E NO. 47161LEE A. DAVIDSON, P.E. NO. 90969ANDREW E. RATH, P.E. NO. 73996

RYAN A. WHITE, P.E. NO. 67400

SPRINGSBONITA

KEY WEST

LEE COUNTY

MIAMI

FT.MYERS

NAPLES

TAMPA

GULF O

F MEXICO

TO PUNTA GORDA TO ARCADIA

TO NAPLES

TO IMMOKALEE

SUBJECTPROPERTY

CAPE CORAL

MYERSFORT

MANATEE ELEMENTARY SCHOOLEMERGENCY GENERATOR

INDEX OF DRAWINGS

COVER SHEET

GENERAL NOTES

AERIAL VIEW

EXISTING CONDITIONS & DEMOLITION PLAN

CONSTRUCTION PLAN & DETAILS

C-00.01

C-00.10

C-00.20

C-10.00

C-20.00

DESCRIPTIONDWG. NO.

13099 S CLEVELAND AVE SUITE 500

FORT MYERS, FL 33907

PREPARED FOR:

TLC ENGINEERINGSOLUTIONS, INC.

2855 COLONIAL BLVDFORT MYERS, FL 33966

OWNER:

LEE COUNTY DISTRICTSCHOOL BOARD

AutoCAD SHX Text
Z:\Active Projects\L\LEE COUNTY-MULTIPLE GENERATORS\MANATEE ELEMENTARY\Site Civil\Sheetfiles\C-00.01 - Cover Sheet.dwg (SDP-COVER) brandon.copper May 26, 2021 - 3:47pm\C-00.01 - Cover Sheet.dwg (SDP-COVER) brandon.copper May 26, 2021 - 3:47pmC-00.01 - Cover Sheet.dwg (SDP-COVER) brandon.copper May 26, 2021 - 3:47pm
AutoCAD SHX Text
US-41
AutoCAD SHX Text
Ave
AutoCAD SHX Text
Anderson
AutoCAD SHX Text
CALOOSAHATCHEE
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
WILDLIFE
AutoCAD SHX Text
REFUGE
AutoCAD SHX Text
PINE ISLAND
AutoCAD SHX Text
NATIONAL WILDLIFE
AutoCAD SHX Text
REFUGE
AutoCAD SHX Text
Santa
AutoCAD SHX Text
Barbara
AutoCAD SHX Text
Boulevard
AutoCAD SHX Text
Chiquita
AutoCAD SHX Text
Boulevard
AutoCAD SHX Text
Parkway
AutoCAD SHX Text
Coral
AutoCAD SHX Text
Cape
AutoCAD SHX Text
J. N. "DING" DARLING
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
WILDLIFE REFUGE
AutoCAD SHX Text
Rest
AutoCAD SHX Text
Area
AutoCAD SHX Text
San
AutoCAD SHX Text
Pine
AutoCAD SHX Text
Island
AutoCAD SHX Text
Road
AutoCAD SHX Text
Shore
AutoCAD SHX Text
Road
AutoCAD SHX Text
Palm Beach Blvd.
AutoCAD SHX Text
Colonial
AutoCAD SHX Text
Blvd.
AutoCAD SHX Text
Blvd.
AutoCAD SHX Text
Carlos
AutoCAD SHX Text
McGregor
AutoCAD SHX Text
Blvd
AutoCAD SHX Text
Bay
AutoCAD SHX Text
TO LA BELLE
AutoCAD SHX Text
CP
AutoCAD SHX Text
P
AutoCAD SHX Text
I-75
AutoCAD SHX Text
I-75
AutoCAD SHX Text
I-75
AutoCAD SHX Text
US-41
AutoCAD SHX Text
US-41
AutoCAD SHX Text
MATLACHA PASS NATIONAL WILDLIFE REFUGE
Page 2: EMERGENCY GENERATOR

4365 Radio Road, Suite 201Naples, Florida 34104

P: 239.434.6060Company Cert. of Authorization No. 00009496

SHEET TITLE:

PROJECT:

REVISIONS:

CLIENT:

DATEREV. DESCRIPTION

SITE LOCATION MAP

TLC ENGINEERING SERVICES, INC.13099 CLEVELAND AVE,

SUITE 500FORT MYERS, FL 33907

PROJECT NO.:20-0141

SHEET NO:

SCALE:

MANATEE ELEMENTARYSCHOOL EMERGENCY

GENERATOR

TICE ST

I-75

HWY 80

ORANGE RIVER BLVD

NOTE: 2021-05-31 - NOT FOR CONSTRUCTION

JEFF L. DAVIDSON, P.E NO. 47161LEE A. DAVIDSON, P.E. NO. 90969ANDREW E. RATH, P.E. NO. 73996

RYAN A. WHITE, P.E. NO. 67400

GENERAL NOTES& DETAILS

C-00.10

AutoCAD SHX Text
Z:\Active Projects\L\LEE COUNTY-MULTIPLE GENERATORS\MANATEE ELEMENTARY\Site Civil\Sheetfiles\C-00.01 - Cover Sheet.dwg (C-00.10) brandon.copper May 26, 2021 - 3:47pm\C-00.01 - Cover Sheet.dwg (C-00.10) brandon.copper May 26, 2021 - 3:47pmC-00.01 - Cover Sheet.dwg (C-00.10) brandon.copper May 26, 2021 - 3:47pm
AutoCAD SHX Text
10.1 GENERAL GENERAL THE STANDARD NOTES SHOWN BELOW SHALL BE INCLUDED ON ALL WATER AND SEWER PLANS SUBMITTED FOR APPROVAL TO LEE COUNTY UTILITIES (LCU). A. ALL WORK SHALL CONFORM TO LATEST REVISION OF THE LEE COUNTY UTILITIES ALL WORK SHALL CONFORM TO LATEST REVISION OF THE LEE COUNTY UTILITIES WORK SHALL CONFORM TO LATEST REVISION OF THE LEE COUNTY UTILITIES WORK SHALL CONFORM TO LATEST REVISION OF THE LEE COUNTY UTILITIES SHALL CONFORM TO LATEST REVISION OF THE LEE COUNTY UTILITIES SHALL CONFORM TO LATEST REVISION OF THE LEE COUNTY UTILITIES CONFORM TO LATEST REVISION OF THE LEE COUNTY UTILITIES CONFORM TO LATEST REVISION OF THE LEE COUNTY UTILITIES TO LATEST REVISION OF THE LEE COUNTY UTILITIES TO LATEST REVISION OF THE LEE COUNTY UTILITIES LATEST REVISION OF THE LEE COUNTY UTILITIES LATEST REVISION OF THE LEE COUNTY UTILITIES REVISION OF THE LEE COUNTY UTILITIES REVISION OF THE LEE COUNTY UTILITIES OF THE LEE COUNTY UTILITIES OF THE LEE COUNTY UTILITIES THE LEE COUNTY UTILITIES THE LEE COUNTY UTILITIES LEE COUNTY UTILITIES LEE COUNTY UTILITIES COUNTY UTILITIES COUNTY UTILITIES UTILITIES UTILITIES OPERATIONAL MANUAL WHICH IS ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES MANUAL WHICH IS ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES MANUAL WHICH IS ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES WHICH IS ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES WHICH IS ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES IS ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES IS ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES ON FILE AT THE DIVISION OF LEE COUNTY UTILITIES FILE AT THE DIVISION OF LEE COUNTY UTILITIES FILE AT THE DIVISION OF LEE COUNTY UTILITIES AT THE DIVISION OF LEE COUNTY UTILITIES AT THE DIVISION OF LEE COUNTY UTILITIES THE DIVISION OF LEE COUNTY UTILITIES THE DIVISION OF LEE COUNTY UTILITIES DIVISION OF LEE COUNTY UTILITIES DIVISION OF LEE COUNTY UTILITIES OF LEE COUNTY UTILITIES OF LEE COUNTY UTILITIES LEE COUNTY UTILITIES LEE COUNTY UTILITIES COUNTY UTILITIES COUNTY UTILITIES UTILITIES UTILITIES OFFICE (1500 MONROE STREET, P.O. BOX 398, FORT MYERS, FLORIDA 33902). B. ANY QUANTITIES SHOWN ON PLANS ARE NOT VERIFIED BY LCU. ANY QUANTITIES SHOWN ON PLANS ARE NOT VERIFIED BY LCU. C. AT THE SITE KEEP AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, AT THE SITE KEEP AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, THE SITE KEEP AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, THE SITE KEEP AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, SITE KEEP AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, SITE KEEP AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, KEEP AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, KEEP AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, AND MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, MAINTAIN ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, ONE RECORD COPY OF ALL CONTRACT DOCUMENTS, RECORD COPY OF ALL CONTRACT DOCUMENTS, RECORD COPY OF ALL CONTRACT DOCUMENTS, COPY OF ALL CONTRACT DOCUMENTS, COPY OF ALL CONTRACT DOCUMENTS, OF ALL CONTRACT DOCUMENTS, OF ALL CONTRACT DOCUMENTS, ALL CONTRACT DOCUMENTS, ALL CONTRACT DOCUMENTS, CONTRACT DOCUMENTS, CONTRACT DOCUMENTS, DOCUMENTS, DOCUMENTS, REFERENCE DOCUMENTS AND ALL TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. DOCUMENTS AND ALL TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. DOCUMENTS AND ALL TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. AND ALL TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. AND ALL TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. ALL TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. ALL TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. TECHNICAL DOCUMENTS SUBMITTED IN GOOD ORDER. DOCUMENTS SUBMITTED IN GOOD ORDER. DOCUMENTS SUBMITTED IN GOOD ORDER. SUBMITTED IN GOOD ORDER. SUBMITTED IN GOOD ORDER. IN GOOD ORDER. IN GOOD ORDER. GOOD ORDER. GOOD ORDER. ORDER. ORDER. AS THE WORK PROGRESSES THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE THE WORK PROGRESSES THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE THE WORK PROGRESSES THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE WORK PROGRESSES THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE WORK PROGRESSES THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE PROGRESSES THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE PROGRESSES THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE THE ENGINEER OR HIS DESIGNATED REPRESENTATIVE ENGINEER OR HIS DESIGNATED REPRESENTATIVE ENGINEER OR HIS DESIGNATED REPRESENTATIVE OR HIS DESIGNATED REPRESENTATIVE OR HIS DESIGNATED REPRESENTATIVE HIS DESIGNATED REPRESENTATIVE HIS DESIGNATED REPRESENTATIVE DESIGNATED REPRESENTATIVE DESIGNATED REPRESENTATIVE REPRESENTATIVE REPRESENTATIVE SHALL RECORD ON ONE SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND RECORD ON ONE SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND RECORD ON ONE SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND ON ONE SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND ON ONE SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND ONE SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND ONE SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND SET OF REPRODUCIBLE DRAWINGS ALL CHANGES AND OF REPRODUCIBLE DRAWINGS ALL CHANGES AND OF REPRODUCIBLE DRAWINGS ALL CHANGES AND REPRODUCIBLE DRAWINGS ALL CHANGES AND REPRODUCIBLE DRAWINGS ALL CHANGES AND DRAWINGS ALL CHANGES AND DRAWINGS ALL CHANGES AND ALL CHANGES AND ALL CHANGES AND CHANGES AND CHANGES AND AND AND DEVIATIONS FROM THE ORIGINAL PLANS. HE SHALL RECORD THE EXACT LOCATION OF FROM THE ORIGINAL PLANS. HE SHALL RECORD THE EXACT LOCATION OF FROM THE ORIGINAL PLANS. HE SHALL RECORD THE EXACT LOCATION OF THE ORIGINAL PLANS. HE SHALL RECORD THE EXACT LOCATION OF THE ORIGINAL PLANS. HE SHALL RECORD THE EXACT LOCATION OF ORIGINAL PLANS. HE SHALL RECORD THE EXACT LOCATION OF ORIGINAL PLANS. HE SHALL RECORD THE EXACT LOCATION OF PLANS. HE SHALL RECORD THE EXACT LOCATION OF PLANS. HE SHALL RECORD THE EXACT LOCATION OF HE SHALL RECORD THE EXACT LOCATION OF HE SHALL RECORD THE EXACT LOCATION OF SHALL RECORD THE EXACT LOCATION OF SHALL RECORD THE EXACT LOCATION OF RECORD THE EXACT LOCATION OF RECORD THE EXACT LOCATION OF THE EXACT LOCATION OF THE EXACT LOCATION OF EXACT LOCATION OF EXACT LOCATION OF LOCATION OF LOCATION OF OF OF ALL CHANGES IN VERTICAL AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT CHANGES IN VERTICAL AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT CHANGES IN VERTICAL AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT IN VERTICAL AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT IN VERTICAL AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT VERTICAL AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT VERTICAL AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT AND HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT HORIZONTAL ALIGNMENT BY OFFSETS AND TIES AT ALIGNMENT BY OFFSETS AND TIES AT ALIGNMENT BY OFFSETS AND TIES AT BY OFFSETS AND TIES AT BY OFFSETS AND TIES AT OFFSETS AND TIES AT OFFSETS AND TIES AT AND TIES AT AND TIES AT TIES AT TIES AT AT AT EACH; SEWER, WATER, ELECTRIC, GAS, COMMUNICATION AND OTHER SERVICES BY SEWER, WATER, ELECTRIC, GAS, COMMUNICATION AND OTHER SERVICES BY SEWER, WATER, ELECTRIC, GAS, COMMUNICATION AND OTHER SERVICES BY WATER, ELECTRIC, GAS, COMMUNICATION AND OTHER SERVICES BY WATER, ELECTRIC, GAS, COMMUNICATION AND OTHER SERVICES BY ELECTRIC, GAS, COMMUNICATION AND OTHER SERVICES BY ELECTRIC, GAS, COMMUNICATION AND OTHER SERVICES BY GAS, COMMUNICATION AND OTHER SERVICES BY GAS, COMMUNICATION AND OTHER SERVICES BY COMMUNICATION AND OTHER SERVICES BY COMMUNICATION AND OTHER SERVICES BY AND OTHER SERVICES BY AND OTHER SERVICES BY OTHER SERVICES BY OTHER SERVICES BY SERVICES BY SERVICES BY BY BY OFF-SET DISTANCE TO PERMANENT IMPROVEMENTS SUCH AS BUILDING AND CURBS. THESE RECORD DRAWINGS MUST BE CERTIFIED BY THE FLORIDA REGISTERED RECORD DRAWINGS MUST BE CERTIFIED BY THE FLORIDA REGISTERED RECORD DRAWINGS MUST BE CERTIFIED BY THE FLORIDA REGISTERED DRAWINGS MUST BE CERTIFIED BY THE FLORIDA REGISTERED DRAWINGS MUST BE CERTIFIED BY THE FLORIDA REGISTERED MUST BE CERTIFIED BY THE FLORIDA REGISTERED MUST BE CERTIFIED BY THE FLORIDA REGISTERED BE CERTIFIED BY THE FLORIDA REGISTERED BE CERTIFIED BY THE FLORIDA REGISTERED CERTIFIED BY THE FLORIDA REGISTERED CERTIFIED BY THE FLORIDA REGISTERED BY THE FLORIDA REGISTERED BY THE FLORIDA REGISTERED THE FLORIDA REGISTERED THE FLORIDA REGISTERED FLORIDA REGISTERED FLORIDA REGISTERED REGISTERED REGISTERED PROFESSIONAL ENGINEER, WHO PREPARED THE PLANS AND SIGNS AND SEALS THESE ENGINEER, WHO PREPARED THE PLANS AND SIGNS AND SEALS THESE ENGINEER, WHO PREPARED THE PLANS AND SIGNS AND SEALS THESE WHO PREPARED THE PLANS AND SIGNS AND SEALS THESE WHO PREPARED THE PLANS AND SIGNS AND SEALS THESE PREPARED THE PLANS AND SIGNS AND SEALS THESE PREPARED THE PLANS AND SIGNS AND SEALS THESE THE PLANS AND SIGNS AND SEALS THESE THE PLANS AND SIGNS AND SEALS THESE PLANS AND SIGNS AND SEALS THESE PLANS AND SIGNS AND SEALS THESE AND SIGNS AND SEALS THESE AND SIGNS AND SEALS THESE SIGNS AND SEALS THESE SIGNS AND SEALS THESE AND SEALS THESE AND SEALS THESE SEALS THESE SEALS THESE THESE THESE PLANS. THE RECORD DRAWINGS SHALL INCLUDE VERTICAL AND HORIZONTAL THE RECORD DRAWINGS SHALL INCLUDE VERTICAL AND HORIZONTAL THE RECORD DRAWINGS SHALL INCLUDE VERTICAL AND HORIZONTAL RECORD DRAWINGS SHALL INCLUDE VERTICAL AND HORIZONTAL RECORD DRAWINGS SHALL INCLUDE VERTICAL AND HORIZONTAL DRAWINGS SHALL INCLUDE VERTICAL AND HORIZONTAL DRAWINGS SHALL INCLUDE VERTICAL AND HORIZONTAL SHALL INCLUDE VERTICAL AND HORIZONTAL SHALL INCLUDE VERTICAL AND HORIZONTAL INCLUDE VERTICAL AND HORIZONTAL INCLUDE VERTICAL AND HORIZONTAL VERTICAL AND HORIZONTAL VERTICAL AND HORIZONTAL AND HORIZONTAL AND HORIZONTAL HORIZONTAL HORIZONTAL ALIGNMENT OF ALL WATER, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, OF ALL WATER, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, OF ALL WATER, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, ALL WATER, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, ALL WATER, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, WATER, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, WATER, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, SEWER, AND EFFLUENT REUSE LINES, VALVES, TEES, AND EFFLUENT REUSE LINES, VALVES, TEES, AND EFFLUENT REUSE LINES, VALVES, TEES, EFFLUENT REUSE LINES, VALVES, TEES, EFFLUENT REUSE LINES, VALVES, TEES, REUSE LINES, VALVES, TEES, REUSE LINES, VALVES, TEES, LINES, VALVES, TEES, LINES, VALVES, TEES, VALVES, TEES, VALVES, TEES, TEES, TEES, BENDS, REDUCERS, HYDRANTS, PUMP STATIONS, SERVICE CONNECTIONS, METER BOXES REDUCERS, HYDRANTS, PUMP STATIONS, SERVICE CONNECTIONS, METER BOXES REDUCERS, HYDRANTS, PUMP STATIONS, SERVICE CONNECTIONS, METER BOXES HYDRANTS, PUMP STATIONS, SERVICE CONNECTIONS, METER BOXES HYDRANTS, PUMP STATIONS, SERVICE CONNECTIONS, METER BOXES PUMP STATIONS, SERVICE CONNECTIONS, METER BOXES PUMP STATIONS, SERVICE CONNECTIONS, METER BOXES STATIONS, SERVICE CONNECTIONS, METER BOXES STATIONS, SERVICE CONNECTIONS, METER BOXES SERVICE CONNECTIONS, METER BOXES SERVICE CONNECTIONS, METER BOXES CONNECTIONS, METER BOXES CONNECTIONS, METER BOXES METER BOXES METER BOXES BOXES BOXES AND/OR PADS, AND OTHER PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF PADS, AND OTHER PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF PADS, AND OTHER PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF AND OTHER PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF AND OTHER PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF OTHER PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF OTHER PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF PERTINENT STRUCTURES. PIPELINE RUNS IN EXCESS OF STRUCTURES. PIPELINE RUNS IN EXCESS OF STRUCTURES. PIPELINE RUNS IN EXCESS OF PIPELINE RUNS IN EXCESS OF PIPELINE RUNS IN EXCESS OF RUNS IN EXCESS OF RUNS IN EXCESS OF IN EXCESS OF IN EXCESS OF EXCESS OF EXCESS OF OF OF 152.4M, (500'), WITHOUT FITTINGS SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION (500'), WITHOUT FITTINGS SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION (500'), WITHOUT FITTINGS SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION WITHOUT FITTINGS SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION WITHOUT FITTINGS SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION FITTINGS SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION FITTINGS SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION SHALL INCLUDE VERTICAL ALIGNMENT INFORMATION INCLUDE VERTICAL ALIGNMENT INFORMATION INCLUDE VERTICAL ALIGNMENT INFORMATION VERTICAL ALIGNMENT INFORMATION VERTICAL ALIGNMENT INFORMATION ALIGNMENT INFORMATION ALIGNMENT INFORMATION INFORMATION INFORMATION AT 152.4M, (500') INTERVALS. SAID ALIGNMENT SHALL BE TIED TO PERMANENT 152.4M, (500') INTERVALS. SAID ALIGNMENT SHALL BE TIED TO PERMANENT 152.4M, (500') INTERVALS. SAID ALIGNMENT SHALL BE TIED TO PERMANENT (500') INTERVALS. SAID ALIGNMENT SHALL BE TIED TO PERMANENT (500') INTERVALS. SAID ALIGNMENT SHALL BE TIED TO PERMANENT INTERVALS. SAID ALIGNMENT SHALL BE TIED TO PERMANENT INTERVALS. SAID ALIGNMENT SHALL BE TIED TO PERMANENT SAID ALIGNMENT SHALL BE TIED TO PERMANENT SAID ALIGNMENT SHALL BE TIED TO PERMANENT ALIGNMENT SHALL BE TIED TO PERMANENT ALIGNMENT SHALL BE TIED TO PERMANENT SHALL BE TIED TO PERMANENT SHALL BE TIED TO PERMANENT BE TIED TO PERMANENT BE TIED TO PERMANENT TIED TO PERMANENT TIED TO PERMANENT TO PERMANENT TO PERMANENT PERMANENT PERMANENT IMPROVEMENTS, SUCH AS ROADWAY AND/OR RAILROAD CENTERLINES AND SUCH AS ROADWAY AND/OR RAILROAD CENTERLINES AND SUCH AS ROADWAY AND/OR RAILROAD CENTERLINES AND AS ROADWAY AND/OR RAILROAD CENTERLINES AND AS ROADWAY AND/OR RAILROAD CENTERLINES AND ROADWAY AND/OR RAILROAD CENTERLINES AND ROADWAY AND/OR RAILROAD CENTERLINES AND AND/OR RAILROAD CENTERLINES AND AND/OR RAILROAD CENTERLINES AND RAILROAD CENTERLINES AND RAILROAD CENTERLINES AND CENTERLINES AND CENTERLINES AND AND AND RIGHTS-OF-WAY, BUILDING AND PROPERTY CORNERS, AND SHALL BE CERTIFIED BY A BUILDING AND PROPERTY CORNERS, AND SHALL BE CERTIFIED BY A BUILDING AND PROPERTY CORNERS, AND SHALL BE CERTIFIED BY A AND PROPERTY CORNERS, AND SHALL BE CERTIFIED BY A AND PROPERTY CORNERS, AND SHALL BE CERTIFIED BY A PROPERTY CORNERS, AND SHALL BE CERTIFIED BY A PROPERTY CORNERS, AND SHALL BE CERTIFIED BY A CORNERS, AND SHALL BE CERTIFIED BY A CORNERS, AND SHALL BE CERTIFIED BY A AND SHALL BE CERTIFIED BY A AND SHALL BE CERTIFIED BY A SHALL BE CERTIFIED BY A SHALL BE CERTIFIED BY A BE CERTIFIED BY A BE CERTIFIED BY A CERTIFIED BY A CERTIFIED BY A BY A BY A A A PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF FLORIDA. THE LAND SURVEYOR, LICENSED IN THE STATE OF FLORIDA. THE LAND SURVEYOR, LICENSED IN THE STATE OF FLORIDA. THE SURVEYOR, LICENSED IN THE STATE OF FLORIDA. THE SURVEYOR, LICENSED IN THE STATE OF FLORIDA. THE LICENSED IN THE STATE OF FLORIDA. THE LICENSED IN THE STATE OF FLORIDA. THE IN THE STATE OF FLORIDA. THE IN THE STATE OF FLORIDA. THE THE STATE OF FLORIDA. THE THE STATE OF FLORIDA. THE STATE OF FLORIDA. THE STATE OF FLORIDA. THE OF FLORIDA. THE OF FLORIDA. THE FLORIDA. THE FLORIDA. THE THE THE PROFESSIONAL LAND SURVEYOR CAN COORDINATE WITH THE CONTRACTOR TO INSTALL LAND SURVEYOR CAN COORDINATE WITH THE CONTRACTOR TO INSTALL LAND SURVEYOR CAN COORDINATE WITH THE CONTRACTOR TO INSTALL SURVEYOR CAN COORDINATE WITH THE CONTRACTOR TO INSTALL SURVEYOR CAN COORDINATE WITH THE CONTRACTOR TO INSTALL CAN COORDINATE WITH THE CONTRACTOR TO INSTALL CAN COORDINATE WITH THE CONTRACTOR TO INSTALL COORDINATE WITH THE CONTRACTOR TO INSTALL COORDINATE WITH THE CONTRACTOR TO INSTALL WITH THE CONTRACTOR TO INSTALL WITH THE CONTRACTOR TO INSTALL THE CONTRACTOR TO INSTALL THE CONTRACTOR TO INSTALL CONTRACTOR TO INSTALL CONTRACTOR TO INSTALL TO INSTALL TO INSTALL INSTALL INSTALL THE NECESSARY APPURTENANCES ON BURIED UTILITIES TO FACILITATE THE SURVEY NECESSARY APPURTENANCES ON BURIED UTILITIES TO FACILITATE THE SURVEY NECESSARY APPURTENANCES ON BURIED UTILITIES TO FACILITATE THE SURVEY APPURTENANCES ON BURIED UTILITIES TO FACILITATE THE SURVEY APPURTENANCES ON BURIED UTILITIES TO FACILITATE THE SURVEY ON BURIED UTILITIES TO FACILITATE THE SURVEY ON BURIED UTILITIES TO FACILITATE THE SURVEY BURIED UTILITIES TO FACILITATE THE SURVEY BURIED UTILITIES TO FACILITATE THE SURVEY UTILITIES TO FACILITATE THE SURVEY UTILITIES TO FACILITATE THE SURVEY TO FACILITATE THE SURVEY TO FACILITATE THE SURVEY FACILITATE THE SURVEY FACILITATE THE SURVEY THE SURVEY THE SURVEY SURVEY SURVEY AFTER CONSTRUCTION IS COMPLETED. IN ADDITION, PROPERTY STRAP NUMBERS AND CONSTRUCTION IS COMPLETED. IN ADDITION, PROPERTY STRAP NUMBERS AND CONSTRUCTION IS COMPLETED. IN ADDITION, PROPERTY STRAP NUMBERS AND IS COMPLETED. IN ADDITION, PROPERTY STRAP NUMBERS AND IS COMPLETED. IN ADDITION, PROPERTY STRAP NUMBERS AND COMPLETED. IN ADDITION, PROPERTY STRAP NUMBERS AND COMPLETED. IN ADDITION, PROPERTY STRAP NUMBERS AND IN ADDITION, PROPERTY STRAP NUMBERS AND IN ADDITION, PROPERTY STRAP NUMBERS AND ADDITION, PROPERTY STRAP NUMBERS AND ADDITION, PROPERTY STRAP NUMBERS AND PROPERTY STRAP NUMBERS AND PROPERTY STRAP NUMBERS AND STRAP NUMBERS AND STRAP NUMBERS AND NUMBERS AND NUMBERS AND AND AND STREET NAMES SHALL BE SHOWN ON THE PLAN. ON A CASE BY CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT A CASE BY CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT A CASE BY CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT CASE BY CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT CASE BY CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT BY CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT BY CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT CASE BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT BASIS, LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT LEE COUNTY UTILITIES MAY WAIVE THE REQUIREMENT COUNTY UTILITIES MAY WAIVE THE REQUIREMENT COUNTY UTILITIES MAY WAIVE THE REQUIREMENT UTILITIES MAY WAIVE THE REQUIREMENT UTILITIES MAY WAIVE THE REQUIREMENT MAY WAIVE THE REQUIREMENT MAY WAIVE THE REQUIREMENT WAIVE THE REQUIREMENT WAIVE THE REQUIREMENT THE REQUIREMENT THE REQUIREMENT REQUIREMENT REQUIREMENT FOR CERTIFICATION BY A PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF CERTIFICATION BY A PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF CERTIFICATION BY A PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF BY A PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF BY A PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF A PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF A PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF PROFESSIONAL LAND SURVEYOR, LICENSED IN THE STATE OF LAND SURVEYOR, LICENSED IN THE STATE OF LAND SURVEYOR, LICENSED IN THE STATE OF SURVEYOR, LICENSED IN THE STATE OF SURVEYOR, LICENSED IN THE STATE OF LICENSED IN THE STATE OF LICENSED IN THE STATE OF IN THE STATE OF IN THE STATE OF THE STATE OF THE STATE OF STATE OF STATE OF OF OF FLORIDA. HOWEVER, PRIOR CONSENT MUST FIRST BE OBTAINED FROM LEE COUNTY HOWEVER, PRIOR CONSENT MUST FIRST BE OBTAINED FROM LEE COUNTY HOWEVER, PRIOR CONSENT MUST FIRST BE OBTAINED FROM LEE COUNTY PRIOR CONSENT MUST FIRST BE OBTAINED FROM LEE COUNTY PRIOR CONSENT MUST FIRST BE OBTAINED FROM LEE COUNTY CONSENT MUST FIRST BE OBTAINED FROM LEE COUNTY CONSENT MUST FIRST BE OBTAINED FROM LEE COUNTY MUST FIRST BE OBTAINED FROM LEE COUNTY MUST FIRST BE OBTAINED FROM LEE COUNTY FIRST BE OBTAINED FROM LEE COUNTY FIRST BE OBTAINED FROM LEE COUNTY BE OBTAINED FROM LEE COUNTY BE OBTAINED FROM LEE COUNTY OBTAINED FROM LEE COUNTY OBTAINED FROM LEE COUNTY FROM LEE COUNTY FROM LEE COUNTY LEE COUNTY LEE COUNTY COUNTY COUNTY UTILITIES. THE COUNTY SHALL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL THE COUNTY SHALL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL THE COUNTY SHALL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL COUNTY SHALL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL COUNTY SHALL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL SHALL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL SHALL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL WITHHOLD FINAL ACCEPTANCE OF THE PROJECT UNTIL FINAL ACCEPTANCE OF THE PROJECT UNTIL FINAL ACCEPTANCE OF THE PROJECT UNTIL ACCEPTANCE OF THE PROJECT UNTIL ACCEPTANCE OF THE PROJECT UNTIL OF THE PROJECT UNTIL OF THE PROJECT UNTIL THE PROJECT UNTIL THE PROJECT UNTIL PROJECT UNTIL PROJECT UNTIL UNTIL UNTIL THE REQUIREMENT FOR RECORD DRAWINGS AND RELATED RECORDS HAS BEEN MET. REQUIREMENT FOR RECORD DRAWINGS AND RELATED RECORDS HAS BEEN MET. REQUIREMENT FOR RECORD DRAWINGS AND RELATED RECORDS HAS BEEN MET. FOR RECORD DRAWINGS AND RELATED RECORDS HAS BEEN MET. FOR RECORD DRAWINGS AND RELATED RECORDS HAS BEEN MET. RECORD DRAWINGS AND RELATED RECORDS HAS BEEN MET. RECORD DRAWINGS AND RELATED RECORDS HAS BEEN MET. DRAWINGS AND RELATED RECORDS HAS BEEN MET. DRAWINGS AND RELATED RECORDS HAS BEEN MET. AND RELATED RECORDS HAS BEEN MET. AND RELATED RECORDS HAS BEEN MET. RELATED RECORDS HAS BEEN MET. RELATED RECORDS HAS BEEN MET. RECORDS HAS BEEN MET. RECORDS HAS BEEN MET. HAS BEEN MET. HAS BEEN MET. BEEN MET. BEEN MET. MET. MET. RECORD DRAWINGS WITHOUT DETAILED FIELD VERIFIED HORIZONTAL AND VERTICAL DRAWINGS WITHOUT DETAILED FIELD VERIFIED HORIZONTAL AND VERTICAL DRAWINGS WITHOUT DETAILED FIELD VERIFIED HORIZONTAL AND VERTICAL WITHOUT DETAILED FIELD VERIFIED HORIZONTAL AND VERTICAL WITHOUT DETAILED FIELD VERIFIED HORIZONTAL AND VERTICAL DETAILED FIELD VERIFIED HORIZONTAL AND VERTICAL DETAILED FIELD VERIFIED HORIZONTAL AND VERTICAL FIELD VERIFIED HORIZONTAL AND VERTICAL FIELD VERIFIED HORIZONTAL AND VERTICAL VERIFIED HORIZONTAL AND VERTICAL VERIFIED HORIZONTAL AND VERTICAL HORIZONTAL AND VERTICAL HORIZONTAL AND VERTICAL AND VERTICAL AND VERTICAL VERTICAL VERTICAL LOCATIONS OF ALL FACILITIES SHOWN WILL BE REJECTED. D. A PRE-CONSTRUCTION MEETING IS REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY A PRE-CONSTRUCTION MEETING IS REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY PRE-CONSTRUCTION MEETING IS REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY PRE-CONSTRUCTION MEETING IS REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY MEETING IS REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY MEETING IS REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY IS REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY IS REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY REQUIRED BEFORE WORK MAY BEGIN. LEE COUNTY BEFORE WORK MAY BEGIN. LEE COUNTY BEFORE WORK MAY BEGIN. LEE COUNTY WORK MAY BEGIN. LEE COUNTY WORK MAY BEGIN. LEE COUNTY MAY BEGIN. LEE COUNTY MAY BEGIN. LEE COUNTY BEGIN. LEE COUNTY BEGIN. LEE COUNTY LEE COUNTY LEE COUNTY COUNTY COUNTY UTILITIES SHALL BE NOTIFIED 48 HOURS PRIOR TO PROJECT MOBILIZATION. E. ALL WORK AND MATERIALS, WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE ALL WORK AND MATERIALS, WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE WORK AND MATERIALS, WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE WORK AND MATERIALS, WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE AND MATERIALS, WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE AND MATERIALS, WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE MATERIALS, WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE MATERIALS, WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE WHICH DO NOT CONFORM TO LCU SPECIFICATIONS, ARE DO NOT CONFORM TO LCU SPECIFICATIONS, ARE DO NOT CONFORM TO LCU SPECIFICATIONS, ARE NOT CONFORM TO LCU SPECIFICATIONS, ARE NOT CONFORM TO LCU SPECIFICATIONS, ARE CONFORM TO LCU SPECIFICATIONS, ARE CONFORM TO LCU SPECIFICATIONS, ARE TO LCU SPECIFICATIONS, ARE TO LCU SPECIFICATIONS, ARE LCU SPECIFICATIONS, ARE LCU SPECIFICATIONS, ARE SPECIFICATIONS, ARE SPECIFICATIONS, ARE ARE ARE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. F. ANY WORK PERFORMED WITHOUT THE KNOWLEDGE OF LCU IS SUBJECT TO ANY WORK PERFORMED WITHOUT THE KNOWLEDGE OF LCU IS SUBJECT TO WORK PERFORMED WITHOUT THE KNOWLEDGE OF LCU IS SUBJECT TO WORK PERFORMED WITHOUT THE KNOWLEDGE OF LCU IS SUBJECT TO PERFORMED WITHOUT THE KNOWLEDGE OF LCU IS SUBJECT TO PERFORMED WITHOUT THE KNOWLEDGE OF LCU IS SUBJECT TO WITHOUT THE KNOWLEDGE OF LCU IS SUBJECT TO WITHOUT THE KNOWLEDGE OF LCU IS SUBJECT TO THE KNOWLEDGE OF LCU IS SUBJECT TO THE KNOWLEDGE OF LCU IS SUBJECT TO KNOWLEDGE OF LCU IS SUBJECT TO KNOWLEDGE OF LCU IS SUBJECT TO OF LCU IS SUBJECT TO OF LCU IS SUBJECT TO LCU IS SUBJECT TO LCU IS SUBJECT TO IS SUBJECT TO IS SUBJECT TO SUBJECT TO SUBJECT TO TO TO RE-EXCAVATION, REMOVAL AND REPLACEMENT OF SAME TO BE DONE AT THE REMOVAL AND REPLACEMENT OF SAME TO BE DONE AT THE REMOVAL AND REPLACEMENT OF SAME TO BE DONE AT THE AND REPLACEMENT OF SAME TO BE DONE AT THE AND REPLACEMENT OF SAME TO BE DONE AT THE REPLACEMENT OF SAME TO BE DONE AT THE REPLACEMENT OF SAME TO BE DONE AT THE OF SAME TO BE DONE AT THE OF SAME TO BE DONE AT THE SAME TO BE DONE AT THE SAME TO BE DONE AT THE TO BE DONE AT THE TO BE DONE AT THE BE DONE AT THE BE DONE AT THE DONE AT THE DONE AT THE AT THE AT THE THE THE CONTRACTOR'S EXPENSE. G. THE CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE THE CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE PERSONNEL AND EQUIPMENT ON THE PERSONNEL AND EQUIPMENT ON THE AND EQUIPMENT ON THE AND EQUIPMENT ON THE EQUIPMENT ON THE EQUIPMENT ON THE ON THE ON THE THE THE JOB AT ALL TIMES DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO AT ALL TIMES DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO AT ALL TIMES DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO ALL TIMES DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO ALL TIMES DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO TIMES DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO TIMES DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO TO SATISFY THE SPECIFICATIONS AND TO TO SATISFY THE SPECIFICATIONS AND TO SATISFY THE SPECIFICATIONS AND TO SATISFY THE SPECIFICATIONS AND TO THE SPECIFICATIONS AND TO THE SPECIFICATIONS AND TO SPECIFICATIONS AND TO SPECIFICATIONS AND TO AND TO AND TO TO TO COMPLETE WORK. H. LCU INSPECTION STAFF MAY OBSERVE PROJECT CONSTRUCTION. LCU INSPECTION STAFF MAY OBSERVE PROJECT CONSTRUCTION. I. THE CONTRACTOR IS TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY THE CONTRACTOR IS TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY CONTRACTOR IS TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY CONTRACTOR IS TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY IS TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY IS TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY ALL EXISTING LINES BEING TIED INTO AND VERIFY ALL EXISTING LINES BEING TIED INTO AND VERIFY EXISTING LINES BEING TIED INTO AND VERIFY EXISTING LINES BEING TIED INTO AND VERIFY LINES BEING TIED INTO AND VERIFY LINES BEING TIED INTO AND VERIFY BEING TIED INTO AND VERIFY BEING TIED INTO AND VERIFY TIED INTO AND VERIFY TIED INTO AND VERIFY INTO AND VERIFY INTO AND VERIFY AND VERIFY AND VERIFY VERIFY VERIFY GRADES BEFORE BEGINNING CONSTRUCTION. J. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE TO LOCATE AND TAKE ALL POSSIBLE TO LOCATE AND TAKE ALL POSSIBLE LOCATE AND TAKE ALL POSSIBLE LOCATE AND TAKE ALL POSSIBLE AND TAKE ALL POSSIBLE AND TAKE ALL POSSIBLE TAKE ALL POSSIBLE TAKE ALL POSSIBLE ALL POSSIBLE ALL POSSIBLE POSSIBLE POSSIBLE PRECAUTIONS TO AVOID ANY DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, TO AVOID ANY DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, TO AVOID ANY DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, AVOID ANY DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, AVOID ANY DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, ANY DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, ANY DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, TO ALL UNDERGROUND PIPELINES, TELEPHONE, TO ALL UNDERGROUND PIPELINES, TELEPHONE, ALL UNDERGROUND PIPELINES, TELEPHONE, ALL UNDERGROUND PIPELINES, TELEPHONE, UNDERGROUND PIPELINES, TELEPHONE, UNDERGROUND PIPELINES, TELEPHONE, PIPELINES, TELEPHONE, PIPELINES, TELEPHONE, TELEPHONE, TELEPHONE, CABLE TV, ELECTRIC LINES/CONDUITS AND STRUCTURES IN ADVANCE OF ANY TV, ELECTRIC LINES/CONDUITS AND STRUCTURES IN ADVANCE OF ANY TV, ELECTRIC LINES/CONDUITS AND STRUCTURES IN ADVANCE OF ANY ELECTRIC LINES/CONDUITS AND STRUCTURES IN ADVANCE OF ANY ELECTRIC LINES/CONDUITS AND STRUCTURES IN ADVANCE OF ANY LINES/CONDUITS AND STRUCTURES IN ADVANCE OF ANY LINES/CONDUITS AND STRUCTURES IN ADVANCE OF ANY AND STRUCTURES IN ADVANCE OF ANY AND STRUCTURES IN ADVANCE OF ANY STRUCTURES IN ADVANCE OF ANY STRUCTURES IN ADVANCE OF ANY IN ADVANCE OF ANY IN ADVANCE OF ANY ADVANCE OF ANY ADVANCE OF ANY OF ANY OF ANY ANY ANY CONSTRUCTION. LCU WILL NOT GUARANTEE ANY LOCATIONS AS SHOWN ON THESE LCU WILL NOT GUARANTEE ANY LOCATIONS AS SHOWN ON THESE LCU WILL NOT GUARANTEE ANY LOCATIONS AS SHOWN ON THESE WILL NOT GUARANTEE ANY LOCATIONS AS SHOWN ON THESE WILL NOT GUARANTEE ANY LOCATIONS AS SHOWN ON THESE NOT GUARANTEE ANY LOCATIONS AS SHOWN ON THESE NOT GUARANTEE ANY LOCATIONS AS SHOWN ON THESE GUARANTEE ANY LOCATIONS AS SHOWN ON THESE GUARANTEE ANY LOCATIONS AS SHOWN ON THESE ANY LOCATIONS AS SHOWN ON THESE ANY LOCATIONS AS SHOWN ON THESE LOCATIONS AS SHOWN ON THESE LOCATIONS AS SHOWN ON THESE AS SHOWN ON THESE AS SHOWN ON THESE SHOWN ON THESE SHOWN ON THESE ON THESE ON THESE THESE THESE PLANS OR THOSE OMITTED FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY OR THOSE OMITTED FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY OR THOSE OMITTED FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY THOSE OMITTED FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY THOSE OMITTED FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY OMITTED FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY OMITTED FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY THESE PLANS. THE CONTRACTOR SHALL BE FULLY THESE PLANS. THE CONTRACTOR SHALL BE FULLY PLANS. THE CONTRACTOR SHALL BE FULLY PLANS. THE CONTRACTOR SHALL BE FULLY THE CONTRACTOR SHALL BE FULLY THE CONTRACTOR SHALL BE FULLY CONTRACTOR SHALL BE FULLY CONTRACTOR SHALL BE FULLY SHALL BE FULLY SHALL BE FULLY BE FULLY BE FULLY FULLY FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO FOR ANY AND ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO FOR ANY AND ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO ANY AND ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO ANY AND ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO AND ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO AND ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO WHICH MAY OCCUR BY HIS FAILURE TO WHICH MAY OCCUR BY HIS FAILURE TO MAY OCCUR BY HIS FAILURE TO MAY OCCUR BY HIS FAILURE TO OCCUR BY HIS FAILURE TO OCCUR BY HIS FAILURE TO BY HIS FAILURE TO BY HIS FAILURE TO HIS FAILURE TO HIS FAILURE TO FAILURE TO FAILURE TO TO TO EXACTLY LOCATE AND PROTECT EXISTING UTILITIES AND STRUCTURES. K. CONTRACTOR SHALL VERIFY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY CONTRACTOR SHALL VERIFY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY SHALL VERIFY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY SHALL VERIFY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY VERIFY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY VERIFY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY QUANTITIES SHOWN ON THE PLANS. IF ANY QUANTITIES SHOWN ON THE PLANS. IF ANY SHOWN ON THE PLANS. IF ANY SHOWN ON THE PLANS. IF ANY ON THE PLANS. IF ANY ON THE PLANS. IF ANY THE PLANS. IF ANY THE PLANS. IF ANY PLANS. IF ANY PLANS. IF ANY IF ANY IF ANY ANY ANY DISCREPANCIES IN QUANTITIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE IN QUANTITIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE IN QUANTITIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE QUANTITIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE QUANTITIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE FOUND, THE CONTRACTOR SHALL NOTIFY THE FOUND, THE CONTRACTOR SHALL NOTIFY THE THE CONTRACTOR SHALL NOTIFY THE THE CONTRACTOR SHALL NOTIFY THE CONTRACTOR SHALL NOTIFY THE CONTRACTOR SHALL NOTIFY THE SHALL NOTIFY THE SHALL NOTIFY THE NOTIFY THE NOTIFY THE THE THE PROJECT ENGINEER AND LCU. L. ALL REGULATORY AND PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED ALL REGULATORY AND PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED REGULATORY AND PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED REGULATORY AND PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED AND PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED AND PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED AGENCIES' REQUIREMENTS SHALL BE COMPLIED AGENCIES' REQUIREMENTS SHALL BE COMPLIED REQUIREMENTS SHALL BE COMPLIED REQUIREMENTS SHALL BE COMPLIED SHALL BE COMPLIED SHALL BE COMPLIED BE COMPLIED BE COMPLIED COMPLIED COMPLIED WITH. M. APPROPRIATE TURBIDITY CONTROL DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE APPROPRIATE TURBIDITY CONTROL DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE TURBIDITY CONTROL DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE TURBIDITY CONTROL DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE CONTROL DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE CONTROL DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE (E.G. SILT FENCES, HAY BAILS) WILL BE (E.G. SILT FENCES, HAY BAILS) WILL BE SILT FENCES, HAY BAILS) WILL BE SILT FENCES, HAY BAILS) WILL BE FENCES, HAY BAILS) WILL BE FENCES, HAY BAILS) WILL BE HAY BAILS) WILL BE HAY BAILS) WILL BE BAILS) WILL BE BAILS) WILL BE WILL BE WILL BE BE BE UTILIZED DURING ALL PHASES OF INSTALLATION AND GRADING. CONTRACTOR IS DURING ALL PHASES OF INSTALLATION AND GRADING. CONTRACTOR IS DURING ALL PHASES OF INSTALLATION AND GRADING. CONTRACTOR IS ALL PHASES OF INSTALLATION AND GRADING. CONTRACTOR IS ALL PHASES OF INSTALLATION AND GRADING. CONTRACTOR IS PHASES OF INSTALLATION AND GRADING. CONTRACTOR IS PHASES OF INSTALLATION AND GRADING. CONTRACTOR IS OF INSTALLATION AND GRADING. CONTRACTOR IS OF INSTALLATION AND GRADING. CONTRACTOR IS INSTALLATION AND GRADING. CONTRACTOR IS INSTALLATION AND GRADING. CONTRACTOR IS AND GRADING. CONTRACTOR IS AND GRADING. CONTRACTOR IS GRADING. CONTRACTOR IS GRADING. CONTRACTOR IS CONTRACTOR IS CONTRACTOR IS IS IS RESPONSIBLE FOR SUBMITTING THE NOTICE OF INTENT AND NOTICE OF TERMINATION FOR SUBMITTING THE NOTICE OF INTENT AND NOTICE OF TERMINATION FOR SUBMITTING THE NOTICE OF INTENT AND NOTICE OF TERMINATION SUBMITTING THE NOTICE OF INTENT AND NOTICE OF TERMINATION SUBMITTING THE NOTICE OF INTENT AND NOTICE OF TERMINATION THE NOTICE OF INTENT AND NOTICE OF TERMINATION THE NOTICE OF INTENT AND NOTICE OF TERMINATION NOTICE OF INTENT AND NOTICE OF TERMINATION NOTICE OF INTENT AND NOTICE OF TERMINATION OF INTENT AND NOTICE OF TERMINATION OF INTENT AND NOTICE OF TERMINATION INTENT AND NOTICE OF TERMINATION INTENT AND NOTICE OF TERMINATION AND NOTICE OF TERMINATION AND NOTICE OF TERMINATION NOTICE OF TERMINATION NOTICE OF TERMINATION OF TERMINATION OF TERMINATION TERMINATION TERMINATION TO THE EPA IN COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS THE EPA IN COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS THE EPA IN COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS EPA IN COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS EPA IN COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS IN COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS IN COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS COMPLIANCE WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS WITH LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS LEE COUNTY'S NPDES PERMIT. CONTRACTOR IS COUNTY'S NPDES PERMIT. CONTRACTOR IS COUNTY'S NPDES PERMIT. CONTRACTOR IS NPDES PERMIT. CONTRACTOR IS NPDES PERMIT. CONTRACTOR IS PERMIT. CONTRACTOR IS PERMIT. CONTRACTOR IS CONTRACTOR IS CONTRACTOR IS IS IS RESPONSIBLE FOR DEVELOPING AND MAINTAINING AN EFFECTIVE STORM WATER FOR DEVELOPING AND MAINTAINING AN EFFECTIVE STORM WATER FOR DEVELOPING AND MAINTAINING AN EFFECTIVE STORM WATER DEVELOPING AND MAINTAINING AN EFFECTIVE STORM WATER DEVELOPING AND MAINTAINING AN EFFECTIVE STORM WATER AND MAINTAINING AN EFFECTIVE STORM WATER AND MAINTAINING AN EFFECTIVE STORM WATER MAINTAINING AN EFFECTIVE STORM WATER MAINTAINING AN EFFECTIVE STORM WATER AN EFFECTIVE STORM WATER AN EFFECTIVE STORM WATER EFFECTIVE STORM WATER EFFECTIVE STORM WATER STORM WATER STORM WATER WATER WATER POLLUTION PREVENTION PLAN. N. IN THE EVENT THAT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT IN THE EVENT THAT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT THE EVENT THAT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT THE EVENT THAT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT EVENT THAT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT EVENT THAT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT THAT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT THAT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT HARD LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT LIMESTONE FORMATION IS ENCOUNTERED, MAKING IT FORMATION IS ENCOUNTERED, MAKING IT FORMATION IS ENCOUNTERED, MAKING IT IS ENCOUNTERED, MAKING IT IS ENCOUNTERED, MAKING IT ENCOUNTERED, MAKING IT ENCOUNTERED, MAKING IT MAKING IT MAKING IT IT IT IMPOSSIBLE TO EXCAVATE TO THE DEPTH REQUIRED UNDER THIS CONTRACT, THE TO EXCAVATE TO THE DEPTH REQUIRED UNDER THIS CONTRACT, THE TO EXCAVATE TO THE DEPTH REQUIRED UNDER THIS CONTRACT, THE EXCAVATE TO THE DEPTH REQUIRED UNDER THIS CONTRACT, THE EXCAVATE TO THE DEPTH REQUIRED UNDER THIS CONTRACT, THE TO THE DEPTH REQUIRED UNDER THIS CONTRACT, THE TO THE DEPTH REQUIRED UNDER THIS CONTRACT, THE THE DEPTH REQUIRED UNDER THIS CONTRACT, THE THE DEPTH REQUIRED UNDER THIS CONTRACT, THE DEPTH REQUIRED UNDER THIS CONTRACT, THE DEPTH REQUIRED UNDER THIS CONTRACT, THE REQUIRED UNDER THIS CONTRACT, THE REQUIRED UNDER THIS CONTRACT, THE UNDER THIS CONTRACT, THE UNDER THIS CONTRACT, THE THIS CONTRACT, THE THIS CONTRACT, THE CONTRACT, THE CONTRACT, THE THE THE CONTRACTOR MAY BE ALLOWED TO REDUCE THE PIPE COVER TO NOT LESS THAN MAY BE ALLOWED TO REDUCE THE PIPE COVER TO NOT LESS THAN MAY BE ALLOWED TO REDUCE THE PIPE COVER TO NOT LESS THAN BE ALLOWED TO REDUCE THE PIPE COVER TO NOT LESS THAN BE ALLOWED TO REDUCE THE PIPE COVER TO NOT LESS THAN ALLOWED TO REDUCE THE PIPE COVER TO NOT LESS THAN ALLOWED TO REDUCE THE PIPE COVER TO NOT LESS THAN TO REDUCE THE PIPE COVER TO NOT LESS THAN TO REDUCE THE PIPE COVER TO NOT LESS THAN REDUCE THE PIPE COVER TO NOT LESS THAN REDUCE THE PIPE COVER TO NOT LESS THAN THE PIPE COVER TO NOT LESS THAN THE PIPE COVER TO NOT LESS THAN PIPE COVER TO NOT LESS THAN PIPE COVER TO NOT LESS THAN COVER TO NOT LESS THAN COVER TO NOT LESS THAN TO NOT LESS THAN TO NOT LESS THAN NOT LESS THAN NOT LESS THAN LESS THAN LESS THAN THAN THAN TWO (2) FEET WHILE MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER (2) FEET WHILE MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER (2) FEET WHILE MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER FEET WHILE MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER FEET WHILE MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER WHILE MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER WHILE MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER MAINTAINING THE LCU REQUIRED THICKNESS OF BEDDING UNDER THE LCU REQUIRED THICKNESS OF BEDDING UNDER THE LCU REQUIRED THICKNESS OF BEDDING UNDER LCU REQUIRED THICKNESS OF BEDDING UNDER LCU REQUIRED THICKNESS OF BEDDING UNDER REQUIRED THICKNESS OF BEDDING UNDER REQUIRED THICKNESS OF BEDDING UNDER THICKNESS OF BEDDING UNDER THICKNESS OF BEDDING UNDER OF BEDDING UNDER OF BEDDING UNDER BEDDING UNDER BEDDING UNDER UNDER UNDER THE PIPE. SUCH DEVIATION FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU PIPE. SUCH DEVIATION FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU PIPE. SUCH DEVIATION FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU SUCH DEVIATION FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU SUCH DEVIATION FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU DEVIATION FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU DEVIATION FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU FROM THE PLANS MUST BE FIRST BE APPROVED BY LCU THE PLANS MUST BE FIRST BE APPROVED BY LCU THE PLANS MUST BE FIRST BE APPROVED BY LCU PLANS MUST BE FIRST BE APPROVED BY LCU PLANS MUST BE FIRST BE APPROVED BY LCU MUST BE FIRST BE APPROVED BY LCU MUST BE FIRST BE APPROVED BY LCU BE FIRST BE APPROVED BY LCU BE FIRST BE APPROVED BY LCU FIRST BE APPROVED BY LCU FIRST BE APPROVED BY LCU BE APPROVED BY LCU BE APPROVED BY LCU APPROVED BY LCU APPROVED BY LCU BY LCU BY LCU LCU LCU AND THE ENGINEER PRIOR TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE THE ENGINEER PRIOR TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE THE ENGINEER PRIOR TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE ENGINEER PRIOR TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE ENGINEER PRIOR TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE PRIOR TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE PRIOR TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE TO THE PIPE LAYING. IF TWO FEET OF COVER OR MORE THE PIPE LAYING. IF TWO FEET OF COVER OR MORE THE PIPE LAYING. IF TWO FEET OF COVER OR MORE PIPE LAYING. IF TWO FEET OF COVER OR MORE PIPE LAYING. IF TWO FEET OF COVER OR MORE LAYING. IF TWO FEET OF COVER OR MORE LAYING. IF TWO FEET OF COVER OR MORE IF TWO FEET OF COVER OR MORE IF TWO FEET OF COVER OR MORE TWO FEET OF COVER OR MORE TWO FEET OF COVER OR MORE FEET OF COVER OR MORE FEET OF COVER OR MORE OF COVER OR MORE OF COVER OR MORE COVER OR MORE COVER OR MORE OR MORE OR MORE MORE MORE CAN NOT BE ATTAINED, THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF NOT BE ATTAINED, THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF NOT BE ATTAINED, THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF BE ATTAINED, THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF BE ATTAINED, THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF ATTAINED, THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF ATTAINED, THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF THE CONTRACTOR SHALL PROVIDE OTHER METHOD OF CONTRACTOR SHALL PROVIDE OTHER METHOD OF CONTRACTOR SHALL PROVIDE OTHER METHOD OF SHALL PROVIDE OTHER METHOD OF SHALL PROVIDE OTHER METHOD OF PROVIDE OTHER METHOD OF PROVIDE OTHER METHOD OF OTHER METHOD OF OTHER METHOD OF METHOD OF METHOD OF OF OF CONSTRUCTION OR PIPE PROTECTION WHICH SHALL FIRST BE APPROVED BY LCU AND OR PIPE PROTECTION WHICH SHALL FIRST BE APPROVED BY LCU AND OR PIPE PROTECTION WHICH SHALL FIRST BE APPROVED BY LCU AND PIPE PROTECTION WHICH SHALL FIRST BE APPROVED BY LCU AND PIPE PROTECTION WHICH SHALL FIRST BE APPROVED BY LCU AND PROTECTION WHICH SHALL FIRST BE APPROVED BY LCU AND PROTECTION WHICH SHALL FIRST BE APPROVED BY LCU AND WHICH SHALL FIRST BE APPROVED BY LCU AND WHICH SHALL FIRST BE APPROVED BY LCU AND SHALL FIRST BE APPROVED BY LCU AND SHALL FIRST BE APPROVED BY LCU AND FIRST BE APPROVED BY LCU AND FIRST BE APPROVED BY LCU AND BE APPROVED BY LCU AND BE APPROVED BY LCU AND APPROVED BY LCU AND APPROVED BY LCU AND BY LCU AND BY LCU AND LCU AND LCU AND AND AND THE ENGINEER, AT NO ADDITIONAL COST TO THE COUNTY. O. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OF EXISTING UTILITIES, STRUCTURES AND OF EXISTING UTILITIES, STRUCTURES AND EXISTING UTILITIES, STRUCTURES AND EXISTING UTILITIES, STRUCTURES AND UTILITIES, STRUCTURES AND UTILITIES, STRUCTURES AND STRUCTURES AND STRUCTURES AND AND AND OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF TO THE BEST INFORMATION AVAILABLE AT THE TIME OF TO THE BEST INFORMATION AVAILABLE AT THE TIME OF THE BEST INFORMATION AVAILABLE AT THE TIME OF THE BEST INFORMATION AVAILABLE AT THE TIME OF BEST INFORMATION AVAILABLE AT THE TIME OF BEST INFORMATION AVAILABLE AT THE TIME OF INFORMATION AVAILABLE AT THE TIME OF INFORMATION AVAILABLE AT THE TIME OF AVAILABLE AT THE TIME OF AVAILABLE AT THE TIME OF AT THE TIME OF AT THE TIME OF THE TIME OF THE TIME OF TIME OF TIME OF OF OF PREPARATION OF THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. OF THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. OF THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. DO NOT PURPORT TO BE ABSOLUTELY CORRECT. DO NOT PURPORT TO BE ABSOLUTELY CORRECT. NOT PURPORT TO BE ABSOLUTELY CORRECT. NOT PURPORT TO BE ABSOLUTELY CORRECT. PURPORT TO BE ABSOLUTELY CORRECT. PURPORT TO BE ABSOLUTELY CORRECT. TO BE ABSOLUTELY CORRECT. TO BE ABSOLUTELY CORRECT. BE ABSOLUTELY CORRECT. BE ABSOLUTELY CORRECT. ABSOLUTELY CORRECT. ABSOLUTELY CORRECT. CORRECT. CORRECT. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND BE FULLY TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND BE FULLY TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND BE FULLY CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND BE FULLY CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND BE FULLY THE CONTRACTOR SHALL VERIFY AND BE FULLY THE CONTRACTOR SHALL VERIFY AND BE FULLY CONTRACTOR SHALL VERIFY AND BE FULLY CONTRACTOR SHALL VERIFY AND BE FULLY SHALL VERIFY AND BE FULLY SHALL VERIFY AND BE FULLY VERIFY AND BE FULLY VERIFY AND BE FULLY AND BE FULLY AND BE FULLY BE FULLY BE FULLY FULLY FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS DAMAGES WHICH MIGHT BE OCCASIONED BY HIS DAMAGES WHICH MIGHT BE OCCASIONED BY HIS WHICH MIGHT BE OCCASIONED BY HIS WHICH MIGHT BE OCCASIONED BY HIS MIGHT BE OCCASIONED BY HIS MIGHT BE OCCASIONED BY HIS BE OCCASIONED BY HIS BE OCCASIONED BY HIS OCCASIONED BY HIS OCCASIONED BY HIS BY HIS BY HIS HIS HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, AND PRESERVE ANY AND ALL EXISTING UTILITIES, AND PRESERVE ANY AND ALL EXISTING UTILITIES, PRESERVE ANY AND ALL EXISTING UTILITIES, PRESERVE ANY AND ALL EXISTING UTILITIES, ANY AND ALL EXISTING UTILITIES, ANY AND ALL EXISTING UTILITIES, AND ALL EXISTING UTILITIES, AND ALL EXISTING UTILITIES, ALL EXISTING UTILITIES, ALL EXISTING UTILITIES, EXISTING UTILITIES, EXISTING UTILITIES, UTILITIES, UTILITIES, STRUCTURES, AND OTHER FEATURES AFFECTING HIS WORK. ANYTHING NOT SHOWN ON AND OTHER FEATURES AFFECTING HIS WORK. ANYTHING NOT SHOWN ON AND OTHER FEATURES AFFECTING HIS WORK. ANYTHING NOT SHOWN ON OTHER FEATURES AFFECTING HIS WORK. ANYTHING NOT SHOWN ON OTHER FEATURES AFFECTING HIS WORK. ANYTHING NOT SHOWN ON FEATURES AFFECTING HIS WORK. ANYTHING NOT SHOWN ON FEATURES AFFECTING HIS WORK. ANYTHING NOT SHOWN ON AFFECTING HIS WORK. ANYTHING NOT SHOWN ON AFFECTING HIS WORK. ANYTHING NOT SHOWN ON HIS WORK. ANYTHING NOT SHOWN ON HIS WORK. ANYTHING NOT SHOWN ON WORK. ANYTHING NOT SHOWN ON WORK. ANYTHING NOT SHOWN ON ANYTHING NOT SHOWN ON ANYTHING NOT SHOWN ON NOT SHOWN ON NOT SHOWN ON SHOWN ON SHOWN ON ON ON THESE DRAWINGS SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND DRAWINGS SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND DRAWINGS SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND BROUGHT TO THE ATTENTION OF THE ENGINEER AND BROUGHT TO THE ATTENTION OF THE ENGINEER AND TO THE ATTENTION OF THE ENGINEER AND TO THE ATTENTION OF THE ENGINEER AND THE ATTENTION OF THE ENGINEER AND THE ATTENTION OF THE ENGINEER AND ATTENTION OF THE ENGINEER AND ATTENTION OF THE ENGINEER AND OF THE ENGINEER AND OF THE ENGINEER AND THE ENGINEER AND THE ENGINEER AND ENGINEER AND ENGINEER AND AND AND SHALL NOT CONSTITUTE AN EXTRA, UNLESS APPROVED BY THE ENGINEER. P. THE CONTRACTOR SHALL CONTACT THE ENGINEER AND LCU IMMEDIATELY CONCERNING THE CONTRACTOR SHALL CONTACT THE ENGINEER AND LCU IMMEDIATELY CONCERNING CONTRACTOR SHALL CONTACT THE ENGINEER AND LCU IMMEDIATELY CONCERNING CONTRACTOR SHALL CONTACT THE ENGINEER AND LCU IMMEDIATELY CONCERNING SHALL CONTACT THE ENGINEER AND LCU IMMEDIATELY CONCERNING SHALL CONTACT THE ENGINEER AND LCU IMMEDIATELY CONCERNING CONTACT THE ENGINEER AND LCU IMMEDIATELY CONCERNING CONTACT THE ENGINEER AND LCU IMMEDIATELY CONCERNING THE ENGINEER AND LCU IMMEDIATELY CONCERNING THE ENGINEER AND LCU IMMEDIATELY CONCERNING ENGINEER AND LCU IMMEDIATELY CONCERNING ENGINEER AND LCU IMMEDIATELY CONCERNING AND LCU IMMEDIATELY CONCERNING AND LCU IMMEDIATELY CONCERNING LCU IMMEDIATELY CONCERNING LCU IMMEDIATELY CONCERNING IMMEDIATELY CONCERNING IMMEDIATELY CONCERNING CONCERNING CONCERNING ANY CONFLICTS WITH LCU UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF CONFLICTS WITH LCU UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF CONFLICTS WITH LCU UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF WITH LCU UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF WITH LCU UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF LCU UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF LCU UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF ARISING DURING CONSTRUCTION OF ARISING DURING CONSTRUCTION OF DURING CONSTRUCTION OF DURING CONSTRUCTION OF CONSTRUCTION OF CONSTRUCTION OF OF OF ANY FACILITIES SHOWN ON THESE DRAWINGS. Q. TRAFFIC MUST BE MAINTAINED AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF MUST BE MAINTAINED AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF MUST BE MAINTAINED AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF BE MAINTAINED AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF BE MAINTAINED AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF MAINTAINED AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF MAINTAINED AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF AT ALL TIMES AS PER LEE COUNTY DEPARTMENT OF ALL TIMES AS PER LEE COUNTY DEPARTMENT OF ALL TIMES AS PER LEE COUNTY DEPARTMENT OF TIMES AS PER LEE COUNTY DEPARTMENT OF TIMES AS PER LEE COUNTY DEPARTMENT OF AS PER LEE COUNTY DEPARTMENT OF AS PER LEE COUNTY DEPARTMENT OF PER LEE COUNTY DEPARTMENT OF PER LEE COUNTY DEPARTMENT OF LEE COUNTY DEPARTMENT OF LEE COUNTY DEPARTMENT OF COUNTY DEPARTMENT OF COUNTY DEPARTMENT OF DEPARTMENT OF DEPARTMENT OF OF OF TRANSPORTATION (LCDOT) AND PER FLORIDA DEPARTMENT OF TRANSPORTATION (LCDOT) AND PER FLORIDA DEPARTMENT OF TRANSPORTATION (LCDOT) AND PER FLORIDA DEPARTMENT OF TRANSPORTATION AND PER FLORIDA DEPARTMENT OF TRANSPORTATION AND PER FLORIDA DEPARTMENT OF TRANSPORTATION PER FLORIDA DEPARTMENT OF TRANSPORTATION PER FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION OF TRANSPORTATION OF TRANSPORTATION TRANSPORTATION TRANSPORTATION (FDOT) STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST FOR ROAD AND BRIDGE CONSTRUCTION, LATEST FOR ROAD AND BRIDGE CONSTRUCTION, LATEST ROAD AND BRIDGE CONSTRUCTION, LATEST ROAD AND BRIDGE CONSTRUCTION, LATEST AND BRIDGE CONSTRUCTION, LATEST AND BRIDGE CONSTRUCTION, LATEST BRIDGE CONSTRUCTION, LATEST BRIDGE CONSTRUCTION, LATEST CONSTRUCTION, LATEST CONSTRUCTION, LATEST LATEST LATEST EDITION. R. THE CONTRACTOR SHALL VERIFY ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS THE CONTRACTOR SHALL VERIFY ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS CONTRACTOR SHALL VERIFY ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS CONTRACTOR SHALL VERIFY ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS SHALL VERIFY ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS SHALL VERIFY ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS VERIFY ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS VERIFY ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS ALL UTILITIES AND PROVIDE AT LEAST 48 HOURS UTILITIES AND PROVIDE AT LEAST 48 HOURS UTILITIES AND PROVIDE AT LEAST 48 HOURS AND PROVIDE AT LEAST 48 HOURS AND PROVIDE AT LEAST 48 HOURS PROVIDE AT LEAST 48 HOURS PROVIDE AT LEAST 48 HOURS AT LEAST 48 HOURS AT LEAST 48 HOURS LEAST 48 HOURS LEAST 48 HOURS 48 HOURS 48 HOURS HOURS HOURS NOTICE TO THE INDIVIDUAL UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO TO THE INDIVIDUAL UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO TO THE INDIVIDUAL UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO THE INDIVIDUAL UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO THE INDIVIDUAL UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO INDIVIDUAL UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO INDIVIDUAL UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO UTILITY COMPANIES AND FDOT AND LCDOT PRIOR TO COMPANIES AND FDOT AND LCDOT PRIOR TO COMPANIES AND FDOT AND LCDOT PRIOR TO AND FDOT AND LCDOT PRIOR TO AND FDOT AND LCDOT PRIOR TO FDOT AND LCDOT PRIOR TO FDOT AND LCDOT PRIOR TO AND LCDOT PRIOR TO AND LCDOT PRIOR TO LCDOT PRIOR TO LCDOT PRIOR TO PRIOR TO PRIOR TO TO TO CONSTRUCTION. S. THE CONTRACTOR SHALL REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, THE CONTRACTOR SHALL REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, CONTRACTOR SHALL REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, CONTRACTOR SHALL REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, SHALL REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, SHALL REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, CURBS, DRIVEWAYS, SIDEWALKS, CURBS, DRIVEWAYS, SIDEWALKS, DRIVEWAYS, SIDEWALKS, DRIVEWAYS, SIDEWALKS, SIDEWALKS, SIDEWALKS, FENCES, ETC., WITH THE SAME TYPE OF MATERIAL THAT WAS REMOVED DURING ETC., WITH THE SAME TYPE OF MATERIAL THAT WAS REMOVED DURING ETC., WITH THE SAME TYPE OF MATERIAL THAT WAS REMOVED DURING WITH THE SAME TYPE OF MATERIAL THAT WAS REMOVED DURING WITH THE SAME TYPE OF MATERIAL THAT WAS REMOVED DURING THE SAME TYPE OF MATERIAL THAT WAS REMOVED DURING THE SAME TYPE OF MATERIAL THAT WAS REMOVED DURING SAME TYPE OF MATERIAL THAT WAS REMOVED DURING SAME TYPE OF MATERIAL THAT WAS REMOVED DURING TYPE OF MATERIAL THAT WAS REMOVED DURING TYPE OF MATERIAL THAT WAS REMOVED DURING OF MATERIAL THAT WAS REMOVED DURING OF MATERIAL THAT WAS REMOVED DURING MATERIAL THAT WAS REMOVED DURING MATERIAL THAT WAS REMOVED DURING THAT WAS REMOVED DURING THAT WAS REMOVED DURING WAS REMOVED DURING WAS REMOVED DURING REMOVED DURING REMOVED DURING DURING DURING CONSTRUCTION OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL BY THE ENGINEER. THE CONTRACTOR SHALL BY THE ENGINEER. THE CONTRACTOR SHALL THE ENGINEER. THE CONTRACTOR SHALL THE ENGINEER. THE CONTRACTOR SHALL ENGINEER. THE CONTRACTOR SHALL ENGINEER. THE CONTRACTOR SHALL THE CONTRACTOR SHALL THE CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL RESTORE ALL AREAS AFFECTED BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, ALL AREAS AFFECTED BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, ALL AREAS AFFECTED BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, AREAS AFFECTED BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, AREAS AFFECTED BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, AFFECTED BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, AFFECTED BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, THE CONSTRUCTION TO ITS ORIGINAL CONDITION, THE CONSTRUCTION TO ITS ORIGINAL CONDITION, CONSTRUCTION TO ITS ORIGINAL CONDITION, CONSTRUCTION TO ITS ORIGINAL CONDITION, TO ITS ORIGINAL CONDITION, TO ITS ORIGINAL CONDITION, ITS ORIGINAL CONDITION, ITS ORIGINAL CONDITION, ORIGINAL CONDITION, ORIGINAL CONDITION, CONDITION, CONDITION, OR BETTER. T. WITHIN THE FDOT AND LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE WITHIN THE FDOT AND LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE THE FDOT AND LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE THE FDOT AND LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE FDOT AND LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE FDOT AND LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE AND LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE AND LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE LCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE ALL DISTURBED AREAS SHALL RECEIVE ALL DISTURBED AREAS SHALL RECEIVE DISTURBED AREAS SHALL RECEIVE DISTURBED AREAS SHALL RECEIVE AREAS SHALL RECEIVE AREAS SHALL RECEIVE SHALL RECEIVE SHALL RECEIVE RECEIVE RECEIVE GRASSING (SEEDING) OR SODDING MATERIALS IN ACCORDANCE WITH FDOT (SEEDING) OR SODDING MATERIALS IN ACCORDANCE WITH FDOT (SEEDING) OR SODDING MATERIALS IN ACCORDANCE WITH FDOT OR SODDING MATERIALS IN ACCORDANCE WITH FDOT OR SODDING MATERIALS IN ACCORDANCE WITH FDOT SODDING MATERIALS IN ACCORDANCE WITH FDOT SODDING MATERIALS IN ACCORDANCE WITH FDOT MATERIALS IN ACCORDANCE WITH FDOT MATERIALS IN ACCORDANCE WITH FDOT IN ACCORDANCE WITH FDOT IN ACCORDANCE WITH FDOT ACCORDANCE WITH FDOT ACCORDANCE WITH FDOT WITH FDOT WITH FDOT FDOT FDOT SPECIFICATIONS. THOSE AREAS THAT ARE CLASSIFIED AS DRAINAGE DITCHES SHALL THOSE AREAS THAT ARE CLASSIFIED AS DRAINAGE DITCHES SHALL THOSE AREAS THAT ARE CLASSIFIED AS DRAINAGE DITCHES SHALL AREAS THAT ARE CLASSIFIED AS DRAINAGE DITCHES SHALL AREAS THAT ARE CLASSIFIED AS DRAINAGE DITCHES SHALL THAT ARE CLASSIFIED AS DRAINAGE DITCHES SHALL THAT ARE CLASSIFIED AS DRAINAGE DITCHES SHALL ARE CLASSIFIED AS DRAINAGE DITCHES SHALL ARE CLASSIFIED AS DRAINAGE DITCHES SHALL CLASSIFIED AS DRAINAGE DITCHES SHALL CLASSIFIED AS DRAINAGE DITCHES SHALL AS DRAINAGE DITCHES SHALL AS DRAINAGE DITCHES SHALL DRAINAGE DITCHES SHALL DRAINAGE DITCHES SHALL DITCHES SHALL DITCHES SHALL SHALL SHALL RECEIVE FULL SOLID SOD. U. THE INFORMATION PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR THE INFORMATION PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR INFORMATION PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR INFORMATION PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR PLANS IS SOLELY TO ASSIST THE CONTRACTOR PLANS IS SOLELY TO ASSIST THE CONTRACTOR IS SOLELY TO ASSIST THE CONTRACTOR IS SOLELY TO ASSIST THE CONTRACTOR SOLELY TO ASSIST THE CONTRACTOR SOLELY TO ASSIST THE CONTRACTOR TO ASSIST THE CONTRACTOR TO ASSIST THE CONTRACTOR ASSIST THE CONTRACTOR ASSIST THE CONTRACTOR THE CONTRACTOR THE CONTRACTOR CONTRACTOR CONTRACTOR IN ASSESSING THE NATURE AND EXTENT OF CONDITIONS WHICH MAY BE ASSESSING THE NATURE AND EXTENT OF CONDITIONS WHICH MAY BE ASSESSING THE NATURE AND EXTENT OF CONDITIONS WHICH MAY BE THE NATURE AND EXTENT OF CONDITIONS WHICH MAY BE THE NATURE AND EXTENT OF CONDITIONS WHICH MAY BE NATURE AND EXTENT OF CONDITIONS WHICH MAY BE NATURE AND EXTENT OF CONDITIONS WHICH MAY BE AND EXTENT OF CONDITIONS WHICH MAY BE AND EXTENT OF CONDITIONS WHICH MAY BE EXTENT OF CONDITIONS WHICH MAY BE EXTENT OF CONDITIONS WHICH MAY BE OF CONDITIONS WHICH MAY BE OF CONDITIONS WHICH MAY BE CONDITIONS WHICH MAY BE CONDITIONS WHICH MAY BE WHICH MAY BE WHICH MAY BE MAY BE MAY BE BE BE ENCOUNTERED DURING THE COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, DURING THE COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, DURING THE COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, THE COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, THE COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, OF WORK. ALL CONTRACTORS ARE DIRECTED, OF WORK. ALL CONTRACTORS ARE DIRECTED, WORK. ALL CONTRACTORS ARE DIRECTED, WORK. ALL CONTRACTORS ARE DIRECTED, ALL CONTRACTORS ARE DIRECTED, ALL CONTRACTORS ARE DIRECTED, CONTRACTORS ARE DIRECTED, CONTRACTORS ARE DIRECTED, ARE DIRECTED, ARE DIRECTED, DIRECTED, DIRECTED, PRIOR TO BIDDING, TO CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM TO BIDDING, TO CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM TO BIDDING, TO CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM BIDDING, TO CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM BIDDING, TO CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM TO CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM TO CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM WHATEVER INVESTIGATIONS THEY MAY DEEM WHATEVER INVESTIGATIONS THEY MAY DEEM INVESTIGATIONS THEY MAY DEEM INVESTIGATIONS THEY MAY DEEM THEY MAY DEEM THEY MAY DEEM MAY DEEM MAY DEEM DEEM DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSION REGARDING THE ACTUAL TO ARRIVE AT THEIR OWN CONCLUSION REGARDING THE ACTUAL TO ARRIVE AT THEIR OWN CONCLUSION REGARDING THE ACTUAL ARRIVE AT THEIR OWN CONCLUSION REGARDING THE ACTUAL ARRIVE AT THEIR OWN CONCLUSION REGARDING THE ACTUAL AT THEIR OWN CONCLUSION REGARDING THE ACTUAL AT THEIR OWN CONCLUSION REGARDING THE ACTUAL THEIR OWN CONCLUSION REGARDING THE ACTUAL THEIR OWN CONCLUSION REGARDING THE ACTUAL OWN CONCLUSION REGARDING THE ACTUAL OWN CONCLUSION REGARDING THE ACTUAL CONCLUSION REGARDING THE ACTUAL CONCLUSION REGARDING THE ACTUAL REGARDING THE ACTUAL REGARDING THE ACTUAL THE ACTUAL THE ACTUAL ACTUAL ACTUAL CONDITIONS THAT WILL BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE THAT WILL BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE THAT WILL BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE WILL BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE WILL BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE AND UPON WHICH THEIR BIDS WILL BE AND UPON WHICH THEIR BIDS WILL BE UPON WHICH THEIR BIDS WILL BE UPON WHICH THEIR BIDS WILL BE WHICH THEIR BIDS WILL BE WHICH THEIR BIDS WILL BE THEIR BIDS WILL BE THEIR BIDS WILL BE BIDS WILL BE BIDS WILL BE WILL BE WILL BE BE BE BASED. V. ALL FRAMES, COVERS VALVE BOXES, METER BOXES AND MANHOLES SHALL BE ALL FRAMES, COVERS VALVE BOXES, METER BOXES AND MANHOLES SHALL BE FRAMES, COVERS VALVE BOXES, METER BOXES AND MANHOLES SHALL BE FRAMES, COVERS VALVE BOXES, METER BOXES AND MANHOLES SHALL BE COVERS VALVE BOXES, METER BOXES AND MANHOLES SHALL BE COVERS VALVE BOXES, METER BOXES AND MANHOLES SHALL BE VALVE BOXES, METER BOXES AND MANHOLES SHALL BE VALVE BOXES, METER BOXES AND MANHOLES SHALL BE BOXES, METER BOXES AND MANHOLES SHALL BE BOXES, METER BOXES AND MANHOLES SHALL BE METER BOXES AND MANHOLES SHALL BE METER BOXES AND MANHOLES SHALL BE BOXES AND MANHOLES SHALL BE BOXES AND MANHOLES SHALL BE AND MANHOLES SHALL BE AND MANHOLES SHALL BE MANHOLES SHALL BE MANHOLES SHALL BE SHALL BE SHALL BE BE BE ADJUSTED TO FINISHED GRADE UPON COMPLETION OF PAVING OR RELATED TO FINISHED GRADE UPON COMPLETION OF PAVING OR RELATED TO FINISHED GRADE UPON COMPLETION OF PAVING OR RELATED FINISHED GRADE UPON COMPLETION OF PAVING OR RELATED FINISHED GRADE UPON COMPLETION OF PAVING OR RELATED GRADE UPON COMPLETION OF PAVING OR RELATED GRADE UPON COMPLETION OF PAVING OR RELATED UPON COMPLETION OF PAVING OR RELATED UPON COMPLETION OF PAVING OR RELATED COMPLETION OF PAVING OR RELATED COMPLETION OF PAVING OR RELATED OF PAVING OR RELATED OF PAVING OR RELATED PAVING OR RELATED PAVING OR RELATED OR RELATED OR RELATED RELATED RELATED CONSTRUCTION. ALL VALVE PADS SHALL BE POURED IN PLACE. NO PRE-FORMED ALL VALVE PADS SHALL BE POURED IN PLACE. NO PRE-FORMED ALL VALVE PADS SHALL BE POURED IN PLACE. NO PRE-FORMED VALVE PADS SHALL BE POURED IN PLACE. NO PRE-FORMED VALVE PADS SHALL BE POURED IN PLACE. NO PRE-FORMED PADS SHALL BE POURED IN PLACE. NO PRE-FORMED PADS SHALL BE POURED IN PLACE. NO PRE-FORMED SHALL BE POURED IN PLACE. NO PRE-FORMED SHALL BE POURED IN PLACE. NO PRE-FORMED BE POURED IN PLACE. NO PRE-FORMED BE POURED IN PLACE. NO PRE-FORMED POURED IN PLACE. NO PRE-FORMED POURED IN PLACE. NO PRE-FORMED IN PLACE. NO PRE-FORMED IN PLACE. NO PRE-FORMED PLACE. NO PRE-FORMED PLACE. NO PRE-FORMED NO PRE-FORMED NO PRE-FORMED PRE-FORMED PRE-FORMED VALVE PADS ALLOWED.
AutoCAD SHX Text
CALL BEFORE YOU DIG
AutoCAD SHX Text
1.800.432.4770
AutoCAD SHX Text
WWW.CALLSUNSHINE.COM
AutoCAD SHX Text
1. CALL 800.432.4770 TWO FULL BUSINESS DAYS BEFORE DIGGING. CALL 800.432.4770 TWO FULL BUSINESS DAYS BEFORE DIGGING. 2. CALL 10 DAYS BEFORE DIGGING WHEN DIGGING UNDER WATER. CALL 10 DAYS BEFORE DIGGING WHEN DIGGING UNDER WATER. 3. WAIT THE REQUIRED TIME FOR BURIED UTILITIES TO BE LOCATED AND MARKED. WAIT THE REQUIRED TIME FOR BURIED UTILITIES TO BE LOCATED AND MARKED. 4. PROTECT THE MARKS DURING YOUR PROJECT. PROTECT THE MARKS DURING YOUR PROJECT. 5. IF MARKS ARE DESTROYED, CALL AGAIN. DIG SAFELY, USING EXTREME CAUTION WHEN DIGGING IF MARKS ARE DESTROYED, CALL AGAIN. DIG SAFELY, USING EXTREME CAUTION WHEN DIGGING WITHIN 24 INCHES ON EITHER SIDE OF THE MARKS TO AVOID HITTING THE BURIED UTILITY LINES.
Page 3: EMERGENCY GENERATOR

MANATEE ELEMENTARY SCHOOL

OAK HAMMOCK MIDDLE SCHOOL

TICE RD

CO

UN

TRY

LAKE

DR

PROJECT AREA

PROPERTY LINE

4365 Radio Road, Suite 201Naples, Florida 34104

P: 239.434.6060Company Cert. of Authorization No. 00009496

SHEET TITLE:

PROJECT:

REVISIONS:

CLIENT:

DATEREV. DESCRIPTION

SITE LOCATION MAP

TLC ENGINEERING SERVICES, INC.13099 CLEVELAND AVE,

SUITE 500FORT MYERS, FL 33907

PROJECT NO.:20-0141

SHEET NO:

SCALE:

MANATEE ELEMENTARYSCHOOL EMERGENCY

GENERATOR

TICE ST

I-75

HWY 80

ORANGE RIVER BLVD

NOTE: 2021-05-31 - NOT FOR CONSTRUCTION

JEFF L. DAVIDSON, P.E NO. 47161LEE A. DAVIDSON, P.E. NO. 90969ANDREW E. RATH, P.E. NO. 73996

RYAN A. WHITE, P.E. NO. 67400

AERIAL VIEW

C-00.20

1:100

N

AutoCAD SHX Text
Z:\Active Projects\L\LEE COUNTY-MULTIPLE GENERATORS\MANATEE ELEMENTARY\Site Civil\Sheetfiles\C-00.20 - Aerial Fluccs.dwg (C-00.20) brandon.copper May 27, 2021 - 7:55am\C-00.20 - Aerial Fluccs.dwg (C-00.20) brandon.copper May 27, 2021 - 7:55amC-00.20 - Aerial Fluccs.dwg (C-00.20) brandon.copper May 27, 2021 - 7:55am
Page 4: EMERGENCY GENERATOR

TOB

TOB

TOE

TOE

REMOVALS LEGEND

4365 Radio Road, Suite 201Naples, Florida 34104

P: 239.434.6060Company Cert. of Authorization No. 00009496

SHEET TITLE:

PROJECT:

REVISIONS:

CLIENT:

DATEREV. DESCRIPTION

SITE LOCATION MAP

TLC ENGINEERING SERVICES, INC.13099 CLEVELAND AVE,

SUITE 500FORT MYERS, FL 33907

PROJECT NO.:20-0141

SHEET NO:

SCALE:

MANATEE ELEMENTARYSCHOOL EMERGENCY

GENERATOR

TICE ST

I-75

HWY 80

ORANGE RIVER BLVD

NOTE: 2021-05-31 - NOT FOR CONSTRUCTION

JEFF L. DAVIDSON, P.E NO. 47161LEE A. DAVIDSON, P.E. NO. 90969ANDREW E. RATH, P.E. NO. 73996

RYAN A. WHITE, P.E. NO. 67400

EXISTING CONDITIONS& DEMOLITION PLAN

C-10.00

1:10

LEGEND

SD

N

SILT FENCE BARRIER

AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
CO
AutoCAD SHX Text
EB
AutoCAD SHX Text
PARKING SPACES
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
6' CLF
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
FDC
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
EXISTING BUILDING FFE = 19.3'
AutoCAD SHX Text
MANATEE ELEMENTARY SCHOOL MAIN BUILDING FFE = 19.4'
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONTRACTOR TO FIELD VERIFY AND REMOVE ±57 LF OFDOWNSPOUT LEADER
AutoCAD SHX Text
EXISTING DOWNSPOUT RAINWATER LEADER; TO REMAIN (CONTRACTOR TO FIELD VERIFY)
AutoCAD SHX Text
Z:\Active Projects\L\LEE COUNTY-MULTIPLE GENERATORS\MANATEE ELEMENTARY\Site Civil\Sheetfiles\C-10.00 - Existing Conditions.dwg (SDP-EXCON) brandon.copper May 27, 2021 - 7:53am\C-10.00 - Existing Conditions.dwg (SDP-EXCON) brandon.copper May 27, 2021 - 7:53amC-10.00 - Existing Conditions.dwg (SDP-EXCON) brandon.copper May 27, 2021 - 7:53am
AutoCAD SHX Text
CLEARING/ GRUBBING LIMITS
AutoCAD SHX Text
CONCRETE REMOVAL
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOE OF SLOPE
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
FINISHED FLOOR ELEV.
AutoCAD SHX Text
CHAIN-LINK FENCE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
LICENSE BUSINESS
AutoCAD SHX Text
POLYVINYL CHLORIDE PIPE
AutoCAD SHX Text
REINFORCED CONC. PIPE
AutoCAD SHX Text
ELLIPSOID REINFORCED CONC. PIPE
AutoCAD SHX Text
INVERT
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
E/P
AutoCAD SHX Text
TOB
AutoCAD SHX Text
TOE
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
FFE
AutoCAD SHX Text
CLF
AutoCAD SHX Text
NTS
AutoCAD SHX Text
LB
AutoCAD SHX Text
PVC
AutoCAD SHX Text
RCP
AutoCAD SHX Text
ERCP
AutoCAD SHX Text
INV.
AutoCAD SHX Text
SET NAIL & TAB "LB 2610"
AutoCAD SHX Text
WATER METER
AutoCAD SHX Text
ELECTRIC METER
AutoCAD SHX Text
IRRIGATION CONTROL VALVE
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
ELECTRIC BOX
AutoCAD SHX Text
ELECTRIC PANEL
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
YARD DRAIN
AutoCAD SHX Text
STORM MANHOLE
AutoCAD SHX Text
SANITARY MANHOLE
AutoCAD SHX Text
WELL
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
IRRIGATION METER
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
TELEPHONE RISER
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
BACK-FLOW PREVENTER
AutoCAD SHX Text
GREASE TRAP
AutoCAD SHX Text
PROPANE TANK
AutoCAD SHX Text
OVERHEAD POWER LINE
AutoCAD SHX Text
TREE
AutoCAD SHX Text
CHAIN-LINK FENCE
AutoCAD SHX Text
W
AutoCAD SHX Text
CB
AutoCAD SHX Text
SS
AutoCAD SHX Text
I
AutoCAD SHX Text
EB
AutoCAD SHX Text
TR
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
EM
AutoCAD SHX Text
CO
AutoCAD SHX Text
T
AutoCAD SHX Text
GT
AutoCAD SHX Text
VAULT BOX
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
SINGLE SIGN
AutoCAD SHX Text
HANDICAP PARKING SPACE
AutoCAD SHX Text
FIBER OPTIC BURIED CABLE
AutoCAD SHX Text
FIRE DEPARTMENT CONNECTION
AutoCAD SHX Text
SET REBAR "LB 2610"
AutoCAD SHX Text
PALM TREE
AutoCAD SHX Text
OAK TREE
AutoCAD SHX Text
VB
AutoCAD SHX Text
FOC
AutoCAD SHX Text
PROP
AutoCAD SHX Text
P
AutoCAD SHX Text
EP
AutoCAD SHX Text
YD
AutoCAD SHX Text
W
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
FDC
AutoCAD SHX Text
SILT FENCE BARRIER
AutoCAD SHX Text
CONSTRUCITON SPECIFICATIONS: 1. THE HEIGHT OF A SILT FENCE SHALL NOT EXCEED 36 INCHES (0.9 M). STORAGE THE HEIGHT OF A SILT FENCE SHALL NOT EXCEED 36 INCHES (0.9 M). STORAGE HEIGHT AND PONDING HEIGHT SHALL NEVER EXCEED 18 INCHES (0.5 M). 2. THE FENCE LINE SHALL FOLLOW THE CONTOUR AS CLOSELY AS POSSIBLE. THE FENCE LINE SHALL FOLLOW THE CONTOUR AS CLOSELY AS POSSIBLE. 3. IF POSSIBLE, THE FILTER FABRIC SHALL BE CUT FROM A CONTINUOUS ROLL TO AVOID IF POSSIBLE, THE FILTER FABRIC SHALL BE CUT FROM A CONTINUOUS ROLL TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED ONLY AT A SUPPORT POST, WITH A MINIMUM 6 INCH (0.2 M) OVERLAP AND BOTH ENDS SECURELY FASTENED TO THE POST. 4. POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET (3.1 M) APART AND DRIVEN POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET (3.1 M) APART AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 12 INCHES (0.3 M)). WHEN EXTRA-STRENGTH FABRIC IS USED WITHOUT THE WIRE SUPPORT FENCE, POST SPACING SHALL NOT EXCEED 6 FEET (1.8 M). 5. TURN THE ENDS OF THE FENCE UPHILL. TURN THE ENDS OF THE FENCE UPHILL. 6. A TRENCH SHALL BE EXCAVATED APPROXIMATELY 4 INCHES (101 MM) WIDE AND 6 A TRENCH SHALL BE EXCAVATED APPROXIMATELY 4 INCHES (101 MM) WIDE AND 6 INCHES (0.2 M) DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 7. WHEN STANDARD-STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE WHEN STANDARD-STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1INCH (25.4 MM) LONG, TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 2 INCHES (51 MM) AND SHALL NOT EXTEND MORE THAN 36 INCHES (0.9 M) ABOVE THE ORIGINAL GROUND SURFACE. 8. THE STANDARD-STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE THE STANDARD-STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND 6 INCHES (0.2 M) OF THE FABRIC SHALL EXTEND INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 36 INCHES (0.9 M) ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES. 9. WHEN EXTRA-STRENGTH FILTER FABRIC AND CLOSER POST SPACING ARE USED, THE WHEN EXTRA-STRENGTH FILTER FABRIC AND CLOSER POST SPACING ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS. 10. THE TRENCH SHALL BE BACKFILLED AND THE SOIL COMPACTED OVER THE TOE OF THE THE TRENCH SHALL BE BACKFILLED AND THE SOIL COMPACTED OVER THE TOE OF THE FILTER FABRIC. 11. SILT FENCES PLACED AT THE TOE OF A SLOPE SHALL BE SET AT LEAST 6 FEET (1.8 SILT FENCES PLACED AT THE TOE OF A SLOPE SHALL BE SET AT LEAST 6 FEET (1.8 M) FROM THE TOE IN ORDER TO INCREASE PONDING VOLUME. 12. SILT FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, SILT FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED AND ANY SEDIMENT STORED BEHIND THE SILT FENCE HAS BEEN REMOVED. INSPECTION AND MAINTENANCE: 1. SILT FENCES AND FILTER BARRIERS SHALL BE INSPECTED WEEKLY AFTER EACH SILT FENCES AND FILTER BARRIERS SHALL BE INSPECTED WEEKLY AFTER EACH SIGNIFICANT STORM (1 INCH (25.4 MM) IN 24 HOUR). 2. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. 3. SEDIMENT SHOULD BE REMOVED WHEN IT REACHES 1/3 HEIGHT OF THE FENCE OR 9 SEDIMENT SHOULD BE REMOVED WHEN IT REACHES 1/3 HEIGHT OF THE FENCE OR 9 INCHES (0.3 M) MAXIMUM. 4. THE REMOVED SEDIMENT SHALL CONFORM WITH THE EXISTING GRADE AND BE THE REMOVED SEDIMENT SHALL CONFORM WITH THE EXISTING GRADE AND BE VEGETATED OR OTHERWISE STABILIZED.
AutoCAD SHX Text
NOTES: 1. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 2. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY. 9" (225mm) MAXIMUM RECOMMENDED STORAGE HEIGHT. 3. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED.
AutoCAD SHX Text
EXTRA STRENGTH FILTER FABRIC NEEDED WITHOUT WIRE MESH SUPPORT
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STEEL OR WOOD POST
AutoCAD SHX Text
ATTACH FILTER FABRIC SECURELY TO UPSTREAM SIDE OF POST
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
10' (3m) MAX. SPACING W/WIRE SUPPORT FENCE 6' (1.8m) MAX. SPACING WITHOUT WIRE SUPPORT FENCE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
STEEL OR WOOD POST 36" (1m) HIGH MAX.
AutoCAD SHX Text
PONDING HEIGHT
AutoCAD SHX Text
TRENCH DETAIL
AutoCAD SHX Text
INSTALLATION WITHOUT TRENCHING
AutoCAD SHX Text
4"x6" (100x150mm) TRENCH WITH COMPACTED BACKFILL
AutoCAD SHX Text
PONDING HEIGHT
AutoCAD SHX Text
3/4" (20mm) MIN. DRAIN ROCK
AutoCAD SHX Text
FLOW
Page 5: EMERGENCY GENERATOR

50.00'

30.00'

4365 Radio Road, Suite 201Naples, Florida 34104

P: 239.434.6060Company Cert. of Authorization No. 00009496

SHEET TITLE:

PROJECT:

REVISIONS:

CLIENT:

DATEREV. DESCRIPTION

SITE LOCATION MAP

TLC ENGINEERING SERVICES, INC.13099 CLEVELAND AVE,

SUITE 500FORT MYERS, FL 33907

PROJECT NO.:20-0141

SHEET NO:

SCALE:

MANATEE ELEMENTARYSCHOOL EMERGENCY

GENERATOR

TICE ST

I-75

HWY 80

ORANGE RIVER BLVD

NOTE: 2021-05-31 - NOT FOR CONSTRUCTION

JEFF L. DAVIDSON, P.E NO. 47161LEE A. DAVIDSON, P.E. NO. 90969ANDREW E. RATH, P.E. NO. 73996

RYAN A. WHITE, P.E. NO. 67400

CONSTRUCTION PLAN& DETAILS

C-20.00

1:10

LEGEND

FLOOD ZONE INFO.

UNPAVED AREA TRENCH BACKFILL DETAILN.T.S.

G-1

GENERAL NOTES

SIDEWALK CROSS SECTION, 6" THICKN.T.S. N

AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
CO
AutoCAD SHX Text
EB
AutoCAD SHX Text
PARKING SPACES
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
6' CLF
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
FDC
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
EXISTING BUILDING FFE = 19.3'
AutoCAD SHX Text
MANATEE ELEMENTARY SCHOOL MAIN BUILDING FFE = 19.4'
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
EXISTING DOWNSPOUT RAINWATER LEADER; TO REMAIN (CONTRACTOR TO FIELD VERIFY)
AutoCAD SHX Text
PROPOSED ENCLOSURE; REFER TO STRUCTURAL PLANS
AutoCAD SHX Text
PROPOSED DETENTION AREA EXPANSION/ RELOCATION
AutoCAD SHX Text
±44 LF 6" DW ADS PIPE
AutoCAD SHX Text
PROP. CONNECTION TO EXISTING STORMWATER PIPE (CONTRACTOR TO FIELD VERIFY)
AutoCAD SHX Text
PROPOSED CONNECTION TO EXISTING DOWNSPOUT (CONTRACTOR TO FIELD VERIFY)
AutoCAD SHX Text
PROPOSED ±56 SFOF SIDEWALK; MATCH EXISTING GRADES
AutoCAD SHX Text
PROPOSED ±100 SFOF SIDEWALK; MATCH EXISTING GRADES
AutoCAD SHX Text
1
AutoCAD SHX Text
APPROX. LOCATION OF CONDUIT ROUTING; REFER TO MEP PLANS
AutoCAD SHX Text
Z:\Active Projects\L\LEE COUNTY-MULTIPLE GENERATORS\MANATEE ELEMENTARY\Site Civil\Sheetfiles\C-20.00 - CONSTRUCTION PLAN.dwg (C-20.00) brandon.copper May 27, 2021 - 8:40am\C-20.00 - CONSTRUCTION PLAN.dwg (C-20.00) brandon.copper May 27, 2021 - 8:40amC-20.00 - CONSTRUCTION PLAN.dwg (C-20.00) brandon.copper May 27, 2021 - 8:40am
AutoCAD SHX Text
STANDARD CONCRETE PAD (DESIGNED BY OTHERS)
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
PROPOSED ELEVATION (NAVD 88)
AutoCAD SHX Text
EXISTING ELEVATION (NAVD 88)
AutoCAD SHX Text
X.XX
AutoCAD SHX Text
X.XX
AutoCAD SHX Text
X.XX
AutoCAD SHX Text
FLOOD ZONE: X X BASE FLOOD ELEVATION = N/A N/A MINIMUM GENERATOR ELEVATION = 19.4' NAVD88 (EXISTING ADJACENT BUILDING F.F.E.)
AutoCAD SHX Text
6" DW ADS PIPE
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
PIPE BEDDING
AutoCAD SHX Text
(SEE NOTE 2)
AutoCAD SHX Text
FIRST STAGE
AutoCAD SHX Text
SECOND STAGE
AutoCAD SHX Text
THIRD STAGE
AutoCAD SHX Text
TRENCH BACKFILL TO LEVEL OF ONE FOOT ABOVE TOP OF PIPE IN6" COMPACTION LIFTS
AutoCAD SHX Text
TRENCH BACKFILL IN COMPACTED MAXIMUM 12" LIFTS TO A 98% REQUIRED DENSITY
AutoCAD SHX Text
TRENCH
AutoCAD SHX Text
LIMITS
AutoCAD SHX Text
1'-0"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
OUTSIDE
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
1'-0"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
1'-0"
AutoCAD SHX Text
REVISED: APRIL 2006
AutoCAD SHX Text
NOTES 1. BACKFILL SHALL BE OF SUITABLE MATERIAL REMOVED FROM EXCAVATION EXCEPT WHERE OTHER MATERIAL IS SPECIFIED. BACKFILL MATERIAL SHALL CONSIST OF EARTH, LOAM, SANDY CLAY, GRAVEL, CRUSHED LIMESTONE, OR OTHER APPROVED MATERIAL. REFER TO TECHNICAL SPECIFICATIONS FOR DETAIL REQUIREMENTS. 2. IF TRENCH BOTTOM CONTAINS ROCK, THEN A MINIMUM IF TRENCH BOTTOM CONTAINS ROCK, THEN A MINIMUM OF A 6" PIPE BEDDING SHALL BE USED.
AutoCAD SHX Text
WHERE ANY TRENCH OCCURS IN AN UNSURFACED AREA, THE THIRD STAGE OF BACKFILLING SHALL EXTEND TO THE FINISHED GRADE.
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
1. THE APPROVAL OF THESE CONSTRUCTION PLANS DOES NOT AUTHORIZE THE APPROVAL OF THESE CONSTRUCTION PLANS DOES NOT AUTHORIZE CONSTRUCTION OF REQUIRED IMPROVEMENTS WHICH ARE INCONSISTENT WITH EASEMENTS OF RECORD. 2. ALL CATEGORY 1 INVASIVE EXOTIC PLANTS AS DEFINED BY THE FLORIDA EXOTIC PEST ALL CATEGORY 1 INVASIVE EXOTIC PLANTS AS DEFINED BY THE FLORIDA EXOTIC PEST PLANTS COUNCIL, SHALL BE REMOVED FROM WITHIN THE PRESERVE AREAS AND SUBSEQUENT ANNUAL REMOVAL OF THESE PLANTS (IN PERPETUITY) SHALL BE THE RESPONSIBILITY OF THE OWNER. 3. FIRE FIGHTING WATER SUPPLY SHALL BE AVAILABLE PRIOR TO THE PLACEMENT OR FIRE FIGHTING WATER SUPPLY SHALL BE AVAILABLE PRIOR TO THE PLACEMENT OR STORAGE OF ANY COMBUSTIBLE MATERIALS ON SITE. 4. ALL PROHIBITED NON-NATIVE/EXOTIC VEGETATION AS DEFINED BY THE LEE COUNTY ALL PROHIBITED NON-NATIVE/EXOTIC VEGETATION AS DEFINED BY THE LEE COUNTY LDC SHALL BE REMOVED FROM THE SITE & IT SHALL BE MAINTAINED FREE OF EXOTICS IN PERPETUITY. ALL ANNUAL REMOVAL OF EXOTIC VEGETATION SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER. 5. THIS SITE PLAN SHALL MEET ALL REQUIREMENTS OF THE LEE COUNTY LDC UNLESS THIS SITE PLAN SHALL MEET ALL REQUIREMENTS OF THE LEE COUNTY LDC UNLESS VARIANCES WERE OBTAINED PRIOR TO CONSTRUCTION. 6. THE SURFACE WATER MANAGEMENT SYSTEM & ALL INFRASTRUCTURE IMPROVEMENTS THE SURFACE WATER MANAGEMENT SYSTEM & ALL INFRASTRUCTURE IMPROVEMENTS AND ONSITE UTILITIES SHALL BE OWNED AND MAINTAINED BY THE PROPERTY OWNER. 7. CONTRACTOR TO MATCH RETURN GRADE AT A MAXIMUM SLOPE OF 1:3 IN GREEN CONTRACTOR TO MATCH RETURN GRADE AT A MAXIMUM SLOPE OF 1:3 IN GREEN SPACE AND 1:20 IN PAVED SPACE; CONTACT ENGINEER IF CONSTRAINTS CANNOT BE MET. FILL TO BE USED TO RE-GRADE/ FILL EXISTING DETENTION AREA
AutoCAD SHX Text
SOD ALL SLOPES
AutoCAD SHX Text
2% SLOPE
AutoCAD SHX Text
6" THICK SIDEWALKS MUST BE INSTALLED OVER A COMPACTED SUB-GRADE
AutoCAD SHX Text
1
Page 6: EMERGENCY GENERATOR

SE

LEC

T S

TR

UC

TU

RA

L

SE

LE

CT

ST

RU

CT

UR

AL

12573 N

ew

Brittany B

lvd

Fort

Myers

, F

lorida 3

3907

Phone: (2

39)

210-5

090

info

@sele

cts

tructu

ral.com

Cert

ific

ation

Au

th. 28

357

JOB NO.:

SCALE:

ENGINEERED BY:

DRAWN BY:

ISSUED DATE:

SEAL

SHEET TITLE:

SHEET NO.:

REVISIONS

C:\S

ele

ct S

tru

ctu

ral D

rop

box\S

ele

ct S

tru

ctu

ral D

ropb

ox\0

1 P

roje

cts

\20

21

Pro

jects

\21

35

1 F

EM

A G

en

era

tors

\2 M

ana

tee

Ele

men

tary

\Wo

rkin

g D

raw

ings\2

135

1_

Man

ate

e E

lem

enta

ry_

Str

uctu

ral_

R2

1.r

vt

5/31/2021

GENERALNOTES

S.1

MA

NA

TE

E E

LE

ME

NT

AR

YS

CH

OO

LT

LC

EN

GIN

EE

RIN

G5301 T

ICE

ST

. F

OR

T M

YE

RS

, F

L 3

3905

Designer

JS

21351

NO. DATE DESCRIPTION

GENERAL STRUCTURAL NOTES

GENERAL: DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE TYPICAL AND APPLY TO SIMILAR SITUATIONS ELSEWHERE, EXCEPT AS OTHERWISE INDICATED. ADAPT REQUIREMENTS OF DETAILS, SECTIONS, PLANS, AND NOTES AT LOCATIONS WHERE CONDITIONS ARE SIMILAR.

CENTER ALL FOOTINGS AND PIERS UNDER COLUMNS ABOVE UNLESS SPECIFICALLY DIMENSIONED OTHERWISE.

CONTRACTOR SHALL LOCATE ALL BURIED UTILITIES PRIOR TO EXCAVATION FOR BUILDING FOUNDATIONS. THE STRUCTURAL ENGINEER SHALL BE NOTIFIED OF POTENTIAL CONFLICTS BETWEEN FOUNDATIONS AND BURIED UTILITIES.

CODE REQUIREMENTS: THE BUILDING STRUCTURE IS DESIGNED IN ACCORDANCE WITH THE 2020 7th EDITION OF THE FLORIDA BUILDING CODE. FOLLOW ALL APPLICABLE PROVISIONS FOR ALL PHASES OF CONSTRUCTION. ADDITIONS ARE IN COMPLIANCE WITH THE 2020 EDITION OF THE FLORIDA EXISTING BUILDING CODE.

ASSUMED FUTURE CONSTRUCTION:VERTICAL: NONEHORIZONTAL: NONE

DESIGN CRITERIA: DESIGN WAS BASED ON STRENGTH AND DEFLECTION CRITERIA OF THE 2020 FLORIDA BUILDING CODE. IN ADDITION TO THE DEAD LOADS AND SUPERIMPOSED DEAD LOADS, THE FOLLOWING LOADS WERE USED FOR DESIGN, WITH LIVE LOADS REDUCED PER THE 2020 FBC. THE DESIGN INCLUDES 5 PSF SUPERIMPOSED DEAD LOAD FOR SPRINKLER PIPING.

WIND SPEED (ASCE 7-16) 170 MPH (132 MPH NOMINAL)RISK CATEGORY IVEXPOSURE CINTERNAL PRESSURE COEFF 0.0 OPEN BUILDINGWALL PRESSURE +/- 60 PSF (170 MPH)

OPENINGS BELOW 60 FEET SHALL BE PROTECTED FROM WIND BORNE DEBRIS PER MISSILE LEVEL D OF ASTM E1996 TABLE 2 REQUIREMENTS. OPENING PROTECTION SHALL COMPLY WITH THE “ENHANCED PROTECTION” OF MISSILE LEVEL E OF ASTM E1996 TABLE 2 REQUIREMENTS.

FOUNDATIONS: FOUNDATION DESIGN IS BASED ON THE GEOTECHNICAL RECOMMENDATIONS IN THE REPORT PREPARED BY: *name* PROJECT NUMBER: *number* DATED: *date* WITH AN ALLOWABLE SOIL BEARING PRESSURE FOR SHALLOW FOUNDATIONS OF *capacity* PSF. CONTRACTOR SHALL FOLLOW THE RECOMMENDATIONS SPECIFIED IN THE GEOTECHNICAL REPORT INCLUDING, BUT NOT LIMITED TO, SUBGRADE PREPARATIONS AND FOUNDATION INSTALLATION. THE GEOTECHNICAL ENGINEER SHALL EXAMINE THE EXCAVATION TO VERIFY SOIL CONDITIONS AND BEARING PRESSURE PRIOR TO PLACEMENT OF CONCRETE.

FOUNDATIONS: FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF 2,500 PSF ON COMPACTED FILL. BEFORE CONSTRUCTION COMMENCES, SOIL BEARING CAPACITY SHALL BE VERIFIED BY A SUBSURFACE INVESTIGATION, AS WELL AS FIELD AND LABORATORY TESTS PERFORMED BY A CERTIFIED TESTING LABORATORY, WHOSE REPORT SHALL INCLUDE ANALYSIS AND RECOMMENDATIONS FOR SITE PREPARATION IN ORDER TO BEAR THE FOUNDATION LOADS. ABOVE REPORT SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW BEFORE FOUNDATION CONSTRUCTION BEGINS.

FOUNDATIONS: FOUNDATION DESIGN IS BASED ON AN ASSUMED ALLOWABLE SOIL BEARING PRESSURE OF 2000 PSF FOR SILTY SAND AND GRAVELS. FOUNDATIONS SHALL BEAR ON COMPETENT NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF QUESTIONABLE SOILS OR POTENTIALLY UNSTABLE CONDITIONS ARE ENCOUNTERED, A GEOTECHNICAL ENGINEER SHALL BE RETAINED TO INVESTIGATE AND PROVIDE RECOMMENDATIONS.

SUBMITTALS: SHOP DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO FABRICATION AND CONSTRUCTION REGARDING ALL STRUCTURAL ITEMS INCLUDING THE FOLLOWING:

CONCRETE MIX DESIGNS, CONCRETE AND MASONRY REINFORCING

SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE ENGINEER. DRAWINGS SUBMITTED WITHOUT REVIEW WILL BE RETURNED UNCHECKED.

IF THE SHOP DRAWINGS DIFFER FROM OR ADD TO THE DESIGN OF THE STRUCTURAL DRAWINGS, THEY SHALL BEAR THE SEAL AND SIGNATURE OF A STRUCTURAL ENGINEER REGISTERED IN THE STATE OF FLORIDA.

SHALL BEAR THE SEAL AND SIGNATURE OF A STRUCTURAL ENGINEER REGISTERED IN THE STATE OF FLORIDA AND SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO FABRICATION. CALCULATIONS SHALL BE INCLUDED FOR ALL CONNECTIONS TO THE STRUCTURE, CONSIDERING LOCALIZED EFFECTS ON THE STRUCTURAL ELEMENTS INDUCED BY THE CONNECTION LOADS. DESIGN SHALL BE BASED ON THE REQUIREMENTS OF THE 2020 FBC.

SHOP DRAWINGS WILL BE REVIEWED FOR GENERAL COMPLIANCE WITH THE DESIGN INTENT OF THE CONTRACT DOCUMENTS ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY COMPLIANCE WITH THE CONTRACT DOCUMENTS AS TO QUANTITY, LENGTH, ELEVATIONS, DIMENSIONS, ETC. CONTRACTOR SHALL NOT BE RELIEVED FROM RESPONSIBILITY FOR ERRORS OR OMISSIONS IN SHOP DRAWINGS OR MIX DESIGNS BY THE ENGINEER’S REVIEW.

DEFERRED SUBMITTALS: IN ACCORDANCE WITH FBC 107.3.4.1, THE FOLLOWING SPECIALITY ITEMS FOR PORTIONS OF THE BUILDING WILL NOT BE SUBMITTED AT THE TIME OF BUILDING PERMIT APPLICATION BUT WILL BE DEFERRED UNTIL AFTER THE PERMIT HAS BEEN ISSUED.PRECAST CONCRETE MEMBERS, MECHANICAL EQUIPMENT STANDS

THESE ELEMENTS ARE PERFORMANCE-BASED DESIGN. THE CONTRACTOR SHALL CONTRACT FOR THE DESIGN AND CONSTRUCTION OF THESE ELEMENTS DURING THE CONSTRUCTION PHASE. THE SHOP DRAWINGS AND CALCULATIONS SHALL BE PREPARED AND SIGNED BY A LICENSED FLORIDA PROFESSIONAL ENGINEER. THEY SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO FABRICATION.THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL.CONCRETE: REINFORCED CONCRETE CONSTRUCTION SHALL CONFORM TO THE FBC AND ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE". CONCRETE STRENGTHS SHALL BE VERIFIED BY STANDARD 28-DAY CYLINDER TESTS PER ASTM C39, AND SHALL BE AS FOLLOWS:

f’c USE3000 PSI FOUNDATIONS/SLAB ON GRADE4000 PSI ALL USES, U.N.O.

CEMENT SHALL CONFORM TO ASTM C150, TYPE 1. FLY ASH CONFORMING TO ASTM C618, TYPE F OR TYPE C, MAY BE USED TO REPLACE UP TO 20% OF THE CEMENT CONTENT, PROVIDED THAT THE MIX STRENGTH IS SUBSTANTIATED BY TEST DATA. COARSE AGGREGATE SHALL CONFORM TO ASTM C33 WITH A MAXIMUM SIZE OF 3/4". FINE AGGREGATE SHALL BE CLEAN, DURABLE, NATURAL SAND CONFORMING TO ASTM C33.

A WATER-REDUCING ADMIXTURE, IF USED, SHALL CONFORM TO ASTM C494 AND USED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S RECOMMENDATIONS, SHALL BE INCORPORATED IN CONCRETE DESIGN MIXES. A HIGH-RANGE WATER-REDUCING ADMIXTURE CONFORMING TO ASTM C494, TYPE F OR G, MAY BE USED IN CONCRETE MIXES, PROVIDING THAT THE SLUMP DOES NOT EXCEED 8”.

SLEEVES, OPENINGS, CONDUIT, AND OTHER EMBEDDED ITEMS NOT SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE APPROVED BY THE STRUCTURAL ENGINEER BEFORE POURING. NO SLEEVE, OPENING, OR INSERT MAY BE PLACED IN BEAMS, JOISTS, OR COLUMNS UNLESS APPROVED BY THE ENGINEER. CONDUITS EMBEDDED IN SLABS SHALL NOT BE LARGER IN OUTSIDE DIMENSION THAN ONE THIRD OF THE THICKNESS OF THE SLAB AND SHALL NOT BE SPACED CLOSER THAN THREE DIAMETERS ON CENTER.

PROVIDE 3/4” CHAMFERS ON ALL EXPOSED CONCRETE EDGES, UNLESS NOTED OTHERWISE.

ALL CONCRETE SHALL BE CURED IMMEDIATELY AFTER FINISHING OPERATIONS.

REINFORCING STEEL: REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60, FOR DEFORMED BAR AND ASTM A1064 FOR SMOOTH WELDED WIRE FABRIC (WWF), UNLESS OTHERWISE NOTED. REINFORCING STEEL TO BE WELDED SHALL CONFORM TO ASTM A706. REINFORCING STEEL SHALL BE SECURELY TIED IN PLACE WITH #16 ANNEALED IRON WIRE.

ALL DETAILING AND ACCESSORIES SHALL CONFORM TO ACI DETAILING MANUAL SP-66. PROVIDE CHAIRS, SPACERS, BOLSTERS, AND ITEMS IN CONTACT WITH FORMS WITH HOT-DIP GALVANIZED LEGS OR PLASTIC LEGS. ACCURATELY POSITION, SUPPORT, AND SECURE REINFORCEMENT AGAINST DISPLACEMENT BY FORMWORK CONSTRUCTION OR CONCRETE PLACEMENT OPERATIONS. "WET-STICKING" OF REINFORCING IS PROHIBITED.

REQUIRED CONCRETE COVER FOR REINFORCING STEEL (UNLESS NOTED OTHERWISE):

FOOTINGS 3" BOTTOM AND SIDES, 2" TOPSLABS 3/4"BEAMS 1-1/2" TO STIRRUPSWALLS 1-1/2”

LAP SPLICE CONTINUOUS VERTICAL OR HORIZONTAL BARS IN CONCRETE MEMBERS IN ACCORDANCE WITH ACI 318, LATEST EDITION, FOR CLASS "B" TENSION LAP SPLICES. DO NOT SPLICE CONTINUOUS TOP BARS IN BEAMS AT ENDS OF CLEAR SPANS. DO NOT SPLICE CONTINUOUS BOTTOM BARS IN BEAMS IN CLEAR SPANS BETWEEN SUPPORTS. SHOW ALL SPLICES ON SHOP DRAWINGS. SPLICE LOCATIONS AND METHODS SUBJECT TO APPROVAL OF STRUCTURAL ENGINEER.

AT SLAB RE-ENTRANT CORNERS, PROVIDE (2) #5 X 4’-0” DIAGONAL BARS. AT SLAB AND WALL OPENINGS PROVIDE A MINIMUM OF (2) #5 BARS ALL FOUR SIDES AND DIAGONALLY; EXTEND THESE BARS A LAP DISTANCE OR A MINIMUM OF 24” PAST THE OPENING OR HOOK BARS IF DISCONTINUOUS.

DOWEL ALL WALLS AND COLUMNS TO FOOTINGS WITH BAR SIZE AND SPACING TO MATCH VERTICAL REINFORCING UNLESS OTHERWISE SHOWN.

SLABS ON GRADE: PREPARE SUBGRADE AS PER THE RECOMMENDATIONS OUTLINED IN THE GEOTECHNICAL REPORT. CHAIR WIRE FABRIC DURING CONCRETE PLACEMENT TO ENSURE PROPER POSITION IN SLAB.

PLACE CRACK CONTROL JOINTS AS SHOWN ON PLAN OR AT 12 FEET MAXIMUM FOR 4” SLAB, OR 15 FEET MAXIMUM FOR 6” SLAB. JOINT SPACING SHALL NOT EXCEED A 1.5 TO 1 WIDTH TO LENGTH RATIO.

FOR 4” THICK SLABS ON GRADE, PROVIDE 6X6 W1.4XW1.4 WELDED WIRE FABRIC OR 1.5 POUNDS PER CUBIC YARD OF MICRO SYNTHETIC FIBERS (FRC MONO-150 OR EQUAL), UNLESS NOTED OTHERWISE. FOR 6” THICK SLABS ON GRADE, PROVIDE 6X6 W2.9XW2.9 WELDED WIRE FABRIC PLACED 2” BELOW TOP OF SLAB OR 3 POUNDS PER CUBIC YARD OF MACRO SYNTHETIC FIBERS (FORTA FERRO OR EQUAL), UNLESS NOTED OTHERWISE.

MECHANICAL ANCHORS: MECHANICAL ANCHORS SHALL HAVE THE ICC-ES EVALUATION REPORT INDICATING CONFORMANCE WITH CURRENT APPLICABLE ICC ES ACCEPTANCE CRITERIA. MECHANICAL ANCHORS SHALL BE EXPANSION TYPE OR SCREW TYPE AS NOTED ON THE DRAWINGS.

UNLESS OTHERWISE NOTED, PROVIDE CARBON STEEL ANCHORS, ZINC PLATED IN ACCORDANCE WITH ASTM B633 OR HOT-DIPPED GALVANIZED ACCORDING TO ASTM A153. PERMANENTLY EXPOSED ANCHORS SHALL BE STAINLESS STEEL. USE 316 STAINLESS STEEL FOR MECHANICAL EQUIPMENT AND FOR ALUMINUM AND FIBERGLASS STRUCTURES AND ASSEMBLIES.

ACCEPTABLE MECHANICAL ANCHORS FOR ANCHORAGE TO CONCRETE SHALL BE AS FOLLOWS, OR AS NOTED ON THE DRAWINGS:

A. EXPANSION ANCHORS1. HILTI KWIK BOLT TZ WEDGE ANCHOR PER ICC-ES ESR-19172. DEWALT POWER-STUD+ SD2, SD4, SD6 EXPANSION ANCHOR PER ICC-ES ESR-25023. SIMPSON STRONG-BOLT 2 EXPANSION ANCHOR PER ICC-ES ESR-3037

B. SCREW ANCHORS1. HILTI KWIK HUS EZ AND KWIK HUS EZ-I SCREW ANCHORS PER ICC-ES ESR-3027 2. DEWALT SCREW-BOLT+ PER ICC-ES ESR-38893. SIMPSON TITEN HD SCREW ANCHOR PER ICC-ES ESR-2713

MINIMUM EMBEDMENT FOR CONCRETE ANCHORS SHALL BE AS FOLLOWS, OR AS NOTED ON THE DRAWINGS:1. 1/2” DIAMETER – 3 3/4” EMBEDMENT2. 5/8” DIAMETER – 5” EMBEDMENT3. 3/4" DIAMETER – 5 3/4” EMBEDMENT

FOR ANCHORAGE TO SOLID GROUTED CMU PROVIDE ONE OF THE FOLLOWING ANCHORS, OR AS NOTED ON THE DRAWINGS:1. HILTI KWIK HUS EZ AND KWIK HUS EZ-I SCREW ANCHORS PER ICC-ES ESR-3056 2. DEWALT SCREW-BOLT+ PER ICC-ES ESR-40423. SIMPSON TITEN HD SCREW ANCHOR PER ICC-ES ESR-1056

MINIMUM EMBEDMENT FOR SOLID GROUTED CMU ANCHORS SHALL BE AS FOLLOWS, OR AS NOTED ON THE DRAWINGS: ANCHORS NOT ALLOWED WITHIN 1 1/2" OF HEAD JOINTS1. 1/2” DIAMETER – 3 3/4” EMBEDMENT2. 5/8” DIAMETER – 5” EMBEDMENT3. 3/4" DIAMETER – 5 3/4” EMBEDMENT

IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED ITEMS PRIOR TO DRILLING HOLES FOR ANCHORS. EXERCISE CARE IN CORING OR DRILLING TO AVOID DAMAGING EXISTING REINFORCING OR EMBEDDED ITEMS. NOTIFY THE ENGINEER IF REINFORCING STEEL OR OTHER EMBEDDED ITEMS ARE ENCOUNTERED DURING DRILLING.

ADHESIVE ANCHORS: ADHESIVE ANCHORS (EPOXY STYLE) SHALL HAVE THE ICC ES EVALUATION REPORT INDICATING CONFORMANCE WITH CURRENT APPLICABLE ICC ES ACCEPTANCE CRITERIA. ADHESIVE SHALL BE MOISTURE INSENSITIVE, ALLOWING INSTALLATIONS IN DAMP OR WATER-FILLED HOLES. ADHESIVE SHALL HAVE A FULL-CURE LOAD OF 2 HOURS OR LESS AT 70°F.

ACCEPTABLE ADHESIVE IN FOUNDATIONS, SLAB ON GRADE, COLUMNS AND WALLS ARE HILTI HY-200, DEWALT AC200+; SIMPSON SET-3G FOR CONCRETE SIMPSON SET-XP FOR MASONRY, IN BEAMS AND ELEVATED SLABS ARE HILTI RE500 V3, OR DEWALT PURE110+, SIMPSON SET-3G.

THREADED STUDS SHALL CONFORM TO ASTM A36, UNLESS NOTED OTHERWISE. PERMANENTLY EXPOSED STUDS SHALL BE STAINLESS STEEL. NUTS AND WASHERS SHALL CONFORM TO SAME SPECIFICATION AS THE SUPPLIED ANCHOR RODS.

INSTALLATION SHALL BE IN CONFORMANCE WITH MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS. EMBEDMENT SHALL BE AS INDICATED ON THE STRUCTURAL DRAWINGS.

IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED ITEMS PRIOR TO DRILLING HOLES FOR ANCHORS. EXERCISE CARE IN CORING OR DRILLING TO AVOID DAMAGING EXISTING REINFORCING OR EMBEDDED ITEMS. NOTIFY THE ENGINEER IF REINFORCING STEEL OR OTHER EMBEDDED ITEMS ARE ENCOUNTERED DURING DRILLING.

MASONRY WALLS: MASONRY UNITS SHALL MEET ASTM C90, TYPE 2. ASSEMBLIES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF f’m= 2,000 PSI. MORTAR SHALL BE TYPE "M" OR "S" AND MEET ASTM C270. GROUT SHALL BE 2,500 PSI MINIMUM COMPRESSIVE STRENGTH AND MEET ASTM C476. GROUT SHALL CONSIST OF A MIXTURE OF CEMENTITIOUS MATERIALS AND AGGREGATE TO WHICH SUFFICIENT WATER HAS BEEN ADDED TO CAUSE THE MIXTURE TO FLOW WITHOUT SEGREGATION OF THE CONSTITUENTS. ALL CELLS CONTAINING VERTICAL BARS, BOND BEAMS, AND ALL CELLS BELOW GRADE SHALL BE FILLED WITH GROUT. MAXIMUM HEIGHT OF GROUT POUR ALLOWED IS 4'-0" UNLESS

CLEAN-OUT OPENING IS PROVIDED AT BOTTOM OF CELLS TO BE FILLED. LOCATE CLEAN-OUT OPENINGS IN AREAS NOT EXPOSED TO VIEW.

UNLESS NOTED OTHERWISE EIGHT INCH MASONRY WALLS SHALL BE PARTIALLY REINFORCED MASONRY WALL CONSTRUCTION WITH #5 AT 48 INCH O.C. IN GROUT FILLED CELLS. ADD (1) #5 REINFORCING BAR EACH SIDE OF OPENINGS EXCEEDING 3 FEET.

PROVIDE REINFORCING BARS AT CORNERS, INTERSECTIONS, AND EACH SIDE OF OPENINGS. PROVIDE (2) REINFORCING BARS EACH SIDE OF OPENINGS OVER 4 FEET WIDE, AND AS SHOWN ON THE PLANS. PROVIDE HOOKED DOWELS INTO FOOTINGS AND STRUCTURE ABOVE AND/OR

BELOW TO PROVIDE CONTINUITY. PROVIDE 9 GAGE GALVANIZED HORIZONTAL JOINT REINFORCING (DUR-O-WAL OR ENGINEER-APPROVED

EQUAL) AT 16” O.C. REINFORCING LAPS TO BE 48 BAR DIAMETERS.

DO NOT PLACE CONDUITS, PIPES, ETC., IN CELLS WITH VERTICAL REINFORCING. DO NOT RUN CONDUITS, PIPES, ETC., HORIZONTALLY IN CMU WALLS PARALLEL TO LENGTH OF WALL. WHERE MASONRY WALLS ABUT CONCRETE COLUMNS TO BE PLACED PRIOR TO ERECTION OF MASONRY WALLS, PROVIDE DOVETAIL SLOTS BETWEEN COLUMN AND WALLS AND GROUT THE CMU CELL CONTAINING THE DOVETAIL ANCHORS. OTHERWISE, EXTEND CMU HORIZONTAL JOINT REINFORCING THROUGH CONCRETE COLUMN.

CONTROL JOINTS SHALL BE PROVIDED IN ALL CONCRETE MASONRY CONSTRUCTION AT A SPACING NOT TO EXCEED THREE TIMES WALL HEIGHT OR 30’-0” MAXIMUM.

USE METAL LATH OR WIRE SCREEN FOR CAVITY CAPS. SHEET METAL, FELT, BUILDING PAPER, OR LIKE MATERIALS ARE PROHIBITED.

TIE BEAMS: TIE BEAMS SHALL BE CONCRETE, POURED AFTER THE BLOCK WALLS BELOW ARE IN PLACE. REINFORCING SHALL BE CONTINUOUS THROUGH TIE BEAMS WITH MINIMUM LAP SPLICES OF 48 BAR DIAMETERS AND BENT BARS AT CORNERS. USE METAL LATH, MORTAR, OR SPECIAL UNITS TO CONFINE CONCRETE TO AREA REQUIRED, IN ACCORDANCE WITH ACI 530.1, SECTION 3.5 B. SOLID METAL OR FELT CAVITY CAPS ARE PROHIBITED.

PRECAST CONCRETE LINTELS: UNLESS INDICATED OTHERWISE, ALL LINTELS TO BE "U" TYPE PRECAST CONCRETE UNITS EQUAL TO UNITS

MANUFACTURED BY CAST-CRETE CORP. AND PRESTRESSED (AND ADDITIONALLY REINFORCED AS REQUIRED) IN ACCORDANCE WITH

CAST-CRETE CORP. ''DESIGN MANUAL", LATEST EDITION, FOR THE SPAN AND LOADING CONDITION RELATIVE TO LINTEL LOCATION.

LINTEL SIZE IF NOT SHOWN ON THE PLANS SHALL BE 8F8-1B FOR OPENINGS LESS THAN 10 FEET AND 8F16-1B/1T FOR OPENINGS 10 FEET TO 20 FEET. PROVIDE 8" MINIMUM BEARING FOR LINTELS UNLESS NOTED OTHERWISE.

ANCHOR RODS: UNLESS INDICATED OTHERWISE ON THE DRAWINGS, ANCHOR RODS SHALL BE ASTM F1554 GRADE 36 AND THE SIZE SHALL BE 3/4 DIA. AND SHALL EMBED INTO THE CONCRETE FOUNDATION A DISTANCE OF 1’-0” WITH A HEAVY HEX NUT AT THE EMBEDDED END.

Page 7: EMERGENCY GENERATOR

T/SLAB

0' - 0"

M1

M1M1

M1

M1M1

M1

M1

M18" SLAB ON GRADE

4" SLAB ON GRADE W/ 6X6W1.4x1.4WWF

F95W

F95W

F95W

F95W

SLO

PE

6

S.4

6

S.4

6

S.4

6

S.4

4

S.4

SLOPE

SLO

PE

SLOPE

7

S.4

SIM

50' - 0"

1' -

0"

4' -

4"

9' -

8"

9' -

0"

5' -

0"

1' -

0"

1' - 0" 14' - 0" 2' - 4" 15' - 4" 10' - 4" 6' - 0" 1' - 0"

M1

30' -

0"

M1

T/SLAB

0' - 0"

1' -

0"

9' -

0"

1' -

0"

8' -

0"

1' -

0"

9' -

0"

1' -

0"

FOUNDATION PLAN NOTES:

1.DO NOT SCALE DRAWINGS.

2. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO COMMENCING CONSTRUCTION. NOTIFY THE ENGINEER OF RECORD OF ANY DISCREPANCIES.

3. VERIFY/COORDINATE THE LOCATION OF ALL UNDERGROUND PIPING WITH THE FOUNDATION.

4. FX INDICATES FOOTING TYPE, REFER TO FOOTING SCHEDULE ON THIS SHEET. X’-X” INDICATES TOP OF FOOTING ELEVATION, -1'-4" UNLESS NOTED OTHERWISE.

5. INDICATES 12" CMU WALLS W/ #6 VERTICALS AT 12" OC MAX EACH FACE, AND AT CORNERS, INTERSECTIONS AND BOTH SIDES OF OPENINGS, UNLESS NOTED OTHERWISE.

SE

LEC

T S

TR

UC

TU

RA

L

SE

LE

CT

ST

RU

CT

UR

AL

12573 N

ew

Brittany B

lvd

Fort

Myers

, F

lorida 3

3907

Phone: (2

39)

210-5

090

info

@sele

cts

tructu

ral.com

Cert

ific

ation

Au

th. 28

357

JOB NO.:

SCALE:

ENGINEERED BY:

DRAWN BY:

ISSUED DATE:

SEAL

SHEET TITLE:

SHEET NO.:

REVISIONS

1/4" = 1'-0"

C:\S

ele

ct S

tru

ctu

ral D

rop

box\S

ele

ct S

tru

ctu

ral D

ropb

ox\0

1 P

roje

cts

\20

21

Pro

jects

\21

35

1 F

EM

A G

en

era

tors

\2 M

ana

tee

Ele

men

tary

\Wo

rkin

g D

raw

ings\2

135

1_

Man

ate

e E

lem

enta

ry_

Str

uctu

ral_

R2

1.r

vt

5/31/2021

FOUNDATIONPLAN

S.2

MA

NA

TE

E E

LE

ME

NT

AR

YS

CH

OO

LT

LC

EN

GIN

EE

RIN

G5301 T

ICE

ST

. F

OR

T M

YE

RS

, F

L 3

3905

Designer

JS

21351

NO. DATE DESCRIPTION

SCALE: 1/4" = 1'-0"

FOUNDATION PLAN

WALL FOUNDATION SCHEDULE

MARK WIDTH THICKNESS REINFORCEMENT COMMENTS

F95W 9' - 6" 3' - 0" (9) #6 CONT. BOT & #6 @ 12"OC TRANSVERSE T&B

-

CMU COLUMN SCHEDULE

MARK SIZE

REINFORCEMENT

COMMENTSVERTICALS TIES

M1 2' - 0" x 2' - 0" (12) #7 #6 @ 12" OC CMU PILASTER

Page 8: EMERGENCY GENERATOR

TB

1 T

22' -

0"

TB1 T22' - 0"

TB1 T22' - 0"

TB1 T22' - 0"

TB1 T22' - 0" TB1 T22' - 0"

TB

1 T

22' -

0"

TB

1 T

22' -

0"

TB

1 T

22' -

0"

T/WALL

22' - 0"

T/WALL

22' - 0"

T/WALL

22' - 0"

TB1 T22' - 0"

T/WALL

22' - 0"

TB

1 T

22' -

0"

WALL PLAN NOTES:

1. DO NOT SCALE DRAWINGS. VERIFY/COORDINATE ALL DIMENSIONS AND ELEVATIONS.

2. INDICATES 12" CMU WALLS W/ #6 VERTICALS AT 12" OC MAX EACH FACE, AND AT CORNERS, INTERSECTIONS AND BOTH SIDES OF OPENINGS, UNLESS NOTED OTHERWISE.

3. TBX INDICATES CONCRETE BEAM TYPE, REFER TO CONCRETE BEAM SCHEDULE ON THIS SHEET.

4. TX'-X" INDICATES TOP OF BEAM ELEVATION.

5. BX'-X" INDICATES BOTTOM ELEVATION

TB

1 T

11' -

8"

TB1 T11' - 8"

TB1 T11' - 8"

TB

1 T

11' -

8"

TB1 T11' - 8"

TB1 T11' - 8"

TB

1 T

11' -

8"

TB1 T11' - 8"

TB

1 T

11' -

8"

8

S.4

8

S.4

8

S.4

8

S.4

PRECAST B6' - 8"

TB1 T11' - 8"

TB

1 T

11' -

8"

SE

LEC

T S

TR

UC

TU

RA

L

SE

LE

CT

ST

RU

CT

UR

AL

12573 N

ew

Brittany B

lvd

Fort

Myers

, F

lorida 3

3907

Phone: (2

39)

210-5

090

info

@sele

cts

tructu

ral.com

Cert

ific

ation

Au

th. 28

357

JOB NO.:

SCALE:

ENGINEERED BY:

DRAWN BY:

ISSUED DATE:

SEAL

SHEET TITLE:

SHEET NO.:

REVISIONS

1/4" = 1'-0"

C:\S

ele

ct S

tru

ctu

ral D

rop

box\S

ele

ct S

tru

ctu

ral D

ropb

ox\0

1 P

roje

cts

\20

21

Pro

jects

\21

35

1 F

EM

A G

en

era

tors

\2 M

ana

tee

Ele

men

tary

\Wo

rkin

g D

raw

ings\2

135

1_

Man

ate

e E

lem

enta

ry_

Str

uctu

ral_

R2

1.r

vt

5/31/2021

WALL PLAN

S.3

MA

NA

TE

E E

LE

ME

NT

AR

YS

CH

OO

LT

LC

EN

GIN

EE

RIN

G5301 T

ICE

ST

. F

OR

T M

YE

RS

, F

L 3

3905

Designer

JS

21351

NO. DATE DESCRIPTION

SCALE: 1/4" = 1'-0"

HIGH WALL PLAN

CONCRETE BEAM SCHEDULE

MARK WIDTH DEPTH

REINFORCEMENT

COMMENTSTOP MID BOT STIRRUPS

TB1 1' - 0" 2' - 0" (2) #5 (4) #5 (2) #5 #3 @ 48" OC -

SCALE: 1/4" = 1'-0"

LOW WALL PLAN

Page 9: EMERGENCY GENERATOR

CONCRETE WALL FOOTINGPER PLAN

EXTEND ALL REINFORCING TO FAR FACE

(1) #5 2'-6"x2'-6" BAREACH LAYER

KEYED JOINT

CONSTRUCTION JOINT

CONTROL JOINT

POSITION REINFORCEMENT IN CENTER OF SLAB

SUBGRADE PER GEOTECHNICAL RECOMMENDATIONS

TH

ICK

NE

SS

1/4

S

LA

B

SLA

BT

HIC

KN

ES

S

SAW CUT JOINTPOSITION REINFORCEMENT IN CENTER OF SLAB

SUBGRADE PER GEOTECHNICAL RECOMMENDATIONS

SLA

BT

HIC

KN

ES

S

NOTES:1. COORDINATE ATTACHMENT LOCATIONS W/ EQUIPMENT MANUFACTURER.

(1) #5 CONT @ PERIMETER

#5 @ 12" OC EW

(1"

MIN

")

PE

R G

EN

ER

AT

OR

MF

R

8"

MIN

1' -

0"

1' - 0"

4" SLAB ON GRADE PER PLAN TO BE STAND ALONE

CONCRETE FOOTING PER PLAN 4

8 B

AR

DIA

LA

P

TIE BEAM PER PLAN

CMU WALL PER PLAN

FINISH GRADE

GROUT CMU SOLID BELOW GRADE

SLAB ON GRADE PER PLAN

GROUT SOLID

PRECAST LINTEL

8F16-1B/1T

NOMINAL WIDTH

FILLED SOLID

NOMINAL HEIGHT

QUANTITY OF #5 REBAR ATBOTTOM OF LINTEL CAVITY

QUANTITY OF #5REBAR AT TOP

WIDTH

NOMINAL

CMU WALL PER PLAN

TIE BEAM PER PLAN

BOND BEAM PER PLAN

WIDTH

NOMINAL

WIDTH

NOMINAL

W < 6' 8F8-1B, 12F8-1B

6' < W ≤ 10' 8F16-1B/2T, 12F16-1B/2T

10' < W ≤ 16' 8F24-1B/2T, 12F24-1B/2T

PRECAST LINTELFILL SOLID W/ TIE BEAM POUR

PRECAST LINTELFILL SOLID W/ BOND BEAM POUR

NO

MIN

AL H

EIG

HT

NO

MIN

AL H

EIG

HT PRECAST LINTEL

PER SCHEDULE

PROVIDE WALL REINFORCING ABOVE AND BELOW OPENINGS

GROUT SILL SOLID W/ (1) #5 HORIZONTAL

CMU WALL PER PLAN

CONCRETE TIE BEAM PER PLAN

TYP

8" MIN

NO

MIN

AL H

EIG

HT

OPENINGWIDTH

LINTEL SIZE

CMU COLUMNPER PLAN

CONCRETE FOOTING PER PLAN

DOWELS TO MATCH SIZE AND QUANTITY OF VERTICAL BARS

48 B

AR

DIA

ME

TE

R L

AP

1/2

TIE

SP

AC

ING

SLAB ON GRADEPER PLANFINISH GRADE

TIE BEAM PER PLAN CMU WALL PER PLAN

CONCRETE FOOTING PER PLAN

CMU WALL PER PLAN

FINISH GRADE

SLAB ON GRADE PER PLAN

8"x8" CMU DRAINAGE OPENING

SE

LEC

T S

TR

UC

TU

RA

L

SE

LE

CT

ST

RU

CT

UR

AL

12573 N

ew

Brittany B

lvd

Fort

Myers

, F

lorida 3

3907

Phone: (2

39)

210-5

090

info

@sele

cts

tructu

ral.com

Cert

ific

ation

Au

th. 28

357

JOB NO.:

SCALE:

ENGINEERED BY:

DRAWN BY:

ISSUED DATE:

SEAL

SHEET TITLE:

SHEET NO.:

REVISIONS

3/4" = 1'-0"

C:\S

ele

ct S

tru

ctu

ral D

rop

box\S

ele

ct S

tru

ctu

ral D

ropb

ox\0

1 P

roje

cts

\20

21

Pro

jects

\21

35

1 F

EM

A G

en

era

tors

\2 M

ana

tee

Ele

men

tary

\Wo

rkin

g D

raw

ings\2

135

1_

Man

ate

e E

lem

enta

ry_

Str

uctu

ral_

R2

1.r

vt

5/31/2021

DETAILS

S.4

MA

NA

TE

E E

LE

ME

NT

AR

YS

CH

OO

LT

LC

EN

GIN

EE

RIN

G5301 T

ICE

ST

. F

OR

T M

YE

RS

, F

L 3

3905

Designer

JS

21351

NO. DATE DESCRIPTION

SCALE: NOT TO SCALE

TYPICAL FOOTING CORNER1 SCALE: NOT TO SCALE

TYPICAL SLAB ON GRADE JOINTS2

SCALE: NOT TO SCALE

EQUIPMENT PAD DETAIL4 SCALE: 3/4" = 1'-0"

CMU SCREENWALL6

SCALE: NOT TO SCALE

TYPICAL CMU WALL OPENING & PRECAST LINTEL SCHEDULE3

SCALE: 3/4" = 1'-0"

CMU COLUMN FOOTING5

SCALE: 3/4" = 1'-0"

CMU SCREENWALL TIE BEAM8

SCALE: 3/4" = 1'-0"

CMU DRAIN OPENING7

Page 10: EMERGENCY GENERATOR

LOCATION OF PROJECT

PROJECT LOCATION MAP PROJECT VICINITY MAP

TLC Engineering Solutions

DESIGN SERVICES FOR EMERGENCY GENERATORS (FEMA) - MANATEE

ELEMENTARY

MANATEE ELEMENTARY SCHOOL

5301 TICE ST

FORT MYERS, FL 33905

LEE COUNTY

LEE COUNTY PROJECT MANAGER:TLC PROJECT MANAGER:

CONTACT INFORMATIONDAVID PINHEIROBRETT SANDS

(239) 357-8547(239) 985-2002

LOCATION OF PROJECT

for

FULL DRAWING INDEX

ELECTRICAL:

E000 - COVER SHEETE001 - ELECTRICAL LEGEND & DRAWING INDEXE002 - ELECTRICAL GENERAL NOTESE100 - ELECTRICAL SITE PLANE101 - ENLARGED SITE PLANE101D - ENLARGED SITE PLAN - DEMOLITIONE200 - ELECTRICAL RISER DIAGRAMS

CIVIL:

C-00.01 - COVER SHEETC-00.10 - GENERAL NOTESC-00.20 - AERIAL VIEWC-10.00 - EXISTING CONDITIONS & DEMOLITION PLANC-20.00 - CONSTRUCTION PLAN & DETAILS

STRUCTURAL:

S.1 - GENERAL NOTESS.2 - FOUNDATION PLANS.3 - WALL PLANS.4 - DETAILS

13099 S. Cleveland Avenue, Suite 500Fort Myers, FL 33907

P 239.275.4240www.tlc-engineers.com

© Copyright 2020 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

®

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

xxxxxx

12" = 1'-0"

5/3

1/2

02

1 1

:07:3

1 P

MC

:\R

evit L

oca

l\72

009

6_

MA

NA

TE

E_R

20

_a

ldin

.grb

ic@

tlc-e

ng

.co

m.r

vt

DE

SIG

N S

ER

VIC

ES

FO

RE

ME

RG

EN

CY

GE

NE

RA

TO

RS

(FE

MA

) -

MA

NA

TE

EE

LE

ME

NT

AR

Y S

CH

OO

L5

30

1 T

ICE

ST

.F

OR

T M

YE

RS

, F

L 3

39

05

720096

5/31/2021

AG

BLS

COVER SHEET

E000

720096

No. Date Description

Page 11: EMERGENCY GENERATOR

SYMBOL DESCRIPTION

ELECTRICAL SYMBOL LEGEND

AUTOMATIC TRANSFER SWITCH

TRANSFORMERT

NEW (HEAVY, SOLID LINE)

EXISTING TO REMAIN (LIGHT, SOLID LINE)

EXISTING TO BE REMOVED (HEAVY, DASHED LINE)

CONDUIT CONTINUED

CONDUIT STUBBED OUT OR UP

GROUND OR GROUND ROD AS NOTED

CONDUIT EXPOSED

CONDUIT CONCEALED IN SLAB, UNDERGROUND OR UNDER FLOOR

CONDUIT CONCEALED ABOVE CEILING OR IN WAL

BRANCH CIRCUIT PANELBOARD, OVER 240 VOLTS, SURFACE MOUNTED

SPECIAL PURPOSE RECEPTACLE, NEMA CONFIGURATION AS NOTED

NOTE: DIAGONAL MARKS INDICATED ON ANY DEVICE REPRESENTS DEVICE CONNECTED TO EMERGENCY CIRCUIT (RED DEVICE FOR RECEPTACLE); TYPICAL FOR ANY DEVICE IN LEGEND

TWO DUPLEX RECEPTACLES (QUAD) WITH COMMON COVERPLATE

GFCI RECEPTACLE; "WP" INDICATES CAST METAL "IN-USE" WEATHERPROOF COVER, WEATHER-RESISTANT LISTED

M

F

LV

OS

4

3

a

30AR

20AF

DUPLEX RECEPTACLE

DIMMER SWITCH, LINE VOLTAGE

MOTOR RATED SWITCH

FAN SWITCH

LOW VOLTAGE SWITCH

WALL MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR SWITCH

FOUR-WAY SWITCH

THREE-WAY SWITCH

NF

30AR NON-FUSED DISCONNECT SWITCH, RATING AS NOTED

SINGLE POLE SWITCH (SUBSCRIPT INDICATES ITEM CONTROLLED)

NF = NON-FUSEDAR = AMPERE RATING OF SWITCH4X SS = NEMA 4X STAINLESS STEEL ENCLOSURE

COMBINATION MAGNETIC MOTOR STARTER, SIZE AS NOTED, 3-POLE UNLESS OTHERWISE NOTED

30/3

03R

MCP AMPERE RATING

# OF POLES

NEMA STARTER SIZE

SINGLE RECEPTACLE

FUSED DISCONNECT

BASIC MATERIALS

S

S

S

S

S

S

S

S

K SINGLE POLE KEY SWITCHS

OSab WALL MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR SWITCH, DUAL RELAYS

RECEPTACLE CONTROLLED PER ASHRAE 90.1 (2010); PROVIDE POWER PACK FOR RECEPTACLE CIRCUIT, TO BE CONTROLLED THROUGH LOCAL ROOM OCCUPANCY SENSOR(S); PROVIDE DEVICE WITH BLUE DOT OR UNIVERSAL POWER SYMBOL

RECEPTACLE MOUNTED ADJACENT TO TV OUTLET, COORDINATE HEIGHT W/ ARCHITECT

DUPLEX RECEPTACLE WITH (2) USB PORTS

DOUBLE DUPLEX RECEPTACLE WITH DEDICATED CIRCUIT FOR AV RACK OR CART

D,OS WALL MOUNTED DUAL TECHNOLOGY DIMMING/OCCUPANCY SENSOR SWITCHS

LVOLOW VOLTAGE OVERRIDE SWITCHS

VS WALL MOUNTED DUAL TECHNOLOGY VACANCY SENSOR SWITCHS

C

TV

U

AV

HOSPITAL GRADE H

TAMPER RESISTANTTR

ISOLATED GROUND (ORANGE DEVICE) IG

WEATHERPROOFWP

DEVICE ABBREVIATION TAGS:

J

FOUR-GANG FLOOR BOX4G

SIX-GANG FLOOR BOX6G

EIGHT-GANG FLOOR BOX8G

J JUNCTION BOX WALL MOUNTED

POKE-THRU WITH 6" CORE DRILL6C

POKE-THRU WITH 8" CORE DRILL8C

GROUND BUS BAR, COPPERGND

SPD SURGE PROTECTIVE DEVICE

STSHUNT-TRIP PUSHBUTTON; SEMI-FLUSH WALL MOUNTED UNLESS OTHERWISE NOTED; NEMA 3R FOR EXTERIOR LOCATIONS

PUSHBUTTON STATION

BAS BUILDING AUTOMATION SYSTEM CONTROL PANEL

MANHOLEMH

SYMBOL DESCRIPTION

PULLBOXPB

NEMA RATING; NEMA 1 UNLESS OTHERWISE NOTED

3R

3RAF = AMPERE RATING OF FUSEAR = AMPERE RATING OF SWITCH4X SS = NEMA 4X STAINLESS STEEL ENCLOSURE

BRANCH CIRCUIT PANELBOARD, OVER 240 VOLTS, FLUSH MOUNTED

BRANCH CIRCUIT PANELBOARD, UNDER 240 VOLTS, SURFACE MOUNTED

BRANCH CIRCUIT PANELBOARD, UNDER 240 VOLTS, FLUSH MOUNTED

CONDUIT HOMERUN TO ELECTRICAL PANEL

EXISTING TO REMAIN ETR

RELOCATEDRL

HANDHOLEHH

ATS

NEMA RATING; NEMA 1 UNLESS OTHERWISE NOTED

NEMA RATING; NEMA 1 UNLESS OTHERWISE NOTED

4X SS = NEMA 4X STAINLESS STEEL ENCLOSURE

SWITCHBOARD/ SWITCHGEAR/ DISTRIBUTION PANEL

EPO EMERGENCY POWER OFF SHUNT-TRIP PUSHBUTTON, RED MUSHROOM HEAD, CLEAR LEXAN PROTECTIVE COVER

IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERSIES ILLUMINATING ENGINEERING SOCIETYIMC INTERMEDIATE METAL CONDUITIN INCHESIPCEA INSULATED POWER CABLE ENGINEERS ASSOCIATIONIT INSTANTANEOUS TRIPJB OR J-BOX JUNCTION BOXKCMIL ONE THOUSAND CIRCULAR MILSKV KILOVOLTKVA KILOVOLT AMPERESKW KILOWATTKWH KILOWATT HOURSLBS POUNDSLED LIGHT EMITTING DIODELP LIGHTNING PROTECTIONLT LIGHTLTG LIGHTINGLSIG LONG TIME, SHORT TIME, INSTANTANEOUS, GROUNDLSIA LONG TIME, SHORT TIME, INSTANTANEOUS, ALARMLSI LONG TIME, SHORT TIME, INSTANTANEOUSMAX MAXIMUMMCA MINIMUM CIRCUIT AMPSMCB MAIN CIRCUIT BREAKERMCC MOTOR CONTROL CENTERMDP MAIN SERVICE DISTRIBUTION PANELMIC MICROPHONEMIN MINIMUMMLO MAIN LUGS ONLYMOCP MAXIMUM OVERCURRENT PROTECTIONMSB MAIN SERVICE SWITCHBOARDMTD MOUNTEDMTG MOUNTINGMTR MOTORMTS MANUAL TRANSFER SWITCHMUX MULTIPLEX (TRANSPONDER) PANELMVA MEGA VOLT AMPSN NEUTRALNC NORMALLY CLOSEDNEC NATIONAL ELECTRICAL CODENEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNFPA NATIONAL FIRE PROTECTION ASSOCIATIONNIC NOT IN CONTRACTNF NON-FUSEDNL NON-LINEARNO NORMALLY OPEN OR NUMBEROL OVERLOADOSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATIONP POLEPB PULLBOXPF POWER FACTORPIV POST INDICATOR VALVEPNL PANELPR PAIRPRI PRIMARYPT POTENTIAL TRANSFORMERPVC POLYVINYLCHLORIDEPWR POWERREC, RECEPT RECEPTACLEREF REFRIGERATORRGS, GRC RIGID GALVANIZED STEEL CONDUITRLA RUNNING LOAD AMPERESRMS ROOT-MEAN-SQUARERPM REVOLUTIONS PER MINUTERTU ROOF TOP UNITSCA SHORT CIRCUIT AMPERESSD SMOKE DETECTORSEC SECONDARYS/N SOLID NEUTRALSPD SURGE PROTECTIVE DEVICESPKR SPEAKERSPST SINGLE POLE SINGLE THROWSS STAINLESS STEELSST SOLID STATE TRIPSTD SHORT TIME TRIPSW SWITCHSWBD SWITCHBOARDSWGR SWITCHGEARTEL TELEPHONETTB TELEPHONE TERMINAL BOARDTTC TELEPHONE TERMINAL CABINETTVEC TELEVISION EQUIPMENT CABINETTYP TYPICALUG UNDERGROUNDUON UNLESS OTHERWISE NOTEDUL UNDERWRITERS LABORATORIESUTIL UTILITYV VOLTVA VOLTAMPEREVAR VOLT AMPERE REACTIVEVAV VARIABLE AIR VOLUMEVFD VARIABLE FREQUENCY DRIVEW WIREWP WEATHER PROOFXFMR TRANSFORMERXFR TRANSFER

ABBREVIATIONS (CONT.)

T DIGITAL TIMER SWITCH W/ 5 MIN. WARNING FLASHS

LVDLOW VOLTAGE OVERRIDE SWITCH WITH DIMMINGS

A/C AIR CONDITIONINGAC ALTERNATING CURRENTABV CLG ABOVE CEILINGADA AMERICANS WITH DISABILITIES ACTAF AMPERE FRAMEAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAHU AIR HANDLING UNITAIC AMPERE INTERRUPTING CAPACITYAL ALUMINUMAMP AMPEREANSI AMERICAN NATIONAL STANDARDS INSTITUTEASA AMERICAN STANDARDS ASSOCIATIONAT AMPERE TRIPATS AUTOMATIC TRANSFER SWITCHAUX AUXILIARYAWG AMERICAN WIRE GUAGEBC BARE COPPERBIL BASIC IMPULSE LEVELBAS BUILDING AUTOMATION SYSTEMBMS BUILDING MANAGEMENT SYSTEMBRKR OR BKR BREAKERC CONDUIT OR RACEWAYCAB CABINETCKT CIRCUITCB CIRCUIT BREAKERCBM CERTIFIED BALLAST MANUFACTURERSCATV CABLE TELEVISIONCCTV CLOSED CIRCUIT TELEVISIONCLEC CLOCK EQUIPMENT CABINETCLG CEILINGCO CONDUIT OR RACEWAY ONLYCOAX COAXIAL CABLECOND CONDUCTORCONN CONNECTIONCPU CENTRAL PROCESSING UNITCRT CATHODE RAY TERMINAL (VIDEO DISPLAY TERMINAL)CT CURRENT TRANSFORMERCU COPPERCW COLD WATERDC DIRECT CURRENTDDC DIRECT DIGITAL CONTROLDEG DEGREEDF DEMAND FACTORDISC DISCONNECTDISC SW DISCONNECT SWITCHDO DRAW OUTDN DOWNDPST DOUBLE POLE SINGLE THROWEDH ELECTRIC DUCT HEATEREMT ELECTRIC METALLIC TUBINGEO ELECTRICALLY OPERATEDEOL END OF LINEEOR ENGINEER OF RECORDETR EXISTING TO REMAINEWC ELECTRIC WATER COOLERFA FIRE ALARMFAAP FIRE ALARM ANNUNCIATOR PANELFATC FIRE ALARM TERMINAL CABINETFBC FLORIDA BUILDING CODEFCU FAN COIL UNITFLA FULL LOAD AMPERESFM FACTORY MUTUALFPU FAN POWERED UNITFT FEETGF GROUND FAULTGFA GROUND FAULT ALARMGFCI GROUND FAULT CIRCUIT INTERRUPTERGFR GROUND FAULT RELAYGND, G GROUNDHP HORSEPOWERHOA HAND-OFF-AUTOMATICHORIZ HORIZONTALIBC INTERNATIONAL BUILDING CODEIC INTERCOMICU INTENSIVE CARE UNITIECC INTERNATIONAL ENERGY CONSERVATION CODE

ABBREVIATIONS

WALL PACK MOUNTED 8' AFF WITH UNV DRIVERTYPE: WMFG: MCGRAW-EDISON

PHILIPSLITHONIA

MODEL: IST-E02-LED-E1-BL3-FINISH-TRLPW16-50-NW-G3-5W-277-FINISHKAXW P1 40K R3 MVOLT DDBXD

WALL MOUNT EMERGENCY LIGHTING UNIT. RATEDFOR WET LOCATION, POLYCARBONATE HOUSING, CORROSION, FLAME AND VANDAL RESISTANT.MOUNT 8' AFFTYPE: EMFG: EVENLITE TCS SERIES

BEGHELLI ECCO LUNA LEDLITHONIA LIGHTING

MODEL: TCSWL-MR16-LEDEL-SE-206LED-120/277WLTU MR

13099 S. Cleveland Avenue, Suite 500Fort Myers, FL 33907

P 239.275.4240www.tlc-engineers.com

© Copyright 2020 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

®

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

xxxxxx

12" = 1'-0"

5/3

1/2

02

1 1

:07:3

3 P

MC

:\R

evit L

oca

l\72

009

6_

MA

NA

TE

E_R

20

_a

ldin

.grb

ic@

tlc-e

ng

.co

m.r

vt

DE

SIG

N S

ER

VIC

ES

FO

RE

ME

RG

EN

CY

GE

NE

RA

TO

RS

(FE

MA

) -

MA

NA

TE

EE

LE

ME

NT

AR

Y S

CH

OO

L5

30

1 T

ICE

ST

.F

OR

T M

YE

RS

, F

L 3

39

05

720096

5/31/2021

AG

BLS

ELECTRICALLEGEND & DRAWINGINDEX

E001

720096

No. Date Description

SHEET INDEXSheet Number Sheet Name Issued (Yes or No)

E000 COVER SHEET

E001 ELECTRICAL LEGEND & DRAWING INDEX

E002 ELECTRICAL GENERAL NOTES

E100 ELECTRICAL SITE PLAN

E101 ENLARGED ELECTRICAL SITE PLAN

E101D ENLARGED SITE PLAN - DEMO

E200 ELECTRICAL RISER DIAGRAMS

Page 12: EMERGENCY GENERATOR

ELECTRICAL GENERAL NOTES

ELECTRICAL DEVICES OUTLET BOXES, JUNCTION BOXES1. LIGHT SWITCHES SHALL BE MOUNTED 48 INCHES ABOVE FINISHED FLOOR TO CENTER LINE OF DEVICE, UNLESS NOTED

OTHERWISE.2. RECEPTACLES SHALL BE MOUNTED 18 INCHES ABOVE FINISHED FLOOR TO CENTER LINE OF DEVICE, UNLESS NOTED OTHERWISE.3. IT IS THE INTENT THAT ALL DEVICE OUTLET BOXES (POWER AND SYSTEMS) BE FLUSH MOUNTED IN WALLS, CEILINGS OR FLOORS,

AND JUNCTION BOXES FLUSH MOUNTED IN WALLS, CEILINGS, OR FLOORS, OR CONCEALED ABOVE ACCESSIBLE CEILINGS, AND NOT SURFACE MOUNTED, UNLESS SPECIFICALLY NOTED ON THE CONTRACT DRAWINGS, OR UNLESS THE ARCHITECT/ENGINEER GRANTS WRITTEN PERMISSION.

4. ALL COMPONENTS OF THE ELECTRICAL SYSTEM (INCLUDE RACEWAYS, ELECTRICAL EQUIPMENT, OUTLET BOXES, JUNCTION BOXES, ETC.) LOCATED IN A HAZARDOUS (CLASSIFIED) LOCATION SHALL BE APPROVED FOR USE IN SAID LOCATION, AS DEFINED BY THE NEC, WHETHER INDICATED ON THE CONTRACT DOCUMENTS OR NOT.

5. ALL DEVICES SHALL BE MOUNTED VERTICALLY, UNLESS NOTED OTHERWISE.6. ALL RECEPTACLES SHALL BE MOUNTED SUCH THAT THE GROUND PIN IS MOUNTED UP.7. WHERE DEVICES ARE SHOWN IN WALLS BACK-TO-BACK ON OPPOSITE SIDES, INSTALL SO THAT THEY ARE SEPARATED BY AT

LEAST 12".8. ALL EXTERIOR RECEPTACLES OR RECEPTACLES LOCATED IN AREAS SUBJECT TO MOISTURE (PARKING GARAGE, WASHDOWN

AREAS IN KITCHEN, ETC) SHALL BE GFCI TYPE. ALL EXTERIOR RECEPTACLES SHALL BE PROVIDED WITH CAST METAL, IN-USE COVER UNLESS NOTED OTHERWISE.

9. WHEN ELECTRICAL BOXES ARE LOCATED IN VERTICAL FIRE-RESISTIVE ASSEMBLIES, THEY SHALL BE INSTALLED WITHOUT AFFECTING THE FIRE CLASSIFICATION. ALL OF THE FOLLOWING CONDITIONS SHALL BE MET:

A. ALL ELECTRICAL BOXES SHALL BE METALLIC.B. BOX OPENING SHALL OCCUR ONLY ON ONE SIDE OF FRAMING SPACE.C. BOX OPENING SHALL NOT EXCEED 16 SQUARE INCHES.D. ALL CLEARANCES BETWEEN OUTLET BOX AND GYPSUM BOARD SHALL BE COMPLETELY FILLED

WITH JOINT COMPOUND (OR OTHER APPROVED MATERIAL).E. PROVIDE A WALL AROUND OUTLETS LARGER THAN 16 SQUARE INCHES. THE INTEGRITY OF THE

WALL RATING SHALL BE MAINTAINED.F. THE TOTAL AGGREGATE SURFACE AREA OF THE BOXES SHALL NOT EXCEED 100 SQUARE

INCHES PER 100 SQUARE FEET.G. OUTLET BOXES LOCATED ON OPPOSITE SIDES OF FIRE RESISTIVE ASSEMBLIES SHALL BE

SEPARATED BY A MINIMUM HORIZONTAL DISTANCE OF 24 INCHES.H. OUTLET BOXES SHALL BE SECURELY FASTENED TO WALL FRAMING MEMBERS.I. THE OPENING IN THE GYPSUM BOARD FACING SHALL BE CUT NOT TO EXCEED 1/8 INCH

BETWEEN THE EDGES OF THE OUTLET BOX AND THE EDGES OF THE OPENING.

ELECTRICAL EQUIPMENT1. EQUIPMENT SHALL BE OF MATERIALS SUITABLE FOR AND RATED FOR THE ENVIRONMENT IN WHICH THEY ARE TO BE

INSTALLED. ALL COMPONENTS OF THE ELECTRICAL SYSTEM LOCATED OUTDOORS OR INDOORS WHERE EXPOSED TO SIGNIFICANT MOISTURE SHALL BE WEATHERPROOF, NEMA 3R, AS A MINIMUM, WHETHER INDICATED ON THE CONTRACT DRAWINGS OR NOT.

2. TERMINATION PROVISIONS FOR ALL ELECTRICAL EQUIPMENT (PANELBOARDS, SWITCHBOARD, TRANSFORMERS, DISCONNECT SWITCHES, MOTOR CONTROLLERS, AUTOMATIC TRANSFER SWITCHES, ENCLOSED CIRCUIT BREAKERS, BUSWAYS, ETC.) SHALL BE LISTED AND IDENTIFIED FOR USE WITH MINIMUM 75 DEG. F CONDUCTORS IN ACCORDANCE WITH NEC.

3. WORKING CLEARANCES FOR ELECTRICAL EQUIPMENT SHALL BE IN COMPLIANCE WITH NEC.4. THE ELECTRICAL DEDICATED EQUIPMENT SPACE EXTENDING FROM FLOOR TO 6' ABOVE ELECTRICAL EQUIPMENT OR TO THE

STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, ARCHITECTURAL APPURTENANCES AND OTHER EQUIPMENT FOREIGN TO THE ELECTRICAL INSTALLATION IN ACCORDANCE WITH NEC.

5. PROVIDE A REINFORCED CONCRETE PAD, SIZED 4" LARGER IN ALL DIRECTIONS THAN THE FOOTPRINT OF THE EQUIPMENT, AND 4" HIGH, FOR ALL FREESTANDING, FLOOR-MOUNTED ELECTRICAL EQUIPMENT. PROVIDE VIBRATION ISOLATORS AND/OR ANCHORS PER MANUFACTURER'S INSTRUCTIONS.

6. PROVIDE SURGE PROTECTION DEVICE FOR ALL MAIN SERVICE EQUIPMENT, PANELBOARDS, EMERGENCY SWITCHBOARDS AND PANELBOARDS, POWER CIRCUITS OR LOW VOLTAGE EXITING THE BUILDING. PROVIDE MINIMUM 30A/3P BREAKER IN BRANCH

CIRCUIT PANELBOARDS AND 60A/3P IN DISTRIBUTION PANELBOARDS OR SWITCHBOARDS, UNLESS NOTED OTHERWISE, OR PER THE SPD MANUFACTURER'S RECOMMENDATIONS FOR SURGE PROTECTION DEVICE.

7. PROVIDE ARC ENERGY REDUCING MAINTENANCE SWITCH FOR ANY BREAKER RATED (OR ABLE TO BE ADJUSTED TO) 1200A OR HIGHER UNLESS OTHER ARC ENERGY REDUCTION MEANS MEETING NEC 240.87 IS INDICATED ON DRAWINGS/SPECIFICATIONS OR OTHERWISE PROVIDED.

CONDUCTORS1. ALL WIRE SHALL BE SIZED AS SHOWN ON THE DRAWINGS. IF NO WIRE SIZE IS SHOWN, THEN WIRE SHALL BE #12 AWG.2. BRANCH CIRCUITS SHALL BE INCREASED IN SIZE AS REQUIRED TO COMPENSATE FOR VOLTAGE DROP FROM LENGTH OF

CIRCUIT DUE TO FIELD ROUTING. FINAL INSTALLATION SHALL NOT EXCEED A MAXIMUM OF 3% VOLTAGE DROP FOR BRANCH CIRCUITS. REFER TO VOLTAGE DROP TABLE BELOW FOR CONDUCTOR SIZES FOR BRANCH CIRCUITS AS FOLLOWS:

A. 120V, 20A CIRCUITS SHALL BE:i. #12 FROM 0-70 FTii. #10 FROM 71-115FTiii. #8 FROM 116-180FT

B. 277V, 20A CIRCUITS SHALL BE:i. #12 FROM 0-140FTii. #10 FROM 141-220FTiii. #8 FROM 221-350FT

ANYTHING LONGER THAN THE ABOVE SHALL BE SUBMITTED TO THE ENGINEER WITH CALCULATIONS FOR APPROVAL.

3. ALL CONDUCTORS IN CABINETS MUST BE CAREFULLY FORMED AND HARNESSED SO THAT EACH CONDUCTOR DROPS OFF DIRECTLY OPPOSITE TO TERMINAL.

4. ALL WIRE SIZES ARE BASED ON AMPACITIES FOR 60 DEG F TEMPERATURE RATING FROM 0-100A AND 75 DEG. F TEMPERATURE RATING LISTED IN NEC FOR 100A AND ABOVE.

5. ALL CONDUCTORS SHALL BE COPPER, THHN/THWN; SOLID FOR #10 AWG AND SMALLER; STRANDED FOR #8 AWG AND LARGER.

6. CONDUCTORS USED IN WET LOCATIONS, INCLUDING BUT NOT LIMITED TO UNDERGROUND CONDUITS/ DUCTBANKS AND EXTERIOR CONDUITS SHALL COMPLY WITH NEC 310.10 AND BE LISTED FOR USE IN WET LOCATIONS.

7. ALL POWER CIRCUITS HAVE BEEN DESIGNED TO MEET 2% OR LESS VOLTAGE DROP FOR FEEDERS, AND 3% OR LESS VOLTAGE DROP FOR BRANCH CIRCUITS.

GROUNDING1. FIRE PROTECTION PIPING SHALL NOT BE USED FOR GROUNDING.2. ALL FEEDERS AND BRANCH CIRCUITS SHALL INCLUDE AN EQUIPMENT GROUND CONDUCTOR. METAL RACEWAYS SHALL NOT BE

USED AS THE SOLE EQUIPMENT GROUND.3. WHERE A PHASE CONDUCTOR IS INCREASED IN SIZE DUE TO VOLTAGE DROP, THE EQUIPMENT GROUND CONDUCTOR SHALL BE

INCREASED IN SIZE PROPORTIONATELY. 4. PROVIDE A GROUND BUS BAR IN EACH ELECTRICAL ROOM FOR ALL NEW CONSTRUCTION AND NEW ROOMS IN EXISTING

CONSTRUCTION, AND IN EXISTING CONSTRUCTION WHERE THERE IS NONE INSTALLED WITHIN AN EXISTING ROOM.

IDENTIFICATION1. PROVIDE TYPED PANEL DIRECTORIES FOR ALL NEW PANELBOARDS, AND EXISTING PANELBOARDS AFFECTED BY THIS

PROJECT. DIRECTORIES SHALL REFLECT PROJECT AS- BUILT CONDITIONS FOR ALL BRANCH CIRCUITS. DIRECTORIES SHALL INCLUDE WHERE EACH PANEL IS FED FROM. ADDITIONALLY, EACH BRANCH CIRCUIT LOAD DESCRIPTION SHALL INCLUDE THE ROOM NUMBER(S) FOR EACH LOAD (I.E., RECEPTACLES-RMS 501,503). ROOM NUMBERS SHALL BE BASED ON ACTUAL ROOM SIGNAGE INSTALLED IN FIELD. COORDINATE EXACT ROOM NUMBERS WITH ARCHITECT/ENGINEER AND OWNER PRIOR TO

COMPLETION OF PANEL DIRECTORIES.2. PROVIDE ENGRAVED PLASTIC LAMINATE NAME TAGS ON EACH SWITCHBOARD, SWITCHGEAR, DISTRIBUTION PANEL,

PANELBOARD, MOTOR CONTROL CENTER, SAFETY SWITCH, ENCLOSED CIRCUIT BREAKER, CABINET, STEP-DOWN TRANSFORMER, TRANSFER SWITCH, ETC., AND ANY OTHER MAJOR COMPONENT OF THE ELECTRICAL SYSTEM.

3. PROVIDE ENGRAVED PLASTIC LAMINATE NAME TAGS FOR EACH DISTRIBUTION BREAKER OR BRANCH CIRCUIT BREAKER IN SWITCHGEAR, SWITCHBOARDS, MOTOR CONTROL CENTERS AND OTHER DISTRIBUTION EQUIPMENT. NAME TAG SHALL INCLUDE LOAD DESCRIPTION AND ROOM NUMBER FOR EACH LOAD.

4. ARC FLASH DANGER/WARNING LABELS SHALL BE APPLIED TO SWITCHBOARD, PANELBOARDS, AND EQUIPMENT CONTROLLERS PER NEC.

5. PROVIDE LABELS ON THE INSIDE OF EACH DEVICE COVERPLATE, IDENTIFYING THE PANEL(S)/ CIRCUIT NUMBER(S) DEVICE IS CONNECTED TO.

6. PROVIDE NEATLY, HANDWRITTEN IDENTIFICATION ON THE EXTERIOR COVER OF ALL JUNCTION BOXES, PULLBOXES AND WIREWAYS, IDENTIFYING THE PANEL(S)/ CIRCUIT NUMBER(S) CONTAINED WITHIN.

7. PROVIDE A PERMANENT SIGN ON THE MAIN ELECTRICAL ROOM DOOR TO THE BUILDING STATING THAT THE MAIN SERVICE DISCONNECTING MEANS IS LOCATED INSIDE.

8. PROVIDE A PERMANENT LABEL ON ALL PANELBOARDS, SWITCHBOARDS, SWITCHGEAR, MOTOR CONTROL CENTERS AND DISTRIBUTION PANELS STATING "DO NOT WORK ON EQUIPMENT WHILE ENERGIZED. LOCK- OUT TAG-OUT REQUIRED".

9. PROVIDE REQUIRED IDENTIFICATION PER ANSI STANDARDS, NEC REQUIREMENTS, AND OWNER'S PUBLISHED DESIGN STANDARDS WHERE APPLICABLE.

10. PROVIDE ENGRAVED PHENOLIC LABEL ON ALL NEW SERVICE EQUIPMENT TO INDICATE THE MAXIMUM AVAILABLE FAULT CURRENT AND THE DATE THE FAULT CURRENT CALCULATION WAS PERFORMED. PROVIDE LABEL ON ALL EXISTING SERVICE EQUIPMENT WHEN MODIFICATIONS OCCUR THAT AFFECT THE MAXIMUM AVAILABLE FAULT CURRENT AT THE SERVICE.

11. PROVIDE ARC FLASH HAZARD ANALYSIS PER NFPA 70E FOR ANY EQUIPMENT INCLUDED WITHIN THE SCOPE OF WORK. INCIDENT ENERGY VALUES SHALL BE INCLUDED ON THE ARC FLASH WARNING

LABELS FOR EACH EQUIPMENT .

1. DEVICES, LIGHT FIXTURES AND EQUIPMENT SHOWN IN DASHED LINE TYPE ARE EXISTING TO BE DEMOLISHED; DEVICES, LIGHT FIXTURES AND EQUIPMENT SHOWN IN LIGHT (SCREENED) SOLID LINE TYPE ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE.

2. EXISTING EQUIPMENT, LIGHT FIXTURES AND DEVICES SHOWN ARE BASED ON FIELD SURVEYS AND RECORD DRAWINGS PROVIDED BY THE OWNER, AND ARE NOT NECESSARILY INCLUSIVE OF ALL EXISTING ELECTRICAL EQUIPMENT, LIGHT FIXTURES AND DEVICES WITHIN PROJECT AREAS. IT IS THE INTENT THAT THE DEMOLITION PLANS PROVIDE A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THE PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED ELECTRICAL DEMOLITION WHETHER INDICATED ON THE PLANS OR NOT

3. EXISTING CIRCUITING SHOWN IS BASED ON RECORD DRAWINGS AND THE SURVEYED PANEL DIRECTORIES, WHERE THEY WERE AVAILABLE. THE ACTUAL CONDITIONS MAY VARY. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE CONDITIONS SHOWN ARE INTENDED TO SHOW THE LOCATIONS OF EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT, WHERE SHOWN ON THE PLAN DRAWINGS, AND IN NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL

COORDINATION NECESSARY TO COMPLETE THE NEW WORK. FIELD CONDITIONS SHALL GOVERN.4. WHERE EXISTING DEVICES ARE INDICATED TO REMAIN OR BE RELOCATED, ARE WITHIN THE SCOPE OF THIS PROJECT AND

EXISTING CIRCUITING INFORMATION IS UNAVAILABLE, CONTRACTOR IS TO PROVIDE CIRCUIT TRACING TO IDENTIFY PANEL AND CIRCUIT SERVING THE DEVICE TO AND PROVIDE THAT INFORMATION TO THE ARCHITECT/ENGINEER PRIOR TO ROUTING CONDUITS AND WIRING FOR NEW DEVICES AND EQUIPMENT WITHIN THE SCOPE OF THIS PROJECT.

5. WHERE EXISTING DEVICES ARE TO REMAIN, CONTRACTOR MUST EXTEND EXISTING CIRCUITING WHERE NECESSARY TO MAINTAIN CONTINUITY OF CIRCUIT.

6. COORDINATE WITH THE OWNER FOR DISPOSITION OF ELECTRICAL ITEMS TO BE DEMOLISHED. OWNER SHALL HAVE THE OPTION TO RETAIN REUSABLE ITEMS SUCH AS COVERPLATES, RECEPTACLES, LIGHT FIXTURES, PANELBOARDS, TRANSFORMERS, ETC. NOT BEING USED IN THE FINISHED WORK. COORDINATE WITH THE OWNER PRIOR TO START OF DEMOLITION. PROPERLY AND LEGALLY DISPOSE OF ALL EQUIPMENT AND MATERIALS BEING REMOVED.

7. COORDINATE EXACT AREAS, WALLS, CEILINGS, ETC. TO BE DEMOLISHED WITH CIVIL AND STRUCTURAL DEMOLITION PLANS.8. WHERE EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT ARE INDICATED TO BE DEMOLISHED, REMOVE ASSOCIATED

CONDUIT AND WIRING BACK TO SOURCE PANEL OR TO NEAREST JUNCTION BOX TO MAINTAIN CIRCUIT CONTINUITY OF DEVICES AND EQUIPMENT TO REMAIN. WHERE PANELS ARE TO REMAIN, TURN BREAKER TO "OFF" POSITION AND LABEL THE CIRCUIT AS "SPARE" ON THE PANEL DIRECTORY.

9. ALL AREAS OUTSIDE THE SCOPE OF CONSTRUCTION ARE TO REMAIN ENERGIZED. COORDINATE PHASING WITH CONSTRUCTION MANAGER AND OWNER PRIOR TO DEMOLITION OF ANY ITEM WHICH MAY RESULT IN INTERRUPTION OF POWER.

10. DISCONNECT ELECTRICAL SERVICE TO ALL EQUIPMENT BEING REMOVED. DEMOLITION SHALL BE PHASED AS REQUIRED BY DIVISION 1, OR DIRECTED BY THE OWNER.

11. REMOVE ALL CONDUIT LEFT EXPOSED BY REMOVAL OF WALLS AND CEILINGS IN REMODELED OR RENOVATED AREA. CAP BOTH ENDS OF REMAINING CONDUIT IN WALL OR FLOOR WHERE CUT.

12. ELECTRICAL DEVICES CONCEALED BY STORAGE SHELVING, CASEWORK, FURNITURE, ETC., AND NOT NOTED ON THE DEMOLITION DRAWINGS ARE TO BE REMOVED AS REQUIRED, UNLESS SHOWN AS EXISTING TO REMAIN.

13. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL OPENINGS IN EXISTING CONSTRUCTION AFTER REMOVAL OF EQUIPMENT AND ELECTRICAL DEVICES, UNLESS OTHERWISE NOTED ON ARCHITECTURAL PLANS. REPAIRS ARE TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED AND SHALL MATCH IMMEDIATELY ADJACENT AREAS IN CONSTRUCTION, MATERIAL, FIRE RATING, FINISH AND COLOR.

14. PROVIDE BLANK COVERPLATES WHERE DEVICES ARE BEING REMOVED FROM EXISTING WALLS TO REMAIN. MATCH COLOR OF NEW ADJACENT DEVICE COVERPLATES.

15. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK AND OBTAIN CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.

16. COORDINATE ALL POWER INTERRUPTION WITH CONSTRUCTION MANAGER, OWNER, AND UTILITY COMPANY (WHERE APPLICABLE) AND DO NOT INTERRUPT POWER WITHOUT WRITTEN PERMISSION. PROVIDE A MINIMUM OF ONE WEEK'S WRITTEN NOTIFICATION PRIOR TO WHEN POWER IS DESIRED TO BE INTERRUPTED. CONTRACTOR SHALL INVESTIGATE AND IDENTIFY ALL LOADS TO BE AFFECTED BY THE REQUESTED INTERRUPTION. CONTRACTOR SHALL SUBMIT WRITTEN SEQUENCE OF STEPS FOR EACH SHUTDOWN ALONG WITH THE ESTIMATED INTERRUPTION DURATIONS. MAKE ARRANGEMENTS TO MAINTAIN POWER TO ALL EXISTING NECESSARY LIGHTING, DEVICES AND EQUIPMENT AS NEEDED AND REQUESTED BY THE OWNER PRIOR TO COMMENCEMENT OF WORK.

17. EXERCISE EXTREME CAUTION WHEN REMOVING/ RELOCATING WIRING AND EQUIPMENT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OTHER WIRING DEVICES, EQUIPMENT AND LIGHT FIXTURES THAT MAY BE CONNECTED TO THE SAME CIRCUIT REMAIN OPERATIONAL AND ACTIVE.

18. INFORMATION INDICATED IN THE DEMOLITION PORTION OF THE CONTRACT DRAWINGS IS DIAGRAMMATIC IN NATURE. FIELD VERIFY ELECTRICAL CIRCUIT HOMERUNS TO ALL ELECTRICAL ITEMS SCHEDULED TO BE DEMOLISHED AND PERFORM THE WORK AS INTENDED AND DEPICTED ON THE DRAWINGS.

19. UPDATE ALL EXISTING ELECTRICAL EQUIPMENT NAMEPLATES AND DIRECTORIES AS NECESSARY TO REFLECT FINAL AS-BUILT CONDITIONS AT THE END OF CONSTRUCTION.

20. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN AND PROTECTED AREA. NOTIFY OWNER WHEN ITEMS ARE READY TO BE REMOVED.

21. COORDINATE ANY ALTERATION AND CHANGES TO THE ELECTRICAL SERVICE WITH THE LOCAL UTILITY COMPANY AND THE OWNER PRIOR TO COMMENCEMENT OF WORK.

22. PROVIDE ANY NECESSARY REPROGRAMMING OF EXISTING BUILDING FIRE ALARM SYSTEMS TO DISABLE FIRE ALARM DEVICES THAT ARE BEING DISCONNECTED AND REMOVED, AND FOR ANY NEW DEVICES THAT ARE ADDED, AS PART OF BID PRICE.

23. ALL CONDUITS SERVING OTHER SPACES THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE DISRUPTION TO THESE OTHER SPACES. ENSURE THAT ALL CONDUITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE PROPERLY SUPPORTED IN ACCORDANCE WITH THE NEC.

24. REMOVE ALL ABANDONED WIRING AND CONDUIT THAT IS WITHIN THE PROJECT AREA PRIOR TO THE END OF CONSTRUCTION.

COORDINATION:1. VERIFY AND COORDINATE LOCATIONS OF ANY MISCELLANEOUS EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS WITH

APPROVED SHOP DRAWINGS, OWNER-PROVIDED CUT SHEETS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL N ECESSARY ELECTRICAL REQUIRED.

2. VERIFY AND COORDINATE LOCATIONS AND EXACT ELECTRICAL REQUIREMENTS FOR ALL EQUIPMENT PRIOR TO SUBMITTAL OF SHOP DRAWINGS OF ELECTRICAL EQUIPMENT. PROVIDE ALL NECESSARY RACEWAYS, CONDUCTORS, BOXES, EQUIPMENT, ACCESSORIES, ASSOCIATED DISCONNECT SWITCHES, CIRCUIT BREAKERS, CONTROL TRANSFORMERS, FIRE ALARM SHUTDOWN, ETC. REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. COORDINATE WITH APPROPRIATE TRADE'S APPROVED SHOP DRAWINGS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL REQUIRED, UNLESS NOTED OTHERWISE.

3. THIS PROJECT REQUIRES COORDINATION DRAWINGS BY THE CONTRACTOR. PARTICIPATE IN THE COORDINATION DRAWING PREPARATION PROCESS AND PROVIDE ALL NECESSARY INFORMATION REQUIRED TO COORDINATE ALL TRADE INFORMATION.

4. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT OF WORK. AVOID INTERFERENCES WITH THE PROGRESS OF OTHER DIVISIONS/TRADES.

5. WHERE WALLS ARE OF TILT-UP OR PRE-CAST CONSTRUCTION, PROVIDE COORDINATION FOR EXACT DIMENSIONS AND OPENINGS REQUIRED FOR ALL ELECTRICAL COMPONENTS INSTALLED WITHIN SUCH WALLSDURING THE SHOP DRAWING REVIEW PROCESS OF THE WALLS, PRIOR TO CONSTRUCTION OF THE WALLS.

6. REFER TO CIVIL, STRUCTURAL, AND VENDOR EQUIPMENT DRAWINGS FOR RELATED INFORMATION AND ADDITIONAL INSTALLATION REQUIREMENTS TO BE PERFORMED AS PART OF THE WORK.

7. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.

8. CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AND/OR SITE AFFECTED BY THIS WORK PRIOR TO SUBMITTING BID PRICE, SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT MAY AFFECT EXECUTION OF THE WORK. SUBMISSION OF A BID PRICE SHALL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE. LATER CLAIMS FOR LABOR, EQUIPMENT AND/OR MATERIALS REQUIRED DUE TO DIFFICULTIES ENCOUNTERED THAT COULD HAVE BEEN REASONABLY OBSERVED WILL NOT BE RECOGNIZED.

9. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE PROJECT'S SCHEDULE OR PHASING.

10. ANY TEMPORARY INTERRUPTION OF POWER REQUIRED FOR THE SYSTEM TIE-IN OR SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN WRITING BY THE OWNER AND SCHEDULED IN ADVANCE.

11. COORDINATE EXACT REQUIREMENTS WITH THE LOCAL UTILITY COMPANIES AND PROVIDERS AND INCLUDE ALL COSTS FOR PROVIDING TEMPORARY AND PERMANENT SERVICES REQUIRED FOR THIS PROJECT IN THE BID PRICE. BID PRICE SHALL INCLUDE, BUT NOT BE LIMITED TO, EXCAVATION, RACEWAYS, BACKFILL, EQUIPMENT, EQUIPMENT PADS, BACKBOARDS, METERS, GROUNDING, UTILITY ENGINEERING AND IMPACT FEES.

GENERAL REQUIREMENTS1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY, ONE TO THE OTHER AND ARE

CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP, METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS, BUT ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.

2. THE DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW EVERY DETAIL OF CONSTRUCTION, METHODS, MATERIALS AND EQUIPMENT, OR EXACT LOCATIONS, ROUTING, ETC. THEY INDICATE THE RESULT TO BE ACHIEVED BY THE ASSEMBLAGE OF SEVERAL SYSTEMS FOR A COMPLETE AND OPERATIONAL ELECTRICAL SYSTEM. DO NOT SCALE THE CONTRACT DOCUMENTS. COORDINATE EXACT EQUIPMENT LOCATIONS WITH THE CIVIL AND STRUCTURAL CONTRACT

DOCUMENTS, AS WELL AS FIELD CONDITIONS, APPROVED SHOP DRAWINGS AND WORK OF ALL OTHER DIVISIONS/TRADES.3. THE TERM "PROVIDE" USED IN THE CONTRACT DOCUMENTS INDICATES TO FURNISH AND INSTALL MATERIALS REQUIRED FOR

CORRECT INSTALLATION OF A COMPLETE SYSTEM, UNLESS SPECIFICALLY NOTED OTHERWISE4. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS SHALL BE NEW, SHALL BE U.L.

LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY

5. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER.

6. CARRY ALL INSURANCE REQUIRED TO PROTECT AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THIS PROJECT

7. GUARANTEE ALL MATERIALS AND WORKMANSHIP ARE FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE ARCHITECT/ENGINEER AND OWNER, UNLESS NOTED OTHERWISE IN DIVISION 1. AT NO ADDITIONAL COSTS, PROVIDE THE CORRECTION OF ANY DEFECTS INCLUDING REPAIR OR REPLACEMENT.

8. INCLUDE ALL COSTS ASSOCIATED WITH PERMITS, LICENSES, FEES, INSPECTIONS, TESTING AND TEMPORARY POWER IN THE BID PRICE, UNLESS NOTED OTHERWISE.

9. IF HAZARDOUS MATERIALS ARE ENCOUNTERED, COMPLY WITH ALL APPLICABLE RULES, REGULATIONS AND GUIDELINES CONCERNING REMOVAL, HANDLING, DISPOSAL AND PROTECTION AGAINST ENVIRONMENTAL EXPOSURE OR POLLUTION. PROVIDE DOCUMENTATION OF SAID COMPLIANCE.

10. PROVIDE ELECTRONIC SUBMITTALS (PRODUCT DATA & SHOP DRAWINGS) FOR EACH MAJOR COMPONENT OF THE ELECTRICAL SYSTEM FOR REVIEW BY THE ENGINEER AND OWNER. MAJOR COMPONENTS INCLUDE, BUT ARE NOT LIMITED TO, RACEWAYS, BOXES, WIRE AND CABLE, EQUIPMENT, DEVICES, LIGHT FIXTURES, SWITCHGEAR, PANELBOARDS, CIRCUIT BREAKERS, SAFETY SWITCHES, ETC. ALL SUBMITTALLS ARE TO BE REVIEWED AND APPROVED BY THE CONTRACTOR FOR CONFORMANCE WITH THE

PROJECT REQUIREMENTS PRIOR TO SUBMITTING TO THE ENGINEER. ALLOW A MINIMUM OF TEN (10) BUSINESS DAYS FOR REVIEW BY ENGINEER, UNLESS NOTED OTHERWISE IN DIVISION 1.

11. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE ENGINEER AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS. WHERE THE CONTRACTOR'S DESIGN SUBSTITUTION RESULTS IN THE NEED FOR THE ENGINEER TO REVISE THE CONTRACT DOCUMENTS, THE ENGINEER RESERVES THE RIGHT TO REQUEST COMPENSATION FROM THE CONTRACTOR FOR SAID SERVICES.

12. MAINTAIN A CURRENT AND ACCURATE SET OF PROJECT RECORD DOCUMENTS (AS-BUILTS) AT THE SITE THROUGHOUT THE DURATION OF THE PROJECT. RECORD DRAWINGS SHALL BE UPDATED EACH DAY TO REFLECT THE ACTUAL LOCATIONS, SIZES, ROUTING, ETC. OF EACH PORTION OF THE ELECTRICAL SYSTEM AFFECTED BY THIS WORK. A FINAL SET OF RECORD DOCUMENTS SHALL BE ISSUED TO THE ENGINEER FOR REVIEW AND THEN SUBMITTED TO THE OWNER WITHIN 30 DAYS AFTER THE DATE OF FINAL ACCEPTANCE. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION INCLUDING SINGLE LINE DIAGRAM, POWER RISER DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM, SITE PLANS AND ALL ELECTRICAL FLOOR PLANS, DETAILS, PANEL SCHEDULES, ETC.

13. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINEMAINTENANCE ACTIONS AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME, PHONE NUMBER AND ADDRESS OF AT LEAST ONE QUALIFIED

SERVICE AGENCY.14. INCLUDE ALL COSTS FOR EXCAVATION, SAW CUTTING, DIRECTIONAL BORING, CORE DRILLING, BACKFILLING, SURFACE

RESTORATION, REPAIR OF FINISHES, ETC. THAT IS REQUIRED IN ORDER TO MEET THE PROJECT REQUIREMENTS.15. INCLUDE IN BID ALL COSTS ASSOCIATED WITH TEMPORARY ELECTRICAL SERVICE AS REQUIRED FOR USE BY ALL TRADES

DURING CONSTRUCTION. REMOVE TEMPORARY POWER AT THE COMPLETION OF THE PROJECT. OBTAIN AND PAY FOR ALL REQUIRED PERMITS FOR TEMPORARY POWER. ENGINEER OF RECORD SHALL BE PROVIDED WITH ADDITIONAL COMPENSATION FROM THE CONTRACTOR WHERE SIGNED & SEALED DRAWINGS ARE REQUESTED BY THE CONTRACTOR TO THE ENGINEER OF RECORD IF REQUIRED BY THE AHJ FOR THE TEMPORARY POWER.

16. LOCATE, IDENTIFY, PROTECT AND DOCUMENT ALL UTILITY LINES LOCATED WITHIN THE PROJECT BOUNDARY. FOR LOCATING SITE UTILITIES, CONTACT ALL LOCAL MUNICIPALITIES AND UTILITIES AT LEAST 48 HOURS PRIOR TO DIGGING.

17. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES, REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH ALL APPLICABLE STATUTES REGARDING MERCURY- CONTAINING DEVICES, AND WITH ALL LOCAL, STATE AND FEDERAL APPLICABLE GUIDELINES AT THE TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN CERTIFICATION OF ACCEPTED DISPOSAL.

18. PROVIDE A COMPLETE UL LISTED LIGHTNING PROTECTION SYSTEM WITH A MASTER LABEL FOR THE GENERATOR YARD PER THE REQUIREMENTS OF NFPA 780, AND THE DIVISION 26 SPECIFICATIONS,

UNLESS NOTED OTHERWISE. LIGHTNING PROTECTION SYSTEM SHALL INCLUDE BURIEDCOUNTERPOISE, UNLESS NOTED OTHERWISE.

11. PANEL SCHEDULES AND FLOOR PLANS MAY INDICATE DEDICATED HOMERUNS FOR EACH BRANCH CIRCUIT. BRANCH CIRCUITS MAY BE GROUPED IN A COMMON HOMERUN WHERE THE HOMERUN DOES NOT EXCEED 3 PHASE CONDUCTORS, 3 NEUTRAL CONDUCTORS, AND 1 EQUIPMENT GROUND. THE HOMERUN RACEWAY SIZE AND CONDUCTOR SIZE SHALL BE INCREASED AS NECESSARY TO COMPLY WITH THE NEC FOR 40% MAXIMUM FILL AND DERATING REQUIREMENTS.

12. PROVIDE SEAL OFF FITTINGS, APPROVED FOR SUCH USE, WHERE RACEWAYS PENETRATE BETWEEN A DRY, CONDITIONED ENVIRONMENT AND THE EXTERIOR OR OTHER WET ENVIRONMENTS AND ADDITIONAL AREAS WHERE

CONDUITS PASS FROM WARM TO COLD LOCATIONS SUCH AS WALK-IN COOLERS OR FREEZERS, BOILER ROOMS, ETC.13. PROVIDE POLYOLEFIN JET-LINE #232 (NYLON PULL STRING) IN EACH EMPTY CONDUIT WITH ENGRAVED METAL TAG

INDICATING CONDUIT DESIGNATION.14. ALL HOMERUNS SHALL BE IN 3/4" RACEWAY MINIMUM.15. CONDUIT SHALL USE SET SCREW TYPE FITTINGS.16. WHERE RACEWAYS ARE INSTALLED IN SLABS, THE MINIMUM SPACING, MAXIMUM RACEWAY

SIZE, AND ANY OTHER STRUCTURAL LIMITATIONS SHALL BE COORDINATED WITH THE STRUCTURAL DRAWINGS AND THE STRUCTURAL ENGINEER PRIOR TO INSTALLATION.

APPLICABLE CODES:ALL WORK UNDER THIS DIVISION SHALL BE IN STRICT COMPLIANCE AND IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF THE FOLLOWING CODES AND STANDARDS INCLUDING THE REGULATIONS OF GOVERNING LOCAL, STATE, COUNTY AND OTHER APPLICABLE CODES. REFER TO SPECIFICATIONS FOR ADDITIONAL CODE REQUIREMENTS:

BUILDING CODES: • FLORIDA BUILDING CODE, 7TH EDITION (2020)• FLORIDA ENERGY CONSERVATION CODE, 7TH EDITION (2020)• FLORIDA FIRE PREVENTION CODE, 7TH EDITION (2020)

ADDITIONAL CODES, STANDARDS, AND REQUIREMENTS1. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).2. INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).3. NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA).4. REQUIREMENTS OF LOCAL POWER COMPANY.5. OWNER'S PUBLISHED DESIGN STANDARDS.

ALL MATERIALS SHALL BE NEW AND FREE OF DEFECTS, AND SHALL BE LISTED BY A NATIONALLY RECOGNIZED TESTING LAB, AS DEFINED BY OSHA. WHERE NO LABELING OR LISTING SERVICE IS AVAILABLE FOR CERTAIN TYPES OF EQUIPMENT, TEST DATA SHALL BE SUBMITTED TO VALIDATE THAT EQUIPMENT MEETS OF EXCEEDS AVAILABLE STANDARDS.

NATIONAL FIRE PROTECTION (NFPA) STANDARDS (CURRENT EDITIONS ADOPTED BY STATE OF FLORIDA):• NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE.• NFPA 37, STANDARD FOR THE INSTALLATION AND USE OF STATIONARY COMBUSTION ENGINES AND GAS TURBINES.• NFPA 54, NATIONAL FUEL GAS CODE.• NFPA 70, NATIONAL ELECTRICAL CODE®.• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE.• NFPA 101, LIFE SAFETY CODE®.• NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS.• NPFA 780, INSTALLATION OF LIGHTNING PROTECTION SYSTEMS

WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS, WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED

APPLICABLE CODES

ELECTRICAL DEMOLITION NOTES13. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM INTERFERENCE WITH NORMAL

BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC. FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR ANY

LOSSES OR ANY DAMAGE RESULTING FROM THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL CONDITION TO THE SATISFACTION OF THE ENGINEER AND OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO PROCEEDING WITH REPAIRS.

RACEWAYS1. FLEXIBLE METAL CONDUIT AND LIQUIDTIGHT FLEXIBLE METAL CONDUIT (FMC & LFMC) SHALL NOT BE USED IN LENGTHS

THAT EXCEED 6'-0" UNLESS SPECIFICALLY NOTED OTHERWISE, OR UNLESS THE ENGINEER GRANTS WRITTEN PERMISSION.2. ALL FEEDER AND BRANCH CIRCUIT CONDUCTORS, INCLUDING LOW VOLTAGE SYSTEMS, SHALL BE INSTALLED IN A COMPLETE

RACEWAY SYSTEM (CONDUIT) UNLESS SPECIFICALLY NOTED OTHERWISE.3. THE USE OF ELECTRICAL NON-METALLIC TUBING (ENT) AND LIQUIDTIGHT FLEXIBLE NON-METALLIC CONDUIT (LFNC) ARE

PROHIBITED UNLESS SPECIFICALLY NOTED OTHERWISE, OR UNLESS THE ENGINEER OR OWNER GRANTS WRITTEN PERMISSION.

4. CONNECTIONS TO TRANSFORMERS, AHU'S, AND PUMPS SHALL BE WITH LIGUIDTIGHT, FLEXIBLE METAL CONDUIT.5. NO PVC CONDUIT MAY BE USED INSIDE OF BUILDING UNLESS ROUTED UNDERGROUND, AND UNLESS NOTED OTHERWISE.6. ALL CONDUIT TERMINATIONS AT TERMINAL BOARDS ARE TO HAVE GROUNDING BUSHINGS AT CONDUIT ENDS.7. ALL CONDUITS ARE TO BE CONCEALED UNLESS IMPOSSIBLE DUE TO EXISTING CONDITIONS (I.E., EXPOSED CEILINGS,

BUILDING EXTERIOR WALL RUNS). CONCEAL ALL CONDUITS ABOVE CEILINGS OR IN WALLS AND MILLWORK. WHERE EXISTING CONDITIONS DICTATE THAT CONDUITS CANNOT BE CONCEALED, NOTIFY ARCHITECT/ENGINEER PRIOR TO INSTALLING CONDUIT FOR RESOLUTION TO ROUTING.

8. SEAL ALL PENETRATIONS AND OPENINGS MADE DURING EXECUTION OF WORK IN FIRE-RATED AND SMOKE-RATED WALLS. WALLS SHALL BE SEALED WITH UL-APPROVED PRODUCT WITH THE SAME OR GREATER RATING OF WALL PENETRATED.

9. PROVIDE ALL PENETRATIONS THROUGH FLOORS, WALLS, CEILINGS AND ROOFS WHERE REQUIRED. COORDINATE LOCATIONS AND SIZES WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS, FIELD CONDITIONS AND WORK OF ALL OTHER DIVISIONS/TRADES. ALL OPENINGS ARE TO BE SEALED WATERTIGHT.

10. ALL RACEWAYS THAT TURN UP THROUGH THE SLAB OR INTO ELECTRICAL EQUIPMENT FROM UNDERGROUND SHALL BE RIGID GALVANIZED STEEL (RGS) WITH BITUMASTIC COATING FOR AT LEAST THE FINAL 18" LENGTH. THE USE OF NON-METALLIC CONDUIT ABOVE GRADE IS PROHIBITED.

LIGHTING:1. LIGHT FIXTURES SUPPORTED BY CEILING GRID SHALL BE SUPPORTED AS FOLLOWS: LIGHT FIXTURES WEIGHING LESS THAN

10 POUNDS SHALL HAVE 12-GAUGE HANGER WIRE CONNECTED FROM THE LIGHT FIXTURE TO THE STRUCTURE ABOVE. LIGHT FIXTURES WEIGHING 10 POUNDS OR MORE SHALL HAVE (2) 12- GAUGE HANGER WIRES ATTACHED AT OPPOSITE CORNERS OF THE LIGHT FIXTURE TO THE STRUCTURE ABOVE.

2. COORDINATE EXACT LOCATIONS OF LIGHT FIXTURES IN LAY-IN AND GYPBOARD CEILINGS WITH ARCHITECTURAL REFLECTED CEILING PLANS, AND WALL MOUNTED EXTERIOR AND INTERIOR LIGHT FIXTURES WITH ARCHITECTURAL ELEVATIONS PRIOR TO INSTALLATION. WHERE THE QUANTITY OF LIGHTS DIFFERS BETWEEN THE ARCHITECTURAL RCP AND THE ELECTRICAL LIGHTING PLANS, PROVIDE THE HIGHEST QUANTITY OF FIXTURES IN THE BID PRICE. THE DISCREPANCY IN QUANTITY SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER. THE HIGHEST QUANTITY SHALL BE CIRCUITED TO THE LOCAL ROOM OR AREA LIGHTING CIRCUITS AND LIGHTING CONTROL DEVICES, UNLESS OTHERWISE DIRECTED IN WRITING BY THE ENGINEER.

3. MODIFY ALL LIGHT FIXTURE CATALOG NUMBERS AS REQUIRED TO COORDINATE WITH THE LIGHTING BRANCH CIRCUIT VOLTAGES INDICATED. COORDINATE THE CATALOG NUMBERS WITH THE EXACT FIXTURE MOUNTING AND TRIM REQUIRED BY THE CEILING IN WHICH EACH FIXTURE IS BEING INSTALLED.

4. ALL LIGHT FIXTURES SHALL BE PROVIDED COMPLETE WITH LAMPS, UNLESS OTHERWISE NOTED.5. ALL EXIT LIGHTS, LIGHT FIXTURES INDICATED WITH UNSWITCHED CIRCUIT (NIGHTLIGHT N/L), EMERGENCY TWIN-HEAD

FIXTURES WITH INTEGRAL BATTERY PACKS, AND BATTERY PACKS INTEGRAL TO LIGHT FIXTURES, SHALL BE WIRED AHEAD OF ANY LOCAL SWITCHING OR LIGHTING CONTROLS.

6. PROVIDE UL WET LABEL OR IP67 RATED LIGHT FIXTURES FOR ALL FIXTURES LOCATED OUTSIDE OR IN PARKING GARAGES, IN SHOWERS, OR OPEN STRUCTURES.

7. EXTERIOR LIGHTING BALLASTS/DRIVERS SHALL HAVE A MINMUM STARTING TEMPERATURE OF -40 DEGREE C, AND A NORMAL AMBIENT OPERATING TEMPERATURE OF 40 DEGREE C.

8. PROVIDE FUSING FOR ALL EXTERIOR LIGHT FIXTURES, OR FIXTURES IN PARKING GARAGES OR OPEN STRUCTURES.9. PROVIDE ALL TEMPORARY NORMAL LIGHTING, EMERGENCY LIGHTING AND EXIT SIGNS REQUIRED DURING THE PROJECT

CONSTRUCTION PHASE.10. REFER TO LIGHT FIXTURE SCHEDULE FOR LIGHT FIXTURE TYPES, DESCRIPTIONS, CATALOG NUMBERS AND ADDITIONAL

INFORMATION PERTINENT TO THE LIGHT FIXTURE OR INSTALLATION THEREOF.11. COORDINATE LIGHT FIXTURE TRIM TYPE AND FINISH COLOR WITH ARCHITECT PRIOR TO ORDERING.12. EACH LIGHTING CIRCUIT SHALL BE PROVIDED WITH A DEDICATED NEUTRAL.GENERATOR YARD

1. PROVIDE A TOOL FINISH ON EXTERIOR WALLS AND BREATHABLE PAINT (COLOR TO MATCH ADJACENT EXISTING BUILDINGS.)2. GENERATOR YARD ACCESS DOORS SHALL BE GALVANIZED, HOLLOW CORE METAL DOORS WITH PANIC HARDWARE.3. DOORS SHALL BE HURRICANE RATED AND IMPACT RATED.4. DOORS TO BE PAINTED TO MATCH ADJACENT EXISTING EXTERIOR DOORS.

13099 S. Cleveland Avenue, Suite 500Fort Myers, FL 33907

P 239.275.4240www.tlc-engineers.com

© Copyright 2020 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

®

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

xxxxxx

12" = 1'-0"

5/3

1/2

02

1 1

:07:3

5 P

MC

:\R

evit L

oca

l\72

009

6_

MA

NA

TE

E_R

20

_a

ldin

.grb

ic@

tlc-e

ng

.co

m.r

vt

DE

SIG

N S

ER

VIC

ES

FO

RE

ME

RG

EN

CY

GE

NE

RA

TO

RS

(FE

MA

) -

MA

NA

TE

EE

LE

ME

NT

AR

Y S

CH

OO

L5

30

1 T

ICE

ST

.F

OR

T M

YE

RS

, F

L 3

39

05

720096

5/31/2021

AG

BLS

ELECTRICALGENERAL NOTES

E002

720096

No. Date Description

Page 13: EMERGENCY GENERATOR

M ERGE

APPROXIMATE LOCATION OF REPLACEMENT GENERATOR ANNUNCIATOR PANEL.

COORDINATE EXACT LOCATION WITH BUILDING OWNER AND COUNTY PROJECT MANAGER. CONTRACTOR SHALL PROVIDE

NEW WIRING AND REUSE EXISTING CONDUIT WHERE POSSIBLE.

E101

1

E101D

1

AREA OF WORK

13099 S. Cleveland Avenue, Suite 500Fort Myers, FL 33907

P 239.275.4240www.tlc-engineers.com

© Copyright 2020 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

®

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

xxxxxx

1" = 40'-0"

5/3

1/2

02

1 1

:07:3

7 P

MC

:\R

evit L

oca

l\72

009

6_

MA

NA

TE

E_R

20

_a

ldin

.grb

ic@

tlc-e

ng

.co

m.r

vt

DE

SIG

N S

ER

VIC

ES

FO

RE

ME

RG

EN

CY

GE

NE

RA

TO

RS

(FE

MA

) -

MA

NA

TE

EE

LE

ME

NT

AR

Y S

CH

OO

L5

30

1 T

ICE

ST

.F

OR

T M

YE

RS

, F

L 3

39

05

720096

5/31/2021

AG

BLS

ELECTRICAL SITEPLAN

E100

720096

1" = 40'-0"1

ELECTRICAL SITE PLAN

No. Date Description

Page 14: EMERGENCY GENERATOR

EMERGENCY SHUT-OFF

BREAK GLASS STATION

LOCATION ON POWER PLANCONCRETE GENERATOR PAD

UL LISTED FOR DIRECT BURIAL

GROUND SYSTEM W/ OZ GEDNEY CLAMP

TIED TO EQUIPMENT

PROVIDE (2) 5/8" X 10' CU-CLAD GRD RODS

PAN HEATER

FINISHED GRADE

WATER JACKET HEATER

SKID MTD DOUBLE WALL UL LISTED TANK

SKID FUEL TANK LOCATED INSIDE.

WEATHERPROOF ENCLOSURE, MUFFLER, AND

FUEL ELECTRIC SOLENOID SHUTOFF VALVE VIA EPOPANEL

CONTROL

BATTERY

CHARGER +

NOTE:REFER TO STRUCTURAL PLANSFOR CONCRETE PAD.

14-#14 THWN IN 1"CONDUIT , TO REMOTE MONITOR

TIE INTO EXISTING CHARGER CIRCUIT.

TO ATS-2, REFER TO RISER DIAGRAM

TO ATS-1, REFER TO RISER DIAGRAM

2. GENERATOR DETAIL - N.T.S.

UTILITY TRANSFORMER

ECB ECB

9 1011

ATS-2 ATS-1

MAIN SWITCHBOARD

MAIN ELECTRICAL ROOM 1-194

WP

WP

WP

E

E

W

W

W

WW

4

3

2

5

6 7 8

ALUMINUM PLATFORM & STAIRS

(2)#10, (1)#10EG IN 3/4" CONDUIT TO PANEL H1A IN MAIN

ELECTRICAL ROOM

(2)#10, (1)#10EG IN 3/4" CONDUIT TO PANEL L1A IN MAIN

ELECTRICAL ROOM

1

TYPICAL EQUIPMENT

AHU-X480V, 3∅

FED FROM "NDH1-4"

AHU-X480V, 3∅

FED FROM "NDH1-4"

1/16" THICK WHITE PLASTIC WITHCOLORED FACE PER SPECIFCIATIONS

1\2" HIGH LETTERING FORPANELBOARD NAME

1/4" HIGH LETTERING FOR REMAINING TEXT

ADHESIVE BACKING WHEN INSTALLEDIN CONDITIONED SPACES

EQUIPMENT VOLTAGE

EQUIPMENT NAME

FASTEN WITH BRASS SCREWS WHENLOCATED IN NON-CONDITIONED OREXTERIOR SPACES

EQUIPMENT SOURCE(PANEL & CIRCUIT)

3. EQUIPMENT NAMEPLATE DETAIL - N.T.S.

13099 S. Cleveland Avenue, Suite 500Fort Myers, FL 33907

P 239.275.4240www.tlc-engineers.com

© Copyright 2020 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

®

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

xxxxxx

As indicated

5/3

1/2

02

1 1

:07:3

8 P

MC

:\R

evit L

oca

l\72

009

6_

MA

NA

TE

E_R

20

_a

ldin

.grb

ic@

tlc-e

ng

.co

m.r

vt

DE

SIG

N S

ER

VIC

ES

FO

RE

ME

RG

EN

CY

GE

NE

RA

TO

RS

(FE

MA

) -

MA

NA

TE

EE

LE

ME

NT

AR

Y S

CH

OO

L5

30

1 T

ICE

ST

.F

OR

T M

YE

RS

, F

L 3

39

05

720096

5/31/2021

AG

BLS

ENLARGEDELECTRICAL SITEPLAN

E101

720096

No. Date Description

3/32" = 1'-0"1

ENLARGED ELECTRICAL SITEPLAN

ELECTRICAL NOTES:

1) PROVIDE NEW REPLACEMENT GENERATOR ANNUNCIATION PANEL. REFER TO SHEET E100 FOR ADDITIONAL DETAILS.

2) APPROXIMATE FEEDER PATHWAYS BETWEEN GENERATOR YARD, UTILITY TRANSFORMER AND MAIN ELECTRICAL ROOM. ALL PROPOSED PATHWAYS OF FEEDER ROUTING IS SHOWN DIAGRAMATICALLY ONLY. EXACT ROUTING SHALL BE VERIFIED BY THE ELECTRICAL CONTRACTOR IN THE FIELD. (TYPICAL ALL). REFER TO CIVIL DRAWINGS FOR ADDITIONAL REQUIREMENTS.

3) LOCATE AND INTERCEPT EXISTING ELECTRICAL SERVICE TO MAIN SWITCHBOARD. NEW SWITCHBOARD FEEDERS FROM ATS-3 SHALL BE ROUTED THROUGH EXISTING CONDUIT STUB-UPS AND INTO SWITCHBOARD ENCLOSURE.

4) LOCATE AND INTERCEPT EXISTING EMERGENCY SIDE TERMINAL FEEDER TO ATS-1 FROM THE EXISTING GENERATOR. THE NEW FEEDER FROM THE GENERATOR YARD SHALL BE TIED INTO AND ROUTED THROUGH EXISTING CONDUIT OUTSIDE OF THE MAIN ELECTRICAL ROOM INTO ATS ENCLOSURE. FEEDERS SERVING ATS-1 NORMAL SIDE TERMINAL FROM NEW GENERATOR SHALL PENETRATE EXTERIOR MAIN ELECTRICAL ROOM WALL DIRECTLY ABOVE SLAB HEIGHT AND FOLLOW INSIDE WALL UP TO CEILING BEFORE CROSSING ELECTRICAL ROOM TO ATS. CONTRACTOR SHALL FIELD VERIFY EXACT ROUTING.

5) NEW GENERATOR EMERGENCY SHUT-OFF PUSH BUTTON.

6) PROPOSED LOCATION OF THE NEW STANDBY DIESEL GENERATOR. TIE INTO AND EXTEND EXISTING CHARGING AND HEATER CIRCUITS AS REQUIRED.

7) REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL REQUIREMENTS.

8) REFER TO CIVIL DRAWINGS FOR ADDITIONAL REQUIREMENTS.

9) LOCATION OF 'ATS-3'.

10) LOCATION OF 'ECB-3'

11) LOCATION OF 'ECB-1'

Page 15: EMERGENCY GENERATOR

UTILITY TRANSFORMER

ELECTRICAL NOTES:

1) EXISTING GENERATOR TO BE DEMOLISHED IN ITS ENTIRETY, INCLUDING FUEL TANK. DEMOLISH EQUIPMENT PAD AND YARD FENCE.

2) CONDUCTORS FROM GENERATOR TO 'ATS-1' SHALL BE DEMOLISHED (SEE RISER DWG).

3) ALL ANCILLARY CIRCUITING RELATED TO THE GENERATORS SHALL BE KEPT IN PLACE FOR POTENTIAL REUSE - I.E. BATTERY CHARGING CIRCUIT, BLOCK HEATER CIRCUIT, ETC. ALL DEMOLISHED GENERATOR COMPONENTS AND CONDUCTORS SHALL BE TURNED OVER TO THE OWNER.

4) DEMOLISH EXISTING GENERATOR ANNUNCIATOR PANEL. CONDUIT FROM GENERATOR TO GAP TO REMAIN FOR POTENTIAL REUSE. REFER TO SHEET E100 FOR ADDITIONAL DETAILS.

5) EXISTING SERVICE ENTRANCE FROM UTILITY TRANSFORMER TO MAIN SWBD SHALL BE DEMOLISHED.

6) FEEDER FROM MAIN SWBD TO NORMAL SIDE TERMINAL OF ATS-1 TO BE DEMOLISHED. OCPD ON MAIN SWBD TO BE RELABELED AS 'SPARE'.

1 42

3

5

6

ATS-2 ATS-1ETR

7.

6.

5.

4.

3.

2.

1.

GENERAL DEMOLITION NOTES:

8.

ALL DEVICES SHOWN ON THIS PLAN ARE EXISTING. REFER TO SYMBOL LEGEND FOR DEVICEDESCRIPTION.

EXISTING CONDITIONS SHOWN ON THIS DRAWING ARE TAKEN FROM ORIGINAL DRAWINGS AND FIELDINVESTIGATION. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. FIELD CONDITIONS SHALLGOVERN.

THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT AREA. IT ISINTENDED TO PROVIDE THE CONTRACTOR WITH A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONSWITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THIS PLAN SHALL BEBROUGHT TO THE ATTENTION OF THE ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIREDDEMOLITION WHETHER SHOWN ON THE PLANS OR NOT.

ALL CONDUITS SERVING OTHER SPACES OR FLOORS, THAT RUN THROUGH THE PROJECT AREA SHALL REMAINACTIVE DURING CONSTRUCTION, SO AS NOT TO CAUSE ANY DISRUPTION TO THESE OTHER SPACES. IT IS THECONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL CONDUITS, NEW OR EXISTING, WITHIN THE PROJECTAREA ARE PROPERLY SUPPORTED AND PROVIDED WITH BONDING BUSHINGS IN ACCORDANCE WITH THENATIONAL ELECTRIC CODE.

ALL ITEMS REMOVED UNDER THIS PROJECT SHALL BE DISPOSED OF OR TURNED OVER TO THE OWNERAT THE OWNER'S DISCRETION.

THIS CONTRACTOR SHALL PROVIDE ELECTRICAL FOR PHASING WORK AS REQUIRED OR DIRECTED BY THEOWNER / ENGINEER. TEMPORARY ELECTRICAL SERVICES (POWER,LIGHTING, FIRE ALARM, ETC) SHALL BE PROVIDED WHEN NEW WORK AFFECTS SERVICESNEEDING TO REMAIN ACTIVE. IF FIRE ALARM SYSTEM CANNOT BE MAINTAINED IN THE CONSTRUCTION AREA, AFIRE WATCH SHALL BE PROVIDED.

UNLESS OTHERWISE NOTED, ALL EQUIPMENT, WIRING DEVICES, LIGHT FIXTURES, CONDUIT AND WIREIN THE PROJECT AREA SHALL REMAIN. THE CONTRACTOR SHALL INVESTIGATE THE PROJECTAREA PRIOR TO BID TO DETERMINE ALL REQUIRED DEMOLITION.

"ETR" DENOTES EXISTING ELECTRICAL DEVICE TO REMAIN.

13099 S. Cleveland Avenue, Suite 500Fort Myers, FL 33907

P 239.275.4240www.tlc-engineers.com

© Copyright 2020 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

®

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

xxxxxx

As indicated

5/3

1/2

02

1 1

:07:4

0 P

MC

:\R

evit L

oca

l\72

009

6_

MA

NA

TE

E_R

20

_a

ldin

.grb

ic@

tlc-e

ng

.co

m.r

vt

DE

SIG

N S

ER

VIC

ES

FO

RE

ME

RG

EN

CY

GE

NE

RA

TO

RS

(FE

MA

) -

MA

NA

TE

EE

LE

ME

NT

AR

Y S

CH

OO

L5

30

1 T

ICE

ST

.F

OR

T M

YE

RS

, F

L 3

39

05

720096

5/31/2021

AG

BLS

ENLARGED SITEPLAN - DEMO

E101D

720096

No. Date Description

1" = 10'-0"1

ENLARGED ELECTRICAL SITE -DEMOLITION

Page 16: EMERGENCY GENERATOR

UTILITYTRANSFORMER

MAINSWBD

EXISTING GENERATOR

ATS-1EHDP

UTILITYTRANSFORMER

MAINSWBD

GENERATOR

2500A 125A N E

LATS-1

EHDPECB-1

N E

L

ATS-3

ELECTRICAL NOTES:

1A) EXISTING GROUNDING SYSTEM AT THE SERVICE ENTERANCE TO REMAIN. THIS GROUNDING POINT SHALL BE RESISTANCE-TESTED FOR COMPLIANCE WITH CODE AND THE SPECIFICATIONS.

2A) EXISTING PAD-MOUNTED UTILITY TRANSFORMER TO REMAIN. ELECTRICAL CONTRACTOR TO COORDINATE SHUTDOWN OF SERVICE WITH THE UTILITY PROJECT MANAGER AND OWNER DURING INTERCEPT & RECONNECT OF THE TRANSFORMER SECONDARY SERVICE ENTRANCE CONDUCTORES.

3A) ALL SETS OF EXISTING UNDERGROUND UTILITY TRANSFORMER SECONDARY CONDUCTORS FEEDING MAIN SWITCHBOARD TO BE DEMOLISHED.

4A) EXISTING GENERATOR TO BE DEMOLISHED.

5A) DEMOLISH FEEDERS FROM GENERATOR TO 'ATS-1.'

6A) DEMOLISH FEEDERS FROM MAIN SWITCHBOARD TO 'ATS-1'. TRANSFER SWITCH NORMAL SIDE TERMINALS SHALL BE REFED DIRECTLY FROM UTILITY TRANSFORMER. RE-LABEL OCPD ON MAIN SWITCHBOARD AS "SPARE."

1B) PROVIDE A NEW COMPREHENSIVE GROUNDING SYSTEM PER NEC ARTICLE 250 AND BOND ALL NEW DRIVEN RODS TO EXISTING GROUNDING SYSTEM.

2B) PROVIDE A 4-POLE AUTOMATIC TRANSFER SWITCH ‘ATS-3’: 480/277V, 3-PHASE, 2500A IN NEMA 3R ENCLOSURE.

3B) NEW DIESEL STANDBY GENERATOR: LEVEL 1, CLASS 24, TYPE 101250KWBELLY TANK SIZED FOR 24-HR RUN TIME AT 100% LOAD. PROVIDE 100% RATED BREAKERS. COORDINATE BREAKER LUG CAPACITY WITH CONDUCTOR REQUIREMENTS PRIOR TO ORDERING UNIT. PROVIDE WEATHER PROOF ENCLOSURE.

4B) PROVIDE A NEW 125A ENCLOSED CIRCUIT BREAKER 'ECB-1' IN NEMA-3R ENCLOSURE. BREAKER SHALL BE 100% RATED AND SERVICE RATED.

5B) PROVIDE ALL NECESSARY PROVISIONS REQUIRED FOR A NEW REPLACEMENT GENERATOR ANNUNCIATOR PANEL. REFER TO SHEET E100 FOR ADDITIONAL DETAILS. LOCATION TO MATCH EXISTING.

6B) PROVIDE A NEW EMERGENCY STOP MUSHROOM-TYPE PUSH-BUTTON FOR GENERATOR SHUTDOWN (EPO) IN A WEATHER RESISTANT ENCLOSURE IN THE LOCATION SHOWN ON THE PLANS. COORDINATE WITH OWNER AND FIELD VERIFY EXACT LOCATION.

7B) PROVIDE A NEW 2500A ENCLOSED CIRCUIT BREAKER 'ECB-3' IN NEMA-3R ENCLOSURE. BREAKER SHALL BE 100% RATED AND SERVICE RATED.

8B) PROVIDE NEW PERMANENT SIGNAGE INDICATING # OUT OF 3 SERVICE DISCONNECTS AND LOCATIONS AT GENERATOR YARD AND OUTSIDE OF MAIN ELECTRICAL ROOM.

9B) REFER TO STRUCTURAL DRAWINGS FOR ALL EQUIPMENT PAD DETAILS.

10B) REFER TO CONTROLS SEQUENCE NOTE BELOW.

6B

5B

3A

2A

1B

2B

3B

4A

PARTIAL RISER DIAGRAM: DEMOLITION

PARTIAL RISER DIAGRAM: PROPOSED NEW

150

ETR

ETR

ETR

ETR

ECB-3

7B

5A

6A

4B

SVC2500

2500

2500

150SVC150

2500

1A

SP

D

SP

D

ECB-3

9B

CONTROLS WIRING TO ATS

N E

L

10B

N E

L

EQH1B

ATS-2

ETR

CONTROLS WIRING TO GEN SET

CONTROLS WIRING TO GEN SET

8B

8B 8B

8B

13099 S. Cleveland Avenue, Suite 500Fort Myers, FL 33907

P 239.275.4240www.tlc-engineers.com

© Copyright 2020 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

®

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

xxxxxx

12" = 1'-0"

5/3

1/2

02

1 1

:07:4

1 P

MC

:\R

evit L

oca

l\72

009

6_

MA

NA

TE

E_R

20

_a

ldin

.grb

ic@

tlc-e

ng

.co

m.r

vt

DE

SIG

N S

ER

VIC

ES

FO

RE

ME

RG

EN

CY

GE

NE

RA

TO

RS

(FE

MA

) -

MA

NA

TE

EE

LE

ME

NT

AR

Y S

CH

OO

L5

30

1 T

ICE

ST

.F

OR

T M

YE

RS

, F

L 3

39

05

720096

5/31/2021

AG

BLS

ELECTRICAL RISERDIAGRAMS

E200

720096

No. Date Description

COPPER CONDUCTOR/FEEDER SCHEDULE (90/75 RATED)

SYMBOLNUMBER OF

SETS

PHASECONDUCTORS (QUANTITY)

SIZE - AWG

NEUTRALCONDUCTORS (QUANTITY)

SIZE - AWG

GROUNDINGCONDUCTORS (QUANTITY)

SIZE - AWG

CONDUITSIZE

(QUANTITY)SIZE REMARKS

150 1 (3) #1/0 (1) #1/0 (1) #6 (1) 2"

2500 6 (3) #600 KCMIL (1) #600 KCMIL (1) #350 KCMIL (1) 4" FOR EACH RUN

SVC150 1 (3) #1/0 (1) #1/0 (1) 2"

SVC2500 6 (3) #600 KCMIL (1) #600 KCMIL ---- (1) 4" FOR EACH SET

GENERATOR LOAD CALCULATION:

PEAK LOAD PER UTILITY: 847 KWFACTOR PER NEC: 1.25TOTAL: 1058 KW

NEW GENERATOR: 1250 KW

CONTROLS SEQUENCE NOTE - ELECTRICAL CONTRACTOR TO COORDINATE WITH SCHOOL DISTRICT CONTROLS CONTRACTOR - CONTROLS CONTRACTOR SHALL RECONFIGURE THE BUILDING AUTOMATION SYSTEM TO PROGRAM THE CHILLER & PUMP OPERATION SEQUENCE AS FOLLOWS:

1) AT DETECTION OF LOSS OF UTILITY POWER, THE ATS SHALL SEND A SIGNAL TO THE GENERATOR TO BEGIN STANDARD GENERATOR START UP SEQUENCE.

2) THE BAS SHALL BE CONFIGURED TO NOT ALLOW CHILLER START UP AT PICKUP OF EMERGENCY POWER.

3) THE CHILLER PUMPS WILL CONTINUE TO RUN FOR A PERIOD OF 5 MINUTES AFTER EMERGENCY POWER HAS BEEN ESTABLISHED, AFTER WHICH THE PUMPS WILL ALSO SHUT DOWN.

4) UPON DETECTION AND RE-ESTABLISHMENT OF NORMAL UTILITY POWER, THE BAS SHALL REENGAGE THE NORMAL STARTUP SEQUENCE FOR CHILLERS AND PUMPS.