Emerging Issues for the Columbia River Corridor Closure Project Protecting the Columbia River U.S. Department of Energy Richland Operations Office River Corridor Closure Project River Corridor Closure Project DOE’s Largest Environmental Cleanup Closure Project Ryan Dodd Deputy Project Manager Washington Closure Hanford, LLC March 1, 2011 Panel Discussion 27

Upload: trandien

Post on 06-Sep-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Emerging Issues for the Columbia River Corridor Closure Project

Protecting the Columbia River

U.S. Department of EnergyRichland Operations Office

River Corridor Closure ProjectRiver Corridor Closure Project

DOE’s Largest Environmental Cleanup Closure Project

Ryan DoddDeputy Project ManagerWashington Closure Hanford, LLC

March 1, 2011

Panel Discussion 27

RIVER CORRIDOR CLOSURE PROJECT

Protecting the Columbia RiverEmerging Issues for the Columbia River Corridor Closure Project, 3/2011 E1102042_2 of 9

DOE’s Largest Environmental Cleanup Closure Project

Environmental Restoration Disposal Facility (ERDF)

Former Fuel Production and Laboratories (300 Area)

400 Area

Hanford Site Boundary (586 sq. miles)

B/CKE/KW

N

D/DRH

F

Central Plateau

The RCC scope extends along the Hanford portion of the Columbia River

River Corridor(220 square miles and 46 linear miles of Columbia River shoreline)

River Corridor Contract• 10-year contract ends 2015• Cost-Plus incentive fee

(target cost) contract• Incentivizes

– Safe and regulatory sound cleanup

– Cost and schedule savings• Parent companies:

URS, Bechtel, CH2M Hill

RIVER CORRIDOR CLOSURE PROJECT

Protecting the Columbia RiverEmerging Issues for the Columbia River Corridor Closure Project, 3/2011 E1102042_3 of 9

DOE’s Largest Environmental Cleanup Closure Project

Demolish Facilities

Remediate Waste Sites

Remove Surplus Facilities

Cocoon Reactors

Burial Ground Excavation

Transport contaminated soil and debris to disposal facility

Treat waste if required,

then dispose

Environmental Restoration Disposal Facility

155 of 312 buildings complete

Over 10 million tons of waste transported to ERDF since 1996

177 of 366 waste sites remediated

Cleaning up the River Corridor represents major challenges in scope

TPA Milestones Completed 28 of 28 regulatory milestones on schedule

RIVER CORRIDOR CLOSURE PROJECT

Protecting the Columbia RiverEmerging Issues for the Columbia River Corridor Closure Project, 3/2011 E1102042_4 of 9

DOE’s Largest Environmental Cleanup Closure Project

Performance• 111 FTE• $140.3M spent*• 365,552 safe hours*

American Recovery and Reinvestment Act of 2009 (ARRA) Produces ResultsProjects• Environmental Restoration

Disposal Facility: Enabling increased disposal rates for accelerated Hanford cleanup.

• 618-10 Burial Ground: Completed characterization of 94 highly contaminated vertical pipe units and 12 trenches. Remediation begins in spring.

• 100-F: Remediating 19 waste sites in F Area, one of Hanford’s nine production reactor sites.

618-10 Burial Ground characterization complete

Environmental Restoration Disposal Facility expansion ahead of schedule

*Data through January 23, 20110

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

FY06 FY07 FY08 FY09 FY10

571K421K

615K

866K

Tons to ERDF

FY11

1.58M

1,800,000

2,000,000

2,200,0002.3M

RIVER CORRIDOR CLOSURE PROJECT

Protecting the Columbia RiverEmerging Issues for the Columbia River Corridor Closure Project, 3/2011 E1102042_5 of 9

DOE’s Largest Environmental Cleanup Closure Project

Supporting DOE’s River Corridor Closure by 2015

The River Corridor Closure Project has been designated by DOE as“The largest single DOE Environmental Management

cleanup closure project”

RIVER CORRIDOR CLOSURE PROJECT

Protecting the Columbia RiverEmerging Issues for the Columbia River Corridor Closure Project, 3/2011 E1102042_6 of 9

DOE’s Largest Environmental Cleanup Closure Project

Here’s where we are today• Maintaining good safety record• Project is ahead of schedule and

under budget• 10-year project is at the half-way

mark and 60% complete• Saved $221M by efficiently

performing work• WCH awarded 94%, or $196M,

of subcontracts to small businesses in FY2010

RIVER CORRIDOR CLOSURE PROJECT

Protecting the Columbia RiverEmerging Issues for the Columbia River Corridor Closure Project, 3/2011 E1102042_7 of 9

DOE’s Largest Environmental Cleanup Closure Project

Technology Needs for Remediation of Highly Contaminated Soil

• Evaluating the extent of the contamination

• Implementing characterization technologies

• Seeking technologies for remediation (http:www.washingtonclosure.com/documents/tech_needs/TechNeeds_324_b_Cell.doc)

The 324 Building operated as a Hazardous Category 2 Nuclear Facility. A hot cell breach caused high level research material to contaminate soil beneath the building.Next steps:

RIVER CORRIDOR CLOSURE PROJECT

Protecting the Columbia RiverEmerging Issues for the Columbia River Corridor Closure Project, 3/2011 E1102042_8 of 9

DOE’s Largest Environmental Cleanup Closure Project

Washington Closure still has 4 years left on contract – why the urgency?• At the halfway point of the contract, the project has safely

completed difficult cleanup work, however, some of the most hazardous and challenging work lies ahead.

• The Closure Contract is unique to Hanford and committed to 2015 Vision

• Established a closure team– Implementing strategic

closeout work schedules– Engaging workforce –

essential for continuity and compliance

– Manage transition of employees – “People Plan”

RIVER CORRIDOR CLOSURE PROJECT

Protecting the Columbia RiverEmerging Issues for the Columbia River Corridor Closure Project, 3/2011 E1102042_9 of 9

DOE’s Largest Environmental Cleanup Closure Project

Challenges Facing our Closure Contract• The first closure contract at Hanford• Vision 2015 footprint reduction schedule adjustments• Contract requirements• Regulatory requirements• American Recovery and Reinvestment Act changes• Increasing risk and complexity of work

– 618-10 and 618-11– 324 Building