entsog | entsog - central eastern europe grip...ahlten operational deg>den germany (gaspool) hub...

20
GAS REGIONAL INVESTMENT PLAN 2014 – 2023 ANNEX D : DATA TABLES / IP’S CAPACITY GRIP Central Eastern Europe

Upload: others

Post on 14-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GAS REGIONAL INVESTMENT PLAN 2014 – 2023

ANNEX D : DATA TABLES / IP’S CAPACITY

GRIP

Central Eastern Europe

Page 2: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

2 | GRIP Central Eastern Europe 2014 – 2023 Annex D

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm FID - GRIP 2013 248,00 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 248,00 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm 2013 GRIP baseline 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm FID - GRIP 2013 1.560,00 1.633,00 1.633,00 1.633,00 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 1.560,00 1.633,00 1.633,00 1.633,00 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70Baumgarten Total 5.424,00 5.620,60 5.620,60 5.620,60 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Total 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00Balassagyarmat Planned HUi>SK Hungary (SK-HU Interconnector) Hub Slovakia Hub Capacity Firm FID - GRIP 2013 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90Balassagyarmat Planned HUi>SK Hungary (SK-HU Interconnector) Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90Balassagyarmat Planned SK>HUi Slovakia Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID - GRIP 2013 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40Balassagyarmat Planned SK>HUi Slovakia Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID + Others - GRIP 2013 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40Balassagyarmat Total 356,60 356,60 356,60 356,60 356,60 356,60 356,60 356,60 356,60Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 485,05Bocholtz Total 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.368,83Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Total 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Total 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Total 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm 2013 GRIP baseline 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID - GRIP 2013 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID + Others - GRIP 2013 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Total 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm 2013 GRIP baseline 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID - GRIP 2013 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID + Others - GRIP 2013 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 54,25 54,25 54,25Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Total 323,34 323,34 323,34 323,34 323,34 323,34 323,34 323,34 334,09 334,09 334,09Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm 2013 GRIP baseline 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm FID - GRIP 2013 163,00 163,00 163,00 163,00 163,00 163,00 25,30 25,30 25,30 25,30 25,30Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm FID + Others - GRIP 2013 163,00 163,00 163,00 163,00 163,00 163,00 25,30 25,30 25,30 25,30 25,30Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Total 703,40 703,40 703,40 703,40 703,40 703,40 428,00 428,00 428,00 428,00 428,00Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Total 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Total 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Total 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm 2013 GRIP baseline 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID - GRIP 2013 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Total 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm 2013 GRIP baseline 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm FID - GRIP 2013 51,00 51,00 51,00 51,20 51,20 51,20 51,20 51,20 51,20 51,20 51,20Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,20 51,20 51,20 51,20 51,20 51,20 51,20 51,20Csanadpalota Operational 21Z000000000236Q RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,80 63,80 63,80 63,80 63,80 63,80 63,80 63,80Csanadpalota Total 153,00 153,00 153,00 217,20 217,20 217,20 217,20 217,20 217,20 217,20 217,20Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm 2013 GRIP baseline 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm FID - GRIP 2013 755,56 755,56 755,56 755,56 755,56 755,56 729,07 729,07 729,07 729,07 729,07Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm FID + Others - GRIP 2013 755,56 755,56 755,56 755,56 755,56 755,56 729,07 729,07 729,07 729,07 729,07Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm FID - GRIP 2013 773,98 773,98 773,98 773,98 773,98 773,98 729,07 729,07 729,07 729,07 729,07Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 773,98 773,98 773,98 773,98 773,98 773,98 729,07 729,07 729,07 729,07 729,07Dornum Total 4.588,61 4.588,61 4.588,61 4.588,61 4.588,61 4.588,61 4.445,82 4.445,82 4.445,82 4.445,82 4.445,82Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm 2013 GRIP baseline 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm FID - GRIP 2013 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Total 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00Drohne GASCADE / OGE Planned DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 144,00 144,00 144,00 144,00 144,00Drohne GASCADE / OGE Total 144,00 144,00 144,00 144,00 144,00Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm FID - GRIP 2013 248,00 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 248,00 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm 2013 GRIP baseline 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm FID - GRIP 2013 1.560,00 1.633,00 1.633,00 1.633,00 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 1.560,00 1.633,00 1.633,00 1.633,00 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70Baumgarten Total 5.424,00 5.620,60 5.620,60 5.620,60 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Total 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00Balassagyarmat Planned HUi>SK Hungary (SK-HU Interconnector) Hub Slovakia Hub Capacity Firm FID - GRIP 2013 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90Balassagyarmat Planned HUi>SK Hungary (SK-HU Interconnector) Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90Balassagyarmat Planned SK>HUi Slovakia Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID - GRIP 2013 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40Balassagyarmat Planned SK>HUi Slovakia Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID + Others - GRIP 2013 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40Balassagyarmat Total 356,60 356,60 356,60 356,60 356,60 356,60 356,60 356,60 356,60Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 485,05Bocholtz Total 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.368,83Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Total 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Total 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Total 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm 2013 GRIP baseline 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID - GRIP 2013 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID + Others - GRIP 2013 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Total 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm 2013 GRIP baseline 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID - GRIP 2013 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID + Others - GRIP 2013 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 54,25 54,25 54,25Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Total 323,34 323,34 323,34 323,34 323,34 323,34 323,34 323,34 334,09 334,09 334,09Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm 2013 GRIP baseline 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm FID - GRIP 2013 163,00 163,00 163,00 163,00 163,00 163,00 25,30 25,30 25,30 25,30 25,30Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm FID + Others - GRIP 2013 163,00 163,00 163,00 163,00 163,00 163,00 25,30 25,30 25,30 25,30 25,30Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Total 703,40 703,40 703,40 703,40 703,40 703,40 428,00 428,00 428,00 428,00 428,00Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Total 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Total 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Total 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm 2013 GRIP baseline 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID - GRIP 2013 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Total 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm 2013 GRIP baseline 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm FID - GRIP 2013 51,00 51,00 51,00 51,20 51,20 51,20 51,20 51,20 51,20 51,20 51,20Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,20 51,20 51,20 51,20 51,20 51,20 51,20 51,20Csanadpalota Operational 21Z000000000236Q RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,80 63,80 63,80 63,80 63,80 63,80 63,80 63,80Csanadpalota Total 153,00 153,00 153,00 217,20 217,20 217,20 217,20 217,20 217,20 217,20 217,20Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm 2013 GRIP baseline 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm FID - GRIP 2013 755,56 755,56 755,56 755,56 755,56 755,56 729,07 729,07 729,07 729,07 729,07Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm FID + Others - GRIP 2013 755,56 755,56 755,56 755,56 755,56 755,56 729,07 729,07 729,07 729,07 729,07Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm FID - GRIP 2013 773,98 773,98 773,98 773,98 773,98 773,98 729,07 729,07 729,07 729,07 729,07Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 773,98 773,98 773,98 773,98 773,98 773,98 729,07 729,07 729,07 729,07 729,07Dornum Total 4.588,61 4.588,61 4.588,61 4.588,61 4.588,61 4.588,61 4.445,82 4.445,82 4.445,82 4.445,82 4.445,82Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm 2013 GRIP baseline 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm FID - GRIP 2013 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Total 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00Drohne GASCADE / OGE Planned DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 144,00 144,00 144,00 144,00 144,00Drohne GASCADE / OGE Total 144,00 144,00 144,00 144,00 144,00Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Interconnection Points

Page 3: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 3

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00 248,00Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm FID - GRIP 2013 248,00 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30Baumgarten Operational 21Y---A001A023-Y AT>SK Austria Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 248,00 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30 273,30Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm 2013 GRIP baseline 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00 1.560,00Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm FID - GRIP 2013 1.560,00 1.633,00 1.633,00 1.633,00 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70Baumgarten Operational 21Y---A001A023-Y SK>AT Slovakia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 1.560,00 1.633,00 1.633,00 1.633,00 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70 1.674,70Baumgarten Total 5.424,00 5.620,60 5.620,60 5.620,60 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00 5.704,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00Ahlten Total 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00 108,00Balassagyarmat Planned HUi>SK Hungary (SK-HU Interconnector) Hub Slovakia Hub Capacity Firm FID - GRIP 2013 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90Balassagyarmat Planned HUi>SK Hungary (SK-HU Interconnector) Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90 50,90Balassagyarmat Planned SK>HUi Slovakia Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID - GRIP 2013 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40Balassagyarmat Planned SK>HUi Slovakia Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID + Others - GRIP 2013 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40 127,40Balassagyarmat Total 356,60 356,60 356,60 356,60 356,60 356,60 356,60 356,60 356,60Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89Bocholtz Operational 21Y---A001A024-V Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 441,89 485,05Bocholtz Total 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.325,67 1.368,83Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Operational 21Z000000000170U Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44 12,44Bocholtz-Vetschau Total 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32 37,32Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Operational 21Z000000000091Q CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00 222,00Brandov (CZ) / Stegal (DE) Total 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00 666,00Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Operational 37Z000000004913W DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86 10,86Broichweiden Süd Total 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57 32,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm 2013 GRIP baseline 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID - GRIP 2013 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Operational 21Z000000000074Q DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID + Others - GRIP 2013 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57 132,57Bunde (DE) / Oude Statenzijl (H) (NL) (GASCADE) Total 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70 397,70Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm 2013 GRIP baseline 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID - GRIP 2013 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M DEg>Y-NLg Germany (GASPOOL) Hub VIP NL/Gaspool Capacity Firm FID + Others - GRIP 2013 43,50 43,50 43,50 43,50 43,50 43,50 43,50 43,50 54,25 54,25 54,25Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Operational 21Z000000000076M Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28 64,28Bunde (DE) / Oude Statenzijl (H) (NL) (GUD) Total 323,34 323,34 323,34 323,34 323,34 323,34 323,34 323,34 334,09 334,09 334,09Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm 2013 GRIP baseline 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00 163,00Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm FID - GRIP 2013 163,00 163,00 163,00 163,00 163,00 163,00 25,30 25,30 25,30 25,30 25,30Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O DEn>Y-NLn Germany (NCG) Hub VIP NL/NCG Capacity Firm FID + Others - GRIP 2013 163,00 163,00 163,00 163,00 163,00 163,00 25,30 25,30 25,30 25,30 25,30Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Operational 21Z000000000075O Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47 71,47Bunde (DE) / Oude Statenzijl (H) (NL) I (OGE) Total 703,40 703,40 703,40 703,40 703,40 703,40 428,00 428,00 428,00 428,00 428,00Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Operational 21Z000000000079G Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18 76,18Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) Total 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54 228,54Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Operational 21Z000000000078I Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85 177,85Bunde (DE) / Oude Statenzijl (L) (NL) (GUD) Total 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55 533,55Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08 5,08Bunder-Tief Total 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24 15,24Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm 2013 GRIP baseline 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID - GRIP 2013 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Operational 21Z000000000239K CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03 28,03Cieszyn (PL) / Český Těšín (CZ) Total 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09 84,09Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm 2013 GRIP baseline 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00 51,00Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm FID - GRIP 2013 51,00 51,00 51,00 51,20 51,20 51,20 51,20 51,20 51,20 51,20 51,20Csanadpalota Operational 21Z000000000236Q HU>RO Hungary Hub Romania Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,20 51,20 51,20 51,20 51,20 51,20 51,20 51,20Csanadpalota Operational 21Z000000000236Q RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,80 63,80 63,80 63,80 63,80 63,80 63,80 63,80Csanadpalota Total 153,00 153,00 153,00 217,20 217,20 217,20 217,20 217,20 217,20 217,20 217,20Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm 2013 GRIP baseline 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56 755,56Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm FID - GRIP 2013 755,56 755,56 755,56 755,56 755,56 755,56 729,07 729,07 729,07 729,07 729,07Dornum Operational NO>Y-NOd Norway Supplier Dornum Capacity Firm FID + Others - GRIP 2013 755,56 755,56 755,56 755,56 755,56 755,56 729,07 729,07 729,07 729,07 729,07Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98 773,98Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm FID - GRIP 2013 773,98 773,98 773,98 773,98 773,98 773,98 729,07 729,07 729,07 729,07 729,07Dornum Operational Y-NOd>DEn Dornum Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 773,98 773,98 773,98 773,98 773,98 773,98 729,07 729,07 729,07 729,07 729,07Dornum Total 4.588,61 4.588,61 4.588,61 4.588,61 4.588,61 4.588,61 4.445,82 4.445,82 4.445,82 4.445,82 4.445,82Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm 2013 GRIP baseline 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm FID - GRIP 2013 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Operational 21Z000000000249H HU>HR Hungary Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00 76,00Dravaszerdahely Total 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00 228,00Drohne GASCADE / OGE Planned DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 144,00 144,00 144,00 144,00 144,00Drohne GASCADE / OGE Total 144,00 144,00 144,00 144,00 144,00Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30Drohne GUD / OGE Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30 46,30

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Page 4: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

4 | GRIP Central Eastern Europe 2014 – 2023 Annex D

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Page 5: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 5

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Page 6: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

6 | GRIP Central Eastern Europe 2014 – 2023 Annex D

Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Total 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Total 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm 2013 GRIP baseline 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID - GRIP 2013 93,90 93,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID + Others - GRIP 2013 93,90 93,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 401,20Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Total 691,13 691,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 1.028,43Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm 2013 GRIP baseline 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID + Others - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm 2013 GRIP baseline 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 509,50 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm 2013 GRIP baseline 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 433,92 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Total 3.184,80 3.184,80 3.184,80 3.184,80 3.184,80 3.445,22 3.201,12 3.201,12 3.201,12 3.201,12 3.201,12Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Total 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Total 84,00 84,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm 2013 GRIP baseline 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID + Others - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.900,90 1.900,90 2.757,90Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 1.029,30 1.029,30 1.886,30Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm 2013 GRIP baseline 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID + Others - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Total 6.441,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 8.847,50 8.847,50 10.561,50Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Total 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Total 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm 2013 GRIP baseline 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Total 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Planned DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Total 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 30,14 30,14 30,14 30,14 30,14Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned DEn>AT/TGL Germany (NCG) Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 180,74 180,74 180,74 180,74 180,74Haiming (bayernets) - DE / Burghausen (Transit) - TGL Total 210,88 210,88 210,88 210,88 210,88Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 33,82 33,82 33,82 33,82 33,82Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Total 33,82 33,82 33,82 33,82 33,82Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Total 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90Interconnector BG RS Planned BGn>RS Bulgaria (NGTS) Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Planned RS>BGn Serbia Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Total 102,00 102,00 102,00 102,00 102,00 102,00 102,00 102,00Interconnector CZ-PL Planned CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 195,90 195,90 195,90 195,90 195,90Interconnector CZ-PL Planned PL>CZ Poland Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 150,60 150,60 150,60 150,60 150,60Interconnector CZ-PL Total 346,50 346,50 346,50 346,50Interconnector ITB (Turkey - Bulgaria) Planned TRi>BG Turkey (Imports) External hub Bulgaria Hub Capacity Firm FID + Others - GRIP 2013 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Total 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Total 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm 2013 GRIP baseline 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID - GRIP 2013 93,90 93,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID + Others - GRIP 2013 93,90 93,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 401,20Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Total 691,13 691,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 1.028,43Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm 2013 GRIP baseline 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID + Others - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm 2013 GRIP baseline 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 509,50 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm 2013 GRIP baseline 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 433,92 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Total 3.184,80 3.184,80 3.184,80 3.184,80 3.184,80 3.445,22 3.201,12 3.201,12 3.201,12 3.201,12 3.201,12Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Total 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Total 84,00 84,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm 2013 GRIP baseline 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID + Others - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.900,90 1.900,90 2.757,90Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 1.029,30 1.029,30 1.886,30Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm 2013 GRIP baseline 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID + Others - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Total 6.441,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 8.847,50 8.847,50 10.561,50Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Total 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Total 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm 2013 GRIP baseline 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Total 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Planned DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Total 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 30,14 30,14 30,14 30,14 30,14Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned DEn>AT/TGL Germany (NCG) Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 180,74 180,74 180,74 180,74 180,74Haiming (bayernets) - DE / Burghausen (Transit) - TGL Total 210,88 210,88 210,88 210,88 210,88Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 33,82 33,82 33,82 33,82 33,82Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Total 33,82 33,82 33,82 33,82 33,82Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Total 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90Interconnector BG RS Planned BGn>RS Bulgaria (NGTS) Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Planned RS>BGn Serbia Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Total 102,00 102,00 102,00 102,00 102,00 102,00 102,00 102,00Interconnector CZ-PL Planned CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 195,90 195,90 195,90 195,90 195,90Interconnector CZ-PL Planned PL>CZ Poland Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 150,60 150,60 150,60 150,60 150,60Interconnector CZ-PL Total 346,50 346,50 346,50 346,50Interconnector ITB (Turkey - Bulgaria) Planned TRi>BG Turkey (Imports) External hub Bulgaria Hub Capacity Firm FID + Others - GRIP 2013 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Page 7: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 7

Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Total 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Total 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm 2013 GRIP baseline 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID - GRIP 2013 93,90 93,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID + Others - GRIP 2013 93,90 93,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 401,20Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Total 691,13 691,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 1.028,43Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm 2013 GRIP baseline 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID + Others - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm 2013 GRIP baseline 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 509,50 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm 2013 GRIP baseline 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 433,92 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Total 3.184,80 3.184,80 3.184,80 3.184,80 3.184,80 3.445,22 3.201,12 3.201,12 3.201,12 3.201,12 3.201,12Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Total 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Total 84,00 84,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm 2013 GRIP baseline 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID + Others - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.900,90 1.900,90 2.757,90Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 1.029,30 1.029,30 1.886,30Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm 2013 GRIP baseline 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID + Others - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Total 6.441,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 8.847,50 8.847,50 10.561,50Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Total 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Total 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm 2013 GRIP baseline 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Total 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Planned DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Total 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 30,14 30,14 30,14 30,14 30,14Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned DEn>AT/TGL Germany (NCG) Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 180,74 180,74 180,74 180,74 180,74Haiming (bayernets) - DE / Burghausen (Transit) - TGL Total 210,88 210,88 210,88 210,88 210,88Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 33,82 33,82 33,82 33,82 33,82Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Total 33,82 33,82 33,82 33,82 33,82Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Total 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90Interconnector BG RS Planned BGn>RS Bulgaria (NGTS) Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Planned RS>BGn Serbia Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Total 102,00 102,00 102,00 102,00 102,00 102,00 102,00 102,00Interconnector CZ-PL Planned CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 195,90 195,90 195,90 195,90 195,90Interconnector CZ-PL Planned PL>CZ Poland Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 150,60 150,60 150,60 150,60 150,60Interconnector CZ-PL Total 346,50 346,50 346,50 346,50Interconnector ITB (Turkey - Bulgaria) Planned TRi>BG Turkey (Imports) External hub Bulgaria Hub Capacity Firm FID + Others - GRIP 2013 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Page 8: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

8 | GRIP Central Eastern Europe 2014 – 2023 Annex D

Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Total 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Total 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm 2013 GRIP baseline 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID - GRIP 2013 93,90 93,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID + Others - GRIP 2013 93,90 93,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 401,20Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Total 691,13 691,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 1.028,43Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm 2013 GRIP baseline 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID + Others - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm 2013 GRIP baseline 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 509,50 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm 2013 GRIP baseline 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 433,92 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Total 3.184,80 3.184,80 3.184,80 3.184,80 3.184,80 3.445,22 3.201,12 3.201,12 3.201,12 3.201,12 3.201,12Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Total 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Total 84,00 84,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm 2013 GRIP baseline 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID + Others - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.900,90 1.900,90 2.757,90Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 1.029,30 1.029,30 1.886,30Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm 2013 GRIP baseline 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID + Others - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Total 6.441,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 8.847,50 8.847,50 10.561,50Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Total 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Total 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm 2013 GRIP baseline 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Total 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Planned DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Total 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 30,14 30,14 30,14 30,14 30,14Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned DEn>AT/TGL Germany (NCG) Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 180,74 180,74 180,74 180,74 180,74Haiming (bayernets) - DE / Burghausen (Transit) - TGL Total 210,88 210,88 210,88 210,88 210,88Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 33,82 33,82 33,82 33,82 33,82Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Total 33,82 33,82 33,82 33,82 33,82Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Total 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90Interconnector BG RS Planned BGn>RS Bulgaria (NGTS) Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Planned RS>BGn Serbia Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Total 102,00 102,00 102,00 102,00 102,00 102,00 102,00 102,00Interconnector CZ-PL Planned CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 195,90 195,90 195,90 195,90 195,90Interconnector CZ-PL Planned PL>CZ Poland Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 150,60 150,60 150,60 150,60 150,60Interconnector CZ-PL Total 346,50 346,50 346,50 346,50Interconnector ITB (Turkey - Bulgaria) Planned TRi>BG Turkey (Imports) External hub Bulgaria Hub Capacity Firm FID + Others - GRIP 2013 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00

Interconnector ITB (Turkey - Bulgaria) Total 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00Interconnector PL - SK Planned PL>SK Poland Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 129,50 129,50 129,50 129,50 141,60Interconnector PL - SK Planned SK>PL Slovakia Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 171,70 171,70 171,70 171,70 286,30Interconnector PL - SK Total 427,90 427,90 427,90 427,90 427,90Interconnector PL-DK Planned DK>PL Denmark Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Planned PL>DK Poland Hub Denmark Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Total 180,80 180,80 180,80Interconnector PL-LT Planned LT>PL Lithuania Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 29,00 29,00 29,00 29,00 29,00Interconnector PL-LT Planned PL>LT Poland Hub Lithuania Hub Capacity Firm FID + Others - GRIP 2013 68,00 68,00 68,00 68,00 68,00Interconnector PL-LT Total 97,00 97,00Interconnector SI-HU Planned HU>SI Hungary Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 38,00 38,00 38,00 38,00 38,00Interconnector SI-HU Planned SI>HU Slovenia Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 45,25 45,25 45,25 45,25 45,25 45,25Interconnector SI-HU Total 45,25 83,25 83,25 83,25 83,25 83,25Ionic-Adriatic Pipeline - IAP / AB Planned HR/IAP>AL Ionic-Adriatic Pipeline (Croatia) Albania Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / AB Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / ME Planned HR/IAP>ME Ionic-Adriatic Pipeline (Croatia) Montenegro Hub Capacity Firm FID + Others - GRIP 2013 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / ME Total 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / Split - HR Planned HR/IAP>HR Ionic-Adriatic Pipeline (Croatia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 75,00 75,00 75,00Ionic-Adriatic Pipeline - IAP / Split - HR Total 75,00 75,00 75,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Total 753,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm 2013 GRIP baseline 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID + Others - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Total 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Total 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm 2013 GRIP baseline 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Total 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30Komotini - TAP / IGB Planned BG/IGB>GR/TAP Interconnector Greece-Bulgaria (Bulgaria) Trans-Adriatic Pipeline (Greece) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Planned GR/TAP>BG/IGB Trans-Adriatic Pipeline (Greece) Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm 2013 GRIP baseline 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Total 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm 2013 GRIP baseline 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID + Others - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Total 324,00 324,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Total 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Total 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Total 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Total 3.900,00 3.482,60 3.482,60 3.482,60 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Total 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,51 144,51Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 72,06 72,06 72,06 108,66 108,66 108,66 108,66 108,66 108,66 108,66 108,66Lwowek Total 216,17 216,17 216,17 252,77 252,77 252,77 252,77 252,77 252,77 252,77 252,77Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm 2013 GRIP baseline 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID + Others - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Total 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00

Drohne GUD / OGE Total 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90 138,90Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm 2013 GRIP baseline 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Operational 21Z000000000143X UA>PL Ukraine Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48 135,48Drozdovichi (UA) -Drozdowicze (PL) Total 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44 406,44East-West Pipeline RO-HU (AGRI) Planned RO>HU Romania Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00East-West Pipeline RO-HU (AGRI) Total 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm 2013 GRIP baseline 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59 10,59Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEg>Y-DKe Germany (GASPOOL) Hub Ellund Capacity Firm FID + Others - GRIP 2013 10,59 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm 2013 GRIP baseline 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DEn>Y-DKe Germany (NCG) Hub Ellund Capacity Firm FID + Others - GRIP 2013 17,30Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm 2013 GRIP baseline 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00 99,00Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 DK>Y-DKe Denmark Hub Ellund Capacity Firm FID + Others - GRIP 2013 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68 32,68Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEg Ellund Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58 28,58Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DEn Ellund Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10 4,10Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Operational 21Y---A001A002-8 Y-DKe>DK Ellund Denmark Hub Capacity Firm FID + Others - GRIP 2013 10,59 61,40 101,96 101,96 101,96 101,96 101,96 101,96 101,96 101,96Ellund Total 346,07 332,65 535,88 698,11 698,11 698,11 698,11 698,11 698,11 698,11 698,11Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm 2013 GRIP baseline 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational NO>Y-NOp Norway Supplier Emden EPT Capacity Firm FID + Others - GRIP 2013 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33 633,33Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEg Emden EPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06 219,06Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>DEn Emden EPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41 210,41Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Operational Y-NOp>Y-NLe Emden EPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39 637,39Emden (EPT1) Total 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56 5.100,56Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm 2013 GRIP baseline 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Operational Y-NLe>NL VIP NL/Emden Netherlands Hub Capacity Firm FID + Others - GRIP 2013 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70 959,70Emden (NL) (GTS) Total 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10 2.879,10Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm 2013 GRIP baseline 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational NO>Y-NOn Norway Supplier Emden NPT Capacity Firm FID + Others - GRIP 2013 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56 355,56Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEg Emden NPT Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00 33,00Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>DEn Emden NPT Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66 76,66Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm 2013 GRIP baseline 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Operational Y-NOn>Y-NLe Emden NPT VIP NL/Emden Capacity Firm FID + Others - GRIP 2013 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36 322,36Emden (NPT) Total 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72 2.362,72Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89 68,89Emsbüren RG (L-gas) Total 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67 206,67Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Operational 21W000000000012G STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Eneco) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89 46,89Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Operational 21Z000000000108Z STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79 93,79Epe Storage (DE) / Enschede (NL) (Essent) Total 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04 422,04Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41 84,41Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Operational 21Z000000000109X STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23 117,23Epe Storage (DE) / Enschede (NL) (Nuon) Total 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92 604,92Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66 197,66Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Operational 21W000000000013E STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31 139,31Etzel (DE) / Oude Statenzijl Etzel-Crystal Total 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91 1.010,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Interconnector ITB (Turkey - Bulgaria) Total 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00Interconnector PL - SK Planned PL>SK Poland Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 129,50 129,50 129,50 129,50 141,60Interconnector PL - SK Planned SK>PL Slovakia Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 171,70 171,70 171,70 171,70 286,30Interconnector PL - SK Total 427,90 427,90 427,90 427,90 427,90Interconnector PL-DK Planned DK>PL Denmark Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Planned PL>DK Poland Hub Denmark Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Total 180,80 180,80 180,80Interconnector PL-LT Planned LT>PL Lithuania Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 29,00 29,00 29,00 29,00 29,00Interconnector PL-LT Planned PL>LT Poland Hub Lithuania Hub Capacity Firm FID + Others - GRIP 2013 68,00 68,00 68,00 68,00 68,00Interconnector PL-LT Total 97,00 97,00Interconnector SI-HU Planned HU>SI Hungary Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 38,00 38,00 38,00 38,00 38,00Interconnector SI-HU Planned SI>HU Slovenia Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 45,25 45,25 45,25 45,25 45,25 45,25Interconnector SI-HU Total 45,25 83,25 83,25 83,25 83,25 83,25Ionic-Adriatic Pipeline - IAP / AB Planned HR/IAP>AL Ionic-Adriatic Pipeline (Croatia) Albania Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / AB Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / ME Planned HR/IAP>ME Ionic-Adriatic Pipeline (Croatia) Montenegro Hub Capacity Firm FID + Others - GRIP 2013 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / ME Total 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / Split - HR Planned HR/IAP>HR Ionic-Adriatic Pipeline (Croatia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 75,00 75,00 75,00Ionic-Adriatic Pipeline - IAP / Split - HR Total 75,00 75,00 75,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Total 753,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm 2013 GRIP baseline 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID + Others - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Total 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Total 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm 2013 GRIP baseline 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Total 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30Komotini - TAP / IGB Planned BG/IGB>GR/TAP Interconnector Greece-Bulgaria (Bulgaria) Trans-Adriatic Pipeline (Greece) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Planned GR/TAP>BG/IGB Trans-Adriatic Pipeline (Greece) Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm 2013 GRIP baseline 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Total 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm 2013 GRIP baseline 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID + Others - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Total 324,00 324,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Total 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Total 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Total 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Total 3.900,00 3.482,60 3.482,60 3.482,60 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Total 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,51 144,51Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 72,06 72,06 72,06 108,66 108,66 108,66 108,66 108,66 108,66 108,66 108,66Lwowek Total 216,17 216,17 216,17 252,77 252,77 252,77 252,77 252,77 252,77 252,77 252,77Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm 2013 GRIP baseline 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID + Others - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Total 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00

Page 9: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 9

Interconnector ITB (Turkey - Bulgaria) Total 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00Interconnector PL - SK Planned PL>SK Poland Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 129,50 129,50 129,50 129,50 141,60Interconnector PL - SK Planned SK>PL Slovakia Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 171,70 171,70 171,70 171,70 286,30Interconnector PL - SK Total 427,90 427,90 427,90 427,90 427,90Interconnector PL-DK Planned DK>PL Denmark Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Planned PL>DK Poland Hub Denmark Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Total 180,80 180,80 180,80Interconnector PL-LT Planned LT>PL Lithuania Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 29,00 29,00 29,00 29,00 29,00Interconnector PL-LT Planned PL>LT Poland Hub Lithuania Hub Capacity Firm FID + Others - GRIP 2013 68,00 68,00 68,00 68,00 68,00Interconnector PL-LT Total 97,00 97,00Interconnector SI-HU Planned HU>SI Hungary Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 38,00 38,00 38,00 38,00 38,00Interconnector SI-HU Planned SI>HU Slovenia Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 45,25 45,25 45,25 45,25 45,25 45,25Interconnector SI-HU Total 45,25 83,25 83,25 83,25 83,25 83,25Ionic-Adriatic Pipeline - IAP / AB Planned HR/IAP>AL Ionic-Adriatic Pipeline (Croatia) Albania Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / AB Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / ME Planned HR/IAP>ME Ionic-Adriatic Pipeline (Croatia) Montenegro Hub Capacity Firm FID + Others - GRIP 2013 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / ME Total 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / Split - HR Planned HR/IAP>HR Ionic-Adriatic Pipeline (Croatia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 75,00 75,00 75,00Ionic-Adriatic Pipeline - IAP / Split - HR Total 75,00 75,00 75,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Total 753,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm 2013 GRIP baseline 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID + Others - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Total 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Total 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm 2013 GRIP baseline 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Total 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30Komotini - TAP / IGB Planned BG/IGB>GR/TAP Interconnector Greece-Bulgaria (Bulgaria) Trans-Adriatic Pipeline (Greece) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Planned GR/TAP>BG/IGB Trans-Adriatic Pipeline (Greece) Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm 2013 GRIP baseline 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Total 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm 2013 GRIP baseline 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID + Others - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Total 324,00 324,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Total 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Total 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Total 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Total 3.900,00 3.482,60 3.482,60 3.482,60 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Total 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,51 144,51Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 72,06 72,06 72,06 108,66 108,66 108,66 108,66 108,66 108,66 108,66 108,66Lwowek Total 216,17 216,17 216,17 252,77 252,77 252,77 252,77 252,77 252,77 252,77 252,77Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm 2013 GRIP baseline 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID + Others - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Total 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00

Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91 209,91Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Operational 21W0000000000095 STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20 206,20Etzel (DE) / Oude Statenzijl Etzel-EKB Total 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33 1.248,33Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01 182,01Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Operational 21W000000000014C STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06 80,06Etzel (DE) / Oude Statenzijl Etzel-Freya Total 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19 786,19Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 BEh>DEg Belgium Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48 136,48Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm 2013 GRIP baseline 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90 93,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID - GRIP 2013 93,90 93,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90 123,90Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Operational 21Z0000000000155 DEg>BEh Germany (GASPOOL) Hub Belgium Hub Capacity Firm FID + Others - GRIP 2013 93,90 93,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 223,90 401,20Eynatten 1 (BE) // Lichtenbusch / Raeren (DE) Total 691,13 691,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 851,13 1.028,43Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm 2013 GRIP baseline 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational BEh>Y-BEhe Belgium Hub Eynatten Capacity Firm FID + Others - GRIP 2013 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72 162,72Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm 2013 GRIP baseline 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50 341,50Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational DEn>Y-BEhe Germany (NCG) Hub Eynatten Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 509,50 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm 2013 GRIP baseline 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92 433,92Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID - GRIP 2013 341,50 341,50 341,50 341,50 341,50 341,50 261,58 261,58 261,58 261,58 261,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>BEh Eynatten Belgium Hub Capacity Firm FID + Others - GRIP 2013 341,50 341,50 341,50 341,50 341,50 433,92 429,58 429,58 429,58 429,58 429,58Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Operational Y-BEhe>DEn Eynatten Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07 185,07Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) Total 3.184,80 3.184,80 3.184,80 3.184,80 3.184,80 3.445,22 3.201,12 3.201,12 3.201,12 3.201,12 3.201,12Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60 105,60Gernsheim Total 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20 211,20Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00 28,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Operational 21Z000000000044Z SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00 21,00Gorizia (IT) /Šempeter (SI) Total 84,00 84,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00 126,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm 2013 GRIP baseline 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00 1.642,00Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90Greifswald Operational RU/NOS>Y-RUg/NOS Nord Stream (Russia) Greifswald Capacity Firm FID + Others - GRIP 2013 959,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.221,90 1.900,90 1.900,90 2.757,90Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30 88,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30Greifswald Operational Y-RUg/NOS>DEg Greifswald Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 88,30 350,30 350,30 350,30 350,30 350,30 350,30 350,30 1.029,30 1.029,30 1.886,30Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm 2013 GRIP baseline 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Operational Y-RUg/NOS>DEg/OPA Greifswald OPAL (Germany (GASPOOL)) Capacity Firm FID + Others - GRIP 2013 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60 871,60Greifswald Total 6.441,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 7.489,50 8.847,50 8.847,50 10.561,50Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Operational 21Z000000000089D DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54 0,54Gubin GAZ-SYSTEM - PL / Guben ONTRAS DE Total 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61 1,61Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Operational 21Z000000000240Z Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92 4,92Haanrade Total 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77 14,77Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm 2013 GRIP baseline 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00 293,00Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Operational 21Z000000000125Z STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40 266,40Haidach (AT) / Haidach USP (DE) Total 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20 1.678,20Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Planned DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Austrian Hub) - TGL Total 148,61 148,61 148,61 148,61 148,61Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 30,14 30,14 30,14 30,14 30,14Haiming (bayernets) - DE / Burghausen (Transit) - TGL Planned DEn>AT/TGL Germany (NCG) Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 180,74 180,74 180,74 180,74 180,74Haiming (bayernets) - DE / Burghausen (Transit) - TGL Total 210,88 210,88 210,88 210,88 210,88Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Planned AT/TGL>DEn Tauerngas Leitung (Austria) Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 33,82 33,82 33,82 33,82 33,82Haiming-Oberkappel (OGE) - DE / Burghausen (Transit) - TGL Total 33,82 33,82 33,82 33,82 33,82Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 CZ>DEg Czech Republic Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90 242,90Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Operational 21Z0000000000228 DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73 48,73Hora Svaté Kateřiny (CZ) / Deutschneudorf (Sayda) (DE) Total 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90 874,90Interconnector BG RS Planned BGn>RS Bulgaria (NGTS) Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Planned RS>BGn Serbia Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00 51,00Interconnector BG RS Total 102,00 102,00 102,00 102,00 102,00 102,00 102,00 102,00Interconnector CZ-PL Planned CZ>PL Czech Republic Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 195,90 195,90 195,90 195,90 195,90Interconnector CZ-PL Planned PL>CZ Poland Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 150,60 150,60 150,60 150,60 150,60Interconnector CZ-PL Total 346,50 346,50 346,50 346,50Interconnector ITB (Turkey - Bulgaria) Planned TRi>BG Turkey (Imports) External hub Bulgaria Hub Capacity Firm FID + Others - GRIP 2013 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Page 10: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

10 | GRIP Central Eastern Europe 2014 – 2023 Annex D

Interconnector ITB (Turkey - Bulgaria) Total 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00Interconnector PL - SK Planned PL>SK Poland Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 129,50 129,50 129,50 129,50 141,60Interconnector PL - SK Planned SK>PL Slovakia Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 171,70 171,70 171,70 171,70 286,30Interconnector PL - SK Total 427,90 427,90 427,90 427,90 427,90Interconnector PL-DK Planned DK>PL Denmark Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Planned PL>DK Poland Hub Denmark Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Total 180,80 180,80 180,80Interconnector PL-LT Planned LT>PL Lithuania Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 29,00 29,00 29,00 29,00 29,00Interconnector PL-LT Planned PL>LT Poland Hub Lithuania Hub Capacity Firm FID + Others - GRIP 2013 68,00 68,00 68,00 68,00 68,00Interconnector PL-LT Total 97,00 97,00Interconnector SI-HU Planned HU>SI Hungary Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 38,00 38,00 38,00 38,00 38,00Interconnector SI-HU Planned SI>HU Slovenia Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 45,25 45,25 45,25 45,25 45,25 45,25Interconnector SI-HU Total 45,25 83,25 83,25 83,25 83,25 83,25Ionic-Adriatic Pipeline - IAP / AB Planned HR/IAP>AL Ionic-Adriatic Pipeline (Croatia) Albania Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / AB Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / ME Planned HR/IAP>ME Ionic-Adriatic Pipeline (Croatia) Montenegro Hub Capacity Firm FID + Others - GRIP 2013 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / ME Total 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / Split - HR Planned HR/IAP>HR Ionic-Adriatic Pipeline (Croatia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 75,00 75,00 75,00Ionic-Adriatic Pipeline - IAP / Split - HR Total 75,00 75,00 75,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Total 753,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm 2013 GRIP baseline 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID + Others - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Total 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Total 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm 2013 GRIP baseline 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Total 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30Komotini - TAP / IGB Planned BG/IGB>GR/TAP Interconnector Greece-Bulgaria (Bulgaria) Trans-Adriatic Pipeline (Greece) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Planned GR/TAP>BG/IGB Trans-Adriatic Pipeline (Greece) Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm 2013 GRIP baseline 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Total 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm 2013 GRIP baseline 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID + Others - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Total 324,00 324,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Total 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Total 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Total 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Total 3.900,00 3.482,60 3.482,60 3.482,60 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Total 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,51 144,51Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 72,06 72,06 72,06 108,66 108,66 108,66 108,66 108,66 108,66 108,66 108,66Lwowek Total 216,17 216,17 216,17 252,77 252,77 252,77 252,77 252,77 252,77 252,77 252,77Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm 2013 GRIP baseline 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID + Others - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Total 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00

Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Total 2.778,00 2.778,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Total 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm 2013 GRIP baseline 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID - GRIP 2013 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 128,80 128,80 128,80 128,80 128,80 153,00 153,00 153,00 153,00 153,00 153,00Mosonmagyarovar Total 386,40 386,40 386,40 386,40 386,40 410,60 410,60 410,60 410,60 410,60 410,60Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Total 309,00 309,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00Nabucco into Austria (AT) Planned AZ/NAB>AT Nabucco (Azerbaijan) Austria Hub Capacity Firm FID + Others - GRIP 2013 535,62 535,62 535,62 535,62 535,62Nabucco into Austria (AT) Total 535,62 535,62 535,62 535,62 535,62Nabucco into Bulgaria (BG) Planned AZ/NAB>BGn Nabucco (Azerbaijan) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Bulgaria (BG) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Planned AZ/NAB>HU Nabucco (Azerbaijan) Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Planned AZ/NAB>RO Nabucco (Azerbaijan) Romania Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Total 63,01 63,01 63,01 63,01 63,01Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Total 453,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Total 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Total 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Total 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Total 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm 2013 GRIP baseline 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID + Others - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Total 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Total 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 988,35 988,35 988,35 988,35 988,35Oberkappel (Net4Gas) Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Total 110,00Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Total 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm 2013 GRIP baseline 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID + Others - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Total 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60Posušje Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00 45,00 45,00 45,00 45,00Posušje Total 45,00 45,00 45,00 45,00 45,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm 2013 GRIP baseline 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID + Others - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Total 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00Rakovica (HR) / Trzac (BA) Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00Rakovica (HR) / Trzac (BA) Total 45,00RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Total 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Total 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13

Interconnector ITB (Turkey - Bulgaria) Total 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00Interconnector PL - SK Planned PL>SK Poland Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 129,50 129,50 129,50 129,50 141,60Interconnector PL - SK Planned SK>PL Slovakia Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 171,70 171,70 171,70 171,70 286,30Interconnector PL - SK Total 427,90 427,90 427,90 427,90 427,90Interconnector PL-DK Planned DK>PL Denmark Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Planned PL>DK Poland Hub Denmark Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Total 180,80 180,80 180,80Interconnector PL-LT Planned LT>PL Lithuania Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 29,00 29,00 29,00 29,00 29,00Interconnector PL-LT Planned PL>LT Poland Hub Lithuania Hub Capacity Firm FID + Others - GRIP 2013 68,00 68,00 68,00 68,00 68,00Interconnector PL-LT Total 97,00 97,00Interconnector SI-HU Planned HU>SI Hungary Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 38,00 38,00 38,00 38,00 38,00Interconnector SI-HU Planned SI>HU Slovenia Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 45,25 45,25 45,25 45,25 45,25 45,25Interconnector SI-HU Total 45,25 83,25 83,25 83,25 83,25 83,25Ionic-Adriatic Pipeline - IAP / AB Planned HR/IAP>AL Ionic-Adriatic Pipeline (Croatia) Albania Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / AB Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / ME Planned HR/IAP>ME Ionic-Adriatic Pipeline (Croatia) Montenegro Hub Capacity Firm FID + Others - GRIP 2013 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / ME Total 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / Split - HR Planned HR/IAP>HR Ionic-Adriatic Pipeline (Croatia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 75,00 75,00 75,00Ionic-Adriatic Pipeline - IAP / Split - HR Total 75,00 75,00 75,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Total 753,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm 2013 GRIP baseline 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID + Others - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Total 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Total 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm 2013 GRIP baseline 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Total 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30Komotini - TAP / IGB Planned BG/IGB>GR/TAP Interconnector Greece-Bulgaria (Bulgaria) Trans-Adriatic Pipeline (Greece) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Planned GR/TAP>BG/IGB Trans-Adriatic Pipeline (Greece) Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm 2013 GRIP baseline 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Total 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm 2013 GRIP baseline 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID + Others - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Total 324,00 324,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Total 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Total 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Total 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Total 3.900,00 3.482,60 3.482,60 3.482,60 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Total 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,51 144,51Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 72,06 72,06 72,06 108,66 108,66 108,66 108,66 108,66 108,66 108,66 108,66Lwowek Total 216,17 216,17 216,17 252,77 252,77 252,77 252,77 252,77 252,77 252,77 252,77Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm 2013 GRIP baseline 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID + Others - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Total 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Total 2.778,00 2.778,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Total 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm 2013 GRIP baseline 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID - GRIP 2013 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 128,80 128,80 128,80 128,80 128,80 153,00 153,00 153,00 153,00 153,00 153,00Mosonmagyarovar Total 386,40 386,40 386,40 386,40 386,40 410,60 410,60 410,60 410,60 410,60 410,60Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Total 309,00 309,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00Nabucco into Austria (AT) Planned AZ/NAB>AT Nabucco (Azerbaijan) Austria Hub Capacity Firm FID + Others - GRIP 2013 535,62 535,62 535,62 535,62 535,62Nabucco into Austria (AT) Total 535,62 535,62 535,62 535,62 535,62Nabucco into Bulgaria (BG) Planned AZ/NAB>BGn Nabucco (Azerbaijan) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Bulgaria (BG) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Planned AZ/NAB>HU Nabucco (Azerbaijan) Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Planned AZ/NAB>RO Nabucco (Azerbaijan) Romania Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Total 63,01 63,01 63,01 63,01 63,01Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Total 453,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Total 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Total 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Total 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Total 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm 2013 GRIP baseline 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID + Others - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Total 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Total 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 988,35 988,35 988,35 988,35 988,35Oberkappel (Net4Gas) Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Total 110,00Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Total 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm 2013 GRIP baseline 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID + Others - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Total 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60Posušje Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00 45,00 45,00 45,00 45,00Posušje Total 45,00 45,00 45,00 45,00 45,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm 2013 GRIP baseline 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID + Others - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Total 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00Rakovica (HR) / Trzac (BA) Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00Rakovica (HR) / Trzac (BA) Total 45,00RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Total 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Total 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13

Page 11: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 11

Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Total 2.778,00 2.778,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Total 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm 2013 GRIP baseline 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID - GRIP 2013 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 128,80 128,80 128,80 128,80 128,80 153,00 153,00 153,00 153,00 153,00 153,00Mosonmagyarovar Total 386,40 386,40 386,40 386,40 386,40 410,60 410,60 410,60 410,60 410,60 410,60Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Total 309,00 309,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00Nabucco into Austria (AT) Planned AZ/NAB>AT Nabucco (Azerbaijan) Austria Hub Capacity Firm FID + Others - GRIP 2013 535,62 535,62 535,62 535,62 535,62Nabucco into Austria (AT) Total 535,62 535,62 535,62 535,62 535,62Nabucco into Bulgaria (BG) Planned AZ/NAB>BGn Nabucco (Azerbaijan) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Bulgaria (BG) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Planned AZ/NAB>HU Nabucco (Azerbaijan) Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Planned AZ/NAB>RO Nabucco (Azerbaijan) Romania Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Total 63,01 63,01 63,01 63,01 63,01Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Total 453,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Total 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Total 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Total 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Total 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm 2013 GRIP baseline 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID + Others - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Total 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Total 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 988,35 988,35 988,35 988,35 988,35Oberkappel (Net4Gas) Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Total 110,00Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Total 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm 2013 GRIP baseline 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID + Others - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Total 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60Posušje Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00 45,00 45,00 45,00 45,00Posušje Total 45,00 45,00 45,00 45,00 45,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm 2013 GRIP baseline 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID + Others - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Total 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00Rakovica (HR) / Trzac (BA) Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00Rakovica (HR) / Trzac (BA) Total 45,00RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Total 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Total 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13

Interconnector ITB (Turkey - Bulgaria) Total 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00Interconnector PL - SK Planned PL>SK Poland Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 129,50 129,50 129,50 129,50 141,60Interconnector PL - SK Planned SK>PL Slovakia Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 171,70 171,70 171,70 171,70 286,30Interconnector PL - SK Total 427,90 427,90 427,90 427,90 427,90Interconnector PL-DK Planned DK>PL Denmark Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Planned PL>DK Poland Hub Denmark Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Total 180,80 180,80 180,80Interconnector PL-LT Planned LT>PL Lithuania Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 29,00 29,00 29,00 29,00 29,00Interconnector PL-LT Planned PL>LT Poland Hub Lithuania Hub Capacity Firm FID + Others - GRIP 2013 68,00 68,00 68,00 68,00 68,00Interconnector PL-LT Total 97,00 97,00Interconnector SI-HU Planned HU>SI Hungary Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 38,00 38,00 38,00 38,00 38,00Interconnector SI-HU Planned SI>HU Slovenia Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 45,25 45,25 45,25 45,25 45,25 45,25Interconnector SI-HU Total 45,25 83,25 83,25 83,25 83,25 83,25Ionic-Adriatic Pipeline - IAP / AB Planned HR/IAP>AL Ionic-Adriatic Pipeline (Croatia) Albania Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / AB Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / ME Planned HR/IAP>ME Ionic-Adriatic Pipeline (Croatia) Montenegro Hub Capacity Firm FID + Others - GRIP 2013 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / ME Total 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / Split - HR Planned HR/IAP>HR Ionic-Adriatic Pipeline (Croatia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 75,00 75,00 75,00Ionic-Adriatic Pipeline - IAP / Split - HR Total 75,00 75,00 75,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Total 753,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm 2013 GRIP baseline 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID + Others - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Total 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Total 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm 2013 GRIP baseline 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Total 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30Komotini - TAP / IGB Planned BG/IGB>GR/TAP Interconnector Greece-Bulgaria (Bulgaria) Trans-Adriatic Pipeline (Greece) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Planned GR/TAP>BG/IGB Trans-Adriatic Pipeline (Greece) Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm 2013 GRIP baseline 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Total 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm 2013 GRIP baseline 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID + Others - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Total 324,00 324,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Total 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Total 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Total 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Total 3.900,00 3.482,60 3.482,60 3.482,60 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Total 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,51 144,51Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 72,06 72,06 72,06 108,66 108,66 108,66 108,66 108,66 108,66 108,66 108,66Lwowek Total 216,17 216,17 216,17 252,77 252,77 252,77 252,77 252,77 252,77 252,77 252,77Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm 2013 GRIP baseline 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID + Others - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Total 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Interconnector ITB (Turkey - Bulgaria) Total 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00Interconnector PL - SK Planned PL>SK Poland Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 129,50 129,50 129,50 129,50 141,60Interconnector PL - SK Planned SK>PL Slovakia Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 171,70 171,70 171,70 171,70 286,30Interconnector PL - SK Total 427,90 427,90 427,90 427,90 427,90Interconnector PL-DK Planned DK>PL Denmark Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Planned PL>DK Poland Hub Denmark Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Total 180,80 180,80 180,80Interconnector PL-LT Planned LT>PL Lithuania Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 29,00 29,00 29,00 29,00 29,00Interconnector PL-LT Planned PL>LT Poland Hub Lithuania Hub Capacity Firm FID + Others - GRIP 2013 68,00 68,00 68,00 68,00 68,00Interconnector PL-LT Total 97,00 97,00Interconnector SI-HU Planned HU>SI Hungary Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 38,00 38,00 38,00 38,00 38,00Interconnector SI-HU Planned SI>HU Slovenia Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 45,25 45,25 45,25 45,25 45,25 45,25Interconnector SI-HU Total 45,25 83,25 83,25 83,25 83,25 83,25Ionic-Adriatic Pipeline - IAP / AB Planned HR/IAP>AL Ionic-Adriatic Pipeline (Croatia) Albania Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / AB Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / ME Planned HR/IAP>ME Ionic-Adriatic Pipeline (Croatia) Montenegro Hub Capacity Firm FID + Others - GRIP 2013 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / ME Total 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / Split - HR Planned HR/IAP>HR Ionic-Adriatic Pipeline (Croatia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 75,00 75,00 75,00Ionic-Adriatic Pipeline - IAP / Split - HR Total 75,00 75,00 75,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Total 753,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm 2013 GRIP baseline 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID + Others - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Total 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Total 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm 2013 GRIP baseline 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Total 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30Komotini - TAP / IGB Planned BG/IGB>GR/TAP Interconnector Greece-Bulgaria (Bulgaria) Trans-Adriatic Pipeline (Greece) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Planned GR/TAP>BG/IGB Trans-Adriatic Pipeline (Greece) Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm 2013 GRIP baseline 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Total 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm 2013 GRIP baseline 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID + Others - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Total 324,00 324,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Total 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Total 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Total 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Total 3.900,00 3.482,60 3.482,60 3.482,60 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Total 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,51 144,51Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 72,06 72,06 72,06 108,66 108,66 108,66 108,66 108,66 108,66 108,66 108,66Lwowek Total 216,17 216,17 216,17 252,77 252,77 252,77 252,77 252,77 252,77 252,77 252,77Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm 2013 GRIP baseline 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID + Others - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Total 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00

Interconnector ITB (Turkey - Bulgaria) Total 92,00 92,00 92,00 92,00 92,00 92,00 92,00 92,00Interconnector PL - SK Planned PL>SK Poland Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 129,50 129,50 129,50 129,50 141,60Interconnector PL - SK Planned SK>PL Slovakia Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 171,70 171,70 171,70 171,70 286,30Interconnector PL - SK Total 427,90 427,90 427,90 427,90 427,90Interconnector PL-DK Planned DK>PL Denmark Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Planned PL>DK Poland Hub Denmark Hub Capacity Firm FID + Others - GRIP 2013 90,40 90,40 90,40Interconnector PL-DK Total 180,80 180,80 180,80Interconnector PL-LT Planned LT>PL Lithuania Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 29,00 29,00 29,00 29,00 29,00Interconnector PL-LT Planned PL>LT Poland Hub Lithuania Hub Capacity Firm FID + Others - GRIP 2013 68,00 68,00 68,00 68,00 68,00Interconnector PL-LT Total 97,00 97,00Interconnector SI-HU Planned HU>SI Hungary Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 38,00 38,00 38,00 38,00 38,00Interconnector SI-HU Planned SI>HU Slovenia Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 45,25 45,25 45,25 45,25 45,25 45,25Interconnector SI-HU Total 45,25 83,25 83,25 83,25 83,25 83,25Ionic-Adriatic Pipeline - IAP / AB Planned HR/IAP>AL Ionic-Adriatic Pipeline (Croatia) Albania Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / AB Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / BH Total 30,00 30,00 30,00Ionic-Adriatic Pipeline - IAP / ME Planned HR/IAP>ME Ionic-Adriatic Pipeline (Croatia) Montenegro Hub Capacity Firm FID + Others - GRIP 2013 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / ME Total 15,00 15,00 15,00Ionic-Adriatic Pipeline - IAP / Split - HR Planned HR/IAP>HR Ionic-Adriatic Pipeline (Croatia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 75,00 75,00 75,00Ionic-Adriatic Pipeline - IAP / Split - HR Total 75,00 75,00 75,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Operational 30Z-G0000000001L UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 251,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00 398,00Isaccea (RO) - Orlovka (UA) Total 753,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00 1.047,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm 2013 GRIP baseline 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Operational 21Z000000000151Y UA>RO/TBP Ukraine Transit Trans-Balkan Pipeline (Romania) Capacity Firm FID + Others - GRIP 2013 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00 753,00Isaccea (RO) - Orlovka (UA) (Trans-Balkan Pipeline) Total 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00 2.259,00Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Operational 21Z000000000090S PL>DEg Poland Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01 4,01Kamminke ONTRAS - DE / Kamminke GAZ-SYSTEM PL Total 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02 12,02Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm 2013 GRIP baseline 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Operational 21Z000000000154S HU>RS Hungary Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10 140,10Kiskundorozsma Total 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30 420,30Komotini - TAP / IGB Planned BG/IGB>GR/TAP Interconnector Greece-Bulgaria (Bulgaria) Trans-Adriatic Pipeline (Greece) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Planned GR/TAP>BG/IGB Trans-Adriatic Pipeline (Greece) Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 82,00 82,00 82,00 82,00 82,00 82,00 82,00Komotini - TAP / IGB Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm 2013 GRIP baseline 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Operational 21Z0000000000066 BY>PL/YAM Belarus Transit Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00 1.021,00Kondratki Total 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00 3.063,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm 2013 GRIP baseline 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C BGn>GR Bulgaria (NGTS) Hub Greece Hub Capacity Firm FID + Others - GRIP 2013 106,00 106,00 106,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00 131,00Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Operational 21Z000000000020C GR>BGn Greece Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 0,00 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30 10,30Kulata (BG) / Sidirokastron (GR) Total 324,00 324,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00 391,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational AT>STcSK Austria Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm 2013 GRIP baseline 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Operational STcSK>AT Slovakia Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00 175,00Láb (SK) / Láb IV (AT) Total 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 1.050,00Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30 5,30Lampertheim I Total 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90 15,90Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Operational 37Z000000001442N DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50 45,50Lampertheim IV Total 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50 136,50Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm 2013 GRIP baseline 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z CZ>SK Czech Republic Hub Slovakia Hub Capacity Firm FID + Others - GRIP 2013 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00 520,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00 780,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Operational 21Z000000000061Z SK>CZ Slovakia Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 780,00 571,30 571,30 571,30 467,00 467,00 467,00 467,00 467,00 467,00 467,00Lanžhot Total 3.900,00 3.482,60 3.482,60 3.482,60 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00 3.274,00Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm 2013 GRIP baseline 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Operational 21Z000000000057Q DEg>PL Germany (GASPOOL) Hub Poland Hub Capacity Firm FID + Others - GRIP 2013 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17 48,17Lasów Total 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,50 144,51 144,51Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06 72,06Lwowek Operational 21Z000000000167J PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 72,06 72,06 72,06 108,66 108,66 108,66 108,66 108,66 108,66 108,66 108,66Lwowek Total 216,17 216,17 216,17 252,77 252,77 252,77 252,77 252,77 252,77 252,77 252,77Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm 2013 GRIP baseline 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Operational 21Z000000000157M BGn>TRe Bulgaria (NGTS) Hub Turkey (Exports) External hub Capacity Firm FID + Others - GRIP 2013 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00 468,00Malkoclar Total 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00 1.404,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S DEg>PL/YAM Germany (GASPOOL) Hub Yamal (Poland) Capacity Firm FID + Others - GRIP 2013 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00 168,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00

Page 12: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

12 | GRIP Central Eastern Europe 2014 – 2023 Annex D

Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Total 2.778,00 2.778,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Total 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm 2013 GRIP baseline 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID - GRIP 2013 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 128,80 128,80 128,80 128,80 128,80 153,00 153,00 153,00 153,00 153,00 153,00Mosonmagyarovar Total 386,40 386,40 386,40 386,40 386,40 410,60 410,60 410,60 410,60 410,60 410,60Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Total 309,00 309,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00Nabucco into Austria (AT) Planned AZ/NAB>AT Nabucco (Azerbaijan) Austria Hub Capacity Firm FID + Others - GRIP 2013 535,62 535,62 535,62 535,62 535,62Nabucco into Austria (AT) Total 535,62 535,62 535,62 535,62 535,62Nabucco into Bulgaria (BG) Planned AZ/NAB>BGn Nabucco (Azerbaijan) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Bulgaria (BG) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Planned AZ/NAB>HU Nabucco (Azerbaijan) Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Planned AZ/NAB>RO Nabucco (Azerbaijan) Romania Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Total 63,01 63,01 63,01 63,01 63,01Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Total 453,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Total 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Total 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Total 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Total 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm 2013 GRIP baseline 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID + Others - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Total 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Total 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 988,35 988,35 988,35 988,35 988,35Oberkappel (Net4Gas) Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Total 110,00Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Total 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm 2013 GRIP baseline 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID + Others - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Total 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60Posušje Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00 45,00 45,00 45,00 45,00Posušje Total 45,00 45,00 45,00 45,00 45,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm 2013 GRIP baseline 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID + Others - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Total 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00Rakovica (HR) / Trzac (BA) Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00Rakovica (HR) / Trzac (BA) Total 45,00RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Total 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Total 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13

RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Total 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Total 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54Reinthal - Bidirectional Austrian-Czech Interconnector Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Total 508,00 508,00 508,00 508,00Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm 2013 GRIP baseline 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID + Others - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Total 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm 2013 GRIP baseline 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Total 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00Rupa (HR) / Jelšane (SI) Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 414,00 414,00 414,00 414,00 414,00Rupa (HR) / Jelšane (SI) Total 414,00 414,00 414,00 414,00 414,00San Dorligo della Valle (IT) /Osp (SI) Planned IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10San Dorligo della Valle (IT) /Osp (SI) Total 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10Sečovlje Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 2,31 2,31Sečovlje Total 2,31 2,31Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Planned HR>RS Croatia Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 176,00Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Total 176,00Slobodnica- Bosanski Brod-Zenica Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 44,00 44,00 44,00 44,00Slobodnica- Bosanski Brod-Zenica Total 44,00 44,00 44,00 44,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID + Others - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Total 448,00 448,00 448,00 448,00 448,00 448,00 448,00 448,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID + Others - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Total 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID + Others - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Total 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Total 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Total 725,50 787,60 803,10 803,10 803,10 803,10 803,10 803,10South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Total 180,00 180,00 180,00 180,00 180,00 180,00 180,00 180,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID + Others - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Total 502,00 502,00 502,00 502,00 502,00 502,00 502,00 502,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID + Others - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Total 208,00 208,00 208,00 208,00 208,00 208,00 208,00 208,00Stara Zagora - IGB / BG Planned BG/IGB>BGn Interconnector Greece-Bulgaria (Bulgaria) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Planned BGn>BG/IGB Bulgaria (NGTS) Hub Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Total 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03Stolberg Planned DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 45,60 45,60 45,60 45,60 45,60 45,60Stolberg Total 45,60 45,60 45,60 45,60 45,60 45,60Tarvisio - IT / Arnoldstein (Transit) - TGL Planned AT/TGL>IT Tauerngas Leitung (Austria) Italia Hub Capacity Firm FID + Others - GRIP 2013 314,96 314,96 314,96 314,96 314,96Tarvisio - IT / Arnoldstein (Transit) - TGL Planned IT>AT/TGL Italia Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 65,40 65,40 65,40 65,40 65,40Tarvisio - IT / Arnoldstein (Transit) - TGL Total 380,36 380,36 380,36 380,36 380,36Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm 2013 GRIP baseline 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm 2013 GRIP baseline 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Total 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00Tarvisio (IT) /Rateče (SI) Planned SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 289,00 289,00 289,00 289,00 289,00 289,00Tarvisio (IT) /Rateče (SI) Total 289,00 289,00 289,00 289,00 289,00 289,00Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Total 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Planned GR/TAP>HR/IAP Trans-Adriatic Pipeline (Greece) Ionic-Adriatic Pipeline (Croatia) Capacity Firm FID + Others - GRIP 2013 150,00 150,00 150,00Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Total 150,00 150,00 150,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm 2013 GRIP baseline 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID + Others - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm 2013 GRIP baseline 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID + Others - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm 2013 GRIP baseline 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00

Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Total 2.778,00 2.778,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Total 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm 2013 GRIP baseline 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID - GRIP 2013 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 128,80 128,80 128,80 128,80 128,80 153,00 153,00 153,00 153,00 153,00 153,00Mosonmagyarovar Total 386,40 386,40 386,40 386,40 386,40 410,60 410,60 410,60 410,60 410,60 410,60Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Total 309,00 309,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00Nabucco into Austria (AT) Planned AZ/NAB>AT Nabucco (Azerbaijan) Austria Hub Capacity Firm FID + Others - GRIP 2013 535,62 535,62 535,62 535,62 535,62Nabucco into Austria (AT) Total 535,62 535,62 535,62 535,62 535,62Nabucco into Bulgaria (BG) Planned AZ/NAB>BGn Nabucco (Azerbaijan) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Bulgaria (BG) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Planned AZ/NAB>HU Nabucco (Azerbaijan) Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Planned AZ/NAB>RO Nabucco (Azerbaijan) Romania Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Total 63,01 63,01 63,01 63,01 63,01Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Total 453,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Total 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Total 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Total 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Total 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm 2013 GRIP baseline 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID + Others - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Total 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Total 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 988,35 988,35 988,35 988,35 988,35Oberkappel (Net4Gas) Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Total 110,00Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Total 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm 2013 GRIP baseline 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID + Others - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Total 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60Posušje Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00 45,00 45,00 45,00 45,00Posušje Total 45,00 45,00 45,00 45,00 45,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm 2013 GRIP baseline 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID + Others - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Total 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00Rakovica (HR) / Trzac (BA) Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00Rakovica (HR) / Trzac (BA) Total 45,00RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Total 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Total 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Total 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Total 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54Reinthal - Bidirectional Austrian-Czech Interconnector Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Total 508,00 508,00 508,00 508,00Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm 2013 GRIP baseline 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID + Others - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Total 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm 2013 GRIP baseline 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Total 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00Rupa (HR) / Jelšane (SI) Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 414,00 414,00 414,00 414,00 414,00Rupa (HR) / Jelšane (SI) Total 414,00 414,00 414,00 414,00 414,00San Dorligo della Valle (IT) /Osp (SI) Planned IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10San Dorligo della Valle (IT) /Osp (SI) Total 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10Sečovlje Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 2,31 2,31Sečovlje Total 2,31 2,31Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Planned HR>RS Croatia Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 176,00Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Total 176,00Slobodnica- Bosanski Brod-Zenica Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 44,00 44,00 44,00 44,00Slobodnica- Bosanski Brod-Zenica Total 44,00 44,00 44,00 44,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID + Others - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Total 448,00 448,00 448,00 448,00 448,00 448,00 448,00 448,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID + Others - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Total 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID + Others - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Total 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Total 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Total 725,50 787,60 803,10 803,10 803,10 803,10 803,10 803,10South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Total 180,00 180,00 180,00 180,00 180,00 180,00 180,00 180,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID + Others - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Total 502,00 502,00 502,00 502,00 502,00 502,00 502,00 502,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID + Others - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Total 208,00 208,00 208,00 208,00 208,00 208,00 208,00 208,00Stara Zagora - IGB / BG Planned BG/IGB>BGn Interconnector Greece-Bulgaria (Bulgaria) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Planned BGn>BG/IGB Bulgaria (NGTS) Hub Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Total 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03Stolberg Planned DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 45,60 45,60 45,60 45,60 45,60 45,60Stolberg Total 45,60 45,60 45,60 45,60 45,60 45,60Tarvisio - IT / Arnoldstein (Transit) - TGL Planned AT/TGL>IT Tauerngas Leitung (Austria) Italia Hub Capacity Firm FID + Others - GRIP 2013 314,96 314,96 314,96 314,96 314,96Tarvisio - IT / Arnoldstein (Transit) - TGL Planned IT>AT/TGL Italia Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 65,40 65,40 65,40 65,40 65,40Tarvisio - IT / Arnoldstein (Transit) - TGL Total 380,36 380,36 380,36 380,36 380,36Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm 2013 GRIP baseline 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm 2013 GRIP baseline 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Total 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00Tarvisio (IT) /Rateče (SI) Planned SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 289,00 289,00 289,00 289,00 289,00 289,00Tarvisio (IT) /Rateče (SI) Total 289,00 289,00 289,00 289,00 289,00 289,00Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Total 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Planned GR/TAP>HR/IAP Trans-Adriatic Pipeline (Greece) Ionic-Adriatic Pipeline (Croatia) Capacity Firm FID + Others - GRIP 2013 150,00 150,00 150,00Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Total 150,00 150,00 150,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm 2013 GRIP baseline 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID + Others - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm 2013 GRIP baseline 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID + Others - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm 2013 GRIP baseline 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00

Page 13: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 13

RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Total 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Total 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54Reinthal - Bidirectional Austrian-Czech Interconnector Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Total 508,00 508,00 508,00 508,00Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm 2013 GRIP baseline 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID + Others - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Total 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm 2013 GRIP baseline 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Total 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00Rupa (HR) / Jelšane (SI) Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 414,00 414,00 414,00 414,00 414,00Rupa (HR) / Jelšane (SI) Total 414,00 414,00 414,00 414,00 414,00San Dorligo della Valle (IT) /Osp (SI) Planned IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10San Dorligo della Valle (IT) /Osp (SI) Total 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10Sečovlje Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 2,31 2,31Sečovlje Total 2,31 2,31Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Planned HR>RS Croatia Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 176,00Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Total 176,00Slobodnica- Bosanski Brod-Zenica Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 44,00 44,00 44,00 44,00Slobodnica- Bosanski Brod-Zenica Total 44,00 44,00 44,00 44,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID + Others - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Total 448,00 448,00 448,00 448,00 448,00 448,00 448,00 448,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID + Others - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Total 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID + Others - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Total 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Total 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Total 725,50 787,60 803,10 803,10 803,10 803,10 803,10 803,10South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Total 180,00 180,00 180,00 180,00 180,00 180,00 180,00 180,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID + Others - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Total 502,00 502,00 502,00 502,00 502,00 502,00 502,00 502,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID + Others - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Total 208,00 208,00 208,00 208,00 208,00 208,00 208,00 208,00Stara Zagora - IGB / BG Planned BG/IGB>BGn Interconnector Greece-Bulgaria (Bulgaria) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Planned BGn>BG/IGB Bulgaria (NGTS) Hub Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Total 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03Stolberg Planned DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 45,60 45,60 45,60 45,60 45,60 45,60Stolberg Total 45,60 45,60 45,60 45,60 45,60 45,60Tarvisio - IT / Arnoldstein (Transit) - TGL Planned AT/TGL>IT Tauerngas Leitung (Austria) Italia Hub Capacity Firm FID + Others - GRIP 2013 314,96 314,96 314,96 314,96 314,96Tarvisio - IT / Arnoldstein (Transit) - TGL Planned IT>AT/TGL Italia Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 65,40 65,40 65,40 65,40 65,40Tarvisio - IT / Arnoldstein (Transit) - TGL Total 380,36 380,36 380,36 380,36 380,36Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm 2013 GRIP baseline 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm 2013 GRIP baseline 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Total 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00Tarvisio (IT) /Rateče (SI) Planned SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 289,00 289,00 289,00 289,00 289,00 289,00Tarvisio (IT) /Rateče (SI) Total 289,00 289,00 289,00 289,00 289,00 289,00Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Total 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Planned GR/TAP>HR/IAP Trans-Adriatic Pipeline (Greece) Ionic-Adriatic Pipeline (Croatia) Capacity Firm FID + Others - GRIP 2013 150,00 150,00 150,00Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Total 150,00 150,00 150,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm 2013 GRIP baseline 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID + Others - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm 2013 GRIP baseline 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID + Others - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm 2013 GRIP baseline 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00

Mallnow Operational 21Z000000000056S PL/YAM>DEg Yamal (Poland) Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00 926,00Mallnow Total 2.778,00 2.778,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00 3.114,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm 2013 GRIP baseline 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Operational 21Z000000000158K UA>RO Ukraine Transit Romania Hub Capacity Firm FID + Others - GRIP 2013 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Mediesu Aurit (RO) - Tekovo (UA) Total 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00 339,00Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm 2013 GRIP baseline 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID - GRIP 2013 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80 128,80Mosonmagyarovar Operational 21Z000000000003C AT>HU Austria Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 128,80 128,80 128,80 128,80 128,80 153,00 153,00 153,00 153,00 153,00 153,00Mosonmagyarovar Total 386,40 386,40 386,40 386,40 386,40 410,60 410,60 410,60 410,60 410,60 410,60Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm 2013 GRIP baseline 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00 103,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Operational 21Z0000000000058 AT>SI Austria Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 103,00 103,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00 113,00Murfeld (AT) / Ceršak (SI) Total 309,00 309,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00 329,00Nabucco into Austria (AT) Planned AZ/NAB>AT Nabucco (Azerbaijan) Austria Hub Capacity Firm FID + Others - GRIP 2013 535,62 535,62 535,62 535,62 535,62Nabucco into Austria (AT) Total 535,62 535,62 535,62 535,62 535,62Nabucco into Bulgaria (BG) Planned AZ/NAB>BGn Nabucco (Azerbaijan) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Bulgaria (BG) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Planned AZ/NAB>HU Nabucco (Azerbaijan) Hungary Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Hungary (HU) Total 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Planned AZ/NAB>RO Nabucco (Azerbaijan) Romania Hub Capacity Firm FID + Others - GRIP 2013 63,01 63,01 63,01 63,01 63,01Nabucco into Romania (RO) Total 63,01 63,01 63,01 63,01 63,01Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Operational 21Z000000000159I RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00 210,00Negru Voda I Total 453,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00 717,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Operational 21Z000000000160X RO/TBP>BGn Trans-Balkan Pipeline (Romania) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 607,00 607,00 607,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00 632,00Negru Voda II Total 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00 1.806,00Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41 2,41Nordlohne Total 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59 69,59Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99 37,99Nüttermoor Gas Storage (DE) / Oude Statenzijl (H) (NL) (EWE) Total 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74 322,74Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46 121,46Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Operational 21W000000000011I STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56 141,56Nüttermoor Gas Storage (DE) / Oude Statenzijl (NL) Renato Total 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06 789,06Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm 2013 GRIP baseline 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Operational 21Y---A001A014-Z DEn>FRn Germany (NCG) Hub France (PEG North) Hub Capacity Firm FID + Others - GRIP 2013 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82 567,82Obergailbach (FR) / Medelsheim (DE) Total 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46 1.703,46Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 AT>DEn Austria Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92 159,92Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47 199,47Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Operational 21Y---A001A012-4 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 199,47 199,47 199,47 199,47 199,47 199,47 154,56 154,56 154,56 154,56 154,56Oberkappel Total 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 1.078,17 988,35 988,35 988,35 988,35 988,35Oberkappel (Net4Gas) Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 55,00Oberkappel (Net4Gas) Total 110,00Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm 2013 GRIP baseline 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Operational 21Z000000000092O DEg>CZ Germany (GASPOOL) Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40 283,40Olbernhau (DE) / Hora Svaté Kateřiny (CZ) Total 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20 850,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm 2013 GRIP baseline 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Operational 21Z000000000242V DEg/OPA>CZ/GZL OPAL (Germany (GASPOOL)) Gazelle (Czech Republic) Capacity Firm FID + Others - GRIP 2013 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20 960,20Opal (DE)/Brandov Opal (CZ) Total 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60 2.880,60Posušje Planned HR/IAP>BA Ionic-Adriatic Pipeline (Croatia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00 45,00 45,00 45,00 45,00Posušje Total 45,00 45,00 45,00 45,00 45,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm 2013 GRIP baseline 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Operational CZ/GZL>Y-CZw Gazelle (Czech Republic) Waidhaus Capacity Firm FID + Others - GRIP 2013 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00 960,00Prymda (CZ)/ Gazelle (GZL) Total 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00 2.880,00Rakovica (HR) / Trzac (BA) Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 45,00Rakovica (HR) / Trzac (BA) Total 45,00RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Operational 21Z000000000253Q DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83 8,83RC Basel Total 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50 26,50RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Operational 21Z0000000003014 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23 26,23RC Lindau/Leiblach Total 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70 78,70RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Page 14: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

14 | GRIP Central Eastern Europe 2014 – 2023 Annex D

RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Total 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Total 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54Reinthal - Bidirectional Austrian-Czech Interconnector Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Total 508,00 508,00 508,00 508,00Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm 2013 GRIP baseline 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID + Others - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Total 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm 2013 GRIP baseline 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Total 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00Rupa (HR) / Jelšane (SI) Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 414,00 414,00 414,00 414,00 414,00Rupa (HR) / Jelšane (SI) Total 414,00 414,00 414,00 414,00 414,00San Dorligo della Valle (IT) /Osp (SI) Planned IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10San Dorligo della Valle (IT) /Osp (SI) Total 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10Sečovlje Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 2,31 2,31Sečovlje Total 2,31 2,31Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Planned HR>RS Croatia Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 176,00Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Total 176,00Slobodnica- Bosanski Brod-Zenica Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 44,00 44,00 44,00 44,00Slobodnica- Bosanski Brod-Zenica Total 44,00 44,00 44,00 44,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID + Others - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Total 448,00 448,00 448,00 448,00 448,00 448,00 448,00 448,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID + Others - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Total 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID + Others - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Total 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Total 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Total 725,50 787,60 803,10 803,10 803,10 803,10 803,10 803,10South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Total 180,00 180,00 180,00 180,00 180,00 180,00 180,00 180,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID + Others - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Total 502,00 502,00 502,00 502,00 502,00 502,00 502,00 502,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID + Others - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Total 208,00 208,00 208,00 208,00 208,00 208,00 208,00 208,00Stara Zagora - IGB / BG Planned BG/IGB>BGn Interconnector Greece-Bulgaria (Bulgaria) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Planned BGn>BG/IGB Bulgaria (NGTS) Hub Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Total 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03Stolberg Planned DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 45,60 45,60 45,60 45,60 45,60 45,60Stolberg Total 45,60 45,60 45,60 45,60 45,60 45,60Tarvisio - IT / Arnoldstein (Transit) - TGL Planned AT/TGL>IT Tauerngas Leitung (Austria) Italia Hub Capacity Firm FID + Others - GRIP 2013 314,96 314,96 314,96 314,96 314,96Tarvisio - IT / Arnoldstein (Transit) - TGL Planned IT>AT/TGL Italia Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 65,40 65,40 65,40 65,40 65,40Tarvisio - IT / Arnoldstein (Transit) - TGL Total 380,36 380,36 380,36 380,36 380,36Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm 2013 GRIP baseline 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm 2013 GRIP baseline 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Total 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00Tarvisio (IT) /Rateče (SI) Planned SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 289,00 289,00 289,00 289,00 289,00 289,00Tarvisio (IT) /Rateče (SI) Total 289,00 289,00 289,00 289,00 289,00 289,00Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Total 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Planned GR/TAP>HR/IAP Trans-Adriatic Pipeline (Greece) Ionic-Adriatic Pipeline (Croatia) Capacity Firm FID + Others - GRIP 2013 150,00 150,00 150,00Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Total 150,00 150,00 150,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm 2013 GRIP baseline 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID + Others - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm 2013 GRIP baseline 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID + Others - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm 2013 GRIP baseline 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00

Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm FID - GRIP 2013 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm FID + Others - GRIP 2013 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm FID - GRIP 2013 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Total 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 891,17 891,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 891,17 891,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17UGS - NL - GTS/DE Total 2.673,50 2.673,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm 2013 GRIP baseline 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm FID - GRIP 2013 2.548,00 2.495,80 2.495,80 2.495,80 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm FID + Others - GRIP 2013 2.548,00 2.495,80 2.495,80 2.495,80 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90Uzhgorod (UA) - Velké Kapušany (SK) Total 7.644,00 7.539,60 7.539,60 7.539,60 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80Vecsés MGT / FGSZ Planned HU>HUi Hungary Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00Vecsés MGT / FGSZ Planned HUi>HU Hungary (SK-HU Interconnector) Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 25,50 25,50 25,50 25,50 25,50 25,50Vecsés MGT / FGSZ Total 76,50 76,50 76,50 76,50 76,50 76,50VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 23,12 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 23,12 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44VIP Kiefersfelden-Pfronten Total 69,36 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Total 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Total 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm 2013 GRIP baseline 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm FID - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm FID + Others - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm 2013 GRIP baseline 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm FID - GRIP 2013 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm FID - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Total 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T CH>DEn Switzerland Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 357,60 357,60 357,60 357,60 357,60 357,60Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Total 1.101,00 1.101,00 1.101,00 1.101,00 1.101,00 1.458,60 1.458,60 1.458,60 1.458,60 1.458,60 1.458,60Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Total 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 203,30 197,10 199,60 174,90 174,90 174,90 235,74 243,93 243,93 243,93 243,93Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 203,30 197,10 199,60 174,90 174,90 174,90 235,74 243,93 243,93 243,93 243,93Winterswijk Total 609,90 597,50 602,50 553,10 553,10 553,10 674,78 691,16 691,16 691,16 691,16Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 93,41 93,41 93,41 276,41 276,41 276,41 276,41 276,41 276,41 276,41 276,41Wloclawek Total 280,22 280,22 280,22 463,22 463,22 463,22 463,22 463,22 463,22 463,22 463,22Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Total 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Total 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm 2013 GRIP baseline 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm FID - GRIP 2013 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm FID + Others - GRIP 2013 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Total 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm 2013 GRIP baseline 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm FID - GRIP 2013 14,50 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm FID + Others - GRIP 2013 14,50 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 14,00 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 14,00 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38Ruse (BG) / Giurgiu (RO) Total 85,50 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02

RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Total 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Total 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54Reinthal - Bidirectional Austrian-Czech Interconnector Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Total 508,00 508,00 508,00 508,00Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm 2013 GRIP baseline 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID + Others - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Total 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm 2013 GRIP baseline 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Total 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00Rupa (HR) / Jelšane (SI) Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 414,00 414,00 414,00 414,00 414,00Rupa (HR) / Jelšane (SI) Total 414,00 414,00 414,00 414,00 414,00San Dorligo della Valle (IT) /Osp (SI) Planned IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10San Dorligo della Valle (IT) /Osp (SI) Total 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10Sečovlje Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 2,31 2,31Sečovlje Total 2,31 2,31Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Planned HR>RS Croatia Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 176,00Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Total 176,00Slobodnica- Bosanski Brod-Zenica Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 44,00 44,00 44,00 44,00Slobodnica- Bosanski Brod-Zenica Total 44,00 44,00 44,00 44,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID + Others - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Total 448,00 448,00 448,00 448,00 448,00 448,00 448,00 448,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID + Others - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Total 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID + Others - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Total 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Total 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Total 725,50 787,60 803,10 803,10 803,10 803,10 803,10 803,10South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Total 180,00 180,00 180,00 180,00 180,00 180,00 180,00 180,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID + Others - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Total 502,00 502,00 502,00 502,00 502,00 502,00 502,00 502,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID + Others - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Total 208,00 208,00 208,00 208,00 208,00 208,00 208,00 208,00Stara Zagora - IGB / BG Planned BG/IGB>BGn Interconnector Greece-Bulgaria (Bulgaria) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Planned BGn>BG/IGB Bulgaria (NGTS) Hub Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Total 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03Stolberg Planned DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 45,60 45,60 45,60 45,60 45,60 45,60Stolberg Total 45,60 45,60 45,60 45,60 45,60 45,60Tarvisio - IT / Arnoldstein (Transit) - TGL Planned AT/TGL>IT Tauerngas Leitung (Austria) Italia Hub Capacity Firm FID + Others - GRIP 2013 314,96 314,96 314,96 314,96 314,96Tarvisio - IT / Arnoldstein (Transit) - TGL Planned IT>AT/TGL Italia Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 65,40 65,40 65,40 65,40 65,40Tarvisio - IT / Arnoldstein (Transit) - TGL Total 380,36 380,36 380,36 380,36 380,36Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm 2013 GRIP baseline 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm 2013 GRIP baseline 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Total 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00Tarvisio (IT) /Rateče (SI) Planned SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 289,00 289,00 289,00 289,00 289,00 289,00Tarvisio (IT) /Rateče (SI) Total 289,00 289,00 289,00 289,00 289,00 289,00Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Total 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Planned GR/TAP>HR/IAP Trans-Adriatic Pipeline (Greece) Ionic-Adriatic Pipeline (Croatia) Capacity Firm FID + Others - GRIP 2013 150,00 150,00 150,00Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Total 150,00 150,00 150,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm 2013 GRIP baseline 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID + Others - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm 2013 GRIP baseline 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID + Others - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm 2013 GRIP baseline 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm FID - GRIP 2013 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm FID + Others - GRIP 2013 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm FID - GRIP 2013 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Total 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 891,17 891,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 891,17 891,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17UGS - NL - GTS/DE Total 2.673,50 2.673,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm 2013 GRIP baseline 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm FID - GRIP 2013 2.548,00 2.495,80 2.495,80 2.495,80 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm FID + Others - GRIP 2013 2.548,00 2.495,80 2.495,80 2.495,80 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90Uzhgorod (UA) - Velké Kapušany (SK) Total 7.644,00 7.539,60 7.539,60 7.539,60 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80Vecsés MGT / FGSZ Planned HU>HUi Hungary Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00Vecsés MGT / FGSZ Planned HUi>HU Hungary (SK-HU Interconnector) Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 25,50 25,50 25,50 25,50 25,50 25,50Vecsés MGT / FGSZ Total 76,50 76,50 76,50 76,50 76,50 76,50VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 23,12 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 23,12 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44VIP Kiefersfelden-Pfronten Total 69,36 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Total 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Total 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm 2013 GRIP baseline 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm FID - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm FID + Others - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm 2013 GRIP baseline 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm FID - GRIP 2013 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm FID - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Total 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T CH>DEn Switzerland Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 357,60 357,60 357,60 357,60 357,60 357,60Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Total 1.101,00 1.101,00 1.101,00 1.101,00 1.101,00 1.458,60 1.458,60 1.458,60 1.458,60 1.458,60 1.458,60Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Total 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 203,30 197,10 199,60 174,90 174,90 174,90 235,74 243,93 243,93 243,93 243,93Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 203,30 197,10 199,60 174,90 174,90 174,90 235,74 243,93 243,93 243,93 243,93Winterswijk Total 609,90 597,50 602,50 553,10 553,10 553,10 674,78 691,16 691,16 691,16 691,16Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 93,41 93,41 93,41 276,41 276,41 276,41 276,41 276,41 276,41 276,41 276,41Wloclawek Total 280,22 280,22 280,22 463,22 463,22 463,22 463,22 463,22 463,22 463,22 463,22Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Total 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Total 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm 2013 GRIP baseline 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm FID - GRIP 2013 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm FID + Others - GRIP 2013 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Total 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm 2013 GRIP baseline 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm FID - GRIP 2013 14,50 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm FID + Others - GRIP 2013 14,50 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 14,00 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 14,00 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38Ruse (BG) / Giurgiu (RO) Total 85,50 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02

Page 15: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 15

Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm FID - GRIP 2013 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm FID + Others - GRIP 2013 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm FID - GRIP 2013 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>DEn Überackern Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20 294,20Überackern (AT) / Burghausen (DE) (1&2&3) Total 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90 2.229,90UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17 891,17UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 891,17 891,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17UGS - NL - GTS/DE Operational STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 891,17 891,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17 1.002,17UGS - NL - GTS/DE Total 2.673,50 2.673,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50 2.895,50Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm 2013 GRIP baseline 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00 2.548,00Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm FID - GRIP 2013 2.548,00 2.495,80 2.495,80 2.495,80 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90Uzhgorod (UA) - Velké Kapušany (SK) Operational 21Z000000000085L UA>SK Ukraine Transit Slovakia Hub Capacity Firm FID + Others - GRIP 2013 2.548,00 2.495,80 2.495,80 2.495,80 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90 2.401,90Uzhgorod (UA) - Velké Kapušany (SK) Total 7.644,00 7.539,60 7.539,60 7.539,60 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80 7.351,80Vecsés MGT / FGSZ Planned HU>HUi Hungary Hub Hungary (SK-HU Interconnector) Hub Capacity Firm FID + Others - GRIP 2013 51,00 51,00 51,00 51,00 51,00 51,00Vecsés MGT / FGSZ Planned HUi>HU Hungary (SK-HU Interconnector) Hub Hungary Hub Capacity Firm FID + Others - GRIP 2013 25,50 25,50 25,50 25,50 25,50 25,50Vecsés MGT / FGSZ Total 76,50 76,50 76,50 76,50 76,50 76,50VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm 2013 GRIP baseline 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12 23,12VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID - GRIP 2013 23,12 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44VIP Kiefersfelden-Pfronten Operational 21Z0000000002895 DEn>AT Germany (NCG) Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 23,12 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44 24,44VIP Kiefersfelden-Pfronten Total 69,36 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00 72,00Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Operational 21Z000000000135W Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85 47,85Vlieghuis Total 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56 143,56Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm 2013 GRIP baseline 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID - GRIP 2013 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B NL>STcDE Netherlands Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40 8,40Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm 2013 GRIP baseline 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID - GRIP 2013 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Operational 21Z000000000110B STcDE>NL Germany Storage Netherlands Hub Capacity Firm FID + Others - GRIP 2013 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10 28,10Vlieghuis (NL) / Kalle (DE) (RWE) Total 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50 109,50Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm 2013 GRIP baseline 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50 1.071,50Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm FID - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational CZ>Y-CZw Czech Republic Hub Waidhaus Capacity Firm FID + Others - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm 2013 GRIP baseline 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm FID - GRIP 2013 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>CZ Waidhaus Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00 450,00Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm FID - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Operational Y-CZw>DEn Waidhaus Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40 1.010,40Waidhaus Total 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50 7.473,50Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T CH>DEn Switzerland Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 357,60 357,60 357,60 357,60 357,60 357,60Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Operational 21Y---A001A016-T DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00 367,00Wallbach (Fluxys TENP)/(FluxSwiss & Swissgas) Total 1.101,00 1.101,00 1.101,00 1.101,00 1.101,00 1.458,60 1.458,60 1.458,60 1.458,60 1.458,60 1.458,60Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm 2013 GRIP baseline 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID - GRIP 2013 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Operational 21Z0000000001232 DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50 218,50Wallbach (OGE) Total 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50 655,50Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30 203,30Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 203,30 197,10 199,60 174,90 174,90 174,90 235,74 243,93 243,93 243,93 243,93Winterswijk Operational 21Z000000000073S Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 203,30 197,10 199,60 174,90 174,90 174,90 235,74 243,93 243,93 243,93 243,93Winterswijk Total 609,90 597,50 602,50 553,10 553,10 553,10 674,78 691,16 691,16 691,16 691,16Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm 2013 GRIP baseline 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID - GRIP 2013 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41 93,41Wloclawek Operational 21Z000000000168H PL/YAM>PL Yamal (Poland) Poland Hub Capacity Firm FID + Others - GRIP 2013 93,41 93,41 93,41 276,41 276,41 276,41 276,41 276,41 276,41 276,41 276,41Wloclawek Total 280,22 280,22 280,22 463,22 463,22 463,22 463,22 463,22 463,22 463,22 463,22Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Operational 21Z000000000136U BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25 167,25Wysokoje Total 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75 501,75Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLg>DEg VIP NL/Gaspool Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14 224,14Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID - GRIP 2013 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Operational Y-NLn>DEn VIP NL/NCG Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04 263,04Zevenaar Total 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55 1.461,55Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm 2013 GRIP baseline 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm FID - GRIP 2013 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Operational 21Z000000000137S BGn>MK Bulgaria (NGTS) Hub Macedonia Hub Capacity Firm FID + Others - GRIP 2013 26,70 26,70 26,70 33,40 33,40 33,40 33,40 33,40 33,40 33,40 33,40Zidilovo Total 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10 80,10Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm 2013 GRIP baseline 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50 14,50Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm FID - GRIP 2013 14,50 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 BGn>RO Bulgaria (NGTS) Hub Romania Hub Capacity Firm FID + Others - GRIP 2013 14,50 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38 46,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00 14,00Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 14,00 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38Ruse (BG) / Giurgiu (RO) Operational 21Z0000000002798 RO>BGn Romania Hub Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 14,00 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38 28,38Ruse (BG) / Giurgiu (RO) Total 85,50 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02 178,02

RC Thayngen-Fallentor Operational 21Z000000000254O DEn>CH Germany (NCG) Hub Switzerland Hub Capacity Firm FID + Others - GRIP 2013 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13 13,13RC Thayngen-Fallentor Total 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38 39,38Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Operational 37Z000000004923T DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18 2,18Reckrod Total 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54 6,54Reinthal - Bidirectional Austrian-Czech Interconnector Planned AT>CZ Austria Hub Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Planned CZ>AT Czech Republic Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 254,00 254,00 254,00 254,00Reinthal - Bidirectional Austrian-Czech Interconnector Total 508,00 508,00 508,00 508,00Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm 2013 GRIP baseline 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Operational 21Z0000000000406 DEn>LU Germany (NCG) Hub Luxemburg Hub Capacity Firm FID + Others - GRIP 2013 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70 38,70Remich Total 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10 116,10Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm 2013 GRIP baseline 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Operational 21Z000000000128T SI>HR Slovenia Hub Croatia Hub Capacity Firm FID + Others - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00Rogatec Total 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00Rupa (HR) / Jelšane (SI) Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 414,00 414,00 414,00 414,00 414,00Rupa (HR) / Jelšane (SI) Total 414,00 414,00 414,00 414,00 414,00San Dorligo della Valle (IT) /Osp (SI) Planned IT>SI Italia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10San Dorligo della Valle (IT) /Osp (SI) Total 6,10 6,10 6,10 6,10 6,10 6,10 6,10 6,10Sečovlje Planned HR>SI Croatia Hub Slovenia Hub Capacity Firm FID + Others - GRIP 2013 2,31 2,31Sečovlje Total 2,31 2,31Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Planned HR>RS Croatia Hub Serbia Hub Capacity Firm FID + Others - GRIP 2013 176,00Slobodnica - Sotin (HR) / Bačko Novo Selo (RS) Total 176,00Slobodnica- Bosanski Brod-Zenica Planned HR>BA Croatia Hub Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 44,00 44,00 44,00 44,00Slobodnica- Bosanski Brod-Zenica Total 44,00 44,00 44,00 44,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Planned RU/SST>HU South Stream (Russia) Hungary Hub Capacity Firm FID + Others - GRIP 2013 224,00 224,00 224,00 224,00 224,00 224,00 224,00 224,00South Stream (Bata, Nagykanizsa) (HU) Total 448,00 448,00 448,00 448,00 448,00 448,00 448,00 448,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Planned RUm>RU/SST Russia (Mainland) Supplier South Stream (Russia) Capacity Firm FID + Others - GRIP 2013 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00 2.109,00South Stream from Russia (RU) Total 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00 4.218,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Planned RU/SST>AT South Stream (Russia) Austria Hub Capacity Firm FID + Others - GRIP 2013 670,00 670,00 670,00 670,00 670,00 670,00 670,00 670,00South Stream into Austria (AT) Total 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00 1.340,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Planned RU/SST>BA South Stream (Russia) Bosnia Herzegovina Hub Capacity Firm FID + Others - GRIP 2013 18,00 18,00 18,00 18,00 18,00 18,00 18,00 18,00South Stream into Bosnia (BH) Total 36,00 36,00 36,00 36,00 36,00 36,00 36,00 36,00South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Planned RU/SST>BGn South Stream (Russia) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 155,30 155,30 155,30 155,30 155,30 155,30 155,30 155,30South Stream into Bulgaria (BG) Total 725,50 787,60 803,10 803,10 803,10 803,10 803,10 803,10South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Planned RU/SST>HR South Stream (Russia) Croatia Hub Capacity Firm FID + Others - GRIP 2013 90,00 90,00 90,00 90,00 90,00 90,00 90,00 90,00South Stream into Croatia (HR) Total 180,00 180,00 180,00 180,00 180,00 180,00 180,00 180,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Planned RU/SST>RS South Stream (Russia) Serbia Hub Capacity Firm FID + Others - GRIP 2013 251,00 251,00 251,00 251,00 251,00 251,00 251,00 251,00South Stream into Serbia RS) Total 502,00 502,00 502,00 502,00 502,00 502,00 502,00 502,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Planned RU/SST>SI South Stream (Russia) Slovenia Hub Capacity Firm FID + Others - GRIP 2013 104,00 104,00 104,00 104,00 104,00 104,00 104,00 104,00South Stream into Slovenia (SI) Total 208,00 208,00 208,00 208,00 208,00 208,00 208,00 208,00Stara Zagora - IGB / BG Planned BG/IGB>BGn Interconnector Greece-Bulgaria (Bulgaria) Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Planned BGn>BG/IGB Bulgaria (NGTS) Hub Interconnector Greece-Bulgaria (Bulgaria) Capacity Firm FID + Others - GRIP 2013 84,90 84,90 84,90 84,90 84,90 84,90 84,90 84,90Stara Zagora - IGB / BG Total 164,00 164,00 164,00 164,00 164,00 164,00 164,00Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60 66,60Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Operational 21Z000000000237O DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41 34,41Steinitz Total 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03 303,03Stolberg Planned DEn>DEg Germany (NCG) Hub Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 45,60 45,60 45,60 45,60 45,60 45,60Stolberg Total 45,60 45,60 45,60 45,60 45,60 45,60Tarvisio - IT / Arnoldstein (Transit) - TGL Planned AT/TGL>IT Tauerngas Leitung (Austria) Italia Hub Capacity Firm FID + Others - GRIP 2013 314,96 314,96 314,96 314,96 314,96Tarvisio - IT / Arnoldstein (Transit) - TGL Planned IT>AT/TGL Italia Hub Tauerngas Leitung (Austria) Capacity Firm FID + Others - GRIP 2013 65,40 65,40 65,40 65,40 65,40Tarvisio - IT / Arnoldstein (Transit) - TGL Total 380,36 380,36 380,36 380,36 380,36Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm 2013 GRIP baseline 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A AT>IT Austria Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00 1.137,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm 2013 GRIP baseline 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Operational 21Z000000000004A IT>AT Italia Hub Austria Hub Capacity Firm FID + Others - GRIP 2013 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00 191,00Tarvisio (IT) / Arnoldstein (AT) Total 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00 3.984,00Tarvisio (IT) /Rateče (SI) Planned SI>IT Slovenia Hub Italia Hub Capacity Firm FID + Others - GRIP 2013 289,00 289,00 289,00 289,00 289,00 289,00Tarvisio (IT) /Rateče (SI) Total 289,00 289,00 289,00 289,00 289,00 289,00Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm 2013 GRIP baseline 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Operational 21Z0000000001321 BY>PL Belarus Transit Poland Hub Capacity Firm FID + Others - GRIP 2013 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23 7,23Tieterowka Total 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68 21,68Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Planned GR/TAP>HR/IAP Trans-Adriatic Pipeline (Greece) Ionic-Adriatic Pipeline (Croatia) Capacity Firm FID + Others - GRIP 2013 150,00 150,00 150,00Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP Total 150,00 150,00 150,00Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm 2013 GRIP baseline 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 AT>Y-ATu Austria Hub Überackern Capacity Firm FID + Others - GRIP 2013 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30 181,30Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm 2013 GRIP baseline 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 DEn>Y-ATu Germany (NCG) Hub Überackern Capacity Firm FID + Others - GRIP 2013 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80 153,80Überackern (AT) / Burghausen (DE) (1&2&3) Operational 21Y---A001A013-1 Y-ATu>AT Überackern Austria Hub Capacity Firm 2013 GRIP baseline 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00 114,00

Point Name Point Status EIC Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Page 16: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

16 | GRIP Central Eastern Europe 2014 – 2023 Annex D

Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023AT>STcAT Austria Hub Austria Storage Capacity Firm 2013 GRIP baseline 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Austria Hub Austria Storage Capacity Firm FID - GRIP 2013 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Austria Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Total 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm 2013 GRIP baseline 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm FID - GRIP 2013 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm FID + Others - GRIP 2013 43,00 57,00 57,00 67,00 82,00 104,00 104,00 104,00 104,00 104,00 104,00BGn>STcBGn Total 130,41 130,41 130,41 130,41 130,41 195,41 195,41 195,41 195,41 195,41 195,41CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm 2013 GRIP baseline 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm FID - GRIP 2013 435,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm FID + Others - GRIP 2013 435,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80CZ>STcCZ Total 1.307,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm 2013 GRIP baseline 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm FID - GRIP 2013 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Total 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 143,82 143,82 143,82 143,82 143,82DEn>STcAT Total 143,82 143,82 143,82 143,82 143,82DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm 2013 GRIP baseline 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm FID - GRIP 2013 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Total 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27HR>STcHR Croatia Hub Croatia Storage Capacity Firm 2013 GRIP baseline 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Croatia Hub Croatia Storage Capacity Firm FID - GRIP 2013 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Croatia Hub Croatia Storage Capacity Firm FID + Others - GRIP 2013 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Total 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88HU>STcHU Hungary Hub Hungary Storage Capacity Firm 2013 GRIP baseline 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Hungary Hub Hungary Storage Capacity Firm FID - GRIP 2013 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Hungary Hub Hungary Storage Capacity Firm FID + Others - GRIP 2013 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Total 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50RO>STcRO Romania Hub Romania Storage Capacity Firm 2013 GRIP baseline 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Romania Hub Romania Storage Capacity Firm FID - GRIP 2013 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Romania Hub Romania Storage Capacity Firm FID + Others - GRIP 2013 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Total 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm FID - GRIP 2013 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Total 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20STcAT>AT Austria Storage Austria Hub Capacity Firm 2013 GRIP baseline 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Austria Storage Austria Hub Capacity Firm FID - GRIP 2013 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Austria Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Total 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 136,65 136,65 136,65 136,65 136,65STcAT>DEn Total 136,65 136,65 136,65 136,65 136,65STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 43,47 43,47 43,47 43,47 43,47 108,47 108,47 108,47 108,47 108,47 108,47STcBGn>BGn Total 130,41 130,41 130,41 130,41 130,41 195,41 195,41 195,41 195,41 195,41 195,41STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm 2013 GRIP baseline 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm FID - GRIP 2013 570,50 746,40 805,30 848,60 947,40 958,50 968,50 968,50 968,50 968,50 968,50STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 570,50 141,00 147,70 159,90 216,50 291,80 291,80 291,80 291,80 291,80 291,80STcCZ>CZ Total 1.711,50 1.457,90 1.523,50 1.579,00 1.734,40 1.820,80 1.830,80 1.830,80 1.830,80 1.830,80 1.830,80

Underground Storages

Page 17: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 17

Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023AT>STcAT Austria Hub Austria Storage Capacity Firm 2013 GRIP baseline 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Austria Hub Austria Storage Capacity Firm FID - GRIP 2013 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Austria Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Total 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm 2013 GRIP baseline 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm FID - GRIP 2013 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm FID + Others - GRIP 2013 43,00 57,00 57,00 67,00 82,00 104,00 104,00 104,00 104,00 104,00 104,00BGn>STcBGn Total 130,41 130,41 130,41 130,41 130,41 195,41 195,41 195,41 195,41 195,41 195,41CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm 2013 GRIP baseline 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm FID - GRIP 2013 435,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm FID + Others - GRIP 2013 435,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80CZ>STcCZ Total 1.307,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm 2013 GRIP baseline 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm FID - GRIP 2013 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Total 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 143,82 143,82 143,82 143,82 143,82DEn>STcAT Total 143,82 143,82 143,82 143,82 143,82DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm 2013 GRIP baseline 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm FID - GRIP 2013 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Total 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27HR>STcHR Croatia Hub Croatia Storage Capacity Firm 2013 GRIP baseline 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Croatia Hub Croatia Storage Capacity Firm FID - GRIP 2013 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Croatia Hub Croatia Storage Capacity Firm FID + Others - GRIP 2013 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Total 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88HU>STcHU Hungary Hub Hungary Storage Capacity Firm 2013 GRIP baseline 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Hungary Hub Hungary Storage Capacity Firm FID - GRIP 2013 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Hungary Hub Hungary Storage Capacity Firm FID + Others - GRIP 2013 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Total 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50RO>STcRO Romania Hub Romania Storage Capacity Firm 2013 GRIP baseline 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Romania Hub Romania Storage Capacity Firm FID - GRIP 2013 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Romania Hub Romania Storage Capacity Firm FID + Others - GRIP 2013 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Total 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm FID - GRIP 2013 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Total 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20STcAT>AT Austria Storage Austria Hub Capacity Firm 2013 GRIP baseline 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Austria Storage Austria Hub Capacity Firm FID - GRIP 2013 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Austria Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Total 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 136,65 136,65 136,65 136,65 136,65STcAT>DEn Total 136,65 136,65 136,65 136,65 136,65STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 43,47 43,47 43,47 43,47 43,47 108,47 108,47 108,47 108,47 108,47 108,47STcBGn>BGn Total 130,41 130,41 130,41 130,41 130,41 195,41 195,41 195,41 195,41 195,41 195,41STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm 2013 GRIP baseline 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm FID - GRIP 2013 570,50 746,40 805,30 848,60 947,40 958,50 968,50 968,50 968,50 968,50 968,50STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 570,50 141,00 147,70 159,90 216,50 291,80 291,80 291,80 291,80 291,80 291,80STcCZ>CZ Total 1.711,50 1.457,90 1.523,50 1.579,00 1.734,40 1.820,80 1.830,80 1.830,80 1.830,80 1.830,80 1.830,80

Page 18: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

18 | GRIP Central Eastern Europe 2014 – 2023 Annex D

Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023AT>STcAT Austria Hub Austria Storage Capacity Firm 2013 GRIP baseline 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Austria Hub Austria Storage Capacity Firm FID - GRIP 2013 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Austria Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Total 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm 2013 GRIP baseline 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm FID - GRIP 2013 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm FID + Others - GRIP 2013 43,00 57,00 57,00 67,00 82,00 104,00 104,00 104,00 104,00 104,00 104,00BGn>STcBGn Total 130,41 130,41 130,41 130,41 130,41 195,41 195,41 195,41 195,41 195,41 195,41CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm 2013 GRIP baseline 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm FID - GRIP 2013 435,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm FID + Others - GRIP 2013 435,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80CZ>STcCZ Total 1.307,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm 2013 GRIP baseline 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm FID - GRIP 2013 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Total 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 143,82 143,82 143,82 143,82 143,82DEn>STcAT Total 143,82 143,82 143,82 143,82 143,82DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm 2013 GRIP baseline 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm FID - GRIP 2013 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Total 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27HR>STcHR Croatia Hub Croatia Storage Capacity Firm 2013 GRIP baseline 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Croatia Hub Croatia Storage Capacity Firm FID - GRIP 2013 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Croatia Hub Croatia Storage Capacity Firm FID + Others - GRIP 2013 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Total 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88HU>STcHU Hungary Hub Hungary Storage Capacity Firm 2013 GRIP baseline 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Hungary Hub Hungary Storage Capacity Firm FID - GRIP 2013 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Hungary Hub Hungary Storage Capacity Firm FID + Others - GRIP 2013 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Total 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50RO>STcRO Romania Hub Romania Storage Capacity Firm 2013 GRIP baseline 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Romania Hub Romania Storage Capacity Firm FID - GRIP 2013 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Romania Hub Romania Storage Capacity Firm FID + Others - GRIP 2013 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Total 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm FID - GRIP 2013 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Total 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20STcAT>AT Austria Storage Austria Hub Capacity Firm 2013 GRIP baseline 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Austria Storage Austria Hub Capacity Firm FID - GRIP 2013 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Austria Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Total 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 136,65 136,65 136,65 136,65 136,65STcAT>DEn Total 136,65 136,65 136,65 136,65 136,65STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 43,47 43,47 43,47 43,47 43,47 108,47 108,47 108,47 108,47 108,47 108,47STcBGn>BGn Total 130,41 130,41 130,41 130,41 130,41 195,41 195,41 195,41 195,41 195,41 195,41STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm 2013 GRIP baseline 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm FID - GRIP 2013 570,50 746,40 805,30 848,60 947,40 958,50 968,50 968,50 968,50 968,50 968,50STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 570,50 141,00 147,70 159,90 216,50 291,80 291,80 291,80 291,80 291,80 291,80STcCZ>CZ Total 1.711,50 1.457,90 1.523,50 1.579,00 1.734,40 1.820,80 1.830,80 1.830,80 1.830,80 1.830,80 1.830,80

STcDE>DEg Germany Storage Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91STcDE>DEg Germany Storage Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91STcDE>DEg Germany Storage Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91STcDE>DEg Total 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72STcDE>DEn Germany Storage Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85STcDE>DEn Germany Storage Germany (NCG) Hub Capacity Firm FID - GRIP 2013 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85STcDE>DEn Germany Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85STcDE>DEn Total 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56STcHR>HR Croatia Storage Croatia Hub Capacity Firm 2013 GRIP baseline 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00STcHR>HR Croatia Storage Croatia Hub Capacity Firm FID - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00STcHR>HR Croatia Storage Croatia Hub Capacity Firm FID + Others - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00STcHR>HR Total 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00STcHU>HU Hungary Storage Hungary Hub Capacity Firm 2013 GRIP baseline 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70STcHU>HU Hungary Storage Hungary Hub Capacity Firm FID - GRIP 2013 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70STcHU>HU Hungary Storage Hungary Hub Capacity Firm FID + Others - GRIP 2013 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70STcHU>HU Total 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10STcPL>PL Poland Storage Poland Hub Capacity Firm 2013 GRIP baseline 401,39 401,39 401,39 401,39 401,39 401,39 401,39 401,39 401,39 401,39 401,39STcPL>PL Poland Storage Poland Hub Capacity Firm FID - GRIP 2013 401,39 401,39 454,19 454,19 459,80 459,80 459,80 459,80 578,60 684,20 684,20STcPL>PL Poland Storage Poland Hub Capacity Firm FID + Others - GRIP 2013 401,39 401,39 454,19 454,19 459,80 459,80 459,80 459,80 578,60 684,20 805,20STcPL>PL Total 1.204,17 1.204,17 1.309,77 1.309,77 1.320,99 1.320,99 1.320,99 1.320,99 1.558,59 1.769,79 1.890,79STcRO>RO Romania Storage Romania Hub Capacity Firm 2013 GRIP baseline 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00STcRO>RO Romania Storage Romania Hub Capacity Firm FID - GRIP 2013 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00STcRO>RO Romania Storage Romania Hub Capacity Firm FID + Others - GRIP 2013 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00STcRO>RO Total 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00STcSK>SK Slovakia Storage Slovakia Hub Capacity Firm 2013 GRIP baseline 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20STcSK>SK Slovakia Storage Slovakia Hub Capacity Firm FID - GRIP 2013 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20STcSK>SK Slovakia Storage Slovakia Hub Capacity Firm FID + Others - GRIP 2013 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20STcSK>SK Total 477,60 477,60 477,60 477,60 477,60 477,60 477,60 477,60 477,60 477,60 477,60

Point Name Point Status EIC Connection Code From To Datatype 2015 2016 2017 2018 2019 2020 2021 2022 2023LNG RV (Regasification Vessel) to Croatia Planned LNG_Tk_HR>HR Croatia LNG Terminals Croatia Hub Capacity Firm FID + Others - GRIP 2013 60,50 60,50 60,50 60,50 60,50 60,50LNG RV (Regasification Vessel) to Croatia Total 60,50 60,50 60,50 60,50 60,50 60,50Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID + Others - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 225,72 225,72 225,72Swinoujscie Total 300,96 300,96 300,96 300,96 300,96 300,96 376,20 376,20 376,20

Point Name Point Status EIC Connection Code From To Datatype 2015 2016 2017 2018 2019 2020 2021 2022 2023LNG RV (Regasification Vessel) to Croatia Planned LNG_Tk_HR>HR Croatia LNG Terminals Croatia Hub Capacity Firm FID + Others - GRIP 2013 60,50 60,50 60,50 60,50 60,50 60,50LNG RV (Regasification Vessel) to Croatia Total 60,50 60,50 60,50 60,50 60,50 60,50Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID + Others - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 225,72 225,72 225,72Swinoujscie Total 300,96 300,96 300,96 300,96 300,96 300,96 376,20 376,20 376,20

LNG Entry Points

Page 19: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

GRIP Central Eastern Europe 2014 – 2023 Annex D | 19

Connection Code From To Datatype 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023AT>STcAT Austria Hub Austria Storage Capacity Firm 2013 GRIP baseline 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Austria Hub Austria Storage Capacity Firm FID - GRIP 2013 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Austria Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72 390,72AT>STcAT Total 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16 1.172,16BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm 2013 GRIP baseline 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm FID - GRIP 2013 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00 43,00BGn>STcBGn Bulgaria (NGTS) Hub Bulgaria (NGTS) Storage Capacity Firm FID + Others - GRIP 2013 43,00 57,00 57,00 67,00 82,00 104,00 104,00 104,00 104,00 104,00 104,00BGn>STcBGn Total 130,41 130,41 130,41 130,41 130,41 195,41 195,41 195,41 195,41 195,41 195,41CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm 2013 GRIP baseline 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80 435,80CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm FID - GRIP 2013 435,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80CZ>STcCZ Czech Republic Hub Czech Republic Storage Capacity Firm FID + Others - GRIP 2013 435,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80 438,80CZ>STcCZ Total 1.307,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40 1.313,40DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm 2013 GRIP baseline 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm FID - GRIP 2013 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Germany (GASPOOL) Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19 1.240,19DEg>STcDE Total 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56 3.720,56DEn>STcAT Germany (NCG) Hub Austria Storage Capacity Firm FID + Others - GRIP 2013 143,82 143,82 143,82 143,82 143,82DEn>STcAT Total 143,82 143,82 143,82 143,82 143,82DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm 2013 GRIP baseline 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm FID - GRIP 2013 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Germany (NCG) Hub Germany Storage Capacity Firm FID + Others - GRIP 2013 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76 1.003,76DEn>STcDE Total 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27 3.011,27HR>STcHR Croatia Hub Croatia Storage Capacity Firm 2013 GRIP baseline 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Croatia Hub Croatia Storage Capacity Firm FID - GRIP 2013 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Croatia Hub Croatia Storage Capacity Firm FID + Others - GRIP 2013 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96 66,96HR>STcHR Total 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88 200,88HU>STcHU Hungary Hub Hungary Storage Capacity Firm 2013 GRIP baseline 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Hungary Hub Hungary Storage Capacity Firm FID - GRIP 2013 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Hungary Hub Hungary Storage Capacity Firm FID + Others - GRIP 2013 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50 367,50HU>STcHU Total 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50 1.102,50RO>STcRO Romania Hub Romania Storage Capacity Firm 2013 GRIP baseline 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Romania Hub Romania Storage Capacity Firm FID - GRIP 2013 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Romania Hub Romania Storage Capacity Firm FID + Others - GRIP 2013 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00 292,00RO>STcRO Total 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00 876,00SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm 2013 GRIP baseline 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm FID - GRIP 2013 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Slovakia Hub Slovakia Storage Capacity Firm FID + Others - GRIP 2013 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40 219,40SK>STcSK Total 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20 658,20STcAT>AT Austria Storage Austria Hub Capacity Firm 2013 GRIP baseline 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Austria Storage Austria Hub Capacity Firm FID - GRIP 2013 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Austria Storage Austria Hub Capacity Firm FID + Others - GRIP 2013 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00 484,00STcAT>AT Total 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00 1.452,00STcAT>DEn Austria Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 136,65 136,65 136,65 136,65 136,65STcAT>DEn Total 136,65 136,65 136,65 136,65 136,65STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm 2013 GRIP baseline 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm FID - GRIP 2013 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47 43,47STcBGn>BGn Bulgaria (NGTS) Storage Bulgaria (NGTS) Hub Capacity Firm FID + Others - GRIP 2013 43,47 43,47 43,47 43,47 43,47 108,47 108,47 108,47 108,47 108,47 108,47STcBGn>BGn Total 130,41 130,41 130,41 130,41 130,41 195,41 195,41 195,41 195,41 195,41 195,41STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm 2013 GRIP baseline 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50 570,50STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm FID - GRIP 2013 570,50 746,40 805,30 848,60 947,40 958,50 968,50 968,50 968,50 968,50 968,50STcCZ>CZ Czech Republic Storage Czech Republic Hub Capacity Firm FID + Others - GRIP 2013 570,50 141,00 147,70 159,90 216,50 291,80 291,80 291,80 291,80 291,80 291,80STcCZ>CZ Total 1.711,50 1.457,90 1.523,50 1.579,00 1.734,40 1.820,80 1.830,80 1.830,80 1.830,80 1.830,80 1.830,80

STcDE>DEg Germany Storage Germany (GASPOOL) Hub Capacity Firm 2013 GRIP baseline 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91STcDE>DEg Germany Storage Germany (GASPOOL) Hub Capacity Firm FID - GRIP 2013 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91STcDE>DEg Germany Storage Germany (GASPOOL) Hub Capacity Firm FID + Others - GRIP 2013 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91 2.050,91STcDE>DEg Total 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72 6.152,72STcDE>DEn Germany Storage Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85STcDE>DEn Germany Storage Germany (NCG) Hub Capacity Firm FID - GRIP 2013 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85STcDE>DEn Germany Storage Germany (NCG) Hub Capacity Firm FID + Others - GRIP 2013 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85 1.863,85STcDE>DEn Total 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56 5.591,56STcHR>HR Croatia Storage Croatia Hub Capacity Firm 2013 GRIP baseline 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00STcHR>HR Croatia Storage Croatia Hub Capacity Firm FID - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00STcHR>HR Croatia Storage Croatia Hub Capacity Firm FID + Others - GRIP 2013 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00 53,00STcHR>HR Total 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00 159,00STcHU>HU Hungary Storage Hungary Hub Capacity Firm 2013 GRIP baseline 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70STcHU>HU Hungary Storage Hungary Hub Capacity Firm FID - GRIP 2013 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70STcHU>HU Hungary Storage Hungary Hub Capacity Firm FID + Others - GRIP 2013 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70 550,70STcHU>HU Total 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10 1.652,10STcPL>PL Poland Storage Poland Hub Capacity Firm 2013 GRIP baseline 401,39 401,39 401,39 401,39 401,39 401,39 401,39 401,39 401,39 401,39 401,39STcPL>PL Poland Storage Poland Hub Capacity Firm FID - GRIP 2013 401,39 401,39 454,19 454,19 459,80 459,80 459,80 459,80 578,60 684,20 684,20STcPL>PL Poland Storage Poland Hub Capacity Firm FID + Others - GRIP 2013 401,39 401,39 454,19 454,19 459,80 459,80 459,80 459,80 578,60 684,20 805,20STcPL>PL Total 1.204,17 1.204,17 1.309,77 1.309,77 1.320,99 1.320,99 1.320,99 1.320,99 1.558,59 1.769,79 1.890,79STcRO>RO Romania Storage Romania Hub Capacity Firm 2013 GRIP baseline 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00STcRO>RO Romania Storage Romania Hub Capacity Firm FID - GRIP 2013 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00STcRO>RO Romania Storage Romania Hub Capacity Firm FID + Others - GRIP 2013 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00 343,00STcRO>RO Total 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00 1.029,00STcSK>SK Slovakia Storage Slovakia Hub Capacity Firm 2013 GRIP baseline 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20STcSK>SK Slovakia Storage Slovakia Hub Capacity Firm FID - GRIP 2013 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20STcSK>SK Slovakia Storage Slovakia Hub Capacity Firm FID + Others - GRIP 2013 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20 159,20STcSK>SK Total 477,60 477,60 477,60 477,60 477,60 477,60 477,60 477,60 477,60 477,60 477,60

Point Name Point Status EIC Connection Code From To Datatype 2015 2016 2017 2018 2019 2020 2021 2022 2023LNG RV (Regasification Vessel) to Croatia Planned LNG_Tk_HR>HR Croatia LNG Terminals Croatia Hub Capacity Firm FID + Others - GRIP 2013 60,50 60,50 60,50 60,50 60,50 60,50LNG RV (Regasification Vessel) to Croatia Total 60,50 60,50 60,50 60,50 60,50 60,50Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID + Others - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 225,72 225,72 225,72Swinoujscie Total 300,96 300,96 300,96 300,96 300,96 300,96 376,20 376,20 376,20

Point Name Point Status EIC Connection Code From To Datatype 2015 2016 2017 2018 2019 2020 2021 2022 2023LNG RV (Regasification Vessel) to Croatia Planned LNG_Tk_HR>HR Croatia LNG Terminals Croatia Hub Capacity Firm FID + Others - GRIP 2013 60,50 60,50 60,50 60,50 60,50 60,50LNG RV (Regasification Vessel) to Croatia Total 60,50 60,50 60,50 60,50 60,50 60,50Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID + Others - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 225,72 225,72 225,72Swinoujscie Total 300,96 300,96 300,96 300,96 300,96 300,96 376,20 376,20 376,20

Point Name Point Status EIC Connection Code From To Datatype 2015 2016 2017 2018 2019 2020 2021 2022 2023LNG RV (Regasification Vessel) to Croatia Planned LNG_Tk_HR>HR Croatia LNG Terminals Croatia Hub Capacity Firm FID + Others - GRIP 2013 60,50 60,50 60,50 60,50 60,50 60,50LNG RV (Regasification Vessel) to Croatia Total 60,50 60,50 60,50 60,50 60,50 60,50Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48 150,48Swinoujscie Planned LNG_Tk_PL>PL Poland LNG Terminals Poland Hub Capacity Firm FID + Others - GRIP 2013 150,48 150,48 150,48 150,48 150,48 150,48 225,72 225,72 225,72Swinoujscie Total 300,96 300,96 300,96 300,96 300,96 300,96 376,20 376,20 376,20

Page 20: ENTSOG | ENTSOG - Central Eastern Europe GRIP...Ahlten Operational DEg>DEn Germany (GASPOOL) Hub Germany (NCG) Hub Capacity Firm 2013 GRIP baseline 36,00 36,00 36,00 36,00 36,00 36,00

ENTSOG aisbl

Avenue de Cortenbergh 100 1000 Brussels, Belgium Tel. +32 2 894 51 00

[email protected] www.entsog.eu