Page 1: ENS Project Status

1

ENS Project StatusENS Project Status

SSøren Poulsenøren Poulsen

EL-TC presentation February EL-TC presentation February 29, 200029, 2000

Page 2: ENS Project Status

2

Status SummaryStatus Summary

New ENSNew ENS• ENS hardware and software is installed in ENS hardware and software is installed in

B212B212• System is operational for communication System is operational for communication

testingtesting• SEPAM and MICENE data are integrated (SE1)SEPAM and MICENE data are integrated (SE1)

Existing SystemExisting System• Old system is still fully operationalOld system is still fully operational• Some data can be seen with both systemSome data can be seen with both system

Page 3: ENS Project Status

3

Examples - screen-shots Examples - screen-shots (1)(1)

Synoptic diagrams (work in Synoptic diagrams (work in progress…)progress…)• CERN, Point 1 (layout, diagram)CERN, Point 1 (layout, diagram)

Alarm listAlarm list• Descriptions, filtering, acceptanceDescriptions, filtering, acceptance

Real-time trendsReal-time trends• Power, current of feederPower, current of feeder

Page 4: ENS Project Status

4

Examples - screen-shots Examples - screen-shots (2)(2)

Archives…Archives…• Nothing yet...Nothing yet...

ListsLists• EventsEvents• Data pointsData points• Time tagsTime tags

Log-inLog-in• AuthenticationAuthentication

Page 5: ENS Project Status

5

ProgressProgress

Basic systemBasic system• Development of CERN Front End interfaceDevelopment of CERN Front End interface• Development of MICENE and SEPAM Development of MICENE and SEPAM

integrationintegration• Other (simpler) equipment to be integrated Other (simpler) equipment to be integrated

soon...soon... System configuration (database)System configuration (database)

• Development of database definitions for Development of database definitions for equipmentequipment

• Development of synoptic diagrams etc.Development of synoptic diagrams etc.

Page 6: ENS Project Status

6

Attention AreasAttention Areas

Major difficult areasMajor difficult areas• Integration of CERN non-industrial equipment Integration of CERN non-industrial equipment

with industrial supervisory system with industrial supervisory system • Understanding of the CERN equipment Understanding of the CERN equipment

required by the contractorrequired by the contractor• Documentation required and producedDocumentation required and produced

Other areasOther areas• Integration in CERN environmentIntegration in CERN environment• Integration with other CERN systems (CAS)Integration with other CERN systems (CAS)

Page 7: ENS Project Status

7

ScheduleSchedule

ENS First releaseENS First release• Operational from April 3rdOperational from April 3rd• Covers LEP Point 1 (SE1)Covers LEP Point 1 (SE1)• Covers integration with CERN systemsCovers integration with CERN systems

RTU Pilot ProjectRTU Pilot Project• Operational from April 3rdOperational from April 3rd• SEM11 MICENEs replaced by RTU systemSEM11 MICENEs replaced by RTU system• Integration with ENS systemIntegration with ENS system

Page 8: ENS Project Status

8

TrainingTraining

To be provided by contractor (end of To be provided by contractor (end of March)March)• General training in overall supervision systemGeneral training in overall supervision system• Special training in RTU systemSpecial training in RTU system

Provided for users involved in operationProvided for users involved in operation• Everybody needs to become familiar with Everybody needs to become familiar with

system from now on…system from now on…• Special introduction to be provided to people Special introduction to be provided to people

directly involveddirectly involved

Page 9: ENS Project Status

9

Operator terminals and Operator terminals and user interfacesuser interfaces

PossibilitiesPossibilities• Modern X terminalsModern X terminals• ““dedicated” PC-based terminalsdedicated” PC-based terminals• ...CERN recommendation pending (support) ...CERN recommendation pending (support)

Proposed new operator terminalsProposed new operator terminals• Dedicated X terminal for Point 1 (SE1)Dedicated X terminal for Point 1 (SE1)• Dedicated X terminal for 104 “Control room”Dedicated X terminal for 104 “Control room”• Any NICE office PC can be usedAny NICE office PC can be used

Page 10: ENS Project Status

10

Operational changes (1)Operational changes (1)

General alarm supervision: CASGeneral alarm supervision: CAS• Alarms from SE1 to be included in Alarms from SE1 to be included in

new “category tree”new “category tree”• No SE1 alarms in old “category tree”No SE1 alarms in old “category tree”

Detailed supervision: ENSDetailed supervision: ENS• Supervision via new facilities Supervision via new facilities

(synoptics, etc.)(synoptics, etc.)• No SEM11 information in OLD systemNo SEM11 information in OLD system

Page 11: ENS Project Status

11

Operational changes (2)Operational changes (2)

Local controlLocal control• RTU system in SEM11RTU system in SEM11

– Independent of ENSIndependent of ENS– Local control in the case of disturbancesLocal control in the case of disturbances– Synoptic diagramsSynoptic diagrams– Local alarm listsLocal alarm lists

Page 12: ENS Project Status

12

What to do ?What to do ?

Personnel involved in operationPersonnel involved in operation• I will arrange for a personal demonstration I will arrange for a personal demonstration

and introduction to operationand introduction to operation Personnel NOT involved in operationPersonnel NOT involved in operation

• Request personal demonstrationRequest personal demonstration• Request setup of operator terminal (PC)Request setup of operator terminal (PC)