This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.
Facility Assessment Report
Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors
Campus Summary
Main 1928 62,367 $3,352,6823
8-Classroom Modular 2013 9,800 $189,6141
Annex 1996 16,936 $707,7301
SITE $428,997
Campus Total $4,679,02389,103
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Entrance Control - Audio and Video Door 1 - Northwest 7EA1 $0
Entrance Control - Audio and Video Door 3 - Southeast 6EA1 $702
Exterior Doors - Exterior Steel Door Door 1 - Northwest 6EA2 $961
Exterior Doors - Exterior Steel Door Door 1.5 - West center 6EA1 $481
Exterior Doors - Exterior Steel Door Door 2 - Southwest 6EA2 $961
Exterior Doors - Exterior Steel Door Door 2.5 - Southwest 6EA2 $961
Exterior Doors - Exterior Steel Door Door 3 - Southeast 6EA2 $961
Exterior Doors - Exterior Steel Door Door 3.5 - North boiler 6EA1 $481
Exterior Doors - Exterior Steel Door Door 3.7 - Northwest 6EA2 $961
Exterior Doors - Overhead Rolling/ Garage Door Door 3.1 - Southeast 6EA1 $1,433
Exterior Doors - Overhead Rolling/ Garage Door Door 3.3 - East boiler 6EA1 $1,433
Exterior Doors - Transom Lite Door 1 - Northwest 7EA2 $0
Exterior Doors - Transom Lite Door 2 - Southwest 6EA2 $627
Exterior Doors - Transom Lite Door 2.5 - Southwest 6EA2 $627
Exterior Doors - Transom Lite Door 3.5 - North boiler 6EA1 $313
Exterior Doors - Transom Lite Door 3.7 - Northwest 6EA2 $627
Exterior Stairs - Stone Door 1 - Northwest 6LF81 $9,152
Exterior Stairs - Stone Door 1.5 - West center 6LF3 $339
Page 1 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Exterior Stairs - Stone Door 2 - Southwest 6LF72 $8,135
Exterior Stairs - Stone Door 2.5 - Southwest 6LF48 $5,423
Exterior Stairs - Stone Door 3 - Southeast 6LF48 $5,423
Exterior Stairs - Stone Door 3.7 - Northwest 6LF72 $8,135
Power Door Operator and Controls Door 3 - Southeast 6EA1 $0
Stair Handrail - Steel_Stair Handrail Door 1 - Northwest 6LF8 $69
Stair Handrail - Steel_Stair Handrail Door 2 - Southwest 6LF8 $69
Stair Handrail - Steel_Stair Handrail Door 3 - Southeast 6LF8 $69
Stair Handrail - Steel_Stair Handrail Door 3.7 - Northwest 6LF6 $52
Foundation
Foundation - Concrete Entire Building 7LF920 $0
Superstructure - Concrete Entire Building 7SF62,367 $0
Lighting
Exterior Lighting - Parapet or Roof Mounted Entire Building 6EA5 $2,683
Exterior Lighting - Wall Mounted Entire Building 6EA10 $2,887
Roof System
Chimney - Brick Chimney- Concrete/ Mortar Liner Roof 1 5LF51 $145,430
Chimney - Brick Chimney- Concrete/ Mortar Liner Roof 1 Cracks, step cracking throughout4LF45 $253,438
Coping - Terra Cotta Roof 1 6LF355 $11,402
Coping - Terra Cotta Roof 2 6LF182 $5,845
Coping - Terra Cotta Roof 3 6LF362 $11,627
Coping - Terra Cotta Roof 4 6LF125 $4,015
Coping - Terra Cotta Roof 5 6LF25 $803
Coping - Terra Cotta Roof 6 6LF25 $803
Downspouts - Interior Downspouts Roof 1 No screens, debris6LF180 $5,982
Downspouts - Interior Downspouts Roof 2 7LF48 $0
Downspouts - Interior Downspouts Roof 3 7LF96 $0
Downspouts - Interior Downspouts Roof 4 6LF40 $1,329
Parapet - 16" - 30" Height Roof 2 6LF72 $2,877
Parapet - 16" - 30" Height Roof 3 6LF88 $3,516
Parapet - 16" - 30" Height Roof 5 6LF25 $999
Parapet - 16" - 30" Height Roof 6 6LF25 $999
Parapet - Parapet < 16" Height Roof 2 6LF110 $2,344
Parapet - Parapet < 16" Height Roof 3 6LF274 $5,838
Parapet - Parapet < 16" Height Roof 4 6LF125 $2,663
Parapet - Parapet > 30" Roof 1 6LF355 $22,692
Page 2 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Roof System
Roof Structure - Concrete Roof 1 7SF11,080 $0
Roof Structure - Concrete Roof 2 7SF3,636 $0
Roof Structure - Concrete Roof 3 7SF7,334 $0
Roof Structure - Concrete Roof 4 7SF1,676 $0
Roof Structure - Concrete Roof 5 7SF82 $0
Roof Structure - Concrete Roof 6 7SF82 $0
Roof - EPDM/ Synthetic Rubber Roof 1 6SF11,080 $93,799
Roof - EPDM/ Synthetic Rubber Roof 2 6SF3,636 $30,781
Roof - EPDM/ Synthetic Rubber Roof 3 6SF7,334 $62,087
Roof - EPDM/ Synthetic Rubber Roof 4 6SF1,676 $14,188
Roof - EPDM/ Synthetic Rubber Roof 5 6SF82 $694
Roof - EPDM/ Synthetic Rubber Roof 6 6SF82 $694
Walls
Cheek-Wall - Concrete Entire Building 6SF80 $820
Exterior Walls - Brick Entire Building 6SF25,492 $171,332
Exterior Walls - Terra Cotta Entire Building 6SF3,020 $20,297
Windows
Guard - Guards perforated Entire Building / West Façade 6SF919 $11,736
Guard - Guards wire guard Entire Building 6SF1,310 $16,729
Lintels - Steel Entire Building 6LF767 $22,265
Lintels - Steel Entire Building / Boiler Room Bowing, cracked brick above4LF9 $4,075
Lintels - Terra Cotta Entire Building 6LF107 $0
Skylite - Glass Single-Pane Entire Building 5SF24 $1,437
Windows - Decorative Entire Building 6SF136 $1,015
Windows - Sash Aluminum Double-pane Entire Building 5SF7,534 $405,842
Building Exterior Subtotal: $1,394,357
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Automatic Transfer Switch Electrical Room 6EA2 $816
Emergency A/C Power - Auditoium and Aisle Lighting Entire Building / 1st Floor 6SF2,830 $1,497
Emergency A/C Power - Corridors and Stairs Entire Building / Electrical Room 6SF9,469 $2,844
Emergency A/C Power - Gym Entire Building / 1st Floor 6SF3,014 $1,121
Page 3 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Emergency A/C Power - Students Toilets Entire Building 6SF1,599 $595
Emergency Battery Packs - Gym Gym / 1st Floor 6EA1 $203
Emergency Generator- Outdoor- Diesel - Below 60 KW Site - East Serves main building only. 7EA1 $0
Exit Signs - Auditoium Entire Building / 1st Floor 7EA8 $0
Exit Signs - Corridors and Stairs Entire Building 7EA13 $0
Exit Signs - Gym Entire Building / 1st Floor 7EA2 $0
Security System - CCTV Entire Building 6SF62,367 $18,729
Security System - Intrusion Detection Entire Building 6SF62,367 $16,053
Main Service
Main Electrical Service - 1200 A 120/208/3PH Electrical Room 6EA1 $5,078
Main Electrical Service - 800 A and 277/480/3PH Electrical Room 6EA1 $3,897
PA System Entire Building Serves the main, annex and modular. Control console located in main.
6SF62,367 $20,513
Power Distribution
Lighting and Power Panels - 100 A Entire Building Emergency power.7EA1 $0
Lighting and Power Panels - 100 A Entire Building 7EA2 $0
Lighting and Power Panels - 100 A Entire Building 7EA4 $0
Lighting and Power Panels - 100 A Entire Building Fuses, emergency power.6EA1 $299
Lighting and Power Panels - Above 100 A Entire Building / Boiler Room 7EA2 $0
Lighting and Power Panels - Above 100 A Entire Building 7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building 7EA9 $0
Lighting and Power Panels - Above 100 A Entire Building 7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Mechanical Room 7EA1 $0
Electrical System Subtotal: $71,643
Building: Main
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel Boiler Room Obsolete technology.4EA1 $49,477
Fire Alarm Strobe Lights Boiler Room / Entire Building 6SF63,367 $22,654
Fire Alarm_System Boiler Room / Entire Building Manual pull stations only. Obsolete technology. 4SF62,367 $123,967
Safty System Subtotal: $196,097
Page 4 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Conditioning
Chemical Pot Feeder Mechanical Room 6EA1 $725
Chiller-Water Cooled- Cetrifugal - 201-300 tons Mechanical Room Serves the main building only.6EA1 $9,403
Cooling Tower - Open Cell Mechanical Room / Lower Roof Two cell tower. 6EA1 $4,969
Glycol Feed Mechanical Room 6EA1 $490
Pipes - Chilled Water Pipe- Copper Mechanical Room / Entire Building 6LF600 $1,133
Pressure Fill System Mechanical Room 6EA1 $1,405
Air Handling Systems
Air Handling Unit- Built Up- Single Zone- Daul Temperature Coils - 4000 - 8000 cfm
Mechanical Room Serves the gym. Fan motor replaced in 2005 renovation.
5EA1 $24,083
Air Handling Unit- Built Up- Single Zone- Daul Temperature Coils - 8001 - 15000 cfm
Mechanical Room Serves the auditorium. Fan motor replaced in 2005 during renovation.
5EA1 $34,007
Air Handling Unit- Package Single Zone- Indoor- Daul Temperature
Coils- - 10001-15000 cfm
Mechanical Room Serves the north classrooms. 6EA1 $3,350
Air Handling Unit- Package Single Zone- Indoor- Daul Temperature
Coils- - 15001-20000 cfm
Mechanical Room Serves the south classrooms. 6EA1 $3,350
Air Intake Mechanical Room / Roof 6EA1 $5,765
Air Intake Mechanical Room / Roof 6EA1 $5,765
Air Intake Mechanical Room / Roof 6EA1 $5,765
Air Intake Mechanical Room / Roof 6EA1 $5,765
Auxiliaries - 4000 - 8000 cfm Mechanical Room 5EA1 $13,523
Auxiliaries - 8001 - 15000 cfm Mechanical Room 5EA1 $12,908
Fan Coil Unit- Celing Mounted - Dual Temperature Coil Main Office Storage Room Ceiling hung exposed. 6EA1 $1,866
Fan Coil Unit- Floor Mounted - Dual Temperature Coil Entire Building / 1st Floor Wall mount cabinet style. 6EA1 $1,793
Fan Coil Unit- Floor Mounted - Dual Temperature Coil Entire Building / 1st Floor Wall mount cabinet style. 6EA1 $1,793
Fan Coil Unit- Floor Mounted - Dual Temperature Coil Entire Building / 2nd Floor Located inside wall.6EA1 $1,793
Fan Coil Unit- Floor Mounted - Dual Temperature Coil Entire Building / 2nd Floor Wall mount cabinet style. 6EA1 $1,793
Fan Coil Unit- Floor Mounted - Dual Temperature Coil Entire Building Located inside wall.6EA8 $14,343
Fan Coil Unit- Floor Mounted - Dual Temperature Coil Entire Building Located inside wall.6EA4 $7,172
Fan Coil Unit- Floor Mounted - Dual Temperature Coil Entire Building Located inside wall.6EA8 $14,343
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Outdoor Return Fans- Air Handling Unit Type - 5000 - 10000 CFM Roof 6EA1 $1,591
Outdoor Return Fans- Air Handling Unit Type - Less than 5000 CFM Roof 6EA1 $1,282
Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 7LF50 $0
Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 7LF50 $0
Zone Dampers Mechanical Room / Plenum With hot water reheat coils. 6EA17 $14,162
Zone Dampers Mechanical Room / Plenum With hot water reheat coils. 6EA12 $9,996
Page 5 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Boiler Systems
Boiler Auxiliary- Non Condensing Hot Water - 2001 - 3000 MBH Boiler Room 6EA2 $4,093
Chemical Pot Feeder Boiler Room 6EA1 $725
Combustion Dampers Boiler Room 6EA2 $818
Glycol Feed System Boiler Room 6EA1 $539
Non Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - 2001 - 3000 MBH
Boiler Room Serves main building only. 6EA2 $1,996
Water Fill System Boiler Room 6EA1 $1,168
Gas Booster
Gas Booster Mechanical Room 6EA2 $998
Heating Devices
Fin Tube - Hot Water Entire Building 6LF100 $944
Radiators - Hot Water Teacher's Toilet Rooms 6EA2 $556
Unit Heater - Gas Boiler Room With electric wall thermostat. 6EA1 $278
Wall Heater - Electric Entire Building 6EA19 $2,639
Wall Heater - Electric Entire Building Missing covers and wires exposed. 4EA2 $2,165
Mechanical Plumbing
Chilled Water Pump - 10 - 20 HP Boiler Room 6EA2 $2,485
Condenser Pump - 10 - 20 HP Boiler Room 6EA2 $2,485
Daul Temperature Pump - 10 - 20 HP Boiler Room 6EA2 $2,485
Hot Water Pump - Less than 10 Boiler Room 6EA3 $3,334
Hydronic Supply and Return - Copper Entire Building 6LF600 $31,480
Hydronic Supply and Return - Galvanized Entire Building / Basement 6LF200 $15,464
Temperature Control
DDC System Entire Building Serves the main building only.6SF62,367 $35,674
Electric Thermostat Entire Building / Boiler Room Gas unit heater. 6EA1 $0
Thermostats - DDC Entire Building 6EA29 $0
Unit Ventilation
Unit Ventilators- Ceiling Mounted- Dual Temperature Coils (Hot/Chilled) Water
3rd Floor 6EA2 $2,495
Ventilation
Exhaust Fans- Indoor - 1501 - 8000 CFM Entire Building / 1st Floor Kitchen exhaust fan. 6EA1 $592
Exhaust Fans- Indoor - 500 - 1500 CFM Entire Building / Mechanical Room 6EA1 $592
Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Entire Building / Roof 6EA2 $1,185
Page 6 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Ventilation
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Roof 6EA1 $592
Roof Mounted Duct Work Entire Building / North Façade Exterior side wall exhaust duct for chiller room. 7LF25 $0
Roof Mounted Duct Work Entire Building / Roof 7LF25 $0
Mechanical System Subtotal: $324,881
Building: Main
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Gas Heater - Less than 150000 BTU/HR Boiler Room 6EA1 $310
Hot Water Storage Tank_Gas - Less than 200 Gallons Boiler Room 7EA1 $0
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building Piping is original to the building and developing leaks in multiple locations.
6SF62,367 $12,486
Domestic Piping-Cold Water Horizontal Lines Entire Building Piping is original to the building and developing leaks in multiple locations.
6SF62,367 $15,161
Domestic Piping-Cold Water Risers Entire Building Piping is original to the building and developing
leaks in multiple locations.
6SF62,367 $11,594
Domestic Piping-Hot Water from Risers to Fixtures Entire Building Piping is original to the building and developing
leaks in multiple locations.
6SF62,367 $9,810
Domestic Piping-Hot Water Horizontal Lines Entire Building Piping is original to the building and developing leaks in multiple locations.
6SF62,367 $11,594
Domestic Piping-Hot Water Return Lines Entire Building Piping is original to the building and developing leaks in multiple locations.
6SF62,367 $8,918
Domestic Piping-Hot Water Return Risers Entire Building Piping is original to the building and developing leaks in multiple locations.
6SF62,367 $8,918
Sanitary Piping Entire Building 6SF62,367 $57,078
Storm Piping Entire Building 6SF62,367 $54,403
Vent Piping Entire Building 6SF62,367 $41,917
Pumps
Pumps - Domestic Booster Pump-Simplex Mechanical Room Not used and don't appear to be functional. Building pressure is still good while bypassing pumps.
4EA2 $50,881
Pumps - Sump-Duplex Mechanical Room 6EA1 $1,387
Plumbing System Subtotal: $284,458
Page 7 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #100 (Special Education)
AC Units 1st Floor old5EA1 $1,826
Ceiling - Plaster/Drywall 1st Floor 6SF340 $1,177
Doors - Side-lite 1st Floor 6SF20 $334
Doors - Transom Window 1st Floor 6SF8 $135
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor old, cracks throughout5SF340 $1,527
Lighting - Lay-in 1st Floor 7EA6 $0
Walls - Plaster/Drywall 1st Floor 6SF810 $2,236
Walls - Structural Glazed Tile 1st Floor 6SF243 $764
Work Sink 1st Floor 6EA1 $379
Classroom #103 (Kindergarten)
Casework 1st Floor 6LF8 $202
Ceiling - Plaster/Drywall 1st Floor 6SF717 $2,481
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF717 $5,055
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Marker Board 1st Floor 7LF41 $0
Walls - Plaster/Drywall 1st Floor 6SF1,194 $3,295
Classroom #104 (Regular Classroom)
Casework 1st Floor 6LF8 $202
Ceiling - Plaster/Drywall 1st Floor 6SF717 $2,481
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF717 $5,055
Lighting - Pendent/Surface 1st Floor cover broken6EA1 $124
Lighting - Pendent/Surface 1st Floor 7EA13 $0
Marker Board 1st Floor 7LF41 $0
Walls - Plaster/Drywall 1st Floor 6SF1,194 $3,295
Classroom #106 (Kindergarten)
Casework 1st Floor 6LF78 $1,970
Ceiling - Plaster/Drywall 1st Floor 6SF717 $2,481
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF717 $5,055
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Page 8 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #106 (Kindergarten)
Walls - Plaster/Drywall 1st Floor 6SF1,194 $3,295
Classroom #107 (Special Education)
Ceiling - Plaster/Drywall 1st Floor 6SF488 $1,689
Doors - Transom Window 1st Floor 6SF8 $135
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF488 $1,068
Lighting - Pendent/Surface 1st Floor 7EA8 $0
Marker Board 1st Floor 7LF16 $0
Walls - Plaster/Drywall 1st Floor crack & peeling5SF20 $102
Walls - Plaster/Drywall 1st Floor 6SF996 $2,749
Classroom #110 (Regular Classroom)
Casework 1st Floor 6LF14 $354
Ceiling - Plaster/Drywall 1st Floor peeling throughout5SF717 $6,572
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF717 $5,055
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Marker Board 1st Floor 7LF41 $0
Walls - Plaster/Drywall 1st Floor 6SF1,188 $3,279
Walls - Plaster/Drywall 1st Floor peeling5SF6 $31
Classroom #201 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor cracking and water damage5SF8 $100
Ceiling - Plaster/Drywall 2nd Floor 6SF725 $2,509
Chalk Board 2nd Floor 4LF8 $734
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF733 $5,168
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF40 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,080 $2,981
Classroom #203 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor 6SF733 $2,537
Doors - Transom Window 2nd Floor 6SF18 $305
Page 9 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #203 (Regular Classroom)
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF733 $5,168
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF40 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,080 $2,981
Classroom #204 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor 6SF670 $2,319
Ceiling - Plaster/Drywall 2nd Floor cracking and water damage5SF11 $137
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF681 $4,801
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF40 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,057 $2,917
Walls - Plaster/Drywall 2nd Floor cracking and water damage5SF10 $51
Classroom #205 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor 6SF733 $2,537
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF733 $5,168
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF40 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,080 $2,981
Classroom #206 (Computer Lab)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor 6SF726 $2,512
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF726 $5,118
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF40 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,123 $3,099
Walls - Plaster/Drywall 2nd Floor cracking and water damage5SF7 $36
Wireless System 2nd Floor 6EA1 $372
Page 10 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #206 (Computer Lab)
Classroom #207 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor 6SF733 $2,537
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF733 $5,168
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF40 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,068 $2,948
Walls - Plaster/Drywall 2nd Floor cracking and water damage5SF12 $61
Classroom #208 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor water damage5SF8 $100
Ceiling - Plaster/Drywall 2nd Floor 6SF710 $2,457
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF718 $5,062
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF40 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,067 $2,945
Classroom #209 (Regular Classroom)
Casework 2nd Floor 6LF20 $505
Ceiling - Plaster/Drywall 2nd Floor 6SF725 $2,509
Ceiling - Plaster/Drywall 2nd Floor water damage5SF8 $100
Doors - Transom Window 2nd Floor 6SF9 $152
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF733 $1,604
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF30 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,074 $2,964
Walls - Plaster/Drywall 2nd Floor water damage5SF6 $31
Classroom #210 (Art Room)
Casework 2nd Floor 6LF35 $884
Ceiling - Plaster/Drywall 2nd Floor 6SF733 $2,537
Chalk Board 2nd Floor 4LF24 $2,203
Page 11 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #210 (Art Room)
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF733 $5,168
Lighting - Pendent/Surface 2nd Floor 7EA18 $0
Marker Board 2nd Floor 7LF10 $0
Walls - Plaster/Drywall 2nd Floor cracking and water damage5SF20 $102
Walls - Plaster/Drywall 2nd Floor 6SF1,350 $3,726
Work Sink 2nd Floor 6EA1 $379
Classroom #211 (Regular Classroom)
Casework 2nd Floor 6LF20 $505
Ceiling - Plaster/Drywall 2nd Floor 6SF721 $2,495
Ceiling - Plaster/Drywall 2nd Floor cracking and water damage5SF12 $150
Chalk Board 2nd Floor 4LF10 $918
Doors - Transom Window 2nd Floor 6SF9 $152
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Tile 2nd Floor 6SF733 $1,604
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF20 $0
Walls - Plaster/Drywall 2nd Floor water damage5SF6 $31
Walls - Plaster/Drywall 2nd Floor 6SF1,074 $2,964
Work Sink 2nd Floor 6EA1 $379
Classroom #300 (Office)
Casework 3rd Floor 6LF27 $682
Ceiling - Plaster/Drywall 3rd Floor 6SF340 $1,177
Doors - Transom Window 3rd Floor 6SF7 $119
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF340 $2,397
Lighting - Lay-in 3rd Floor 7EA4 $0
Marker Board 3rd Floor 7LF4 $0
Walls - Plaster/Drywall 3rd Floor 6SF393 $1,085
Walls - Structural Glazed Tile 3rd Floor 6SF590 $1,856
Classroom #301 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF729 $2,523
Ceiling - Plaster/Drywall 3rd Floor water damage5SF4 $50
Chalk Board 3rd Floor 4LF8 $734
Page 12 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #301 (Regular Classroom)
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF733 $5,168
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF40 $0
Walls - Plaster/Drywall 3rd Floor water damage5SF6 $31
Walls - Plaster/Drywall 3rd Floor 6SF1,074 $2,964
Classroom #303 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor water damage5SF10 $125
Ceiling - Plaster/Drywall 3rd Floor 6SF723 $2,502
Chalk Board 3rd Floor 4LF8 $734
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF733 $5,168
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF40 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,080 $2,981
Classroom #304 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor cracking and water damage5SF12 $150
Ceiling - Plaster/Drywall 3rd Floor 6SF669 $2,315
Chalk Board 3rd Floor 4LF8 $734
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF681 $4,801
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF40 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,067 $2,945
Classroom #305 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor cracking and water damage5SF14 $175
Ceiling - Plaster/Drywall 3rd Floor 6SF719 $2,488
Chalk Board 3rd Floor 4LF8 $734
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF733 $5,168
Page 13 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #305 (Regular Classroom)
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF40 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,080 $2,981
Classroom #306 (Regular Classroom)
Casework 3rd Floor 6LF7 $177
Ceiling - Plaster/Drywall 3rd Floor water damage5SF12 $150
Ceiling - Plaster/Drywall 3rd Floor 6SF714 $2,471
Doors - Transom Window 3rd Floor 6SF16 $271
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF726 $5,118
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF40 $0
Storage/ Closet 3rd Floor 6SF139 $1,008
Walls - Plaster/Drywall 3rd Floor water damage5SF5 $26
Walls - Plaster/Drywall 3rd Floor 6SF1,062 $2,931
Classroom #307 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF733 $2,537
Chalk Board 3rd Floor 4LF8 $734
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF733 $5,168
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF40 $0
Walls - Plaster/Drywall 3rd Floor cracking and water damage5SF4 $20
Walls - Plaster/Drywall 3rd Floor 6SF1,076 $2,970
Classroom #308 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF718 $2,485
Chalk Board 3rd Floor 4LF8 $734
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF718 $5,062
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF40 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,067 $2,945
Page 14 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #310 (Office)
Ceiling - Plaster/Drywall 3rd Floor 6SF304 $1,052
Ceiling - Plaster/Drywall 3rd Floor cracking and water damage5SF6 $75
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF310 $2,185
Lighting - Pendent/Surface 3rd Floor 7EA4 $0
Walls - Plaster/Drywall 3rd Floor 6SF387 $1,068
Walls - Plaster/Drywall 3rd Floor cracking and water damage5SF6 $31
Walls - Structural Glazed Tile 3rd Floor 6SF590 $1,856
Classrooms Subtotal: $287,827
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Ceiling - Plaster/Drywall 1st Flr- Copy Rm (Former restroom behind Auditorium)
6SF109 $377
Doors - Wood Doors inclu hw 1st Flr- Copy Rm (Former restroom behind Auditorium)
6EA1 $301
Floor - Tile Ceramic/ Porcelain 1st Flr- Copy Rm (Former restroom behind Auditorium)
6SF109 $231
Lighting - Pendent/Surface 1st Flr- Copy Rm (Former restroom
behind Auditorium)
7EA1 $0
Power Distribution 1st Flr- Copy Rm (Former restroom
behind Auditorium)
7EA6 $0
Walls - Plaster/Drywall 1st Flr- Copy Rm (Former restroom behind Auditorium)
6SF125 $345
Walls - Structural Glazed Tile 1st Flr- Copy Rm (Former restroom behind Auditorium)
6SF250 $787
Ceiling - Plaster/Drywall 1st Flr- Work Rm in Main Office 6SF146 $505
Doors - Steel Doors incl hw 1st Flr- Work Rm in Main Office 6EA1 $301
Floor - Wood 1st Flr- Work Rm in Main Office 6SF146 $1,029
Lighting - Pendent/Surface 1st Flr- Work Rm in Main Office 7EA2 $0
Power Distribution 1st Flr- Work Rm in Main Office 7EA10 $0
Walls - Plaster/Drywall 1st Flr- Work Rm in Main Office 6SF624 $1,722
Ceiling - Plaster/Drywall Basement - Assistant Eng. Office 6SF108 $374
Doors - Wood Doors inclu hw Basement - Assistant Eng. Office 6EA1 $301
Floor - Tile Basement - Assistant Eng. Office badly worn and cracked floor tiles5SF108 $485
Page 15 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Lighting - Pendent/Surface Basement - Assistant Eng. Office 7EA2 $0
Power Distribution Basement - Assistant Eng. Office 7EA2 $0
Walls - Plaster/Drywall Basement - Assistant Eng. Office 6SF230 $635
Ceiling - Plaster/Drywall Kitchen Office 6SF52 $180
Doors - Wood Doors inclu hw Kitchen Office 6EA1 $301
Floor - Tile/Sheet Kitchen Office 6SF52 $52
Lighting - Pendent/Surface Kitchen Office 7EA1 $0
Power Distribution Kitchen Office 7EA2 $0
Walls - Plaster/Drywall Kitchen Office 6SF357 $985
Ceiling - Plaster/Drywall Main Office 6SF339 $1,173
Doors - Transom Window Main Office 6SF8 $135
Doors - Wood Doors inclu hw Main Office 6EA2 $602
Floor - Wood Main Office 6SF339 $2,390
Lighting - Pendent/Surface Main Office 7EA6 $0
Power Distribution Main Office 7EA6 $0
Storage/ Closet Main Office 6SF12 $87
Walls - Plaster/Drywall Main Office 6SF894 $2,467
Ceiling - Plaster/Drywall Principals office Some minor cracking6SF154 $533
Doors - Transom Window Principals office 6SF8 $135
Doors - Wood Doors inclu hw Principals office 6EA1 $301
Floor - Wood Principals office 6SF154 $1,086
Lighting - Pendent/Surface Principals office Ceiling fan7EA1 $0
Power Distribution Principals office 7EA6 $0
Walls - Plaster/Drywall Principals office 6SF590 $1,628
Ceiling - Plaster/Drywall Rm 101A- Counselor Office in Library 6SF232 $803
Doors - Transom Window Rm 101A- Counselor Office in Library 6SF40 $677
Doors - Wood Doors inclu hw Rm 101A- Counselor Office in Library 6EA4 $1,204
Floor - Tile Ceramic/ Porcelain Rm 101A- Counselor Office in Library 6SF232 $491
Lighting - Pendent/Surface Rm 101A- Counselor Office in Library 7EA4 $0
Power Distribution Rm 101A- Counselor Office in Library 7EA10 $0
Walls - Plaster/Drywall Rm 101A- Counselor Office in Library 6SF580 $1,601
Auditorium & Theater
Balcony Seating 1st Floor 6EA95 $16,522
Ceiling - Plaster/Drywall 1st Floor 6SF2,815 $23,468
Ceiling - Plaster/Drywall 1st Floor water damaged5SF15 $473
Ceiling - Plaster/Drywall 1st Floor Underside of Balcony 6SF400 $3,924
Doors - Wood Doors inclu hw 1st Floor 6EA10 $3,010
Page 16 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Auditorium & Theater
Floor - Carpet 1st Floor 6SF1,234 $2,629
Floor - Concrete 1st Floor balcony floor6SF874 $462
Floor - Terrazzo 1st Floor 6SF320 $700
Floor - Tile 1st Floor old5SF1,246 $5,595
Lighting - Chandelier, Incandescent 1st Floor 7EA8 $0
Lighting - Pendent/Surface 1st Floor 7EA5 $0
Lighting - Wall Mounted 1st Floor 7EA17 $0
Main Floor Seating 1st Floor 6EA288 $50,088
Sound System 1st Floor 6EA1 $10,721
Stage 1st Floor 6SF467 $2,698
Stage Curtain 1st Floor 6EA2 $0
Stage Curtain 1st Floor torn5EA6 $73,722
Stage-Stairs - Wood 1st Floor 6LF10 $117
Stairs - Terrazzo 1st Floor 6LF18 $138
Walls - Plaster/Drywall 1st Floor peeling, needs painting5SF5,412 $46,822
Walls - Plaster/Drywall 1st Floor cracked & water damaged in stairs to balcony5SF66 $745
Gymnasia
Ceiling - Lay-in 1st Floor 6SF3,014 $9,051
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF3,014 $21,248
Lighting - Metal Halide/Sodium Vapor 1st Floor 7EA12 $0
Scoreboards 1st Floor 6EA1 $2,244
Walls - Plaster/Drywall 1st Floor 6SF3,674 $10,140
Walls - Structural Glazed Tile 1st Floor Some Cracking in corners6SF1,524 $4,795
Kitchen
Ceiling - Plaster/Drywall 1st Floor 6SF458 $1,585
Doors - Transom Window 1st Floor 6SF9 $152
Doors - Wood Doors inclu hw 1st Floor 6EA4 $1,204
Floor - Tile/Sheet 1st Floor very worn, needs replacement 5SF458 $2,057
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Storage/ Closet 1st Floor 6SF110 $798
Walls - Plaster/Drywall 1st Floor 6SF998 $2,754
Library
Casework 101- Media Center 6LF48 $1,212
Ceiling - Plaster/Drywall 101- Media Center peeling throughout5SF1,128 $10,340
Page 17 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Library
Doors - Transom Window 101- Media Center 6SF16 $271
Doors - Wood Doors inclu hw 101- Media Center 6EA2 $602
Floor - Carpet 101- Media Center Wood6SF1,128 $2,403
Lighting - Pendent/Surface 101- Media Center 7EA22 $0
Storage/ Closet 101- Media Center 6SF70 $508
Walls - Plaster/Drywall 101- Media Center 6SF1,606 $4,432
Lunch & Multipurpose Room
Ceiling - Plaster/Drywall 2nd Floor Staff 6SF356 $1,232
Doors - Wood Doors inclu hw 2nd Floor Staff 6EA1 $301
Floor - Tile 2nd Floor Staff 6SF356 $779
Lighting - Pendent/Surface 2nd Floor Staff 7EA6 $0
Storage/ Closet 2nd Floor Staff 6SF150 $1,088
Walls - Plaster/Drywall 2nd Floor Staff 6SF594 $1,639
Walls - Plaster/Drywall 2nd Floor Staff cracking and water damage5SF6 $31
Walls - Structural Glazed Tile 2nd Floor Staff 6SF452 $1,422
Ceiling - Plaster/Drywall Rm 108- Teacher Lunchroom 6SF240 $831
Doors - Transom Window Rm 108- Teacher Lunchroom 6SF8 $135
Doors - Wood Doors inclu hw Rm 108- Teacher Lunchroom 6EA1 $301
Floor - Tile Rm 108- Teacher Lunchroom 6SF240 $525
Lighting - Pendent/Surface Rm 108- Teacher Lunchroom 7EA5 $0
Walls - Plaster/Drywall Rm 108- Teacher Lunchroom 6SF884 $2,440
MDF_IDF
AC Unit 2nd floor inside 206 6EA1 $496
Doors - Steel Doors incl hw 2nd floor inside 206 6EA1 $301
Mechanical/ Service Rooms
Janitor's Closet 1st Floor water damaged ceiling5SF87 $1,403
Storage Room 1st Floor former Men's Rm behind auditorium6SF84 $602
Janitor's Closet 2nd Floor 6SF65 $466
Janitor's Closet 3rd Floor water damage throughout5SF31 $500
Air Intake Plenums Basement 6SF796 $4,929
Air Tunnel Basement 6SF820 $5,077
Auditorium Plenums Basement 6SF960 $5,944
Boiler Room Basement 18 ft severe crack in floor6SF1,575 $11,284
Crawl Space - Unfinished Basement flooded floors, water damage to most walls.5SF2,687 $35,773
Interior Stairs Basement 6LF16 $144
Mechanical/ Service Rooms Basement water damage throughout, flooding5SF827 $13,340
Page 18 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Mechanical/ Service Rooms
Storage Room Basement previous water damage and flooding6SF2,200 $15,761
Vaults Basement old chemical supply area, floor badly worn and damaged
5SF360 $5,807
Restroom
Accessories 1st floor Boys- Next to 104 6SF225 $2,075
Ceiling - Plaster/Drywall 1st floor Boys- Next to 104 6SF215 $744
Ceiling - Plaster/Drywall 1st floor Boys- Next to 104 peeling5SF10 $125
Doors - Transom Window 1st floor Boys- Next to 104 6SF16 $271
Doors - Wood Doors inclu hw 1st floor Boys- Next to 104 6EA3 $903
Floor Drain 1st floor Boys- Next to 104 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st floor Boys- Next to 104 6SF225 $476
Hand Dryer 1st floor Boys- Next to 104 6EA2 $460
Lavatory 1st floor Boys- Next to 104 6EA2 $639
Lighting - Pendent/Surface 1st floor Boys- Next to 104 7EA4 $0
Partitions 1st floor Boys- Next to 104 6EA2 $594
Urinals 1st floor Boys- Next to 104 6EA4 $1,344
Walls - Plaster/Drywall 1st floor Boys- Next to 104 peeling5SF12 $61
Walls - Plaster/Drywall 1st floor Boys- Next to 104 6SF265 $731
Walls - Structural Glazed Tile 1st floor Boys- Next to 104 6SF461 $1,450
Walls - Structural Glazed Tile 1st floor Boys- Next to 104 6SF92 $401
Walls - Tile Ceramic/ Porcelain 1st floor Boys- Next to 104 6SF92 $208
Water Closet 1st floor Boys- Next to 104 6EA2 $672
Accessories 1st Floor Girls- Across from Gym 6SF336 $3,099
Ceiling - Plaster/Drywall 1st Floor Girls- Across from Gym 6SF336 $1,163
Doors - Transom Window 1st Floor Girls- Across from Gym 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor Girls- Across from Gym 6EA2 $602
Floor Drain 1st Floor Girls- Across from Gym 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st Floor Girls- Across from Gym 6SF336 $711
Hand Dryer 1st Floor Girls- Across from Gym 6EA2 $460
Lavatory 1st Floor Girls- Across from Gym 6EA2 $639
Lighting - Pendent/Surface 1st Floor Girls- Across from Gym 7EA7 $0
Partitions 1st Floor Girls- Across from Gym 6EA8 $2,375
Walls - Plaster/Drywall 1st Floor Girls- Across from Gym 6SF574 $1,584
Walls - Structural Glazed Tile 1st Floor Girls- Across from Gym 6SF451 $1,419
Water Closet 1st Floor Girls- Across from Gym 6EA8 $2,688
Accessories 1st Flr- In Gym 6SF68 $627
Ceiling - Plaster/Drywall 1st Flr- In Gym 6SF62 $215
Page 19 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Ceiling - Plaster/Drywall 1st Flr- In Gym water damaged5SF6 $75
Doors - Wood Doors inclu hw 1st Flr- In Gym 6EA1 $301
Floor - Tile Ceramic/ Porcelain 1st Flr- In Gym 6SF68 $144
Lavatory 1st Flr- In Gym 6EA1 $320
Lighting - Pendent/Surface 1st Flr- In Gym 7EA1 $0
Partitions 1st Flr- In Gym missing door5EA1 $751
Student Lockers - One Tier 1st Flr- In Gym 6EA5 $464
Walls - Plaster/Drywall 1st Flr- In Gym 6SF392 $1,082
Water Closet 1st Flr- In Gym 6EA1 $336
Accessories 1st flr Mens- Across from Lunchroom 6SF125 $1,153
Ceiling - Plaster/Drywall 1st flr Mens- Across from Lunchroom 6SF125 $433
Doors - Transom Window 1st flr Mens- Across from Lunchroom 6SF8 $135
Doors - Wood Doors inclu hw 1st flr Mens- Across from Lunchroom 6EA1 $301
Floor - Tile Ceramic/ Porcelain 1st flr Mens- Across from Lunchroom 6SF125 $265
Hand Dryer 1st flr Mens- Across from Lunchroom 6EA1 $230
Lavatory 1st flr Mens- Across from Lunchroom 6EA2 $639
Lighting - Pendent/Surface 1st flr Mens- Across from Lunchroom 7EA2 $0
Partitions 1st flr Mens- Across from Lunchroom 6EA2 $594
Walls - Plaster/Drywall 1st flr Mens- Across from Lunchroom peeling5SF12 $61
Walls - Plaster/Drywall 1st flr Mens- Across from Lunchroom 6SF536 $1,479
Water Closet 1st flr Mens- Across from Lunchroom 6EA2 $672
Accessories 2nd Floor Boys 6SF219 $2,020
Ceiling - Plaster/Drywall 2nd Floor Boys 6SF209 $723
Ceiling - Plaster/Drywall 2nd Floor Boys cracked and water damage5SF10 $125
Doors - Transom Window 2nd Floor Boys 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor Boys 6EA2 $602
Floor Drain 2nd Floor Boys 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd Floor Boys cracked tile5SF10 $209
Floor - Tile Ceramic/ Porcelain 2nd Floor Boys 6SF209 $442
Hand Dryer 2nd Floor Boys 6EA2 $460
Lavatory 2nd Floor Boys 6EA2 $639
Lighting - Pendent/Surface 2nd Floor Boys 7EA5 $0
Partitions 2nd Floor Boys 6EA2 $594
Urinals 2nd Floor Boys 6EA4 $1,344
Walls - Plaster/Drywall 2nd Floor Boys 6SF372 $1,027
Walls - Structural Glazed Tile 2nd Floor Boys 6SF207 $651
Walls - Tile Ceramic/ Porcelain 2nd Floor Boys 6SF248 $560
Page 20 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Water Closet 2nd Floor Boys 6EA2 $672
Accessories 2nd Floor Girls 6SF338 $3,118
Ceiling - Plaster/Drywall 2nd Floor Girls 6SF338 $1,170
Doors - Wood Doors inclu hw 2nd Floor Girls 6EA2 $602
Floor Drain 2nd Floor Girls 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd Floor Girls cracked tile5SF10 $209
Floor - Tile Ceramic/ Porcelain 2nd Floor Girls 6SF328 $694
Hand Dryer 2nd Floor Girls 6EA2 $460
Lavatory 2nd Floor Girls 6EA2 $639
Lighting - Pendent/Surface 2nd Floor Girls 7EA5 $0
Partitions 2nd Floor Girls 6EA8 $2,375
Walls - Plaster/Drywall 2nd Floor Girls 6SF590 $1,628
Walls - Structural Glazed Tile 2nd Floor Girls 6SF438 $1,378
Walls - Tile Ceramic/ Porcelain 2nd Floor Girls 6SF196 $443
Water Closet 2nd Floor Girls 6EA8 $2,688
Accessories 2nd Floor Staff 6SF124 $1,144
Ceiling - Plaster/Drywall 2nd Floor Staff 6SF124 $429
Doors - Wood Doors inclu hw 2nd Floor Staff 6EA1 $301
Floor - Tile Ceramic/ Porcelain 2nd Floor Staff 6SF124 $262
Hand Dryer 2nd Floor Staff 6EA1 $230
Lavatory 2nd Floor Staff 6EA2 $639
Lighting - Pendent/Surface 2nd Floor Staff 7EA2 $0
Partitions 2nd Floor Staff 6EA2 $594
Walls - Plaster/Drywall 2nd Floor Staff 6SF542 $1,496
Water Closet 2nd Floor Staff 6EA2 $672
Accessories 3rd Floor Boys- Next to 304 6SF219 $2,020
Ceiling - Plaster/Drywall 3rd Floor Boys- Next to 304 6SF219 $758
Doors - Transom Window 3rd Floor Boys- Next to 304 6SF16 $271
Doors - Wood Doors inclu hw 3rd Floor Boys- Next to 304 6EA2 $602
Floor Drain 3rd Floor Boys- Next to 304 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd Floor Boys- Next to 304 crack5SF12 $251
Floor - Tile Ceramic/ Porcelain 3rd Floor Boys- Next to 304 6SF209 $442
Hand Dryer 3rd Floor Boys- Next to 304 6EA2 $460
Lavatory 3rd Floor Boys- Next to 304 6EA2 $639
Lighting - Pendent/Surface 3rd Floor Boys- Next to 304 7EA5 $0
Partitions 3rd Floor Boys- Next to 304 6EA2 $594
Urinals 3rd Floor Boys- Next to 304 6EA4 $1,344
Page 21 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Walls - Plaster/Drywall 3rd Floor Boys- Next to 304 6SF372 $1,027
Walls - Structural Glazed Tile 3rd Floor Boys- Next to 304 6SF207 $651
Walls - Tile Ceramic/ Porcelain 3rd Floor Boys- Next to 304 6SF248 $560
Water Closet 3rd Floor Boys- Next to 304 6EA2 $672
Accessories 3rd Floor Girls- Across from 307 6SF262 $2,417
Ceiling - Plaster/Drywall 3rd Floor Girls- Across from 307 6SF262 $907
Doors - Transom Window 3rd Floor Girls- Across from 307 6SF16 $271
Doors - Wood Doors inclu hw 3rd Floor Girls- Across from 307 6EA4 $1,204
Floor Drain 3rd Floor Girls- Across from 307 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd Floor Girls- Across from 307 6SF258 $546
Hand Dryer 3rd Floor Girls- Across from 307 6EA2 $460
Lavatory 3rd Floor Girls- Across from 307 6EA2 $639
Lighting - Pendent/Surface 3rd Floor Girls- Across from 307 7EA5 $0
Partitions 3rd Floor Girls- Across from 307 6EA7 $2,078
Walls - Masonry 3rd Floor Girls- Across from 307 6SF323 $1,016
Walls - Plaster/Drywall 3rd Floor Girls- Across from 307 cracking and water damage5SF32 $163
Walls - Plaster/Drywall 3rd Floor Girls- Across from 307 6SF470 $1,297
Walls - Tile Ceramic/ Porcelain 3rd Floor Girls- Across from 307 6SF92 $208
Water Closet 3rd Floor Girls- Across from 307 6EA8 $2,688
Accessories Engineer W.R. - Assistant 6SF29 $267
Ceiling - Plaster/Drywall Engineer W.R. - Assistant 6SF29 $100
Doors - Wood Doors inclu hw Engineer W.R. - Assistant 6EA1 $301
Floor - Tile Engineer W.R. - Assistant cracked and worn tile5SF29 $130
Lavatory Engineer W.R. - Assistant 6EA1 $320
Lighting - Pendent/Surface Engineer W.R. - Assistant 7EA1 $0
Walls - Plaster/Drywall Engineer W.R. - Assistant 6SF50 $138
Water Closet Engineer W.R. - Assistant 6EA1 $336
Accessories In Principals office 6SF27 $249
Ceiling - Plaster/Drywall In Principals office 6SF27 $93
Doors - Wood Doors inclu hw In Principals office 6EA1 $301
Floor - Tile Ceramic/ Porcelain In Principals office 6SF27 $57
Lavatory In Principals office 6EA1 $320
Lighting - Pendent/Surface In Principals office 7EA1 $0
Lighting - Wall Mounted In Principals office 7EA1 $0
Walls - Plaster/Drywall In Principals office 6SF236 $651
Water Closet In Principals office 6EA1 $336
Page 22 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Rooms (Other Than Classrooms) Subtotal: $557,405
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Plaster/Drywall 1st Floor 6SF3,709 $22,966
Ceiling - Plaster/Drywall 1st Floor peeling5SF50 $872
Doors - Transom Window 1st Floor 6EA12 $203
Doors - Wood Doors include hw 1st Floor 6EA6 $1,806
Drinking Fountains - Single Fountain 1st Floor 6EA6 $1,654
Drinking Fountains - Single Water Cooler 1st Floor 6EA2 $633
Floor - Terrazzo 1st Floor 6SF589 $4,944
Floor - Tile/Sheet 1st Floor 6SF3,120 $1,695
Lighting - Pendent/Surface 1st Floor 7EA29 $0
Student Lockers - One Tier 1st Floor 6EA177 $16,432
Walls - Plaster/Drywall 1st Floor 6SF1,906 $8,449
Walls - Structural Glazed Tile 1st Floor 6SF4,827 $15,186
Ceiling - Plaster/Drywall 2nd Floor 6SF3,441 $21,306
Ceiling - Plaster/Drywall 2nd Floor cracking and water damage5SF25 $436
Drinking Fountains - Single Fountain 2nd Floor 6EA8 $2,206
Floor - Terrazzo 2nd Floor 6SF346 $2,904
Floor - Tile/Sheet 2nd Floor 6SF3,120 $1,695
Lighting - Pendent/Surface 2nd Floor 7EA32 $0
Student Lockers - One Tier 2nd Floor 6EA139 $12,904
Walls - Plaster/Drywall 2nd Floor cracking and water dmage5SF10 $100
Walls - Plaster/Drywall 2nd Floor 6SF1,805 $8,002
Walls - Structural Glazed Tile 2nd Floor 6SF4,827 $15,186
Ceiling - Plaster/Drywall 3rd Floor cracking and water damage5SF60 $1,047
Ceiling - Plaster/Drywall 3rd Floor 6SF2,140 $13,251
Drinking Fountains - Single Fountain 3rd Floor 6EA6 $1,654
Floor - Terrazzo 3rd Floor 6SF220 $1,847
Floor - Tile/Sheet 3rd Floor 6SF1,979 $1,075
Lighting - Pendent/Surface 3rd Floor 7EA18 $0
Student Lockers - One Tier 3rd Floor 6EA91 $8,448
Walls - Plaster/Drywall 3rd Floor cracking and water damage5SF6 $60
Walls - Plaster/Drywall 3rd Floor 6SF2,194 $9,726
Page 23 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Walls - Structural Glazed Tile 3rd Floor 6SF1,802 $5,669
Safety
Camera Viewing Station 1st Floor Security, Principal, Asst Principal & IT office6EA4 $2,730
Security Cameras 1st Floor / Entire Building not working, due to software issues5EA12 $8,253
Security Cameras 1st Floor / Entire Building not working, due to software issues5EA3 $2,063
Stairs
Ceiling - Plaster/Drywall North Stair 6SF474 $3,470
Floor - Terrazzo North Stair 6SF284 $2,384
Handrails North Stair 6LF106 $919
Lighting - Pendent/Surface North Stair 7EA5 $0
Stairs - Terrazzo North Stair 6LF58 $538
Walls - Plaster/Drywall North Stair cracking & peeling5SF1,897 $8,654
Walls - Structural Glazed Tile North Stair 6SF345 $1,085
Ceiling - Plaster/Drywall South East Stairs water damaged5SF20 $409
Ceiling - Plaster/Drywall South East Stairs 6SF272 $1,991
Floor - Terrazzo South East Stairs 6SF109 $915
Handrails South East Stairs 6LF52 $451
Lighting - Pendent/Surface South East Stairs 7EA2 $0
Stairs - Terrazzo South East Stairs 6LF29 $269
Walls - Plaster/Drywall South East Stairs water damaged5SF20 $124
Walls - Plaster/Drywall South East Stairs 6SF1,147 $3,166
Walls - Structural Glazed Tile South East Stairs 6SF333 $1,048
Ceiling - Plaster/Drywall South West Stairs 6SF368 $2,694
Ceiling - Plaster/Drywall South West Stairs peeling5SF106 $1,843
Floor - Terrazzo South West Stairs 6SF284 $2,384
Handrails South West Stairs 6LF106 $919
Lighting - Pendent/Surface South West Stairs cover missing6EA1 $124
Lighting - Pendent/Surface South West Stairs 7EA4 $0
Stairs - Terrazzo South West Stairs 6LF58 $538
Walls - Plaster/Drywall South West Stairs 6SF1,792 $4,946
Walls - Plaster/Drywall South West Stairs water damaged5SF105 $652
Walls - Structural Glazed Tile South West Stairs 6SF345 $1,085
Building Interior Subtotal: $236,013
Page 24 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Total Building Cost $3,352,682
Building: 8-Classroom Modular
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Entrance Control - Audio and Video Door 4 - North 7EA1 $0
Exterior Doors - Exterior Steel Door Door 4 - North 6EA2 $961
Exterior Doors - Exterior Steel Door Door 5 - South 6EA2 $961
Ramps - Concrete Door 5 - South 7LF20 $0
Foundation
Foundation - Masonry Entire Building 7LF418 $0
Superstructure - Metal Deck/ Concrete Topping Entire Building 7SF9,800 $0
Lighting
Exterior Lighting - Wall Mounted Entire Building 6EA8 $2,310
Roof System
Downspouts - Exterior Downspouts Main Roof 6LF360 $11,964
Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF9,800 $0
Roof - EPDM/ Synthetic Rubber Main Roof 7SF9,800 $0
Walls
Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF3,376 $19,166
Windows
Guard - Guards perforated Entire Building 7SF720 $0
Windows - Sash Aluminum Double-pane Entire Building 7SF720 $0
Building Exterior Subtotal: $35,362
Building: 8-Classroom Modular
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Emergency Battery Packs - Corridors and Stairs Entire Building Emergency lights, also in classrooms6EA18 $3,645
Emergency Battery Packs - Corridors and Stairs Entire Building Exit signs. 6EA2 $405
Exit Signs - Corridors and Stairs Entire Building additional exit signs in classrooms7EA2 $0
Security System - CCTV Entire Building 6SF9,800 $2,943
Security System - Intrusion Detection Entire Building 6SF9,800 $2,523
Page 25 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: 8-Classroom Modular
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Main Service
PA System Electrical Room / Entire Building Serves the main, annex, and modular. Control
console located in main.
6SF9,800 $3,223
Power Distribution
Lighting and Power Panels - Above 100 A Entire Building 7EA4 $0
Main Distribution Panels - 400 - 600 amp Entire Building 7EA2 $0
Electrical System Subtotal: $12,739
Building: 8-Classroom Modular
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel 1st Floor 6EA1 $6,406
Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF9,800 $3,504
Fire Alarm_System 1st Floor / Entire Building 6SF9,800 $4,765
Sprinkler System
Sprinkler Heads Entire Building 7SF9,800 $0
Sprinkler Piping Entire Building 6SF9,800 $1,822
Wet Sprinkler System Entire Building 6SF9,800 $2,523
Safty System Subtotal: $19,018
Building: 8-Classroom Modular
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Temperature Control
Electric Controls Entire Building 6SF4,800 $0
Electric Controls Entire Building 7SF4,800 $0
Electric Thermostat Entire Building / 1st Floor 6EA4 $0
Electric Thermostat Entire Building / 1st Floor 7EA4 $0
Unit Ventilation
Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling
Entire Building 7EA4 $0
Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling
Entire Building 6EA4 $0
Page 26 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: 8-Classroom Modular
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Ventilation
Exhaust Fans- Roof Mounted - Less than 500 CFM Roof 7EA2 $0
Exhaust Fans- Roof Mounted - Less than 500 CFM Roof 6EA2 $592
Mechanical System Subtotal: $592
Building: 8-Classroom Modular
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Electric Heater - Less than 20 KW Mechanical Room 6EA1 $682
Electric Heater - Less than 20 KW Mechanical Room 7EA1 $0
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF9,800 $1,962
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF9,800 $2,382
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF9,800 $1,542
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF9,800 $1,822
Domestic Piping-Hot Water Return Lines Entire Building 6SF9,800 $1,401
Sanitary Piping Entire Building 6SF9,800 $8,969
Storm Piping Entire Building 6SF9,800 $8,549
Vent Piping Entire Building 6SF9,800 $6,587
Plumbing System Subtotal: $33,895
Building: 8-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #M121 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF815 $2,447
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF815 $1,783
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor 6SF75 $544
Walls - Metal Panel 1st Floor 6SF900 $6,718
Work Sink 1st Floor 6EA1 $379
Page 27 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: 8-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #M122 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF815 $2,447
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF815 $1,783
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor 6SF75 $544
Walls - Metal Panel 1st Floor 6SF900 $6,718
Work Sink 1st Floor 6EA1 $379
Classroom #M123 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF815 $2,447
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF815 $1,783
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor 6SF75 $544
Walls - Metal Panel 1st Floor 6SF900 $6,718
Work Sink 1st Floor 6EA1 $379
Classroom #M124 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF815 $2,447
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF815 $1,783
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor 6SF75 $544
Walls - Metal Panel 1st Floor 6SF900 $6,718
Work Sink 1st Floor 6EA1 $379
Classroom #M125 (Regular Classroom)
Ceiling - Lay-in 1st Floor 7SF815 $0
Doors - Wood Doors inclu hw 1st Floor 7EA2 $0
Floor - Tile 1st Floor 7SF815 $0
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor 7SF75 $0
Walls - Metal Panel 1st Floor 7SF900 $0
Work Sink 1st Floor 7EA1 $0
Page 28 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: 8-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #M126 (Regular Classroom)
Ceiling - Lay-in 1st Floor 7SF815 $0
Doors - Wood Doors inclu hw 1st Floor 7EA2 $0
Floor - Tile 1st Floor 7SF815 $0
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor 7SF75 $0
Walls - Metal Panel 1st Floor 7SF900 $0
Work Sink 1st Floor 7EA1 $0
Classroom #M127 (Regular Classroom)
Ceiling - Lay-in 1st Floor 7SF815 $0
Doors - Wood Doors inclu hw 1st Floor 7EA2 $0
Floor - Tile 1st Floor 7SF815 $0
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor 7SF75 $0
Walls - Metal Panel 1st Floor 7SF900 $0
Work Sink 1st Floor 7EA1 $0
Classroom #M128 (Regular Classroom)
Ceiling - Lay-in 1st Floor 7SF815 $0
Doors - Wood Doors inclu hw 1st Floor 7EA2 $0
Floor - Tile 1st Floor 7SF815 $0
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor 7SF75 $0
Walls - Metal Panel 1st Floor 7SF900 $0
Work Sink 1st Floor 7EA1 $0
Classrooms Subtotal: $49,894
Building: 8-Classroom Modular
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Accessories Boy's W.R. Next to 121 6SF162 $1,494
Ceiling - Lay-in Boy's W.R. Next to 121 6SF162 $486
Doors - Wood Doors inclu hw Boy's W.R. Next to 121 6EA1 $301
Page 29 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: 8-Classroom Modular
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Floor Drain Boy's W.R. Next to 121 6EA1 $1,059
Floor - Tile/Sheet Boy's W.R. Next to 121 6SF162 $162
Hand Dryer Boy's W.R. Next to 121 6EA2 $460
Lavatory Boy's W.R. Next to 121 6EA2 $639
Lighting - Lay-in Boy's W.R. Next to 121 7EA2 $0
Partitions Boy's W.R. Next to 121 6EA1 $297
Urinals Boy's W.R. Next to 121 6EA2 $672
Walls - Metal Panel Boy's W.R. Next to 121 6SF320 $2,389
Water Closet Boy's W.R. Next to 121 6EA1 $336
Accessories Boy's W.R. Next to 125 **Brand new modular summer 20157SF162 $0
Ceiling - Lay-in Boy's W.R. Next to 125 7SF162 $0
Doors - Wood Doors inclu hw Boy's W.R. Next to 125 7EA1 $0
Floor Drain Boy's W.R. Next to 125 7EA1 $0
Floor - Tile/Sheet Boy's W.R. Next to 125 7SF162 $0
Hand Dryer Boy's W.R. Next to 125 7EA2 $0
Lavatory Boy's W.R. Next to 125 7EA2 $0
Lighting - Lay-in Boy's W.R. Next to 125 7EA2 $0
Partitions Boy's W.R. Next to 125 7EA1 $0
Urinals Boy's W.R. Next to 125 7EA2 $0
Walls - Metal Panel Boy's W.R. Next to 125 7SF320 $0
Water Closet Boy's W.R. Next to 125 7EA1 $0
Accessories Girl's W.R. Next to 122 6SF180 $1,660
Ceiling - Lay-in Girl's W.R. Next to 122 6SF180 $541
Doors - Wood Doors inclu hw Girl's W.R. Next to 122 6EA1 $301
Floor - Tile/Sheet Girl's W.R. Next to 122 6SF180 $180
Hand Dryer Girl's W.R. Next to 122 6EA2 $460
Lavatory Girl's W.R. Next to 122 6EA2 $639
Lighting - Lay-in Girl's W.R. Next to 122 7EA2 $0
Partitions Girl's W.R. Next to 122 6EA4 $1,188
Walls - Metal Panel Girl's W.R. Next to 122 6SF300 $2,239
Water Closet Girl's W.R. Next to 122 6EA4 $1,344
Accessories Girl's W.R. Next to 126 **Brand new modular summer 20157SF180 $0
Ceiling - Lay-in Girl's W.R. Next to 126 7SF180 $0
Doors - Wood Doors inclu hw Girl's W.R. Next to 126 7EA1 $0
Floor - Tile/Sheet Girl's W.R. Next to 126 7SF180 $0
Hand Dryer Girl's W.R. Next to 126 7EA2 $0
Lavatory Girl's W.R. Next to 126 7EA2 $0
Page 30 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: 8-Classroom Modular
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Lighting - Lay-in Girl's W.R. Next to 126 7EA2 $0
Partitions Girl's W.R. Next to 126 7EA4 $0
Walls - Metal Panel Girl's W.R. Next to 126 7SF300 $0
Water Closet Girl's W.R. Next to 126 7EA4 $0
Accessories Staff RR next to 123 6SF47 $434
Ceiling - Lay-in Staff RR next to 123 6SF47 $141
Doors - Wood Doors inclu hw Staff RR next to 123 6EA1 $301
Floor - Tile/Sheet Staff RR next to 123 6SF47 $47
Hand Dryer Staff RR next to 123 6EA1 $230
Lavatory Staff RR next to 123 6EA1 $320
Lighting - Lay-in Staff RR next to 123 7EA1 $0
Walls - Metal Panel Staff RR next to 123 6SF112 $836
Water Closet Staff RR next to 123 6EA1 $336
Accessories Unisex & Staff RR next to 127 **Brand new modular summer 20157SF47 $0
Ceiling - Lay-in Unisex & Staff RR next to 127 7SF47 $0
Doors - Wood Doors inclu hw Unisex & Staff RR next to 127 7EA1 $0
Floor - Tile/Sheet Unisex & Staff RR next to 127 7SF47 $0
Hand Dryer Unisex & Staff RR next to 127 7EA1 $0
Lavatory Unisex & Staff RR next to 127 7EA1 $0
Lighting - Lay-in Unisex & Staff RR next to 127 7EA1 $0
Walls - Metal Panel Unisex & Staff RR next to 127 7SF112 $0
Water Closet Unisex & Staff RR next to 127 7EA1 $0
Rooms (Other Than Classrooms) Subtotal: $19,492
Building: 8-Classroom Modular
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Lay-in 1st Floor 6SF996 $2,991
Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204
Drinking Fountains - Double Fountain 1st Floor 6EA4 $1,344
Floor - Tile/Sheet 1st Floor 6SF996 $541
Lighting - Lay-in 1st Floor 7EA14 $0
Walls - Metal Panel 1st Floor 6SF1,680 $12,541
Page 31 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: 8-Classroom Modular
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Building Interior Subtotal: $18,621
Total Building Cost $189,614
Building: Annex
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Entrance Control - Audio and Video Door 6 - North 6EA1 $702
Exterior Doors - Exterior Steel Door Door 6 - North 6EA2 $961
Exterior Doors - Exterior Steel Door Door 7 - South 6EA2 $961
Exterior Doors - Exterior Steel Door Door 8 - East 6EA1 $481
Ramps - Concrete Door 8 - East 6LF30 $4,507
Foundation
Foundation - Concrete Entire Building 7LF610 $0
Superstructure - Slab on Grade Entire Building 7SF16,936 $0
Lighting
Exterior Lighting - Wall Mounted Entire Building 6EA17 $4,909
Roof System
Chimney - Metal Flue Main Roof 7LF12 $0
Downspouts - Exterior Downspouts Main Roof 6LF678 $22,532
Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF16,936 $0
Roof - Metal Main Roof 6SF16,936 $226,927
Walls
Canopy - Metal Entire Building 6SF48 $1,031
Exterior Walls - Brick Entire Building 6SF4,592 $30,863
Windows
Guard - Guards perforated Entire Building 6SF1,813 $23,152
Lintels - Concrete Entire Building 7LF262 $0
Lintels - Steel Entire Building 6LF19 $552
Windows - Sash Aluminum Double-pane Entire Building 6SF1,813 $13,533
Building Exterior Subtotal: $331,110
Page 32 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Annex
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Automatic Transfer Switch Electrical Room 6EA1 $408
Emergency A/C Power - Corridors and Stairs Entire Building 6SF2,631 $790
Exit Signs - Corridors and Stairs Entire Building No battery back-up.2EA7 $3,818
Security System - CCTV Entire Building 6SF16,936 $5,086
Security System - Intrusion Detection Entire Building 6SF16,936 $4,359
UPS - Less than 30 KW MDF Room 7EA1 $0
Main Service
Independent Electrical Service for emergency power Electrical Room Secondary service from the utility company. 6EA1 $2,921
Main Electrical Service - 800 A and 120/208/3PH Electrical Room 6EA1 $3,570
PA System Entire Building Serves main, annex, and modular. Control console located in main.
6SF16,936 $5,570
Power Distribution
Lighting and Power Panels - 100 A Electrical Room 7EA1 $0
Lighting and Power Panels - 100 A Electrical Room Fuses, emergency power.6EA1 $299
Lighting and Power Panels - Above 100 A Electrical Room 7EA3 $0
Main Distribution Panels - 400 - 600 amp Electrical Room 7EA1 $0
Electrical System Subtotal: $26,822
Building: Annex
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel Entire Building / Electrical Room 6EA1 $6,406
Fire Alarm Strobe Lights Entire Building 6SF16,936 $6,055
Fire Alarm_System Entire Building 6SF16,936 $8,234
Sprinkler System
Sprinkler Heads Entire Building 7SF16,936 $0
Sprinkler Piping Entire Building 6SF16,936 $3,148
Wet Sprinkler System Entire Building 6SF16,936 $4,359
Safty System Subtotal: $28,202
Building: Annex
Category: Mechanical System
Page 33 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Make Up Air Unit- Indoor Mounted- Hot Water Coils - 6000 - 10,000 cfm Mechanical Room Serves the corridors. 6EA1 $3,350
Boiler Systems
Boiler Auxiliary- Non Condensing Hot Water - 2001 - 3000 MBH Boiler Room 6EA2 $4,093
Chemical Pot Feeder Boiler Room 6EA1 $725
Combustion Dampers Boiler Room 6EA2 $818
Glycol Feed System Boiler Room 6EA1 $539
Non Condensing- Flexible Tube- Atmospheric- Hot Water Boiler - 2001 -
3000 MBH
Boiler Room Serves only the Annex. 6EA2 $1,996
Water Fill System Boiler Room 6EA1 $1,168
Heating Devices
Cabinet Heaters - With Hot Water Coil Entire Building 6EA6 $2,126
PTAC - Hot Water Heating and Self Contained Cooling MDF Room and Office Office. Integral thermostat.6EA1 $270
PTAC - Hot Water Heating and Self Contained Cooling MDF Room and Office MDF Room. Integral thermostat.6EA1 $270
Unit Heater - Hot Water Mechanical Room With electric wall thermostats. 6EA3 $837
Mechanical Plumbing
Hot Water Pump - Less than 10 Boiler Room 6EA2 $2,222
Hydronic Supply and Return - Copper Entire Building 6LF500 $26,233
Temperature Control
Electric Controls Entire Building Boiler Room and Sprinkler Room only. 6SF500 $0
Electric Thermostat Entire Building 6EA3 $0
Unit Ventilation
Unit Ventilators- Floor Mounted- Hot Water w/ DX Cooling Coil & w/ Self Contained Compressors
Entire Building Integral thermostats. 6EA13 $16,220
Ventilation
Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Roof 6EA1 $592
Exhaust Fans- Roof Mounted - Greater than 8000 CFM Roof 6EA1 $592
Exhaust Fans- Roof Mounted - Less than 500 CFM Roof 6EA1 $296
Mechanical System Subtotal: $62,350
Building: Annex
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Gas Heater - Less than 150000 BTU/HR Sprinkler Room 5EA1 $2,249
Page 34 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Annex
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF16,936 $4,117
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF16,936 $3,148
Domestic Piping-Hot Water Return Lines Entire Building 6SF16,936 $2,422
Sanitary Piping Entire Building 6SF16,936 $15,500
Storm Piping Entire Building 6SF16,936 $14,773
Vent Piping Entire Building 6SF16,936 $11,383
Plumbing System Subtotal: $53,592
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #400 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor 6SF870 $2,613
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile/Sheet 1st Floor 6SF870 $871
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF795 $2,331
Walls - Plaster/Drywall 1st Floor 6SF300 $828
Classroom #401 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor water damaged5SF1 $8
Ceiling - Lay-in 1st Floor 6SF869 $2,610
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF865 $1,893
Floor - Tile 1st Floor damaged5SF5 $29
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF795 $2,331
Walls - Plaster/Drywall 1st Floor 6SF300 $828
Classroom #402 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Page 35 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #402 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF870 $2,613
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF870 $1,903
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF495 $1,451
Walls - Plaster/Drywall 1st Floor 6SF600 $1,656
Classroom #403 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor 6SF870 $2,613
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile/Sheet 1st Floor 6SF870 $871
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF495 $1,451
Walls - Plaster/Drywall 1st Floor 6SF600 $1,656
Classroom #404 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor 6SF870 $2,613
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF870 $1,903
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF495 $1,451
Walls - Plaster/Drywall 1st Floor 6SF600 $1,656
Classroom #405 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor 6SF870 $2,613
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF870 $1,903
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Page 36 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #405 (Regular Classroom)
Walls - Concrete Block 1st Floor 6SF795 $2,331
Walls - Plaster/Drywall 1st Floor 6SF300 $828
Classroom #408 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor 6SF870 $2,613
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF865 $1,893
Floor - Tile 1st Floor damaged, small holes5SF5 $29
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF795 $2,331
Walls - Plaster/Drywall 1st Floor 6SF300 $828
Classroom #409 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor 6SF866 $2,601
Ceiling - Lay-in 1st Floor water damaged5SF4 $32
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF870 $1,903
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF495 $1,451
Walls - Plaster/Drywall 1st Floor 6SF600 $1,656
Classroom #410 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor 6SF870 $2,613
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF870 $1,903
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF795 $2,331
Walls - Plaster/Drywall 1st Floor 6SF300 $828
Page 37 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #411 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor water damaged5SF2 $16
Ceiling - Lay-in 1st Floor 6SF868 $2,607
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF870 $1,903
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF495 $1,451
Walls - Plaster/Drywall 1st Floor 6SF600 $1,656
Classroom #412 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor water damaged5SF8 $64
Ceiling - Lay-in 1st Floor 6SF862 $2,589
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor damaged5SF1 $6
Floor - Tile 1st Floor 6SF869 $1,901
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF795 $2,331
Walls - Plaster/Drywall 1st Floor 6SF300 $828
Classroom #413 (Regular Classroom)
Casework 1st Floor 6LF34 $859
Ceiling - Lay-in 1st Floor 6SF870 $2,613
Chalk Board 1st Floor 4LF7 $643
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF870 $1,903
Lighting - Lay-in 1st Floor 7EA9 $0
Marker Board 1st Floor 7LF12 $0
Walls - Concrete Block 1st Floor 6SF300 $879
Walls - Plaster/Drywall 1st Floor 6SF795 $2,194
Classrooms Subtotal: $111,429
Building: Annex
Page 38 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Ceiling - Lay-in Rm 406- Shared Office of Asst Princ/Bilingual Coordinator/Pre-k coordinator
6SF360 $1,081
Doors - Steel Doors incl hw Rm 406- Shared Office of Asst Princ/Bilingual Coordinator/Pre-k coordinator
6EA1 $301
Floor - Tile Rm 406- Shared Office of Asst Princ/Bilingual Coordinator/Pre-k coordinator
6SF360 $788
Lighting - Lay-in Rm 406- Shared Office of Asst
Princ/Bilingual Coordinator/Pre-k
coordinator
7EA4 $0
Power Distribution Rm 406- Shared Office of Asst
Princ/Bilingual Coordinator/Pre-k
coordinator
7EA10 $0
Walls - Concrete Block Rm 406- Shared Office of Asst Princ/Bilingual Coordinator/Pre-k coordinator
6SF190 $557
Walls - Plaster/Drywall Rm 406- Shared Office of Asst Princ/Bilingual Coordinator/Pre-k coordinator
6SF600 $1,656
Ceiling - Lay-in Rm 407- Special Ed Pullout Rm 6SF205 $616
Doors - Steel Doors incl hw Rm 407- Special Ed Pullout Rm 6EA1 $301
Floor - Tile Rm 407- Special Ed Pullout Rm 6SF205 $449
Lighting - Lay-in Rm 407- Special Ed Pullout Rm 7EA3 $0
Power Distribution Rm 407- Special Ed Pullout Rm 7EA8 $0
Walls - Concrete Block Rm 407- Special Ed Pullout Rm 6SF420 $1,231
Walls - Plaster/Drywall Rm 407- Special Ed Pullout Rm 6SF300 $828
MDF_IDF
AC Unit 1st Floor 6EA1 $496
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Finishes 1st Floor 6SF72 $514
Mechanical/ Service Rooms
Janitor's Closet 1st Floor mold on wall5SF34 $548
Mechanical/ Service Rooms 1st Floor some minor damage on ceiling in mechanical room6SF716 $5,130
Restroom
Accessories Boys 6SF638 $5,885
Ceiling - Plaster/Drywall Boys 6SF638 $2,208
Floor Drain Boys 6EA2 $2,118
Floor - Concrete Epoxy/ Painted Boys 6SF638 $338
Page 39 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Hand Dryer Boys 6EA2 $460
Lavatory Boys 6EA4 $1,278
Lighting - Lay-in Boys 7EA5 $0
Partitions Boys 6EA2 $594
Partitions Boys door missing5EA1 $751
Urinals Boys 6EA8 $2,688
Walls - Concrete Block Boys 6SF1,180 $3,459
Water Closet Boys 6EA3 $1,008
Accessories Girls 6SF638 $5,885
Ceiling - Plaster/Drywall Girls 6SF638 $2,208
Floor Drain Girls 6EA2 $2,118
Floor - Concrete Epoxy/ Painted Girls 6SF638 $338
Hand Dryer Girls rusting5EA2 $1,181
Lavatory Girls 6EA4 $1,278
Lighting - Lay-in Girls 7EA5 $0
Partitions Girls 6EA11 $3,266
Walls - Concrete Block Girls 6SF1,170 $3,430
Walls - Concrete Block Girls crack5SF10 $141
Water Closet Girls 6EA11 $3,696
Accessories Staff Men 6SF44 $406
Ceiling - Plaster/Drywall Staff Men 6SF44 $152
Doors - Steel Doors incl hw Staff Men 6EA1 $301
Floor Drain Staff Men 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain Staff Men 6SF44 $93
Lavatory Staff Men 6EA1 $320
Lighting - Lay-in Staff Men 7EA1 $0
Walls - Concrete Block Staff Men 6SF240 $704
Water Closet Staff Men 6EA1 $336
Accessories Staff Women 6SF44 $406
Ceiling - Plaster/Drywall Staff Women 6SF44 $152
Doors - Steel Doors incl hw Staff Women 6EA1 $301
Floor Drain Staff Women 6EA1 $1,059
Floor - Tile Staff Women 6SF44 $96
Lavatory Staff Women 6EA1 $320
Lighting - Lay-in Staff Women 7EA1 $0
Walls - Concrete Block Staff Women 6SF240 $704
Water Closet Staff Women 6EA1 $336
Page 40 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Rooms (Other Than Classrooms) Subtotal: $65,866
Building: Annex
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Lay-in 1st Floor 6SF2,011 $6,039
Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204
Drinking Fountains - Single Fountain 1st Floor 6EA2 $551
Floor - Tile Ceramic/ Porcelain 1st Floor 6SF174 $485
Floor - Tile/Sheet 1st Floor 6SF1,832 $996
Floor - Tile/Sheet 1st Floor damaged5SF5 $29
Lighting - Lay-in 1st Floor 7EA21 $0
Walls - Concrete Block 1st Floor 6SF6,500 $19,055
Building Interior Subtotal: $28,359
Total Building Cost $707,730
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Civil/Drainage
Civil/ Drainage - Catch Basin Entire Site 6EA10 $10,938
Civil/ Drainage - Site Manhole Entire Site 6EA6 $8,956
Fencing
Fencing - Chain Link Entire Site 6LF322 $6,046
Fencing - Chain Link Entire Site / Parking Lot Corroded, bent5LF340 $20,736
Fencing - Guard Rail Entire Site 6LF300 $3,466
Fencing - New Standard Ornamental Entire Site 6LF1,219 $38,890
Landscape
Benches Entire Site 6EA4 $1,720
Landscape - Grass Entire Site 6SF28,537 $23,669
Landscape - Hardscape- Concrete Entire Site 6SF8,244 $42,558
Landscape - Hardscape- Concrete Entire Site cracked, heaving4SF170 $3,620
Page 41 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Landscape
Landscape - Hardscape- Pavers Entire Site 6SF600 $3,398
Parkway trees Entire Site 7EA53 $0
Planting Beds/ Area Entire Site 6SF580 $954
Play Area - Asphalt/ Hardscape Entire Site 6SF29,575 $71,474
Retaining Wall - Concrete Entire Site 7SF275 $0
Trash Receptacles Entire Site 7EA4 $0
Parking Lot
Surface - Asphalt Parking Lot- East 5SF25,508 $116,360
Surface - Concrete Parking Lot- East 6SF2,400 $5,800
Surface - Concrete Parking Lot- East / East cracked4SF200 $4,259
Trash Enclosure - Chain Links Parking Lot- East 6SF240 $4,211
Playground
Equipment - School Age 5-12 West 6EA1 $3,546
Surface - Poured Surface West 6SF1,575 $11,532
Sidewalks
Sidewalks - Perimeter Sidewalks Entire Site 6SF17,715 $35,212
Sidewalks - Perimeter Sidewalks Entire Site cracks, heaving4SF250 $4,022
Signage
Flag Pole - Flag Pole Entire Site LED display not working5EA1 $7,630
Marquee - Free Standing Back lighted w/ LED Entire Site 7EA1 $0
Site Subtotal: $428,997
Total Site Cost $428,997
Campus Total ² ³
² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space
reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;
it does not reflect a complete project cost.
¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report;
by the time the report is compiled, they have been resolved.
$4,679,023
Page 42 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below.
Definitions
● Quantity
● Unit
means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,
depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and
additional work triggered by building codes.
means, for each item, the total number (or amount) of that item that exists and was evaluated.
means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like
chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).
● Cost
● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.
● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs.
Page 43 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
Main
YYN40551653211891210210Regular ClassroomArt Room 2nd Floor
YYN406516556231726206206Regular ClassroomComputer Lab 2nd Floor
YNN40651701011717103103Regular ClassroomKindergarten 1st Floor
YNN40651351011717106106Regular ClassroomKindergarten 1st Floor
NYN402666621340Book Storage300Other Instructional UseOffice 3rd Floor
NYN402044211310Storage310Other Instructional UseOffice 3rd Floor
YNN40651701011717104104Regular ClassroomRegular Classroom 1st Floor
YNN40651701011717110110Regular ClassroomRegular Classroom 1st Floor
YYN4055165611733201201Regular ClassroomRegular Classroom 2nd Floor
YYN4055165611733203203Regular ClassroomRegular Classroom 2nd Floor
YYN4065165711681204204Regular ClassroomRegular Classroom 2nd Floor
YYN4055165611733205205Regular ClassroomRegular Classroom 2nd Floor
YYN4055165611733207207Regular ClassroomRegular Classroom 2nd Floor
YYN4065165411718208208Regular ClassroomRegular Classroom 2nd Floor
YYN4055165411733209209Regular ClassroomRegular Classroom 2nd Floor
YYN4055165611733211211Regular ClassroomRegular Classroom 2nd Floor
YYN4055165711733301301Regular ClassroomRegular Classroom 3rd Floor
YYN4055165411733303303Regular ClassroomRegular Classroom 3rd Floor
YYN4065165611681304304Regular ClassroomRegular Classroom 3rd Floor
YYN4055165611733305305Regular ClassroomRegular Classroom 3rd Floor
YYN4065165611726306306Regular ClassroomRegular Classroom 3rd Floor
YYN4055165611733307307Regular ClassroomRegular Classroom 3rd Floor
YYN4065165611718308308Regular ClassroomRegular Classroom 3rd Floor
NNN403264611340100HealthSpecial Education 1st Floor
YYN4052136811488107107Regular ClassroomSpecial Education 1st Floor
8-Classroom Modular
NNN402448401815M121M121Regular ClassroomRegular Classroom 1st Floor
NNN402448401815M122M122Regular ClassroomRegular Classroom 1st Floor
NNN402448401815M123M123Regular ClassroomRegular Classroom 1st Floor
NNN402448401815M124M124Regular ClassroomRegular Classroom 1st Floor
NNN402448401815M125M125Regular ClassroomRegular Classroom 1st Floor
NNN402448401815M126M126Regular ClassroomRegular Classroom 1st Floor
NNN402448401815M127M127Regular ClassroomRegular Classroom 1st Floor
NNN402448401815M128M128Regular ClassroomRegular Classroom 1st Floor
Page 44 of 45TONTI Assessment Date: 11/23/15
Enrico Tonti Elementary School5815 S Homan Ave Chicago, IL 60629
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
Annex
YNN4050105124870123400Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870124401Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870121402Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870122403Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870104404Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870108405Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870103408Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870107409Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870102410Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870106411Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870101412Regular ClassroomRegular Classroom 1st Floor
YNN40501051241870105413Regular ClassroomRegular Classroom 1st Floor
Page 45 of 45TONTI Assessment Date: 11/23/15