Sustainable Development and Energy Efficiency
Energy Efficiency and Cleaner Production in
Industry and Energy Saving Initiatives in the
Construction Sector of Georgia
Nelly Verulava, Energy Efficiency and Environment
Protection Centre
Information about Georgia
Territory: 70 000 km2
Population: 4,5 mln
Capital: Tbilisi 1,2 mln
Access to Energy is a crucial and absolutely essential
enabling condition for achieving sustainable development .
Energy more than any other single issue, holds the key to
future sustainable development in the world. Energy is a
fundamental input for promote the integrating of the three
components of sustainable development : economic
development, social development and environmental
protection
EU INNOVER EAST project aims to promote to
Georgia ( as to other EPC s) in energy sphere
by developing new innovation services, energy
efficiency and the greater use of renewable
energy sources, that are the key priorities of
the national energy strategy of Georgia.
The analytical Policy Paper of the EBRD, “Strategy for
Georgia” (2012), uniquely determined that for maintaining
Georgia on the path of strong and sustainable growth, it
is crucial to modernize the energy sector, to foster private
investors and to support Georgia’s regional and global
economic integration. The Bank promised to help Georgia
in these areas s
Georgia lacks policy dedicated to targeting energy
efficiency, however Georgia faces two important
challenges: (i) High import dependency: a focus on
increasing the energy security; (ii) Very high energy
intensity of both industry and households.
There is no unified energy efficiency law in place for all
types of energy. There is no building code with
requirements for energy savings.s
Georgia’s high dependence on imported oil and gas
should, in itself, provide a sufficient incentive for the
Georgian authorities to implement strong energy
efficiency policies.
NGOs in Georgia and among them have been
promoting energy efficiency by providing different
assessment reports and carrying out pilot projects –
Energy Efficiency Initiatives – with the support of
international organisations, as USAID,UNDP, ECE
WB,EBRD, EU INOGATE Program and others.
Very important decision of the City Hall of Tbilisi was join to EU
Initiative Covenant of Mayors for Climate Change Mitigation by which
Tbilisi should become a low –carbon city., Was elaborated SEAP for
reucing CO2 emission by 20% by 2020
In the process of development of energy efficiency in Georgia
particular important role played , Norway - Georgian “Long
Term Capacity Building Program, launched to promote local
business development focusing on Energy Efficiency and
Cleaner Production. The Program included cooperation with
the same type Norwegian –Azerbaijan Program ‘Cleaner
Production and Energy Efficiency”. The Program was carried
out in the period 2003-2012 with the financial support of the
Government of Norway..
Bellow are presented the examples of Energy Audits and EE
Measures implemented under these Programs in the Industrial (SME s) and Building Sectors of Georgia
EBRD -Business Advisory Services (BAS) Program aimed at
enabling SMEs to access a diverse range of consulting
services by facilitating projects - was also important for
Georgia, for supporting to create sustainable and commercially
viable infrastructures of SME s.
Energy is basic for tree Components of Sustainable
Development : the economic and social development and
environmental Protection
Industrial ( SME s) Sector
1. City Gori Asphalt Factory
Factory main stations are: bitumen brewing, sand gravel preparation; installations of
mixers –heaters ; Boiler Plant.
For achieving energy efficiency were planned:
Reconstruction of the Boiler Plant (boilers replacement); pipeline insulation; Return of
condensate to Boiler Plant ; Thermal insulation of pipeline network ; installation of
new motors with Variable-Speed Drives (VSD).
In Boiler Plant are installed two old Russian type steam boilers E-1/9
Measures of EE Investment
(GEL)
Savings
( GEL/year)
Payback period
(year)
1. Reconstruction of
Boiler Plant
22 000 19 300 1. 1
2. Thermalinsulation of
steam pipelines
2 000 1300 1.5
Total 24 000 20 600
2. City Gori COMPANY “ASTOR INTERNATIONAL” .
Concentrated Apple Juice Factory
Energy Audit Report provides modernization of two stations : Substitution
of Apple Pieces-Pressing Aggregate ; Modernization of the Boiler Plant
Selected. German production high-efficiency Apple Pressing Drum TypeAggregate, In which losses of the raw material is no more 20%. Theelectrical capacity of aggregate is 75 kW. (The power capacity of theexisting aggregate is 150 kW ).
Measures of EE Investment
(GEL)
Savings
( GEL/year)
Payback period
(year)
1. Apple Pieces-Pressing Aggregate
150 000 20 040 7.4
2 Modernization of the Boiler Plant
34 000 12 500 2.7
Total 184 000 32 540
•EE Measures : 1. Power supply system upgrading in the Factory through installation of
new HV transformer,
1000 MW:
• Investment 12 000 USD, loan 7 000 USD
• Electricity savings 134 550 kWh/year or 12 400 USD/year
• Raw materials savings 5 tons/year or 5 000 USD/year
• Payback 1 year
Status: The Project was implemented
3. Milk Factory “Sante” in Tbilisi
4. Mill Factory “Progress” In City Rustavi
- EE Measure : 1.Reactive Power Compensator has been
installed
• Investment 9 000 USD, loan 6 000 USD
• Savings 17 500 USD/year, payback 0,5 year
• Status: The Project was implemented
5. Non–Alcoholic Drinks Factory “Oasis” in Tbilisi
EE –Measures :
1.Transfer to natural gas from petrol in a truck’s
engine:
•Investment 500 USD, loan 500 USD
•Savings 3 840 USD/year
•Payback 0,2 year
•Less environmental pollution
•The project was implemented
2. Replacement of disposable filters with
washable filters:
•Investment 1 500 USD, loan 1 500 USD
•Savings 1 170 USD/year
•Payback 0,4 year
•Less wastes
•Status: The Project was implemented
6. Bread Factory № 1 in Tbilisi
EE Measure : 1.Replacement of steam feeding system with water
spray equipment in bakery ovens:
• Investment 17 500 USD
• Loan 7 000 USD
• Natural gas savings 257 740 m3/ year or 33 000 USD/year
• Payback 0,6 year
• Status: waiting for equipment delivery from USA
In the Table bellow is presented general information
about the proposed energy efficiency measures at
the Bread factory Cholkhuri in Tbilisi, identified as
result of the detailed Energy Audit :
7. Bread Factory “Colkhuri “ in Tbilisi
In “Colkhuri” was conducted Energy Audit for identification of
Energy efficiency measures
Name of Energy Efficiency Measure Investment
( GEL)
Energy
Savings
( kWh/year)
Savings
( GEL/ year)
Payback
Period
( Year)
1The tightening and thermal insulation of
Dough fix devices 1200 26 640 4593 0.26
2. The installation of heat exchanger at the
stack of the bakery stoves, for recovering heat
from flue gases900
21 600 1490 0.60
3. 3. Utilization of Renewable Energy –
I Installation of Solar Water Heating
System
18 300 48 000 3312 5.5
4.Installation of Energy efficient Lighting
System 350 9288 1486 0.23
5 5 The Substitution of Electrical Heating by
Energy Efficient water Heating System 4200 12 000 1002 4.19
6. Installation of Energy Efficient Double
Glassing Windows
2720 3000 480 5.6
7. The Substitution of Excessive Capacity
Motors
150 4000 576 0.26
8. To Switch from Diesel Fuel to Compressed
Natural Gas ( CNG ) in the Bread
Distribution Cars of the Factory.
8000 23 725 0.4
Total 35 820 36 664
In the Factory was implemented the EE measure for recycling of
thermal energy by installation of Heat Exchanger
Heat Exchanger for flue gases on the–stack
ensures save energy by recovering heat. This
measure is replicable at many Georgian
bakeries and other Factories
Schema installation of Heat Exchanger on the stack of Boiler Plant
8. Bakery plant “Imerioni” in Tbilisi
The mass balance shows, that from 100 kg of flour mixed with other
ingredients it is possible to receive 130 kg/h baked bread. There is
opportunity to receive about 135 kg/h bread if the dough fix period
will be shorten. The implementation of Energy efficiency measure:
thermal insulation of dough fix device gives opportunity to shorten
the fix period
Energy Efficiency measure: Thermal insulation of dough fix device
9. Bread Factory № 4 in TbilisiEE Measure : 1. Substitution of flour pneumatic transportation system with mechanical
one:
•Investment 16 000 USD
•Loan 7 000 USD
•Electricity savings 468 660 kWh/year or 26 479 USD/ year
Payback 0,6 year
•Status: The Project is implemented
Energy Auditing of Buildings
Buildings are biggest consumer of energy resources . Buildings
consume more than 40% of total energy consumption in the word.
The existing building stock of Georgia with its Soviet legacy
buildings is characterized with very low efficiency. The
thermal resistance to heat flow of the buildings, for instance
in Tbilisi is 3 – 4 times less than requires for energy
efficiency, for Tbilisi climate zone. Georgia uses 40 -50 %
more energy for heating per square meter of floor space, than
the EU countries with the same climate.
The improvement of energy efficiency in building sector of
Georgia should play important role for reduce country’s
dependence on energy import and lead to Improved
national and energy security
Heat losses from Building How to stop energy losses?
Roof 18%
HHeating and
Ventilation 32 %
Windows 17%
Walls 17%Floor 16%
Heat losses in the distribution of building
Improve of thermal resistance of building’s envelope (walls,
windows, floors, roof) can reduce energy consumption by
building on 50-60% (to increase energy effeciency of the
building).
Energy Audit Report
LTD “ # 6 Authorized School “
28, Lado .Asatiani st. Tbilisi
Renovation of School Building
for Increase Energy Efficiency
Energy Audit. conducted in the LTD Company “# 6 Authorized
School “ showed big potential of savings of annual consumption of :
electricity and natural gas in the school building . There were identified
energy efficiency measures the realization of that will improve of
educational, economic and environmental protection indices of the
company, that are connected with reduction of emissions of CO2 ,
SO2, NO2 to the atmosphere.
Name of Energy Efficiency Measure Investment
( USD)
Energy
Savings
( kWh/year)
Savings
( USD / year)
Payback
Period
( Year)
1. The reconstruction of boiler house
including :
a) The substitution of boilers on liquid
fuel by high efficiency condensing
gas boilers. Will be installed two
water heating boilers with
capacity 290 kW ( one
standby capacity) manufactured
by Company BUDEROS,
and auxiliary equipments
b) The construction of the gas
pipeline to boiler house
140 000
among them :
110 000
30 000
230 850
34 486
4.05
2 . The thermal insulation of the roof
of building
40 000 153 900 8970 4.45
3. The installation of energy efficient
double glazed windows
16 000 32 062 1868 8.5
5 4. Installation of Energy efficient lighting
system
66 000 73 872 7092 9.2
5. The utilization of renewable energy –
installation of Solar Water Heating
(SWH) System
15 878 84991 3872 4.1
6. Installation of DRYMAT –System,
for permanently dry building’s wall ( with the potential to save
approximately 5% of the heating
consumption).
45 000
Total 322 878
Bellow are presented the examples Energy Audits in Buildings
conducted by Azerbaijan and Georgian Energy Efficiency
Centers in Baku and Tbilisi under Norwegian “ Program Energy
Efficiency and Cleaner Production “ in 2004
A view of growing Baku A view of the old and newTbilisi
Energy Institute, Baku
ENCON Potential - Energy Audit
Building: Energy Institute, Baku Project no: 8Heated area:
4 032 m²
Energy conservation measures Investment Net savings Payback NPVQ*
[USD] [kWh/yr] [USD/yr] [year]
1. Replacement of the pumps for
water supply1 200 24 190 1 660 0,7 9,2
2. Replacement of the heating
system
8 200 156 440 3 810 2,2 4,4
3. Replacement of lighting devices 2 540 25 800 1 760 1,4 4,1
4. Installation of independent boiler-
house18 200 201 200 4 880 3,7 1,6
Total ENCON measures 30 140 407 630 12 110 2,5
5. Replacement of windows 22 600 152 810 3 820 5,9 0,9
6. Additional insulation of the roof 4 830 24 600 620 7,8 0,3
Total all measures 57 570 585 040 16 550 3,5
School N 143, Tbilisi
ENCON Potential - Energy Audit
Building: School # 143, Tbilisi Project no: 1Heated area:
3 875 m²
Energy conservation measures Investment
[USD]
Net savings Payback
[year]
NPVQ*
[kWh/yr] [USD/yr]
1. Insulation of pipes 450 16 660 350 1,3 5,7
2. Double-glazing of the windows 7 910 128 660 2 440 3,2 1,7
3. Installation of valves 980 27 900 290 3,4 1,0
Total ENCON measures 9 340 173 220 3 080 3,0