Eng: Eyad Haddad Construction Proje ct Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 1 / Lect. 1 2 nd Semester 2008/2009 UP Copyrights 2008 Construction Project Management Eng: Eyad Haddad

Upload: stephany-morris

Post on 27-Dec-2015

232 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management1

Construction Project Management

Faculty of Applied Engineering and Urban Planning

Civil Engineering Department

Week 1 Lect 1

2nd Semester 20082009

UP Copyrights 2008

Const

ruct

ion P

roje

ct

Managem

ent

Eng Eyad Haddad

Eng Eyad Haddad Construction Project Management

2

Construction Project Management

AgendaAbout Eyad Haddad

Structure and delivery

Assessment

Ground rules

About Construction Project Management

What makes Construction Project Management important

Mission Statement

Eng Eyad Haddad Construction Project Management

3

Construction Project Management

About Eyad Haddad

Master Degree of Construction Management

Eyad Haddad contact details

Website httpwwwupedups

Email ehadad1977hotmailcom

Room BK008

Office Hours (1100 ndash 930 )الثالثاء( amp 1100 ndash 930 )االحد

Mobile ---

All lecture slides assignments Notes will be posted on the web as can

as possible

Eng Eyad Haddad Construction Project Management

4

Construction Project Management

Structure and delivery

2 lectures per week (90 minutes each)

Students will be expected to attend the lectures

)1100 ndash 930 (الثالثاء) amp 1100 ndash 930(االحد

Students will be expected to have undertaken a

wide range of reading

Eng Eyad Haddad Construction Project Management

5

Construction Project Management

Resources

1048766 The World Wide Web (www)

1048766 Library books

1048766 Magazines and Journals

1048766 Most key documents will be available electronically

Eng Eyad Haddad Construction Project Management

6

Construction Project Management

Assessment1 Coursework Assignment you will be expected to Write

5 assignments this term (- marks)

2 5-quizes (short exams) during the lecture without prior

notice (- marks)

bull Lectures attendance (- marks)

bull Term Project amp Presentation (- marks)

bull Mid-Term exam (20 marks)

bull 2hour final exam (60 marks)

Eng Eyad Haddad Construction Project Management

7

Construction Project Management

Ground rules Coming in late

Disruption of any kind

Donrsquot ask for an extension without good Reason

Individual work only is allowed Group

discussions for concepts and problems

Donrsquot copy previous year work

When confused ask instructor

Academic honesty

Eng Eyad Haddad Construction Project Management

8

Construction Project Management

Ground rules Cont

Cell Phones are strictly prohibited Please

Donrsquot bring your cell to the lecture or

keep it always closed

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 2: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

2

Construction Project Management

AgendaAbout Eyad Haddad

Structure and delivery

Assessment

Ground rules

About Construction Project Management

What makes Construction Project Management important

Mission Statement

Eng Eyad Haddad Construction Project Management

3

Construction Project Management

About Eyad Haddad

Master Degree of Construction Management

Eyad Haddad contact details

Website httpwwwupedups

Email ehadad1977hotmailcom

Room BK008

Office Hours (1100 ndash 930 )الثالثاء( amp 1100 ndash 930 )االحد

Mobile ---

All lecture slides assignments Notes will be posted on the web as can

as possible

Eng Eyad Haddad Construction Project Management

4

Construction Project Management

Structure and delivery

2 lectures per week (90 minutes each)

Students will be expected to attend the lectures

)1100 ndash 930 (الثالثاء) amp 1100 ndash 930(االحد

Students will be expected to have undertaken a

wide range of reading

Eng Eyad Haddad Construction Project Management

5

Construction Project Management

Resources

1048766 The World Wide Web (www)

1048766 Library books

1048766 Magazines and Journals

1048766 Most key documents will be available electronically

Eng Eyad Haddad Construction Project Management

6

Construction Project Management

Assessment1 Coursework Assignment you will be expected to Write

5 assignments this term (- marks)

2 5-quizes (short exams) during the lecture without prior

notice (- marks)

bull Lectures attendance (- marks)

bull Term Project amp Presentation (- marks)

bull Mid-Term exam (20 marks)

bull 2hour final exam (60 marks)

Eng Eyad Haddad Construction Project Management

7

Construction Project Management

Ground rules Coming in late

Disruption of any kind

Donrsquot ask for an extension without good Reason

Individual work only is allowed Group

discussions for concepts and problems

Donrsquot copy previous year work

When confused ask instructor

Academic honesty

Eng Eyad Haddad Construction Project Management

8

Construction Project Management

Ground rules Cont

Cell Phones are strictly prohibited Please

Donrsquot bring your cell to the lecture or

keep it always closed

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 3: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

3

Construction Project Management

About Eyad Haddad

Master Degree of Construction Management

Eyad Haddad contact details

Website httpwwwupedups

Email ehadad1977hotmailcom

Room BK008

Office Hours (1100 ndash 930 )الثالثاء( amp 1100 ndash 930 )االحد

Mobile ---

All lecture slides assignments Notes will be posted on the web as can

as possible

Eng Eyad Haddad Construction Project Management

4

Construction Project Management

Structure and delivery

2 lectures per week (90 minutes each)

Students will be expected to attend the lectures

)1100 ndash 930 (الثالثاء) amp 1100 ndash 930(االحد

Students will be expected to have undertaken a

wide range of reading

Eng Eyad Haddad Construction Project Management

5

Construction Project Management

Resources

1048766 The World Wide Web (www)

1048766 Library books

1048766 Magazines and Journals

1048766 Most key documents will be available electronically

Eng Eyad Haddad Construction Project Management

6

Construction Project Management

Assessment1 Coursework Assignment you will be expected to Write

5 assignments this term (- marks)

2 5-quizes (short exams) during the lecture without prior

notice (- marks)

bull Lectures attendance (- marks)

bull Term Project amp Presentation (- marks)

bull Mid-Term exam (20 marks)

bull 2hour final exam (60 marks)

Eng Eyad Haddad Construction Project Management

7

Construction Project Management

Ground rules Coming in late

Disruption of any kind

Donrsquot ask for an extension without good Reason

Individual work only is allowed Group

discussions for concepts and problems

Donrsquot copy previous year work

When confused ask instructor

Academic honesty

Eng Eyad Haddad Construction Project Management

8

Construction Project Management

Ground rules Cont

Cell Phones are strictly prohibited Please

Donrsquot bring your cell to the lecture or

keep it always closed

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 4: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

4

Construction Project Management

Structure and delivery

2 lectures per week (90 minutes each)

Students will be expected to attend the lectures

)1100 ndash 930 (الثالثاء) amp 1100 ndash 930(االحد

Students will be expected to have undertaken a

wide range of reading

Eng Eyad Haddad Construction Project Management

5

Construction Project Management

Resources

1048766 The World Wide Web (www)

1048766 Library books

1048766 Magazines and Journals

1048766 Most key documents will be available electronically

Eng Eyad Haddad Construction Project Management

6

Construction Project Management

Assessment1 Coursework Assignment you will be expected to Write

5 assignments this term (- marks)

2 5-quizes (short exams) during the lecture without prior

notice (- marks)

bull Lectures attendance (- marks)

bull Term Project amp Presentation (- marks)

bull Mid-Term exam (20 marks)

bull 2hour final exam (60 marks)

Eng Eyad Haddad Construction Project Management

7

Construction Project Management

Ground rules Coming in late

Disruption of any kind

Donrsquot ask for an extension without good Reason

Individual work only is allowed Group

discussions for concepts and problems

Donrsquot copy previous year work

When confused ask instructor

Academic honesty

Eng Eyad Haddad Construction Project Management

8

Construction Project Management

Ground rules Cont

Cell Phones are strictly prohibited Please

Donrsquot bring your cell to the lecture or

keep it always closed

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 5: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

5

Construction Project Management

Resources

1048766 The World Wide Web (www)

1048766 Library books

1048766 Magazines and Journals

1048766 Most key documents will be available electronically

Eng Eyad Haddad Construction Project Management

6

Construction Project Management

Assessment1 Coursework Assignment you will be expected to Write

5 assignments this term (- marks)

2 5-quizes (short exams) during the lecture without prior

notice (- marks)

bull Lectures attendance (- marks)

bull Term Project amp Presentation (- marks)

bull Mid-Term exam (20 marks)

bull 2hour final exam (60 marks)

Eng Eyad Haddad Construction Project Management

7

Construction Project Management

Ground rules Coming in late

Disruption of any kind

Donrsquot ask for an extension without good Reason

Individual work only is allowed Group

discussions for concepts and problems

Donrsquot copy previous year work

When confused ask instructor

Academic honesty

Eng Eyad Haddad Construction Project Management

8

Construction Project Management

Ground rules Cont

Cell Phones are strictly prohibited Please

Donrsquot bring your cell to the lecture or

keep it always closed

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 6: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

6

Construction Project Management

Assessment1 Coursework Assignment you will be expected to Write

5 assignments this term (- marks)

2 5-quizes (short exams) during the lecture without prior

notice (- marks)

bull Lectures attendance (- marks)

bull Term Project amp Presentation (- marks)

bull Mid-Term exam (20 marks)

bull 2hour final exam (60 marks)

Eng Eyad Haddad Construction Project Management

7

Construction Project Management

Ground rules Coming in late

Disruption of any kind

Donrsquot ask for an extension without good Reason

Individual work only is allowed Group

discussions for concepts and problems

Donrsquot copy previous year work

When confused ask instructor

Academic honesty

Eng Eyad Haddad Construction Project Management

8

Construction Project Management

Ground rules Cont

Cell Phones are strictly prohibited Please

Donrsquot bring your cell to the lecture or

keep it always closed

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 7: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

7

Construction Project Management

Ground rules Coming in late

Disruption of any kind

Donrsquot ask for an extension without good Reason

Individual work only is allowed Group

discussions for concepts and problems

Donrsquot copy previous year work

When confused ask instructor

Academic honesty

Eng Eyad Haddad Construction Project Management

8

Construction Project Management

Ground rules Cont

Cell Phones are strictly prohibited Please

Donrsquot bring your cell to the lecture or

keep it always closed

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 8: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

8

Construction Project Management

Ground rules Cont

Cell Phones are strictly prohibited Please

Donrsquot bring your cell to the lecture or

keep it always closed

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 9: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

9

Construction Project Management

Course Objectives Project stages

Project delivery approaches and contract types

Detailed cost estimation

Planning

Scheduling using Bar charts CPM

Resource scheduling amp Resource leveling

Scheduling of Repetitive Projects

Time-Cost Trade-off Analysis

Cash flow analysis

Project updating and delay analysis

Bidding analysis and pricing policy

Project control techniques

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 10: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

10

Construction Project ManagementSyllabus

1 INTRODUCTION 11 Construction Industry 12 The Players 13 Categories of Construction Projects 14 Project Manager 15 Project Phases 151 Pre-construction 152 Procurement Phase 153 Construction Phase 154 Closeout

2 CONTRACT STRATEGY 21 Organization Structures 22 Contractual Relationships 23 Construction Contracts 24 Contract Documents 25 Tender Documents 26 Tendering Methods 27 Bid Evaluation

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 11: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

11

Construction Project Management

Syllabus (Cont)

3 PLANNING AND SCHEDULING

31 Planning

311 Work Breakdown

312 Activity Duration

313 Logical Relationships

314 Overlap

315 Network Representation

32 Scheduling

321 Activity on Arrows )CPM(

322 Activity on Nodes )PDM(

323 Bar Chart

324 Time Scaled Diagram

325 Program Evaluation and Review Techniques )PERT(

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 12: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

12

Construction Project Management

Syllabus (Cont)4 RESOURCE MANAGEMENT

41 Objectives42 Resource Scheduling43 Resource Leveling

5 SCHEDULING OF REPETITIVE PROJECTS51 Linear Projects52 Summary Diagrams53 Line of Balance )LOB( Representation

531 Resource-driven Scheduling 532 CPM-LOB Integration 533 Drawing LOB

6 SCHEDULE UPDATING AND DELAYS 61 Scheduling Updating 62 Delays 621 Type of Delays 622 The As-Built Schedule 623 Analysis of Concurrent Delays

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 13: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

13

Construction Project Management

Syllabus (Cont)7 CASH FLOW AND FINANCE MANAGEMENT 71 Contract Cash Flow 711 Contract Cost-Expense Curves 712 Cost of Finance 72 Project Cash Flow 721 Profit 722 Payback Period 723 Maximum Capital Lock-up 73 Discounted cash Flow 731 Net Present Value 732 Internal Rate of Return 8 TIME-COST TRADE-OFF 81 Activity Time-Cost Relationship 82 Contract Time-Cost Relationship 83 Optimum Contract Duration

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 14: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

14

Construction Project Management

Syllabus (Cont)9 ESTIMATING AND TENDERING

91 Cost Estimating Steps92 Preparation of Method Statement93 Risk Management931 Risk Identification932 Risk Responses94 Estimating Direct Cost941 Unit Rate Estimating942 Operational Estimating95 Estimating Indirect Cost951 Site Overheads952 Head Office Overheads96 Producing Tender Price961 Costs962 Mark-up97 Pricing Policy971 Balanced Bid972 Unbalanced Bid973 Method Related Charg

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 15: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

15

Construction Project Management

Syllabus (Cont)

10 COST CONTROL

101 Developing Cost Curves

102 The Earned Value Concept

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 16: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

16

Construction Project Management

About Construction Project Management

Syllabus

What makes Construction Project

Management Challenging

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 17: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

17

Construction Project Management

Construction Vs Manufacturing

Uncertain demand

More simulation in manufacturing

More data available fewer changes

Process and product is well established

Higher ability to standardize and control

the product

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 18: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

18

Construction Project Management

Construction Vs Manufacturing

1048766 One-of a kind Project specific

1048766 Many specialties

1048766 Location weather

1048766 High risk

1048766 Availability of resources

1048766 On time on budget

1048766 Social Political amp Environmental Impact

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 19: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

19

Construction Project Management

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 20: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

20

Construction Project Management

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 21: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

21

Construction Project Management

Software Packages

1048766 Primavera

1048766 Microsoft Project

1048766 Many other software

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 22: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

22

Construction Project Management

Mission Statement

The mission is to help organizations achieve

their project objectives of scope quality

budget and schedule within the context of the

natural social and political environment in

which the project is being developed

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 23: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

23

Limits of the project

Total pages of the project from 20-30 pages

Font size 12

Title and sub titles is bold

The space between rows is 150

The project must consists of the following items

1 Abstract (05-1) pages

2 Introduction (05 ndash 1) pages

3 Literature review (2 ndash 10) pages

4 Methodology (1 ndash 2) pages

5 Data collection (1 ndash 2) pages

6 Analysis (1 ndash 5) pages

7 Discussion (1 ndash 5) pages

8 Conclusions amp recommendations (1 ndash 5) pages

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
Page 24: Eng: Eyad Haddad Construction Project Management 1 Construction Project Management Faculty of Applied Engineering and Urban Planning Civil Engineering

Eng Eyad Haddad Construction Project Management

24

Questions

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24