Energy Efficiency Engineering Ltd. GAS FIRED EQUIPMENT FIELD APPROVALS PART2. Jozef Jachniak, P.Eng. What will we talk about today?. Part 1 Review Review Compliance Requirements Who is Responsible and For What? Who is Safety Code Officer? Who Else May Require Compliance? - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/1.jpg)
Energy Efficiency Engineering Ltd.
Jozef Jachniak, P.Eng.
GAS FIRED EQUIPMENT FIELD APPROVALS
PART2
![Page 2: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/2.jpg)
What will we talk about today?• Part 1 Review• Review Compliance Requirements• Who is Responsible and For What?• Who is Safety Code Officer?• Who Else May Require Compliance?• What Does Alberta Gas Code Regulation Require?• Who is the CSA B149.3 For?• Who is the CSA B149.1 For?• What is the CSA B149.1 All About?• What is an Inspector Looking For?
![Page 3: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/3.jpg)
What will we talk about today? (cont.)
• What Is the Objective of ENEFEN Field Approval• What Does ENEFEN Field Approval Consist Of?• How Do We Do Field Approvals?• Introduction to ENEFEN Database• How do We Do Design and Engineering?• Engineering Calculations• Quality Control and Safety Compliance• The End Result
![Page 4: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/4.jpg)
Part I Review
• Introduction to ENEFEN• What does ENEFEN do?• Why are Field Approvals required?• Safety legislation(s) behind Field Approvals• Which codes do we have to comply with?• What does CSA do?• Who is AHJ (Authority Having Jurisdiction)• Who is IB (Inspection Body)
![Page 5: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/5.jpg)
Part I Review (cont.)
• What is the Province Wide Variance all about?• Who is responsible for compliance?• Non-compliance is an offence• Penalties can be imposed (monetary and jail)• Bill C-45 assigns criminal liability for accidents
to individuals at organizations • Uncertified appliances and equipment require
special inspection and approval • What is the difference between “certification”
and “approval”
![Page 6: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/6.jpg)
Part I Review (cont.)
• Who can do Field Approvals?• What is the accreditation all about?• How about P.Eng. doing a Field Approval?• Is stamping of a drawing sufficient?• What documentation is required?• Who will check it?• What will happen if there is no proof of Field
Approval?• How about GRANDFATHERING?
![Page 7: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/7.jpg)
Review of Compliance Requirements
• Primary Compliance is with the Provincial Act(s) • Alberta Safety Codes Act requires compliance with:• Amusement Rides Standards• Building Code• Electrical Code• Elevating Devices Code (including Ropeways)• Fire Code• Gas Code• Plumbing Code• Pressure Equipment Safety• Private Sewage Disposal Systems
![Page 8: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/8.jpg)
Who is Responsible?• Minister (co-ordinate and encourage)• Owner (ensure compliance, maintenance, safety)• Designer (ensure compliance, submit for review or
registration, notify if deregistered)• Manufacture (ensure compliance)• Contractor (ensure compliance)• Vendor (do not advertise or sell, lease or dispose of if
non compliant, provide warnings if non-compliant)• P.Eng. (ensure compliance)• COMPLIANCE WITH ACT !!
![Page 9: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/9.jpg)
Who is Not Liable?
• Crown• Council or members of council• Safety Codes Officers• Accredited Agencies and their
employees and officers• Administrators
![Page 10: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/10.jpg)
Who is a Safety Codes Officer?
• Individual designated by Administrator• Person who holds appropriate
certificate of competency and meets the requirements of regulation
![Page 11: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/11.jpg)
What Can a Safety Codes Officer Do?
• Enter premises without warrant• Carry out an inspection• Review designs and evaluate quality management
systems and manufacturing, construction processes• Photograph or otherwise record• Ask for full disclosure in writing or orally• Temporary close and disconnect• Require tests or evaluations• Apply to Court for enforcement
![Page 12: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/12.jpg)
Who Else Can Require Compliance?
• Energy Resources Conservation Board (ERCB)
• Electrical Inspector• Fire Department Inspector• Insurance Company
![Page 13: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/13.jpg)
What does Alberta Gas Code Regulation Require?
• CSA B149.1-10 Natural Gas and Propane Installation Code
• CSA B149.2-10 Propane Storage And Handling Code • CSA B149.5-10 Installation Code for Propane Fuel
Systems on Tanks on Highway Vehicles• CSA B108-99 Natural Gas Fuelling Stations Installation
Code• CSA B109.01 Natural Gas for Vehicles Installation Code• Alberta Building Code 2006
![Page 14: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/14.jpg)
Who is the CSA B149.3-10 Code For?
• CSA B149.3-10 Code For Field Approval of Fuel-Related Components on Appliances And Equipment
• CSA B149.3-10 is For Accredited Inspectors and Safety Codes Officers
• CSA B149.3-10 Is Not a Design Guideline• CSA B149.3-10 is a MINIMUM REQUIREMENT• CSA B149.3-10 is not a LAW, it is just a guideline
for Field Approvals
![Page 15: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/15.jpg)
What is the CSA B149.1-10 For?
• CSA B149.1-10 is for Installers of:• Appliances, equipment, components and
accessories where gas is to be used for fuel purposes
• Piping and tubing systems from utility termination or propane tank
• Vehicle natural gas refueling appliances• Stationary gas engines and turbines
![Page 16: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/16.jpg)
What Else Does CSA B149.1-10 Reference?
• CSA B149.1-10 references 50 other standards• Among those standards are:• B51-09 Boiler, pressure vessel and pressure
piping code• B149.3-10 Code for Field Approvals• C22.1 Canadian Electrical Code Part I• National Building Code of Canada NRC 2005
![Page 17: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/17.jpg)
What Does CSA B149.1-10 Include?
• Definitions• Approval Requirements (B149.3)• Responsibilities of the Installer (compliance, operator
training, manufacturers instructions)• Training and quality of labour• Suitability of use• Meter and Service Regulator• Electrical Connections and Components• Mobile Homes• Hazardous Locations
![Page 18: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/18.jpg)
What Does CSA B149.1-10 Include? (cont)
• Leak detection• Appliance Clearances• Appliance Accessibility• Outdoor Installations• Appliances in Garages• Combined Heating Systems• Automatic Fire Extinguishing systems• High Altitude installations• Odorization
![Page 19: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/19.jpg)
What Does CSA B149.1-10 Include? (cont)
• Pressure Controls• Piping and Tubing Systems (pressure drops,
sizing, expansion)• Venting of Pressure Controls (sizing)• Installation of specific Appliances• Flue Venting• Combustion Air Supply• Natural Gas Compressors and Cylinders• Vehicle Refueling Appliances
![Page 20: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/20.jpg)
Installer's Responsibilities
• Compliance With Above 27+ Installation Topics• Use of ONLY Certified or Field Approved
Appliances• Testing and Commissioning of the Installation• Operator / Owner Training• Documentation of Installation and User Manuals• Rating Plate• Appropriate Inspections, and Permits
![Page 21: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/21.jpg)
What Is an Inspector Looking For?
• Appliance Proof of Certification (sticker).......... OR• Compliance with (B149.3-10) :• Pilot Gas Valve Train• Main Gas Valve Train• Burner• Additional Requirements for Liquid Propane Trains• Qualifications of the Installer (Mechanical, Electrical)• Installation• Unions and Flanges• Pressure Test Points• Pressure Ratings• Bleed Vents Control Devices
![Page 22: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/22.jpg)
What Is an Inspector Looking For? (cont)
• Observation of Main Burner Flame and Ignition Source• Pneumatic Control Systems• Ignition Systems• Combustion Safety Controls• Purge• Low Fire Start• Temperature, Pressure and Level Safety Limits• Gas pressure Safety Limits• Auxiliary Fans and Dampers• Special Appliance Applications• Appliance Location Hazards
![Page 23: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/23.jpg)
What Is an Inspector Looking For? (cont)
• Accessibility• Explosion Relief• Temperature Controllers and Sensors• Fuel /Air Ratio Controllers• Gas / Air Mixers and Blowers• Programmable Controllers (PLC’s)• Electrical Power Supply• Appliance Circuits (wiring diagram)• Rating Plate• Initial Startup Procedure
![Page 24: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/24.jpg)
What Are The Objectives Of ENEFEN Field Approval?
• To Systematically Review Various Aspects of Design, Assembly, Installation, Wiring, Testing, Commissioning, Documentation, Operator Training
• To Confirm that the Final Installation Meets or Exceeds Applicable Codes and Sound Combustion Engineering and Controls Principles.
• To Review Potential Hazards and Methods of their Avoidance / Mitigation
• To Confirm that the Installation can be Safely and Reliably Operated and Maintained in its Process and Environment
![Page 25: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/25.jpg)
What Does NFN Field Approval Consist Of?
• EVALUATION• ENGINEERING & DESIGN
• DESIGN APPROVAL IN PRINCIPLE
• FIELD INSPECTION
![Page 26: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/26.jpg)
What Does NFN Field Approval Consist Of?
![Page 27: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/27.jpg)
How Do We Do Field Approvals?
• Proprietary MySQL Database Of Field Approval FAQs and FRAs
• Google Docs and Excel Interface• Client Document Tracking System• Automated and Repeatable Evaluation
Process• Extensive Reporting Compliant with Code
Requirements
![Page 28: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/28.jpg)
Data Base Content Groups
• Client and Owner Contact Data• Client Project Data• Process Data• Location Data• Appliance Data• Main / Secondary / Pilot Fuel Data• Instrument Gas Data• Electrical Data
![Page 29: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/29.jpg)
Data Base Content Groups (cont.)
• Heater Shell Data• Fire Tube Data• Stack Data• Windbox Data• Flame Cell Data• Main Burner Data• Pilot Burner Data• Combustion Air Controls Data
![Page 30: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/30.jpg)
Data Base Content Groups (cont.)
• Heater Permissives Data• BMS / FSG Data• Heater Control System• Main Fuel Train• Pilot Fuel Train• Fuel Gas Venting• Controls• PLC Based BMS
![Page 31: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/31.jpg)
Data Base Content Groups (cont.)• Factory Acceptance Testing• Marking and Alarms• Installation Upstream Piping• Installation Mechanical / Electrical• Startup and Commissioning• Combustion Readings• Documentation• Personnel Training• Heater Code Compliance Data
![Page 32: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/32.jpg)
![Page 33: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/33.jpg)
![Page 34: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/34.jpg)
How Do We Do Design and Engineering?
• Standard Design Codes• Client and Application Templates• Automatic Drawing Generation• Automatic BOM Generation• Library of Computerized Engineering
Subroutines• Rating Plate Design Generation• Provincial Application Forms Generation• P.Eng. Stamping for Alberta, BC and SK
![Page 35: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/35.jpg)
![Page 36: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/36.jpg)
![Page 37: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/37.jpg)
Engineering Calculations?
• Thermal Heat Transfer• Fuel Mixtures Properties• Thermal Oxidation• Fuel Train Pressure Drop• PSV Sizing• Vent Line Sizing• Combustion Efficiency Calculation• EfficiencyGram Calculation
![Page 38: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/38.jpg)
![Page 39: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/39.jpg)
How About Quality Control and Safety Compliance?
• Standards Of Operations Compliant with ISO/IEC 17020
• Accreditation with Standards Council of Canada in Progress
• ENEFEN Field Approval Process Reviewed and Accepted in writing by Alberta Municipal Affairs
• ISNetworld Registered• Health and Safety Program in Place• Approved Vendor for Various Oil Companies
![Page 40: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/40.jpg)
![Page 41: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/41.jpg)
![Page 42: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/42.jpg)
![Page 43: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/43.jpg)
![Page 44: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/44.jpg)
Any Questions?Please feel free to call Jozef at 780-940-3464
THANK YOU
![Page 45: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/45.jpg)
Safety Legislation?
![Page 46: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/46.jpg)
Code?
![Page 47: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/47.jpg)
CSA B149.1 Installation Code?
![Page 48: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/48.jpg)
What else is required?
![Page 49: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/49.jpg)
Approval of Appliances
![Page 50: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/50.jpg)
Responsibilities
![Page 51: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/51.jpg)
Responsibilities
![Page 52: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/52.jpg)
Responsibilities
![Page 53: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/53.jpg)
Responsibilities of the installer
![Page 54: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/54.jpg)
More responsibilities 1
![Page 55: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/55.jpg)
More responsibilities 2
![Page 56: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/56.jpg)
More responsibilities 3
![Page 57: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/57.jpg)
Province Wide Variance
![Page 58: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/58.jpg)
Province Wide Variance
![Page 59: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/59.jpg)
Prohibitions
![Page 60: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/60.jpg)
Penalties
![Page 61: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/61.jpg)
INSPECTION AND APPROVAL REQUIRED
![Page 62: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/62.jpg)
Administration
![Page 63: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/63.jpg)
ENEFEN Approvals Accepted by AMA
![Page 64: Energy Efficiency Engineering Ltd](https://reader035.vdocuments.net/reader035/viewer/2022062321/56812e3d550346895d93b8a5/html5/thumbnails/64.jpg)
CSA B149.3