energy intelligence for industry
DESCRIPTION
Energy Intelligence for Industry helps small industrial customers manage their energy usage by providing real-time energy feedback and alerts.TRANSCRIPT
![Page 1: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/1.jpg)
Pg. 1
Energy Intelligence ProgramMonitor your industrial facility and save energy!
• Tool that provides real-time feedback to help you manage energy in your manufacturing plant.
• Determine how much and when you use energy.• CEE helps you interpret your energy patterns to
improve the efficiency of your operation.
![Page 2: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/2.jpg)
Pg. 2
Track And Get Real-Time Feedback
![Page 3: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/3.jpg)
Pg. 3
Create Energy Thresholds and Alerts
![Page 4: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/4.jpg)
Pg. 4
Compare Usage Day-Over-Day
![Page 5: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/5.jpg)
Pg. 5
What Are The Benefits Of Participating?
• Determine how much and when you use energy:• Identify wasted energy during non-production periods• Identify demand peaks that cause high energy bills
• CEE assessment of building and equipment• We develop energy strategies to optimize your energy use• We make suggestions to lower your baseline energy use
• Save money by implementing strategies• Our goal is to find a minimum of 5% in energy savings
![Page 6: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/6.jpg)
Pg. 6
How Much Does It Cost?
The program requires a customer time commitment and a small electrician expense that is reimbursed by CEE.• Program is paid for by Xcel Energy.
• All participants in pilot must be approved by Xcel Energy
• Electrician cost is reimbursed by CEE.• Electrician bills customer; Customer bills CEE.• Approximately $500 - $1000 per meter.
![Page 7: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/7.jpg)
Pg. 7
How Much Time Does It Take?
• Off and on site engagement will require about 8 hours of a facility managers time over the 4-8 month program period.
![Page 8: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/8.jpg)
Pg. 8
How Does The Program Work?
1. Install Monitoring
2. Conduct Assessment; Collect Data
3. Energy Patterns Meeting
4. Low-cost/No-cost Energy Experiments
5. Energy Impacts Meeting
6. Equipment and Rebate Recommendations
7. Uninstall Monitoring
![Page 9: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/9.jpg)
Pg. 9
Install Monitoring
CEE works with your licensed electrician to install monitoring equipment at your electric service.
![Page 10: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/10.jpg)
Pg. 10
Conduct Assessment
CEE conducts an energy assessment with your staff to understand equipment and schedules.
![Page 11: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/11.jpg)
Pg. 11
Energy Patterns MeetingAfter about three months, CEE meets with you to review Energy Patterns and provide training on the Energy Intelligence dashboard.
![Page 12: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/12.jpg)
Pg. 12
Low-cost/No-cost Energy Experiments
CEE and customer experiment to lower energy usage over the next two months and see the impact on the dashboard.
![Page 13: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/13.jpg)
Pg. 13
Energy Impacts
Impacts from experiments are validated on dashboard and quantified in $ savings.
$50 energy savings
![Page 14: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/14.jpg)
Pg. 14
Equipment and Rebate Recommendations
In addition to identifying low-cost/no-cost operational savings, CEE provides suggestions for equipment upgrades and studies.• Equipment assessment and recommendations• Coordination with Xcel Energy for:
• Equipment rebates• Study funding
![Page 15: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/15.jpg)
Pg. 15
Example Energy Patterns
• The next slides are examples of energy patterns found with real-time monitoring and feedback.
![Page 16: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/16.jpg)
Pg. 16
How Low Can You Go?Weekend Use
How come the energy use from Midnight to 6 AM (non-production) varies?
![Page 17: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/17.jpg)
Pg. 17
Night Moves! What is going on when you are not there?
Cleaning crew turns on lights at 9 PM and they stay on until morning.
![Page 18: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/18.jpg)
Pg. 18
Working for the Weekend?Equipment left running
Air compressor left on over weekend. Leaks cause it to run during non-production time period.
![Page 19: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/19.jpg)
Pg. 19
Start Me Up!Excessive start-up time
Electrically-heated tanks are turned at noon during a non-production day.
![Page 20: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/20.jpg)
Pg. 20
This One Goes to Eleven.Spikes During Production
Electric resistance heat in an air curtain causes a large demand spike (and charge).
![Page 21: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/21.jpg)
Pg. 21
Fight the Power!Sags/Outages during Production
Customer experienced a loss of a phase at 2:30 PM.
![Page 22: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/22.jpg)
Pg. 22
Who Is Eligible To Participate?
• An Xcel Energy (MN Territory) electric customer.• Small to Mid-Sized:
• You pay between $5000 - $25000 per month for electricity.• Your peak electric demand is less than 600 KW.
• Your business takes raw materials and uses machinery to produce a finished product.
• Acceptance into the pilot program is subject to approval by Xcel Energy.
![Page 23: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/23.jpg)
Pg. 23
How Do I Sign Up?
• Sign Participant Agreement and Bill History Release• Collect Electrician Contact Information
MAIL/EMAIL TO:
Kevin Bengtson
Project Manager
Center for Energy and Environment
212 3rd Avenue North, Minneapolis MN 55401
![Page 24: Energy Intelligence for Industry](https://reader036.vdocuments.net/reader036/viewer/2022062418/556104dfd8b42a8c388b5815/html5/thumbnails/24.jpg)