Eastern Neighborhood TRIPS
Community Task Force meetingTHEMES & OPPORTUNITIES PRESENTATION
Eastern Neighborhood TRIPS
Community Task Force meetingTHEMES & OPPORTUNITIES PRESENTATION
06 | 08 | 2010 | SAN FRANCISCO, CALIFORNIA
2
Agenda
• Major Themes & Opportunities by mode:• Transit• Pedestrian• Bicycle • Shuttles CarSharing Taxis• Parking• Goods Movement• Vehicle Circulation
• Proposed Study methodology• Key milestones • Next Steps
3
Major transit routes operate relatively slowly
Considerable gaps in east-west transit service through the study area
The Regional-scale rail service investments
Transit in 16th St faces challenges
SoMa one-way street network can make transit confusing to use\
Transit Themes:
3
4
Transit Toolkit: Transit Effectiveness Project
5
Pedestrian conditions are not consistent throughout the study area
Arterials streets in SoMa present challenges to pedestrians
Gaps and barriers in the pedestrian network are presents to all neighborhoods within the study area
Ped injury collisions were concentrated on a few primary travel corridors
Difficulty of crossing 16th Street
Significant barriers of the pedestrian network in the Central Waterfront
Pedestrian Themes
6
Streetscape Toolkits: Better Street Plan
7Streetscape Toolkit: “Parklets” Bicycle/Public Space
8
Bicycle ThemesBest conditions and facilities, but critical gaps in the network exist
Many designated bicycle routes continue to lack designated bicycle lanes
Insufficient bicycle parking available
Bicycle Route Signage challenging to navigate
9Bicycle Toolkit: Bicycle Plan
Bike Lanes/Paths Sharrows Bike Racks
Bike Signage
10Innovative Bicycle Toolkit
On-Street Bike Corrals
Bicycle Boxes
Protected Bicycle Lanes
11
Vehicle circulation ThemesHigh congestion during peak hours in EN area
Built and operated to accommodate high volumes of regional traffic
The major arteries in the SoMa area present challenges for pedestrians and transit
Grid transitions and I-80 create challenges for circulation
12Traffic circle
Traffic Calming Toolkit
Traffic island
Speed cushion
13
Parking Themes
High on-street parking occupancy can increase double parking which creates obstacles for transit and traffic
Large areas of the SoMa and Showplace Square have high curb parking demand but lack parking meters
Several residential districts in the study area have very high rates of parking occupancy
14
Parking Toolkit-SFPark
15
Goods Movement ThemesThere is a perceived shortage of loading and unloading space for delivery vehicles
SoMa streets are important corridors for goods movement
In area with high parking occupancy, delivery vehicles struggle to fing legal loading spaces
In mixed-use districts, delivery trucks share space with passenger vehicles, pedestrians, and bikes
16
Shuttles, taxis and car sharingThemes
The increasing prevalence of shuttle services has the potential to conflict with existing Muni service
Most taxi stands are concentrated in SoMa
Shuttles serving Downtown and SoMa destinations provide overlapping routes
Carsharing is highly utilized in the SoMa area
Most shuttles systems are not open to the general public
17
Leverage projects in EN area
• 2nd and 5th street Bicycle Lanes
• Central Subway 4th Street TOD Planning
• Transit Center District Plan
• Van Ness BRT
Parallel Planning Efforts
18
Preliminary Evaluation Framework• Mix of qualitative & quantitative criteria• Key Goals-identifies the issue
– Evaluation Criteria-identifies the objective:• Metrics-the measurements/tools used to inform the
goal/objective
• Key Proposed Goals include:– Integration and Access– Community– Economy– Environment– Deliverability
• Evaluate the performance of the system and then prioritize and rank projects
• Determine the projects that fall within the scope of EN TRIPS and which will be included in other future projects and programs
19
Next Steps
• Future Conditions Analysis– Develop future conditions modeling inputs– Perform future condition model runs using
base network assumptions– Identify initial key-corridor intersections for
Modeling analysis
20
EN-TRIPS 6 month Look AheadTask Milestone Date
Issues and Opportunities Report Jun-2010
Future Year Land Use & Transportation Conditions Report Aug-2010
Inventory of Key EN Priority Corridors Aug-2010
Preliminary Street Redesign Options for Select Priority Corridors Nov-2010
Circulation Analysis Report Nov-2010
Key Eastern neighborhoods Transportation Public Realm Improvement Projects Report Jan-2011
Funding and Implementation Strategy Document Jan-2011
• Next Task Force input opportunity after future conditions report is completed• Opportunity for Communitywide Update meeting in July/August