environment
DESCRIPTION
Health. RegulatorySystems. Environment. Safety. Health. Protection of workers ICRP National regulations Existing practices What about abnormal working situations? (Andreyeva). Environment. International conventions Espoo convention Waste convention etc. - PowerPoint PPT PresentationTRANSCRIPT
Environment
Health
Safety
RegulatorySystems
Health
• Protection of workers
• ICRP• National regulations• Existing practices
• What about abnormal working situations? (Andreyeva)
Environment
• International conventions– Espoo convention– Waste convention etc.
• National regulations related to discharges and waste management
• What about discharges during remediation of contaminated areas? (Andreyeva)
• Specifications for management of radioactive waste• Criteria for long term safety of facilities?
Safety
• Risk assessments to prioritise risk reduction measures
• Safety convention• Hazard identification, safety analysis, safety
assessment and emergency preparedness
• How to find the balance between need for actions and risk associated with the actions?
Regulatory systems
• Prime responsibility with operator– Constructive dialogue with regulators
• Responsibilities of different regulators– Clear who is lead regulator on a given issue– Cooperation between regulators
• Regulations– Clear which apply when– Avoid gaps and overlaps
• Holistic approach– Interactions between environment, health and safety
Potential actions
Risk characterisation
Env
ironm
ent,
Hea
lth a
nd S
afet
y A
sses
sent
s
Priorities
Sources and sites
Ris
k
Time
No acti
on
Various actions
Regulatory levels
Risk reduction
Priorities of actions
1 ----2 ----3 ----4 ----5 ----
?
!
Regulatorysystems
Recommendations
• EIA and ERA should be performed prior to all decisions made with respect to countermeasures
• EIA and ERA should be performed for situations without measures and with measures
• EIA and ERA should be performed to select between alternative measures
• EIA and ERA should be performed to prioritise sources of risk
Recommendations
• EIA/ERA should be performed for all nuclear sources prior to actions taken
• Common approaches and methods for EIA/ERA should be developed
• Uncertainty estimates in EIA and ERA should be included in the assessments
• Joint effort (fieldwork etc.) should be undertaken to reduce the uncertainties in EIA/ERA of sources in question