energy saving project for toyota motor thailand · 2019-12-18 · • vesta uses their own working...

18
Energy Saving Project For Toyota Motor Thailand

Upload: others

Post on 12-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Energy Saving Project

For

Toyota Motor Thailand

Page 2: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

The only Total Solutions Company (Verified by UNIDO)

A. Demand Side Energy Mgmt B. Supply Side Energy Mgmt

• Power Management

- Down stream

- Upstream

• Water Management

- Recycle & reuse

- Treatment

• Steam Management

- Boiler

- Oven & etc.,

• Waste Heat Management

- Boiler Waste Heat

- Oven Waste Heat

- Hot & Cold Water Exchange

• Co-generation

• Tri-generation

• Wind Energy

• Solar Energy

• Renewable Energy/Incineration

- Biomass

- Biogas

- Waste (Solid, Industrial & etc.,)

Page 3: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

E-Saving

Cooling System

Waste Heat

Energy

Supply Side Mgm:

-Cogeneration

-Tri-generation Water Supply System

Water Recycle & Reuse

Compressed Air

Pumps & Fans

- Thermal Circ Pumps

- Exhaust Fans

- Supply Fans

- C/Tower Pumps

Lighting System

Boiler, Steam and

Hot Water

Page 4: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Energy Resource

Management System

Water

Conservation

System

Power

Conservation

System

Waste Heat

recovery

System

Steam

Conservation

System

Fuel & Gas

Conservation

System

Develop

Solutions

Energy Audit Process

Power

Energy Consumption Costs

Reduction Challenges

Water

Gas Fuel

Steam Heat

Oil

Customized

design

R & D Centre

R & D Centre

Information

through IT

software Control

Monitor

Saving

Determination

Process

System

(Tool)

Software

Monitoring

& Control

Page 5: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Efficiency control requires:

- Enormous data

- elaborate analytical study

Inefficiency may be caused by:

- very high/incompatible load

- equipment inefficiency

- aging of catalyst

- high pressure drop in steam/feed/product lines…

- Frequent shut down/starts up etc.,………….

Page 6: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for
Page 7: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Sharing of Energy Saving Cost

Vesta “Pay-As-You-Save” Concept

Innovative Financing Mechanisms

through VESTA

Funding of energy saving investments by VESTA, using

energy savings to pay for the investment.

The advantage is that customer does not have to put up

cash to finance the initial investment. It merely has to

make payments to the performance contractor (VESTA).

Page 8: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Sharing of Energy Saving Costs:

UT UT UT

Before During After

(Under Guarantee)

Towards

Startup Costs

VESTA

Your Profit,

Your

Profit

Ele

ctr

icity E

xp.

Pay-as-you-save

Real financing saving

No capital expenditure

Pay back through your saving

Win-win

opportunity

Page 9: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Benefits of P.A.Y.S. (EPC) Financing

• Includes technical support & assistance which offers turnkey services:

- feasibility analysis, design, engineering, construction management,

installation, operation, maintenance, and financing

• VESTA uses their own working capital for identifying & developing projects.

• Activities VESTA conduct for a project are bundled into that project’s cost.

• VESTA will recoup their working capital with funds from the Saving made

• PAYS concept normally operate under a performance contract (PC)

- depends on the amount of energy saved.

- It is compensated based on measured results

• Customers would reduce the technical, financial, and operational risks

Page 10: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Toyota Motor E-Saving Project Record

Page 11: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Toyota Motor Thailand (Samrong Plant)

Start Project(PH#1) January 2007

Technology VSD+CERMS

Agreement Contact Shared Saving

Total Investment 25 M

E-Saving per year 3.7 M

Agreement period 6 Year

Completed Contract

Page 12: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Toyota Motor Thailand (Samrong Plant)

Start Project(PH#2) January 2007

Technology Lighting(E-Ballast)

Agreement Contact Shared Saving

Total Investment 1M

Saving per year 432,783

Agreement period 36 Month

Completed Contract

Page 13: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Toyota Motor Thailand (Gate Way Plant)

Start Project October 2007

Technology VSD+CERMS

Agreement Contact

Shared Saving

Total Investment 14.7 M

Saving per year 3 M

Agreement period 6 Year

Completed Contract

Page 14: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Toyota Motor Thailand (Banpho Plant)

Start Project(PH#1) January 2009

Technology VSD+CERMS

Agreement Contact Shared Saving

Total Investment 9.5 M

Saving per year 1.9 M

Agreement Contact 6 Year

Completed Contract

Page 15: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Toyota Motor Thailand (Banpho Plant)

Start Project(PH#2) January 2010

Technology RTO Heat Recovery

Agreement Contact Shared Saving

Total Investment 38.4 M

Saving per year 10 M

Agreement period 4.5 Year

Completed Contract

Page 16: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

โดย สถาบนัพลงังานเพ่ืออุตสาหกรรม สภาอุตสาหกรรมแห่งประเทศไทย สนบัสนุนโดย กรมพฒันาพลงังานทดแทนและอนุรักษพ์ลงังาน กระทรวงพลงังาน

Page 17: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for
Page 18: Energy Saving Project For Toyota Motor Thailand · 2019-12-18 · • VESTA uses their own working capital for identifying & developing projects. • Activities VESTA conduct for

Thank You

End of Presentation