From: Yaganiski, Jason (Edmonton) Sent: March-12-15 10:37 AM To: Van De Veen, Brad (Edmonton); Allen, Shane (Edmonton) Cc: Roman, Rick (Site); Burke, Sean L (Site); Pearson, Darcy (Site); Paschinski, Paul; Van De Veen, Kyle (Edmonton); Manku, Baj (Edmonton); James Zureski ([email protected] ) ([email protected] ) Subject: FW: Line 67 Completion FYI Thank you, Jason 780 271 7557 From: Doug Frunchak [mailto:[email protected] ] Sent: March-12-15 10:33 AM To: Adrian Bergauer; Florindo Guimaraes; Steven Caron; McNamara, Tony (Edmonton); Yaganiski, Jason (Edmonton); 'Sikora, Aaron'; 'Halkyard, Mark'; Doyle, Shaun Cc: Robin Stephens; Keith Baxter; John Hart; Curtis Kaye; Marc Paquette; Mitch St. Louis; Milan Devic Subject: Line 67 Completion All, A great big thank you to everyone involved in the completion of E2H Line 67. This line was turned over to Operations on March 5 th , 12 days ahead of schedule. Doug Frunchak Assistant Construction Manager Upstream Facilities Projects ETE/EAE Site 780-400-4484 Cell 780-446-0834 [email protected] *** WORLEYPARSONS GROUP NOTICE *** "This email is confidential. If you are not the intended recipient, you must not disclose or use the information contained in it. If you have received this email in error, please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the

Upload: darcy-pearson

Post on 12-Apr-2017

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Enbridge Thank you email for early completion of Line 67 - EAE Project

From: Yaganiski, Jason (Edmonton) Sent: March-12-15 10:37 AMTo: Van De Veen, Brad (Edmonton); Allen, Shane (Edmonton)Cc: Roman, Rick (Site); Burke, Sean L (Site); Pearson, Darcy (Site); Paschinski, Paul; Van De Veen, Kyle (Edmonton); Manku, Baj (Edmonton); James Zureski ([email protected]) ([email protected])Subject: FW: Line 67 Completion

FYI

Thank you,

Jason780 271 7557

From: Doug Frunchak [mailto:[email protected]] Sent: March-12-15 10:33 AMTo: Adrian Bergauer; Florindo Guimaraes; Steven Caron; McNamara, Tony (Edmonton); Yaganiski, Jason (Edmonton); 'Sikora, Aaron'; 'Halkyard, Mark'; Doyle, ShaunCc: Robin Stephens; Keith Baxter; John Hart; Curtis Kaye; Marc Paquette; Mitch St. Louis; Milan DevicSubject: Line 67 Completion

All,

A great big thank you to everyone involved in the completion of E2H Line 67. This line was turned over to Operations on March 5th, 12 days ahead of schedule.

Doug FrunchakAssistant Construction ManagerUpstream Facilities Projects ETE/EAESite 780-400-4484Cell [email protected]

*** WORLEYPARSONS GROUP NOTICE *** "This email is confidential. If you are not the intended recipient, you must not disclose or use the information contained in it. If you have received this email in error, please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the views or opinions of any company in the WorleyParsons Group of Companies."