engineering fabricator€¦ · hp flare ko drum (v-6210) 1 13,500 id: 2,300mm tl-tl: 7,200mm 13+3mm...

24
Engineering Fabricator

Upload: others

Post on 29-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Engineering Fabricator

  • OVERVIEW

  • Petronas License

  • PRODUCT & SERVICES

  • SCOPE OF SERVICES

    • Mechanical Static / Process Equipment

    • Pressure Vessels, Heat Exchangers, Tanks

    • Skids & Modules

    • Engineering,Fabrication, erection, installation & integration

    • Pipe Racks Modules

    • Plant Fabrication and Erection

    • Steel Structures Building, Warehouse

    • Site mechanical erection and installation works

    • Mechanical Fabrication

    • Out fittings for Oil Rigs

    • Water Intake Screens/ Stoplog/ Stop Gate

    • Offshore Marine Post, Transit Tower, Helideck Structure, Platforms & Ladders, Handrails

    • Galvanized Steel Grating (Serrated & non-Serrated)

    • Manpower Supply – Technical and Skilled Workers

  • 7

    Condensate Recovery Unit13.5mL x 5mW x 8mH

    Weight : 75MT

    Process Skids

    Condensate Recovery Unit6.2mL x 7.7mW x12.2mH

    Weight: 103 MT

    Fuel Gas Treatment UnitWeight: 30MT

  • FR

    Add a footer 8

    Pressure Vessels

    8

    ASME U U2 Stamp & PED Vessels, Separators,

    Scrubbers, Drums, Reactors, Columns, Towers, Hoppers

    Carbon Steel, Stainless Steel, Duplex, High & low Alloy,

    Clad Material

  • License and Testimonial

    Fabricators of Beaudrey’s products • Screens• Stopgates-Stoplogs• Penstocks• Trash Rakes• Debris Filters• Condenser Tube Cleaning

  • FR

    Greasing Unit Fluid Handling Unit

    10

    Clarifier Mud Handling Seawater filtration

  • FR

    Offshore Piling Structure

    Marine Structure

    Offshore Platforms

    SS & CS Gratings

  • WORKSHOP 1 at PASIR GUDANG, JOHOR

    10,117m2 (2.5 acres) Fabrication Workshop at Pasir Gudang, Johor3 Fabrication Bays covered area 3,240m2 (54m x 60m) with dedicated bay for Stainless steel material7,000m2 Open assembly and laydown yardFully equipped with overhead cranes, rolling and bending machines, CNC plasma cutting machine, punch/shear hydraulic ironworker machines

  • 10,117m2 (2.5 acres) Fabrication Workshop at Pasir Gudang, Johor3 Fabrication Bays covered area 3,240m2 (54m x 60m) with dedicated bay for Stainless steel material7,000m2 Open assembly and laydown yardFully equipped with overhead cranes, rolling and bending machines, CNC plasma cutting machine, punch/shear hydraulic ironworker machines

    WORKSHOP 1 at PASIR GUDANG, JOHOR

  • WORKSHOP 1 at PASIR GUDANG, JOHOR

  • FR

    New Fabrication Shop Land Size: 107.4m x 72m

    7,736m2

    Covered Shop: 3,960m2

    Bay 1: 18m x 72mBay 2: 22m x 72mBay 3: 18m x 60m

    Height under-hook: Bay 2 : 15.7m Bay 1&3 : 9.8m

    NEW WORKSHOP at PASIR GUDANG, JOHOR

  • INTEGER EXPERIENCE ON PRESSURE VESSELS, HEAT EXCHANGERS, STORAGE TANKS

    Year Project Name & Weight KG Wall Design

    Supplied Location Each Thickness Pressure Max Min

    1 2019

    Sapura Offshore Sdn

    Bhd /

    Reliance Industries

    Limited /Sikka Ports &

    Terminals Limited

    Sikka Ports and

    Terminal, Berth A2

    Jamnagar, India

    Foam Compound Storage

    Tank2 1,070

    ID: 1725mm

    Ht: 1080mm8mm 2A240 TYPE 316L ATM 65

    oC 7.5

    oC

    Best Engineering

    PracticeNo

    2 2019

    Thermac Engineering

    Sdn Bhd /

    Afcons-Sapura

    Consortium

    Oil and Natural Gas

    Corporation (ONGC)

    ONGC Central

    Processing Platform

    (CPP) for block KG-

    DWN 98/2, India

    Hot and Cold Glycol

    Exchanger 4 36,000

    ID: 406.4mm

    HT: 700mm

    Plate

    Flange/Bl

    ind:

    40/35

    Shell 6

    SA516-70 17 FV Barg 230oC ASME Sec VIII Div 1

    ASME U StampNo

    7 4,180OD: 2,000mm

    OL: 4,500mm25mm SS304 6 barg 150oC

    ASME Sec VIII Div 1

    PED and CE MarkingNo

    3 3,280OD: 1,850mm

    OL: 4,063mm25mm SS304 6 barg 150oC

    ASME Sec VIII Div 1

    PED and CE MarkingNo

    4

    Reactor Jacketed Cone &

    Jacketed Shell and

    Collecting Chamber

    3 11,250

    ID:2974mm

    /1200mm

    Height: 5400mm

    12mm

    SUS316L / SA240-316L

    Outer Jacket: SS400 /

    S275JR

    0.3 Barg - - Tanabe No

    5 Hopper 15 900~ 1590

    ID:1200mm~200

    0mm

    Height:

    500mm~2100m

    m

    4~6mm SA240 Type 304 ATM 50oC - Tanabe No

    6HP Flare KO Drum (V-

    6210)1 13,500

    ID: 2,300mm

    TL-TL: 7,200mm13+3mm

    SA516-70N + SS316L

    Cladded material10/FV Barg 150oC -50oC

    ASME Sec VIII Div 1

    2017 ED + PTS

    12.20.01

    ASME U Stamp

    No

    7LP Production Separator

    (V-1010)1 120,000

    ID: 5,800mm,

    TL-TL: 19,300mm23+3mm

    SA516-70N + SS316L

    WOL material10/FV Barg 65oC -0oC

    ASME Sec VIII Div 1

    2017 ED + PTS

    12.20.01

    No

    PWHT

    Filter Leaf Vessels

    Bokor Phase 3

    Development

    BOCPP-A Central

    Processing Platform,

    Malaysia

    Malaysia Marine

    Heavy Engineering Sdn

    Bhd (MMHE) /

    Petronas Carigali Sdn

    Bhd

    2019

    No Client / Owner Equipment Qty Design TemperatureDimension Material Design Code

    3 2019 Tapis Teknik Sdn

    Bhd

    Denka Advantech Pte.

    Ltd. Tuas Plant,

    Singapore

    Tanabe Engineering

    Singapore Pte Ltd /

    Tanabe Technical

    Service Malaysia Sdn

    Bhd

    2019

  • INTEGER EXPERIENCE ON PRESSURE VESSELS, HEAT EXCHANGERS, STORAGE TANKS

    Year Project Name & Weight KG Wall Design

    Supplied Location Each Thickness Pressure Max Min

    8

    1st Stage Gaslift

    Compressor Suction

    Scrubber (V-2410 A/B)

    2 7,000ID: 1,600mm

    TL-TL: 2,460mm22+3mm

    SA516-70N + SS316L

    Cladded material28/FV Barg 65

    oC -20

    oC

    ASME Sec VIII Div 1

    2017 ED + PTS

    12.20.01

    No

    9

    2nd Stqage Gaslift

    Compressor Suction

    Scrubber (V-2420 A/B)

    2 7,500ID: 1,500mm

    TL-TL: 2,450mm28+3mm

    SA516-70N + SS316L

    Cladded material40 Barg 65

    oC -20

    oC

    ASME Sec VIII Div 1

    2017 ED + PTS

    12.20.01

    No

    10

    3rd Stage Gaslift

    Compressor Suction

    Scrubber (V-2430 A/B)

    2 7,000ID: 1,200mm

    TL-TL: 2,250mm34+3mm

    SA516-70N + SS316L

    WOL material80 Barg 65oC -20oC

    ASME Sec VIII Div 2

    2017 ED + PTS

    12.20.01

    ASME U2 Stamp

    Yes

    11Gaslift Discharge

    Scrubber (V-2440)1 6,900

    ID: 1,100mm

    TL-TL: 22,50mm38+3mm

    SA516-70N + SS316L

    Cladded material80 Barg 65oC -20oC

    ASME Sec VIII Div 1

    2017 ED + PTS

    12.20.01

    Yes

    12 Surge Vessel (V-1020) 1 23,000ID: 3350mm

    TL-TL: 6,900mm19+3mm

    SA516-70N + SS316L

    Cladded material10/FV Barg 65

    oC 0

    oC

    ASME Sec VIII Div 1

    2017 ED + PTS

    12.20.01

    No

    13 2012 OVIVO / Singapore LNG Singapore LNG Terminal Seawater Filter Package 4 10,000ID:2,000mm

    TL-TL: 3718mm8mm Duplex SS UNS S31803 8 Barg 60

    oC - ASME No

    Bokor Phase 3

    Development

    BOCPP-A Central

    Processing Platform,

    Malaysia

    Malaysia Marine

    Heavy Engineering Sdn

    Bhd (MMHE) /

    Petronas Carigali Sdn

    Bhd

    2019

    PWHTNo Client / Owner Equipment Qty Design TemperatureDimension Material Design Code

  • EXPERIENCE LIST / PROJECT REFERENCES 2019

    NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    1

    Engineering design supply procurement fabrication

    and delivery of 2 units of Foam Compound Storage

    Tanks

    Stainless Steel 316L Foam Compound

    Storage Tanks

    Sikka Ports and Terminal, Berth A2

    Jamnagar, India

    Reliance Industries Limited /Sikka

    Ports & Terminals Limited Sapura Offshore Sdn Bhd Sapura Offshore Sdn Bhd August 2019 October 2019

    2Supply and Fabrication of Steel Ladders and

    Stainless Steel PlatesSteel Ladders and Plates

    MDE5 Melaka Refinery Diesel Euro 5

    Project Malaysia Refining Company

    Hyundai Engineering

    Company Ltd

    Tan Bock Kwee & Sons

    Sdn BhdAugust 2019 Sept 2019

    3Fabrication for Mezzanine Deck and Walkway of the

    Offshore Supply Ship “Sapura Jane”Platform Deck and Walkway Sapura Jane Offshore Supply Ship Sapura Sapura

    Advantage Marine

    Services (Malaysia) Sdn

    Bhd

    July 2019 Sept 2019

    4

    Supply and Fabrication of Vertical Filter Leaf

    Vessels in accordance to PED with CE Marking, and

    FEA on Clutch Door

    Vertical Filter Leaf Vessels Tapis Teknik Sdn Bhd July 2019 Sept 2019

    5Engineering Design Supply Procurement

    Fabrication & Delivery of Heat Exchangers

    Hot and Cold Glycol Exchangers shell

    All welded heat exchangers

    ONGC Central Processing Platform

    (CPP) for block KG-DWN 98/2,

    Oil and Natural Gas Corporation

    (ONGC)

    Afcons - Sapura

    Consortium

    Thermac Engineering

    Sdn Bhd July 2019 Nov 2019

    6Engineering Design Supply Procurement

    Fabrication & Delivery of Pressure Vessels

    Production Separator

    HP Flare KO Drum

    Gaslift Compressor Suction Scrubbers 1st,

    2nd & 3rd Stages

    Gaslift Discharge Scrubber

    Surge Vessel

    (details refer to PV Experience list attached)

    Bokor Phase 3 Development

    BOCPP-A Central Processing

    Platform

    Petronas Carigali Sdn Bhd Malaysia Marine Heavy

    Engineering Sdn Bhd

    Malaysia Marine Heavy

    Engineering Sdn Bhd May 2019 Sept 2019

    7

    Supply, Procurement, Fabrication & Delivery of

    Jacketed Cone and Jacketed Connection for

    Reactors

    Reactors RE2301 & RE2401 SUS316L SS400

    Jacketed Cone / Connecting Chamber r

    Jacketed Connection / Jacketed Shell

    Hoppers x 15 units

    Fused Silica Filler Plant, Tuas

    Singapore

    Denka Advantech Pte Ltd,

    Singapore

    Tanabe Engineering

    Singapore Pte Ltd

    Tanabe Technical Service

    Malaysia Sdn Bhd

    May & August

    2019July & Nov 2019

    8

    Supply, Procurement, Fabrication of Flanges,

    Nozzles, Pipes, Weir Plates, Gaskets, etc for 8 units

    of Pressure Vessels

    Supply, Procurement, Fabrication of Flanges,

    Nozzles, Pipes, Weir Plates, Gaskets, etc for 8

    units of Pressure Vessels

    Shell Middle Distillate Synthesis Shell MDS JGC Singapore Shell April 2019 June 2019

    9Fabricate and Supply of HDG Heavy Duty Gratings,

    Stainless steel trash screensScreens

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV)

    Tan Bock Kwee & Sons

    Sdn BhdApril 2019 May 2019

    10Fabrication and Supply Hot Dipped Galvanised

    GratingGrating, Access Platforms

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV)

    Zhong Huaxing

    Development (M) Sdn

    Bhd

    April 2019 May 2019

    11Fabrication and Supply Hot Dipped Galvanised

    GratingGrating

    Rapid Refinery Package 28B Euro 5

    Mogas Isomerization, Tame &

    Tankage

    PETRONAS CTCI-MIE CN Eleco Engineering

    Sdn BhdApril 2019 May 2019

    12 Supply and Fabricate Jacking plates and strips Jacking Plates and strips VerwaterVerwater Ind Services

    Singapore Pte LtdJanuary 2019 January 2019

  • EXPERIENCE LIST / PROJECT REFERENCES 2018-2012

    NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    1

    Supply and Fabrication of

    Piping and Steel Structures,

    installation of equipment,

    E&I Works, skid integration,

    and FAT for the offshore

    Condensate Recovery

    Unit Skid Package

    Condensate Recovery Skid Total Wt: 103.2MT

    6.2mL x 7.7mW x12.2mH

    LD Cold Seperator: SA 240 316L, Wt: 1991 kg

    ID 900mm x T/T 3445, Thickness 8t,

    Suction Scrubber: SA 516GR70N, Wt 4074kg

    ID 1100mm, T/T 4670mm, Thickness 12.7t,

    HP Cold Seperator: SA240 316L, Wt: 2657kg

    ID900mm, T/T 3205mm, Thickness 12t,

    MEG Recovery Vessel: SA516Gr70N, Wt 7159kg

    ID 1200mm, T/T6405mm, Thickness 12.7t

    Erb West Development Low

    Pressure Condensate Recovery

    System for Petronas Sabah

    Operations

    PETRONASNGL Tech Services Sdn

    Bhd

    NGL Tech Services Sdn

    Bhd2018 Dec 2019

    2

    Provision of Project Management, Supervision,

    Technical and Skilled workers, Inspection and

    Testing

    Provision of Project Management, Supervision,

    Technical and Skilled workers, Inspection and

    Testing

    Erb West Development Low

    Pressure Condensate Recovery

    System for Petronas Sabah

    Operations

    PETRONAS Vestigo Petroleum Sdn

    Bhd.

    NGL Tech Services Sdn

    Bhd2018 2016

    3

    Supply and

    Fabrication of

    Piping and

    Steel Structures,

    installation of

    equipment,

    E&I Works,

    skid integration

    and FAT

    Fuel Gas Skid Total Weight 32MT

    6.5mL x 4.2mW x 6mH

    Fuel Gas Scrubber SS516+316L clad

    1.6mID x 3.7mT/T, 32+4mm Thk; Wt:7,539kg

    Fuel Gas Filters SA312 TP 316L Wt: 760kg

    ID 336.5mm x T/T 3045mm, Thickness 9.53t,

    Fuel Gas Superheaters SA312TP 316L

    Wt: 441kg

    ID 304.84mm x T/T 3540mm, Thickness 9.53t

    Bokor Phase 3 Redevelopment -

    Central Processing Platform (CPP) PETRONAS

    Malaysia Marine and

    Heavy Engineering Sdn

    Bhd (MMHE)

    Innovative Synergy

    Solutions Sdn Bhd (ISS)2018 April 2019

    4

    Supply and Fabrication of

    Piping and Steel Structures,

    installation of equipment,

    E&I Works,integration

    and FAT for

    Vapour Recovery Skid

    Packages

    Vapour Recovery Skid 3.4mL x 2.1mW x 1.8mH

    Total Weight: 5MT

    Piping (ASTM A312 TP316) and Skid Structural

    Bokor Phase 3 Redevelopment -

    Central Processing Platform (CPP) PETRONAS

    Malaysia Marine and

    Heavy Engineering Sdn

    Bhd (MMHE)

    Innovative Synergy

    Solutions Sdn Bhd (ISS)2018 April 2019

    5Fabricate and Supply of Hot Dip Falvanized

    Gratings, Chequered Plates Cover, Grating

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV)

    Gadang Engineering Sdn

    Bhd2018 Dec 2018

    6Fabricate and Supply of Hot Dip Falvanized

    Gratings, Chequered Plates Cover, Grating

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV) Sino TCC (M) Sdn Bhd 2018 Dec 2018

    7Fabricate and Supply Hot Dip Galvanized Heavy and

    Light Duty Gratings Grating

    Rapid Refinery Package P2

    RefineryPETRONAS Sinopec

    Sinohydro Corporation

    (M) Sdn Bhd2018 Nov 2018

  • EXPERIENCE LIST / PROJECT REFERENCES 2018-2012

    NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    8Fabricate and Supply Hot Dip Galvanized Heavy and

    Light Duty Gratings Grating

    Rapid Refinery Package 4 Sulphur

    Recovery UnitPETRONAS Petrofac Petrofac E & C Sdn Bhd 2018 May 2018

    9Fabricate and Supply Hot Dip Galvanized Heavy and

    Light Duty Gratings, Light Towers, Steel StructuresGrating

    Rapid Refinery Package 12B Solid

    Product Jetty and associated

    Handling Facilities (SPJ) at Tanjung

    Setapa

    PETRONASSYS-McConnell Dowell

    (SPJ) Joint Venture

    SYS-McConnell Dowell

    (SPJ) Joint Venture2018 Dec 2018

    10Fabricate and Supply of HDG Heavy Duty Gratings,

    Stainless steel trash screensScreens

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV)

    Tan Bock Kwee & Sons

    Sdn Bhd2018 Dec 2018

    11 Fabrication and supply of Piping Works PipingRapid Refinery Package 16A

    Effluent Treatment PlantPETRONAS

    Wabag Muhibah JV Sdn

    Bhd

    Wabag Muhibah JV Sdn

    Bhd2018 August 2018

    12Fabrication and Supply Hot Dipped Galvanised

    GratingGrating

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV)

    WCT Construction Sdn

    Bhd2018 Dec 2018

    13Fabrication and Supply Hot Dipped Galvanised

    GratingGrating

    Rapid Refinery and Petrochemical

    Plant Package 2, 3, 7, 12, 14, 27PETRONAS

    Sinopec

    Technical Reunidas

    Tecnimont-HQC JV

    Technip-Fluor JV

    Zhong Huaxing

    Development (M) Sdn

    Bhd

    2018 Dec 2018

    14

    Fabricate and supply of Guides, Jigs, Band Screen,

    Bar Screens, BeaTrash Rake, Washing Pipes, Flush

    Pipies, Trash Baskets, Beams for Renaissance

    Screens, Rakes Steel Structures and PipingJamaica Renaissance 190 MW

    power plant U847718

    South Jamaica Power Company

    (SJPC) TSK Spain Beaudrey Asia Sdn Bhd 2018 August 2018

    15

    Fabricate and Supply Main Shaft (A29 Filter),

    Travelling Bandscreen, Structure, Piping, Supports,

    Lifting Lugs

    Screen, Steel Structure and Piping

    Malaysia Kota Tinggi

    WaterTreatment Plant C112317

    Munseh Johor River

    PUB, Singapore's National Water

    Agency

    Munseh Engineering Sdn

    Bhd Beaudrey Asia Sdn Bhd 2018 June 2018

    16

    Fabrication and supply of StopLogs Gates, Trash

    Rake, Travelling Band Screen and ByPass for

    Carem Project

    Screens, Rakes, Steel Structures and Piping

    Argentina U847117 Carem - Project

    Balance of Plant of the Reactor

    Carem 25 Nuclear power plant

    Argentina’s Comision Nacional de

    Energia Atómica (CNEA)

    Tecna /

    Grupo Isolux Corsan Beaudrey Asia Sdn Bhd 2018 August 2018

    17Fabricate and Supply of Travelling Bandscreen and

    AccesorriesScreen, Steel Structure and Piping

    Malaysia Bukit Shah Project

    C112517 Johor water solution

    project

    BEWG (M) Sdn Bhd BEWG (M) Sdn Bhd E. Beaudrey & C IE 2018 Nov 2018

    18 Fabricate and Supply of Structures Steel StructuresSingapore Tengeh Retrofit Water

    Treamtnet Plant Project M846116

    PUB, Singapore's National Water

    Agency

    PUB, Singapore's

    National Water Agency Beaudrey Asia Sdn Bhd 2018 August 2018

    19 Supply and Fabricate of Jacking Timber Gage Supply and Fabricate of Jacking Timber Gage YC Logistics YC Logistics Sdn Bhd 2018 December 2018

    20 Fabricate and Supply of Silencor Core Silencor CoreRapid Refinery Package 5 Steam

    Creacker ComplexPETRONAS Toyo Engineering Toyo Engineering 2018 January 2019

  • EXPERIENCE LIST / PROJECT REFERENCES 2018-2012

    NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    21 Fabricate and supply of Travelling Band Screen Screen, Steel Structure and Piping Singapore Tengeh Project PUB, Singapore's National Water

    Agency

    PUB, Singapore's

    National Water Agency Beaudrey Asia Sdn Bhd 2017 2017

    22

    Fabrication and Supply Hot Dipped Galvanised

    Grating and CrMoly SA387 Grade II Class II Plate

    Materials

    Grating Rapid Refinery P3 PETRONAS Tecnicas Reunidas PetroVietnam 2017 2017

    23

    Fabrication and Supply Hot Dipped Galvanised

    Grating and CrMoly SA387 Grade II Class II Plate

    Materials

    Grating Rapid Refinery P3 PETRONAS Tecnicas Reunidas

    Zhonghe Huaxing

    Development (M) Sdn

    Bhd (China Nuclear)

    2017 2017

    24Fabrication and Supply Hot Dipped Galvanised

    GratingGrating Rapid Refinery P2 PETRONAS Sinopec Engineering

    Sinohydro Corporation

    (M) Sdn Bhd2017 2017

    25

    Fabrication and Supply of Offshore Pile Clamp

    Platform, Offshore Walkway Structure,

    Embedded SUS316L Plates,

    GratingRapid Refinery P12B Marine

    FacilityPETRONAS

    SYS-McConnell Dowell

    (SPJ) Joint Venture

    SYS-McConnell Dowell

    (SPJ) Joint Venture2017 2017

    26

    Supply and Fabrication of

    Piping and Steel Structures,

    installation of equipment,

    E&I Works, skid integration,

    and FAT

    for the Condensate

    Recovery Skid Package

    Condensate Recovery Skid

    13.5mL x 5mW x 8mH

    Total Weight: 75MT

    LD Cold Seperator: SA 240 316L, ID 900mm x

    T/T 3445, Thickness 8t, Wt 1991kg

    Suction Scrubber: SA 516 GR 70N, ID 1100mm,

    T/T 4670mm, Thickness 12.7t, Wt 4074kg

    HP Cold Seperator: SA 240 316L, ID900mm,

    T/T 3205mm, Thickness 12t, Wt 2657kg

    MEG Recovery Vessel: SA516 Gr 70N, ID

    1200mm, T/T6405mm, Thickness 12.7t, Wt

    7159kg

    Petronas FPSO Mampu-1 Vestigo Petroleum Sdn Bhd. MISC BerhadNGL Tech Services Sdn

    Bhd2016 2016

    27

    Provision of Project Management, Supervision,

    Technical and Skilled workers, Inspection and

    Testing

    Provision of Project Management, Supervision,

    Technical and Skilled workers, Inspection and

    Testing

    Petronas FPSO Mampu-1 Vestigo Petroleum Sdn Bhd. MISC Berhad NGL Tech Services Sdn

    Bhd 2016 2016

    28Fabricate and Supply of Continuous Tube

    Cleanig Equipment

    Continuous Tube Cleaning Equipment

    Wt: 15000kg

    Material (components): Mixture of ASTM A570

    Gr50 / UNS S 31803 / ASTM Gr.65 SS400 /

    Mexico Centro Morelos Combined

    Cycle 724 MW Power Plant Mexico state utility CFE Comisioin Federal Beaudrey Asia Sdn Bhd 2016 2016

  • EXPERIENCE LIST / PROJECT REFERENCES 2018-2012

    NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    29

    Civil, M&E, Steel Structures Fabrication, Erection

    and Construction of a Workshop and Warehouse

    Building at Rapid Refinery Project site at

    Pengerang

    Steel Structures Fabrication, Erection, Civil

    and M&E WorksRapid Refinery P2 PETRONAS Sinopec Engineering Sinopec Engineering 2016 2016

    30 Fabrication and Supply of Steel Structures Steel Structures Rapid Refinery P3 PETRONAS Tecnicas Reunidas PetroVietnam 2016 2016

    31Fabrication and Supply of Heavy Lift and

    Transportation BeamsBeams ` PETRONAS Siemens ALE 2016 2016

    32 Fabrication of Out Fitting for Jack Up Rig B378 Outfitting Jack up Rig B378 Japan’s BOTL Frigstad Offshore Keppel FEL 2015 2015

    33Supply and Fabrication of Steel Structures for

    Heavy LiftSteel Structures - ALE - ALE 2015 2015

    34Supply, Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    Thailand Khanom 977MW Gas

    turbine combined cycle (GTCC)

    power generation plant

    Khanom Electricity Generating

    Co., Ltd. (KEGCO)

    Mitsubishi Heavy

    Industries, Ltd. (MHI) Beaudrey 2014 2015

    35Civil, M&E, Steel Structures Fabrication, Erection

    and Construction of a Warehouse Building

    Steel Structures Fabrication, Erection, Civil

    and M&E WorksMalaysia Senai Idaman Park SKS Southern Sdn Bhd. SKS Southern Sdn Bhd. SKS Southern Sdn Bhd. 2015 2015

    36Supply, Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    Philippines Pagbilao 735MW coal-

    fired power station

    Team Energy, JVTokyo Electric

    Power Company and Marubeni

    Corporation

    Mitsubishi Hitachi

    Power Systems and

    Korea's Daelim

    Industrial

    Beaudrey 2015 2015

    37Supply, Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    Mexico Iberdrola Dulces Nombres

    II, 300-MW combined cycle power

    plant (CCGT)

    Iberdrola Iberdrola ingeniería y

    construcción. Beaudrey 2015 2015

    38Supply, Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    India Mundra LNG Regasification

    Plant Project GSPC LNG Limited(GLL) Toyo Engineering Beaudrey 2015 2015

    39Supply, Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    Indonesia Banggai Ammonia

    Plant

    PT Surya Esa Perkasa (SEP), PT

    Panca Amara Utama (PAU).

    Toyo Engineering - PT

    Inti Karya Persada

    Tehnik (IKPT)

    Beaudrey 2015 2015

    40

    Fabrication of Out Fitting for Jack Up Rig B360,

    363, 369, 370, 371, 372, 373, Semi Submesible

    M1235, M1222

    Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2014 2014

    41Civil, M&E, Steel Structures Fabrication, Erection

    and Construction of a Warehouse Building

    Steel Structures Fabrication, Erection, Civil

    and M&E WorksMalaysia Seelong, Senai Excel Metal Industries (Malaysia)

    Excel Metal Industries

    (Malaysia)

    Excel Metal Industries

    (Malaysia)2014 2014

  • EXPERIENCE LIST / PROJECT REFERENCES 2018-2012

    NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    42Supply, Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    Saudi Arabia 2,640MW Jeddah

    South power plant Saudi Electricity Co (SEC)

    Hyundai Heavy

    Industries (HHI) Beaudrey 2014 2014

    43Supply and Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    Saudi Arabia Shuqaiq 2.64GW oil-

    fired power plant Saudi Electricity Co (SEC)

    Hyundai Heavy

    Industries (HHI) Beaudrey 2014 2014

    44

    Supply, Fabrication and Erection of Steel

    Structure Building and Installation and Erection

    of Plant Equipment

    Steel Structure Fabrication and Erection,

    Installation of Plant Equipment

    Malaysia Tanjung Langsat

    Biomass Steam PlantTPM Technopark Sdn Bhd

    TPM Technopark Sdn

    BhdAKK Engineering 2013 2013

    45Supply and Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    Malaysia Tanjung BinPower Plant

    Phase 2 1,000 MW supercritical

    coal-fired power plant

    Tanjung Bin Energy Issuer Bhd /

    Malakoff Corporation Alstom Power Beaudrey 2013 2013

    46Supply and Fabricate and supply of Raw Water

    Intake EquipmentScreen, Steel Structure and Piping

    Mexico Centro Morelos Combined

    Cycle 724 MW Power Plant Mexico state utility CFE Comisioin Federal Beaudrey 2013 2013

    47Supply and Fabricate and supply of Raw Water

    Intake EquipmentFilter Vessels - Super Duplex Material

    Chile Guacolda 54 MW coal-fired

    power generation plant Empresa Eléctrica Guacolda

    Mitsubishi Heavy

    Industries, Ltd. (MHI) Beaudrey 2013 2013

    48

    Fabrication of Out Fitting for Jack Up Rig B342,

    345, 346, 349, 350, 351, 352, 353, 354, 355, 356,

    357, 358

    Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2013 2013

    49Design Supply Fabrication and Installation of 4

    units Duplex Filter Vessels and Oil Water

    Separator

    Oil Seperator:

    Material: Mixture of SS304 / Carbon Steel ,

    Fabrication Weight: 12,270kg

    4400mm x 1435mm x 3450mm

    Filter Vessel

    Material Duplex UNS S31803, ID 2000mm,

    TL/TL 3718mm, Thickness 8mm, Weight

    10,000kg

    Singapore LNG Terminal Singapore LNG Corporation

    (SLNG)

    Samsung C&T

    Corporation Ovivo Water 2012 2012

    50Fabrication of Out Fitting for Jack Up Rig B322,

    B323, b326, 327, 329, 330, 333, 335, 336, 341Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2013 2013

    51Fabrication Erection Paining. Overturning and

    Seafasterning of 600 ton Helideck Structures 600 ton Helideck Structures Jack up Rig Helideck Mencase Offshore Mencase Offshore Keppel FEL 2012 2012

  • THANK YOU

    Integer Engineering Sdn Bhd (979727-P)Sales Office: Head Office & Fabrication 2A-2 Jalan Puteri 4/2 PLO 685 Jalan Platinum Utama Bandar Puteri, 47100 Puchong Pasir Gudang Industrial Estate Zone 12BSelangor, Malaysia 81700 Pasir Gudang, Johor, MalaysiaPhone: +6010-6612380 +603-80527003E: [email protected] www.integergroup.com.my

    mailto:[email protected]://www.integergroup.com.my/