energy - cimolai · 35 mk 4007 panel c o m p le tion m a r 07/ 05/ 13 v e n 07/ 06/ 13 m a r 07/...

4
Energy Process Equipment

Upload: others

Post on 25-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Energy - Cimolai · 35 Mk 4007 Panel c o m p le tion m a r 07/ 05/ 13 v e n 07/ 06/ 13 m a r 07/ 05/ 13 v en 07/ 0 6/1 3 32 g 2.368 h 100% 36 Mk 4008 Panel c o m p le tion g io 14/03

EnergyP r o c e s s E q u i p m e n t

Page 2: Energy - Cimolai · 35 Mk 4007 Panel c o m p le tion m a r 07/ 05/ 13 v e n 07/ 06/ 13 m a r 07/ 05/ 13 v en 07/ 0 6/1 3 32 g 2.368 h 100% 36 Mk 4008 Panel c o m p le tion g io 14/03

Mission

Monfalcone Plant & Dock

A new and modern business vision based on the pillars of Expertise, Market Know-ledge, Delivery Reliability integrated with the existing huge industrial capacity, te-chnology and safety organization.

Our aim is to fabricate Process equip-ment as Vessels, Columns, Reactors and Heat Transfer components being part of our knowledge and skills.

In detail, design and fabrication of pro-cess equipment for different industries:

Upstream pressure equipment for exploi-tation, drilling and development of reser-voirs.

Midstream pressure equipment for Oil & Gas treatment and transportation Down-stream pressure equipment for Refining (Hydrotreatment, Catalytic Reforming, Coking, Distillation, Vacuum Process…), Gas Liquefaction, Gas To Liquid, Scrub-bing, De-Hydration.

Petrochemical pressure equipment for processes of Nitrogen-Hydrogen plants (Urea-Ammonia) or Alcohol (Methanol).

Chemical pressure equipment for “Pla-stic Products” as Polyethylene (Low Density, Ultra Low Density, High Density), Polypropylene (PP), Polyethylene Tere-phthalate (PET), Polyvinyl Chloride (PVC).

Power pressure equipment for Steam Condensing, Waste Heat Recovery, He-aters.

In addition to Carbon Steel, materials as Low Alloy Steel (Cr-Mo, Cr-Mo-V and Ni), Stainless Steel and Nonferrous are treated using dedicated processes and methods.

No restrictions in Equipment diameter and weight

BEYOND

WELDING

Direct access to the Dock

COVERED AREA46.700 m2

TOTAL AREA280.000 m2

QUAY900 x 12 mt

Length Draft

Page 3: Energy - Cimolai · 35 Mk 4007 Panel c o m p le tion m a r 07/ 05/ 13 v e n 07/ 06/ 13 m a r 07/ 05/ 13 v en 07/ 0 6/1 3 32 g 2.368 h 100% 36 Mk 4008 Panel c o m p le tion g io 14/03

N6N1 N2

N3

N7N8N9

N4N5

KEY PLAN - VIEW FROM TOP

N6N1 N2

N3

N7N8N9

N4N5

KEY PLAN - VIEW FROM TOP

ID Description Start Finish Actual Start Actual Finish Duration Work % complete

1 PIETER SCHELTE TOP SIDE LIFTING SYSTEM ven 07/09/12 gio 30/04/15 ven 07/09/12 NA 923,5 g 2.106.382,48 h 68%2 TLS BEAM CONSTRUCTION ven 07/09/12 gio 30/04/15 ven 07/09/12 NA 923,5 g 1.619.994,47 h 64%3 TLS BEAM STRENGTHENED CONSTRUCTION (12 BEAMS) ven 07/09/12 sab 20/12/14 ven 07/09/12 NA 806,5 g 1.149.822,35 h 81%4 Completion 3rd Jig lun 14/10/13 lun 14/10/13 lun 14/10/13 lun 14/10/13 0 g 0 h 100%5 Completion 4th Jig lun 05/05/14 lun 05/05/14 NA NA 0 g 0 h 0%6 Clarification by ALLSEAS of material to be used for strengthening of 12 beams (TQ

240)mar 22/04/14 mar 22/04/14 mar 22/04/14 mar 22/04/14 0 g 0 h 100%

7 TLS Beam 1 ven 07/09/12 mar 06/05/14 ven 07/09/12 NA 587,5 g 120.700,98 h 99%8 Cutting and Bevelling ven 07/09/12 ven 11/01/13 ven 07/09/12 ven 11/01/13 126,5 g 7.059 h 100%9 Sub Assemblies Construction lun 26/11/12 mar 10/09/13 lun 26/11/12 mar 10/09/13 281,88 g 64.158,98 h 100%10 Frame Construction gio 14/02/13 mer 03/04/13 gio 14/02/13 mer 03/04/13 49 g 4.978 h 100%11 Plates Joining lun 26/11/12 lun 18/02/13 lun 26/11/12 lun 18/02/13 85 g 5.999,98 h 100%12 Panel Line lun 14/01/13 mer 03/04/13 lun 14/01/13 mer 03/04/13 80 g 5.900 h 100%13 T-Casting gio 07/03/13 sab 18/05/13 gio 07/03/13 sab 18/05/13 73 g 900 h 100%14 TS100 Beam Head mar 19/03/13 mar 10/09/13 mar 19/03/13 mar 10/09/13 168,88 g 11.582 h 100%15 Mk 1000 Completion mar 19/03/13 mar 10/09/13 mar 19/03/13 mar 10/09/13 168,88 g 11.582 h 100%16 Heat Treatment mar 09/07/13 ven 12/07/13 mar 09/07/13 ven 12/07/13 4 g 0 h 100%17 TS200 Panels Construction lun 04/03/13 mar 18/06/13 lun 04/03/13 mar 18/06/13 107 g 5.700 h 100%18 Mk 2000 Panel completion lun 06/05/13 sab 01/06/13 lun 06/05/13 sab 01/06/13 27 g 900 h 100%19 Mk 2001 Panel completion mar 07/05/13 lun 03/06/13 mar 07/05/13 lun 03/06/13 28 g 900 h 100%20 Mk 2003 LP Completion lun 04/03/13 mar 18/06/13 lun 04/03/13 mar 18/06/13 107 g 2.700 h 100%21 Mk 2004 Back Locking pawl lun 11/03/13 gio 28/03/13 lun 11/03/13 gio 28/03/13 18 g 1.200 h 100%22 TS300 Panels Construction gio 07/03/13 mar 28/05/13 gio 07/03/13 mar 28/05/13 83 g 3.000 h 100%23 Mk 3000 Panel completion mer 20/03/13 mer 10/04/13 mer 20/03/13 mer 10/04/13 22 g 1.000 h 100%24 Mk 3001 Panel completion gio 07/03/13 mar 28/05/13 gio 07/03/13 mar 28/05/13 83 g 1.000 h 100%25 Mk 3002 Panel completion gio 14/03/13 sab 18/05/13 gio 14/03/13 sab 18/05/13 66 g 1.000 h 100%26 TS400 Panels Construction gio 07/02/13 lun 24/06/13 gio 07/02/13 lun 24/06/13 138 g 26.099 h 100%27 Arrow construction gio 07/02/13 mer 03/04/13 gio 07/02/13 mer 03/04/13 56 g 3.000 h 100%28 Mk 4000 Panel completion ven 29/03/13 gio 23/05/13 ven 29/03/13 gio 23/05/13 56 g 3.000 h 100%29 Mk 4001 Panel completion mer 10/04/13 mer 15/05/13 mer 10/04/13 mer 15/05/13 36 g 1.500 h 100%30 Mk 4002 Panel completion mer 17/04/13 ven 17/05/13 mer 17/04/13 ven 17/05/13 31 g 1.510 h 100%31 Mk 4003 Panel completion ven 24/05/13 lun 24/06/13 ven 24/05/13 lun 24/06/13 32 g 2.924 h 100%32 Mk 4004 Panel completion mer 20/03/13 gio 16/05/13 mer 20/03/13 gio 16/05/13 58 g 3.580 h 100%33 Mk 4005 Panel completion gio 14/03/13 mer 15/05/13 gio 14/03/13 mer 15/05/13 63 g 2.615 h 100%34 Mk 4006 Panel completion dom 19/05/13 mar 04/06/13 dom 19/05/13 mar 04/06/13 17 g 2.102 h 100%35 Mk 4007 Panel completion mar 07/05/13 ven 07/06/13 mar 07/05/13 ven 07/06/13 32 g 2.368 h 100%36 Mk 4008 Panel completion gio 14/03/13 mar 07/05/13 gio 14/03/13 mar 07/05/13 55 g 1.200 h 100%37 Mk 4009 Panel completion gio 28/03/13 sab 11/05/13 gio 28/03/13 sab 11/05/13 45 g 600 h 100%38 Mk 4010 Panel completion mer 17/04/13 mer 15/05/13 mer 17/04/13 mer 15/05/13 29 g 600 h 100%39 Mk 4011 Panel completion gio 14/03/13 lun 20/05/13 gio 14/03/13 lun 20/05/13 68 g 1.100 h 100%40 Beam Construction ven 10/05/13 gio 31/10/13 ven 10/05/13 gio 31/10/13 167,5 g 47.183 h 100%41 TS200 Lower Front Box ven 07/06/13 mar 20/08/13 ven 07/06/13 mar 20/08/13 68 g 9.500 h 100%42 Mk 2002-2004-ribs Assembly ven 07/06/13 mer 03/07/13 ven 07/06/13 mer 03/07/13 27 g 300 h 100%43 Mk 2003 Assembly - Welding gio 11/07/13 dom 28/07/13 gio 11/07/13 dom 28/07/13 18 g 3.100 h 100%44 Heat Treatment lun 29/07/13 mer 31/07/13 lun 29/07/13 mer 31/07/13 3 g 0 h 100%45 Mk 2000 Assembly gio 01/08/13 lun 05/08/13 gio 01/08/13 lun 05/08/13 5 g 100 h 100%46 Mk 2001 Assembly gio 01/08/13 lun 05/08/13 gio 01/08/13 lun 05/08/13 5 g 100 h 100%47 Welding of TS200 lun 10/06/13 mar 20/08/13 lun 10/06/13 mar 20/08/13 65 g 5.900 h 100%48 TS300 Lower Rear Box dom 26/05/13 lun 15/07/13 dom 26/05/13 lun 15/07/13 51 g 1.990 h 100%49 Mk 3000, 3002 Assembly dom 26/05/13 mar 28/05/13 dom 26/05/13 mar 28/05/13 3 g 200 h 100%50 Mk 3001 Assembly mer 29/05/13 ven 31/05/13 mer 29/05/13 ven 31/05/13 3 g 210 h 100%51 Welding TS300 gio 06/06/13 lun 15/07/13 gio 06/06/13 lun 15/07/13 40 g 1.580 h 100%52 TS400 Upper Box ven 10/05/13 gio 31/10/13 ven 10/05/13 gio 31/10/13 167,5 g 30.130 h 100%53 Mk 4008 Assembly box ven 10/05/13 dom 12/05/13 ven 10/05/13 dom 12/05/13 3 g 140 h 100%54 Mk 4009 Assembly box lun 13/05/13 mar 14/05/13 lun 13/05/13 mar 14/05/13 2 g 100 h 100%55 Mk 4010 Assembly box mer 15/05/13 ven 17/05/13 mer 15/05/13 ven 17/05/13 3 g 120 h 100%56 Mk 4004 Assembly box lun 20/05/13 mar 21/05/13 lun 20/05/13 mar 21/05/13 2 g 100 h 100%57 Mk 4011 Assembly box mar 21/05/13 mer 22/05/13 mar 21/05/13 mer 22/05/13 2 g 150 h 100%58 Mk 4000 Assembly box ven 24/05/13 sab 25/05/13 ven 24/05/13 sab 25/05/13 2 g 180 h 100%59 Mk 4001 Assembly box mer 12/06/13 gio 13/06/13 mer 12/06/13 gio 13/06/13 2 g 200 h 100%60 Mk 4005 Assembly box ven 14/06/13 gio 20/06/13 ven 14/06/13 gio 20/06/13 7 g 540 h 100%61 Mk 4006 Assembly box ven 21/06/13 sab 22/06/13 ven 21/06/13 sab 22/06/13 2 g 310 h 100%62 Mk 4002 Assembly box dom 23/06/13 lun 24/06/13 dom 23/06/13 lun 24/06/13 2 g 260 h 100%63 Mk 4007 Assembly box mar 25/06/13 sab 29/06/13 mar 25/06/13 sab 29/06/13 5 g 290 h 100%64 Mk 4003 Assembly box dom 30/06/13 mar 02/07/13 dom 30/06/13 mar 02/07/13 3 g 340 h 100%65 Welding TS400 mer 15/05/13 gio 31/10/13 mer 15/05/13 gio 31/10/13 162,5 g 27.200 h 100%66 Mk 1000 Assembly sab 27/07/13 dom 28/07/13 sab 27/07/13 dom 28/07/13 2 g 200 h 100%67 Final Beam Assembly mer 24/07/13 lun 07/10/13 mer 24/07/13 lun 07/10/13 69 g 5.563 h 100%68 Assembly of TS300 lun 29/07/13 ven 02/08/13 lun 29/07/13 ven 02/08/13 5 g 760 h 100%69 Assembly of TS200 lun 16/09/13 mar 17/09/13 lun 16/09/13 mar 17/09/13 2 g 1.143 h 100%70 Final Welding dom 04/08/13 lun 07/10/13 dom 04/08/13 lun 07/10/13 58 g 3.500 h 100%71 Welding of stainless steel mer 24/07/13 lun 19/08/13 mer 24/07/13 lun 19/08/13 20 g 160 h 100%72 Final Machining dom 20/10/13 ven 22/11/13 dom 20/10/13 ven 22/11/13 34 g 0 h 100%73 Beam Completion sab 23/11/13 mar 06/05/14 sab 23/11/13 NA 153 g 2.300 h 92%74 Rack welding / Locking Pawl Machining sab 23/11/13 dom 05/01/14 sab 23/11/13 dom 05/01/14 37 g 750 h 100%75 Outfitting plates sab 23/11/13 gio 09/01/14 sab 23/11/13 gio 09/01/14 40 g 1.250 h 100%76 Painting mer 12/02/14 lun 03/03/14 mer 12/02/14 lun 03/03/14 20 g 0 h 100%77 Beam Rotation gio 13/03/14 sab 15/03/14 gio 13/03/14 sab 15/03/14 3 g 300 h 100%78 Beam Outfitting dom 01/12/13 mar 06/05/14 dom 01/12/13 NA 145 g 0 h 86%79 Preassembly of lever dom 01/12/13 mar 18/03/14 dom 01/12/13 mar 18/03/14 100 g 0 h 100%80 Outfitting of the beam mer 19/03/14 mar 06/05/14 mer 19/03/14 NA 45 g 0 h 58%81 Lever installation mer 19/03/14 mer 19/03/14 mer 19/03/14 mer 19/03/14 1 g 0 h 100%82 Extending of Locking Pawl Push Rod mer 02/04/14 mer 02/04/14 mer 02/04/14 mer 02/04/14 1 g 0 h 100%83 Manifold block 9300 installation lun 07/04/14 lun 07/04/14 lun 07/04/14 lun 07/04/14 1 g 0 h 100%84 Install N2 accumulator 8330 + Manifold 8333, N2 accumulator 8340 +

Manifold 8343lun 07/04/14 mer 09/04/14 lun 07/04/14 mer 09/04/14 3 g 0 h 100%

85 Locking pawl installation mer 09/04/14 ven 11/04/14 mer 09/04/14 ven 11/04/14 3 g 0 h 100%86 Install N2 accumulator 2690 ven 11/04/14 dom 13/04/14 ven 11/04/14 dom 13/04/14 3 g 0 h 100%87 Bracket & Cylinder Pre-assembly mer 09/04/14 gio 10/04/14 mer 09/04/14 gio 10/04/14 2 g 0 h 100%88 AHC Accumulator 9500 mar 08/04/14 ven 11/04/14 mar 08/04/14 ven 11/04/14 4 g 0 h 100%89 AHC Installation 9200 sab 12/04/14 mar 15/04/14 sab 12/04/14 mar 15/04/14 4 g 0 h 100%90 FL Cylinders installation 8200 mer 16/04/14 mar 29/04/14 mer 16/04/14 NA 11 g 0 h 60%91 Painting Touch up sab 26/04/14 ven 02/05/14 NA NA 6 g 0 h 0%92 Closing / ancillary activities sab 26/04/14 mar 06/05/14 NA NA 10 g 0 h 0%93 TLS Beam 2 sab 12/01/13 lun 06/10/14 sab 12/01/13 NA 606 g 103.824 h 90%94 Cutting and Bevelling sab 12/01/13 mer 20/02/13 sab 12/01/13 mer 20/02/13 40 g 5.000 h 100%95 Sub Assemblies Construction lun 18/02/13 mer 11/09/13 lun 18/02/13 mer 11/09/13 199 g 50.746 h 100%96 Frame Construction lun 18/02/13 ven 24/05/13 lun 18/02/13 ven 24/05/13 96 g 4.028 h 100%

PIETER SCHELTE TOP SIDE LIFTING SYSTEMTLS BEAM CONSTRUCTION

TLS BEAM STRENGTHENED CONSTRUCTION (12 BEAMS)4 Completion 3rd Jig

5 Completion 4th Jig6 Clarification by ALLSEAS of material to be used for strengthening of 12 beams (TQ 240)

TLS Beam 1Cutting and Bevelling

Sub Assemblies ConstructionFrame Construction

Plates JoiningPanel Line

T-CastingTS100 Beam Head

Mk 1000 CompletionHeat Treatment

TS200 Panels ConstructionMk 2000 Panel completion Mk 2001 Panel completion

Mk 2003 LP CompletionMk 2004 Back Locking pawl

TS300 Panels ConstructionMk 3000 Panel completion

Mk 3001 Panel completion Mk 3002 Panel completion

TS400 Panels ConstructionArrow construction

Mk 4000 Panel completion Mk 4001 Panel completion Mk 4002 Panel completion

Mk 4003 Panel completion Mk 4004 Panel completion Mk 4005 Panel completion

Mk 4006 Panel completion Mk 4007 Panel completion

Mk 4008 Panel completion Mk 4009 Panel completionMk 4010 Panel completion Mk 4011 Panel completion

Beam ConstructionTS200 Lower Front Box

Mk 2002-2004-ribs Assembly Mk 2003 Assembly - WeldingHeat TreatmentMk 2000 Assembly Mk 2001 Assembly

Welding of TS200TS300 Lower Rear Box

Mk 3000, 3002 Assembly Mk 3001 Assembly

Welding TS300TS400 Upper Box

Mk 4008 Assembly box Mk 4009 Assembly boxMk 4010 Assembly box Mk 4004 Assembly box Mk 4011 Assembly box Mk 4000 Assembly box

Mk 4001 Assembly box Mk 4005 Assembly box Mk 4006 Assembly box Mk 4002 Assembly box Mk 4007 Assembly boxMk 4003 Assembly box

Welding TS400Mk 1000 Assembly

Final Beam AssemblyAssembly of TS300

Assembly of TS200Final Welding

Welding of stainless steelFinal Machining

Beam CompletionRack welding / Locking Pawl MachiningOutfitting plates

PaintingBeam Rotation

Beam OutfittingPreassembly of lever

Outfitting of the beamLever installation

Extending of Locking Pawl Push RodManifold block 9300 installationInstall N2 accumulator 8330 + Manifold 8333, N2 accumulator 8340 + Manifold 8343

Locking pawl installationInstall N2 accumulator 2690Bracket & Cylinder Pre-assemblyAHC Accumulator 9500AHC Installation 9200

FL Cylinders installation 8200Painting Touch up Closing / ancillary activities

TLS Beam 2Cutting and Bevelling

Sub Assemblies ConstructionFrame Construction

ago set ott nov dic gen feb mar apr mag giu lug ago set ott nov dic gen feb mar apr mag giu lug ago set ott nov dic gen feb mar apr mag giu lug ago set ott nov dic gen feb mar aprTri 3, 2012 Tri 4, 2012 Tri 1, 2013 Tri 2, 2013 Tri 3, 2013 Tri 4, 2013 Tri 1, 2014 Tri 2, 2014 Tri 3, 2014 Tri 4, 2014 Tri 1, 2015 Tri 2, 2015 Tri 3, 2015 Tri 4, 2015 Tri 1, 2016

Pieter Schelte TLS ProjectAllseas

15 April 2014 - Revised Schedule to level 4 (Strengthening and Lengthening Activities Included)�������������������

The above schedule does not include relevant supply of outfitting material by ALLSEAS which is deemed being available on site at least 20 days before relevant installation. Duration of piping activities generally in yellow above are indicative and subject to confirmation by COMPANY.Duration of installation activities of manifold and AHC accumulator 9500 to be verified.

Fabrication Technology

Page 4: Energy - Cimolai · 35 Mk 4007 Panel c o m p le tion m a r 07/ 05/ 13 v e n 07/ 06/ 13 m a r 07/ 05/ 13 v en 07/ 0 6/1 3 32 g 2.368 h 100% 36 Mk 4008 Panel c o m p le tion g io 14/03

Monfalcone

North Adriatic Sea

CIMOLAI ENERGY SRLOFFICES & FACTORIES

Zona Industriale - Via Timavo, 6934074 Monfalcone (GO) – ITALY

Tel. (+39) 0481 – 281414 Fax (+39) 0481 - 281722

www.cimolai.com mail: [email protected]

REGISTERED OFFICE Via Ungaresca, 38

33170 Pordenone (PN) - ITALY TAX CODE & VAT CODE 01318230305

R.E.A PN-100071 Share Capital Fully Paid up € 31.200

Single Shareholder Company

Company subject to management and coordination by CIMOLAI SpA Share Capital € 16.200.000

Contact

Certificates

09.2015