The commissioning of the
RNC is performed after the
hardware and software are
installed. The commissioning
ensures that the RNC works
properly as designed.
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
3/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 3
Upon completion of this course, you
will be able to:
Describe the procedure of BSC6810
system commissioning
Discuss loading commissioning, local
office commissioning, interface and
service commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
4/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 4
References
RNC System Description RNC Architecture and Principle RNC Commissioning Guide
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
5/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 5
Chapter 1 System Commissioning Overview
Chapter 2 System Commissioning
Chapter 3 Checking RNC Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
6/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 6
RNC Commissioning Preparations
This task describes how to obtain the installation software
License
MML command scripts
System Commissioning Overview
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
7/33HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 7
Main contents of system commissioning
1. Commissioning RNC Equipment
2. Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface
3. Handling Alarms During RNC Commissioning
4. Verifying RNC Services
5. Integrating the RNC into the M2000
6. Creating RNC Scheduled Tasks
7. Checking RNC Commissioning Results
System Commissioning Overview
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
8/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 8
Chapter 1 System Commissioning Overview
Chapter 2 System Commissioning
Chapter 3 Checking RNC Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
9/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 9
2.1 Commissioning RNC Equipment
2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface
2.3 Handling Alarms During RNC Commissioning
2.4 Verifying RNC Services
2.5 Integrating the RNC into the M2000
2.6 Creating RNC Scheduled Tasks
Maincontentsof system commissioning
Chapter 2 System Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
10/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 10
Commissioning BAMs
Obtain the Installation Information of the BAM Software
Administrator password of Windows Server 2003 .
Password for the user sa to log in to SQL Server 2000 .
Fixed IP addresses of the internal and external networks .
Remotely Logging In to the BAM
Choose Start > Run . The Run dialog box is displayed.Enter mstsc /console and click OK. The Remote Desktop
Connection dialog box is displayed.
When entering the mstsc /console, leave a space between mstsc and
/console!
Enter the external virtual IP address of the BAM for remote login, and
then click Connect.
Enter the name and password of an administrator-level user of the
BAM, and then click OK. You are remotely logged in to the BAM.
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
11/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 11
Checklist for BAM Software Settings Performed Before Delivery
Installing Windows Server 2003The default password of the administrator of the active and standby BAMs is11111111.
Starting the Routing and Remote Access serviceThe Routing and Remote Access service is started and Startup Type is setto Automatic.
Starting the Terminal Services serviceThe Terminal Services service is started and Startup Type is set toAutomatic.
Creating the internal network team
The preset IP addresses of the internal Ethernet adapters are:
Active BAM: 80.168.3.50 (255.0.0.0)
Standby BAM: 80.168.3.60 (255.0.0.0)
Creating the external network team
The preset IP addresses of the external Ethernet adapters are:
Active BAM: 172.121.139.201 (255.255.255.0)
Standby BAM: 172.121.139.202 (255.255.255.0)
Configuring backup channel IP addresses of the active andstandby BAMs
The preset backup channel IP addresses are:
Active BAM: 192.168.3.50 (255.255.255.0)
Standby BAM: 192.168.3.60 (255.255.255.0)
Configuring commissioning IP addresses of the active andstandby BAMs
The preset commissioning IP addresses are:
Active BAM: 192.168.6.50 (255.255.255.0)
Standby BAM: 192.168.6.60 (255.255.255.0)
Installing SQL Server 2000 The default password of the sa account is 11111111.
Installing SQL Server 2000 Service Pack 4 The version number is 8.00.2039.
Commissioning BAMs
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
12/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 12
Checking BAM Software
Check the version of Windows Server 2003 on the BAM.
Check active services on the BAM.
Check the version of SQL Server on the BAM.
Check the operation of the SQL Server database.
Check the login mode of the SQL Server database on the BAM.
Check the data sequence of the SQL Server database on the BAM.
Check the name consistency between the BAM and SQL Server.
Check and ensure that no BAM has the same name as that of the current BAM
in the same subnet.
Check the teaming of the Ethernet adapters on the BAM.
Check the teaming modes of the Ethernet adapters on the BAM.
Check the system time and time zone of the BAM and ensure that it is
consistent with the local time.
Check and ensure that the system patron is not installed on BAMs.
Commissioning BAMs
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
13/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 13
Installing the BAM Application inthe Active Workspace
For details, refer to Software Installation Slide.
Checking the Operation of the BAM Application
Working Modes ofBAM
Description
Single-BAM modeWhen the BAM application is installed, State of each service is
Started, and Startup Type of each service is Automatic.
Dual-BAM mode
When the BAM application is installed successfully,
For the active BAM, State of each service is Started, andStartup Type of each service is Automatic.
For the standby BAM, the State parameter values of SNTPClient, FTP Server, DynMonitor, and FTP Client are Started
and the Startup Type parameter values of these services areAutomatic. The State parameter values of other services areStopped and the Startup Type of them are Disabled.
If the heartbeat test between the active and standby BAMssucceeds, the status bar displays DSS OK.
Commissioning BAMs
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
14/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 14
Checking the RNC LMT
Installing the RNC LMT Application
Connecting the RNC LMT to the BAM
Starting the Local Maintenance Terminal of the RNC
Commissioning the RNC LMT
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
15/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 15
Loading RNC Software and Data Files
Generating RNC Data Files
The generated subrack loading file is saved in BAM ActiveWorkspace Installation Directory\LoadData.
On the MML client, run the SET OFFLINE command , Run the RSTDATA command.
Running commands in batches.
Run the FMT DATA command to set Format type toALL_SUBRACK(Format all subracks) for formatting all subracks.
Run the SET ONLINE.
Setting RNC Loading Modes (Commissioning)
On the MML client, run the SET LODCTRL command to set Boardstart load control. to LFB (Load from BAM and write flash) .
Starting the RNC Message Tracing (Commissioning).
Starting the Loading Progress Window.
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
16/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 16
Loading the RSS Subrack
Switch on the power distribution boxes SW3 and SW6 to power onthe RSS subrack. The boards in the RSS subrack automatically load
the host software and data file from the BAM.
On the MML client, run the RST SUBRACK command to set
Subrack No. to 0. A dialog is displayed, asking you whether to
proceed. Click Yes. The boards in the RSS subrack automatically
load the host software and data file from the BAM.
Observe the loading progress of the associated RSS subrack in
Progress Management.
After the loading of the RSS subrack, click the Device Panel tab in
the navigation tree and then double-click the shelf node to be
queried.
The RSS subrack loading lasts 3 to 5 minutes.
Loading RNC Software and Data Files
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
17/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 17
Loading the RBS Subrack
Switch on the power distribution box to power on the RBS subrack.
On the MML client, run the RST SUBRACK command to set
Subrack No. to Number of the RBS to be loaded.
Observe the loading progress of the associated RBS subrack in the
Progress Management window.
After the current RBS subrack is loaded, go to Step 2 to load other
RBS subracks until all the RBS subracks of the RNC are loaded.
After all the RBS subracks are loaded, click the Device Panel tab in
the navigation tree and then double-click the shelf node to bequeried.
Observe the signaling connection setup on the Iub interface and cell
setup in the message tracing window.
Loading RNC Software and Data Files
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
18/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 18
Verifying the License
The license of the local office is in BAM Active Workspace
Installation Directory\FTP\Licenseand the file name is license.lic.
Run the LST CFGMODE to query the data configuration of all the
subracks. If the subrack is in offline mode, run the SET ONLINE
command to set the subrack to the online mode.
Run the ACT LICENSE command and set File Name to the name
of the specified license to activate the license.
Run the DSP LICENSE command and set Query type to SCU
(SPU, BAM). The system displays the current configuration of each
licensed service.
Verifying the License
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
19/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 19
The RNC supports switchover of boards such as the OMUaSCUa
SPUaGCUaAOUaUOIaFG2aGOUaPEUaAEUa
POUa
After the switchover of boards, the existing standby board becomes
the active one. The process lasts 2 to 5 seconds. The existing activeboard becomes the standby one and is reset. The process lasts 2 to
5 minutes
Verifying Switchover Between Active and Standby Boards
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
20/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 20
2.1 Commissioning RNC Equipment
2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface
2.3 Handling Alarms During RNC Commissioning
2.4 Verifying RNC Services
2.5 Integrating the RNC into the M2000
2.6 Creating RNC Scheduled Tasks
Maincontentsof system commissioning
Chapter 2 System Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
21/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 21
Verifying the Iub Interface
Checking physical link.
Checking control plane.
Checking user plane.
Checking management
plane.
Checking cell status.
ApplicationProtocol
DataStream(s)
ALCAP(s)
TransportNetwork
Layer
SignallingBearer(s)
Transport NetworkUser Plane
Control Plane User Plane
Transport NetworkUser Plane
Transport NetworkControl Plane
RadioNetwork
Layer
SignallingBearer(s)
DataBearer(s)
Physical Layer
Interface and Service Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
22/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 22
Verifying the Iu-CS
Iu-PS,Iur Interface
Checking physical links.
Checking control plane.
Checking user plane.
ApplicationProtocol
DataStream(s)
ALCAP(s)
TransportNetwork
Layer
SignallingBearer(s)
Transport NetworkUser Plane
Control Plane User Plane
Transport NetworkUser Plane
Transport NetworkControl Plane
RadioNetwork
Layer
SignallingBearer(s)
DataBearer(s)
Physical Layer
Interface and Service Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
23/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 23
2.1 Commissioning RNC Equipment
2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface
2.3 Handling Alarms During RNC Commissioning
2.4 Verifying RNC Services
2.5 Integrating the RNC into the M2000
2.6 Creating RNC Scheduled Tasks
Maincontentsof system commissioning
Chapter 2 System Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
24/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 24
On the main menu of Local Maintenance Terminal, choose
Fault Management > Browse Alarm
Check whether there are alarms in the alarm browse window
Handle the alarm according to the suggestions in the Alarm
Handling part
If the alarm cannot be cleared, contact Huawei for technical
support
Handling Alarms During RNC Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
25/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 25
2.1 Commissioning RNC Equipment
2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface
2.3 Handling Alarms During RNC Commissioning
2.4 Verifying RNC Services
2.5 Integrating the RNC into the M2000
2.6 Creating RNC Scheduled Tasks
Maincontentsof system commissioning
Chapter 2 System Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
26/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 26
Start the following RNC message tracing tasks: message tracing
over the Uu, Iu, Iub, Iur (Optional. Mandatory in inter-RNC handover),and CDT and REDIRECT serial-port print
Verify the voice service
Verify the CS streaming service
Verify the PS service
Verify mobility management
Verify OM management
Verify HSDPA
Verify HSUPA
Verify Other Services
Verifying RNC Services
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
27/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 27
2.1 Commissioning RNC Equipment
2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface
2.3 Handling Alarms During RNC Commissioning
2.4 Verifying RNC Services
2.5 Integrating the RNC into the M2000
2.6 Creating RNC Scheduled Tasks
Maincontentsof system commissioning
Chapter 2 System Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
28/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 28
Integrating the RNC into the M2000
BSC6810 physical connecting
with the operation and
maintenance network
Set the route from BSC6810 to
M2000
Add BSC6810 in M2000
Collecting the information of
location and IP address of
BSC6810 Add a new network and
BSC6810 in M2000
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
29/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 29
2.1 Commissioning RNC Equipment
2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface
2.3 Handling Alarms During RNC Commissioning
2.4 Verifying RNC Services
2.5 Integrating the RNC into the M2000
2.6 Creating RNC Scheduled Tasks
Maincontentsof system commissioning
Chapter 2 System Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
30/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 30
Automatically back up the RNC configuration data, performance
data, and alarm data
Automatically back up RNC logs
Creating RNC Scheduled Tasks
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
31/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 31
Chapter 1 System Commissioning Overview
Chapter 2 System Commissioning
Chapter 3 Checking RNC Commissioning
-
8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0
32/33
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 32
Check RNC commissioning results according to Checklists
for RNC Commissioning
Please refer to the manual about the detailed forms
Action ExecutionData Record (End Time, Personnel,
Data)/Reason for No Execution
The RSS subrack isloaded.
All the RBS subracksare loaded.
Checking RNC Commissioning Results
-