engineers architects roof replacement...deck. replace damaged or deteriorated roof deck on a unit...

10
Titlesheet A-0.0 As Shown 1 A 1 2 2 3 3 4 4 5 5 B C D E A B C D E © Copyright 2018. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use. Plotted: 9/17/2018 4:38 PM by Chaijenkit, Tanya File Name: P:\2018\2018.0xxx\2018.0772.0 - TRIPHAHN CENTER ROOF REPLACEMENT RFQ (PS)\Drawings\Roof Replacement.dwg Description Mark Date Project No. Date Drawn Checked Scale Sheet Title Sheet No. Triphahn Center Roof Replacement Hoffman Estates Park District Project Client Headquarters & Laboratories: Northbrook, Illinois Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Honolulu | Houston | Los Angeles | Minneapolis | New Haven | New York Princeton | San Francisco | Seattle | Washington, D.C. Wiss, Janney, Elstner Associates, Inc. 330 Pfingsten Road Northbrook, Illinois 60062 847.272.7400 tel | 847.480.9534 fax www.wje.com ENGINEERS ARCHITECTS MATERIALS SCIENTISTS TC 1685 West Higgins Road Hoffman Estates, IL 60169 Issued for Bid 9.17.18 1685 West Higgins Road Hoffman Estates, IL 60169 September 17, 2018 2018.0772 PS / RAW 1. Contractor to verify all conditions and dimensions in the field. Notify Architect/Engineer (A/E) of any variation from Drawings. Do not scale Drawings. 2. Contractor shall secure and pay for Permits, Government Fees and Licenses as required by the Village of Hoffman Estates for proper execution and completion of the work. 3. All exits are to remain open and operable as a means of egress from the building at all times. Provide adequate protection for all building occupants and pedestrians throughout the duration of the repair work. 4. Contractor to provide close-up/hands-on scaffolding access for A/E to observe all repairs during the course of the repairs. 5. Contractor shall coordinate any storage of materials at the building with the Owner. 6. Contractor shall repair any damage to the building (walls, roof, etc.), landscaping, and adjacent properties caused by the Contractor to the satisfaction of the Owner. 7. A certificate of insurance meeting the requirements as outlined by the Owner must be provided and approved prior to materials being stored on site and commencement of work. 8. Parapet Hooks will not be acceptable for swing stage rigging. 9. Do not overload roof with construction materials and/or equipment. Coordinate location for storage in parking lot with building. A-0.0 Titlesheet A-1.0 Roof Plan A-2.0 Metal Roof Details A-2.1 Metal Roof Details A-2.2 Metal Roof Details A-3.0 Alternate 1: PVC Roof Details A-3.1 Alternate 1: PVC Roof Details INDEX OF DRAWINGS LOCATION MAP: GENERAL NOTES Triphahn Center Roof Replacement 1685 West Higgins Road Hoffman Estates, Illinois for: Hoffman Estates Park District 1685 West Higgins Road Hoffman Estates, Illinois by: 330 Pfingsten Road Wiss, Janney, Elstner Associates, Inc. WJE ENGINEERS ARCHITECTS MATERIAL SCIENTISTS Northbrook, IL 60062 847.272.7400 tel | 847.480.9534 fax A-4.0 Alternate 2: PVC Roof Details A-5.0 Translucent Panel Details A-5.1 Translucent Panel Details SUMMARY OF WORK Base Bid: In general, the scope of work includes the following: 1. Remove metal roofing panels and underlayment to existing insulation layer. 2. Over existing insulation, install plywood/polyisocyanurate composite board. 3. Remove metal wall panels to existing substrate. 4. Install felt underlayment and waterproof underlayment over plywood surface and install batten seam metal roof system. 5. Install flush seam metal wall panel system with continuous insulation behind. 6. Remove and replace translucent skylight and wall panel system. Alternate No. 1: (Provide single-ply membrane in lieu of metal panels) 1. Remove all existing roofing, flashings and underlayment down to the existing insulation. 2. Replace damaged or deteriorated insulation on a unit price basis. 3. Mechanically fasten 3" polyisocyanurate insulation and 1 2 " DensDeck Prime gypsum roof board through the existing insulation into the steel deck at the rate of one fastener per 2 square feet. 4. Fully adhere a 60 mil fleece-back PVC membrane to the gypsum board substrate. 5. Heat weld simulated standing seam extrusions to the membrane. TRIPHAHN CENTER Alternate No. 2: 1. Remove all existing roofing, flashings, and insulation down to the existing metal deck. 2. Replace damaged or deteriorated roof deck on a unit price basis. 3. Mechanically fasten 5 1 2 " polyisocyanurate insulation and 1 2 " gypsum board into the steel deck at the rate of one fastener per 2 square feet. 4. Install a 60 mil fully adhered PVC roofing membrane and associated flashings.

Upload: others

Post on 30-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Titlesheet

A-0.0

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

1. Contractor to verify all conditions and dimensions in the field. Notify Architect/Engineer(A/E) of any variation from Drawings. Do not scale Drawings.

2. Contractor shall secure and pay for Permits, Government Fees and Licenses asrequired by the Village of Hoffman Estates for proper execution and completion of thework.

3. All exits are to remain open and operable as a means of egress from the building at alltimes. Provide adequate protection for all building occupants and pedestriansthroughout the duration of the repair work.

4. Contractor to provide close-up/hands-on scaffolding access for A/E to observe allrepairs during the course of the repairs.

5. Contractor shall coordinate any storage of materials at the building with the Owner.

6. Contractor shall repair any damage to the building (walls, roof, etc.), landscaping, andadjacent properties caused by the Contractor to the satisfaction of the Owner.

7. A certificate of insurance meeting the requirements as outlined by the Owner must beprovided and approved prior to materials being stored on site and commencement ofwork.

8. Parapet Hooks will not be acceptable for swing stage rigging.

9. Do not overload roof with construction materials and/or equipment. Coordinate locationfor storage in parking lot with building.

A-0.0 TitlesheetA-1.0 Roof PlanA-2.0 Metal Roof DetailsA-2.1 Metal Roof DetailsA-2.2 Metal Roof DetailsA-3.0 Alternate 1: PVC Roof DetailsA-3.1 Alternate 1: PVC Roof Details

INDEX OF DRAWINGS

LOCATION MAP:

GENERAL NOTES

Triphahn CenterRoof Replacement1685 West Higgins RoadHoffman Estates, Illinoisfor: Hoffman Estates Park District

1685 West Higgins RoadHoffman Estates, Illinois

by: 330 Pfingsten RoadWiss, Janney, Elstner Associates, Inc.WJE ENGINEERS

ARCHITECTSMATERIAL SCIENTISTS Northbrook, IL 60062

847.272.7400 tel | 847.480.9534 fax

A-4.0 Alternate 2: PVC Roof DetailsA-5.0 Translucent Panel DetailsA-5.1 Translucent Panel Details

SUMMARY OF WORK

Base Bid:In general, the scope of work includes the following:

1. Remove metal roofing panels and underlayment to existing insulation layer.

2. Over existing insulation, install plywood/polyisocyanurate composite board.

3. Remove metal wall panels to existing substrate.

4. Install felt underlayment and waterproof underlayment over plywood surface and install battenseam metal roof system.

5. Install flush seam metal wall panel system with continuous insulation behind.

6. Remove and replace translucent skylight and wall panel system.

Alternate No. 1: (Provide single-ply membrane in lieu of metal panels)1. Remove all existing roofing, flashings and underlayment down to the existing insulation.

2. Replace damaged or deteriorated insulation on a unit price basis.

3. Mechanically fasten 3" polyisocyanurate insulation and 12" DensDeck Prime gypsum roof boardthrough the existing insulation into the steel deck at the rate of one fastener per 2 square feet.

4. Fully adhere a 60 mil fleece-back PVC membrane to the gypsum board substrate.

5. Heat weld simulated standing seam extrusions to the membrane.

TRIPHAHN CENTER

Alternate No. 2:1. Remove all existing roofing, flashings, and insulation down to the existing metal deck.

2. Replace damaged or deteriorated roof deck on a unit price basis.

3. Mechanically fasten 5 12" polyisocyanurate insulation and 12" gypsum board into the steel deckat the rate of one fastener per 2 square feet.

4. Install a 60 mil fully adhered PVC roofing membrane and associated flashings.

Page 2: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Roof Plan

A-1.0

As Shown

Roof PlanScale: 1/16" = 1'-0"1

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

N

METAL ROOF

METAL ROOF

TRANSLUCENT SKYLIGHT PANELS

TRANSLUCENT SKYLIGHT PANELS

SINGLE-PLY MEMBRANEROOF

CONDENSERUNIT

RELIEFVENT

CONDENSERUNIT

EXHAUST FAN

EXHAUSTFAN

EXHAUST FAN

132'-1"

132'

-0"

71'-10" 64'-6"

29'-0

"8'

-2"

136'-4"

8'-1"

CHIMNEY STACK

1

ROOF REPLACEMENT NOTE LEGENDMARK

2

A-5.1

6

24'-0

"

1 4

2

2

2

2

5

1

4

F

BASE BID (METAL ROOFING) - REMOVE ALL EXISTING ROOFING, FLASHINGS, ANDUNDERLAYMENT DOWN TO THE EXISTING INSULATION. REPLACE DAMAGED ORDETERIORATED INSULATION ON A UNIT PRICE BASIS. MECHANICALLY FASTEN APLYWOOD/ POLYISOCYANURATE COMPOSITE BOARD CONSISTING OF 3 INCHPOLYISOCYANURATE INSULATION AND 3/4 INCH CDX PLYWOOD THROUGH THEEXISTING INSULATION INTO THE STEEL DECK AT THE RATE OF ONE FASTENERPER SQUARE FOOT. INSTALL A #30 FELT UNDERLAMENT OVER THE SUBSTRATESURFACE AND A SELF-ADHERED WATERPROOFING UNDERLAYMENT AT EAVES,SADDLES, WALLS, AND EQUIPMENT PENETRATIONS. MECHANICALLY FASTEN A26 GAUGE BATTEN SEAM METAL ROOF SYSTEM AND FLASHINGS. SEE DETAIL1/A-2.0 FOR NEW ROOF ASSEMBLY.

BASE BID (TRANSLUCENT SKYLIGHT PANELS) - REMOVE AND REPLACE EXISTING

234" DEEP TRANSLUCENT SKYLIGHT SYSTEM AND ASSOCIATED BLOCKING AND

FLASHINGS. INSTALL NEW INTERIOR TRIM TO CONCEAL BLOCKING.

3BASE BID (TRANSLUCENT WALL PANELS) - REMOVE AND REPLACE EXISTINGTRANSLUCENT WALL PANEL SYSTEM. THIS IS TO INCLUDE THE REPLACEMENTOF SOFFIT PANELS AT BASE OF WALL PANELS.

4ALTERNATE 1 (SINGLE-PLY ROOFING) - REMOVE ALL EXISTINGROOFING, FLASHINGS, AND UNDERLAYMENT DOWN TO THE EXISTINGINSULATION. REPLACE DAMAGED OR DETERIORATED INSULATION ON A UNITPRICE BASIS. MECHANICALLY FASTEN 3” POLYISOCYANURATE BOARDAND 1/2” DENSDECK PRIME GYPSUM ROOF BOARD THROUGH THE EXISTINGINSULATION INTO THE STEEL DECK AT THE RATE OF ONE FASTENER PER 2SQUARE FEET. FULLY ADHERE A 60 MIL FLEECE BACK PVC MEMBRANE TO THEGYPSUM BOARD SUBSTRATE AND HEAT WELD SIMULATED STANDING SEAMEXTRUSIONS TO THE MEMBRANE. SEE DETAIL 1/A-3.0 FOR NEW ROOFASSEMBLY.

5ALTERNATE 2 (LOW-SLOPE ROOFING) - REMOVE ALL EXISTINGROOFING, FLASHINGS, AND INSULATION DOWN TO THE EXISTING METALDECK. REPLACE DAMAGED OR DETERIORATED ROOF DECK ON A UNIT PRICEBASIS. MECHANICALLY FASTEN 5 1/2” POLYISOCYANURATE INSULATIONAND 1/2” GYPSUM BOARD INTO THE STEEL DECK AT THE RATE OF ONEFASTENER PER 2 SQUARE FEET. INSTALL A 60 MIL FULLY ADHERED PVCROOFING MEMBRANE AND ASSOCIATED FLASHINGS. SEE DETAIL 1/A-4.0 FORNEW ROOF ASSEMBLY.

6VERTICAL WALL PANELS (BASE BID AND ALTERNATE 1) - REMOVE EXISTINGWALL PANELS AND UNDERLAYMENT TO SUBSTRATE. INSTALL NEW MOISTUREBARRIER OVER EXISTING SUBSTRATE AND INSTALL NEW 2 INCHPOLYISOCYANURATE INSULATION OVER WALL SUBSTRATE. INSTALL NEWHORIZONTAL HAT CHANNEL FURRING 24 INCHES O.C. OVER NEW THERMALCLIPS ATTACHED TO THE EXISTING SUBSTRATE. MECHANICALLY ATTACH NEW12 INCH FLUSH SEAM PANELS TO THE HORIZONTAL FURRING. SEE DETAIL2/A-2.0.

7TIE-IN AT SOUTH BUILDING - REMOVE EXISTING MEMBRANE AT DRAINAGESADDLE. CUT SADDLE FLUSH WITH WALL OF ADJACENT BUILDING AT NORTHEND OF SADDLE. INSTALL WATERPROOFING UNDERLAYMENT ON SADDLE ANDMINIMUM 3 FEET UP THE FIELD OF THE ROOF. REMOVE EXISTING COPING ANDEXTEND WATERPROOF UNDERLAYMENT UP ADJACENT WALL TO TOP OF THEPARAPET. INSTALL SHEET METAL ROOFING PANELS AT SADDLE AND INTEGRATEWITH FIELD PANELS. INSTALL EPDM MEMBRANE OVER TOP OF PARAPET WALLAND SEAL TO PENETRATIONS. INSTALL NEW COPING METAL AND SEAL ATPENETRATIONS THROUGH COPING WITH PMMA LIQUID FLASHING MEMBRANE.

8TYPICAL GUTTER EDGE - INSTALL WOOD BLOCKING AT PERIMETER TO MATCHHEIGHT OF INSULATION AND NAILBASE ASSEMBLY. MECHANICALLY FASTENGUTTER TO WOOD BLOCKING AND STRIP-IN FLANGE WITH WATERPROOFUNDERLAYMENT. SET Z-RETAINER STRIP IN SEALANT AND ENGAGE METALPANEL EDGE INTO Z-RETAINER. SEE DETAIL 3/A-2.0.

9CHIMNEY STACK - REMOVE EXISTING FLASHING COLLAR AND SAVE FOR REUSE.REMOVE FLASHING SLEEVE TO EXPOSE CHIMNEY STACK. FABRICATE NEWSHEET METAL FLASHING SLEEVE AND INTEGRATE INTO METAL ROOF SYSTEM.REINSTALL FLASHING COLLAR AND SEAL ALONG TOP EDGE. SEE DETAIL3/A-2.2.

10VENT STACKS - FABRICATE METAL SLEEVE APPROXIMATELY 1 INCH LARGERTHAN THE DIAMETER OF THE PIPE AND MECHANICALLY ATTACH TO THEBOTTOM SIDE OF THE METAL PANEL IN A SOLID BED OF BUTYL SEALANT.APPROXIMATELY 1 INCH ABOVE THE TOP OF THE COLLAR, INSTALL A SHEETMETAL STORM COLLAR SECURED TO THE VENT STACK PIPE WITH A STAINLESSSTEEL DRAWBAND. INSTALL SEALANT ALONG THE TOP EDGE OF THE COLLARAND AT THE JUNCTION OF THE METAL ROOF PANEL AND FLASHING SLEEVE.

11PLUMBING VENTS (BASE BID) - FABRICATE METAL SLEEVE APPROXIMATELY 1INCH LARGER THAN THE DIAMETER OF THE PLUMBING VENT PIPE ANDMECHANICALLY ATTACH TO THE BOTTOM SIDE OF THE METAL PANEL IN ASOLID BED OF BUTYL SEALANT. INSTALL A SHEET METAL FLASHING CAP OVERTHE TOP OF THE PIPE OVERLAPPING THE FLASHING SLEEVE 2 INCHES. FASTENFLASHING CAP TO THE FLASHING SLEEVE WITH RIVETS.

12SNOW RETENTION - SET EPDM GASKET ON ROOF PANEL AND INSTALL SNOWRETENTION BRACKETS 16" O.C. IN BUTYL MASTIC. MECHANICALLY FASTENBRACKET INTO STEEL DECK WITH STAINLESS STEEL FASTENERS WITH EPDMWASHERS. INSTALL SEALANT OVER FASTENERS AND INSTALL A COVE BEAD ATPERIMETER OF BRACKET. INSTALL TUBING PER MANUFACTURERRECOMMENDATIONS. SEE DETAIL 4/A-2.1.

13MECHANICAL CURBS - REMOVE EXISTING FLASHINGS AT THE PERIMETER.LOCATIONS OF EACH EQUIPMENT SUPPORT. ADD WOOD BLOCKING ALONGTHE EXISTING CURB RAIL TO PROVIDE SUITABLE FLASHING HEIGHTS.DISCONNECTION AND RECONNECTION OF MECHANICAL EQUIPMENT, IFREQUIRED, SHALL BE INCLUDED IN THE BASE BID. INSTALL NEW SHEETMETAL “SKIRT” FLASHINGS SET BENEATH THE DOWNWARD LEG OF THE SHEETMETAL FLANGE. DETAIL SIMILAR TO 3/A-4.0.

14ROOF DRAINS - EXISTING PRIMARY ROOF DRAINS TO REMAIN. SEE TYPICALDRAIN DETAIL 2/A-4.0 FOR REQUIRED PROCEDURE FOR EACH DRAIN LOCATION.NOTE THAT CAST IRON GRATINGS MAY BE REUSED AND PLASTIC GRATINGSWILL NOT BE ACCEPTED.

15ROOF HATCH - REMOVE EXISTING FLASHINGS AT THE PERIMETER OF ROOFHATCH. TEMPORARILY REMOVE HATCH AND ADD WOOD BLOCKING TOPROVIDE SUITABLE FLASHING HEIGHTS. INSTALL NEW SHEET METAL "SKIRT"FLASHINGS SET BENEATH THE DOWNWARD LEG OF THE SHEET METAL HATCHCOVER. SEE DETAIL 4/A-4.0.

16PLUMBING VENTS (ALTERNATES) - REMOVE EXISTING FLASHINGS AT PIPES.INSTALL FIELD MEMBRANE TO PIPES, MECHANICALLY FASTEN, AND INSTALL AFLASHING BOOT OVER PIPE. INSTALL SEALANT BEHIND TOP EDGE OF BOOT,INSTALL STAINLESS STEEL CLAMP, AND INSTALL SEALANT OVER TOP EDGE OFTHE BOOT.

F

6TYP.

10

8TYP.

6TYP.

13TYP.

11TYP.

15

8TYP.

12

7

9

3

3

A-5.1

5

A-5.0

2

A-5.0

3

A-2.1

3

A-2.1

2

A-2.1

1

4'-0"

Page 3: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Metal Roof Details

A-2.0

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

Metal Roof System DetailScale: 3" = 1'-0"1

BATTEN SEAM METAL ROOFPANEL

RED ROSIN SLIP SHEET

#30 FELT UNDERLAYMENT

NEW 3"POLYISOCYANURATE/3

4" PLYWOOD COMPOSITENAIL BASE

EXISTING 3" INSULATION TOREMAIN

Gable DetailScale: 3" = 1'-0"5

EXISTING METAL ROOFDECK

Gutter DetailScale: 3" = 1'-0"3

BATTEN SEAM METAL ROOFPANEL

RED ROSIN SLIP SHEET

#30 FELT UNDERLAYMENT

BATTEN CLIP WITH FASTENERS

NEW 3" POLYISOCYANURATE /3

4" PLYWOOD COMPOSITE NAILBASE

EXISTING 3" INSULATION TOREMAIN

EXISTING METAL ROOF DECK

GABLE FLASHING WITH"J" CLOSURE

FIELD-FORM PANEL LEGTO I.D. OF "J" CLOSURE

ADD WOOD NAILERS ASNECESSARY TO MATCHHEIGHT OF NAIL BASE

BLOCK WALL

CONTINUOUS CLEAT

SEALANT

SLOPE 412":12"

RED ROSIN SLIP SHEET

WATERPROOF UNDERLAYMENT

GUTTER FLASHING

GUTTER STRAP(FIELD-FORMED)

SNAP-ON BATTEN CAP

SNAP-ON BATTEN CLIP

NEOPRENE END PLUG

PANEL

"Z" RETAINER STRIP SETIN SEALANT

NEW 3" POLYISOCYANURATE /3

4" PLYWOOD COMPOSITE NAILBASE

EXISTING 3" INSULATION TOREMAIN

EXISTING METAL ROOF DECK

2 New Coping DetailScale: 3" = 1'-0"

BASE BID-EXISTING ROOF MEMBRANE ANDSHEATHING TO REMAIN.EXISTING BATT INSULATION INSTUD SPACES TO REMAIN.ALTERNATE 2-INSTALL NEW NAILBASEINSULATION ON THE ROOF SIDEOF PARAPET. ADHERE NEWROOF MEMBRANE TO NAILBASE.FILL STUD SPACES WITHSPRAYFOAM INSULATION.

NEW CONTINUOUS WOODBLOCKING. FASTEN TO STUDTRACK AT 16" O.C. WITH 14"SCREWS.

NEW 0.625" PREFINISHEDALUMINUM COPING. FASTEN TOBLOCKING AT ROOF SIDE.

LAP ROOF MEMBRANEOVER AIR/MOISTUREBARRIER AND SET INFULL BED OF SEALANT.NAIL IN PLACE.

3"

NEW CONTINUOUSCLEAT

NEW FLUSH SEAMMETAL PANEL SYSTEM

NEW 2" RIGIDINSULATION

NEW THERMAL CLIPS

NEW AIR/MOISTUREBARRIER. EXTEND ONTOTOP OF BLOCKING FORCOPING.

NEW HORIZONTALFURRING

MECHANICALLY FASTENAIR/MOISTURE BARRIERAT OVERHANG

Fascia to Soffit Flashing DetailScale: 3" = 1'-0"4

NEW METAL PANEL SYSTEM

MANUFACTURER'SFASCIA TO SOFFITFLASHING

NEW 2" RIGID INSULATION

NEW HORIZONTALFURRING

NEW THERMAL CLIPS

NEW AIR/MOISTUREBARRIER. ADHERE TOSOFFIT PANEL.

EXISTING SOFFIT PANELTO REMAIN

FASTENER

EXISTING WALL FRAME ANDINSULATION

NEW METAL PANELSYSTEM

RIVET

SNAP-ON BATTEN COVER

ADD WOOD BLOCKING ASNECESSARY TO MATCH HEIGHTOF ASSEMBLY

A-5.0

3

A-5.0

2

A-2.0

2

Page 4: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Metal Roof Details

A-2.1

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

Coping Detail atBuilding Tie-InScale: 3" = 1'-0"3

EPDM MEMBRANE OVER TOP OFPARAPET

COPING METAL FASTENED 24"O.C. THROUGHCOUNTERFLASHING

SHEET METALCOUNTERFLASHING INSTALLEDBEHIND COPING

EXISTING PVC MEMBRANE

CONTINUOUS CLEATFASTENED 12" O.C.

SHEET METAL SADDLEFLASHING

WATERPROOFUNDERLAYMENT

GENERAL NOTES:1. ALL PENETRATIONS THROUGH COPINGMETAL SHALL BE FLASHED ONTO THESURFACE OF THE COPING METAL WITHPMMA MATERIAL

Metal Roof to Saddle TransitionScale: 1 1/2" = 1'-0"2

RED ROSIN SLIP SHEET

UNDERLAYMENT

SHEET METAL SADDLE

1"2'-

0"

METAL ROOF PANEL

SLO

PE

SNAP-ON BATTENCOVER

INSTALL SEALANT ATENDS OF VERTICALSEAMS

LOCK PANEL PANS TOENGAGE EDGE METAL ROOF SUBSTRATE

Metal Roof to New Addition TransitionScale: 1 1/2" = 1'-0"1

6" MIN. OVERLAP METALVALLEY PIECE 6" MIN.OVER ROOF PANEL

SHEET METAL VALLEYFLASHING, RUN DOWNFACE OF CRICKET

MATCH THE CONTOUROF THE METAL ROOFPANEL

2 BEADS OFSEALANT INOVERLAP

NEOPRENE END PLUG

Snow Guard Bracket DetailScale: 3" = 1'-0"4

WATER CUTOFF MASTICBETWEEN EPDM ANDBRACKET. TYP. EACHFASTENER.

SILICONE SEALANTOVER FASTENER, TYP.

SNAP-ON BATTEN SEAM

SELF-ADHERING EPDMUNDER BASE PLATE

ALPINE SNOW PP145 HI PIPEBRACKET AT 16" O.C. SECUREDTO METAL ROOF DECK WITHFOUR FASTENERS PER BRACKET

TUBING INSTALLED PERMANUFACTURERRECOMMENDATIONS

COVE BEAD OF SEALANT, MIN.1

4" BOND TO BOTH THE BASEPLATE AND ROOF PANEL

RED ROSIN SLIP SHEET

#30 FELTUNDERLAYMENT

NEW 3"POLYISOCYANURATE/3/4" PLYWOODCOMPOSITE NAIL BASE

EXISTING 3" INSULATIONTO REMAIN

EXISTING METAL ROOFDECK

2"

TYPICAL METALROOF PANEL

SNAP-ON BATTENCOVER (TYP.)

SURFACE MOUNTEDCOUNTERFLASHINGFASTENED 12" O.C.

SEALANT

Page 5: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Metal Roof Details

A-2.2

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

RED ROSIN SLIP SHEET

Vent Stack FlashingScale: N.T.S.2

Boiler Flue FlashingScale: N.T.S.3

Hip Cap FlashingScale: N.T.S.4

Plumbing Vent FlashingScale: N.T.S.1

UNDERLAYMENT

ROOF SUBSTRATE

FLASHING CAP

METAL FLASHING SLEEVE

SLEEVE FLANGE BELOW

FASTEN FLASHING SLEEVEFLANGE TO ROOF PANELAND NOT TO DECK SO ASNOT TO FIX PANEL ATPENETRATION

SEALED SEAM

SNAP-ON BATTEN SEAM COVER

MIN. 2 BEADS OF SEALANTPLACED BETWEEN UPSLOPEFLASHING FLANGE AND TOPSIDE OF PANEL

SEAL ENDS OF SEAMS

RED ROSIN SLIP SHEET

UNDERLAYMENT

ROOF SUBSTRATE

6" MIN. OVERLAP AND SEALANT

NEW METAL FLASHING SLEEVEINTEGRATED INTO METALROOFING PANELS WITHMATCHING PROFILE

METAL ROOF PANEL

REMOVE FLASHINGSKIRT AND REINSTALL

NEW SEALANT AT EDGEOF FLASHING SKIRT

SHEET METAL FLASHING

SLOPE

SLOPE

SLOPE

SHEET METAL HIP CAP

Z-CLOSURE FASTENED ANDSET IN SEALANT. DO NOTSEAL VERTICAL LEGS.

METAL ROOF PANEL

SNAP-ON BATTEN SEAMCOVER

RED ROSIN SLIP SHEET

UNDERLAYMENT

NAIL BASE SUBSTRATE

EXISTING INSULATION

METAL ROOF DECKING

TEMPERATURE-APPROPRIATESEALANT

STAINLESS STEEL DRAWBAND

SHEET-METAL RAIN COLLAR

GASKETED FASTENERS- SECUREFLASHING SLEEVE FLANGE TOROOF PANEL AND NOT TO DECKSO AS NOT TO FIX PANEL ATPENETRATION

SET SHEET METAL SLEEVE INCONTINUOUS BEAD OF SEALANT

SNAP-ON BATTENSEAM COVER

RED ROSIN SLIP SHEET

UNDERLAYMENT

ROOF SUBSTRATE

INSULATION APPROPRIATEFOR STACK TEMPERATURE

SHEET METAL FLASHINGSLEEVE

METAL ROOF PANEL

4" MIN. FLANGE

SEALANT

SLOPE

SLOPE

METAL ROOF PANEL

SNAP-ON BATTEN SEAM COVER

FABRICATE FLASHING TOMATCH CONTOUR OFBATTENS

6" MIN. OVERLAPAND SEALANT

Page 6: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Alternate 1:

PVC Roof Details

A-3.0

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

Simulated Standing Seam Profile (Alternate 1)Scale: 1'-0" = 1'-0"3

Simulated Standing SeamSpacing Layout (Alternate 1)Scale: 1 1/2" = 1'-0"5

Flashing at PVC CoatedMetal Joints (Alternate 1)Scale: 3" = 1'-0"4

PVC COATED METAL

4" WIDE FLASHING STRIP,HOT-AIR WELDED INPLACE

2" WIDE ALUMINUMTAPE OVER JOINT

Snow Guard Detail (Alternate 1)Scale: N.T.S.2

60 MIL PVC MEMBRANE

SIMULATED STANDINGSEAM EXTRUSION

SHEET METALINSERTS

MANUFACTURER'SPROPRIETARY SNOWGUARD RAIL

WOOD BLOCKING

METAL BASE PLATEAND INTEGRAL PVCSTRIPPING

SNOW GUARDBRACKET

SIMULATED STANDING SEAMEXTRUSION

HOT-AIR WELD

PVC Roof System Detail (Alternate 1)Scale: 3" = 1'-0"1

SIMULATED STANDING SEAMEXTRUSION

60 MIL FLEECE-BACKED PVCMEMBRANE ADHERED

INSULATION FASTENER ANDPLATE1

2" COVER BOARD

NEW 2 12" POLYISOCYANURATEINSULATION

EXISTING 3" INSULATION TOREMAIN

EXISTING METAL ROOF DECK

4"

2"

1/4"

4" MIN.

1'-6 3/4" 1'-6 3/4" 1'-6 3/4" 1'-6 3/4"

60 MIL PVC MEMBRANE,ADHERED

COVER BOARD

NEW 2 12" POLYISOCYANURATEINSULATION

Page 7: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Alternate 1:

PVC Roof Details

A-3.1

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

Gravel Stop Metal Edge (Alternate 1)Scale: 3" = 1'-0"1

EXISTING 3" INSULATION TOREMAIN

NEW 212" POLYISOCYANURATE

INSULATION

COVER BOARD

60 MIL PVC MEMBRANE

PVC COATED METALFASTENED 4" O.C.,STAGGERED USING 1"GALVANIZED ANNULARRING NAILS OR OTHERACCEPTABLE FASTENER

CONTINUOUS CLEAT(MIN. 22 GA.)

WOOD NAILERS TOMATCH HEIGHT OFINSULATION AND COVERBOARD

PVC COATED METALWATER DAM

PVC FLASHING STRIP, HOT-AIRWELDED

EXISTING METAL ROOF DECK

Gutter Detail (Alternate 1)Scale: 3" = 1'-0"2

METAL GUTTER

METAL GUTTERSUPPORT 24" O.C.

PVC CLAD METALFASTENED 4" O.C.,STAGGERED USING 1"GALVANIZED ANNULARRING NAILS OR OTHERACCEPTABLE FASTENER

PVC FLASHING STRIP,HOT-AIR WELDED

WOOD NAILERS TOMATCH HEIGHT OFCOVER BOARD

60 MIL PVC MEMBRANE

COVER BOARD

NEW 212" POLYISOCYANURATE

INSULATION

EXISTING 3" INSULATION TOREMAIN

EXISTING METAL ROOF DECK

Vent Stack Flashing (Alternate 1)Scale: 3" = 1'-0"3 Plumbing Vent Detail (Alternate 1)

Scale: 3" = 1'-0"4

60 MIL PVC MEMBRANE,MECHANICALLY ATTACHED

COVER BOARD

NEW 212" POLYISOCYANURATE

INSULATION

EXISTING METAL ROOF DECK

PRE-MOLDED PVC PIPE BOOT

STAINLESS STEEL HOSE CLAMP

SEALANT AT TOP EDGE

PLUMBING VENT PENETRATION

8" M

IN.

1" M

IN.

EXISTING 3" INSULATION TOREMAIN

60 MIL PVC MEMBRANE,MECHANICALLY ATTACHED

COVER BOARD

NEW 212" POLYISOCYANURATE

INSULATION

EXISTING METAL ROOF DECK

EXISTING 3" INSULATION TOREMAIN

PVC BASE FLASHING

PVC FLASHING MEMBRANE

FIBERGLASS BATT

SHEET METAL SLEEVE

VENT STACK

RAIN COLLAR WITH HIGHTEMPERATURE SEALANTSTAINLESS STEEL HOSE CLAMP

NOTE: REFER TO SHEET A-2.0 FORNOTES RELATED TO WALL PANELS

Page 8: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Alternate 2:

PVC Roof Details

A-4.0

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

Roof System Detail (Alternate 2)Scale: 3" = 1'-0"1

FULLY ADHERED 60 MIL PVCMEMBRANE

TWO LAYERS OF 212"

POLYISOCYANURATEINSULATION, ADHERED

58" SUBSTRATE BOARD

MECHANICALLY ATTACHED TOMETAL DECK AT THE RATE OFONE FASTENER PER 2 SF.

EXISTING METAL ROOF DECK

AIR / VAPOR BARRIER

Roof Drain Detail (Alternate 2)Scale: 3" = 1'-0"2

Removable Curb Flashing Detail (Alternate 2) Scale: 3" = 1'-0"3

Non-Removable Curb Flashing Detail (Alternate 2)Scale: 3" = 1'-0"4

SELF-FLASHING UNIT

ADDITIONAL WOOD BLOCKING,IF REQUIRED (TO ACHIEVE AN 8"MIN. FLASHING HEIGHT)

GROMMETTED FASTENERS 12"O.C.

COUNTERFLASHING INSTALLEDBEHIND FLANGE

FLASHING TO ACCEPTABLESUBSTRATE

SPECIFIED SECUREMENT

HOT-AIR WELD60 MIL PVC MEMBRANE

COVER BOARD, ADHERED

TWO LAYERS OF 212"

POLYISOCYANURATEINSULATION, ADHERED

EXISTING 3" INSULATION TOREMAIN

AIR / VAPOR BARRIER

SUBSTRATE BOARDMECHANICALLY ATTACHED TOMETAL DECK

EXISTING METAL ROOF DECK

60 MIL PVC MEMBRANE

COVER BOARD, ADHERED

TWO LAYERS OF 212"

POLYISOCYANURATEINSULATION, ADHERED

AIR / VAPOR BARRIER

SUBSTRATE BOARDMECHANICALLY ATTACHEDTO METAL DECK

EXISTING METAL ROOF DECK

NON-REMOVABLE UNIT

GROMMETTED FASTENERS 12"O.C.

COUNTERFLASHING INSTALLEDBEHIND FLANGE

FLASHING TO ACCEPTABLESUBSTRATE

SPECIFIED SECUREMENT

HOT-AIR WELD

Pipe Flashing Detail (Alternate 2) Scale: 3" = 1'-0"5 Plumbing Vent Detail (Alternate 2)

Scale: 3" = 1'-0"6

12" COVER BOARD, ADHERED

60 MIL PVC MEMBRANE

COVER BOARD, ADHERED

TWO LAYERS OF 212"

POLYISOCYANURATEINSULATION, ADHERED

AIR / VAPOR BARRIER

SUBSTRATE BOARDMECHANICALLY ATTACHEDTO METAL DECK

EXISTING METALROOF DECK

PRE-MOLDED PVC PIPE BOOT

STAINLESS STEEL HOSE CLAMP

SEALANT AT TOP EDGE

PLUMBING VENT PENETRATION

8" M

IN.

1" M

IN.

60 MIL PVC MEMBRANE

COVER BOARD, ADHERED

TWO LAYERS OF 212"

POLYISOCYANURATEINSULATION, ADHERED

AIR / VAPOR BARRIER

SUBSTRATE BOARDMECHANICALLY ATTACHEDTO METAL DECK

EXISTING METAL ROOF DECK

8" M

IN.

PVC FLASHING MEMBRANE

STAINLESS STEEL HOSE CLAMP

SEALANT AT TOP EDGE

PIPE PENETRATION

PVC BASE FLASHING

MECHANICALLY FASTENMEMBRANE AT PENETRATION MECHANICALLY FASTEN

MEMBRANE AT PENETRATION

60 MIL PVC MEMBRANE

COVER BOARD, ADHERED

TWO LAYERS OF 212"

POLYISOCYANURATEINSULATION, ADHERED

AIR / VAPOR BARRIER

SUBSTRATE BOARDMECHANICALLY ATTACHEDTO METAL DECK

EXISTING METAL ROOF DECK

CAST IRON DRAIN STRAINER

SEALANT UNDER MEMBRANEAT CLAMPING RING

CLAMPING RING

MANUFACTURER'S REQUIREDSECUREMENT

PVC MEMBRANE FLASHING

TAPERED INSULATIONIN SUMP

Page 9: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Translucent Panel

Details

A-5.0

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

Wall Head DetailScale: 6" = 1'-0"1

Skylight Sill DetailScale: 3" = 1'-0"2

2 3 4" TRANSLUCENT PANELSYSTEM

TRANSLUCENT PANELFLASHING BY PANELMANUFACTURER

SEALANT AND BACKERROD WITH CORD WEEPSAT 24" O.C.

8" M

IN.

12" PLASTIC SHIMS

SET IN FULL BED OFSILICONE SEALANT

NEW 0.032" PREFINISHEDALUMINUM TRIM

NEW TREATED WOODBLOCKING. FASTEN TOSTEEL BEAM.

EXISTING STEEL BEAM TOREMAIN

SEMI-RIGID INSULATION

SLIP SHEET (DASHED)

NEW BATTEN SEAMROOF SYSTEM

EXISTING INSULATIONAND METAL DECK TOREMAIN

NEW PLYWOOD

NEW RIGIDINSULATION

PREFINISHED ALUMINUMCLOSURE 3" WIDE WITH 14"UPTURNED LEG

UNDERLAYMENTMEMBRANE SEAL TOCLOSURE AT BACK LEG

A-5.1

1 & 2

A-5.1

4

A-5.0

1

Skylight Head DetailScale: 3" = 1'-0"3

NEW 2" THICK SEMI-RIGIDINSULATION

NEW SHEATHING

NEW HORIZONTAL FURRING

NEW PREFINISHEDALUMINUMCOUNTERFLASHING

NEW .040" PREFINISHEDFLASHING WITH RECEIVER.STRIP IN WITH AIR BARRIERMEMBRANE.

NEW METAL PANEL SYSTEM

NEW FLASHINGMEMBRANE

NEW CONTINUOUSALUMINUM CLEAT

NEW SEALANT ANDBACKER ROD WITHCORD WEEPS AT 24"O.C.

234" TRANSLUCENT

PANEL SYSTEM

14" PLASTIC SHIMS

NEW PREFINISHEDALUMINUM TRIM

NEW WOODBLOCKING, ANCHORAT 24" O.C.

NEW CONTINUOUSALUMINUM TRIM(TWO-PIECE)

2 3 4" TRANSLUCENT PANELSYSTEM

A-5.1

3

TRANSLUCENT PANELFLASHING BY PANELMANUFACTURER

NEW 0.040"PREFINISHED ALUMINUMCOUNTERFLASHING

UNDERLAYMENTMEMBRANE. SEAL TOCLOSURE AT BACK LEG.

PREFINISHED 0.032"ALUMINUM CLOSURE 3" WIDEWITH 14" UPTURNED LEG

2 3 4" TRANSLUCENT PANELSYSTEM

NEW TREATED WOODBLOCKING. FASTEN TOSTEEL PLATE.

12" PLASTIC SHIMS

SET IN FULL BED OFSILICONE SEALANT

AT INTERIOR

NEW TREATED WOODBLOCKING. FASTEN TOSTEEL BEAM.

NEW THERMAL CLIPS

WET SEAL PANELJOINT WITH SILICONE

1/2"

EXISTING STEEL PLATE TOREMAIN

NEW 0.032" PREFINISHEDALUMINUM TRIM

SEALANT WITH WEEPCORDS AT 24" O.C.

1/2"

FOAM/METAL CLOSURE.SEAL TO PANEL ANDPROVIDE 1 WEEP.

EXTEND "GUTTER" AT HIPRAFTERS OVER UPTURNEDLEG AT SILL FLASHING ANDBEND DOWN TO DRAIN

1/2"

3" M

IN.

FELT UNDERLAYMENT

Page 10: ENGINEERS ARCHITECTS Roof Replacement...deck. replace damaged or deteriorated roof deck on a unit price basis. mechanically fasten 5 1/2” polyisocyanurate insulation and 1/2” gypsum

Translucent Panel

Details

A-5.1

As Shown

1

A

1

2

2

3

3

4

4

5

5

B

C

D

E

A

B

C

D

E

©C

opyr

ight

201

8. A

ll rig

hts r

eser

ved.

No

part

of th

is d

ocum

ent m

ay b

e re

prod

uced

in a

ny fo

rm o

r by

any

mea

ns w

ithou

tpe

rmis

sion

from

Wis

s, Ja

nney

, Els

tner

Ass

ocia

tes,

Inc.

(WJE

). W

JE d

iscl

aim

s any

resp

onsi

bilit

y fo

r its

una

utho

rized

use

.

Plot

ted:

9/1

7/20

18 4

:38

PM b

y C

haije

nkit,

Tan

ya

File

Nam

e: P

:\201

8\20

18.0

xxx\

2018

.077

2.0

- TR

IPH

AH

N C

ENTE

R R

OO

F R

EPLA

CEM

ENT

RFQ

(PS)

\Dra

win

gs\R

oof

Rep

lace

men

t.dw

g

DescriptionMark Date

Project No.

Date

Drawn

Checked

Scale

Sheet Title

Sheet No.

Triphahn Center

Roof Replacement

Hoffman Estates

Park District

Project

Client

Headquarters & Laboratories: Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York

Princeton | San Francisco | Seattle | Washington, D.C.

Wiss, Janney, Elstner Associates, Inc.

330 Pfingsten Road

Northbrook, Illinois 60062

847.272.7400 tel | 847.480.9534 fax

www.wje.com

ENGINEERSARCHITECTSMATERIALS SCIENTISTS

TC

1685 West Higgins Road

Hoffman Estates, IL 60169

Issued for Bid9.17.18

1685 West Higgins Road

Hoffman Estates, IL 60169

September 17, 2018

2018.0772

PS / RAW

Wall Jamb and Batten DetailScale: 6" = 1'-0"4

2 3/

4"

5/8"1 1/8" PANEL DIMENSION

Enlarged Wall Sill DetailScale: 6" = 1'-0"2

EXISTING STEEL STUDFRAMING. REPAIR ASNECESSARY. A/E TOINSPECT FRAMING AFTEREXISTING TRANSLUCENTPANELS ARE REMOVED TODETERMINE REPAIRSREQUIRED.

NEW 12" TYPE X GYPSUMSHEATHING

2" RIGID INSULATION.TAPE ALL JOINTS WITHFOIL TAPE.

NEW 0.040" PREFINISHEDALUMINUM SOFFITPANELS

S.S. CLIPS AT 16" O.C. (STAGGER)

SEALANT JOINT

2 3 4" TRANSLUCENTPANEL SYSTEM

FLASHING MEMBRANE

FILL WITH SEALANT

1" RIGID INSULATION.TAPE ALL JOINTS WITHFOIL TAPE.

NEW THROUGH-WALLFLASHING. FORMRECEIVER AT BOTTOMEDGE.

NEW AIR/MOISTUREBARRIER

NEW 0.040" PREFINISHEDALUMINUM PANELS.RIVET TO CLIPS WITHCOLOR MATCH RIVETS.

NEW CONTINUOUS S.S.TERMINATION CLOSURESET IN SEALANT

Wall Sill DetailScale: 3" = 1'-0"1

A-5.1

2

EXISTING STUDS AT 16" O.C.

NEW WOOD BLOCKING ASNECESSARY TO SUPPORTAIR BARRIER. INSTALLBETWEEN STOREFRONTCLIPS.

EXISTING STOREFRONTSYSTEM TO REMAIN

PREFORMED SILICONE TOSEAL AIR/MOISTUREBARRIER TO STOREFRONT

NEW AIR/MOISTURE BARRIER2 3 4" TRANSLUCENTPANEL SYSTEM

NEW 2" RIGID INSULATION

EXISTING STEEL STUDFRAMING. REPAIR ASNECESSARY. A/E TOINSPECT FRAMINGAFTER EXISTINGTRANSLUCENT PANELSARE REMOVED TODETERMINE REPAIRSREQUIRED.

11 1/2"

Wall Panel Lateral Anchorage DetailScale: 6" = 1'-0"3

COUNTERSUNKFASTENERS

2 3 4" TRANSLUCENTPANEL SYSTEM

CONTINUOUS SEALANT

CONTINUOUS 0.063"PREFINISHED ALUMINUMTRIM

CONTINUOUS WOODBLOCKING

PREFINISHED STEEL CLIPANGLES TO MATCHMULLION COLOR. DESIGNAND ANCHORAGE TO BEBY TRANSLUCENT PANELCONTRACTOR.

SEALANT

PREFINISHED ALUMINUMRIVETS

TRANSLUCENT PANELFLASHING (PREFINISHEDALUMINUM) BY PANELMANUFACTURER

1/2"

EXISTING STEEL ANGLETO REMAIN. CLEAN ANDPAINT

NEW SEALANT ANDBACKER ROD WITHCORD WEEPS AT 24" O.C.

NEW CONTINUOUS 1XBLOCKING

CONTINUOUS PLASTICSHIMS SET IN SEALANT.PROVIDE 14" GAPBETWEEN.

1/2"

1"

1 1/

2"

CUT 1" DEEPCONTINUOUS REGLETIN MASONRY FORCLOSURE

NEW 0.040"PREFINISHEDALUMINUM CLOSURE

NEW SEALANT ANDBACKER ROD

NEW SEALANTJOINTS

5/8"WET SEAL HEAD AND JAMBSAT ALL PANELS WITHSILICONE. INSTALL AT 45°FLAT PROFILE.

Roof Batten DetailScale: 6" = 1'-0"6

Ridge DetailScale: 6" = 1'-0"5

SEALANT AND BACKER ROD

WET SEAL PANELS WITHSILICONE. INSTALL AT 45°FLAT PROFILE.

2 3 4" TRANSLUCENT PANELSYSTEM

PREFINISHED ALUMINUM"GUTTER" WITH HEMMEDEDGES TURNED UP 14"

NEW SEALANT JOINTS (TYP.)

NEW PREFINISHEDALUMINUM TRIM

NEW CONTINUOUS WOODBLOCKING. ANCHOR TOSTEEL BEAM.

14" CONTINUOUS PLASTIC

SHIMS SET IN SEALANT

CONTINUOUS SEALANT

2 3/

4"

EXISTING STEEL BEAM

3"

NEW 12" TYPE X GYPSUMSHEATHING

FILL SPACE AT END OFFLOOR WITH SEMI-RIGIDINSULATION

EXISTING MEZZANINEFLOOR. VERIFYCONSTRUCTION IN FIELD.