Introductions
Michael Deru National Renewable Energy Laboratory
New resources
Glen Anderson ETC Group
Deep dive into chiller performance
Matthew Gudorf University of California
Irvine
Large campus chiller efficiency
opportunities
![Page 3: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/3.jpg)
Central Plant Resource Map
3
![Page 4: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/4.jpg)
Click to edit Master title style Central Plant Resource Map
4
![Page 5: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/5.jpg)
How Well are Your Systems Performing?
5
Compare your building to a range of standard benchmarks
Your Building
![Page 6: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/6.jpg)
Matthew Gudorf UC Irvine
![Page 7: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/7.jpg)
![Page 8: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/8.jpg)
Quick Facts
• Established in 1965 • Comprehensive Research
University • 13 Lab buildings past two
decades • 8-24MW Load
• 1,526 Acres • 10M+ Square feet • 7.5M Sqft District Utilities • 24,489 Undergraduates • 6,268 Postgraduates • $20,754,196 Utility Budget
![Page 9: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/9.jpg)
9
UCI Substation 66kV/12kV
Edison MacArthur Substation
66kV
Campus Utilities
![Page 10: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/10.jpg)
UCI Substation 66kV/12kV
Edison MacArthur Substation
66kV
Central Plant: 8 chillers
Gas turbine: 13.5 MW Steam turbine: 5.6 MW
Campus Utilities
![Page 11: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/11.jpg)
UCI Substation 66kV/12kV
Edison MacArthur Substation
66kV
Central Plant: 8 chillers
Gas turbine: 13.5 MW Steam turbine: 5.6 MW Solar Rooftop PV
3.6 MW
TES
Campus Utilities
![Page 12: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/12.jpg)
UCI Substation 66kV/12kV
Edison MacArthur Substation
66kV
Central Plant: 8 chillers
Gas turbine: 13.5 MW Steam turbine: 5.6 MW Solar Rooftop PV
3.6 MW
TES
CPV 113kW
Campus Utilities
![Page 13: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/13.jpg)
UCI Substation 66kV/12kV
Edison MacArthur Substation
66kV
Central Plant: 8 chillers
Gas turbine: 13.5 MW Steam turbine: 5.6 MW Solar Rooftop PV
3.6 MW
CPV 113kW
Campus Utilities
![Page 14: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/14.jpg)
Central Plant: 8 chillers
Serve 82 Buildings TES
Thermal Storage 4,500,000 Gal
60,000 Ton-Hour
Campus Utilities
![Page 15: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/15.jpg)
Manufacture Rating in Tons Refrigerant Year Installed
Chiller #1 Trane 1000 R-123 1992
Chiller #2 Trane 1000 R-123 1997
Chiller #3 Trane 1000 R-123 1997
Chiller #4 York 2000 R-134a 2002
Chiller #5 Trane 2500 R-123 1999
Chiller #6 Trane 2500 R-123 2004
Chiller #7 York 3000 R-134a 2007
Chiller #8 York 3000 R-134a 2007
Chiller Plant Details
16,000 Tons of nominal chiller capacity
![Page 16: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/16.jpg)
Chilled Water System
• AHU coils designed for 39°F supply • System ΔT of 20-23°F • PIC-V or Flow Limiters at each AHU • Average load 3,100 tons • Peak load 13,000 tons • 74,400 Ton-Hours per day • Flow Capacity @ 30” header is
35,600 gpm • Secondary pump capacity 25,200
gpm @ 100 feet of head • TES pump capacity is 22,700 gpm
@ 90 feet of head • Delivered 0.7kW per ton
![Page 17: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/17.jpg)
Chilled Water Load Side Optimization 1997-2016 the campus changed out AHU coils to provide a ΔT minimum of 20°F at the same time stacked coils are re-piped reverse return to eliminate the need for balancing valves.
The system makes use of Pressure independent control valves and flow limiters to minimize use and maximize energy efficiency
Monitoring the hydronic system at the building level
![Page 18: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/18.jpg)
Tank holds 4.5 million gallons of chilled water
Tank is 107’ tall by 88’ in diameter
When chilled to 39°F, rated storage is 186,400 kWh
0-8MW of load can be shifted
Originally built to shift load to off-peak rates
Thermal Energy Storage
![Page 19: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/19.jpg)
45%
UC Irvine Drastically Reduces Load
![Page 20: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/20.jpg)
Operating Limitations 1 The interconnection agreement is for inadvertent export of power only.
2 Curtailment of the CTG is limited to 7.5MW due to emissions
3 Solar power production cannot be curtailed (PPA)
4 Efficiency of the CTG drops as output is reduced
5 Import electricity cost more than self generation
Load Generation Import Electricity
So how is the near perfect management as shown on the right achieved? UC Irvine uses TES as an electrical battery to flatten and shape load to match generation!
![Page 21: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/21.jpg)
909 kW Solar Rooftop PV
(Mesa Parking)
725 kW Solar Rooftop PV (SC Parking)
935 kW Solar Rooftop PV (SS Parking)
Central Plant NGCC
13.5 [MW]
GT
4.5 [MW]
ST
Ten 12 [KV]
circuits
3,575 [KWpeak]
PV
Load PV
UCI Campus
66 [KV] circuit
SCE
7 Electric Chillers
GT = Gas Turbine ST = Steam Turbine
NGCC = Natural Gas Combined Cycle SCE = Southern California Edison
Balancing Load and Generation
TES
Storage
![Page 22: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/22.jpg)
Duck curve with large swings Does it all work?
Add chiller Load and Charge TES tank
No chiller load Utilization of TES Tank
24 Hours
0-18
MW
![Page 23: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/23.jpg)
Flattest possible load shape Matched to Generation
24 Hours
0-18
MW
Utilize Solar
Maximize Base Loaded CTG
Import as little as possible
![Page 24: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/24.jpg)
Actual Load and Generation Graph From UCI Campus
![Page 25: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/25.jpg)
$-
$0.20
$0.40
$0.60
$0.80
$1.00
$1.20
$1.40
$1.60
$1.80
2008 2009 2010 2011 2012 2013 2014 2015
Energy Cost Per Square foot
Financial Savings
Optimization of load and generation results in financial savings • Minimal import of expensive electricity • Solar offsetting peak demand
![Page 26: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/26.jpg)
Next steps Save energy and reduce load at each AHU Optimize electrical generation and load Optimize delta T of CHW system Optimize the chillers
• approach optimization (difference between the leaving water and the saturated refrigerant temperature
• lift optimization (difference between condenser refrigerant pressure and evaporator refrigerant pressure)
• cooling tower optimization pumps and fans
Plant staff shall select which chillers to run and when. The optimization system shall then optimize the selected equipment. Load shape and maintaining load will takes precedence.
![Page 27: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/27.jpg)
Glen Anderson ETC Group
![Page 28: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/28.jpg)
OPENING THE BLACK BOX
Glen R Anderson, PE
2016 Better Buildings Summit Washington DC
May 11, 2016
![Page 29: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/29.jpg)
2016 BETTER BUILDINGS SUMMIT
OUTLINE OUTLINE • What drives chiller efficiency? • How can you check each component of a chiller? • Case studies of completing live chiller performance testing
![Page 30: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/30.jpg)
2016 BETTER BUILDINGS SUMMIT
![Page 31: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/31.jpg)
2016 BETTER BUILDINGS SUMMIT ©
TOOLS TO OPEN THE BLACK BOX
![Page 32: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/32.jpg)
2016 BETTER BUILDINGS SUMMIT
COLLECTING AND ANALYZING DATA
![Page 33: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/33.jpg)
2016 BETTER BUILDINGS SUMMIT
![Page 34: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/34.jpg)
2016 BETTER BUILDINGS SUMMIT
REFRIGERATION CYCLE Work is proportional to difference between evaporator and condenser pressure
Reduce work by dropping condenser pressure (Temperature) or raising evaporator pressure (Temperature)
![Page 35: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/35.jpg)
2016 BETTER BUILDINGS SUMMIT
OPENING THE BLACK BOX • Human Head • Chiller
X-Rays
![Page 36: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/36.jpg)
2016 BETTER BUILDINGS SUMMIT
OPENING THE BLACK BOX • Human Head
X-Rays Live Chiller Performance Test
Live Actual COP
• Chiller
![Page 37: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/37.jpg)
2016 BETTER BUILDINGS SUMMIT
WHAT THE CHILLER PERFORMANCE TEST DOES
![Page 38: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/38.jpg)
2016 BETTER BUILDINGS SUMMIT
WHAT THE CHILLER PERFORMANCE TEST DOES
P1
P2
h3 h2 h1
P1 / T1
P2 / T2
3
Cycle Compression
Work
Cycle Cooling Capacity
![Page 39: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/39.jpg)
2016 BETTER BUILDINGS SUMMIT
WHAT THE CHILLER PERFORMANCE TEST DOES
P1
P2
h3 h2 h1
P1 / T1
P2 / T2
3
Actual COP =
![Page 40: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/40.jpg)
2016 BETTER BUILDINGS SUMMIT
WHAT THE CHILLER PERFORMANCE TEST DOES
P1
P2
h3 h2 h1
Actual COP = h1 – h2
h2 – h3 TON kW
![Page 41: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/41.jpg)
2016 BETTER BUILDINGS SUMMIT
• A local manufacturing company that had been aggressively executing efficiency projects and doing maintenance
• Looking for more effective way to measure performance
1ST LOOK INSIDE THE BLACK BOX
![Page 42: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/42.jpg)
2016 BETTER BUILDINGS SUMMIT
180 TON WATER COOLED SCREW CHILLER
![Page 43: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/43.jpg)
2016 BETTER BUILDINGS SUMMIT
OBVIOUS DEGRADATION IN PERFORMANCE
![Page 44: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/44.jpg)
2016 BETTER BUILDINGS SUMMIT
WHY?
2-3% power gain / 1°F drop in refrigerant temp
Data suggests evaporator problems
![Page 45: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/45.jpg)
2016 BETTER BUILDINGS SUMMIT
• 2x the Required Oil in the Evaporator • Compressor had been replaced. Technician
added recommended amount of oil, overfilling the chiller because of existing oil.
• Excess oil coating the tubes acts as an insulator, requiring chiller to make colder refrigerant to deliver necessary cooling, increasing energy.
ANSWER
![Page 46: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/46.jpg)
2016 BETTER BUILDINGS SUMMIT
CLIMACHECK FLOW CHART OVERVIEW
![Page 47: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/47.jpg)
2016 BETTER BUILDINGS SUMMIT
CLIMACHECK (CONDENSER)
![Page 48: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/48.jpg)
2016 BETTER BUILDINGS SUMMIT
CLIMACHECK (COMPRESSOR)
![Page 49: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/49.jpg)
2016 BETTER BUILDINGS SUMMIT
CLIMACHECK (EVAPORATOR)
![Page 50: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/50.jpg)
2016 BETTER BUILDINGS SUMMIT
ONLINE BENCHMARKING
![Page 51: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/51.jpg)
2016 BETTER BUILDINGS SUMMIT
STATE OF THE ART CHILLER OPERATING INEFFICIENTLY
![Page 52: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/52.jpg)
2016 BETTER BUILDINGS SUMMIT
STATE OF THE ART CHILLER OPERATING INEFFICIENTLY
52
30% higher energy consumption 30,000 kWh/year wasted energy
![Page 53: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/53.jpg)
2016 BETTER BUILDINGS SUMMIT ©
KNOW THE PERFORMANCE – MAXIMIZE EFFICIENCY
53
Re-Commissioning - result of structured optimisation
Scoping period “baseline”
consumption
Implementation Validation Performance monitored operation
Optimization
![Page 54: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/54.jpg)
2016 BETTER BUILDINGS SUMMIT
ALL THE DATA YOU NEED
![Page 55: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/55.jpg)
2016 BETTER BUILDINGS SUMMIT
• Low refrigerant • High refrigerant • Fouled evaporators / condensers • Un-balanced flow
TEST RESULTS FROM ANOTHER 12 CHILLERS
![Page 56: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/56.jpg)
2016 BETTER BUILDINGS SUMMIT
VIEWING DATA WITH A FAMILIAR PLATFORM
![Page 57: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/57.jpg)
2016 BETTER BUILDINGS SUMMIT
COMPARE MAIN KPIS
Chiller 5 & 6 least efficient
Chiller 4 has lower load
![Page 58: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/58.jpg)
2016 BETTER BUILDINGS SUMMIT
LOW REFRIGERANT
Chiller 5 vs 6 before fixes Chiller 6 has refrigerant added
Chiller 6 used more power than Chiller 5
Chillers 5 & 6 used equal power
![Page 59: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/59.jpg)
2016 BETTER BUILDINGS SUMMIT
COMPARE SPECIFIC DATA POINTS
![Page 60: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/60.jpg)
2016 BETTER BUILDINGS SUMMIT
COMPARING DATA - SUPERHEAT
![Page 61: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/61.jpg)
2016 BETTER BUILDINGS SUMMIT
COMPARING REFRIGERANT PRESSURE
Chiller 4 dP = 47.2 psi Chiller 6 dP = 53.6 psi
![Page 62: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/62.jpg)
2016 BETTER BUILDINGS SUMMIT
COMPARING REFRIGERANT TEMPS
Chiller 4 has coldest condenser refrigerant and warmest evaporator refrigerant
![Page 63: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/63.jpg)
2016 BETTER BUILDINGS SUMMIT
Design flow is 3,000 GPM Minimum flow is ~2,250 GPM
ZEROING IN ON THE CULPRIT
![Page 64: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/64.jpg)
2016 BETTER BUILDINGS SUMMIT
All-Variable Speed Centrifugal Chiller Plants, Thomas Hartman, ASHRAE Journal, September 2001
CHILLER PERFORMANCE
![Page 65: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/65.jpg)
2016 BETTER BUILDINGS SUMMIT
LOADS AREN’T WHAT YOU THINK What tonnage do you stage on/off the chillers?
![Page 66: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/66.jpg)
2016 BETTER BUILDINGS SUMMIT
TEST RESULTS SUMMARY
Site Chiller # chiller issues # flow issues # Other Issues % Savings1 1 1 30%2 3 2 12%2 52 6 1 1 17%3 4 1 7%3 5 2 1 10%3 6 1 1 18%4 1 1 1 10%4 2 1 1 16%4 3 1 5%5 1 1 1 5%5 2 1 1 5%5 3 1 1 5%
![Page 67: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/67.jpg)
2016 BETTER BUILDINGS SUMMIT
OTHER COOL SLIDES
![Page 68: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/68.jpg)
2016 BETTER BUILDINGS SUMMIT
Source: Ultraefficient All-Variable-Speed Chilled Water Plants, Ben Erpelding, HPAC Engineering, March 2006
CHILLER PLANT EFFICIENCIES
![Page 69: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/69.jpg)
2016 BETTER BUILDINGS SUMMIT
CHILLER EFFICIENCY VS. TEMP
0.200
0.220
0.240
0.260
0.280
0.300
0.320
0.340
0.360
0.380
0.400
0.0 20.0 40.0 60.0 80.0 100.0 120.0
kW/t
on
% load
42 F Water
44 F Water
ENERGY ENGINEERING FOR A SUSTAINABLE FUTURE
7% Less Energy
![Page 70: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/70.jpg)
2016 BETTER BUILDINGS SUMMIT
PRIMARY/SECONDARY PUMPING
Bypass Flow = Wasted Energy Bypass Flow – Secondary flow must be < primary flow
![Page 71: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/71.jpg)
2016 BETTER BUILDINGS SUMMIT
DEATH SPIRAL
ENERGY ENGINEERING FOR A SUSTAINABLE FUTURE
$78,000 savings per year!
![Page 73: Energy Efficiency for Large Building Chiller Systems](https://reader031.vdocuments.net/reader031/viewer/2022020301/587a1a101a28ab0d798bfa77/html5/thumbnails/73.jpg)
Thank you!
Matthew Gudorf, UC Irvine [email protected]
Glen Anderson, ETC Group [email protected]
Michael Deru, National Renewable Energy Laboratory [email protected]
73