EN/STI investigations during LS1in TDC2 and TCC2
TDC2:-TCSC (collimator) to be replaced if …
TCC2:-Targets Stations T2-T4-T6
*Monitors and Target equipment*Cabling*Flow meters
Annual maintenance
To keep in mind for each operation: waste, contamination
TCSC in TDC2To be replaced only if budget is allocated and dripping acid is stopped from falling onto the TCSC!!
Needs:-RP-Transport-VSC-STI
Conflicts:-Large radioactive vessel to transport
TARGET Stations T2-4-6 in TCC2Moniteur TBIU BAC Moniteur TBID
Moteur blindage mobile
Patch Panel
Ventilateur
Switchs Blindage mobile
Monitors and Target to replace
Needs:-RP-Transport-STI
Conflicts:-Large amount of radioactive assemblies to transport (x9)
Only if BI budget accepted!
Cabling on Targets to replace
Needs:-RP-BI-VSC-STI
To replace
To remove
To keep
Flow meters to replace on T2-4-6T2-T4
T6
Needs:-RP-CV-STI
Annual maintenanceAccès Ligne Direc. Elec. Equipement Déplacement Fin de course Refroidissement Vide Remarques Hor. Vert. Hor. Vert. Débit Temper. BA 80 TCC2 D BA 80 BAC T2 / / / / / TBIU T2 / / / / TBID T2 / / / / Eau T2 / / / / / Ventilateur T2 / / / / / / Blindage D T2 / / / / / Blindage G T2 / / / / /
BA 80 TCC2 D BA 80 BAC T4 / / / / / TBIU T4 / / / / TBID T4 / / / / Eau T4 / / / / / Ventilateur T4 / / / / / / Blindage D T4 / / / / / Blindage G T4 / / / / / BA 80 TCC2 D BA 80 BAC T6 / / / / / TBIU T6 / / / / TBID T6 / / / / Eau T6 / / / / / Ventilateur T6 / / / / / / Blindage D T6 / / / / / Blindage G T6 / / / / / Palan pont / / / / / TDC2 G TCSC 211708 / / / / / / TDC2 G TCSC 220436 / / / / / /