    Engineering Support for RefineryPlanning and Scheduling

    Improve performance and marginswith aspenONE Engineering

    Aspen Product Management

    January 3, 2015

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    2/22

    2010 Aspen Technology, Inc. All rights reserved | 2

    Agenda

    Why Engineering Support for Planning

    Engineering Best Practices

    Integrated Petroleum Supply Chain Workflow

    Key Activities

    Why aspenONE Engineering

    Next Steps

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    3/22

    2010 Aspen Technology, Inc. All rights reserved | 3

    Why Engineering Support for RefineryPlanning and Scheduling

    Improve Refining Marginswith accurate planning modelsthrough engineering models

    Improve and sustain refinery margins

    Faster and better feedstock selection

    Accurate planning and scheduling models Agility in response to operational opportunities

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    4/22

    2010 Aspen Technology, Inc. All rights reserved | 4

    Engineering Best Practices

    Feedstockselection

    agility

    PerformanceMonitoringof units andequipment

    Planningmodel

    updatesfor accuracy

    Capital projectassessments

    for optimaldesigns

    Plantoperations

    decision supportfor timely response

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    5/22

    2010 Aspen Technology, Inc. All rights reserved | 5

    Asset Engineering Lifecycle and Workflow

    Integrating Engineering Business ProcessesEnables Best Practices

    Research andDevelopment

    ConceptualEngineering

    BasicEngineering

    DetailedEngineering

    PlantOperations

    Planning andScheduling

    Develop Process

    Technology

    Select Process

    Technology

    Produce ConceptualProcess Design

    Produce ConceptualEngineering Design

    Construct and Pre-commission Plant

    Commission andHandover Plant

    Daily PlantOperations

    MaintainEquipment

    Procure and Control Equipment,Materials and Services

    Produce DetailedEngineering Design

    Identify Plant

    Capital Projects

    Produce DetailedProcess Design

    FEED

    Planning andScheduling

    PlantOperations

    Select Crude Oilsand Feedstocks

    Issue OperatingTargets

    Monitor and GuidePlant Performance

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    6/22

    2010 Aspen Technology, Inc. All rights reserved | 6

    Planning and Scheduling Model Updates

    Challenge

    Challenge Challenge

    Impact

    Planners andprocess engineerswork in silos

    Engineering

    models are neededas input to updaterefinery wideplanning models

    Reduced predictivecapability andproduct quality

    Variation between

    plan vs. actual

    Lost Margins

    Higher margins

    with optimal yields and on-time,on-spec performance

    Solution

    Easier updating of

    planning and schedulingmodels to reflect actual

    plant performance

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    7/22 2010 Aspen Technology, Inc. All rights reserved | 7

    Unique to aspenONE

    Workflow toupdate planning

    models usingrigorous models

    Ease of usewith calibrationtools and links

    between models

    Supportcollaboration

    between engineersand planners

    Businessapplication

    access by plannersand schedulersthrough Excel

    Collaborative workflow to update planning and scheduling models

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    8/22 2010 Aspen Technology, Inc. All rights reserved | 8

    Refinery activityHeadquarters activity

    Market

    Demand

    Forecasting

    Refinery Planning

    Refinery

    Scheduling

    Production Plan

    Primary Distribution Scheduling

    (depot inventory management)

    Distribution PlanningMarket Forecast

    Constrained Forecast

    Refinery

    Production targets

    Distribution & Exchange Plan

    Market Forecast

    Scheduled Movements

    to/from Refineries

    Secondary

    Distribution

    Scheduling

    Retail Demand(by terminal)

    Blend

    Scheduling

    & optimisation

    Trading

    Accounting

    (SAP)

    Deals

    Sales History

    Production Schedule

    Actualised

    movements

    Advanced Process Control

    Process Unit

    Set-pointsBlend recipes

    Pipeline

    simulation &

    scheduling

    Batch

    confirmation

    Batchnomination

    Integrated Petroleum Supply Chain (IPSC)

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    9/22 2010 Aspen Technology, Inc. All rights reserved | 9

    Refinery activityHeadquarters activity

    Market

    Demand

    Forecasting

    Refinery Planning

    Refinery

    Scheduling

    Production Plan

    Primary Distribution Scheduling

    (depot inventory management)

    Distribution PlanningMarket Forecast

    Constrained Forecast

    Refinery

    Production targets

    Distribution & Exchange Plan

    Market Forecast

    Scheduled Movements

    to/from Refineries

    Secondary

    Distribution

    Scheduling

    Retail Demand(by terminal)

    Blend

    Scheduling

    & optimisation

    Trading

    Accounting

    (SAP)

    Deals

    Sales History

    Production Schedule

    Actualised

    movements

    Advanced Process Control

    Process Unit

    Set-pointsBlend recipes

    Pipeline

    simulation &

    scheduling

    Batch

    confirmation

    Batchnomination

    Integrated Petroleum Supply Chain (IPSC)

    Engineering Models Support

    Planning & Scheduling

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    10/22 2010 Aspen Technology, Inc. All rights reserved | 10

    Example: A Recent IPSC Project

    Global Orion

    PPIMS

    LocalORION/MBO

    AtOMS

    Advisor

    RefSys PSMA

    PublishedSchedule (13)

    Tank andVessel

    MovementsData

    Tank Info,Products, Units

    Stream flows &Qualities from

    IP21

    From IP.21:

    process and lab

    data such as

    flows, temp,

    pressure, level,

    inventory data

    To Oracle

    Financials

    From IP.21:

    process and lab

    data

    Plan Data

    From IP.21: lab

    data

    ReconciledData

    PPIMS

    LocalORION/MBO

    AtOMS

    Advisor

    RefSys PSMA

    PIMS to Orion(11)

    Orion Imports (12)

    Tank andVessel

    MovementsData

    Tank Info,Products, Units

    From IP.21:

    process and lab

    data such as

    flows, temp,

    pressure, level,

    inventory data

    From IP.21:

    process and lab

    data

    Plan Data

    From IP.21: lab

    data

    ReconciledData

    PPIMS

    LocalORION/MBO

    AtOMS

    Advisor

    RefSys PSMA

    Tank andVessel

    MovementsData

    Tank Info,Products, Units

    From IP.21:

    process and lab

    data such as

    flows, temp,

    pressure, level,

    inventory data

    From IP.21:

    process and lab

    data

    Plan Data

    From IP.21: lab

    data

    ReconciledData

    XPIMS1. Mid-Term

    Planning

    2. Short-Term

    PlanningIRT

    InventoryProjections (9)

    3. RefineryScheduling

    DSS

    To Oracle

    Financials

    To Oracle

    Financials

    4. Operations

    Execution

    5. Production Accounting

    6. Operational PerformanceManagement

    PS EM

    RBV ODM

    Data Loading

    Line of Pallots

    MAA MAB SHUMOG

    XPIMS

    KPC Int Mktg

    $

    Ref MAA, MAB, SHU

    Demand,Prices (1)

    Demand (2)

    ShutdownDays (3)

    Sales, Target Inventory (4)

    IRT (5)

    Shares Same DataBase

    KPC Supply Ops

    Nominations

    Shipment Events (Vol, Prd, Dem, etc)

    Finalised Feasible Shipments to Local Orion (7)

    AggregatedDemand (8) Aggregated

    Demand (8)AggregatedDemand (8)

    InventoryProjections (9)

    InventoryProjections (9)

    Global Targets: Sales, IRT, Capacity Inventory to Local Plan (10)

    PIMS to Orion(11)

    PIMS to Orion(11)

    Orion Imports (12)Orion Imports (12)Published

    Schedule (13)Published

    Schedule (13)

    Reuters, Platts, etc

    Component & Product Prices (14)

    Nominations

    Stream flows &Qualities from

    IP21

    Stream flows &Qualities from

    IP21

    KPC Supply Ops

    Supply Program

    HQ Refinery 1 Refinery 2 Refinery 3

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    11/22 2010 Aspen Technology, Inc. All rights reserved | 11

    Example: A Recent IPSC Project

    Global Orion

    PPIMS

    LocalORION/MBO

    AtOMS

    Advisor

    RefSys PSMA

    PublishedSchedule (13)

    Tank andVessel

    MovementsData

    Tank Info,Products, Units

    Stream flows &Qualities from

    IP21

    From IP.21:

    process and lab

    data such as

    flows, temp,

    pressure, level,

    inventory data

    To Oracle

    Financials

    From IP.21:

    process and lab

    data

    Plan Data

    From IP.21: lab

    data

    ReconciledData

    PPIMS

    LocalORION/MBO

    AtOMS

    Advisor

    RefSys PSMA

    PIMS to Orion(11)

    Orion Imports (12)

    Tank andVessel

    MovementsData

    Tank Info,Products, Units

    From IP.21:

    process and lab

    data such as

    flows, temp,

    pressure, level,

    inventory data

    From IP.21:

    process and lab

    data

    Plan Data

    From IP.21: lab

    data

    ReconciledData

    PPIMS

    LocalORION/MBO

    AtOMS

    Advisor

    RefSys PSMA

    Tank andVessel

    MovementsData

    Tank Info,Products, Units

    From IP.21:

    process and lab

    data such as

    flows, temp,

    pressure, level,

    inventory data

    From IP.21:

    process and lab

    data

    Plan Data

    From IP.21: lab

    data

    ReconciledData

    XPIMS1. Mid-Term

    Planning

    2. Short-Term

    PlanningIRT

    InventoryProjections (9)

    3. RefineryScheduling

    DSS

    To Oracle

    Financials

    To Oracle

    Financials

    4. Operations

    Execution

    5. Production Accounting

    6. Operational PerformanceManagement

    PS EM

    RBV ODM

    Data Loading

    Line of Pallots

    MAA MAB SHUMOG

    XPIMS

    KPC Int Mktg

    $

    Ref MAA, MAB, SHU

    Demand,Prices (1)

    Demand (2)

    ShutdownDays (3)

    Sales, Target Inventory (4)

    IRT (5)

    Shares Same DataBase

    KPC Supply Ops

    Nominations

    Shipment Events (Vol, Prd, Dem, etc)

    Finalised Feasible Shipments to Local Orion (7)

    AggregatedDemand (8) Aggregated

    Demand (8)AggregatedDemand (8)

    InventoryProjections (9)

    InventoryProjections (9)

    Global Targets: Sales, IRT, Capacity Inventory to Local Plan (10)

    PIMS to Orion(11)

    PIMS to Orion(11)

    Orion Imports (12)Orion Imports (12)Published

    Schedule (13)Published

    Schedule (13)

    Reuters, Platts, etc

    Component & Product Prices (14)

    Nominations

    Stream flows &Qualities from

    IP21

    Stream flows &Qualities from

    IP21

    KPC Supply Ops

    Supply Program

    HQ Refinery 1 Refinery 2 Refinery 3

    Engineering Support for Planning

    and Scheduling is built into this project

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    12/22 2010 Aspen Technology, Inc. All rights reserved | 12

    Refinery Plant Data enters IPSC via theEngineering Models (see terms next slide)

    RTOReal Time 24/7 Automatic

    Data Collection

    APCDMCplus

    Real Time Data Base (IP.21, PI, PHD)

    Simplified Modelsto Aspen PIMS &

    Scheduler

    Plant Targets(APC setpoints)

    ASW Link

    Plant DCS

    ASWOn DemandManual DataCollection

    AODReal Time 24/7Automatic Data

    Collection

    To IPSC From IPSC

    Aspen RefSYS FlowsheetsEngineering Models forPlanning and Scheduling Support with

    Data Reconciliation and Calibration

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    13/22 2010 Aspen Technology, Inc. All rights reserved | 14

    Planning and Scheduling Support WorkflowsStart with Aspen RefSYS*

    Aspen RefSYS Flowsheets

    Aspen PIMS andAspen Petroleum Scheduler

    * The new name for Aspen RefSYS is Aspen HYSYS Petroleum Refining

    Excel

    Assay Tables forCrude Distillation

    Case Study/Excel orSwing Cut Utility

    Workflow 1 Excel

    LP Submodelsfor Reactors

    Case Study/Excel orPIMS Support Utility

    Workflow 2

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    14/22

    2010 Aspen Technology, Inc. All rights reserved | 15

    Planning and Scheduling Support Workflowswith PIMS to Petroleum Scheduler Integration

    Workflow 2

    Aspen RefSYSFlowsheets

    Aspen PIMS

    Excel

    Assay Tables forCrude Distillation

    Case Study/Excel orSwing Cut Utility

    Workflow 1 Excel

    LP Submodelsfor Reactors

    Case Study/Excel orPIMS Support Utility

    Aspen PIMS

    Aspen Petroleum

    Scheduler

    Aspen Petroleum

    SchedulerWorkflow 3V7.3 Utilities

    Workflow 4SMC file transfer

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    15/22

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    16/22

    2010 Aspen Technology, Inc. All rights reserved | 17

    Crude Assay Management

    ChallengeChallenge ChallengeImpact

    Characterizingeach crudesproperties andcomposition is

    time consuming Blending crudes

    into a singlefeedstockcomplicates settingoperational targets

    Errors can havesignificant impacton simulationresults

    Lost opportunitycrude oils

    Lost Margins

    Higher marginsExploit opportunity feedstocksand improve operating plans

    Solution

    Improved crude oil

    blending to increaseaccuracy and reduce

    simulation times

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    17/22

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    18/22

    2010 Aspen Technology, Inc. All rights reserved | 19

    Why is Crude Oil Characterization Important?

    Petroleum refinery profit margins are under great pressure

    Crude oil prices and product prices move independentlydestabilizing profit margins

    Feed and product costs must be well understood to protect

    profit margins

    Crude oil compositions must be well defined to correctlyprice feed stocks and products

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    19/22

    2010 Aspen Technology, Inc. All rights reserved | 20

    How does Crude Oil CharacterizationImprove Profits?

    Crude oil characterization data is used in three main ways: Engineering models (Aspen HYSYS Petroleum Refining)

    Planning models (Aspen PIMS)

    Scheduling models (Aspen Petroleum Scheduler)

    Engineering models confirm crude distillation units cansuccessfully process purchased crude oils

    Planning models select optimal crudes oils for refinery

    Scheduling models assure smooth and predictable delivery ofproducts

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    20/22

    2010 Aspen Technology, Inc. All rights reserved | 21

    Where is Crude Oil Characterization Done?

    Planning and Scheduling Support tools Third party products

    Flowsheet simulators

    Aspen HYSYS Oil Manager Aspen RefSYS MacroCut

    Aspen Plus (ADA)

    In house crude cutting programs

    Large oil companies

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    21/22

    2010 Aspen Technology, Inc. All rights reserved | 22

    Crude Oil Characterization Methods Used inAspen HYSYS and Aspen RefSYS

    Feed

    StreamModel

    Lab Data:

    Gravity,Distillation,

    etc.

    RefSYS

    Macro CutInput

    Table

    RefSYSAssay

    Manager

    HYSYS

    Oil

    Manager

    3rdparty

    assay managers

    Other crude

    cutting programs

    RefSYS Macro Cut

    Input Table

  • 8/10/2019 Engineering Support of Planning and Scheduling Revsion 81

    22/22

    2010 Aspen Technology Inc All rights reserved | 23

    Crude Oil Characterization Usage

    Feed

    Stream

    Model

    Lab Data:

    Gravity,

    Distillation,

    etc.

    RefSYS

    Macro Cut

    Input

    Table

    RefSYS

    Assay

    Manager

    HYSYS

    Oil

    Manager

    3rdparty

    assay managers

    Other crude

    cutting programs

    RefSYS Macro Cut

    Input Table

    HYSYS/RefSYS

    Fractionation

    Models

    RefSYS cases

    confirm crude

    unit can

    process crude

    Yields

    & Properties

    for PIMS

    Yields

    & Properties

    for Petroleum

    Scheduler

    Fractionation models re-assemble narrow range hyposinto wider range product cuts for PIMS assay tables