IntroductionIntroduction• Memorandum of Understanding (MoU) between Agartala Municipal
Corporation (AMC) Energy Efficiency Services Limited(A JV company of PSUs of Ministry of Power, Government of India) signed on 9th December 2014 to replace 32216 conventional lights with LED street lights.
• EESL to install, operate & maintain these LED street lights over 10 years.• Entire capital cost by EESL, repayment of the capital cost will be made through
the savings on energy bills
LED Streetlight Pilot Project being inaugurated by Hon’ble Power Minister/UD (Govt. of Tripura) on 8th January, 2015
Benefits to AMC
• Annual Energy Savings = 5.40 Million Units
• Annual Cost Savings = Rs. 3.77 Crores• Annual Maintenance Savings = Rs. 0.32 Crores• Total Annual Savings = Rs. 4.08 Crores
• EESL Annuity = Rs. 5.18 Crores
-------------------------------------------------------------
• 31640 Lights replaced in 60 days from the date of placement of LOI to manufacturers.
• Balance 576 Lights will be completed by 30th June 2015
• Centrally Controlled Monitoring System (CCMS) to be installed by 15th August, 2015
Project ImplementationProject Implementation
Welcome gate of AgartalaWelcome gate of Agartala
BEFORE AFTER
NEAR DAINIK SAMBAD , VIP ROAD
Power Factor: 0.96Lux Level: 28.9 lux
Power Factor: 0.42Lux Level: 17.6 lux
IN FRONT OF RAJBHAVAN
Power Factor: 0.98Lux Level: 32.3 lux
NEAR BHOLA GIRI ASHRAM
Power Factor: 0.96Lux Level: 27 lux
Power Factor: 0.97
Power Factor: 0.97